34676 Federal Register / Vol. 72, No.

121 / Monday, June 25, 2007 / Notices

However, the non-party commentors adjacent to the dam. In addition, the DEPARTMENT OF ENERGY
will not receive copies of all documents project boundary would include 2.32
filed by other parties or issued by the acres of National Forest System land Federal Energy Regulatory
Commission (except for the mailing of and 0.66 acre of U.S. Bureau of Land Commission
environmental documents issued by the Management land. [Project No. P–9988–015]
Commission) and will not have the right
This EA contains the Commission
to seek court review of the Augusta Canal Authority; Notice of
staff’s analysis of the potential future
Commission’s final order. Application Tendered for Filing With
The Commission strongly encourages environmental effects of the project.
the Commission, Soliciting Additional
electronic filings of comments, protests Staff has concluded that licensing the
Study Requests, and Establishing
and interventions in lieu of paper using project, with appropriate environmental
Procedural Schedule for Relicensing
the ‘‘eFiling’’ link at http:// protective measures, would not
and Deadline for Submission of Final
www.ferc.gov. Persons unable to file constitute a major federal action that Amendments
electronically should submit an original would significantly affect the quality of
and 14 copies of the protest or the human environment. June 15, 2007.
intervention to the Federal Energy A copy of the EA is available for Take notice that the following
Regulatory Commission, 888 First review at the Commission in the Public hydroelectric application has been filed
Street, NE., Washington, DC 20426. Reference Room or may be viewed on with the Commission and is available
This filing is accessible on-line at the Commission’s Web site at http:// for public inspection.
http://www.ferc.gov, using the a. Type of Application: New major
www.ferc.gov using the ‘‘eLibrary’’ link.
‘‘eLibrary’’ link and is available for license.
Enter the docket number excluding the b. Project No.: P–9988–015.
review in the Commission’s Public
last three digits in the docket number c. Date Filed: May 31, 2007.
Reference Room in Washington, DC.
field to access the document. For d. Applicant: Augusta Canal
There is an ‘‘eSubscription’’ link on the
assistance, contact FERC Online Authority.
Web site that enables subscribers to
receive e-mail notification when a Support at e. Name of Project: King Mill
document is added to a subscribed FERCOnlineSupport@ferc.gov Hydroelectric Project.
docket(s). For assistance with any FERC or toll-free at (866) 208–3676, or for f. Location: The King Mill Project is
Online service, please e-mail TTY, (202) 502–8659. located on the Augusta Canal about 6
FERCOnlineSupport@ferc.gov, or call You may also register online at http:// miles downstream of the Augusta
(866) 208–3676 (toll free). For TTY, call Diversion Dam, adjacent to the
www.ferc.gov/docs-filing/
(202) 502–8659. Savannah River, Richmond County,
esubscription.asp to be notified via e-
Comment Date: 5 p.m. Eastern Time Augusta, GA. The project does not affect
mail of new filings and issuances federal lands.
on July 6, 2007. related to this or other pending projects. g. Filed Pursuant to: Federal Power
Kimberly D. Bose, For assistance, contact FERC Online Act 16 U.S.C. 791 (a)–825(r).
Secretary. Support. h. Applicant Contact: Mr. Dayton
[FR Doc. E7–12184 Filed 6–22–07; 8:45 am] Any comments should be filed within Sherrouse, Executive Director, Augusta
BILLING CODE 6717–01–P 30 days from the date of this notice and Canal Authority, 1450 Green Street,
should be addressed to Kimberly D. Suite 400, Augusta, GA 30901;
Bose, Secretary, Federal Energy Telephone (706) 823–0440, Ext. 1.
DEPARTMENT OF ENERGY Regulatory Commission, 888 First i. FERC Contact: Sarah Florentino,
Street, NE., Washington, DC 20426. Telephone (202) 502–6863, or e-mail
Federal Energy Regulatory Please affix ‘‘Applegate Dam Project No. sarah.florentino@ferc.gov. Additional
Commission information on Federal Energy
11910–002’’ to all comments. Comments
Regulatory Commission (FERC)
[Project No. 11910–002 Oregon] may be filed electronically via the
hydroelectric projects is available on
Internet in lieu of paper. The
Applegate Dam; Notice of Availability FERC’s Web site: http://www.ferc.gov/
Commission strongly encourages
of Environmental Assessment industries/hydropower.asp.
electronic filings. See 18 CFR j. This application is not ready for
June 15, 2007. 385.2001(a)(1)(iii) and the instructions environmental analysis at this time.
In accordance with the National on the Commission’s Web site (http:// k. Cooperating agencies: We are
Environmental Policy Act of 1969 and www.ferc.gov) under the ‘‘e-filing’’ link. asking Federal, State, local, and tribal
Federal Energy Regulatory Commission Please contact Tim Looney by agencies with jurisdiction and/or
(Commission) regulations, 18 CFR Part telephone at (202) 502–6096 or by e- special expertise with respect to
380 (Order No. 486, 52 FR 47897), mail at Timothy.Looney@ferc.gov if you environmental issues to cooperate with
Office of Energy Projects staff have have any questions. us in the preparation of the
reviewed Symbiotics, LLC’s application environmental document. Agencies who
for the proposed Applegate Dam Project Kimberly D. Bose, would like to request cooperating status
and prepared this environmental Secretary. should follow the instructions for filing
assessment (EA). The proposed project [FR Doc. E7–12191 Filed 6–22–07; 8:45 am] such requests described in item m
would be located at the existing U.S. BILLING CODE 6717–01–P below. Cooperating agencies should
Army Corps of Engineers’ (Corps) note the Commission’s policy that
Applegate dam located at river mile 45.7 agencies that cooperate in the
sroberts on PROD1PC70 with NOTICES

on the Applegate River, near the town preparation of the environmental


of Medford, in Jackson County, Oregon. document cannot also intervene. See, 94
The proposed project facilities would FERC ¶ 61,076 (2001).
occupy 7.1 acres of federal land l. Pursuant to Section 4.32(b)(7) of 18
administered by the Corps below and CFR of the Commission’s regulations, if

VerDate Aug<31>2005 23:08 Jun 22, 2007 Jkt 211001 PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 E:\FR\FM\25JNN1.SGM 25JNN1
Federal Register / Vol. 72, No. 121 / Monday, June 25, 2007 / Notices 34677

any resource agency, Indian Tribe, or of: (1) Intake works consisting of a 50- www.ferc.gov using the ‘‘eLibrary’’ link.
person believes that an additional foot-long, 15-foot-high headgate and Enter the docket number excluding the
scientific study should be conducted in intake structure; (2) primary and last three digits in the docket number
order to form an adequate factual basis secondary steel trash racks; (3) a 200- field to access the document. For
for a complete analysis of the foot-long, 40-foot-wide, concrete-lined, assistance, contact FERC Online
application on its merit, the resource open flume head race; (4) a 435-foot- Support at
agency, Indian Tribe, or person must file long, 30-foot-wide brick and masonry FERCOnlineSupport@ferc.gov or toll-
a request for a study with the powerhouse; (5) two vertical shaft free at (866) 208–3676, or for TTY, (202)
Commission not later than 60 days from turbine/generator units with an installed 502–8659. A copy is also available for
the date of filing of the application, and capacity of 2.25 megawatts; (6) a 435- inspection and reproduction at the
serve a copy of the request on the foot-long, 30-foot-wide, concrete-lined, address in item (h) above.
applicant. open tailrace section which returns
m. Deadline for filing additional study p. You may also register online at
flows to the Augusta Canal, and (7) http://www.ferc.gov/esubscribenow.htm
requests and requests for cooperating appurtenant facilities. There is no dam
agency status: July 30, 2007. to be notified via email of new filings
or impoundment, as approximately 881
All documents (original and eight and issuances related to this or other
cfs of water is withdrawn from the
copies) should be filed with: Kimberly pending projects. For assistance, contact
Augusta Canal when operating at full
D. Bose, Secretary, Federal Energy FERC Online Support.
capacity. Developed head is
Regulatory Commission, 888 First approximately 32 feet. The estimated q. With this notice, we are initiating
Street, NE., Washington, DC 20426. generation is 14,366 MWh annually. consultation with the Georgia State
Additional study requests and Historic Preservation Officer (SHPO), as
Nearly all generated power is utilized by
requests for cooperating agency status required by § 106, National Historic
the Standard Textile Plant, located
may be filed electronically via the Preservation Act, and the regulations of
within the King Mill building, for textile
Internet in lieu of paper. The
production. No new facilities or changes the Advisory Council on Historic
Commission strongly encourages
in project operation are proposed. Preservation, 36, CFR, at § 800.4.
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions o. Locations of the Application: A r. Procedural Schedule: The
on the Commission’s Web site (http:// copy of the application is available for application will be processed according
www.ferc.gov) under the ‘‘e-Filing’’ link. review at the Commission in the Public to the following Hydro Licensing
n. Project Description: The existing Reference Room or may be viewed on Schedule. Revisions to the schedule
King Mill Hydroelectric Project consists the Commission’s Web site at http:// may be made as appropriate.

Milestone Target date

Issue Scoping Document 1 for comments .............................................................................................................................. September 2007.


Request Additional Information (if necessary) ........................................................................................................................ November 2007.
Notice of Acceptance/Notice of Ready for Environmental Analysis ....................................................................................... February 2008.
Filing of interventions, recommendations, preliminary terms and conditions, and fishway prescriptions .............................. April 2008.
Reply comments due ............................................................................................................................................................... May 2008.
FERC issues single EA (without a draft) ................................................................................................................................. September 2008.
Comments on EA due ............................................................................................................................................................. November 2008.

s. Final amendments to the a. Filing Type: Whitewater Access (2835–026) on any comments or
application must be filed with the Plan. motions filed.
Commission no later than 30 days from b. Project No: 2835–026. k. Description of Proposal: NYSEG
the issuance date of the notice of ready c. Date Filed: May 23, 2007. filed a Whitewater Access Plan (plan)
for environmental analysis. d. Applicant: New York State Electric pursuant to article 414 of the project
and Gas Corporation (NYSEG). license. The plan addresses impacts of
Kimberly D. Bose, e. Name of Project: Rainbow Falls
Secretary. whitewater access and public usage on
Hydroelectric Project.
the upper Chasm boating on other
[FR Doc. E7–12188 Filed 6–22–07; 8:45 am] f. Location: On the Ausable River, in
recreational users of Ausable Chasm and
BILLING CODE 6717–01–P Clinton County, New York.
g. Filed Pursuant to: Federal Power Ausable River downstream. It includes
Act, 16 U.S.C. 791(a)–825(r). an estimate of potential demand for
DEPARTMENT OF ENERGY h. Applicant Contact: Mr. Hugh Ives, whitewater boating, costs estimates for
89 East Avenue, Rochester, NY 14649. providing and maintaining access to the
Federal Energy Regulatory Phone: (585) 724–8209. upper Chasm, and a proposal to
Commission i. FERC Contact: Any questions on possibly limit, continue, or discontinue
this notice should be addressed to Gina whitewater access at the project. The
[Project No. 2835–026] plan recommends that whitewater
Krump at (202) 502–6704 or
gina.krump@ferc.gov. access be discontinued at the site due to
New York State Electric and Gas
j. Deadline for filing comments and low usage, and safety and security
Corporation; Notice of Compliance
/or motions: July 6, 2007. concerns.
Filing and Soliciting Comments,
All documents (original and eight l. Locations of the Application: This
sroberts on PROD1PC70 with NOTICES

Motions To Intervene, and Protests


copies) should be filed with: Kimberly filing is available for review and
June 15, 2007. D. Bose, Secretary, Federal Energy reproduction at the Commission’s
Take notice that the following report Regulatory Commission, 888 First Public Reference Room, located at 888
has been filed with the Commission and Street, NE., Washington, DC 20426. First Street, NE., Room 2A, Washington,
is available for public inspection: Please include the project number DC 20426, or by calling (202) 502–8371.

VerDate Aug<31>2005 23:08 Jun 22, 2007 Jkt 211001 PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 E:\FR\FM\25JNN1.SGM 25JNN1