E N T E RP R I S E T R A N S FO R M AT I O N P R O G R A M M E
Version 0.11.0
DOCUMENT MANAGEMENT
DOCUM E NT LOCATI O N
REVISION HISTORY
Changes
Marked?
Version
Date
Author
Change Description
0.1
10/02/201
0
Vinod Shekhapuram
1st Draft
0.2
26/02/201
0
Vinod Shekhapuram
1.0
26/02/201
0
Vinod Shekhapuram
Approved
Version No.
Version Date
Document Location
L3 12.2.6 Planning
Budgeting and
Forecasting
Scope Document
ET Workshop Minutes
Planning Budgeting and
Forecasting
Minutes Document
QUALITY REVIEW
This document has been reviewed for quality by the following personnel.
Name
Function
Sachin Kamat
Peer review
Subin Rajasekaran
ET-PMO
Chris Anderson
Quality
Date of approval
PAGE 2 OF 70
A P P R O VA L S
This document has been approved by the following people. Signed approval forms are filed in Quality section of
the Project Control Book.
Name
Function
Geoff Walker
Business Representative
Chandra Yee
Date of approval
Signature
DISTRIBUTION
PAGE 3 OF 70
TA B L E O F C O N T E N T S
Name
Function
Chandra Yee
Jennie Thompson
Matt Bolton
Jessie Xuan
Wendy Ainsworth
Glen Cattermole
Nicole Smith
Andrew Hutchinson
Mike Robertson
Sadanand Shenoy
BI Developer
Geoff Walker
Management Accountant
Jo Broad
Simon Healy
Nigel Thompson
Financial Controller
Clinton Jenkins
ET Business Representative
Jonathan Holmes
Adrian Simnett
Chris Anderson
ET Quality Assurance
David Clegg
ET Change Management
Pat McKeefry
ET Data Management
Marien de Wilde
ET Solution Architect
Andrew Christian
ET Technical
Andrew Greally
Gary Robinson
Tracey Boyes
1................................ INTRODUCTION
.........................................................................
1.1.................... Document Purpose
..............................................................
1.2...................Document Structure
..............................................................
2...........................................
.........................................................................
2.3.............Summary of workstream
scope....................................................
2.4........................ Non Functional
requirements.........................................
4.1............................ Introduction
............................................................
4.2............... Process Flow Details
BUDGETING......................................
4.3............... Process Flow Details
FORECASTING..................................
4.4............... Process Flow Details
VERSION maintenance......................
5......................... STANDARD REPORTS
.......................................................................
6...........MASTER DATA CONSIDERATIONS
.......................................................................
6.1..................... M a s t e r D a t a
V E R S I O N S ......................................
7........................... SAP DEVELOPMENT
.......................................................................
7.1.............................. sAP Gaps
............................................................
7.2
Interface Developments.................................................................................................................................
7.3
Conversions...................................................................................................................................................
7.4
Report Definitions...........................................................................................................................................
7.5
Forms.............................................................................................................................................................
7.6
Workflows.......................................................................................................................................................
TESTING CONSIDERATIONS..................................................................................................................................
10
PAGE 4 OF 70
10.1
10.2
10.3
10.4
10.5
11
BATCH REQUIREMENTS.........................................................................................................................................
12
FUTURE CONSIDERATIONS...................................................................................................................................
13
OPEN ISSUES..........................................................................................................................................................
14
APPENDIX................................................................................................................................................................
14.1
Conventions Used..........................................................................................................................................
14.2
Glossary.........................................................................................................................................................
PAGE 5 OF 70
INTRODUCTION
1 .1
DOCUMENT PURPOSE
This blueprint document is a result of the discussion between Contact business and ET project team. The
document encompasses the business process flow and the design requirements for the specific L3
processes as per the ET scope documents. This document will be used as the basis for the solution
delivered for the future state process
The blueprint document serves as a central repository for the end to end business process flows which
reflect project scope. The document will be used as a baseline for the following future project activities:
SAP technical developments including Reports, Interfaces, Data management activities, System
enhancements, Forms and Workflows
Creation of end user training material including business process procedures and steps
1 .2
DOCUMENT STRUCTURE
Section Heading
Section Content
Process Scope
Key Decisions
Standard Reports
SAP development
Number
PAGE 6 OF 70
Section
Section Heading
Section Content
Testing Considerations
10
Conversion Considerations
11
Batch requirements
12
Future Considerations
13
Open Issues
14
Appendices
Number
PAGE 7 OF 70
SCOPE
2 .1
The vision for Finance is: To be a highly valued partner providing financial expertise, supporting the business
to make effective business decisions and achieve outstanding results.
The associated Strategic Drivers to realise this Vision are:
2 .2
B E N E F I T S R E A L I S AT I O N
The following table presents the benefits identified and quantified within the programme benefits case that
pertain to the process covered within this blueprint document and evaluates the contribution thereof to the
achievement of these benefits.
Benefit
Benefit Description
Reference
BPDD
Consistent
with Target
Improvement?
(Y/N)
Streamlined Financial
Productivity
PAGE 8 OF 70
Benefit
Benefit Description
Reference
BPDD
Consistent
with Target
Improvement?
(Y/N)
S U M M A RY O F W O R K S T R E A M S C O P E
2 .3
2 .3 . 1
P RO CES S S COP E
The following table outlines the processes included in 12.3.6 Planning Budgeting & Forecasting as per the
ET Program Scope documents
Level 1
Level 2
Level 3
12.0 Financials
2 .3 . 2
The following table outlines the exceptions identified from the confirmed and agreed ET Program Scope
documents for 12.3.6 Planning Budgeting and Forecasting, supported by Programme Change Control
procedure.
CR #
Exception description
Resolution details
(early warning)
PAGE 9 OF 70
CR #
Exception description
Resolution details
2 .4
The following table outlines the key non-functional requirements identified for the ET Program Scope.
Description
Scalability
Usability
Supportability
Auditing
Archiving
Security
PAGE 10 OF 70
Description
Performance
Provides pre-defined
PAGE 11 OF 70
This section records the key decisions made during and post the design workshops. Including any
assumptions made that support these decisions. Should any deviations from the standard SAP processes
be proposed, the reasons supporting these decisions should be contained within this section.
Number Decision / Assumption Details
01
BI-IP Planning functionality will not be implemented in the Finance wave at Contact as
per the Level 3 Scoping workshops.
At Contact SAP will be the central repository for Plan data. The Strategic Plan (five
years), Budget and Forecast will be loaded to SAP. Note that access to the Strat Plan
will be restricted.
03
The Strategic Plan will be updated every financial year. This will be stored as a new
version per financial year. Current year plus 5 years forward need to be open for input.
04
Multiple plan versions will be used Budget/Forecast per cycle. Forecast versions will be
retained in SAP per month. These are outlined in Section 4.2.1 and Section 4.3.1
05
The Strategic Plan and Budget versions, as per Section 4.2.1, will be maintained for
Origin Submissions and are for Central Finance purposes only, i.e. tags B, C and D.
The business units will populate versions A, E and F only.
06
Rolling forecasts, i.e. a forecast spans more than 1 financial year, are to be supported
in SAP for input/output of plan data and reporting.
PAGE 12 OF 70
Controlling (CO) for Cost Centre (CC) and Internal orders (IO)
Project Systems (PS) for WBS (Work Breakdown Structure Element) including project OPEX.
Wipro is that Project Opex is not settled to Cost Centres, but will be available
for reporting at a Cost Centre level in FI / New GL.
Revenue
The FI New GL (cost centre/profit centre) view will hold all the integrated planning data
(distinguishing between cost centre / non cost centre costs) for high level aggregated
actual v plan reporting and variance analysis. Non cost centre costs will be a
summation of Projects and internal orders which are populated with a profit centre
Custom BI reports will provide a detailed view of actual v planned costs broken down
into detail by cost element/ cost object (cost centre, WBS, IO) and WBS type
(Capex/Opex). The requirement for this reporting is captured in section 7.4, and is also
a requirement in the Reporting BPDD. This report will need to be available on a timely
basis from BI (ideally real time) to support tight deadlines in planning cycles.
Note: Cost centre to profit centre will be mapped 1:1 at Contact refer Profit centre
BPDD.
The process described above is recommended process by SAP/Wipro with the
introduction of SAP New GL functionality. Projects with Opex costs will be locked so no
further postings to them will be allowed after completion of the project. The overall
process will be subject to BPDD safeguard review which will consider SAP standard
practice and integrated processes.
08
Integrated solution design will need to support Capex and Opex Recoveries. E.g. At
Contact all Contractors costs are charged to Opex (this is Contact policy).
The
corresponding Recovery to Opex will be posted when the project is on-charged using a
Capex WBS
Integrated solution also needs to support revenue, e.g. Sundry income from Retail
Meter Rent will be posted against a Profit Centre revenue element, and the
corresponding costs of this service will be against a Cost Centre cost element in SAP.
Some of these may also need to be used in combination with WBS elements.
PAGE 13 OF 70
Integrated planning will be default active for Internal Order & WBS element at a master
data level
10
Integrated planning will be activated in configuration for all CO & FI Planning in order to
flow plan data from CO to FI
11
Plan data from other source systems such as the Retail Model, Gas Model, ICE, E@R
etc. will be used as an input into Budgets, Forecasts and the Strat Plan and will be
required to be uploaded /interfaced into SAP. Refer Section 7.2.
12
Plan data for Budget, Forecasts and Strat Plan loaded into SAP will need to be output
for uploading/interfacing into ICE/E@R models.
13
Data from external systems e.g. ICE, E@R, etc., will need to be at the business unit
level of detail (revenue/cost element and cost object e.g. Cost centre / Profit centre) to
be uploaded to SAP. Contact will need to establish the appropriate business unit level of
detail (profit centre group) for balance sheet and profit and loss items required for
budgets/forecasts.
14
Contact will use Excel upload functionality for uploading or changing the plan data via
SAP Planning Templates.
It is important that SAP Planning Templates are developed in a format that
budget/project managers can easily populate, and the format is suitable for loading
multiple cost objects (cost centres, WBS, Internal orders) or profit centres plans into
SAP. Refer Forms section. Templates will also be required for the uploading of SKF
data.
15
b.
c.
The Forecast will reflect monthly actuals and the forecast for the subsequent
months, i.e. the first forecast (usually in August) will be based on the month 1
actuals plus budget for the remaining months. For subsequent months the
forecast will be based on actuals for the preceding months, and the previous
month forecast for the remaining months. There is no forecast undertaken in
both the first and last months of the financial year.
d.
PAGE 14 OF 70
Version control will need to be centrally managed by Contact to coordinate locking and
copying of versions. The use of the global variable to assist the end-user in selecting
the correct version is recommended.
17
Contact will ensure that versions are empty before loading any plan data.
18
Contact will use NZD for the planning currency. In future consideration should be given
to incorporating foreign currencies, i.e. USD, AUD, etc.
19
20
Planning Distribution keys required for Contact are equal distribution (divided by12),
calendar days working days. Note that phasing can be done manually. Customer
numbers may also be used for distributing planned amounts and if so this will be loaded
as a planned SKF. Further distribution keys may be identified during realisation phase.
21
Profit Centres
Transfer Pricing
Profitability Accounting
Projects
Capex plans will be loaded by individual Project and the appropriate WBS level for each
project. Capex reports will be available at a project level (at an input/project costs view).
In SAP The split of Stay in Business v Growth will be available at a project level.
Note: Cash Capex planning will be done outside of SAP. In future this will need to be
considered within a planning tool. Refer Reporting BPDD for Cash Capex actuals.
Note: In future non project direct asset purchases will be planned against a cost centre
or an internal order.
PAGE 15 OF 70
24
The organization units described in this document are provisional and are subject to
change. The final SAP enterprise structure will be designed and presented in a
separate document after completion of all blueprint workshops
25
Process for Assessments and Distribution detailed in Cost centre BPDD can also be
executed for plan data.
PAGE 16 OF 70
F U T U R E S TAT E P R O C E S S
INTRODUCTION
4 .1
Develop financial targets that are aligned with the strategic goals of the organisation
Establish clear ownership and accountability for achieving targets and objectives
Provide transparency of the resources that the organisation will require in the upcoming period.
The Planning process includes both the full year budget/target setting process and the monthly/quarterly reforecasting process.
The planning, budgeting and forecasting process includes the following:
2.
Strategic Plan
Annual Budget
Monthly Forecasting
Rolling Forecast
Level of Detail
Define Timetable
Communicate to participants;
Planning Approach
Strategic Plan
PAGE 17 OF 70
3.
Budgets
Forecasts (Monthly)
Rolling Forecasts
Overhead expense
Plant Maintenance
4.
Upload formatted template files into relevant individual SAP Modules General Ledger
(Including Profit Centre Accounting)
4 .1 . 1
Project Manager
Management Accountant
General Manager
O VE RV I E W
PAGE 18 OF 70
12.Financials
12.1FSC
(inacsluC
&M
Tre
rya)shMgmt
12.2FinancialAccounting
12.3ManagementAccounting
12.4FinancialAnalytics
Accounting and the L3 process Planning Budgeting & Forecasting (12.3.6 Planning Budgeting and
Forecasting)
The following Level 4 activities and sub-processes are found within the process Planning Budgeting &
Forecasting and covered in detail within this document,
Budgeting
Forecasting
Master Data
4 .1 . 2
Version Maintenance
automatically transfers planning data for Internal orders, Cost Centre Accounting, WBS, etc to the
New GL in FI and against Profit Centres
Planning Period Lock Planning periods can be locked in order to avoid entry into the approved planned
data.
Planning Version Lock - Planning versions can be locked to prevent changing or creating plan data
Other planning features:
PAGE 19 OF 70
Actual data can be easily converted as plan data for next year planning.
All planning files can be easily uploaded using single transaction code.
Versions defined to CO are also defined in FI for flow of plan data from CO to FI.
Planning templates are used for creating or uploading plan data for each object.
Planning statistical key figures, which are used as the basis for the allocation of costs
Using internal order planning, we can compare plan and actual costs, and carry out variance
analysis.
WBS Planning
Cost planning deals with the costs you expect to incur in connection with your project as it is executed.
FI New GL Planning (profit Centres)
Balance Sheet & Revenue accounts are planned in FI New GL against Profit Centres.
Using Integrated Planning, the costs from the CO module are transferred to FI New GL providing a full view
of the plan by Profit Centre
PAGE 20 OF 70
Controlling (CO) for Cost Centre (CC) and Internal orders (IO)
Project Systems (PS) for WBS (Work Breakdown Structure Element) - including project OPEX.
Note that the recommended approach by SAP / Wipro is that Project Opex is not settled to Cost
Centres, but will be available for reporting at a Cost Centre level in FI / New GL.
Revenue
Standard reporting is available in each of these areas to look specifically at planned costs against e.g. cost
centre and projects
The FI New GL (cost centre/profit centre) view will hold all the integrated planning data (distinguishing
between cost centre / non cost centre costs) for high level aggregated actual v plan reporting and variance
analysis. Non cost centre costs will be a summation of Projects and internal orders which are populated with
a profit centre
Note: Cost centre to profit centre will be mapped 1:1 at Contact refer Profit centre BPDD.
Custom BI reporting will provide a detailed view of actual v planned revenue and costs broken down into
detail by profit centre, cost element/ cost object (cost centre, WBS, IO,) and WBS type (Capex/Opex). The
requirement for this reporting is captured in section 7.4, and is also a requirement in the Reporting BPDD.
Report s in BI used for budgeting and forecasting will need to be available on a timely basis from BI (ideally
real time) to support tight deadlines in planning cycles. Changes in the planned data will need to made at the
source module and integrated back through to BI to finalise.
The process described above is recommended process by SAP/Wipro with the introduction of SAP New GL
functionality. For projects a structure will be set up with WBS type to post to either a WBS Opex or Capex.
Opex Costs in projects will not settle to a cost centre but on project completion will be locked so no further
postings to them will be allowed. The overall process will be subject to BPDD safeguard review which will
consider SAP standard practice and integrated processes
The design will also need to support Recoveries. E.g. at Contact all Contractors costs are charged to Opex
(this is Contact policy). The corresponding Recovery to Opex will be posted when the project is on-charged
using a Capex WBS
PAGE 21 OF 70
Integrated solution also needs to support revenue, e.g. Sundry income from Retail Meter Rent will be posted
against a Profit Centre revenue element, and the corresponding costs of this service will be against a Cost
Centre cost element in SAP.For a net result of these Recoveries e.g. Retail meter leases, Land recoveries,
planned costs will also be posted against the Profit centre via integrated planning to show the overall result
P R O C E S S F L O W D E TA I L S B U D G E T I N G
4 .2
4 .2 . 1
P RO CES S OV E RV I E W
The current budgeting process commences around February each year, with business units using budgeting
tool such as ICE and Excel spreadsheet models to bring together plan and actual information at an
appropriate level for initial business unit management review.
Plans are usually submitted in this process to cover a 1 year time period and phased monthly to ultimately
become the new annual budget.
In Contact, plan data for costs is loaded in Controlling module and Balance sheet and Revenue accounts are
planned in FI module against profit centres.
The objects for planning in Controlling are a combination of Cost Centre/Cost Element, Internal Order/Cost
Element & WBS Element/Cost Element.
The objects for planning in FI are a combination of Balance Sheet account/Profit centre & Revenue Element /
Profit Centre.
Other source
The planning data in the source systems are created in SAP upload format and are uploaded manually into
SAP system using standard Excel upload functionality.
PAGE 22 OF 70
The following versions and planning stages have been identified for the Budgeting process
Tag
Name
Version
A00
Origin Submission 1
B00
Origin Submission 2
C00
Origin Submission 3
D00
E00
Final Budget
F00
Note that the Origin Submissions are for Central Finance purposes only, i.e. tags B, C and D. The business
units will populate versions A, E and F only.
Versions naming convention is shown above as a starting point but may change during realisation phase to
provide more logic or consistency in the budget/forecast planning cycle
Refer List of Draft Planning versions
For finance year 2010-2011, the budgeting data will be already completed before SAP go-live;
hence this data will be mapped and migrated into SAP system.
From next financial year onwards, budgeting process will be undertaken in SAP system.
As a starting point, the budget data from the source is uploaded into SAP in version A00.
After accountant adjustment plan data is copied to B00 for Origin submission
C00 and D00 are also maintained for the subsequent Origin submissions
Version E00 is used to post the high level Leadership team adjustments which are then allocated by
the Accountant across the business unit. After all the adjustments are made and approved by the
respective business, the budget data is copied to the final version F00.
Budget data is loaded into SAP and phased for 12 periods (months).
The plan data is automatically updated to profit centres through the respective objects in CO.
PAGE 23 OF 70
PAGE 24 OF 70
4. 2 .2
Note: The ARIS process diagram covers the steps to be followed for processing of Budgeting , however relevant manual steps has been incorporated in order to show
the process. Link to the ARIS Document: ARIS Diagram
Link to Microsoft Visio Diagram
PLANNING BUDGETING AND FORECASTING
PAGE 25 OF 70
4 .2 . 3
P RO CES S S TE P S BUDG E TI NG
Process
Step Ref.
01
Process Step
SAP T-Code
T. code : OKP1
(CO Planning)
02
T. code : TBD
03
T. code : TBD
04
Check whether to
copy strategic plan
year 1 into version
A00
T. code : TBD
05
T.Code : TBD
06
Check whether to
upload budget data
from any of the
sources
Manual
07
T.Code : TBD
Upload
Budget
data
(excel
spreadsheets) in to SAP version
A00
along
with
Accounting
Adjustments using the standard
SAP excel upload functionality.
(Costs budget into CO)
T. code : OB52
(FI Planning)
PAGE 26 OF 70
Process
Step Ref.
08
Process Step
SAP T-Code
T.Code : TBD
Upload
Budget
data
(excel
spreadsheets) in to SAP A00 along
with Accounting Adjustments
(Balance Sheet / Revenue budget
into FI) using standard SAP excel
upload functionality.
09
T.Code : TBD
10
Origin Submission 1
Manual
11
First
Review
completed by Origin
Manual
12
T.Code : TBD
13
Management
Accountant
makes
adjustment to the
budget data (Costs) in
SAP CO & B/S and
Revenue in SAP FI
using excel online in
version C00
T.Code : TBD
14
Origin Submission 2
Manual
15
Second
review
completed by Origin
Manual
16
T.Code : TBD
version
of
PAGE 27 OF 70
Process
Step Ref.
17
Process Step
SAP T-Code
Management
Accountant
makes
adjustment to the
budget data (Costs) in
SAP CO & B/S and
Revenue in SAP FI
using excel online in
version D00
T.Code : TBD
18
Origin Submission 3
Manual
19
Third
review
completed by Origin
Manual
20
T.Code : TBD
21
Decide whether to
make any Accountant
Re-allocation
/
Leadership
team
adjustments
Manual
22
Accountant
splits
leadership adjustment
/
Accountant
Reallocation
to
the
budget data (Costs) in
SAP CO using excel
online in F00
T.Code : TBD
Accountant
splits leadership
adjustment / Accountant
Reallocation to the budget data (Costs)
in SAP CO using excel online in
version F00
23
Accountant
splits
leadership adjustment
/
Accountant
Reallocation
to
the
budget data (B/S &
Revenue) in SAP FI
using excel online in
F00
T.Code : TBD
Accountant
splits leadership
adjustment / Accountant
Reallocation to the budget data (B/S &
Revenue) in SAP FI using excel
online in version F00
24
T.Code : TBD
25
Lock
Version
Previous Year
T.Code : TBD
for
any
/
PAGE 28 OF 70
P R O C E S S F L O W D E TA I L S F O R E C A S T I N G
4 .3
4 .3 . 1
P RO CES S OV E RV I E W
Forecasting is carried out monthly by most business units. The forecasting process is not expected to
fundamentally differ from the planning process other than in terms of frequency of execution, input
template design and level of guidance documentation raised within the business. The basic roles and
transactions involved in forecasting are almost same as for planning.
Capex and Depreciation spreadsheet (some of this will be calculated by SAP and some is
expected to be manually calculated externally)
Other source
Budget data of first month if forecasting is for starting of year i.e. 2 month.
A matrix showing the to and from source flows will be finalised during realisation.
PAGE 29 OF 70
The planning data in the source systems are created in SAP upload format and are uploaded manually
into SAP system using standard upload functionality.
Following versions and planning stages will be used in Contact for process of forecasting (Current
Month)
Tag
Name
Version
A01
B01
C01
Final Forecast
F01
Versions naming convention is shown above as a starting point but may change during realisation
phase to provide more logic or consistency in the budget/forecast planning cycle versions across Cost
Objects. For forecast versions the period will be reflected within the version i.e. A01, A02, A03 etc. to
retain each months forecast
Refer List of Draft Planning versions (Contact Planning Versions (Updared)
For finance year 2010-2011, the forecasting data will be already completed for months July to
October before SAP go-live; hence this data will be mapped and migrated into SAP system.
From next month i.e. October 2010 onwards, forecasting process will be continued in SAP
system.
It is also ensured that versions are empty before performing any planning activity.
In Contact, forecasting versions for previous years and future years will be locked for avoiding
posting of planned records outside the relevant planning cycle.
The Forecast will reflect monthly actuals and the forecast for the subsequent months, i.e. the
first forecast (usually in August) will be based on the month 1 actuals plus budget for the
remaining months. For subsequent months the forecast will be based on actuals for the
preceding months, and the previous month forecast for the remaining months. There is no
forecast undertaken in both the first and last months of the financial year.
A01 will be used as the starting point for forecast budget managers will then make their
forecast adjustments to this version
The forecasting adjustments made in A01 are copied to B01 where all subsequent Accountant
adjustments are made
PAGE 30 OF 70
The plan data is automatically updated to profit centres through the respective objects in CO.
PAGE 31 OF 70
4. 3 .2
Note: The ARIS process diagram covers the steps to be followed for processing of Forecasting, however relevant manual steps has been incorporated in order to show
the process. Link to the ARIS Document: ARIS Document
PAGE 32 OF 70
4 .3 . 3
P RO CES S S TE P S FO RE CAS TI NG
Process
Step Ref.
Process Step
SAP T-Code
T.Code : OKP1
(CO)
02
Check if forecasting
version is maintained
for new financial year
T.code : TBD
03
T.code : TBD
04
Check
if
the
forecasting is for first
month
Manual
05
Copy
first
month
budget values F10 to
forecast version in FI
& CO
T.code : TBD
06
T.code : TBD
07
T.code : TBD
08
Decide whether to
make any forecast
adjustments
Manual
09
Make adjustments to
the forecast data
T.code : TBD
10
T.code : TBD
01
T.Code : FB52
PAGE 33 OF 70
Process
Step Ref.
Process Step
SAP T-Code
11
Decide whether to
make any forecast
adjustments
Manual
12
Make adjustments to
the forecast data
T.code : TBD
13
Decide whether to
make any forecast
adjustments
14
Make adjustments to
the forecast data
15
Decide whether to
make any forecast
adjustments
16
Make adjustments to
the forecast data
Manual
18
Decide whether to
make any forecast
adjustments
19
T.code : TBD
Manual
T.code : TBD
17
T.Code TBD
Manual
T.code TBD
PAGE 34 OF 70
Process
Step Ref.
20
Process Step
Copy forecast data
from version Tag C to
final version Tag D
and lock version Tag
C
SAP T-Code
T.code TBD
P R O C E S S F L O W D E TA I L S P L A N V E R S I O N M A I N T E N A N C E
4 .4
4 .4 . 1
P RO CES S OV E RV I E W
Version in SAP is used to record various plan data. Version 0 is the standard version for which actuals are
recorded in SAP except NewGL (which is 1).
Contact will use versions for Strategic Plan, Forecasting, Budgeting, etc.
Versions for previous years and future years will be locked to avoid any posting of planned data.
Before loading of planning data, the period will be unlocked for the respective year.
PAGE 35 OF 70
4. 4 .2
Note: The ARIS process diagram covers the steps to be followed for processing of Version Maintenance, however relevant manual steps has been incorporated in
order to show the process. Link to the ARIS Document:
PAGE 36 OF 70
4 .4 . 3
Process
Step Ref.
01
02
Process Step
SAP T-Code
Send
request
to
master
data
maintainer
Manual
Determine
approver
Manual
the
Approve
request
04
or
Reject
Manual
Provide clarifications
Manual
05
Manual
06
T.code TBD
07
T.code TBD
08
Manual
take
PAGE 37 OF 70
S TA N D A R D R E P O R T S
This section lists the standard SAP reports required to support the process.
Report Name
Scoping Reference
Description
12.3.6
T.code : S_BCE_68001398
12.3.6
T.code :TBD
S_ALR_87013532 Plan/Actual/Variance
CJI4 Project Plan Cost Line Items
PAGE 38 OF 70
Report Name
Scoping Reference
Description
PAGE 39 OF 70
M A S T E R D ATA C O N S I D E R AT I O N S
This section deals with the master data design considerations. Any specific business input to the
master data design is captured within this section.
1 .1
MAS TE R DATA VE RS I O NS
Version in SAP is used to record various plan data. Version 0 is the standard version for which actuals
are recorded in SAP.
Versions for previous years and future years will be locked to avoid any posting of planned
data.
Before loading of planning data, the period will be unlocked for the respective year.
PAGE 40 OF 70
SAP DEVELOPMENT
The following sections describe the development work required to implement the processes described within this document. The required development may include
the following:
Change Requests are listed in section 2.2.2 for all the new developments not mentioned in the existing scope.
7. 1
SAP GAPS
L3
Process /
Step
Type
Priority
C/H/M/
L
Current
Scope (or)
New
No
Description of Gap
839
Modelling
841
840
Business Justification
PAGE 41 OF 70
7. 2
I N T E R FA C E D E V E L O P M E N T S
This section outlines the list of all interfaces for the process
No
L3
Process /
Step
System to /
from
Priority
C/H/M/L
Current
Scope
(or) New
01
ICE
12.3.6
ICE to SAP
Current
02
E@R
12.3.6
E@R to SAP
Current
03
SAP to ICE/E@R
12.3.6
Outbound
from SAP
Current
05
OCCAM
12.3.6
OCCAM
Spreadsheet
to SAP
Current
Business Justification
PAGE 42 OF 70
No
L3
Process /
Step
System to /
from
Priority
C/H/M/L
Current
Scope
(or) New
06
Retail Model
12.3.6
Retail Model
Spreadsheet
Current
07
Gas Model
12.3.6
Gas Model
Spreadsheet
Current
08
HFM (Hyperion)
12.3.6
SAP
Current
09
12.3.6
SAP
Current
SAP
Current
(from
Forms
section)
10
Other Income
Routine Opex
Contractor Recoveries
Meter lease
HR planning
Business Justification
PAGE 43 OF 70
7. 3
CONVERSIONS
This section outlines the list of all conversions for the process
Ref #
Data Object
Source System
Target System
Description
01
ECC SAP
Current
SKF
ECC SAP
Current
Forecast data by
period and version for
current year (for
October go-live this
would be July
October 2010)
This will need to be
loaded into SAP by
Revenue/Cost Element
and BS account)/Cost
Object/Profit Centre
Revenue Analysis
02
SKF
PAGE 44 OF 70
Ref #
Data Object
03
Strategic
Plan
Data
Source System
Target System
Description
Mozaic/ICE/E@R/Other
ECC SAP
Current
spreadsheets
PAGE 45 OF 70
7. 4
REPORT DEFINITIONS
This section outlines the list of all non-standard reports identified for this process for financial and non-financial data (SKF).
No
01
Report Name
and Description
Owner
Type
SAP Planning
templates
Management
Accounting
TBD
Format
Drill
Up/
Drill
Dow
n
Company
code
Fiscal Year
Period
Etc.
TBD
Parameters
/
Dimensions
Current
Scope
(or)
New
Audience
(1)
Sou
rce
NA
Business
Managers,
Accountant
s etc
TBD
Adhoc
/
month
ly
Current
Freq
Priority
(2)
02
Planning template
outputs
Management
Accounting
ABAP
Company
code
Fiscal Year
Period
Etc.
TBD
NA
Accountant
s/
Developme
nt and
Acquisition
Plan
ning
data
Adhoc
/
month
ly
Current
03
Planning
information
Management
Accounting
TBD
Company
code
Fiscal Year
Period
Etc.
ALV
NA
Business
Managers,
Accountant
s etc
Plan
ning
data
Adhoc
/
month
ly
Current
PAGE 46 OF 70
No
Report Name
and Description
Owner
Type
Parameters
/
Dimensions
Format
Drill
Up/
Drill
Dow
n
ALV
NA
Audience
(1)
Sou
rce
Business
Managers,
Accountant
s etc
Plan
ning
data
Freq
Current
Scope
(or)
New
Priority
(2)
Financial
Statements
Management
Accounting
TBD
or
Repor
t
Paint
er
Company
code
Fiscal Year
Period
Etc.
PAGE 47 OF 70
Adhoc
/
month
ly
Current
No
Report Name
and Description
Owner
Type
Parameters
/
Dimensions
Format
Drill
Up/
Drill
Dow
n
Audience
(1)
Sou
rce
Freq
Current
Scope
(or)
New
Priority
(2)
Capex planning
data
Management
Accounting
TBD
Capital Expenditure at
various consolidated and
detailed levels by period,
financial year and total cost,
e.g.
Total Capex
Total Growth Capex
Total Stay in Business
Capex
Total Generation Growth
Total Geothermal Growth
Total Geothermal Station
Development Growth
Total Tauhara
Tauhara Drilling programme
Meter Types
Company
code
Fiscal Year
Period
Etc.
ALV
NA
Business
Managers,
Accountant
s etc
Plan
ning
data
Adhoc
/
month
ly
Current
06
Management
Accounting
Repor
t
Paint
er
Company
code, Profit
centre, Cost
centre,
Fiscal Year
Period, Cost
Object
(dimension
available in
FAGLGLEX
TBD
Drill
down
Business
Managers,
Accountant
s etc
Actu
al
and
Plan
ning
data
Adhoc
/
month
ly
Current
planned
costs
broken
PAGE 48 OF 70
No
Report Name
and Description
Owner
Type
Parameters
/
Dimensions
Format
Drill
Up/
Drill
Dow
n
Audience
(1)
Sou
rce
Freq
Current
Scope
(or)
New
Priority
(2)
T)
Etc.
07
BI Detailed Actual
v Plan version
Management
Accounting
BI
BI
report
to
provide
object
(cost
centre,
08
Rolling forecast
report
Management
Accounting
BI
by
version
variable
combination
with
period/year
Company
code, Profit
centre, Cost
centre,
Fiscal Year
Period, Cost
Object
(dimension
to show
CC,WBS,IO)
, WBS type
(Capex/Ope
x)
Etc.
BI Query
Drill
down
Business
Managers,
Accountant
s etc
Actu
al
and
Plan
ning
data
Adhoc
/
month
ly
Current
Company
code, Profit
centre, Cost
centre,
Fiscal Year
Period,
Version Cost
Object
BI Query
Drill
down
Business
Managers,
Accountant
s etc
Actu
al
and
Plan
ning
data
Adhoc
/
month
ly
Current
PAGE 49 OF 70
No
09
Report Name
and Description
Owner
Type
Plan version
comparison
Management
Accounting
BI
This
report
is
to
show
(1)
(2)
Parameters
/
Dimensions
Company
code, Profit
centre, Cost
centre,
Fiscal Year
Period,
Version Cost
Object
Format
BI Query
Drill
Up/
Drill
Dow
n
Drill
down
Audience
(1)
Sou
rce
Business
Managers,
Accountant
s etc
Actu
al
and
Plan
ning
data
Freq
Adhoc
/
month
ly
Current
Scope
(or)
New
Current
Priority
(2)
PAGE 50 OF 70
7. 5
FORMS
This section identifies the Forms required to be printed from system to execute the process. Input forms may also be mentioned.
Ref. #
Current Scope
(or) New
Description
01
Current
Contact will use planning layouts with Integrated Excel functionality for exporting/uploading planned data to SAP.
The screen will be built up based on the planning parameters and will include the relevant planning layout. In
addition, some extra Excel preformatted forms to support upload of information using the same planning layout.
For Forecasts and the Rolling Forecast an interactive SAP planning layout with values loaded for relevant period
will be required. Values are populated based on the copying function of actuals, budgets (where applicable) and
previous forecasts.
It is important that SAP Planning Templates are developed in a format that budget/project managers can easily
populate, and the format is suitable for loading multiple cost objects (Cost centres, WBS, Internal orders) or Profit
centres plans into SAP.
PAGE 51 OF 70
Ref. #
Current Scope
(or) New
02
Current
Description
7. 6
WORKFLOWS
This section outlines the list of all workflows for the process
Name of the
Workflow
Name of the
Components/
Modules
Current
Scope (or)
New
Business Justification
SMT Budget
N/A
Current
Communication
(early warning)
Planning
N/A
Instructions
Current
N/A
Current
PAGE 52 OF 70
Name of the
Workflow
Name of the
Components/
Modules
Current
Scope (or)
New
Business Justification
Plan change
N/A
Current
N/A
Current
PAGE 53 OF 70
A U T H O R I Z AT I O N & R O LE S
This section provides a description of the roles associated with this process and activity. This will
provide inputs to the authorization roles and authorization matrix document which is to be prepared
during the realization phase.
Role Name
Role Description
Management
Existing
Accountant
Accountant
Existing
Existing
Accountant
Master data
maintainer
maintenance, etc
Master data
approver
New
New
New
data.
PAGE 54 OF 70
T E S T I N G C O N S I D E R AT I O N S
The following table describes key scenarios which are recommended to be included in testing,
including any specific risks or issues that should be given particular attention in testing. This list is not
intended to be exhaustive but rather be used as input into the testing phase to ensure key
considerations are adequately addressed as part of the identification and development of detailed test
cases
Role Name
Respective
Roles
Description of Testing
L3 Process /
Priority
Special
Requirement
Step
(C/H/M/L)
Instructions
12.3.6
Master data
should exist in
the system
Respective
Roles
12.3.6
Master data
should exist in
the system
Master data
maintainer
Version Maintenance
12.3.6
Master data
should exist in
the system
Allocation
Accountant
Distribution and
assessment cycles
Respective
Roles
12.3.6
Master data
should exist in
the system
Respective
Roles
12.3.6
Master data
should exist in
the system
PAGE 55 OF 70
10
C O N V E R S I O N I N I T I A L R U LE S
10 .1 S A P O B J E C T S O U R C E ( F R O M L E G A C Y )
Data object identification from legacy systems.
Object
Description
Budget data for 20102011 by period. This
will need to be loaded
into SAP by
Revenue/Cost Element
and BS account)/Cost
Object/Profit Centre
Amounts and SKF
Referencing
Mozaic/Exchequer/numerous spreadsheets,
e.g. revenue analysis
SAP
Mozaic /Exchequer/ICE/E@R/numerous
spreadsheets, e.g. revenue analysis
SAP
Forecast data
Forecast data by
period and version for
current year (for
October go-live this
would be July
SAP
Budget data
PAGE 56 OF 70
Object
Description
October 2010)
This will need to be
loaded into SAP by
Revenue/Cost Element
and BS account)/Cost
Object/Profit Centre
Referencing
10 .2 H I G H L E V E L D ATA R E Q U I R E M E N T S
Data requirements for the history and anticipated volumes.
Data
Data Components
Length of History
Budget data
Planning
Forecast data
Planning
Planning
Anticipated Volumes
PAGE 57 OF 70
10 .3 D ATA C L E A N S I N G R E Q U I R E M E N T S
Specific data cleansing requirements identified.
Data Object
Source System
Cleansing Requirements
TBD
10 .4 I N T E R I M P R O C E S S / C U T O V E R / D E P L O Y M E N T C O N S I D E R AT I O N S
Data or process considerations relating to interim processes required during cutover and or deployment.
Description of Impact
Anticipated duration
10 .5 A R C H I VA L R E Q U I R E M E N T S L E G A C Y S Y S T E M S
Data archival requirements as identified
PLANNING BUDGETING AND FORECASTING
PAGE 58 OF 70
Data Object
Source System
Archival Requirements
PAGE 59 OF 70
11
B AT C H R E Q U I R E M E N T S
Frequency
Information of task
Daily,
which requires
Weekly,
background
Monthly,
processing will be
etc,
Comments
(Required variants if known)
Schedule Manager
could be used as the
central repository for
Planning tasks.
PAGE 60 OF 70
12
F U T U R E C O N S I D E R AT I O N S
Details
At Finance wave go live the forecast/budget process requires the management
accountants to coordinate the planning process with their business units. In future
Contact would like to work towards a self-service model where budget holders will be
directly updating SAP via Excel planning (or other interface/tool) with the aim of reducing
complexity and minimizing time for completing the process. To do this additional training
and SAP Licence's will be required for self-service users
Is the budget/ forecast practical in terms of having to load data into all sub modules and
cost objects separately (for CC IO WBS Rev BS). To reduce complexity and minimize
time Contact will need a customized front end or interface so budget/project managers
can easily load their budgets/forecasts into SAP against multiple cost objects
Is a SAP based Planning tool required for this?
BI-IP Planning functionality will not be implemented in the Finance wave at Contact as
per the Level 3 Scoping workshops.
PAGE 61 OF 70
13
OPEN ISSUES
This section contains all the Open Issues from the Programme Issues Register related to this process.
Including a history of closed issues, not recorded as key decisions, if required.
Issue
No
1
Name Description
Notes
PAGE 62 OF 70
Issue
No
4
Name Description
Notes
PAGE 63 OF 70
14
APPENDIX
1 4. 1 C O N V E N T I O N S U S E D
The process design is supported by a process flow chart. The following diagram depicts the flow chart
conventions for the BPD process flow chart:
The diagrams of ARIS models show the relationships between objects depicted by their symbols.
Objects are representations of the real world entities (e.g. tasks, organisations, roles, etc.) that need to
be modelled and analysed.
Object
Symbol
Relationship
Connection
Occurrence
Attributes
Properties
O
r..
The following symbols would be used to create the process models in ARIS:
Carriesout&Supports
EVENT
Event
ports
PAGE 64 OF 70
ARIS Events represent the changing state of the world as a process proceeds:
Although events appear in the ARIS swim-lanes, but they are independent of the Positions, based on
O
r..
Carriesout&Supports
FUNCTION
M
anualFunction
SAPfunction
ARIS Functions represent the activities or tasks carried out as part of a business process; ideally with
each one adding some value to the business. Functions may be carried out by people or by IT
systems. They have inputs (information or material), create outputs (different information or a product)
Carriesout&Supports
Functions have a direct relationship with the Positions corresponding to the swim lanes where they lie.
PROCESS INTERFACE
Carriesout&Supports
Processinterface
Process interface object is used to give a visual indication of the connecting models. The name of the
process interface object is the name of a process, to which the hand-off is given/ coming from.
Although process interface object appears in the ARIS swim-lanes, but it is independent of the
riesout&Supports
PAGE 65 OF 70
SAPvalue-addedchain
SAPvalue-addedchain
Value Added Functions are high level functions used to describe the abstraction of the
detailed process view. A value adding chain will give the highest level view of the end-to-end
process. Value Added Function is used to describe the different levels in the processes. This can
be further broken down to any level based on the process complexity.
Typically a Value Added Function will be a part of Value Added Chain Diagram (VACD) and
will be used to depict Level 1 and Level 2 processes
POSITION
Position
In ARIS models, swim lanes are identified based on the Positions. All functions lying in a particular
swim lane identified by a position are under the responsibility of the particular person holding that
position.
There may be multiple people, holding the same position example Buyer.
One person may hold two different positions, under different circumstances example a single
person can be Requestor at one point in time and Requisitioner at the other point.
Orguannitizty
atipo
enal
PAGE 66 OF 70
FLOW OPERATORS
XORRule
When used as an input, only one of the preceding paths can trigger the following function at a
time.
ANDRule
When used as an input, all of the preceding input paths must be completed to before the next
function can commence.
When used after an object, there are two more possible outcomes from input path and all of
the outcomes must exist based in any business scenario.
ORRule
When used as an input, one or all of the preceding paths can trigger the following function.
When used as an output, one or all of the number of exit routes can be followed.
CONNECTOR
Connectors demonstrate the transfer of data or the flow of a process , generally left to right or
top to bottom
1 4. 2 G L O S S A RY
Refer to ET glossary of terms: ET Glossary
Terminology/ Acronym
Description
SAP
Company Code
PAGE 67 OF 70
Terminology/ Acronym
Description
complete self-contained set of accounts can be drawn up for
purposes of external reporting.
This includes recording of all relevant transactions and generating all
supporting documents required for financial statements.
GL
Document Type
Posting date
Document date
Period
Fiscal year
Transaction Code
Currency
Posting key
A two-digit numerical key that determines the way line items are
posted. This key determines several factors including the:
Account type
PAGE 68 OF 70
Terminology/ Acronym
Description
Interface
Workflow
Account Type
Asset accounts
Customer accounts
Vendor accounts
G/L accounts
PAGE 69 OF 70
Country
Bank Key
Bank
Key
Terminology/ Acronym
Description
Cost Centre
Profit centre
Functional requirements
Allocation criteria
Physical location
An organizational unit in Accounting that reflects a managementoriented structure of the organization for the purpose of internal
control. Operating results for profit centers can be analyzed using
either the cost of sales approach or the period accounting approach.
By analyzing the fixed capital as well, you can expand your profit
centers for use as investment centers.
Program
ABAP
Dump Analysis
Transport
The import process reads objects from the data file and
writes them to the database of the target system.
PAGE 70 OF 70