You are on page 1of 70

CONTACT ENERGY

E N T E RP R I S E T R A N S FO R M AT I O N P R O G R A M M E

Business Process Design Document


12.3.6 Planning Budgeting and Forecasting

Version 0.11.0

February 26th 2010


Author: Terry Baker / Vinod Shekhapuram
Owner: ET-PMO

DOCUMENT MANAGEMENT

DOCUM E NT LOCATI O N

This document is stored in << BPDD Planning Budgeting & Forecasting>>


Paper copies of this document are valid only on the day they are printed. Refer to the author if you are in any
doubt about the currency of this document.

REVISION HISTORY

Changes
Marked?

Version

Date

Author

Change Description

0.1

10/02/201
0

Vinod Shekhapuram

1st Draft

0.2

26/02/201
0

Vinod Shekhapuram

Updated for walkthrough and approval


workshop

1.0

26/02/201
0

Vinod Shekhapuram

Approved

AS S OCI ATE D DOCUM E NT ( S )

Following documents need to be read in conjunction with this document


Document Name

Version No.

Version Date

Document Location

L3 12.2.6 Planning
Budgeting and
Forecasting

Scope Document

ET Workshop Minutes
Planning Budgeting and
Forecasting

Minutes Document

QUALITY REVIEW

This document has been reviewed for quality by the following personnel.
Name

Function

Sachin Kamat

Peer review

Subin Rajasekaran

ET-PMO

Chris Anderson

Quality

PLANNING BUDGETING AND FORECASTING

Date of approval

PAGE 2 OF 70

A P P R O VA L S

This document has been approved by the following people. Signed approval forms are filed in Quality section of
the Project Control Book.
Name

Function

Geoff Walker

Business Representative

Chandra Yee

Business Process Owner

Date of approval

Signature

DISTRIBUTION

This document has been distributed to:

PLANNING BUDGETING AND FORECASTING

PAGE 3 OF 70

TA B L E O F C O N T E N T S

Name

Function

Chandra Yee

Finance Mgr Group Performance

Jennie Thompson

ET Delivery Lead Finance

Matt Bolton

Financial Accounting Manager

Jessie Xuan

Snr Grp Performance Accountant

Wendy Ainsworth

Retail Finance Manager

Glen Cattermole

Finance Mgr Generation

Nicole Smith

Snr Strategic Analyst

Andrew Hutchinson

Finance Mgr Operations

2.1..................Vision and Business


Objectives.............................................

Mike Robertson

Gen Ops Accounting Manager

2.2................... Benefits Realisation


..............................................................

Sadanand Shenoy

BI Developer

Geoff Walker

Management Accountant

Jo Broad

LPG Finance Manager

Simon Healy

Corporate Finance Manager

3......................... KEY DECISIONS AND


ASSUMPTIONS.............................................

Nigel Thompson

Financial Controller

4.................... FUTURE STATE PROCESS


.......................................................................

Clinton Jenkins

ET Business Representative

Jonathan Holmes

ET Business Lead Finance

Adrian Simnett

ET Solution Delivery Mgr Finance

Chris Anderson

ET Quality Assurance

David Clegg

ET Change Management

Pat McKeefry

ET Data Management

Marien de Wilde

ET Solution Architect

Andrew Christian

ET Technical

Andrew Greally

ET Solution Delivery Mgr Generation / PMO

Gary Robinson

ET Business Lead Generation

Tracey Boyes

Audit and Assurance

1................................ INTRODUCTION
.........................................................................
1.1.................... Document Purpose
..............................................................
1.2...................Document Structure
..............................................................
2...........................................
.........................................................................

2.3.............Summary of workstream
scope....................................................
2.4........................ Non Functional
requirements.........................................

4.1............................ Introduction
............................................................
4.2............... Process Flow Details
BUDGETING......................................
4.3............... Process Flow Details
FORECASTING..................................
4.4............... Process Flow Details
VERSION maintenance......................
5......................... STANDARD REPORTS
.......................................................................
6...........MASTER DATA CONSIDERATIONS
.......................................................................
6.1..................... M a s t e r D a t a
V E R S I O N S ......................................
7........................... SAP DEVELOPMENT
.......................................................................
7.1.............................. sAP Gaps
............................................................

7.2

Interface Developments.................................................................................................................................

7.3

Conversions...................................................................................................................................................

7.4

Report Definitions...........................................................................................................................................

7.5

Forms.............................................................................................................................................................

7.6

Workflows.......................................................................................................................................................

AUTHORIZATION & ROLES.....................................................................................................................................

TESTING CONSIDERATIONS..................................................................................................................................

10

CONVERSION INITIAL RULES................................................................................................................................

PLANNING BUDGETING AND FORECASTING

PAGE 4 OF 70

10.1

SAP Object Source (From Legacy)................................................................................................................

10.2

High Level Data Requirements......................................................................................................................

10.3

Data Cleansing Requirements.......................................................................................................................

10.4

Interim Process/cutover/deployment Considerations.....................................................................................

10.5

Archival Requirements Legacy Systems.....................................................................................................

11

BATCH REQUIREMENTS.........................................................................................................................................

12

FUTURE CONSIDERATIONS...................................................................................................................................

13

OPEN ISSUES..........................................................................................................................................................

14

APPENDIX................................................................................................................................................................
14.1

Conventions Used..........................................................................................................................................

14.2

Glossary.........................................................................................................................................................

PLANNING BUDGETING AND FORECASTING

PAGE 5 OF 70

INTRODUCTION

1 .1

DOCUMENT PURPOSE

This blueprint document is a result of the discussion between Contact business and ET project team. The
document encompasses the business process flow and the design requirements for the specific L3
processes as per the ET scope documents. This document will be used as the basis for the solution
delivered for the future state process
The blueprint document serves as a central repository for the end to end business process flows which
reflect project scope. The document will be used as a baseline for the following future project activities:

SAP solution configuration design

SAP technical developments including Reports, Interfaces, Data management activities, System
enhancements, Forms and Workflows

Creation of business process testing suite for system integration testing

Creation of end user training material including business process procedures and steps

Change management planning and execution

Future business process improvements

1 .2

DOCUMENT STRUCTURE

Sections in this document are structured as follows:


Section

Section Heading

Section Content

Process Scope

Summary of Scope & Exceptions

Key Decisions

Future State Process Identification

Standard Reports

Master Data Considerations

SAP development

Number

PLANNING BUDGETING AND FORECASTING

Key Decisions identified for the Future


State Process
Future State Process diagram and details
along with SAP Transaction codes
Standard SAP reports identified that will be
used within the process
Master data considerations required for
Future State Process
SAP Gaps, Interface, Conversions ,
Reporting, Forms, Workflows

PAGE 6 OF 70

Section

Section Heading

Section Content

Authorizations and User Roles

Details of User roles/ Authorization matrix.

Testing Considerations

10

Conversion Considerations

11

Batch requirements

12

Future Considerations

13

Open Issues

14

Appendices

Number

PLANNING BUDGETING AND FORECASTING

Details of Key Scenarios recommended for


testing
Details of SAP Opening balance data
conversion considerations
Details of Batch jobs requirements with
frequency
Details of all future considerations for the
Process
List of Scoping issues
Contains conventions and glossary to
terms.

PAGE 7 OF 70

SCOPE

2 .1

VISION AND BUSINESS OBJECTIVES

The vision for Finance is: To be a highly valued partner providing financial expertise, supporting the business
to make effective business decisions and achieve outstanding results.
The associated Strategic Drivers to realise this Vision are:

Standardised, simplified and automated operation / improved decision making


Increase adaptability and decrease the effort spent on transactional processing, moving the focus to
decision support activities.

Financial management of projects


Reduce the level of project financial management supported by spreadsheets and the number of manual
workarounds in place to meet core reporting requirements.
Provide a standardised practice across Contact and enable portfolio-level views of resources and
investment that will drive more effective prioritisation decisions and improved monitoring.

Strategic approach to procurement


Introduce a procurement capability underpinned by enforceable standard practices, company-wide
reporting and creates a platform to establish, manage, monitor and measure suppliers according to
strategic importance in the long term.

Embedding financial discipline in the organisation


Replace manual internal controls that often both inhibit efficiency and have internal audit report items
raised.

2 .2

B E N E F I T S R E A L I S AT I O N

The following table presents the benefits identified and quantified within the programme benefits case that
pertain to the process covered within this blueprint document and evaluates the contribution thereof to the
achievement of these benefits.
Benefit

Benefit Description

Reference

BPDD

Comments (if any)

Consistent
with Target
Improvement?
(Y/N)

FIN 1.1 & 1.2

Streamlined Financial

Budget and plan information

Operation & Business

held within SAP which will

Productivity

enable streamlined reporting


activity.

PLANNING BUDGETING AND FORECASTING

PAGE 8 OF 70

Benefit

Benefit Description

Reference

BPDD

Comments (if any)

Consistent
with Target
Improvement?
(Y/N)

FIN 3.1 & 3.2

Recruitment, Training Costs

and new staff efficiency

Budget and plan information


held within SAP which will
enable streamlined reporting
activity.

S U M M A RY O F W O R K S T R E A M S C O P E

2 .3

2 .3 . 1

P RO CES S S COP E

The following table outlines the processes included in 12.3.6 Planning Budgeting & Forecasting as per the
ET Program Scope documents
Level 1

Level 2

Level 3

12.0 Financials

12.3 Management Accounting

12.3.6 Planning Budgeting and


Forecasting

2 .3 . 2

P RO CES S S COP E EX CE P TIO NS

The following table outlines the exceptions identified from the confirmed and agreed ET Program Scope
documents for 12.3.6 Planning Budgeting and Forecasting, supported by Programme Change Control
procedure.
CR #

Exception description

Resolution details

Workflow - SMT Budget Communication

De-scoped - Will be done manually

(early warning)

(outside system). Phase 1 has no Budget


co-ordination tool.

Workflow - Planning Instructions

De-scoped - Will be done manually


(outside system). Phase 1 has no Budget
co-ordination tool.

PLANNING BUDGETING AND FORECASTING

PAGE 9 OF 70

CR #

Exception description

Resolution details

Workflow - plan data requires approval

De-scoped - Will be done manually


(outside system). Phase 1 has no Budget
co-ordination tool.

Workflow - Plan change

De-scoped - Will be done manually


(outside system). Phase 1 has no Budget
co-ordination tool.

Workflow - Plan approved

De-scoped - Will be done manually


(outside system). Phase 1 has no Budget
co-ordination tool.

2 .4

NON FUNCTIONAL REQUIREMENTS

The following table outlines the key non-functional requirements identified for the ET Program Scope.

Non functional parameters

Description

Scalability

Provision built to accommodate specified database growth without


the need for re-design and encompasses master and transactional
data with minimum retention period for key data objects.

Usability

Meets the requirements for system accessibility, user authentication,


intuitive transaction flows, customisable and textual error messaging,
usability of mobile services etc.

Supportability

All software components and versions in use will be certified as per


Product Availability Matrices and retained at current maintenance
levels

Auditing

Provides ability to fulfil specified transaction auditing

Archiving

Provides ability to archive business transactions based on set criteria

Security

Provides secure and controlled access to data by employing role


based authentication and secure access control

PLANNING BUDGETING AND FORECASTING

PAGE 10 OF 70

Non functional parameters

Description

Performance

Provides pre-defined

Transaction and Screen response times

Transaction and volume through put

Batch processing with-in operational windows

PLANNING BUDGETING AND FORECASTING

PAGE 11 OF 70

KEY DECISIONS AND ASSUMPTIONS

This section records the key decisions made during and post the design workshops. Including any
assumptions made that support these decisions. Should any deviations from the standard SAP processes
be proposed, the reasons supporting these decisions should be contained within this section.
Number Decision / Assumption Details
01

BI-IP Planning functionality will not be implemented in the Finance wave at Contact as
per the Level 3 Scoping workshops.

In future consideration may be given to

implementing a SAP planning tool, e.g. BPO


02

At Contact SAP will be the central repository for Plan data. The Strategic Plan (five
years), Budget and Forecast will be loaded to SAP. Note that access to the Strat Plan
will be restricted.

03

The Strategic Plan will be updated every financial year. This will be stored as a new
version per financial year. Current year plus 5 years forward need to be open for input.

04

Multiple plan versions will be used Budget/Forecast per cycle. Forecast versions will be
retained in SAP per month. These are outlined in Section 4.2.1 and Section 4.3.1

05

The Strategic Plan and Budget versions, as per Section 4.2.1, will be maintained for
Origin Submissions and are for Central Finance purposes only, i.e. tags B, C and D.
The business units will populate versions A, E and F only.

06

Rolling forecasts, i.e. a forecast spans more than 1 financial year, are to be supported
in SAP for input/output of plan data and reporting.

PLANNING BUDGETING AND FORECASTING

PAGE 12 OF 70

Number Decision / Assumption Details


07

In Contact, Planning data will be input in the following areas of SAP


Costs

Controlling (CO) for Cost Centre (CC) and Internal orders (IO)

Project Systems (PS) for WBS (Work Breakdown Structure Element) including project OPEX.

Note that the recommended approach by SAP /

Wipro is that Project Opex is not settled to Cost Centres, but will be available
for reporting at a Cost Centre level in FI / New GL.
Revenue

FI (Using New GL to plan against Profit Centres)

Balance sheet items

FI (Using New GL to plan against Profit Centres)

The FI New GL (cost centre/profit centre) view will hold all the integrated planning data
(distinguishing between cost centre / non cost centre costs) for high level aggregated
actual v plan reporting and variance analysis. Non cost centre costs will be a
summation of Projects and internal orders which are populated with a profit centre
Custom BI reports will provide a detailed view of actual v planned costs broken down
into detail by cost element/ cost object (cost centre, WBS, IO) and WBS type
(Capex/Opex). The requirement for this reporting is captured in section 7.4, and is also
a requirement in the Reporting BPDD. This report will need to be available on a timely
basis from BI (ideally real time) to support tight deadlines in planning cycles.
Note: Cost centre to profit centre will be mapped 1:1 at Contact refer Profit centre
BPDD.
The process described above is recommended process by SAP/Wipro with the
introduction of SAP New GL functionality. Projects with Opex costs will be locked so no
further postings to them will be allowed after completion of the project. The overall
process will be subject to BPDD safeguard review which will consider SAP standard
practice and integrated processes.
08

Integrated solution design will need to support Capex and Opex Recoveries. E.g. At
Contact all Contractors costs are charged to Opex (this is Contact policy).

The

corresponding Recovery to Opex will be posted when the project is on-charged using a
Capex WBS
Integrated solution also needs to support revenue, e.g. Sundry income from Retail
Meter Rent will be posted against a Profit Centre revenue element, and the
corresponding costs of this service will be against a Cost Centre cost element in SAP.
Some of these may also need to be used in combination with WBS elements.

PLANNING BUDGETING AND FORECASTING

PAGE 13 OF 70

Number Decision / Assumption Details


09

Integrated planning will be default active for Internal Order & WBS element at a master
data level

10

Integrated planning will be activated in configuration for all CO & FI Planning in order to
flow plan data from CO to FI

11

Plan data from other source systems such as the Retail Model, Gas Model, ICE, E@R
etc. will be used as an input into Budgets, Forecasts and the Strat Plan and will be
required to be uploaded /interfaced into SAP. Refer Section 7.2.

12

Plan data for Budget, Forecasts and Strat Plan loaded into SAP will need to be output
for uploading/interfacing into ICE/E@R models.

13

Data from external systems e.g. ICE, E@R, etc., will need to be at the business unit
level of detail (revenue/cost element and cost object e.g. Cost centre / Profit centre) to
be uploaded to SAP. Contact will need to establish the appropriate business unit level of
detail (profit centre group) for balance sheet and profit and loss items required for

budgets/forecasts.
14

Contact will use Excel upload functionality for uploading or changing the plan data via
SAP Planning Templates.
It is important that SAP Planning Templates are developed in a format that
budget/project managers can easily populate, and the format is suitable for loading
multiple cost objects (cost centres, WBS, Internal orders) or profit centres plans into
SAP. Refer Forms section. Templates will also be required for the uploading of SKF
data.

15

The following types of budget preparation will be undertaken:


a.

The Strategic Plan will be zero-based.

b.

The Budget will be zero-based, however if the Strategic Plan is to be used as


the starting point for the Budget then year 1 of the Strategic Plan will become
the Budget.

c.

The Forecast will reflect monthly actuals and the forecast for the subsequent
months, i.e. the first forecast (usually in August) will be based on the month 1
actuals plus budget for the remaining months. For subsequent months the
forecast will be based on actuals for the preceding months, and the previous
month forecast for the remaining months. There is no forecast undertaken in
both the first and last months of the financial year.

d.

By month/cycle, there will be a separate Forecast version retained in SAP

PLANNING BUDGETING AND FORECASTING

PAGE 14 OF 70

Number Decision / Assumption Details


16

Version control will need to be centrally managed by Contact to coordinate locking and
copying of versions. The use of the global variable to assist the end-user in selecting
the correct version is recommended.

17

Contact will ensure that versions are empty before loading any plan data.

18

Contact will use NZD for the planning currency. In future consideration should be given
to incorporating foreign currencies, i.e. USD, AUD, etc.

19

Plan data will include planning for Statistical Key figures.

20

Planning Distribution keys required for Contact are equal distribution (divided by12),
calendar days working days. Note that phasing can be done manually. Customer
numbers may also be used for distributing planned amounts and if so this will be loaded
as a planned SKF. Further distribution keys may be identified during realisation phase.

21

Co-dependent processes have been identified as:


o

Profit Centres

Cost Centres/Internal orders

Transfer Pricing

Profitability Accounting

G/L and accrual accounting

Projects

Reporting (Board and Ownership, Financial Analytics, BI)

Investment Management (includes depreciation)

Plant Maintenance (Generation go-live)

Finalisation of these co-dependent BPDDs may impact on this document.


22

Capex plans will be loaded by individual Project and the appropriate WBS level for each
project. Capex reports will be available at a project level (at an input/project costs view).
In SAP The split of Stay in Business v Growth will be available at a project level.

Note: Cash Capex planning will be done outside of SAP. In future this will need to be
considered within a planning tool. Refer Reporting BPDD for Cash Capex actuals.
Note: In future non project direct asset purchases will be planned against a cost centre
or an internal order.

PLANNING BUDGETING AND FORECASTING

PAGE 15 OF 70

Number Decision / Assumption Details


23

Integrations workshops/Deployment strategy will need to consider impact of planning


objects required for Generation (Projects, Internal orders). Note that Internal Orders
could be used to plan for Maintenance costs until Generation is implemented in SAP.

24

The organization units described in this document are provisional and are subject to
change. The final SAP enterprise structure will be designed and presented in a
separate document after completion of all blueprint workshops

25

Process for Assessments and Distribution detailed in Cost centre BPDD can also be
executed for plan data.

PLANNING BUDGETING AND FORECASTING

PAGE 16 OF 70

F U T U R E S TAT E P R O C E S S

INTRODUCTION

4 .1

The purpose of the Planning process is to:

Develop financial targets that are aligned with the strategic goals of the organisation

Establish clear ownership and accountability for achieving targets and objectives

Provide transparency of the resources that the organisation will require in the upcoming period.

Allow prioritisation of competing objectives.

On-going monitoring of progress towards achieving the financial targets

Embed best business practices in the planning process.

The Planning process includes both the full year budget/target setting process and the monthly/quarterly reforecasting process.
The planning, budgeting and forecasting process includes the following:

Establish Planning Strategy

Setup Planning Templates

Start Planning Round

Process Planning Round until there is an approved plan version

Each of these is discussed in more detail below.


1.

Establish Planning Strategy


Assumption that the Strategic Plan has been approved.

2.

Define the planning cycles that will be implemented for Contact;

Strategic Plan

Annual Budget

Monthly Forecasting

Rolling Forecast

Define planning approach for planning cycles;

Top Down / Bottom Up

Level of Detail

Define Timetable

Key Underlying Assumptions (linked to the Strategic Plan)

Communicate to participants;

Roles and Responsibilities

Planning Approach

Business Plan commentary required to support budget request.

Setup Planning Templates


Create standard templates for capturing planning data to support;

Strategic Plan

PLANNING BUDGETING AND FORECASTING

PAGE 17 OF 70

3.

Budgets

Forecasts (Monthly)

Rolling Forecasts

Templates to include if applicable;

Actual Data in forecast versions

Statistical Data i.e. FTEs for Payroll Costs

Define standard templates to support;

Balance Sheet Accounts

Profit and Loss Accounts

Revenue and Cost of Goods Sold

Overhead expense

Plant Maintenance

Start Planning Round

4.

Define appropriate receivers of planning templates;

Cost Centre Managers

Business Unit Analysts

Management Accountants, etc

Process Planning Round until there is an approved plan version

Receive templates back

Upload formatted template files into relevant individual SAP Modules General Ledger
(Including Profit Centre Accounting)

Cost Centre Accounting (Overhead)

4 .1 . 1

Cost Centre Accounting (Plant Maintenance)

Capital Budgets (Project Systems / Investment Management)

Balance Sheet & Revenue (FI Planning)

Review information (Segmented and Consolidated Information Level)

Publish report for review and approval by relevant Manager, e.g.

Cost Centre Manager

Project Manager

Management Accountant

Profit Centre Manager

General Manager

Update/adjust for iterations as required, e.g. following GM review of Business Area

Produce consolidated information for SMT discussion and approval.

Update/adjust for iterations as required (including application of stretch).

O VE RV I E W

Level 2 (Business Scenario) - 12.3 Management Accounting


There are 4 business scenarios within the Financial Mega Process. This document covers Financial

PLANNING BUDGETING AND FORECASTING

PAGE 18 OF 70

12.Financials

12.1FSC
(inacsluC
&M
Tre
rya)shMgmt

12.2FinancialAccounting

12.3ManagementAccounting

12.4FinancialAnalytics

Accounting and the L3 process Planning Budgeting & Forecasting (12.3.6 Planning Budgeting and
Forecasting)

The following Level 4 activities and sub-processes are found within the process Planning Budgeting &
Forecasting and covered in detail within this document,

Budgeting

Forecasting

Master Data

4 .1 . 2

Version Maintenance

FUNCTI O NALI TY O F S AP FI & CO P LANNI NG

Key Concepts in SAP Planning


Planning Version Versions enable you to have independent sets of planning data e.g. Budget, Forecast
Integrated Planning By aactivating integrated planning with FI New General Ledger the system

automatically transfers planning data for Internal orders, Cost Centre Accounting, WBS, etc to the
New GL in FI and against Profit Centres
Planning Period Lock Planning periods can be locked in order to avoid entry into the approved planned
data.
Planning Version Lock - Planning versions can be locked to prevent changing or creating plan data
Other planning features:

PLANNING BUDGETING AND FORECASTING

PAGE 19 OF 70

Plan data can be copied from one version to another version.

Actual data can be easily converted as plan data for next year planning.

Planning data can be modified easily using excel online.

Standard SAP functionality for uploading planning files in FI & CO.

All planning files can be easily uploaded using single transaction code.

Standard reports available in SAP to report the Actual vs Plan data.

Company specific reports can be developed in SAP/BI system.

Controlling (CO) Planning/ Project Systems (PS) Planning


In SAP, we can plan on various cost objects for each cost element e.g. Cost Centre, Activity Type, SKF
(Statistical Key Figure), Project or WBS Element, Internal Order, etc to compare actual versus plan for
variance analysis

Versions defined to CO are also defined in FI for flow of plan data from CO to FI.

Planning templates are used for creating or uploading plan data for each object.

Cost Centre Planning

Cost centre planning consists of the following areas:

Planning of activity quantities and/or prices


Planning of costs expected to be incurred

Planning statistical key figures, which are used as the basis for the allocation of costs

Internal Order Planning

Using internal order planning, we can compare plan and actual costs, and carry out variance
analysis.
WBS Planning
Cost planning deals with the costs you expect to incur in connection with your project as it is executed.
FI New GL Planning (profit Centres)
Balance Sheet & Revenue accounts are planned in FI New GL against Profit Centres.

Using Integrated Planning, the costs from the CO module are transferred to FI New GL providing a full view
of the plan by Profit Centre

PLANNING BUDGETING AND FORECASTING

PAGE 20 OF 70

Key Considerations for Contact

In Contact, Planning data will be input in the following areas of SAP


Costs

Controlling (CO) for Cost Centre (CC) and Internal orders (IO)

Project Systems (PS) for WBS (Work Breakdown Structure Element) - including project OPEX.
Note that the recommended approach by SAP / Wipro is that Project Opex is not settled to Cost
Centres, but will be available for reporting at a Cost Centre level in FI / New GL.

Revenue

FI (Using New GL to plan against Profit Centres)

Balance sheet items

FI (Using New GL to plan against Profit Centres)

Standard reporting is available in each of these areas to look specifically at planned costs against e.g. cost
centre and projects

The FI New GL (cost centre/profit centre) view will hold all the integrated planning data (distinguishing
between cost centre / non cost centre costs) for high level aggregated actual v plan reporting and variance
analysis. Non cost centre costs will be a summation of Projects and internal orders which are populated with
a profit centre
Note: Cost centre to profit centre will be mapped 1:1 at Contact refer Profit centre BPDD.

Custom BI reporting will provide a detailed view of actual v planned revenue and costs broken down into
detail by profit centre, cost element/ cost object (cost centre, WBS, IO,) and WBS type (Capex/Opex). The
requirement for this reporting is captured in section 7.4, and is also a requirement in the Reporting BPDD.
Report s in BI used for budgeting and forecasting will need to be available on a timely basis from BI (ideally
real time) to support tight deadlines in planning cycles. Changes in the planned data will need to made at the
source module and integrated back through to BI to finalise.
The process described above is recommended process by SAP/Wipro with the introduction of SAP New GL
functionality. For projects a structure will be set up with WBS type to post to either a WBS Opex or Capex.
Opex Costs in projects will not settle to a cost centre but on project completion will be locked so no further
postings to them will be allowed. The overall process will be subject to BPDD safeguard review which will
consider SAP standard practice and integrated processes
The design will also need to support Recoveries. E.g. at Contact all Contractors costs are charged to Opex
(this is Contact policy). The corresponding Recovery to Opex will be posted when the project is on-charged
using a Capex WBS

PLANNING BUDGETING AND FORECASTING

PAGE 21 OF 70

Integrated solution also needs to support revenue, e.g. Sundry income from Retail Meter Rent will be posted
against a Profit Centre revenue element, and the corresponding costs of this service will be against a Cost
Centre cost element in SAP.For a net result of these Recoveries e.g. Retail meter leases, Land recoveries,
planned costs will also be posted against the Profit centre via integrated planning to show the overall result

P R O C E S S F L O W D E TA I L S B U D G E T I N G

4 .2

4 .2 . 1

P RO CES S OV E RV I E W

The current budgeting process commences around February each year, with business units using budgeting
tool such as ICE and Excel spreadsheet models to bring together plan and actual information at an
appropriate level for initial business unit management review.
Plans are usually submitted in this process to cover a 1 year time period and phased monthly to ultimately
become the new annual budget.
In Contact, plan data for costs is loaded in Controlling module and Balance sheet and Revenue accounts are
planned in FI module against profit centres.
The objects for planning in Controlling are a combination of Cost Centre/Cost Element, Internal Order/Cost
Element & WBS Element/Cost Element.
The objects for planning in FI are a combination of Balance Sheet account/Profit centre & Revenue Element /
Profit Centre.

The source of budgeting data is from

OCCAM (Optimisation tool based on hydrology)

Retail Model spreadsheet

Gas Model spreadsheet

Capex and Depreciation spreadsheet

Other income spreadsheet

Routine Opex / Contractor Recoveries, meter lease spreadsheets

LPG Gross Margin spreadsheet

Other source

The planning data in the source systems are created in SAP upload format and are uploaded manually into
SAP system using standard Excel upload functionality.

PLANNING BUDGETING AND FORECASTING

PAGE 22 OF 70

The following versions and planning stages have been identified for the Budgeting process
Tag

Name

Version

Starting Point / Accounting Adjustment (can include ICE)

A00

Origin Submission 1

B00

Origin Submission 2

C00

Origin Submission 3

D00

Accountant Re-allocation / Leadership team adjustments

E00

Final Budget

F00

Note that the Origin Submissions are for Central Finance purposes only, i.e. tags B, C and D. The business
units will populate versions A, E and F only.
Versions naming convention is shown above as a starting point but may change during realisation phase to
provide more logic or consistency in the budget/forecast planning cycle
Refer List of Draft Planning versions

High level future state process of Budgeting in Contact -

For finance year 2010-2011, the budgeting data will be already completed before SAP go-live;
hence this data will be mapped and migrated into SAP system.

From next financial year onwards, budgeting process will be undertaken in SAP system.

In SAP, finalised budgets will be locked for all budgeting versions.

As a starting point, the budget data from the source is uploaded into SAP in version A00.

Accountant Adjustments are made in A00

After accountant adjustment plan data is copied to B00 for Origin submission

C00 and D00 are also maintained for the subsequent Origin submissions

Version E00 is used to post the high level Leadership team adjustments which are then allocated by
the Accountant across the business unit. After all the adjustments are made and approved by the
respective business, the budget data is copied to the final version F00.

Budget data is loaded into SAP and phased for 12 periods (months).

The plan data is automatically updated to profit centres through the respective objects in CO.

Actual vs Plan reports are generated using the version F00.

The complete budgeting process is captured in ARIS process diagram.

PLANNING BUDGETING AND FORECASTING

PAGE 23 OF 70

Contact' Current Budgeting Process

PLANNING BUDGETING AND FORECASTING

PAGE 24 OF 70

4. 2 .2

P RO CE S S FLO W DI AG RAM BUDG E TI NG

Refer to appendix for conventions of flow charts

Note: The ARIS process diagram covers the steps to be followed for processing of Budgeting , however relevant manual steps has been incorporated in order to show
the process. Link to the ARIS Document: ARIS Diagram
Link to Microsoft Visio Diagram
PLANNING BUDGETING AND FORECASTING

PAGE 25 OF 70

4 .2 . 3

P RO CES S S TE P S BUDG E TI NG

Process
Step Ref.
01

Process Step

SAP T-Code

Process Step Description

Open relevant posting


periods for Planning
input in FI & CO

T. code : OKP1
(CO Planning)

Open the respective plan periods in


FI & CO

02

Check whether the


budgeting version is
maintained in SAP for
new financial year and
integrated planning is
active

T. code : TBD

Check whether the integrated


planning is active for respective
budget version and financial year is
maintained for the respective budget
version

03

Maintain version for


the financial year and
active
integrated
planning

T. code : TBD

Maintain the version for the


budgeting
financial
year
and
activate the integrated planning in FI
& CO if it is not maintained.

04

Check whether to
copy strategic plan
year 1 into version
A00

T. code : TBD

Check whether there is need to


copy the strategic plan year 1 data
into version A00 as starting point for
budgeting

05

Copy strategic plan


year 1 into budget
version A00

T.Code : TBD

Copy the strategic plan year 1 data


into budget version A00 as starting
point

06

Check whether to
upload budget data
from any of the
sources

Manual

Check whether there is need to


upload budget data from any of the
source like OCCAM, Retail Model,
Gas Model, etc.

07

Upload Budget data


(excel spreadsheets)
in to SAP version A00
along with Accounting
Adjustments
(Costs budget into
CO)

T.Code : TBD

Upload
Budget
data
(excel
spreadsheets) in to SAP version
A00
along
with
Accounting
Adjustments using the standard
SAP excel upload functionality.
(Costs budget into CO)

T. code : OB52
(FI Planning)

The upload files are already created


in SAP template format

PLANNING BUDGETING AND FORECASTING

PAGE 26 OF 70

Process
Step Ref.
08

Process Step

SAP T-Code

Process Step Description

Upload Budget data


(excel spreadsheets)
in to SAP A00 along
with
Accounting
Adjustments
(Balance
Sheet
/
Revenue budget into
FI)

T.Code : TBD

Upload
Budget
data
(excel
spreadsheets) in to SAP A00 along
with Accounting Adjustments
(Balance Sheet / Revenue budget
into FI) using standard SAP excel
upload functionality.

09

Copy budget data


from version A00 to
B00 & Lock Version
A00

T.Code : TBD

Copy budget data from version A00


to B00 & Lock Version A00

10

Origin Submission 1

Manual

Submit the first version of budget


data to Origin

11

First
Review
completed by Origin

Manual

First review completed by Origin

12

Copies the budget


data from version B00
to C00 & lock version
B00

T.Code : TBD

Copy the budget data from version


B00 to C00 & lock version B00

13

Management
Accountant
makes
adjustment to the
budget data (Costs) in
SAP CO & B/S and
Revenue in SAP FI
using excel online in
version C00

T.Code : TBD

Management Accountant makes


adjustment to the budget data
(Costs) in SAP CO & B/S and
Revenue in SAP FI using excel
online in version C00 as per first
review by Origin

14

Origin Submission 2

Manual

Submit the Second


budget data to Origin

15

Second
review
completed by Origin

Manual

Second review completed by Origin

16

Copies the budget


data from version C00
to D00 & lock version
C00

T.Code : TBD

Copy the budget data from version


C00 to D00 & lock version C00

PLANNING BUDGETING AND FORECASTING

The upload files are already created


in SAP template format

version

of

PAGE 27 OF 70

Process
Step Ref.
17

Process Step

SAP T-Code

Process Step Description

Management
Accountant
makes
adjustment to the
budget data (Costs) in
SAP CO & B/S and
Revenue in SAP FI
using excel online in
version D00

T.Code : TBD

Management Accountant makes


adjustment to the budget data
(Costs) in SAP CO & B/S and
Revenue in SAP FI using excel
online in version D00 as per second
review comments of Origin

18

Origin Submission 3

Manual

Submit the third version of budget


data to Origin

19

Third
review
completed by Origin

Manual

Third review completed by Origin

20

Copies the budget


data from version D00
to F00 & lock version
D00

T.Code : TBD

Copy the budget data from version


D00 to F00 & lock version D00

21

Decide whether to
make any Accountant
Re-allocation
/
Leadership
team
adjustments

Manual

Decide whether to make


Accountant
Re-allocation
Leadership team adjustments

22

Accountant
splits
leadership adjustment
/
Accountant
Reallocation
to
the
budget data (Costs) in
SAP CO using excel
online in F00

T.Code : TBD

Accountant
splits leadership
adjustment / Accountant
Reallocation to the budget data (Costs)
in SAP CO using excel online in
version F00

23

Accountant
splits
leadership adjustment
/
Accountant
Reallocation
to
the
budget data (B/S &
Revenue) in SAP FI
using excel online in
F00

T.Code : TBD

Accountant
splits leadership
adjustment / Accountant
Reallocation to the budget data (B/S &
Revenue) in SAP FI using excel
online in version F00

24

Copies the budget


data from version F00
to final version F10 &
lock version F00

T.Code : TBD

Copy the budget data from version


F00 to final version F10 & lock
version F00

25

Lock
Version
Previous Year

T.Code : TBD

Lock budget version for Previous


financial year

PLANNING BUDGETING AND FORECASTING

for

any
/

PAGE 28 OF 70

P R O C E S S F L O W D E TA I L S F O R E C A S T I N G

4 .3

4 .3 . 1

P RO CES S OV E RV I E W

Forecasting is carried out monthly by most business units. The forecasting process is not expected to
fundamentally differ from the planning process other than in terms of frequency of execution, input
template design and level of guidance documentation raised within the business. The basic roles and
transactions involved in forecasting are almost same as for planning.

In Contact forecasting is incremental.


In Contact, plan data for costs is loaded in Controlling module and Balance sheet & revenue accounts
are planned in FI module.
The objects for planning in Controlling would be combination of Cost Centre/Cost Element, Internal
Order/Cost Element & WBS Element/Cost Element.
The objects for planning in FI would be combination of Balance Sheet account/Profit centre & Revenue
Account / Profit Centre.

The source of forecasting data to/from SAP (directly or indirectly) is:

OCCAM (Optimisation tool based on hydrology)

Retail Model spreadsheet

Gas Model spreadsheet

E@R (Earnings at Risk)

Actuals of a month from SAP.

Capex and Depreciation spreadsheet (some of this will be calculated by SAP and some is
expected to be manually calculated externally)

Other income spreadsheet

Routine Opex / Contractor Recoveries, meter lease spreadsheets

LPG Gross Margin spreadsheet

Other source

Budget data of first month if forecasting is for starting of year i.e. 2 month.

A matrix showing the to and from source flows will be finalised during realisation.

PLANNING BUDGETING AND FORECASTING

PAGE 29 OF 70

The planning data in the source systems are created in SAP upload format and are uploaded manually
into SAP system using standard upload functionality.

Following versions and planning stages will be used in Contact for process of forecasting (Current
Month)
Tag

Name

Version

Starting Point / Manager Adjustment

A01

Accountant Adjustments / Leadership Team Adjustments /

B01

Accountants Re-allocating Leadership team Adjustments


C

Earnings and Risk Loaded (submitted to Origin)

C01

Final Forecast

F01

Versions naming convention is shown above as a starting point but may change during realisation
phase to provide more logic or consistency in the budget/forecast planning cycle versions across Cost
Objects. For forecast versions the period will be reflected within the version i.e. A01, A02, A03 etc. to
retain each months forecast
Refer List of Draft Planning versions (Contact Planning Versions (Updared)

High level future state process of Forecasting in Contact -

For finance year 2010-2011, the forecasting data will be already completed for months July to
October before SAP go-live; hence this data will be mapped and migrated into SAP system.

From next month i.e. October 2010 onwards, forecasting process will be continued in SAP
system.

It is also ensured that versions are empty before performing any planning activity.

In Contact, forecasting versions for previous years and future years will be locked for avoiding
posting of planned records outside the relevant planning cycle.

The Forecast will reflect monthly actuals and the forecast for the subsequent months, i.e. the
first forecast (usually in August) will be based on the month 1 actuals plus budget for the
remaining months. For subsequent months the forecast will be based on actuals for the
preceding months, and the previous month forecast for the remaining months. There is no
forecast undertaken in both the first and last months of the financial year.

A01 will be used as the starting point for forecast budget managers will then make their
forecast adjustments to this version

The forecasting adjustments made in A01 are copied to B01 where all subsequent Accountant
adjustments are made

Earnings at Risk is loaded into C01 and submitted to Origin

PLANNING BUDGETING AND FORECASTING

PAGE 30 OF 70

Final forecast is copied into F01

The plan data is automatically updated to profit centres through the respective objects in CO.

The complete forecasting process is captured in ARIS process diagram.

Contact's Current Forecasting Process

PLANNING BUDGETING AND FORECASTING

PAGE 31 OF 70

4. 3 .2

P RO CE S S FLO W DI AG RAMS FO RE CAS TI NG

Refer to appendix for conventions of flow charts

Note: The ARIS process diagram covers the steps to be followed for processing of Forecasting, however relevant manual steps has been incorporated in order to show
the process. Link to the ARIS Document: ARIS Document

PLANNING BUDGETING AND FORECASTING

PAGE 32 OF 70

4 .3 . 3

P RO CES S S TE P S FO RE CAS TI NG

Process
Step Ref.

Process Step

SAP T-Code

Process Step Description

Open posting periods


for planning input in FI
& CO

T.Code : OKP1
(CO)

Open the planning periods in FI &


CO

02

Check if forecasting
version is maintained
for new financial year

T.code : TBD

Check if the forecasting versions is


maintained in the new financial year

03

Maintain version for


financial year and
active
integrated
planning

T.code : TBD

Maintain the version for new


financial year and activate the
integrated planning in FI & CO
module

04

Check
if
the
forecasting is for first
month

Manual

Check if the forecasting is for the


first month of the financial year

05

Copy
first
month
budget values F10 to
forecast version in FI
& CO

T.code : TBD

If the forecasting is for the first


month of the financial year, copy the
budget values from version F10 to
respective forecast version in FI &
CO

06

Copy previous month


actual to forecast
version in FI & CO

T.code : TBD

If the forecasting is for the second


month onwards, copy previous
month actual to respective version
in FI & CO

07

Update forecast data


to SAP version if
required

T.code : TBD

Upload forecast data in to SAP


version (TAG A) if required.

08

Decide whether to
make any forecast
adjustments

Manual

Manager decides whether to make


any forecast adjustments

09

Make adjustments to
the forecast data

T.code : TBD

Manager makes adjustments to the


forecast data accordingly

10

Copy forecast data


from version (TAG A)
to (TAG B) and lock
version (TAG A)

T.code : TBD

After manager adjustments are


made, copy the forecast data from
Version TAG A to TAG B and lock
version TAG A

01

PLANNING BUDGETING AND FORECASTING

T.Code : FB52

Costs forecast into CO module and


B/S and Revenue forecast data into
FI

PAGE 33 OF 70

Process
Step Ref.

Process Step

SAP T-Code

Process Step Description

11

Decide whether to
make any forecast
adjustments

Manual

Decides whether to make any


Accountant adjustments to the
forecast data

12

Make adjustments to
the forecast data

Accountant makes adjustment to


the forecast data

T.code : TBD

13

Decide whether to
make any forecast
adjustments

14

Make adjustments to
the forecast data

15

Decide whether to
make any forecast
adjustments

16

Make adjustments to
the forecast data

Manual

Copy forecast data


from Tag B to Tag C
and lock version Tag
B

18

Decide whether to
make any forecast
adjustments

19

Upload E@R forecast


data into SAP

PLANNING BUDGETING AND FORECASTING

Decides whether to make any


Leadership adjustments (high level)
to the forecast data
Leadership adjustments are made
to the forecast data accordingly

T.code : TBD

Costs adjustments in SAP CO


module and B/S & Revenue
adjustments in CO module in the
respective version

Manual

Decides whether to split leadership


adjustments to the forecast data
Splits the Leadership adjustments
to the forecast data accordingly

T.code : TBD

17

Costs adjustments in SAP CO


module and B/S & Revenue
adjustments in CO module in the
respective version

T.Code TBD

Manual

T.code TBD

Costs adjustments in SAP CO


module and B/S & Revenue
adjustments in CO module in the
respective version
After the adjustments, copy the
forecast data from version Tag B to
Tag C and lock version Tag B
Decides whether to make any
adjustments by uploading the E@R
forecast data
Upload the forecast data from E@R
(Earnings and Risk) into SAP

PAGE 34 OF 70

Process
Step Ref.
20

Process Step
Copy forecast data
from version Tag C to
final version Tag D
and lock version Tag
C

SAP T-Code

T.code TBD

Process Step Description


After all the adjustments are made,
copy the forecast data from version
Tag C to Tag D and lock the version
Tag C

P R O C E S S F L O W D E TA I L S P L A N V E R S I O N M A I N T E N A N C E

4 .4

4 .4 . 1

P RO CES S OV E RV I E W

Version in SAP is used to record various plan data. Version 0 is the standard version for which actuals are
recorded in SAP except NewGL (which is 1).

Contact will use versions for Strategic Plan, Forecasting, Budgeting, etc.

Versions for previous years and future years will be locked to avoid any posting of planned data.

Before loading of planning data, the period will be unlocked for the respective year.

PLANNING BUDGETING AND FORECASTING

PAGE 35 OF 70

4. 4 .2

P RO CE S S FLO W DI AG RAM PLAN VE RS IO N MAI NTE NANCE

Refer to appendix for conventions of flow charts

Note: The ARIS process diagram covers the steps to be followed for processing of Version Maintenance, however relevant manual steps has been incorporated in
order to show the process. Link to the ARIS Document:

PLANNING BUDGETING AND FORECASTING

PAGE 36 OF 70

4 .4 . 3

P RO CES S S TE P S P LAN VE RS I O N MAI NTE NANCE

Process
Step Ref.
01

02

Process Step

SAP T-Code

Process Step Description

Send
request
to
master
data
maintainer

Manual

Send the master data request to


Master Data Maintainer

Determine
approver

Manual

MDM determines the approver for


updating the versions

the

MDM forwards the request to


Master data approver and request
for
03

Approve
request

04

or

Reject

Manual

Master data approver will


action to Approve or Reject

Provide clarifications

Manual

If the request was rejected by


Master data approver, MDM will
provide clarifications accordingly

05

Check if the request is


to create or Change

Manual

After the request was approved,


MDM checks whether the request is
to Create new version or change the
version

06

Create new version

T.code TBD

Creates the new version accordingly


in FI & CO module with all required
parameters

07

Change the existing


version

T.code TBD

Changes the version accordingly in


FI & CO module

08

Inform the requestor

Manual

MDM informs the requestor with the


relevant comments

PLANNING BUDGETING AND FORECASTING

take

PAGE 37 OF 70

S TA N D A R D R E P O R T S

This section lists the standard SAP reports required to support the process.
Report Name

Scoping Reference

Description

SAP T.Code or Menu Path

Security report showing access rights


to planning templates

12.3.6

Report showing who has access to


what templates

T.code : S_BCE_68001398

Headcount report and other SKFs

12.3.6

Headcount/FTEs by profit centre/cost


centre/business unit etc. Budget,
forecast and actual data.

T.code :TBD

Cost Centre Planning reports

T.code: Standard SKF reports


S_ALR_87013611 Cost Centre:
Actual/Plan/Variance
KSBP Cost Centre: Plan Line items

Internal Order Planning reports

S_ALR_87012993: Orders: Actual/plan/variance


KOBP: Orders: Plan Line Items

Project Planning Reports

S_ALR_87013532 Plan/Actual/Variance
CJI4 Project Plan Cost Line Items

Profit Centre Planning Reports

S_ALR_87009712 Profit Center: Area list


plan/act.
S_ALR_87013340 PrCtr Group: Plan/Actual
Comparison

PLANNING BUDGETING AND FORECASTING

PAGE 38 OF 70

Report Name

Scoping Reference

Description

SAP T.Code or Menu Path

KE5Y Profit Center: Plan Line Items

This is not an exhaustive list of SAP Standard reports

PLANNING BUDGETING AND FORECASTING

PAGE 39 OF 70

M A S T E R D ATA C O N S I D E R AT I O N S

This section deals with the master data design considerations. Any specific business input to the
master data design is captured within this section.

1 .1

MAS TE R DATA VE RS I O NS

Version in SAP is used to record various plan data. Version 0 is the standard version for which actuals
are recorded in SAP.

Contact will use versions for Forecasting, Budgeting, etc.

Versions for previous years and future years will be locked to avoid any posting of planned
data.

Before loading of planning data, the period will be unlocked for the respective year.

PLANNING BUDGETING AND FORECASTING

PAGE 40 OF 70

SAP DEVELOPMENT

The following sections describe the development work required to implement the processes described within this document. The required development may include
the following:

SAP Gaps - Enhancements


Interface
Conversions
Reporting
Forms
Workflows

Change Requests are listed in section 2.2.2 for all the new developments not mentioned in the existing scope.

7. 1

SAP GAPS
L3
Process /
Step

Type

Priority
C/H/M/
L

Current
Scope (or)
New

No

Description of Gap

839

Modelling

Closed in L3 Scoping Workshop

841

Budget Coordination Tool

Closed in L3 Scoping Workshop

840

Automatic updating core


accounting system (ECC6) with
plan data stored in BI

Closed in L3 Scoping Workshop

PLANNING BUDGETING AND FORECASTING

Business Justification

PAGE 41 OF 70

7. 2

I N T E R FA C E D E V E L O P M E N T S

This section outlines the list of all interfaces for the process

No

Interface Name and Description

L3
Process /
Step

System to /
from

Priority
C/H/M/L

Current
Scope
(or) New

01

ICE

12.3.6

ICE to SAP

Current

Budget/Forecast /Strat plan extract from ICE to upload to


SAP at a business unit level of detail

02

E@R

12.3.6

E@R to SAP

Current

Budget/Forecast /Strat plan - extract from E@R to upload to


SAP at a business unit level of detail

03

SAP to ICE/E@R

12.3.6

Outbound
from SAP

Current

Budget/Forecast /Strat plan - extract from SAP to load into


ICE/E@R

05

OCCAM

12.3.6

OCCAM
Spreadsheet
to SAP

Current

Budget/Forecast /Strat plan. Actual & Statistical Data.


Spreadsheet to be uploaded to SAP

PLANNING BUDGETING AND FORECASTING

Business Justification

PAGE 42 OF 70

No

Interface Name and Description

L3
Process /
Step

System to /
from

Priority
C/H/M/L

Current
Scope
(or) New

06

Retail Model

12.3.6

Retail Model
Spreadsheet

Current

Budget/Forecast /Strat plan. Actual & Statistical Data.


Spreadsheet to be uploaded to SAP

07

Gas Model

12.3.6

Gas Model
Spreadsheet

Current

Budget/Forecast /Strat plan. Actual & Statistical Data.


Spreadsheet to be uploaded to SAP

08

HFM (Hyperion)

12.3.6

SAP

Current

Actual/Forecast/Budget data to HFM


(included as Interface re process 12.2.1) - CHECK

09

Various budget spreadsheets, e.g.

12.3.6

SAP

Current

Budget/Forecast /Strat plan. Actual & Statistical Data.


Spreadsheet to be uploaded to SAP

SAP

Current
(from
Forms
section)

Budget /Forecast/Strat plan template for interface of HR


related costs by cost element /cost centre. May include SKF
e.g. Headcount

10

LPG Gross Margin

Capex and Depreciation

Other Income

Routine Opex

Contractor Recoveries

Meter lease

Statistical Key Figures

HR planning

PLANNING BUDGETING AND FORECASTING

Business Justification

PAGE 43 OF 70

7. 3

CONVERSIONS

This section outlines the list of all conversions for the process
Ref #

Data Object

Source System

Target System

Current Scope (or)


New

Description

01

Budget Data Amounts and

Mozaic and numerous

ECC SAP

Current

SKF

other spreadsheets, e.g.

Budget data for 20102011 by period. This


will need to be loaded
into SAP by
Revenue/Cost Element
and BS account)/Cost
Object/Profit Centre

ECC SAP

Current

Forecast data by
period and version for
current year (for
October go-live this
would be July
October 2010)
This will need to be
loaded into SAP by
Revenue/Cost Element
and BS account)/Cost
Object/Profit Centre

Revenue Analysis

02

Forecast Data - Amounts and

Mozaic and numerous

SKF

other spreadsheets, e.g.


Revenue Analysis

PLANNING BUDGETING AND FORECASTING

PAGE 44 OF 70

Ref #

Data Object

03

Strategic

Plan

Amounts and SKF

Data

Source System

Target System

Current Scope (or)


New

Description

Mozaic/ICE/E@R/Other

ECC SAP

Current

Strategic Plan data for


2010-2011 Strat plan
by period. This will
need to be loaded into
SAP by Revenue/Cost
Element and BS
account)/Cost
Object/Profit Centre

spreadsheets

PLANNING BUDGETING AND FORECASTING

PAGE 45 OF 70

7. 4

REPORT DEFINITIONS

This section outlines the list of all non-standard reports identified for this process for financial and non-financial data (SKF).

No

01

Report Name
and Description

Owner

Type

SAP Planning
templates

Management
Accounting

TBD

Metrics Included / Query /


KPI Measured

Templates in format that is


easily understood by users
and suitable for loading into
SAP
Refer Forms section

Format

Drill
Up/
Drill
Dow
n

Company
code
Fiscal Year
Period
Etc.

TBD

Parameters
/
Dimensions

Current
Scope
(or)
New

Audience
(1)

Sou
rce

NA

Business
Managers,
Accountant
s etc

TBD

Adhoc
/
month
ly

Current

Freq

Priority
(2)

02

Planning template
outputs

Management
Accounting

ABAP

Output reports in format for


loading into other systems
(ICE, E@R, and HFM). Note
that E@R currently uploads
monthly transactions which
are extracted from MOZAIC
via a report. Could be a .csv
files to these
systems/models

Company
code
Fiscal Year
Period
Etc.

TBD

NA

Accountant
s/
Developme
nt and
Acquisition

Plan
ning
data

Adhoc
/
month
ly

Current

03

Planning
information

Management
Accounting

TBD

Profit and Loss / Balance


Sheet / OCAT / Cashflow
statement / Capex by profit
centre/cost centre/business
unit.

Company
code
Fiscal Year
Period
Etc.

ALV

NA

Business
Managers,
Accountant
s etc

Plan
ning
data

Adhoc
/
month
ly

Current

Planning Data required by


month and in aggregate for
PLANNING BUDGETING AND FORECASTING

PAGE 46 OF 70

No

Report Name
and Description

Owner

Type

Metrics Included / Query /


KPI Measured

Parameters
/
Dimensions

Format

Drill
Up/
Drill
Dow
n

ALV

NA

Audience
(1)

Sou
rce

Business
Managers,
Accountant
s etc

Plan
ning
data

Freq

Current
Scope
(or)
New

Priority
(2)

the plan period (full year, to


year end and rolling
forecast) as well as
comparative data, i.e.
current year actual/ forecast/
budget & prior year actual
and budget.
Need statistical data (prices,
volumes, and customer
numbers) as well as dollar
amounts.
Required by plan version
also.
04

Financial
Statements

Management
Accounting

TBD
or
Repor
t
Paint
er

Profit and Loss / Balance


Sheet / OCAT / Cashflow
statement as a consolidated
version for Contact Group
(taking into account
consolidation entries) as well
as for individual legal
entities.

Company
code
Fiscal Year
Period
Etc.

Planning Data required by


month and in aggregate for
the plan period (full year, to
year end and rolling
forecast) as well as
comparative data, i.e.
current year actual /forecast/
PLANNING BUDGETING AND FORECASTING

PAGE 47 OF 70

Adhoc
/
month
ly

Current

No

Report Name
and Description

Owner

Type

Metrics Included / Query /


KPI Measured

Parameters
/
Dimensions

Format

Drill
Up/
Drill
Dow
n

Audience
(1)

Sou
rce

Freq

Current
Scope
(or)
New

Priority
(2)

budget & prior year actual


and budget.
Required by plan version
also.
05

Capex planning
data

Management
Accounting

TBD

Capital Expenditure at
various consolidated and
detailed levels by period,
financial year and total cost,
e.g.
Total Capex
Total Growth Capex
Total Stay in Business
Capex
Total Generation Growth
Total Geothermal Growth
Total Geothermal Station
Development Growth
Total Tauhara
Tauhara Drilling programme
Meter Types

Company
code
Fiscal Year
Period
Etc.

ALV

NA

Business
Managers,
Accountant
s etc

Plan
ning
data

Adhoc
/
month
ly

Current

06

FI New GL Actual v Plan


version

Management
Accounting

Repor
t
Paint
er

FI new GL report to provide

Company
code, Profit
centre, Cost
centre,
Fiscal Year
Period, Cost
Object
(dimension
available in
FAGLGLEX

TBD

Drill
down

Business
Managers,
Accountant
s etc

Actu
al
and
Plan
ning
data

Adhoc
/
month
ly

Current

an aggregated view of actual


v

planned

costs

broken

down into detail by cost


element/ cost object, Profit
Centre

PLANNING BUDGETING AND FORECASTING

PAGE 48 OF 70

No

Report Name
and Description

Owner

Type

Parameters
/
Dimensions

Metrics Included / Query /


KPI Measured

Format

Drill
Up/
Drill
Dow
n

Audience
(1)

Sou
rce

Freq

Current
Scope
(or)
New

Priority
(2)

T)
Etc.

07

BI Detailed Actual
v Plan version

Management
Accounting

BI

BI

report

to

provide

detailed view of actual v


planned costs broken down
into detail by cost element/
cost

object

(cost

centre,

WBS, IO), Profit Centre and


WBS type (Capex/Opex).

08

Rolling forecast
report

Management
Accounting

BI

This report is to show rolling


forecast

by

version

variable
combination

PLANNING BUDGETING AND FORECASTING

with

period/year

Company
code, Profit
centre, Cost
centre,
Fiscal Year
Period, Cost
Object
(dimension
to show
CC,WBS,IO)
, WBS type
(Capex/Ope
x)
Etc.

BI Query

Drill
down

Business
Managers,
Accountant
s etc

Actu
al
and
Plan
ning
data

Adhoc
/
month
ly

Current

Company
code, Profit
centre, Cost
centre,
Fiscal Year
Period,
Version Cost
Object

BI Query

Drill
down

Business
Managers,
Accountant
s etc

Actu
al
and
Plan
ning
data

Adhoc
/
month
ly

Current

PAGE 49 OF 70

No

09

Report Name
and Description

Owner

Type

Metrics Included / Query /


KPI Measured

Plan version
comparison

Management
Accounting

BI

This

report

is

to

show

strategic plan v budget or


forecast by period and year

(1)
(2)

Parameters
/
Dimensions
Company
code, Profit
centre, Cost
centre,
Fiscal Year
Period,
Version Cost
Object

Format

BI Query

Drill
Up/
Drill
Dow
n
Drill
down

Audience
(1)

Sou
rce

Business
Managers,
Accountant
s etc

Actu
al
and
Plan
ning
data

Freq

Adhoc
/
month
ly

Current
Scope
(or)
New
Current

Priority
(2)

S= Strategic; M = Management; O = Operational (i.e. mainly used by operational teams)


C = Critical (i.e. mandatory, business cannot function without it/regulatory requirement); H = High (i.e. accessed widely, important to measure business function); M = Medium (i.e. used selectively by
target audient); L = Low (i.e. used sparingly)

PLANNING BUDGETING AND FORECASTING

PAGE 50 OF 70

7. 5

FORMS

This section identifies the Forms required to be printed from system to execute the process. Input forms may also be mentioned.
Ref. #

Current Scope
(or) New

Description

01

Current

SAP Planning Templates


This applies to all Forms below.
Planning layouts for will be required for the following (by month, version, year, cost object and cost element):
1.
2.
3.
4.

Input of planning data for Strategic Plan and Budget


Input of plan data for the Forecast
Input of planning data for Rolling Forecasts
Input of Statistical Key Figures

Contact will use planning layouts with Integrated Excel functionality for exporting/uploading planned data to SAP.
The screen will be built up based on the planning parameters and will include the relevant planning layout. In
addition, some extra Excel preformatted forms to support upload of information using the same planning layout.
For Forecasts and the Rolling Forecast an interactive SAP planning layout with values loaded for relevant period
will be required. Values are populated based on the copying function of actuals, budgets (where applicable) and
previous forecasts.
It is important that SAP Planning Templates are developed in a format that budget/project managers can easily
populate, and the format is suitable for loading multiple cost objects (Cost centres, WBS, Internal orders) or Profit
centres plans into SAP.

PLANNING BUDGETING AND FORECASTING

PAGE 51 OF 70

Ref. #

Current Scope
(or) New

02

Current

Description

Budget /Forecast/Strat plan template for interface of HR related costs


Refer Interface Section 7.2
Budget /Forecast/Strat plan template for interface of HR related costs by cost element /cost centre. May include
SKF e.g. Headcount

7. 6

WORKFLOWS

This section outlines the list of all workflows for the process
Name of the
Workflow

Name of the
Components/
Modules

Description of the Workflow

Current
Scope (or)
New

Business Justification

SMT Budget

N/A

Pre-budget communication to SMT. Early

Current

De-scoped - Will be done manually (outside system).

Communication

warning that budget is approaching and need

(early warning)

to make time & resources available

Planning

N/A

Instructions

Instructions to Budget holders re budget.

Phase 1 has no Budget co-ordination tool.

Current

Roles / responsibilities, timelines, assumptions

De-scoped - Will be done manually (outside system).


Phase 1 has no Budget co-ordination tool.

to be used etc (refer section 3.1)


Plan data
requires approval

N/A

Email notification to relevant people (cost


centre manager) etc when plan data requires

Current

De-scoped - Will be done manually (outside system).


Phase 1 has no Budget co-ordination tool.

approval. Event triggered i.e. template has


been completed by relevant user.
PLANNING BUDGETING AND FORECASTING

PAGE 52 OF 70

Name of the
Workflow

Name of the
Components/
Modules

Description of the Workflow

Current
Scope (or)
New

Business Justification

Plan change

N/A

Email notification to relevant people (cost

Current

De-scoped - Will be done manually (outside system).

centre manager) etc when plan data has been

Phase 1 has no Budget co-ordination tool.

changed. Event triggered.


Plan approved

N/A

Record stages of approval of plan data, e.g.


Treasury sign-off, GM review. I.e. provide a

Current

De-scoped - Will be done manually (outside system).


Phase 1 has no Budget co-ordination tool.

view of which stage the approval is at


throughout the process.

PLANNING BUDGETING AND FORECASTING

PAGE 53 OF 70

A U T H O R I Z AT I O N & R O LE S

This section provides a description of the roles associated with this process and activity. This will
provide inputs to the authorization roles and authorization matrix document which is to be prepared
during the realization phase.
Role Name

Role Description

Existing or New role within Contact

Management

Performs planning adjustment at

Existing

Accountant

various levels, uploads planning data,


etc

Accountant

Performs planning adjustment

Existing

pertaining to Accountant, etc


Manager

Performs planning adjustment

Existing

pertaining to Manager, etc


Planning

Copies planning data, uploads

Accountant

planning data, etc

Master data

Maintains the version, master data

maintainer

maintenance, etc

Master data

Person responsible for

approver

change/create /blocking of master

New

New

New

data.

Transaction code details


Ref Attachment Link

PLANNING BUDGETING AND FORECASTING

PAGE 54 OF 70

T E S T I N G C O N S I D E R AT I O N S

The following table describes key scenarios which are recommended to be included in testing,
including any specific risks or issues that should be given particular attention in testing. This list is not
intended to be exhaustive but rather be used as input into the testing phase to ensure key
considerations are adequately addressed as part of the identification and development of detailed test
cases
Role Name

Respective
Roles

Description of Testing

L3 Process /

Priority

Special

Requirement

Step

(C/H/M/L)

Instructions

End to end process of


budgeting

12.3.6

Master data
should exist in
the system

Respective
Roles

End to end process of


forecasting

12.3.6

Master data
should exist in
the system

Master data
maintainer

Version Maintenance

12.3.6

Master data
should exist in
the system

Allocation
Accountant

Distribution and
assessment cycles

Respective
Roles

End to end process for


Strategic Planning

12.3.6

Master data
should exist in
the system

Respective
Roles

End to end process for


rolling forecasting

12.3.6

Master data
should exist in
the system

PLANNING BUDGETING AND FORECASTING

PAGE 55 OF 70

10

C O N V E R S I O N I N I T I A L R U LE S

10 .1 S A P O B J E C T S O U R C E ( F R O M L E G A C Y )
Data object identification from legacy systems.
Object

Description
Budget data for 20102011 by period. This
will need to be loaded
into SAP by
Revenue/Cost Element
and BS account)/Cost
Object/Profit Centre
Amounts and SKF

Legacy Source System

Referencing

Mozaic/Exchequer/numerous spreadsheets,
e.g. revenue analysis

SAP

Strategic Plan data

Strategic Plan data for


2010-2011 Strat plan
by period. This will
need to be loaded into
SAP by Revenue/Cost
Element and BS
account)/Cost
Object/Profit Centre
Amounts and SKF

Mozaic /Exchequer/ICE/E@R/numerous
spreadsheets, e.g. revenue analysis

SAP

Forecast data

Forecast data by
period and version for
current year (for
October go-live this
would be July

Mozaic /Exchequer/numerous spreadsheets,


e.g. revenue analysis

SAP

Budget data

PLANNING BUDGETING AND FORECASTING

PAGE 56 OF 70

Object

Description
October 2010)
This will need to be
loaded into SAP by
Revenue/Cost Element
and BS account)/Cost
Object/Profit Centre

Legacy Source System

Referencing

Amounts and SKF

10 .2 H I G H L E V E L D ATA R E Q U I R E M E N T S
Data requirements for the history and anticipated volumes.
Data

Data Components

Length of History

Budget data

Planning

2010-2011 Budget &


Previous Year data
(i.e. current year and
previous year
Budgets)

Forecast data

Planning

Current Year (for


October go-live July
2010 Oct 2010 )&
Previous year data

Strat Plan Data

Planning

Strategic Plan data for


2010-2011 Strat plan
by period. )&
Previous year data

PLANNING BUDGETING AND FORECASTING

Anticipated Volumes

PAGE 57 OF 70

10 .3 D ATA C L E A N S I N G R E Q U I R E M E N T S
Specific data cleansing requirements identified.
Data Object

Source System

Cleansing Requirements

Anticipated Volume of Data to Be Cleansed

TBD

10 .4 I N T E R I M P R O C E S S / C U T O V E R / D E P L O Y M E N T C O N S I D E R AT I O N S
Data or process considerations relating to interim processes required during cutover and or deployment.
Description of Impact

Anticipated duration

Planning for Generation projects

High level Description


Integrations workshops/Deployment strategy will need to consider
impact of planning objects required for Generation (Projects,
Internal orders). Note that Internal Orders could be used to plan
for Maintenance costs until Generation is implemented in SAP.

10 .5 A R C H I VA L R E Q U I R E M E N T S L E G A C Y S Y S T E M S
Data archival requirements as identified
PLANNING BUDGETING AND FORECASTING

PAGE 58 OF 70

Data Object

Source System

PLANNING BUDGETING AND FORECASTING

Archival Requirements

Anticipated Volume of Data to be archived

PAGE 59 OF 70

11

B AT C H R E Q U I R E M E N T S

Requirements for automating data processing jobs as batch runs.


L3
Process /
Step
12.3.6

Batch Program Name


and Description

Frequency

Information of task

Daily,

which requires

Weekly,

background

Monthly,

processing will be

etc,

Comments
(Required variants if known)

Planning tasks to be finalized during


Realisation phase

updated and available


in planning task list

Schedule Manager
could be used as the
central repository for
Planning tasks.

PLANNING BUDGETING AND FORECASTING

PAGE 60 OF 70

12

F U T U R E C O N S I D E R AT I O N S

This section details considerations to be assessed by the Programme or Business at an appropriate


time for future projects. This section may also records the dependencies, integrations and key
decisions for open issues that relate to a future wave within the programme.
Number
1

Details
At Finance wave go live the forecast/budget process requires the management
accountants to coordinate the planning process with their business units. In future
Contact would like to work towards a self-service model where budget holders will be
directly updating SAP via Excel planning (or other interface/tool) with the aim of reducing
complexity and minimizing time for completing the process. To do this additional training
and SAP Licence's will be required for self-service users

Is the budget/ forecast practical in terms of having to load data into all sub modules and
cost objects separately (for CC IO WBS Rev BS). To reduce complexity and minimize
time Contact will need a customized front end or interface so budget/project managers
can easily load their budgets/forecasts into SAP against multiple cost objects
Is a SAP based Planning tool required for this?
BI-IP Planning functionality will not be implemented in the Finance wave at Contact as
per the Level 3 Scoping workshops.

In future consideration may be given to

implementing a SAP planning tool, e.g. BPO

PLANNING BUDGETING AND FORECASTING

PAGE 61 OF 70

13

OPEN ISSUES

This section contains all the Open Issues from the Programme Issues Register related to this process.
Including a history of closed issues, not recorded as key decisions, if required.
Issue
No
1

Name Description

Notes

ICE/E@R planning data will need to


interface into SAP and may need to be at
a lower level of detail than output currently.
Business need to determine level of BU
required (PC group for Retail Gen
Wholesale Corp etc) for reviewing ICE to
see if we can get this breakdown for P&L
and BS (BS AP/AR/Assets/Inventory).
ICE will also need to provide planning data
by other dimensions, i.e. location as well
as legal entity (company code).

SEM-BCS Consolidation - do we need to


take planning data to Consolidation
module (open issue also in Group Close
BPDD) will the forecast /Budget from
ICE broken down by business unit include
the group position or do we need to run
eliminations from SEM-BCS
Note: ICE assumes eliminations have
already been performed at Company level.
This open item may change dependent
upon resolution of item 1.

Confirm business requirement for


conversion of any previous financial years
budget/forecast/strategic plan data
(actuals will be loaded into SAP for current
year + previous year).
This includes Amounts and SKF

PLANNING BUDGETING AND FORECASTING

PAGE 62 OF 70

Issue
No
4

Name Description

Notes

Evaluate whether a single process for


planning for Generation or other parts of
Contact rather than planning on both
Internal Orders and Project WBSEs.

Historical data to support Board and


Ownership reporting requires last 5 years
of statistical data (revenue analysis) would
need to be uploaded into BI/BW to support
this reporting.

PLANNING BUDGETING AND FORECASTING

PAGE 63 OF 70

14

APPENDIX

1 4. 1 C O N V E N T I O N S U S E D
The process design is supported by a process flow chart. The following diagram depicts the flow chart
conventions for the BPD process flow chart:
The diagrams of ARIS models show the relationships between objects depicted by their symbols.
Objects are representations of the real world entities (e.g. tasks, organisations, roles, etc.) that need to
be modelled and analysed.

ARIS object related terms:

An ARIS representation of a real-world entity (e.g. task, organisation,

Object

system, data item, etc.)

Symbol

The visual depiction of an object in an ARIS model diagram

Relationship

Connection
Occurrence

The ARIS representation of the interaction between real-world entities


represented by ARIS objects.
A visible relationship. The line connecting two objects in an ARIS model
diagram denoting an ARIS relationship.
An instance where an object is used in a model or in different models.
ARIS modelling information stored for different ARIS items (e.g. models,

Attributes

objects, relationships and databases, users, user groups, font formats,


etc.).

Properties

O
r..

The totality of all information (including attributes) about ARIS items.

The following symbols would be used to create the process models in ARIS:

Carriesout&Supports

EVENT

Event

An event represents a state that is relevant in terms of


business management and which influences or controls the further
flow of business processes.

Events trigger functions and are results of functions. As


opposed to a function which represents a time-consuming process,
an event occurs at one point in time.

ports

PLANNING BUDGETING AND FORECASTING

PAGE 64 OF 70

ARIS Events represent the changing state of the world as a process proceeds:

External changes that trigger the start of the process


(e.g. customer order received ),

Internal changes of state as the process proceeds


(e.g. product manufactured ),

The final outcome of the process that has an external effect


(e.g. order delivered to customer).

Although events appear in the ARIS swim-lanes, but they are independent of the Positions, based on

O
r..

which swim lanes are defined.

Carriesout&Supports

FUNCTION

M
anualFunction

SAPfunction

A function is the technical task or


activity performed on an object in order
to support one or several business
objectives.

ARIS Functions represent the activities or tasks carried out as part of a business process; ideally with
each one adding some value to the business. Functions may be carried out by people or by IT
systems. They have inputs (information or material), create outputs (different information or a product)

Carriesout&Supports

and may consume resources.

Functions have a direct relationship with the Positions corresponding to the swim lanes where they lie.

PROCESS INTERFACE

Carriesout&Supports

Processinterface

A process interface is used to connect two different process


flows. It has no active attributes affecting the process flow, but is
only used as a break-point between two processes at the same
level.

The linked model can be assigned to the process interface


object

Process interface object is used to give a visual indication of the connecting models. The name of the
process interface object is the name of a process, to which the hand-off is given/ coming from.

Although process interface object appears in the ARIS swim-lanes, but it is independent of the

riesout&Supports

Positions, based on which swim lanes are defined.

PLANNING BUDGETING AND FORECASTING

PAGE 65 OF 70

Value Added Function

SAPvalue-addedchain

A Value Added Chain object is a set of coordinated


processes, sub processes and elementary process steps,
conducted by both people and equipment, which will lead to
accomplishing a specific organizational goal.

SAPvalue-addedchain

Value Added Functions are high level functions used to describe the abstraction of the
detailed process view. A value adding chain will give the highest level view of the end-to-end
process. Value Added Function is used to describe the different levels in the processes. This can
be further broken down to any level based on the process complexity.
Typically a Value Added Function will be a part of Value Added Chain Diagram (VACD) and
will be used to depict Level 1 and Level 2 processes

POSITION

Position

The actors involved for planning, execution and control of


business process shall be captured in form of positions

In ARIS models, swim lanes are identified based on the Positions. All functions lying in a particular
swim lane identified by a position are under the responsibility of the particular person holding that
position.

There may be multiple people, holding the same position example Buyer.
One person may hold two different positions, under different circumstances example a single
person can be Requestor at one point in time and Requisitioner at the other point.

ORGANIZATIONAL UNIT TYPE

Orguannitizty
atipo
enal

An Organizational Unit represents a particular entity/


participant as per company structure

Certain specific participants shall be represented as Organizational units. These participants


shall be current organization, business units, external parties, partners, suppliers, customers or third
party members associated with the organization. Example: Bank, System, Vendor etc.

PLANNING BUDGETING AND FORECASTING

PAGE 66 OF 70

FLOW OPERATORS

An XOR (Exclusive OR) operator is used to connect or split


multiple paths in an exclusive fashion.

XORRule

When used as an input, only one of the preceding paths can trigger the following function at a
time.

When used as an output, only one of a number of exit routes is to be followed.

An AND operator is used to connect or split multiple paths in


a parallel fashion.

ANDRule

When used as an input, all of the preceding input paths must be completed to before the next
function can commence.

When used after an object, there are two more possible outcomes from input path and all of
the outcomes must exist based in any business scenario.

An OR operator is used to connect or split multiple paths in a


non-exclusive fashion, i.e. one or all of the paths may be followed

ORRule

When used as an input, one or all of the preceding paths can trigger the following function.
When used as an output, one or all of the number of exit routes can be followed.

CONNECTOR

Connectors depict the linkage between Business objects

Connectors demonstrate the transfer of data or the flow of a process , generally left to right or
top to bottom

1 4. 2 G L O S S A RY
Refer to ET glossary of terms: ET Glossary
Terminology/ Acronym

Description

SAP

SAP standards for System, Application and Data Processing which is


a software supports business functions

Company Code

The smallest organizational unit of Financial Accounting for which a

PLANNING BUDGETING AND FORECASTING

PAGE 67 OF 70

Terminology/ Acronym

Description
complete self-contained set of accounts can be drawn up for
purposes of external reporting.
This includes recording of all relevant transactions and generating all
supporting documents required for financial statements.

GL

General Ledger Account

Document Type

A key that distinguishes the business transactions to be posted. The


document type determines where the document is stored as well as
the account types to be posted

Posting date

Date on which a business transaction is transferred into one or more


accounting ledgers on document entry

Document date

The date on which the original document (such as vendor invoice)


was created

Period

Unit of time into which a fiscal year is subdivided. Company data


can be analyzed on a particular date in each period. In accounting, a
fiscal year can be subdivided into a maximum of 16 periods. The
fiscal year itself is a period.

Fiscal year

A period of usually 12 months, for which the company produces


financial statements and takes inventory.

A fiscal year need not

correspond to the calendar year. Under certain circumstances, fiscal


years containing fewer than 12 months are also permitted (short
fiscal year)
Role

The collection of activities that a person performs to participate in


one or more business scenarios in an organization. Access to the
transactions, reports, Web-based applications, and other objects
contained in roles is through user menus.

Transaction Code

Sequence of characters that identifies a transaction in the SAP


System.
A transaction code can contain up to 20 characters and should
always begin with a letter. Permitted characters are letters from A to
Z, numbers from 0 to 9, and the underscore.
To call a transaction, you enter the transaction code in the command
field and choose Enter.

Currency

A medium of exchange in current use within a particular country.

Posting key

A two-digit numerical key that determines the way line items are
posted. This key determines several factors including the:

Account type

Type of posting (debit or credit)

Layout of entry screens

PLANNING BUDGETING AND FORECASTING

PAGE 68 OF 70

Terminology/ Acronym

Description

Interface

Connecting point between two components in a system. Examples:

Technical interface (for example, the interface between two


sets of hardware)

Software interface (for example, the interface between two


programs working together)

Workflow

Sequence of steps processed either by people or by the SAP


System. The chronological and logical sequence of the steps, linked
to the evaluation of conditions, is monitored by the workflow
manager and can be controlled flexibly with event-related response
mechanisms.

From a technical point of view, a workflow is

represented by a workflow work item (type F).


Client

In commercial, organizational and technical terms, a self-contained


unit in an R/3 System with separate master records and its own set
of tables.

Account Type

Key that specifies the accounting area to which an account belongs.


Examples of account types are:

Asset accounts

Customer accounts

Vendor accounts

G/L accounts

The account type is required in addition to the account number to


identify an account, because the same account number can be used
for each account type.
Document

The proof of a business transaction. A distinction is made between


original documents and data processing (DP) documents:

Original documents include incoming invoices, bank


statements and carbon copies of outgoing invoices.

DP documents include accounting documents, sample


documents and recurring entry documents.

Whereas accounting documents are a representation of the original


document in the SAP System, sample and recurring entry
documents are simply templates to simplify entry of accounting
transactions.

PLANNING BUDGETING AND FORECASTING

PAGE 69 OF 70

Country
Bank Key
Bank
Key

Terminology/ Acronym

Description

Cost Centre

An organizational unit within a controlling area that represents a


defined location of cost incurrence. The definition can be based on:

Profit centre

Functional requirements

Allocation criteria

Physical location

Responsibility for costs

An organizational unit in Accounting that reflects a managementoriented structure of the organization for the purpose of internal
control. Operating results for profit centers can be analyzed using
either the cost of sales approach or the period accounting approach.
By analyzing the fixed capital as well, you can expand your profit
centers for use as investment centers.

Program

An ABAP program contains source code and can also include


screens.

ABAP

A programming language developed by SAP for application


development. All R/3 applications are written in Advanced Business
Application Programming (ABAP).

Dump Analysis

A review of a program error. A dump analysis provides the developer


with information about the cause of a program error and suggests
possible solutions.

Transport

The transfer of SAP System components from one system to


another. The components to be transported are specified in the
object list of a transport request. Each transport consists of an
export process and an import process:

The export process reads objects from the source system


and stores them in a data file at operating system level.

The import process reads objects from the data file and
writes them to the database of the target system.

The SAP System maintains a transport log of all actions during


export and import

PLANNING BUDGETING AND FORECASTING

PAGE 70 OF 70