You are on page 1of 1

APPENDIX-1

BDV FLOWRATES FOR FIRE CASE & COLD BLOWDOWN CASE

BDV Tag

Fire case Flow


(kg/hr)

Cold Blowdown Flow


(kg/hr)

RO (D/S)
Temperature
(C)

Gas Lift Compressor First and Second Stage (Train 1)

BDV-2027

14055

18500

-23.1

Gas Lift Compressor First and Second Stage (Train 2)

BDV-3027

14055

18500

-23.1

Gas Lift Compressor First and Second Stage (Train 3)

BDV-4027

14055

18500

-23.1

ULGTP

Gas Lift Compressor Third and Fourth Stage (Train 1)

BDV-2029

71774

50000

-67.5

ULGTP

Gas Lift Compressor Third and Fourth Stage (Train 2)

BDV-3029

71774

50000

-67.5

ULGTP

Gas Lift Compressor Third and Fourth Stage (Train 3)

BDV-4029

71774

50000

-67.5

ULGTP

Gas Injection Compressor (Train 1)

BDV-2032

76883

56000

-98.0

ULGTP

Gas Injection Compressor (Train 2)

BDV-3032

76883

56000

-98.0

ULGTP

Gas Dehydration Unit (Train 1)

BDV -2861

52685

54000

-54.0

ULGTP

10

Gas Dehydration Unit (Train 2)

BDV -3861

52685

54000

-54.0

ULGTP

11

Gas Sweetening Unit

BDV -1605

28684

24700

-23.5

ULGTP

12

Fuel Gas Conditioning (Train 1)

BDV-2551

6759

6500

-22.5

ULGTP

13

Gas Injection Compressor Discharge Manifold

BDV-2033

6422

5000

-107.0

ULGTP

14

Gas Injection Line From ULGTP to ULRP

BDV-2034

15842

32857

-107.0

ULGTP

15

Gas Lift Compressor Second Stage Discharge Manifold

BDV-2028

16470

8531

-62.0

ULGTP

16

Gas Lift Compressor Fourth Stage Discharge Manifold

BDV-2030

8016

6833

-89.0

ULGTP

17

Gas Lift Line From ULGTP to ULRP

BDV-2031

17987

13463

-98.0

Location

No

ULGTP

ULGTP

ULGTP

Description

ULGTP

18

Gas Dehydration unit outlet to Gas Lift Compressor Third Stage

BDV-2035

7645

8900

-58.0

ULGTP

19

HP Fuel Gas from ULGTP to ULUTP: Bridge section between ULGTP and ULRP

BDV-1026

1005

1008

-22.0

ULGTP

20

Produced Gas Line From ULRP to ULGTP

BDV-2026

3012

5850

-9.0

ULGTP

21

Fuel Gas Conditioning (Train 2)

BDV-3551

6759

6500

-22.5

ULGTP

22

Dry Gas Line from ULGTP to ULRP (motive gas for pigging)

BDV-1027

1902

2250

-57.0

ULGTP

23

Gas Lift Compressors Inlet Manifold

BDV-1028

797

2050

-21.0

ULGTP

24

GSU Outlet line

BDV-1029

744

670

-23.0

ULGTP

25

HP Fuel Gas from ULGTP to ULUTP: Bridge section between ULRP and ULSP

BDV-1028

2219

900

-6.7

ULGTP

26

Produced Gas From ULSP to ULGTP: Section on ULRP

BDV-1075

2973

4700

-12.5

ULGTP

27

VRU package train 1

BDV-2618

1077

1000

-5.0

ULGTP

28

VRU package train 2

BDV-3618

1077

1000

-5.0

ULGTP

29

HP FG Distribution

BDV-1030

2858

2600

-21.0

ULRP

Dry gas to GL Pig Launcher (Motive Gas for Pigging)

BDV-1035

3569

19000

-97.0

ULRP

Gas injection manifold

BDV-1036

39249

31000

-107.0

ULRP

Gas lift manifold

BDV-1037

17387

11500

-97.0

ULRP

Dry Gas Manifold (Motive Gas for Pigging)

BDV-1076

315

245

-57.0

ULRP

Dry Gas to GI Pig Launcher (Motive Gas for Pigging)

BDV-1038

2720

22500

-106.0

ULRP

HP Fuel Gas from ULGTP to ULUTP: Section on ULRP

BDV-1079

948

870

-22.0

ULRP

Well fluid line Section on ULRP (Receivers + Manifold)

BDV-1078

13897

91000

-72.0

ULSP

Production Separator and Scrubber Train 1

BDV-2025

36509

26000

-6.0

ULSP

Production Separator and Scrubber Train 2

BDV-3025

36509

26000

-6.0

ULSP

Separator Scrubbers Outlet Manifold

BDV-1025

1896

1900

-8.5

ULSP

Produced gas line from ULSP to ULRP

BDV-1026

1589

3100

-6.5

ULSP

Well fluid line from ULRP : Bridge section between ULRP and ULSP

BDV-1077

6120

190000

-73.0

ULSP

HP Fuel Gas from ULGTP to ULUTP: Bridge section between ULSP and ULUTP

BDV-1028

2422

2400

-21.0

ULSP

HP Fuel Gas from ULGTP to ULUTP: Section on ULSP

BDV-1027

252

2250

-56.0

ULSP

Well fluid to production separator manifold

BDV-2026

1355

9050

-73.0

ULUTP

Fuel Gas Conditioning (Train 1)

BDV-2551

6759

6500

-22.5

ULUTP

Fuel Gas Conditioning (Train 2)

BDV-3551

6759

6500

-22.5

ULUTP

HP Fuel gas Inlet manifold

BDV-1026

2067

1900

-22.0

ULUTP

Fuel Gas Buffer Drum

BDV-1029

9066

3200

-6.7

Notes:
1. RO d/s temperature shall be used for performing cold blowdown case in Flarenet (Cold blowdown flow & Temperature d/s RO are as per MMDT study results)

You might also like