You are on page 1of 2

53546 Federal Register / Vol. 72, No.

181 / Wednesday, September 19, 2007 / Notices

information about the energy DEPARTMENT OF ENERGY comment date. On or before the
information collection submitted to comment date, it is not necessary to
OMB for review: (1) The collection Federal Energy Regulatory serve motions to intervene or protests
numbers and title; (2) the sponsor (i.e., Commission on persons other than the Applicant.
the Department of Energy component; The Commission encourages
Notice of Effectiveness of Exempt electronic submission of protests and
(3) the current OMB docket number (if
Wholesale Generator or Foreign Utility interventions in lieu of paper using the
applicable); (4) the type of request (i.e., Company Status
new, revision, extension, or ‘‘eFiling’’ link at http://www.ferc.gov.
reinstatement); (5) response obligation September 12, 2007. Persons unable to file electronically
(i.e., mandatory, voluntary, or required should submit an original and 14 copies
Bethlehem Renewable Energy, LLC of the protest or intervention to the
to obtain or retain benefits); (6) a (EG07–53–000); El Segundo Power II Federal Energy Regulatory Commission,
description of the need for and LLC (EG07–57–000); Forward Energy 888 First Street, NE., Washington, DC
proposed use of the information; (7) a LLC (EG07–58–000); Kleen Energy 20426.
categorical description of the likely Systems, LLC (EG07–59–000); Hopewell This filing is accessible online at
respondents; and (8) an estimate of the Cogeneration Limited Partnership http://www.ferc.gov, using the
total annual reporting burden (i.e., the (EG07–60–000); Peetz Table Wind ‘‘eLibrary’’ link and is available for
estimated number of likely respondents Energy, LLC (EG07–62–000); NRG review in the Commission’s Public
times the proposed frequency of Texas Power LLC (EG07–63–000); Reference Room in Washington, DC.
response per year times the average Jamaica Private Power Company There is an ‘‘eSubscription’’ link on the
hours per response). Limited and Private Power Operators Web site that enables subscribers to
1. Forms EIA–886, ‘‘Annual Survey of Limited (FC07–51–000) receive e-mail notification when a
Alternative Fueled Vehicles’’ Take notice that during the month of document is added to a subscribed
August 2007, the status of the above- docket(s). For assistance with any FERC
2. Energy Information Administration
captioned entities as Exempt Wholesale Online service, please e-mail
3. OMB Number 1905–0191 Generators or Foreign Utility Companies FERCOnlineSupport@ferc.gov, or call
4. Three-year extension of a currently became effective by operation of the (866) 208–3676 (toll free). For TTY, call
approved collection Commission’s regulations. 18 CFR (202) 502–8659.
366.7(a). Comment Date: 5 p.m. Eastern Time
5. Mandatory on October 9, 2007.
6. EIA’s ‘‘Annual Survey of Kimberly D. Bose,
Secretary. Kimberly D. Bose,
Alternative Fueled Vehicle Suppliers
and Users’’ collects basic data necessary [FR Doc. E7–18444 Filed 9–18–07; 8:45 am] Secretary.
to meet EIA’s legislative mandates as BILLING CODE 6717–01–P [FR Doc. E7–18441 Filed 9–18–07; 8:45 am]
well as the needs of EIA’s public and BILLING CODE 6717–01–P

private customers. Data collected


include the number and type of DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Alternative Fueled Vehicles (AFVs) that Federal Energy Regulatory
vehicle suppliers made available in the Commission Federal Energy Regulatory
previous calendar year and plan to make Commission
available in the following calendar year; [Docket No. NJ07–8–000]
[Project No. 1005]
the number, type and geographic
Bonneville Power Administration;
distribution of AFVs in use in the Notice of Filing City of Boulder; Notice Soliciting
previous calendar year; and the amount Applications
and distribution of each type of September 12, 2007.
Alternative Transportation Fuel (ATF) Take notice that on September 6, September 13, 2007.
consumed in the previous calendar year. 2007, pursuant to 18 CFR 35.28(e) and On August 30, 2004, the City of
The data are used for analyses and 18 CFR 385.207, Bonneville Power Boulder (City), the licensee for the
publications. Administration filed a petition for Boulder Canyon Hydroelectric Project
declaratory order granting reciprocity No.1005, filed a notice of intent to file
7. Federal, State and Local an application for a small conduit
approval for certain terms and
governments; fuel providers; Original conditions of its Open Access exemption for a reconfigured Boulder
Equipment Manufacturers; and Transmission Tariff and a request for an Canyon Project, pursuant to section
Conversion facilities. exemption of the filing fee. 15(b)(1) of the Federal Power Act (FPA).
8. 10,812.50 hours Any person desiring to intervene or to The current license for Project No. 1005
Statutory Authority: Section 3507(h)(1) of
protest this filing must file in expires on August 31, 2009.
the Paperwork Reduction Act of 1995 (Pub.
accordance with Rules 211 and 214 of The project is located on Boulder
L. No. 104–13) (44 U.S.C. 3501 et seq.). the Commission’s Rules of Practice and Creek, in Boulder County, near the City
Procedure (18 CFR 385.211, 385.214). of Boulder, Colorado. The project
Issued in Washington, DC, September 13, Protests will be considered by the occupies about 36 acres of U.S. Forest
2007. Commission in determining the Service lands within Roosevelt National
Jay H. Casselberry, appropriate action to be taken, but will Forest. The licensed project consists of:
Agency Clearance Officer, Energy Information not serve to make protestants parties to (a) A concrete gravity dam about 720
rwilkins on PROD1PC63 with NOTICES

Administration. the proceeding. Any person wishing to feet long having a maximum height of
[FR Doc. E7–18421 Filed 9–18–07; 8:45 am] become a party must file a notice of 175 feet, including a spillway about 127
BILLING CODE 6450–01–P
intervention or motion to intervene, as feet long with a crest elevation of
appropriate. Such notices, motions, or 8,181.5 feet mean sea level (msl),
protests must be filed on or before the creating the Barker Reservoir which has

VerDate Aug<31>2005 16:58 Sep 18, 2007 Jkt 211001 PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 E:\FR\FM\19SEN1.SGM 19SEN1
Federal Register / Vol. 72, No. 181 / Wednesday, September 19, 2007 / Notices 53547

a surface area of 200 acres and a gross Hoisington, (202) 502–6032 or by e-mail interest, and is reasonably necessary or
storage capacity of 11,687 acre-feet at at Gaylord.hoisington@ferc.gov. appropriate for such purposes.
normal pool elevation 8,180 feet msl; (b) The Commission reserves the right to
Kimberly D. Bose,
an outlet gate control structure; (c) a 5- require a further showing that neither
Secretary. public nor private interests will be
foot-by-5-foot concrete tunnel, about
[FR Doc. E7–18424 Filed 9–18–07; 8:45 am] adversely affected by continued
225 feet long and connecting by way of
a valve house to an 11.7-mile-long, 36- BILLING CODE 6717–01–P approvals of CPV Liberty’s issuance of
inch-diameter concrete gravity pipeline; securities or assumptions of liability.
(d) the Kossler Reservoir, a reregulating Copies of the full text of the Director’s
DEPARTMENT OF ENERGY Order are available from the
reservoir having a surface area of 12.25
Commission’s Public Reference Room,
acres and a gross storage capacity of 165 Federal Energy Regulatory
888 First Street, NE., Washington, DC
acre-feet at maximum pool elevation Commission
20426. The Order may also be viewed
7,717.6 feet msl and formed by three on the Commission’s Web site at
earth embankment structures: (i) [Docket Nos. ER07–1193–000] http://www.ferc.gov, using the eLibrary
Southwest Dam, an earth-concrete core link. Enter the docket number excluding
structure about 450 feet long and about CPV Liberty, LLC; Notice of Issuance the last three digits in the docket
18 feet high; (ii) Northeast Dam, an earth of Order number filed to access the document.
embankment structure about 20 feet September 13, 2007. Comments, protests, and interventions
high and 180 feet long; and (iii) West may be filed electronically via the
CPV Liberty, LLC (CPV Liberty) filed
Dam, an earth embankment structure Internet in lieu of paper. See, 18 CFR
an application for market-based rate
420 feet long, having a maximum height 385.2001(a) (1) (iii) and the instructions
authority, with an accompanying rate
of about 5 feet; (e) a concrete outlet schedule. The proposed market-based on the Commission’s Web site under the
structure with trash screens and a gate rate schedule provides for the sale of ‘‘e-Filing’’ link. The Commission
connecting to a 9,340-foot-long steel energy, capacity and ancillary services strongly encourages electronic filings.
penstock varying in diameter from 56 to at market-based rates. CPV Liberty also Kimberly D. Bose,
44 inches; (f) a powerhouse containing requested waivers of various
two generating units having a total Secretary.
Commission regulations. In particular, [FR Doc. E7–18425 Filed 9–18–07; 8:45 am]
installed capacity of 20 megawatts; (g) a CPV Liberty requested that the
13–kV generator bus and two 13/115–kV BILLING CODE 6717–01–P
Commission grant blanket approval
step-up transformers; and (h) under 18 CFR part 34 of all future
appurtenant facilities. issuances of securities and assumptions DEPARTMENT OF ENERGY
The City did not file an application of liability by CPV Liberty.
for a new license or an exemption On September 10, 2007, pursuant to Federal Energy Regulatory
application for the project. Pursuant to delegated authority, the Director, Commission
18 CFR 16.25 (2007), the Commission is Division of Tariffs and Market
[Docket No. AC07–204–000]
soliciting license applications from Development—West, granted the
potential applicants other than the requests for blanket approval under part Great Lakes Gas Transmission Limited
existing licensee. This is necessary 34 (Director’s Order). The Director’s Partnership; Notice of Filing
because the deadline for filing an Order also stated that the Commission
application for new license or would publish a separate notice in the September 13, 2007.
exemption and any competing Federal Register establishing a period of Take notice that on August 28, 2007,
applications, pursuant to 18 CFR 16.9 time for the filing of protests. Great Lakes Gas Transmission Limited
Accordingly, any person desiring to be Partnership (‘‘Great Lakes LP’’)
(2007) was August 31, 2007, and no
heard concerning the blanket approvals submitted a filing requesting approval of
other applications for license for this
of issuances of securities or assumptions its accounting treatment for changes in
project were filed.
of liability by CPV Liberty, should file deferred tax balances as the result of a
The licensee is required to make a protest with the Federal Energy sale and purchase of an existing general
available certain information described Regulatory Commission, 888 First partner interest, and a corresponding
in 18 CFR 16.7 (2007). Such information Street, NE., Washington, DC 20426, in Internal Revenue Code section 754
is available by contacting the City of accordance with Rules 211 and 214 of election. Great Lakes LP’s accounting
Boulder, Director of Public Water Works the Commission’s Rules of Practice and treatment writes off 46.45 percent of its
for Utilities, P.O. Box 791, Boulder, CO Procedure. 18 CFR 385.211, 385.214 deferred tax liabilities to equity. In
80306–0791, or by phone at (303) 441– (2004). addition, Great Lakes LP proposes to
3266. Notice is hereby given that the write off to equity deferred tax liabilities
A potential applicant that files a deadline for filing protests is October associated with retirement plans
notice of intent within 90 days from the 10, 2007. provided by the seller of the general
date of issuance of this notice: (1) May Absent a request to be heard in partner interest. These adjustments
opposition to such blanket approvals by reduce Great Lakes LP’s deferred tax
apply for a license under Part I of the
the deadline above, CPV Liberty is balances and increase its equity by
FPA and Part 4 (except section 4.38) of
authorized to issue securities and approximately $135 million.
the Commission’s Regulations within 18
assume obligations or liabilities as a Any person desiring to intervene or to
months of the date on which it files its guarantor, indorser, surety, or otherwise protest this filing must file in
rwilkins on PROD1PC63 with NOTICES

notice; and (2) must comply with the in respect of any security of another accordance with Rules 211 and 214 of
requirements of 18 CFR 16.8 and 16.10 person; provided that such issuance or the Commission’s Rules of Practice and
of the Commissions regulations. assumption is for some lawful object Procedure (18 CFR 385.211 or 385.214).
Questions concerning this notice within the corporate purposes of CPV Protests will be considered by the
should be directed to Gaylord Liberty, compatible with the public Commission in determining the

VerDate Aug<31>2005 16:58 Sep 18, 2007 Jkt 211001 PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:\FR\FM\19SEN1.SGM 19SEN1

You might also like