Structural Integrity Management and Risk

Based Inspection Recent Developments


SNAME Texas Section Meeting
G. Abdel Ghoneim, Ph.D., P.E.
08 December 2009

Agenda
Introduction
Gulf of Mexico Activity
SIM and RBI Fundamentals
Recent Standards
Challenges
Summary

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

GOM Platform Activity

900
800
700

No.ofStructures

600
500
19451972

400

19731982
19832009

300
200
100

Source: MMS, B.J. Kruse, III

0
Source:
MMS
<50
51100
SIM and RBI Recent Developments

101150

SNAME Texas Section Meeting, 08 December 2009


Det Norske Veritas AS. All rights reserved.

151200

201250

251300

301350

351400

WaterDepth(ft)

09 December 2009
3

>400

GOM Platform Decommissioning

GoM Platform Vintage (Years)

15%
30%

25%

30%

<5

5-15

15-30

>30

Total ~ 3,900 Platforms


Average Removal Age ~ 16 years
Source: MMS, B.J. Kruse, III, K. S. Patterson, WISTA Oct 2008
SIM and RBI Recent Developments
SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

The Issues

Source: O'Connor, BP, M. Lalani, June 2007


SIM and RBI Recent Developments
SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

API RPs and Guidelines

API 2A-WSD, Recommended Practice for Planning Designing and Constructing Fixed
Offshore Platforms Working Stress Design.

API 2A-LRFD, Recommended Practice for Planning Designing and Constructing Fixed
Offshore Platforms Load and Resistance Factor Design.

API Bulletin 2TD, Guidelines for Tie-downs on Offshore Production Structures for Hurricane
Season.

API 2T, Recommended Practice for Planning Designing and Constructing Tension Leg
Platforms.

API 2FPS, Recommended Practice for Planning Designing and Constructing Floating
Production Systems.

API 2SK, Recommended Practice Design and Analysis of Stationkeeping Systems for
Floating Structures.

API 2RD, Recommended Practice Design of Risers for Floating Production Systems
(FPSs) and Tension-Leg Platforms (TLPs).

API 2I, Recommended Practice In-Service Inspection of Mooring Hardware for Floating
Drilling Units.

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

API 2HINS Inspection Initiator Process

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

Destroyed GoM Platforms


Number of PlatformsDestroyed

80
69

70

60
60
47

50
40
40
30
20
10

14
8
2

1948

1961

7
3

1969

1974

1979

1985

7
2

0
1964

1965

1992

2002

2004

2005

2005

2008

2008

Year

1.20E-03

R
RSR =
S100

1.00E-03
Annual Failure P robability

R
RSR =
S

1.00E-03

1.00E-03
8.00E-04
6.00E-04

5.00E-04

5.00E-04
4.00E-04

4.00E-04
2.00E-04
2.00E-04
1.00E-05
0.00E+00
Stiff, 2009

Stiff, 2009

Stahl, et.al.,
2000

THIC, 1992
Source

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

Stahl, 1986

ISO 19901-2,
2004

ISO 19902,
2008

Platform Structural Analysis


Load exposure

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

Safety format (LRFD vs. WSD)


Requirement Rd<Sd
Design
Load (Ld)

Design
Resistance (Rd)

Probability Density

Characteristic
Load

Mean
Load

Characteristic
Resistance
Resistance Mean
Resistance
Factor
Load
Factor

Load and Resistance


SIM and RBI Recent Developments
SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

10

SIM Process
Management of Change
SIM Process
Hazard Evaluation and
Risk Assessment

Company
Policy

Contingency
Plans

Develop Integrity
Management Plan (IMP) for
Structure / System
Reporting and
Communication

Implement IMP for the


Structure / System

Audits and
Reviews

Learning and Improvement


Organization and
Personnel

Information
Management

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

11

Principles of Asset Integrity Management


Integrity management life cycle activities

Update risk
status

Monitor Integrity

Integrity
Update overall
inspection plan

Assess risk
(incl. SRS)

Evaluate Risk

Inspection
plan

Filter
findings

Findings

Actions

Plan survey

Inspect
Do follow-up
actions

Evaluate
findings

Record
findings

Inspect

Maintain
Plan follow up
actions
SIM and RBI Recent Developments
SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

12

Slide 12

Why SIM - Ageing Problem?


The contribution of structural failure to the total number of historic
accidents is less than 10% based on worldwide data (Kvitrud, et. al.,
2001).
The reliability of a structure against environmental loads may become
unacceptable in extended lifetime. Subsidence, degradation and
changes to the original design may occur at a higher rate in extended
platform life.
Lack of data on the structure (e.g. drawings, steel type, welding
procedures, inspection results and details about earlier repairs etc.)
may result in higher uncertainty.
Using a systematic approach for evaluating whether a structure is
safe for use beyond its initial design life, taking the above mentioned
issues into account, is the objective of SIMS.
The SIM system has proven invaluable even for relatively newer
structures both fixed and floating.
Ersdal, G. Ph.D. Thesis, U of Stavanger, October 2005
SIM and RBI Recent Developments
SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

13

WCT
Seminar
April 26,

Ageing & Need for SIM & RBI

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

14

What is Risk-Based Inspection (RBI)?


Strategic process for lowering risk and lowering cost
An integrated, data-based methodology that factors risk into inspection
decision making
Risk analysis includes not only probability of failure (PoF) but also
consequence of failure (CoF)
A qualitative and quantitative process for managing
structurres/equipment based on risk analysis
A systematic process that establishes and prioritises risk levels for each
component in the structure
RBI is an important element in the SIM system.

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

15

ORBIT : Main principles


Inspections

Analyses / (re-)design

Input data

Condition
Evaluation

Operating
req. & limits

Inspection
results

Monitoring

Monitoring
results

Condition evaluations
(sections and components)

Action plans
Inspection plan

Activities plan

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

16

Observations

Events /
History

Terminology

Robustness

Fatigue/Fracture

RSR

Failure

Push-over/Time-domain

Safety Category

Assessment/Re-assesment

Consequence of Failure Category

Risk/Reliability

Strength

RBI

Hazards

Design Life

Acceptability Criteria

Standards/Regulations

Air Gap Wave-in-Deck

Limit States

Probabilistic Methods

WSD/ASD and LRFD

Bayesian Approach

Design Criteria

Degradation

Joint Flexibility

Fitness-for-purpose

SRS

SIMS

Load Factor

Bias

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

17

The Two Main Steps of RBI

Expected RISK Cost


6
Normalised Expected Cost

Expected Inspection Cost


Expected Failure Cost

Expected Repair Cost


4

Total Expected Risk Cost

3
2
1
0
1.0E-04

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

18

1.0E-03
1.0E-02
Target Failure Probability Level

1.0E-01

Key Concepts

The Key Concepts of RBI


RISK

Probability of Failure
GFF

Consequence of
Failure

X Item DF
Damage area

Age

Item repair

Damage
type/rate

Other repairs
Injury
Business int.

Insp.
effective.

Env. clean up

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

19

Consequence models estimate:


-

Heat radiation levels from fires


Gas dispersion distances
Durations of fires
Explosion pressures
Number of fatalities per accident
Environmental effect

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

20

Reducing Risk
Inspection frequencies
Inspection scope / thoroughness
Inspection tools / techniques
Inspection practices (internal vs. external)
Building more Redundancies
Maintenance
Proper use/understanding the limitations
Emergency response
Trained crew
Effective communication lines
Local knowledge

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

21

Marine Safety Regulations


Classification
Societies

International
Maritime
Organization

Formal Safety Assessment


Step 1 Hazard
Identification

Step 2
Risk
Assessment

Step 3
Risk Control Options

Step 4
Cost Benefit Assessment

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

Rules

Rules

Classification of Mobile
Offshore Units

MODU Code

22

Step 5
Decision Making
Recommendations

Risk Assessment

Hazard review

Hazard checklist

HAZOP (hazard and operability study)

FMECA (failure modes, effects and criticality


analysis)

SWIFT (structured what-if analysis)

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

23

Risk matrices

Risk ranking

Structured judgement

Risk Assessment

Fault trees

Event trees

Bow tie diagrams

THREATS

CONSEQUENCES

Major
accident

Accident
Scenario

Controls

Rules and standards

Engineering judgement

Risk criteria

Cost-benefit analysis

Company values

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

24

Increasing individual risks and societal concerns

Management
System

Unacceptable
region

Tolerable
region

Broadly acceptable
region

Quantitative Methods

Historical data analysis

Fault tree analysis

Event tree analysis

Consequence modelling

Evacuation modelling

Risks and uncertainties

Evacuation
1.0E-04
per year

Weather

Outcome

Severe
0.01

50% fatalities

Rough
0.09

30% fatalities

Moderate
0.4

10% fatalities

Calm
0.5

5% fatalities

Calm
26%

Severe
5%
Rough
28%

Moderate
41%
SIM and RBI Recent Developments
SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

25

Influences on Technique Selection


Decision context

Lifecycle stage

Major hazard potential

Novelty/non-standard

Techniques

Uncertainty

Practicality

Views/perceptions

Strengths and
weaknesses

Good practice

Efficiency

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

26

Traditional Inspection Planning vs. RBI Planning

Traditional

RBI

Inspection based on experience


(usually by previous
failures/breakdowns)

Inspection based on experience and


systematic (risk) review

Inspection effort driven by


likelihood of failure

Inspection effort driven by risk, i.e.


likelihood of failure and consequences
of failure

Reactive fire fighting, running


behind the ball

Pro-active planning and execution of


inspections

Systematic identification of appropriate


NDT techniques

Use of appropriate / Inappropriate


NDT techniques

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

27

Suitable and Sufficient Inspection Planning

Suitable techniques appropriate for the assessment being


made

Sufficient adequate to show the risks are ALARP, without


requiring further elaboration
S i n g l e c o m p o n e n t c o n si d d e r e d ; D e si g n l i v e = 2 0 y r

Failure probability

1 . 0 E -0 2

1 . 0 E -0 3

1 . 0 E -0 4

1 . 0 E -0 5

1 . 0 E -0 6
0

10

12

14

S e rv ic e tim e in y e a rs
SIM and RBI Recent Developments
SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

28

16

18

20

RBI Investment and Savings


$800,000

$675,000

$700,000

$600,000

$600,000

$550,000

$500,000

$500,000

$400,000

$400,000

$250,000

$300,000
$200,000
$100,000

$85,000

$50,000

$0

RBI
Study
Invest

Inspect Prod
& Maint Cost
Savings Savings

RBI
Study
Invest

$65,000

Inspect Prod
& Maint Cost
Savings Savings

RBI
Study
Invest

Inspect Prod
& Maint Cost
Savings Savings

Refinery - 35
Pressure Vessels

Refinery - 50
Pressure Vessels

Total $ Savings = $1.1M

Total $ Savings = $650,000

Total $ Savings = $1.25M

ROI = 22:1

ROI = 8:1

ROI = 19:1

Chemical Plant - 200


Pressure Vessels

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

29

rbi invesment & savings

Typical ROI = 8:1


$800,000

$675,000

$700,000

$600,000

$600,000

$550,000

$500,000

$500,000

$1,520,000

$400,000
$300,000
$200,000

$50,000

$75,000

$100,000
$0

RBI
Study
Invest

Inspect Prod
& Maint Cost
Savings Savings

Chemical Plant - 200


Pressure Vessels
Total $ Savings = $1.1M

RBI
Study
Invest

Offshore Installation
Piping & Vessels
Total $ Savings = $1.52M

ROI = 22:1

ROI = 20:1

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

Inspect Prod
& Maint Cost
Savings Savings

30

$65,000

RBI
Study
Invest

Inspect Prod
& Maint Cost
Savings Savings

Refinery - 50
Pressure Vessels
Total $ Savings = $1.25M
ROI = 19:1

ORBIT Structure

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

31

RBI Detailed Assessment

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

32

RBI Detailed Assessment

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

33

Inspection Planning
Challenges: No general standard, guideline or common industry practice available
for inspection planning for structures
RBI Analysis Process
New fatigue analysis results

Only done ones

Updated FIPs
(input and results)

SIMS

Member condition

Inspection history

SIMS FIPs Upload

Master RBI Table (2004)


- Fatigue point identification
- fatigue damage rates
- Analysis Method Fatigue
- Analysis Method Collapse
- consequence of member failure
- preferred inspection method
- etc.

Updated Master RBI Table


- RBI Input and results
Inspection plan (FIPs)

RBI analysis report

New fatigue analysis


Fatigue Master Table

Orbit Workflow Manager


Orbit Workflow Manager

RBI analysis
ORBIT/Profast
New RBI Analysis results
(Profast jnl files & database

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

34

Relevant DNV Publications


RP-F107 Pipeline Risk Assessment
RP-G101 RBI of Topsides Equipment
OS-E304 Offshore Mooring Steel Wire Ropes
OSS-121 Class base on Risk Assessment
OSS-303 Risk Based Verification
OSS-304 Risk Based Verification of Offshore Structures

Available online: webshop.dnv.com

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

35

DNV RP-F107 Pipeline Risk Assessment


Cost Benefit Analysis

Risk Matrix

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

36

DNV RP-G101 RBI of Topsides Equipment

Maintenance Management System


SIM and RBI Recent Developments
SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

37

DNV RP-G101 RBI of Topsides Equipment

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

38

DNV RP-G101 RBI of Topsides Equipment

ISO 17776 (2000)


SIM and RBI Recent Developments
SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

39

Push-over Analysis

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

40

SIM System

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

41

Decision Time

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

42

Structural Operational Challenges


New Env.
Criteria

Wave diffraction

Earthquake /
Accidental Loads

Structural modifications/
Weight Management
Platform
strength

COG

Subsidence of seabed/
Possible WiD

Objective Reassessment of Jacket Platforms:


To
safe
useuse
untiluntil
end of
production
Todocument
document
safe
end
of production

Deck
Strength

Date for change in platform operation


(from
Datemanned
for change
in platform operation
to unmanned)

(from manned to unmanned)

Establish evacuation criteria

Cost and scheduling of structural mitigation

Cost and scheduling of structural mitigation


Fatigue strength &
Inspection planning

Foundation
capacity

Inspection planning

Large amount
of
information
SIM and RBI Recent Developments
SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

43

Some Challenges
Wave-in-deck-load (WiD) and load on jacket (WoJ) and variation with time
90

90
Fx - Total (inc. "jet" effect)

80

Fx - WoJ (incl. "jet" effect)

80

70

Fx - WoJ (without "jet" effect)


Fx - WiD (Comflow)

70

Fz - WoJ

Fx (MN)

50

60
50

Fz - WiD (Comflow)

40

40

30

30

20

20

10

10

0
2.2

2.7

3.2

3.7

4.2

4.7

5.2

5.7

6.2

6.7

7.2

7.7

8.2

8.7

9.2

9.7

-10

-10

-20

-20

-30

-30
Time (sec)

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

44

Fz (MN)

60

Challenges (contd)
Determination of failure criteria
Excessive deformation

Dynamic behavior
delta

Elastic
flexibility

Axial joint deformation, delta


SIM and RBI Recent Developments
SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

45

Rise time for wave-in-deck load coincide with one quarter of platform
lowest eigenperiod

New vs. Old

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

46

NORSOK STANDARD N-006, March 2009

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

47

NORSOK Assessment Principles


Requirements to in-service inspection planning and structural integrity management
of jacket structures in general may be found in ISO 19902, Clause 23.
Requirements to inspection and condition monitoring are given in ISO 19903,
Chapter 14.
Requirements to in-service inspection, monitoring and maintenance are given in ISO
19904-1, Chapter 18.
Shut-down and unmanning procedure shall be implemented in order to ensure that
there is less than 5x10-4 annual probability of the facility being exposed to
environmental actions exceeding the structural capacity determined according to the
ALS, with personnel onboard.
In cases of pollution risk or main safety function impairment it should be shown that
the combined probability of a structural failure and leakage that could lead to
significant pollution is less than 1x10-4 per year.

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

48

API RP 2SIM (Draft) ToC

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

49

API RP 2SIM (Draft)


Data

Evaluation

Managed system
for archive and
retrieval of SIM
data and other
pertinent records

Evaluation of
structural integrity
and fitness for
purpose;
development of
remedial actions

Data

Strategy
Overall inspection
philosophy &
strategy and
criteria for inservice inspection

Initiator
Triggered

Evaluation

No

Strategy

Program
Detailed work
scopes for
inspection
activities and
offshore execution
to obtain quality
data

Program

Yes

Assessment

SIM Process and Document Organization

Source: Draft API RP 2SIM


SIM and RBI Recent Developments
SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

50

API RP 2SIM (Draft) RBI Intervals


Assessment Initiator
(See 4.3.5)

Risk
Category

Inspection Interval Ranges

High

3-years to 5-years

Medium

6-years to 10-years

Low

11-years or greater

Assessment Category
(See 4.3.4.4)

Consequence of Platform Failure


(see 4.3.4)

Assessment
Category
and
Assessment
Information

Assessment Information
(See 7.3)

YES

Notes:
a) The timing for the first underwater periodic inspection should be determined
from the date of platform installation or when the baseline inspection was
completed.
b) Risk-based intervals should be adjusted to verify uninterrupted cathodic
protection of the platform. This should be based on data evaluation from prior
inspections.

Inadequate
Deck Height?
(see 4.3.5.1)

Assessment Methods
Section 7
Simple Method
(see 7.5)
Design Level
Method
(see 7.6)
Ultimate Strength
Method
(see 7.7)

Assessment Criteria
Sections 8, 9
- Assessment Type
- Assessment
Category

- Assessment
Criteria
- Load Approach

Assessment Criteria
- Design Level
- Ultimate Strength
- Environmental Load

Assessment
Method

- Assessment
Category

RSR Criteria
- Minimum RSR

Alternative
Methods
(see 7.8)

Pass Assessment?

Mitigation and Risk


Reduction Section 9

Mitigation
And Risk
Assessment
Document
(see 4.2)

Source: Draft API RP 2SIM


SIM and RBI Recent Developments
SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

51

API 2A 20th and 21st Ed. RSRs


20th Ed. GOM
Assessment
Category

21st Ed. GOM


Assessment Category

Reserve Strength Ratio (RSR)

Reserve Strength Ratio (RSR)


GoM L-1 (High)

1.6 for Central Region1


1.2 for Other Regions

A-1 High

1.21

A-2 Medium

0.8

GoM L-2 (Medium)

1.2

A-3 Low

0.62

GoM L-3 (Low)

1.0

Other U.S.
Offshore Areas

2.0

1. This

RSR is applicable only for continued use of the platform for its
present purpose. Not applicable for Change-of Use conditions.
2. Not to be used for water depth greater than 400 ft.

1. Includes

platforms located in the associated Transition Regions. The 100-year


return period metocean conditions as defined in API RP2 MET should be
used to compute the RSR.

20th Ed. Other U.S. Offshore Areas


Assessment Category

Reserve Strength Ratio (RSR)


API RP2A 19th
Edition and
Earlier

A-1 High

1.6

API RP2A 20th


Edition and Later

2.0

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

52

Summary
Structural Integrity Management (SIM) and Risk based inspection planning (RBI)
are tools employed to develop bases for asset management and in-service
inspection in order to extend the useful life of the structure and increase its
reliability level.
SIM is geared towards managing the asset data and communicating status to
corporate management in a systematic manner.
RBI entails:
-

A risk screening process in order to identify critical areas and summarize the failure
modes.
The consequences of possible failures and repair strategy are established in close
co-operation with the operator.
The costs of inspection and repair for failures are established.
Probabilistic progressive collapse analyses are performed for a number of
representative mechanisms in the structures.
A cost optimal inspection strategy is established.

Finally, a user friendly tailor made software is developed to to perform the life cycle
management of the Assets.
SIM and RBI Recent Developments
SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

53

Safeguarding life, property


and the environment
www.dnv.com

SIM and RBI Recent Developments


SNAME Texas Section Meeting, 08 December 2009
Det Norske Veritas AS. All rights reserved.

54