DETAILED OF THE CONSTRUCTION ESTIMATE

CONCRETE MATERIALS :

FOOTING 1

CLASS "A" MIXTURE


FOOTING DEMINSION
LENGTH:

1.2 m

WIDTH:

1m

THICK:

0.35 m

VOL. OF FOOTING

0.42

cu.m.

TOTAL VOLUME OF THE


VOLUME=
CEMENT:

12

FOOTING

5.04 cu.m.

5.04

45.36 bags

SAND:

5.04

0.5

2.52 cu.m.

GRAVEL:

5.04

5.04 cu.m.

REINFORCE BARS MATERIALS :

FOOTING 1

NET LENGTH :
1.2

0.075 +

0.075

1.05 m

TOTAL NO. OF CUT BARS IN ONE FOOTING BY DIRECT COUNTING


6x

12

pcs

TOTAL NO. OF BARS FOR THE 12


12

12

144

FOOTING

pcs

1.05

SELECT THE STEEL BARS WHOSE LENGTH IS ECONOMICALLY CUT INTO


6

1.05

5.71429 pcs

Divide the result:


144

29

pcs of 16mm diameter bars

TIE WIRE
NUMBER OF THE BAR INTERSECTION IN ONE FOOTING
6

TOTAL TIES FOR

12
12

Using

0.25 m

36

ties

432

ties

FOOTINGS
36

length per tie =

432

One kilo of no. 16 G.I. wire is approximately


108

30 =

3.6

30 m
kilos

0.250

108

DETAILED OF THE CONSTRUCTION ESTIMATE

1.05

M LONG

meters

CONCRETE MATERIALS :

FOOTING 2

CLASS "A" MIXTURE


FOOTING DEMINSION
LENGTH:

1m

WIDTH:

1m

THICK:

0.35 m

VOL. OF FOOTING

0.35 cu.m.

TOTAL VOLUME OF THE

VOLUME=
CEMENT:

FOOTING

1.4 cu.m.

1.4

12.6 bags

SAND:

1.4

0.5

0.7 cu.m.

GRAVEL:

1.4

1.4 cu.m.

REINFORCE BARS MATERIALS :

FOOTING 2

NET LENGTH :
1

0.075 +

0.075

0.85 m

TOTAL NO. OF CUT BARS IN ONE FOOTING BY DIRECT COUNTING


5x

10

pcs

TOTAL NO. OF BARS FOR THE


10

40

FOOTING

pcs

0.85

SELECT THE STEEL BARS WHOSE LENGTH IS ECONOMICALLY CUT INTO


6

0.85

0.85

7.05882 pcs

Divide the result:


40

pcs of 16mm diameter bars

TIE WIRE
NUMBER OF THE BAR INTERSECTION IN ONE FOOTING
5

TOTAL TIES FOR

4
Using

0.25 m

25

ties

100

ties

FOOTINGS
25

length per tie =

100

One kilo of no. 16 G.I. wire is approximately


25

30 =

0.8

30 m
kilos

0.250

25

meters

meters

LONG

COLUMN 1 TIES :

HEIGHT FROM GROUND LINE TO BEAM


HT. =

6.6

Mtrs.

0.2 m. spacing

Divide:
6.6
0.2

44 pcs

- Total ties of the columns=

12

- Multiply:
12 x 44

528

- Length of one lateral ties


1.45 m. long cut from a 6.00 m. steel bars
6
=
1.45

w= 0.275

pcs

- Result
d= 0.45

528
5

10 pcs
tiesl bars

= 104 pcs- 10 mm ties bars

- Tie wire
no. of ties in a column
6
x
44 =

264

total wire for the


264 x
12 =

12
3168

multiply:
3168 x

One kilo of no. 16 G.I. wire is approximately


792

35 =

22.6

35 m
kilos

0.25 =

792

EAM

m. spacing

pcs

6.00 m. steel bars

10 mm ties bars

columns
pcs

w= 0.275

12

A=
d=

0.45

7.5

6
bars

B=
TOTAL =

7.6

0.200
mtrs. Length

Result:
no. of vertical bars
Total of vertical bars =

pcs of one column


99.94 pcs

16mm vertical bars

column post

rtical bars