Indoor Substations
Suministro Elctrico Sustentable
Congreso Bienal Internacional
ABB Group
November 13, 2009 | Slide 1
Agenda
Introduction
Utilities challenges and requirements
Example of Indoor substations
MALTE - Complete pre-fabricated AIS substation up to 72.5 kV
URBAN - Site built indoor AIS substation up to 170 kV
Truly invisible GIS substations for all voltage levels
Summary
ABB Group
November 13, 2009 | Slide 2
Substations built years ago outskirt the city and today are
surrounded by residential and commercial areas
Consequences are:
ABB Group
November 13, 2009 | Slide 3
ABB Group
November 13, 2009 | Slide 4
ABB Group
November 13, 2009 | Slide 5
Transformer Noise
Heat Dissipation
Agenda
Introduction
Utilities challenges and requirements
Example of Indoor substations
MALTE - Complete pre-fabricated AIS substation up to 72.5 kV
URBAN - Site built indoor AIS substation up to 170 kV
Truly invisible GIS substations for all voltage levels
Summary
ABB Group
November 13, 2009 | Slide 6
MALTE - up to 72.5 kV
Complete pre-fabricated AIS substation
ABB Group
November 13, 2009 | Slide 7
MALTE - up to 72.5 kV
Complete pre-fabricated AIS substation
ABB Group
November 13, 2009 | Slide 8
MALTE - up to 72.5 kV
Complete pre-fabricated AIS substation
ABB Group
November 13, 2009 | Slide 9
HV-cables connection to
Power transformer.
MALTE - up to 72.5 kV
Complete pre-fabricated AIS substation
Summary
Small footprint
ABB Group
November 13, 2009 | Slide 10
connection to network
commissioning
Agenda
Introduction
Utilities challenges and requirements
Example of Invisible substations
MALTE - Complete pre-fabricated AIS substation up to 72.5 kV
URBAN - Site built indoor AIS substation up to 170 kV
Truly invisible GIS substations for all voltage levels
Summary
ABB Group
November 13, 2009 | Slide 11
ABB Group
November 13, 2009 | Slide 12
URBAN up to 170 kV
Site built indoor AIS substation
ABB Group
November 13, 2009 | Slide 13
Before renewal
After renewal
145 kV AIS
145 kV AIS
URBAN up to 170 kV
Site built indoor AIS substation
ABB Group
November 13, 2009 | Slide 14
URBAN up to 170 kV
Site built indoor AIS substation
ABB Group
November 13, 2009 | Slide 15
Portable maintenance
stand mounted on CB truck
URBAN up to 170 kV
Site built indoor AIS substation
ABB Group
November 13, 2009 | Slide 16
Control Room
Agenda
Introduction
Utilities challenges and requirements
Example of Invisible substations
MALTE - Complete pre-fabricated AIS substation up to 72.5 kV
URBAN - Site built indoor AIS substation up to 170 kV
Truly invisible GIS substations for all voltage levels
Summary
ABB Group
November 13, 2009 | Slide 17
HV Module - PASS
ABB Group
November 13, 2009 | Slide 18
HV Module - PASS
Polymeric Bushings
Breaker
TC
Mechanism
Line / Earth
Disconnector
ABB Group
November 13, 2009 | Slide 19
3 x 40 MVA Transformers
Shopping Iguatemi
Jockey Club
Subestao Itaim
ABB Group
November 13, 2009 | Slide 20
rea
disponibilizada
BL
CX
Subestao
existente
CX
A
GRAM
102.30
UR
- H=
3,0
0m
30
2.
10
101.80
NA+102,5m
PORTA
101.80
TR1
SA1
SA2
BCAP6
PORTA
101
S. BATERIAS
PORTA
25
2.
10
25
2.
10
80
1,
10
CONJUNTO BLINDADO 3
30
2.
10
30
2.
10
MANUTENO DO DISJUNTOR
105
ACESSO ESCADA
PORTA
111
DER
INTERL
FUTURO
107
104
BCAP5
TR3
TR3
TR3
BCAP4
100
110
NA+101,8m
CONJUNTO BLINDADO 2
PARALELEPIPEDO
101.80
FUTURO
DER
INTERL
FUTURO
112
106
BCAP3
TR2
TR2
NA+102,3m
NA+102,5m
TR2
NA+101,8m
BCAP2
109
B
103
TR1
CONJUNTO BLINDADO 1
FUTURO
DER
INTERL
FUTURO
108
102
BCAP1
TR1
NA+101,8m
25
2.
10
PORTA
101.436
100.862
101.52
101.127
101.127
101.191
101.302
S
ABB Group
November 13, 2009 | Slide 21
101.20
3
101.52
BL BL BL
VARIAVEL
PORTA
MURO - H=3,00 m
101.068
100.814
S
Substation Layout
ABB Group
November 13, 2009 | Slide 22
ABB Group
November 13, 2009 | Slide 23
ABB Group
November 13, 2009 | Slide 24
Itaim Substation
ABB Group
November 13, 2009 | Slide 25
Agenda
Introduction
Utilities challenges and requirements
Example of Invisible substations
MALTE - Complete pre-fabricated AIS substation up to 52.5 kV
URBAN - Site built indoor AIS substation up to 170 kV
Truly invisible GIS substations for all voltage levels
Summary
ABB Group
November 13, 2009 | Slide 26
ABB Group
November 13, 2009 | Slide 27
Environmental friendly
ABB Group
November 13, 2009 | Slide 28
ABB Group
November 13, 2009 | Slide 29
GIS Substation
3 x 40 MVA Transformers
ABB Group
November 13, 2009 | Slide 30
ABB Group
November 13, 2009 | Slide 31
ABB Group
November 13, 2009 | Slide 32
ABB Group
November 13, 2009 | Slide 33
ABB Group
November 13, 2009 | Slide 34
ABB Group
November 13, 2009 | Slide 35
ABB Group
November 13, 2009 | Slide 36
ABB Group
November 13, 2009 | Slide 37
Summary
Cost Comparison
Conventional S/E
Indoor S/E
Erection time
ABB Group
November 13, 2009 | Slide 38
Equipos/Montaje/Ing
70%
60%
Obras Civiles
30%
40%
Total Cost
100%
130%
Summary
ABB Group
November 13, 2009 | Slide 39
Main Benefits
Reduce Footprint
Reduced Outages
Increase Reliability
Reduce Maintenance
ABB Group
November 13, 2009 | Slide 40
In operation
Copel - Uvaranas
Electropaulo - Itaim
Petrobras - Repar
In Construction
Copel - Pilarzinho
ABB Group
November 13, 2009 | Slide 41