SAEC Road Connectivity Project (SRCP)

Leguwaghat- Bhojpur Road (Ch. 0+000 to 65 + 546.9


Contract Package No.: SRCP/ ICB/ LB/ 01

SUMMARY OF COST ESTIMATE


Part
No.
1
2
3
4
5
6
7
8
9
A
B
C
D
E
F

Description of Works

Amount (NRs.)

GENERAL
SITE CLEARANCE
EARTHWORKS
RETAINING AND BREAST WALL
CROSS DRAINAGE, SIDE DRAINAGE AND MISCELLANEOUS
WORKS
PAVEMENT WORKS
ROAD FURNITURE AND TRAFFIC SAFETY MEASURES
DAYWORKS
PROVISIONAL SUM
Total Bid Price with Provisional Sum [Item 1 to 9 ]
Total Bid Price with Provisional Sum [ A- Item 9 ]
Discount, If any
Total Bid Price after Discount without Provisional Sum [B- C]
Add VAT [ 13% of D]
Total Bid with Provisional Sum and VAT [D+ Item 9+ E]

Signature:
Bidder

Cost Summary_Page 1 of 15

SAEC Road Connectivity Project (SRCP)


Leguwaghat- Bhojpur Road (Ch. 0+000 to 65 + 546.98)
Contract Package No.: SRCP/ ICB/ LB/ 01

COST ESTIMATE
Part. 1:GENERAL
Spec.
Item No.
Clause

Description of Works

Unit

Unit Rate in
Figure

Qty

Unit Rate in Wo

1.01 Providing office facility for the Employer

100

1.01 a) Office seceraty/ computer operator

Per- mon.

42

1.01 b) Office Assistant

Per- mon.

42

1.01 c) Office Boy

Per- mon.

42

Construction of Building for Office (type 3) and


1.01 d)
accomodation (type 2) at Bhojpur

m2

215

1.01 e)

Furniture and Equipment for office and


accomodation

LS

1.01 f)

Maintenance and run building, furniture,


equipment and stationaries

mon.

30

mon.

42

LS

Vehicle (type 1) -hardtop jeep, 4 wheel drive at


1.01 g) least 2500 cc capacity including driver, fuel and
maintenance
1.02

Providing , furnishing and maintenance of material


testing laboratory (main lab, type-1)

1.02 a) Providing laboratory space


100

1.02 b)

Providing and furnishing laboratory equipment,


furniture etc

LS

1.02 c)

Maintenance and operation of laboratory office


space, equipment, furnitures etc.

mon.

30

BOQ 1 Cost_Page 2 of 15

SAEC Road Connectivity Project (SRCP)


Leguwaghat- Bhojpur Road (Ch. 0+000 to 65 + 546.98)
Contract Package No.: SRCP/ ICB/ LB/ 01

COST ESTIMATE

Part. 1:GENERAL

Spec.
Item No.
Clause
1.03
100

Description of Works

Unit

Unit Rate in
Figure

Qty

Unit Rate in Words

Amount (NRs.)

Remarks

Maintenance of road

1.03 a) Maintenance of road during construction period

Km- mon.

1,966

1.03 b) Maintenance of road during defect liabilty period

Km- mon.

787

100

1.04

Providing and installation project signboard

no

100

1.05

Insurance for Contaractor's work, plant, materials and


manpower including staff of the Employer and
LS
Engineer

100

1.06

Third Party insurance

LS

100

1.07

Supplying video cassettes

set

100

1.08

Supplying Softwel for the use of the Engineer

set

100

1.09

Operating and maintenance of Ferry till the


completion of the Project

mon.

30

TOTAL PART 1- Carried to Summary

BOQ 2 Cost_Page 3 of 15

SAEC Road Connectivity Project (SRCP)

Leguwaghat- Bhojpur Road (Ch. 0+000 to 65 + 546


Contract Package No.: SRCP/ ICB/ LB/ 01

COST ESTIMATE
PART 2: SITE CLEARANCE
Spec.
Clause

200

Item
No.

Unit Rate in
Figure

Unit

Qty

m2

65,550.00

2.02 a) Above 300 mm to 600 mm

no

40.00

2.02 b) Above 600 mm to 900 mm

no

19.00

Clearing and grubbing of forest including uprooting,


carrying and disposing of vegetation, grass, bush,
2.01
sapling and trees of girth up to 300 mm (measured at
a height of 1m above the ground level

2.02
200

Description of Works

Feeling trees (the girth measured at a height of 1m


above the ground level) including cutting of trunks
and branches, removing the roots, stacking
serviceable materials and disposal of unserviceable
materials and back filling the depressions/pits, all
complete

Dismantling bridge, culverts and other structures


2.03 including stockpiling the reusable materials and
disposal of unusable materials, all complete
200

200

2.03 a) Random rubble masonary in cement mortar

m3

125.00

2.03 b) Gabion work

m3

2,360.00

2.03 c) Dry stone masonary

m3

15.00

m3

10,000.00

Clearing landslide, debris from causeways, culverts


2.04 and side drains including haulage and disposal, all
complete

Total of Part 02

BOQ 3 Cost_Page 4 of 15

SAEC Road Connectivity Project (SRCP)


Leguwaghat- Bhojpur Road (Ch. 0+000 to 65 + 546.98)
Contract Package No.: SRCP/ ICB/ LB/ 01

COST ESTIMATE
PART 3: EARTHWORK
Spec.
Clause

Item
No.
3.01

900

Description of Works

Unit

Qty

Road way excavation including haulage and disposal up to 1


km at appropirate location, all complete

3.01 a) Common material

m3

1,001

3.01 b) Hard rock

30,974

3.02 a) Common material

m3

76,122

3.02 b) Hard rock

2,321

3.02
900

Earthwork excavation for road side drain and structures


including haulage and disposal at appropirate location, all
complete

900

3.03

Formation of embankment with excavated soil including


haulage, compaction in layers not exceeding 150 mm and
watering, all complete

m3

88,545

900

3.04

Backfilling with common materials in layers in the structures


including compaction and watering, all complete

m3

11,597

2400/3
100

3.05

m3

1,287

900

3.06

Backfilling with common materials in layers behind side


drain including compaction and watering, all complete

m3

1,420

1200

3.07

Providing, laying, spreading, watering, levelling and


compaction of road side shoulder materials, all complete

3.07 a) Base course material

m3

31,777

3.07 b) Gravel sub base material

43,680

m3

47,195

3.08

Unit Rate in
Figure

Backfilling with graded filter material in layer in the


structures including compaction and watering, all complete.

Haulage of surplus cut materials beyond 1 km at appropirate


location as instructed by the Engineer
TOTAL PART 3 - Carried to Summary

BOQ 4 Cost_Page 5 of 15

SAEC Road Connectivity Project (SRCP)


Leguwaghat- Bhojpur Road (Ch. 0+000 to 65 + 546.98)
Contract Package No.: SRCP/ ICB/ LB/ 01

COST ESTIMATE
PART 4: RETAINING AND BREAST WALL
Spec.
Clause

2400

2400

Item
No.

Description of Works

Unit

Qty

4.01 a) Using new stones

m3

26,625

4.01 b) Using stones from dismanteled item

1,393

4.02 a) Using new stones

m3

691

4.02 b) Using stones from dismanteled item

m3

175

Unit Rate in
Figure

Unit Rate in Words

Providing and placing machine made gabion and


mattresses of hexagonal mesh size 100 mm * 120 mm
4.01
with mesh wire 3mm, selvedge wire 3.9 mm and lacing
wire 2.4 mm including stone placing, all complete

Providing and laying random rubble masonary in MM 5


4.02 cement mortar including pointing, scaffolding and curing,
all complete

2000

Providing and Placing cement concrete M10/ 40 for


4.03 foundation and footing etc including compaction, curing
and testing, all complete

m3

46

2600

4.04

Providing and laying dry stone masonry including


dressing, all complete

m3

100

2400/2
600

4.05

Providing and laying dry stone masonry including


dressing, all complete

m3

100

TOTAL PART 4 - Carried to Summary

BOQ 5 Cost_Page 6 of 15

SAEC Road Connectivity Project (SRCP)


Leguwaghat- Bhojpur Road (Ch. 0+000 to 65 + 546.98)
Contract Package No.: SRCP/ ICB/ LB/ 01

COST ESTIMATE
PART 5: CROSS DRAINAGE, SIDE DRAINAGE AND MISCELLANEOUS WORKS
Spec.
Item No.
Clause

Description of Works

Unit

Qty

5.01

Providing and laying random rubble masonry in MM 5


cement mortar including pointing, scaffolding and curing, all
complete

5.01 a)

Using new stones

m3

23815

5.01 b)

Using stones from dismanteled item

175

5.02

Providing and placing cement concrete for foundation and


footing etc including compaction, curing and testing, all
complete.

5.02 a)

M 10/40

m3

2448

5.02 b)

M 15/40

m3

148

5.03

Providing and placing machine mixed cement concrete for


the superstructure, deckslab, girder etc including compaction,
curing and testing, all complete

m3

5.03 a)

M 20/20

m3

5510

5.03 b)

M 25/20

m3

390

2000/3
5.04
100

Providing and placing machine mixed cement concrete M 20/


20 for precast slab including compaction, curing and testing,
all complete

m3

169

2000 5.05

Providing and laying reinforcement including cutting, cutting,


bending, binding, fixing in position etc, all complete

mt

71

5.06

Providing preparing and installing formwork including


necessary supports and removing after completion of works,
all complete

m3

5.06 a)

Foundation, footing and slab structures

m2

6899

5.06 b)

Precast element

1010

5.07

Providing and laying RCC pipes (class NP3) with or without


collars, jointed with stiff mixture

5.07 a)

450 mm dia (internal)

Lin.m

135

5.07 b)

900 mm dia (internal)

Lin.m

2638

Providing and laying HDPE pipe of 160 mm dia. (pressure 4


kg/cm2 ) for drainage outlet, sub soil drain etc including
perforation and jointing, all complete

Lin.m

430

2600

2000

2000

1800

700

700 5.08

2400 5.09

Providing, laying and fixing geo- textile (filter fabric), all


complete

m2

25975

2400 5.10

Providing and laying dry stone soling in foundation, all


complete

m3

1269

2400 5.11

Providing and laying dry stone rip- rap, all complete

m4

80

700 5.12

Providing and laying granular bedding material including


compaction and watering, all complete

m5

466

700 5.13

Providing and laying grouted stone pitching in protection


work with stones and cement mortar (1:3) including curing,
all complete

m3

30

Lin.m

379

3109 5.14

Providing and laying PVC pipe of 100 mm dia. (pressure


4kg/cm2

Unit Rate in
Figure

BOQ 6 Cost_Page 7 of 15

Unit Rate in

SAEC Road Connectivity Project (SRCP)


Leguwaghat- Bhojpur Road (Ch. 0+000 to 65 + 546.98)
Contract Package No.: SRCP/ ICB/ LB/ 01

COST ESTIMATE
PART 5: CROSS DRAINAGE, SIDE DRAINAGE AND MISCELLANEOUS WORKS
Spec.
Item No.
Clause

Description of Works

Unit

Qty

Unit Rate in
Figure

TOTAL PART 5 - Carried to Summary

BOQ 6 Cost_Page 8 of 15

Unit Rate in

SAEC Road Connectivity Project (SRCP)


Leguwaghat- Bhojpur Road (Ch. 0+000 to 65 + 546.98)
Contract Package No.: SRCP/ ICB/ LB/ 01

COST ESTIMATE
PART 6: PAVEMENT WORKS
Spec.
Clause

Item
No.

Description of Works

Unit

Qty

1000

Preparation of subgrade by filling or cutting in all


6.01 type of materials including compaction and watering,
all complete

m2

529,223.00

1000

Providing and laying suitable material for capping


6.02 layer including compaction and watering, all
complete

m3

606.00

1200

6.03

Providing, laying, Spreading, watering, levelling and


compaction of natural gravel subbase, all complete

m3

71,256.00

1200

Providing , laying, spreading, watering, levelling and


6.04 compaction of graded crushed stone base course, all
complete

m3

44,398.00

1300

Providing and sparaying bituminious prime coat MC


6.05 30/ MC 70 including cleaning the road surface using
wire, brushes, broom etc, all complete

m2

383,442.00

1300

6.06

Providing and laying sand seal over newly primed


surface, all complete

m2

383,442.00

1300

6.07

Providing and applying bituminious binder for


surface dressing, all complete

Lit

745,798.00

1300

6.08

Providing and applying cutter (kerosene) for bitumen


of surface dressing, all complete

Lit

30,030.00

6.09

Providing and applying chippings for surface


dressing (Class C), all complete

6.09 a) 14mm nominal size

mt

5,177.00

6.09 b) 10 mm nominal size

mt

2,567.00

Kg

3,880.00

1300

1300

6.10

Providing and applying anti stripping agent, all


complete

Unit Rate in
Figure

Unit Rate in Words

TOTAL PART 6 - Carried to Summary

BOQ 7 Cost_Page 9 of 15

SAEC Road Connectivity Project (SRCP)


Leguwaghat- Bhojpur Road (Ch. 0+000 to 65 + 546.98)
Contract Package No.: SRCP/ ICB/ LB/ 01

COST ESTIMATE
PART &: ROAD FURNITURE AND TRAFFIC SAFETY MEASURE
Spec.
Clause

Item No.

Unit

Unit Rate
in Figure

Qty

7.01

Supplying and erecting traffic sign in place including


steel tube, steel plates, cement concrete, painting,
writing and supporting steel angle, nut and bolt etc as
per the drawing, all complete

7.01 a)

Single post

no.

519

7.01 b)

Double or more posts

no.

125.00

7.02

Supplying and placing RCC kilometer post including


excavation, backfilling, painting and writing etc as
per drawing, all complete

7.02 a)

Standard kilometer post (placed at each km)

no.

53.00

7.02 b)

5th kilometer post (placed at 5 km)

no.

13.00

7.03

Supplying and fixing in place RCC delineator post


with reflective element including excavation,
backfilling, painting, and erection etc as per drawing,
all complete

no.

7,609.00

1500

1500

1500

Description of Works

Unit Rate in Words

TOTAL PART 7 Carried to Summary

BOQ 8 Cost_Page 10 of 15

SAEC Road Connectivity Project (SRCP)


Leguwaghat- Bhojpur Road (Ch. 0+000 to 65 + 546.98)
Contract Package No.: SRCP/ ICB/ LB/ 01

COST ESTIMATE
PART 8: DAY WORKS
Spec.
Item No.
Clause

Description of Works

Unit

Qty

8.01 a) Foreman / Supervisor

md

60

8.01 b) Skilled labour (mason, carpenter, mechanic etc.)

md

60

8.01 c) General labour (Unskilled labour, helper, assistant operator etc)

md

250

8.02 a) Cement

mt

10

8.02 b) Sand

mt

20

8.02 c) Aggregate

mt

20

8.02 d) Diesel

lit

490

8.02 e) Petrol

lit

490

8.03 a) Tipper truck (4-6 ton capacity)

hr

250

8.03 b) Tipper truck (8-10 ton capacity)

hr

250

8.03 c) Water tanker (4000 - 6000 lit capacity)

hr

250

8.03 d) Loader ( 1- 1.5 m bucket capacity )

hr

250

8.03 e) Excavator ( 135 HP)

hr

250

8.03 f) Motor grader ( 135 HP )

hr

250

8.03 g) Vibratory roller ( 8- 10 ton capacity)

hr

250

8.03 h) Concrete mixer (0.4 m capacity )

hr

250

8.03 i) Concrete vibrator

hr

250

Unit Rate in
Figure

Works shall only be executed as Dayworks only under the written


instruction of the Engineer
8.01 Labour

8.02 Materials

8.03 Equipment

TOTAL PART 8 - Carried to Summary

BOQ 9 Cost_ Page 11 of 15

SAEC Road Connectivity Project (SRCP)


Leguwaghat- Bhojpur Road (Ch. 0+000 to 65 + 546.98)
Contract Package No.: SRCP/ ICB/ LB/ 01

COST ESTIMATE

Unit Rate in Words

BOQ 9 Cost_ Page 12 of 15

SAEC Road Connectivity Project (SRCP)


Leguwaghat- Bhojpur Road (Ch. 0+000 to 65 + 546.98)
Contract Package No.: SRCP/ ICB/ LB/ 01

COST ESTIMATE
PART 9: PROVISIONAL SUMS
Spec.
Clause

Unit

Qty

Unit Rate in
Figure

9.01 a) Dust and noise mitigitation measures

PS

200000.00

Two Hundred Th

9.01 b) Personal protective equipment

PS

1035000.00

One Million Thirty Fiv

Off site verification testing (not specified in the


specification ) materials as required by the Engineer

PS

400000.00

9.03

Relocation of services as instructed by the Engineer

PS

2000000.00

100

9.04

Social complience and safe guards as instructed by the


Engineer

PS

700000.00

Seven Hundred Th

2800

9.05

Bio engineering works (structure and protection


works)

PS

1966410.00

One Million Nine Hu


Thousand Four Hun

9.06

Land for construction of the Employer's buildings for


office and accomodation at Bhojpur as instructed by
the Engineer

PS

1500000.00

Item No.
9.01

100

100
100

9.02

Description of Works

Unit Rate in

Environmental Mitigation

Four Hundred Th

Two Millio

One Million Five Hund

TOTAL PART 9 - Carried to Summary

BOQ 10 Cost_Page 13 of 15

Project Implementation Directorate


Kathmandu Upatyaka Khanepani Limited

Kathmandu Valley Water Supply and Sanitation Project


Distribution Network Improvement - Package 1
Contract No.: KUKL/DNI/01/01

BILL OF QUANTITIES
Bill No. 11: Inlet/Outlet Connection Works at Panipokhari Reservoir
Item

Description of Works

Unit

Quantity

Rate (NRs.)
In figure

In words

11.1

Total of BOQ 11 Carried to Summary

BOQ 11_14 of 15

ject Implementation Directorate

andu Upatyaka Khanepani Limited

ley Water Supply and Sanitation Project


n Network Improvement - Package 1
tract No.: KUKL/DNI/01/01

LL OF QUANTITIES

Amount (NRs.)

BOQ 11_15 of 15