REDUCTION IN APC & ACHIEVING PAT

TARGET IN POWER PLANTS


BY
GAURANG BHATT
DIRECTOR TECHNICAL
YANTRA HARVEST ENERGY PVT LTD

CII GBC Forum Aug 2011

Yantra Harvest Energy India

India Power Scenario


Indias Power requirement Scenario.
2500

298
218

1915

GW

BU

1500
1000
500

100

q 64% Power Generation = Thermal

250
200

153

1392

150

969

100

690
50

q 2009 Thermal Power Generation 81.6GW

350
300

2000

2006-07 10th
2011-12 11th
Plan End (actual)
Plan End

2016-17 12th
plan End

Energy Re quirement (BU)

13th Plan

Peak Load (GW)

q Aux Power = 8-10% = 6-7GW


1.0% REDUCTION IN Aux Power = 800MW Power Saved in Current Generation .
= 1600MW considering Future !

Majority of Aux Power = MV Motor


2

Yantra Harvest Energy India

Approach for Setting Targets Depends upon the Objective of the


Scheme
Total Saving Objective = 8.97 MTOE

SN

1
2
3
4
5
7
6
8
Total

Sector

Power (Thermal)
Iron & Steel
Cement
Fertilizers
Aluminium
Paper & pulp
Textile
Chlor-Alkali

No. of
Identified DCs

Reported
Share of Apportioned
Energy
Consumptio
Energy
Consumption
n
reduction
(MTOE)
104.14
28.00
11.87
7.86
7.73
2.09
1.62
0.84
164.15

145
80
65
28
10
31
85
18
462

(%)
63.44%
17.06%
7.23%
4.79%
4.71%
1.27%
0.99%
0.51%
100%

(MTOE)
5.691
1.530
0.649
0.430
0.422
0.114
0.089
0.046
8.97
3

AUX POWER CONSUMPTION

Induced Draft Fan ( ID Fan )

Forced Draft Fan ( FD Fan )30%

Primary Air Fan ( PA Fan )

q Circulating Water Pump

4%1%
HT MOTOR
LT MOTOR
MISC

95%

30%

( CWP )

q Condensate Extraction Pumps ( CEP )


q

Water Supply Pumps

Boiler Feed Water Pump ( BFW Pump )

High Pressure Boiler Feed Pump (PBFP )

33%

Yantra Harvest Energy India

How to Become more Effecient


n Maximum capacity Utilization Lower energy consumption
n Changes in Production Process
n Use of Substitutes
n Using more Energy Efficient machine
n Recovery of energy that is wasted
n Use of Energy saving Devices

Yantra Harvest Energy India

TYPICAL AUXILIARY CONSUMPTION


FOR Thermal Power Plant OF 210MW
AUXILIARY

QTY

POWER IN
MW

Boiler Feed Pump

02

8.0MW

ID Fan

02

3.0MW

PA Fan

02

2.5MW

FD Fan

02

1.0MW

CW Pump

02

1.0MW

CE Pump

02

0.5MW

Coal Handling Plant


And common aux.

Approximate

2.0MW

TOTAL ( 8.5% )

18.0MW
6

Yantra Harvest Energy India

Expected Saving After


Installation of MV Drive to Aux
AUXILIARY

Rated POWER
IN MW

Present
Consumption in
MW **

Expexted
Consumption with
MV Drive

TOTAL ( 8.5% )

18.0MW

16.0 MW

12.0MW- 12.40MW

Expected saving = 3.6MW 4 MW

Yantra Harvest Energy India

Yantra Harvest Energy India

ABOUT YANTRA- Energy Saving Solutions History

2009-11

2007-2009

2006

a) Introduction .

a) Reliance Dahanu
3 nos .
CEP ,PA Fan.
b) Reliance Goa,Samalkot
2 nos .
c) Monnett Ispat CWP
2 nos .
d) APGENCO 1 no
e) Cell Bypass Feature
Implemented .

a) Green Field Cement Plant


-21 nos .
b) Power Plants Retrofits 30 nos
- Lanco
- GMR
- CESC
- Kota TPS
- APGENCO
c) Metals 7 nos
- JSW Steel
- Hindalco .
d) Oil & Gas HPCL
e) Introduction of Vector Control
Synchronous Transfer ,GPRS
Remote Diagnostics

Target Energy Saving 2011 15MW

Majority Retrofit
9

Yantra Harvest Energy India

Savings
Projects

MW

MWh/Yr

Tons CO2

Completed

2.932

23456

25801

Under Execution

4.990

39920

43921

Target 2011-12

15

10

Yantra Harvest Energy India

Eg : Power Plant

System Desired Pressure & Flow are Imp Factors in Determining


Operating Point- especially in Power Plant Applications
11

Yantra Harvest Energy India

Centrifugal Load Affinity- Law

12

Yantra Harvest Energy India

Fan Systems

Pumping Systems

Control Valve

VFD

Variable Fluid -Coupling

15-20% Effeciency Diff depending on


Speed .

13

Note : Above are Indicative Data

Yantra Harvest Energy India

Reliance Energy Dahanu


CEP Case Study

CEP Process Flowchart

Dahanu Thermal Power Station

Data of CEP Before MV Drive Installation - DOL Operation

TURN-KEY PROJECT SCOPE OF WORK

CEP-2A discharge pressure ( Head )


Dearator Pressure
Flow
Motor speed
Current
Power consumed by CEP without MV drive

: 21.3 Kg/cm^2
: 6.9 Kg/cm^2
: 640 T/hr
: 50 Hz = 1480 rpm
: 59.2 Amp
: 590KWH

CEP-2A discharge pressure


Dearator Pressure
Flow
Motor Speed
Control Valve CD14 Position
Current
Power consumed by CEP with MV drive

: 16.5 Kg/cm^2
: 6.9 Kg/cm^2
: 640 T/hr
: 45.4 Hz = 1362 rpm
: 86% open
: 40.4 Amp
: 415KWH

MV Drive with Bypass Panel


Civil room for MV drive system
Necessary Cooling arrangement
Cable Laying & Terminations
Data of CEP after Installation of MV drive
Interfacing with existing DCS system

ENERGY SAVING OF 150KW TO 175KW PER HOUR ACHIEVED ( 25% )


Yantra Harvest Energy India

14

APGENCO Vijayawada
ID Fan Case Study

Fan Process Flowchart


TURN-KEY PROJECT SCOPE OF WORK Data of ID Fan Before MV DriveIDInstallation
- DOL Operation

Scoop Position
: 60-65% Open
MV Drive with Bypass Panel
Air Flow
: 700 TPH
Civil room for MV drive system
Fan Speed
: 640 rpm
Suction Pressure
: -130 mmwc
Necessary Cooling arrangement
Furnace Pressure
: -10 to -15 mmwc
Motor Speed
: 50 Hz 740 rpm
Supply of All Cables
Current
: 155 160 Amp
Power Consumption without MV Drive : 1500 KW
Cable Laying & Terminations
Interfacing with existing DCS system Data of CEP after Installation of MV drive
Scoop Position

Hydraulic Coupling kept in Line


With Scoop Tube position
At 100% open

: 100% Open
Air Flow
: 700 TPH
Fan Speed
: 640 rpm
Suction Pressure
: -130 mmwc
Furnace Pressure
: -10 to -15 mmwc
Motor Speed
: 43 Hz 645 rpm
Current
: 104 Amp
Power Consumption using MV Drive : 1150 KW

ENERGY SAVING OF 350KW PER HOUR PER FAN ACHIEVED ( 24% )

15

Yantra Harvest Energy India

Reliance Energy Samalkot


HPBFP Case Study

HPBFP Process Flowchart

Data of ID Fan Before MV Drive Installation - DOL Operation


HPBFP Discharge Pressure

Samalkot Combined Cycle Plant


TURN-KEY PROJECT SCOPE OF WORK

HPBFP Flow
HP ECO outlet Pressure
HP Drum Pressure
Operating Frequency
Power Consumption

: 121 bar
: 207 TPH
: 86 bar
: 76 bar
: 50 Hz
: 1100 KW

Data of CEP after Installation of MV drive

MV Drive with Bypass Panel


Supply of All Cables
Cable Laying & Terminations
Interfacing with existing DCS system

HPBFP Discharge Pressure

: 90 bar
HPBFP Flow
: 207 TPH
HP ECO outlet Pressure
: 86 bar
HP Drum Pressure
: 76 bar
Operating Frequency
: 43 Hz
Power Consumption
: 800 KW
ENERGY SAVING OF 300KW PER HOUR ACHIEVED ( 27% )
16

Yantra Harvest Energy India

ENERGY CONSUMPTION PATTERN


BEFORE INSTALLATION

AFTER INSTALLATION

DATE

I D FAN -1 (in KWH)

N.O HEATS

KWH / HEAT

DATE

I D FAN -1 (in KWH)

N.O HEATS

KWH / HEAT

10/09/2010

22600

27

837.037

16/09/2010

23520

29

811.034

12/09/2010

23160

26

859.230

18/09/2010

20920

26

804.615

13/09/2010

21780

28

777.857

20/09/2010

21740

28

776.428

14/09/2010

23300

25

932

22/09/2010

20770

28

741.785

24/09/2010

20960

25

838.444

26/09/2010

21280

26

818.461

28/09/2010

21720

29

748.965

01/10/2010

20400

29

703.44

03/10/2010

20570

29

709.310

05/10/2010

20100

27

744.444

07/10/2010

19230

25

769.2

09/10/2010

19060

27

705.925

10/10/2010

18390

27

681.111

11/10/2010

17320

26

666.153

12/10/2010

17230

26

662.692

13/10/2010

13720

26

527.692

14/10/2010

13870

26

533.46

15/10/2010

14800

27

548.148

16/10/2010

13500

25

540.00

17/10/2010

15330

26

589.615

MODIFICATION # 1
MODIFICATION # 2

MODIFICATION # 3

MODIFICATION # 4

MODIFICATION # 5

INDEPTH PROCESS KNOWLEDGE HELPS TO MAXIMISE ENERGY SAVING


17

Yantra Harvest Energy India

Concept :

18

Yantra Harvest Energy India

Yantra Harvest : Total Value Added Approach


a)MV VFD System
b)Bypass System
c)Airconditioning System
d)Cable Laying /Cable Schedule
e)Civil Room VFD Panel
f)Interfacing /Tuning with DCS PLC
Service Back up :
a) Post Warranty AMC
b) Service Spares at Plant Level during Warranty

19

Yantra Harvest Energy India

20

Yantra Harvest Energy India

Pay on Performance / Guaranteed Energy Basis .

Guaranteed Energy Basis Outright Payment

Guaranteed Energy Basis Pay out of Saving

1) Energy Saving Guarantee Decided .


2) Payback within agreed limits
3) Price Negotiated
4) Penalty for non achievement decided .

1) Energy Saving Guarantee Decided .


2) Payback within agreed limits
3) Finance Cost included
4) EMI Decided within stipulated time
5) Penalty for non achievement decided .

21

Yantra Harvest Energy India

YANTRA HARVEST MV DRIVE

22

Yantra Harvest Energy India

YANTRA HARVEST MV DRIVE

23

Yantra Harvest Energy India

MV Drive Ratings

3300V Series:
Rated motor 300 ~ 7000KW

6600V Series:
Rated motor 300 ~ 14000KW

11000V Series:
Rated motor 300 ~ 24000KW

24

Yantra Harvest Energy India

Summary
q Popularity of MV Drives has substantially Increased in last 2-3 years
- Great Contribution to Energy Saving and Smart Equipment Control .
q Payback -2 years in many cases : Pay Out of Saving Schemes becoming Popular .
q Main Customers Requirements :
a) Assured Savings with Guarantees .
b) No Change in Process Conditions Infact Chance to Make it Better .
c) Smooth Changeover from existing systems .Turnkey Retrofits .
- No Effect of Harmonics / Effects on Existing Motors .
- Ease of Installation ,Ease of Use .
d) Fault Tolerance and Increased Availability through
- Advanced Cell Bypass Systems ( Multi Cell Technology )
- Suitable Bypass Systems to Existing Systems .
- Management of Grid Disturbances .
c) Long Term Assured Service Backups with AMCs
Recommended to Look at Performance Criterion rather than Topology
25

Yantra Harvest Energy India

ENERGY SAVED
IS
ENERGY GENERATED

26

Yantra Harvest Energy India