You are on page 1of 18

1/28/2015

Content

Reinforcing Asphalt using High Tenacity


Polymeric Geogrids

Basics
Current Situation
Repair Methods
Conventional Treatment
Asphalt Reinforcement
HaTelit C40/17
Installation
Interlayer Bonding
Dynamic Fatigue Testing
Why Polyester as Asphalt Reinforcement?

28.01.2015

New Developments:
SamiGrid XP50S
HaTelit BL

Graham
Thomson (Director),
Unternehmensprsentation
HUESKER Asia Pacific Pte Ltd, Singapore

28.01.2015
28.01.2015

Partner Meeting Bali 2014

28.01.2015

Unternehmensprsentation

Conclusions & Benefits


11

28.01.2015
28.01.2015

Partner Meeting Bali 2014

Basics

Basics

Asphalt pavement

Asphalt pavement

22

Asphalt Surface course


Asphalt Binder course
Asphalt Surface course
Asphalt Binder course

Asphalt Bearing course

Asphalt Bearing course

Crack development:
Ageing of the Bitumen
Temperature variations
Dynamic loads (traffic)

28.01.2015

28.01.2015
28.01.2015

OLD road construction

Unternehmensprsentation

Partner Meeting Bali 2014

33

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

44

1/28/2015

Current situation
Current Situation

Repair methods
Filling Potholes

http://www.edmonton.ca

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

55

28.01.2015

Unternehmensprsentation

28.01.2015
28.01.2015

Partner Meeting Bali 2014

66

Conventional Treatment

Repair methods

Milling and the installation of a new asphalt layer

Crack Sealing

Source: http://www.aplusasphaltandconcrete.com

Source: http://www.thesurfacemasters.com

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

77

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

88

1/28/2015

Conventional Treatment

Asphalt Reinforcement

Conventional
rehabilitation

Rehabilitation
with HaTelit

Milling
Surface
course
New surface
course

Milling
Surface
course
New surface
course

Binder course

Binder course

Bearing course

Bearing course

After short time: Reflective cracks

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

99

Partner Meeting Bali 2014

Asphalt Reinforcement

HaTelit

Lifetime of the pavement is significantly increased!


28.01.2015

Unternehmensprsentation

28.01.2015
28.01.2015

10

10
10

Partner Meeting Bali 2014

Asphalt Reinforcement
Resurfacing, using full-area
reinforcement

Reinforcement strips in road widenings

HaTelit
50 cm

HaTelit

50 cm
40 mm

40 mm

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

11

11
11

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

12

12
12

1/28/2015

Asphalt Reinforcement

Asphalt Reinforcement

Reinforcement of a paver joint / single cracks

Reinforcement of an asphalt
overlay on concrete wearing
course

HaTelit
50 cm

50 cm

HaTelit

40 mm

40 mm

28.01.2015

Unternehmensprsentation

28.01.2015
28.01.2015

Partner Meeting Bali 2014

13

13
13

28.01.2015

Unternehmensprsentation

28.01.2015
28.01.2015

Partner Meeting Bali 2014

14

14
14

HaTelit C40/17
What is HaTelit C 40/17
Purpose

Flexible reinforcement grid out of


high modulus Polyester with a
mesh size of 4 cm

Extension of the service intervals

Ultralight non-woven serves as


installation aid
( Melting point PP at 150C)

Decrease of the maintenance costs


Increase the service life of a road

Grid is heat resistant up to 200C


Grid and non-woven are bituminous
coated (excellent interlayer bonding)
28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

15

15
15

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

16

16
16

1/28/2015

HaTelit Installation

HaTelit Installation
Preparation of the surface

Installation of HaTelit

Conditions for an optimum interlayer bond must be given.


1. Preparation of the surface

HaTelit always has to be placed between two


asphalt layers (levelling asphalt layer)!

2. Spraying of bitumen emulsion


3. Applying / Unrolling HaTelit

The base must be dry and clean

4. Asphalt installation

Large cracks and potholes have to be filled


Vertical movements must be corrected

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

17

17
17

Partner Meeting Bali 2014

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

HaTelit Installation

HaTelit Installation

Spraying the bitumen emulsion

Applying / Unrolling HaTelit

18

18
18

The emulsion must be allowed to break


Unrolling HaTelit with a simple system,
either manually, or mechanically

When using:
- Emulsion with 70% Bitumen content:
- Emulsion with 60% Bitumen content:

min. 0.6 kg/m


min. 0.7 kg/m

HaTelit must be placed free of folds


and wrinkles on the prepared surface

On a milled, rough or opentextured surface the


minimum rate needs to be further increased.
On milled surfaces it can be up to 1.0 - 1.2 kg/m
(Using an emulsion with 70% Bitumen content)
28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

In curves the grid can be cut an placed


in parts
19

19
19

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

20

20
20

1/28/2015

HaTelit Installation

HaTelit Installation
Asphalt Installation

Overlaps must be treated


with emulsion

Covering with minimum


40 mm asphalt layer

Cutting can simply


be done with a knife

min.15 cm
min. 25 cm

Asphalt installation should follow


the HaTelit installation
without delay
28.01.2015

HUESKER Synthetic
GmbH

28.01.2015
28.01.2015

HUESKER
Synthetic
Unternehmensprsentation
GmbH

21

21
21

Partner Meeting Bali 2014

HaTelit Installation

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

22

22
22

Partner Meeting Bali 2014

Interlayer Bonding
The general local technical
guidelines for asphalt works
have to be followed

Vehicles have to be
moved carefully!

Force-locked interlayer bonding at unreinforced


asphalt layers:

Friction
Interlocking
Adhesion

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

23

23
23

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

24

24
24

1/28/2015

Interlayer Bonding
Interlayer bonding with HaTelit:

AERONAUTICS TECHNOLOGICAL INSTITUTE


Friction
Adhesion

Dynamic fatigue tests

Inter-locking

Tests to determine the effect of HaTelit


in Anti Reflective Cracking applications
in Asphalt overlays
[Dr. Guillermo Montestruque, 2000]

Force-locked interlayer bond!

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

25

25
25

Partner Meeting Bali 2014

Research Dr. Guillermo Montestruque

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

26

26
26

Partner Meeting Bali 2014

Research Dr. Guillermo Montestruque


Typical crack
(without reinforcement)

N=79,884
(1) Overlay
(2) blocks with opening
(3) Elastic base (rubber)

Material:
Precrack:
HaTelit position:
Load position:
Contact pressure:

28.01.2015

28.01.2015
28.01.2015

HaTelit C 40/17
3 mm, 6mm, 9 mm
directly above the crack tip
Bending and shear mode
560 kN/m
Unternehmensprsentation

Partner Meeting Bali 2014

27

27
27

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

28

28
28

1/28/2015

Research Dr. Guillermo Montestruque

Research Dr. Guillermo Montestruque

Typical crack
(with HaTelit)

Bending mode
without HaTelit

N=503,832

28.01.2015

Unternehmensprsentation

28.01.2015
28.01.2015

Partner Meeting Bali 2014

29

29
29

Research Dr. Guillermo Montestruque

28.01.2015

Unternehmensprsentation

28.01.2015
28.01.2015

30

30
30

Partner Meeting Bali 2014

Research Dr. Guillermo Montestruque

Bending mode
with HaTelit

Improvement factor
Vf = Nf(with Hatelit) / Nf(without Hatelit)

Nf =

1
cf1

cf1 =

1
N f ((B)
F)

2
N f ((S)
C)

4.60 < Vf < 6.14


28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

31

31
31

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

32

32
32

1/28/2015

Why Polyester?

FEM Simulation

1. Coefficient of thermal expansion of


asphalt and Polyester are almost similar.

Without
HaTelit

Ratio of the coefficient of thermal expansion [1/K]:

With
HaTelit

28.01.2015

Unternehmensprsentation

28.01.2015
28.01.2015

Partner Meeting Bali 2014

33

33
33

-Concrete:

~1,3 10-3

-Steel:

~1,0 10-3

-Asphalt:
-Polyester:

~6,0 10-4
~8,0 10-5

Ratio: ~ 1 / 7

-Asphalt:
-Glass-fibre:

~6,0 10-4
~4,5 10-6

Ratio: ~ 1 / 133

28.01.2015

28.01.2015
28.01.2015

Ratio: ~ 1 / 1

Unternehmensprsentation

Partner Meeting Bali 2014

34

34
34

Why Polyester?

Why Polyester?

3. Polyester has a high resistance against


damage during installation!

2. Polyester is flexible, so it accommodates


very well to the surrounding asphalt

Laid reinforcement is always exposed


to a great deal of stress!!
28.01.2015

28.01.2015
28.01.2015

Due to the flexibility it accommodates


to the surrounding asphalt!
Unternehmensprsentation

Partner Meeting Bali 2014

35

35
35

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

36

36
36

1/28/2015

Case Studies

Why Polyester?

Airport Salgado Filho, Porto Alegre - Brazil

Conclusion:
The mechanical properties of Polyester match
very well to the characteristics of asphalt!

This leads to:


Very low internal stresses
Good bond of the material to the
surrounding asphalt
Polyester does not act as a foreign material

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

37

37
37

Reference: Monser C.A., Montestruque G.E., Silva A.E.F., (2010), Evaluation of an


airport pavement after almost 8 years of overlay rehabilitation with a Polyester
28.01.2015
geogrid asphalt reinforcement, Unternehmensprsentation
9th International Conference on Geosynthetics,
Brazil.
28.01.2015
28.01.2015

Partner Meeting Bali 2014

Case Studies

Case Studies

Background:

Existing pavement in January 2002

In January 2002 the Taxiway of a commercial


aircraft maintenance area had to be rehabilitated

38

38
38

25 cm

High traffic volume,


e.g. Boeing 777 with a weight of 250 t

Concrete slabs
5.0m x 3.5m

Existing pavement was made of concrete slabs

Bearing course

A possible rehabilitation method would have been


the installation of thick new asphalt layers
BUT:
A plain asphalt layer cannot prevent the propagation
(reflection) of the expansion joints

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

39

39
39

A thickness increase may delay reflective cracking,


but is economically inefficient

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

40

40
40

10

1/28/2015

Case Studies

Case Studies

Condition after 8 years

Rehabilitation with HaTelit C 40/17


1. Injection / sealing of voids and expansion joints
2. Installation of an asphalt levelling course (20 mm)
3. Placing HaTelit C 40/17

HaTelit C 40/17

4. Installation of a 50 mm asphalt wearing course

unreinforced
HaTelit C 40/17
Concrete slabs

Bearing course

28.01.2015

Shoulder

However, only the middle (critical) part of the taxiway,


where the planes taxi, had been reinforced.

28.01.2015
28.01.2015

Unternehmensprsentation

41

41
41

Partner Meeting Bali 2014

Case Studies

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

42

42
42

Case Studies
Ochtrup Rosenstrae, Germany
Pavement rehabilitation, 1996

Condition after 8 years

Very high traffic volume, mainly trucks

HaTelit C 40/17

Road condition: very bad


longitudinal and transverse cracks
unreinforced

Design: Renewing the 5cm top asphalt layer


HaTelit

C 40/17

After milling...

unreinforced
28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

43

43
43

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

44

44
44

11

1/28/2015

Case Studies

Case Studies
Possibilities for rehabilitation:
1. Installation of a complete new pavement,
-> difficult to realize (time) and very expensive!
2. Application of a reinforcement to increase the period
of time until the next rehabilitation
Installation:
first survey:
last survey:

13.05.1996
15.05.2001
August 2009

2001

1996
28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

45

45
45

Case Studies

28.01.2015

28.01.2015
28.01.2015

2001

Unternehmensprsentation

46

46
46

Partner Meeting Bali 2014

Case Studies
Despite a steadily high traffic volume...
the pavement is still in an excellent condition!
2001

Letter of reference, June 2002:


... Due to the installation of the
reinforcement into the asphalt
pavement, no cracks appeared
at the surface until today .
This procedure was chosen in that
time in order not to remove the
cracked binder- and bearing
course,...

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

47

47
47

2005

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

April 2009

48

48
48

12

1/28/2015

Case Studies

Case Studies

Result:

assessment
in August / September 2009

Isolated cracks were


found, but just at the outside
edge of the pavement

28.01.2015

28.01.2015
28.01.2015

* TV Rheinland is a global leader


in independent testing and
assessment services.

Unternehmensprsentation

Partner Meeting Bali 2014

Reason?
49

49
49

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

50

50
50

Partner Meeting Bali 2014

Conclusions & Benefits

Case Studies

HaTelit ...
Reduces stress peaks over the tip of a crack and
therefore delays reflective cracking
Has a high resistance against installation damage
Improves the mechanical properties of the entire system
Also reduces the formation of ruts in areas with high
traffic due to the load-distribution effect

10 - 20 cm

Longer life cycles


Reduction in maintenance costs
Cost-effective solution for rehabilitation

%age Deterioration

Benefits of HaTelit

Economical Benefits:

Years of use

28.01.2015

28.01.2015
28.01.2015

Result:
No cracks were found in the reinforced areas
Unternehmensprsentation

Partner Meeting Bali 2014

Environmental Benefits
51

51
51

Savings in natural resources due to


prolonged service intervals

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

52

52
52

13

1/28/2015

SamiGrid XP 50 S
Application areas

SamiGrid XP 50 S

Special solution to be used directly on concrete


(Therefore PVA as raw material)
Can be used on ASR (Alkali-Silica Reaction)
affected pavements

SamiGrid XP 50 S

Or, for example, when the installation of a levelling course


is not possible (height restrictions)

Composite of PVA-Grid and 130 g/m2 non-woven


Bitumen saturated non-woven creates a SAMI
Tensile strength of the grid: 50 kN/m
The grid adds a reinforcing effect
28.01.2015

Unternehmensprsentation

53

28.01.2015

Unternehmensprsentation

54

Has a bituminous finish on one side (interlayer bond)


28.01.2015
28.01.2015

Partner Meeting Bali 2014

53
53

Installation

28.01.2015
28.01.2015

Partner Meeting Bali 2014

54
54

Installation

Installation of SamiGrid

Please always consider


the detailed installation
guidelines!

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

1. Surface preparation

55

55
55

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

56

56
56

14

1/28/2015

Installation

Installation

Installation of SamiGrid

Installation of SamiGrid

1. Surface preparation
2. Spraying 1.8-2.3 kg/m
of a polymer modified
bitumen emulsion with
70% bitumen content

28.01.2015

28.01.2015
28.01.2015

1. Surface preparation
2. Spraying 1.8-2.3 kg/m of
a polymer modified
bitumen emulsion with
70% bitumen content
3. Application of SamiGrid
directly into the fresh
emulsion
Unternehmensprsentation

Partner Meeting Bali 2014

57

57
57

Case Study

28.01.2015

Unternehmensprsentation

28.01.2015
28.01.2015

28.01.2015
28.01.2015

58
58

Partner Meeting Bali 2014

Case Study

Example: Bardowick, Mhlenstrae (Germany)

28.01.2015

58

Unternehmensprsentation

Partner Meeting Bali 2014

Covering with minimum


40 mm asphalt layer

59

59
59

Asphalt installation can


start before the emulsion
is completely broken!
28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

60

60
60

15

1/28/2015

Proof of effectiveness
Schematic view of Thermal Cracking Test at
BELGIUM ROAD RESEARCH CENTRE (BRRC, 2002)

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

61

61
61

28.01.2015

Unternehmensprsentation

28.01.2015
28.01.2015

Partner Meeting Bali 2014

62

62
62

New Product: HaTelit BL

Case Study

HaTelit BL?

South Dublin - Ireland

Further development of HaTelit C 40/17.


Self adhesive!
HaTelit laminated to a bitumen sheet
Roll width: 1.0 m - Roll length: 15.0 m

Application areas
Rehabilitation of asphalt/concrete pavements
Especially:
- Targeted repair of single cracks
- Targeted repair of paver joints (e.g. binder-binder)
28.01.2015

Unternehmensprsentation

63

28.01.2015

Unternehmensprsentation

64

Also ideal for small areas of up to around 500 m2


28.01.2015
28.01.2015

Partner Meeting Bali 2014

63
63

28.01.2015
28.01.2015

Partner Meeting Bali 2014

64
64

16

1/28/2015

HaTelit BL

HaTelit BL

Installation HaTelit BL

Installation HaTelit BL

Peel off release film,

Place HaTelit BL roll in


correct position for unrolling.
28.01.2015

and fold back under roll.

Apply exposed bitumen backing to base and press down.


Unternehmensprsentation

28.01.2015
28.01.2015

Partner Meeting Bali 2014

65

65
65

HaTelit BL

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

66

66
66

HaTelit BL

Installation HaTelit BL

Pull release film upwards and


unroll HaTelit BL in direction
of laying while gently pulling.

28.01.2015

28.01.2015
28.01.2015

At end of laying section, carefully


cut off grid from roll with a knife.

Unternehmensprsentation

Partner Meeting Bali 2014

67

67
67

28.01.2015

28.01.2015
28.01.2015

Unternehmensprsentation

Partner Meeting Bali 2014

68

68
68

17

1/28/2015

HaTelit BL
Benefits of HaTelit BL

HaTelit is a cost-saving and economically viable


alternative to conventional construction solutions!

Active retardation of reflective cracking


Extension of pavement service life
Appreciable reduction in maintenance costs
Strong bond with asphalt due to bitumen content
of the grid > 60%
Reinforcing, stress-relieving and sealing function

28.01.2015

28.01.2015
28.01.2015

HaTelit boasts a long track record in the rehabilitation


of asphalt pavements Unternehmensprsentation

Partner Meeting Bali 2014

69

69
69

28.01.2015

28.01.2015
28.01.2015

Thank you!

Unternehmensprsentation

Partner Meeting Bali 2014

70

70
70

18