You are on page 1of 41

Alfredo Gallegos, FES Manager, 10 y 11 de Noviembre 2009

Indoor Substations
Suministro Elctrico Sustentable
Congreso Bienal Internacional
ABB Group
November 13, 2009 | Slide 1

Agenda

Introduction
Utilities challenges and requirements
Example of Indoor substations
MALTE - Complete pre-fabricated AIS substation up to 72.5 kV
URBAN - Site built indoor AIS substation up to 170 kV
Truly invisible GIS substations for all voltage levels
Summary

ABB Group
November 13, 2009 | Slide 2

Reasons to migrate from Outdoor to Indoor Substation

Substations built years ago outskirt the city and today are
surrounded by residential and commercial areas

Consequences are:

ABB Group
November 13, 2009 | Slide 3

Pressure to Minimize visual impact

Incidents of people entering the Substations

Important land cost

Increase pressure of availability

Requirements on Substations from neighbors

ABB Group
November 13, 2009 | Slide 4

Open air substation not so nice aesthetic,


want power without seeing it

Station modularized and as much as


possible pre-manufactured

Originally outskirt of city, now surrounded


by residential buildings, offices, shopping
centers, hotels etc.

No substation fence and yard, building


itself give the shell protection

Acoustic problem from humming of power


transformers

Underground-in and underground-out, i.e.


cable to first line tower in case of OH-line
bays

Third party safety, especially children


playing

Site work as little and short as possible,


saves cost, shorten overall delivery time
and minimize disturbance to neighbors
during site activities

Engineer problems facing an Indoor Substation

ABB Group
November 13, 2009 | Slide 5

Transformer Noise

HV Over Head Lines Incoming

Easy Access to Power Transformers

Heat Dissipation

Agenda

Introduction
Utilities challenges and requirements
Example of Indoor substations
MALTE - Complete pre-fabricated AIS substation up to 72.5 kV
URBAN - Site built indoor AIS substation up to 170 kV
Truly invisible GIS substations for all voltage levels
Summary

ABB Group
November 13, 2009 | Slide 6

MALTE - up to 72.5 kV
Complete pre-fabricated AIS substation

ABB Group
November 13, 2009 | Slide 7

MALTE - up to 72.5 kV
Complete pre-fabricated AIS substation

ABB Group
November 13, 2009 | Slide 8

Transformer foundation and


oil pit

Only one precast foundation


for the whole substation,
function also as oil pit

Power Transformer put in


place

MALTE - up to 72.5 kV
Complete pre-fabricated AIS substation

ABB Group
November 13, 2009 | Slide 9

Interior from HV-module

HV-cables connection to
Power transformer.

MALTE - up to 72.5 kV
Complete pre-fabricated AIS substation
Summary

High availability (equipment indoor)

Small footprint

ABB Group
November 13, 2009 | Slide 10

~100 m2 (1/3 of traditional)

Land preparation minimized, all equipment pre-fabricated

Short time at site (~2 weeks)

connection to network

commissioning

Low maintenance cost

Can easily be moved

Personnel and third party safe

Agenda

Introduction
Utilities challenges and requirements
Example of Invisible substations
MALTE - Complete pre-fabricated AIS substation up to 72.5 kV
URBAN - Site built indoor AIS substation up to 170 kV
Truly invisible GIS substations for all voltage levels
Summary

ABB Group
November 13, 2009 | Slide 11

HV Module LTB Compact

ABB Group
November 13, 2009 | Slide 12

URBAN up to 170 kV
Site built indoor AIS substation

ABB Group
November 13, 2009 | Slide 13

Before renewal

After renewal

145 kV AIS

145 kV AIS

URBAN up to 170 kV
Site built indoor AIS substation

ABB Group
November 13, 2009 | Slide 14

URBAN up to 170 kV
Site built indoor AIS substation

ABB Group
November 13, 2009 | Slide 15

Portable maintenance
stand mounted on CB truck

CB truck can easily be


exchanged using a fork lift

URBAN up to 170 kV
Site built indoor AIS substation

ABB Group
November 13, 2009 | Slide 16

Medium Voltage switchgear

Yellow reflective stripe on floor


for emergency evacuation,
instead of battery lighting.

Better and more nature friendly


solution

Control Room

Back-up relay and control


equipment in same physical
hardware.

Agenda

Introduction
Utilities challenges and requirements
Example of Invisible substations
MALTE - Complete pre-fabricated AIS substation up to 72.5 kV
URBAN - Site built indoor AIS substation up to 170 kV
Truly invisible GIS substations for all voltage levels
Summary

ABB Group
November 13, 2009 | Slide 17

HV Module - PASS

ABB Group
November 13, 2009 | Slide 18

HV Module - PASS

Polymeric Bushings

Breaker
TC
Mechanism
Line / Earth
Disconnector

ABB Group
November 13, 2009 | Slide 19

Indoor AIS 138kV Substation Eletropaulo/SP

138 kV Substation in Sao Paulo, Brazil.

3 x 40 MVA Transformers

Available Footprint 35 x 35 mt2

Shopping Iguatemi

Jockey Club
Subestao Itaim

ABB Group
November 13, 2009 | Slide 20

Itaim Substation Layout

rea
disponibilizada
BL

CX

Subestao
existente

CX
A
GRAM
102.30

UR

- H=
3,0
0m

PISO DRENANTE - UTILIZAR PARALELIPPEDOS DO EXISTENTE


102.25 e suas variveis

30
2.
10

101.80

NA+102,5m

PORTA

101.80

TR1
SA1

SA2

BCAP6

PORTA

101

S. BATERIAS

BANCO DE BATERIAS 1 - 125V

BANCO DE BATERIAS 2 - 125V

PORTA

25
2.
10

25
2.
10

80
1,
10

CONJUNTO BLINDADO 3

30
2.
10

30
2.
10

MANUTENO DO DISJUNTOR

105

ACESSO ESCADA

PORTA

111
DER
INTERL
FUTURO
107
104
BCAP5
TR3

TR3

TR3
BCAP4
100
110
NA+101,8m

CONJUNTO BLINDADO 2

PARALELEPIPEDO
101.80

FUTURO
DER
INTERL
FUTURO
112
106
BCAP3

TR2

TR2

NA+102,3m
NA+102,5m

TR2

NA+101,8m

BCAP2
109
B

103

TR1

CONJUNTO BLINDADO 1

FUTURO
DER
INTERL
FUTURO
108
102
BCAP1
TR1

NA+101,8m

25
2.
10

PORTA

101.436

100.862

101.52
101.127

101.127

101.191

101.302
S

ABB Group
November 13, 2009 | Slide 21

101.20
3

101.52

BL BL BL

VARIAVEL

rampa sobe (i=14,5%)


mdia

PORTA

MURO - H=3,00 m

102.30 (piso zero)

101.068

100.814
S

Substation Layout

ABB Group
November 13, 2009 | Slide 22

Itaim Substation Layout

ABB Group
November 13, 2009 | Slide 23

Itaim Substation Layout

ABB Group
November 13, 2009 | Slide 24

Indoor AIS 138kV Substation Eletropaulo/SP

Itaim Substation

ABB Group
November 13, 2009 | Slide 25

Agenda

Introduction
Utilities challenges and requirements
Example of Invisible substations
MALTE - Complete pre-fabricated AIS substation up to 52.5 kV
URBAN - Site built indoor AIS substation up to 170 kV
Truly invisible GIS substations for all voltage levels
Summary

ABB Group
November 13, 2009 | Slide 26

Underground GIS substation

ABB Group
November 13, 2009 | Slide 27

Barbana GIS Substation

Underground GIS substation

Waterfall for hiding


transformer humming

Waterfall enrich visual and


audible perception of park

Water also used for


transformer cooling via heat
exchanger

Complete bay modules from


factory for fast and easy work
at site

Environmental friendly

Personnel and third party safe

Underground GIS substation

ABB Group
November 13, 2009 | Slide 28

People have their say

People were involved in the design of the surrounding park

Underground GIS substation

ABB Group
November 13, 2009 | Slide 29

Barbana GIS Substation


layout and configuration

GIS Substation

145 kV Substation in Rio de Janeiro - Leblon

3 x 40 MVA Transformers

Available Footprint 25 x 25 mt2

ABB Group
November 13, 2009 | Slide 30

Substation Leblon: Plant Layout

ABB Group
November 13, 2009 | Slide 31

Substation Leblon: Plant Layout

ABB Group
November 13, 2009 | Slide 32

Substation Leblon: Plant Layout

ABB Group
November 13, 2009 | Slide 33

Substation Leblon: Plant Layout


Fotomontagem

ABB Group
November 13, 2009 | Slide 34

Substation : LIGHTDistribution Utility GIS SS Leblon

ABB Group
November 13, 2009 | Slide 35

Substation : LIGHTDistribution Utility GIS SS Leblon

ABB Group
November 13, 2009 | Slide 36

Substation : LIGHTDistribution Utility GIS SS Leblon

ABB Group
November 13, 2009 | Slide 37

Summary

Cost Comparison

Conventional S/E
Indoor S/E

Erection time

ABB Group
November 13, 2009 | Slide 38

Equipos/Montaje/Ing
70%
60%

AIS/GIS solution around 1.5 to 2 years

Obras Civiles
30%
40%

Total Cost
100%
130%

Summary

ABB Group
November 13, 2009 | Slide 39

Main Benefits

No visual Impact (Community)

Reduce Footprint

Potential surplus Land*

Reduced Outages

Improve company image

Increase Reliability

Reduce Maintenance

ABB Experience in Brazil

ABB Group
November 13, 2009 | Slide 40

In operation

Energia Sao Jos - Manaus

Light - Light Leblon

Copel - Uvaranas

Electropaulo - Itaim

Petrobras - Repar

In Construction

Light - Light Copacabana

Copel - Capim Siqueira

Copel - Pilarzinho

Copel - Jardim Bandeirantes

ABB Group