ICA-WHSD-PPP-EEP001

ENVIRONMENTAL EMERGENCY
MANAGEMENT PLAN
Employer: Northern Capital
Highway

Rev. 0

Project: Western High Speed Diameter ProjectStage IV & Stage V

Page / 1/3

ENVIRONMENTAL EMERGENCY
MANAGEMENT PLAN
WESTHERN HIGH-SPEED DIAMETER PROJECT
STAGE IV & STAGE V
ST. PETERSBURG /RUSSIAN
FEDERATION
REVISION DESCRIPTION:

The revisions indicated by red highlighted colour in the related texts.

Controlled Copy: _____

Assigned to: ______________________________


Uf uk Do g and e mir

M et e De mir

00

14/12/2012

Quality Manager (QM)

PMO Director

REV.

DATE

PREPARED BY

APPROVED BY

Confidential
This document contains proprietary information, which is owned by ICA ASTALDI IC
ICTAS WHSD INSAAT ANONIM SIRKETI and is subject to copyright. ICA ASTALDI IC ICTAS
WHSD INSAAT ANONIM SIRKETI has contributed such information for the purpose of

ICA-WHSD-PPP-EEP-001 Rev.00 14/12/2012

ICA-WHSD-PPP-EEP001

ENVIRONMENTAL EMERGENCY
MANAGEMENT PLAN
Employer: Northern Capital
Highway

Rev. 0

Project: Western High Speed Diameter ProjectStage IV & Stage V

Page / 2/3

performance of the Western High Speed Diameter Project Stage IV & Stage V Project
only, and any use or reproduction for any other purpose is strictly prohibited.

Drill
Impact

Oil Spillage

Risks

Corrective Actions

(Frequen
cy)

Soil
pollution
by oil,

After the leakage has been


detected;.

2 times in
a year

In the event of less than 4 liter


oil leakage:

Spreading
by rain to 1.
Chips should be sprinkled
the land.
to the leakage area for
absorption.
2.

Responsible

HSE Dept.
Machinery &
Equipment Dept.
Emergency
Response Team

Polluted soil should be


removed and packed with
special packet and sent to the
Dangerous Waste Area.

In the event of more than 4 liter


oil leakage:

Fuel Spillage

Soil
pollution
by fuel,
Spreading
by rain to
the land.
Fire

1.

To prevent spread,
leakage are should be
surrounded by chip pouches.

2.

Environmental Protection
Organization should be
informed in ASAP.

Workers should be remove from


site.

2 times in
a year

HSE Dept.

2 times in
a year

HSE Dept.

All mashineries should be


stopped.

Emergency
Response Team

Dont allow to smoke.


The same with machinery &
equipment oil leakage
procedure.
In case of fire, fire prevention
procedure will be applied.

Paint and
Chemicals

Spreading
by rain to

Workers should be remove form


site and area should be

ICA-WHSD-PPP-EEP-001 Rev.00 14/12/2012

Emergency

ENVIRONMENTAL EMERGENCY
MANAGEMENT PLAN
Employer: Northern Capital
Highway

Project: Western High Speed Diameter ProjectStage IV & Stage V

ICA-WHSD-PPP-EEP001
Rev. 0
Page / 3/3

Drill
Impact

Spillage

Risks

the land.

Corrective Actions

(Frequen
cy)

surrounded by signal tape and


warning signages should be
placed.

Responsible

Response Team

According to MSDS of material,


cleaning procedure should be
applied.
Huge Spillages

Explosion of Gas
Cylinders
(Oxygen,
Acetylene,
Propane)

Explosion

Fire

In case of
every all
kind fire.

In case of huge leakages


Environmental Protection
Organization should be informed
in ASAP.

2 times in
a year

Emergency Management Plan

2 times in
a year

Fire

Fire Management Plan &


Emergency Management Plan

ICA-WHSD-PPP-EEP-001 Rev.00 14/12/2012

2 times in
a year

HSE Dept.
Emergency
Response Team
HSE Dept.
Emergency
Response Team

HSE Dept.
Emergency
Response Team