You are on page 1of 11

* Curve Estimation.

TSET NEWVAR=NONE.
CURVEFIT
/VARIABLES=COHESION WITH PSSING
/CONSTANT
/MODEL=LINEAR LOGARITHMIC INVERSE QUADRATIC CUBIC COMPOUND POWER S GROWTH EXPONENTIAL LGSTIC
/PRINT ANOVA
/PLOT FIT.

Curve Fit
[DataSet0]

Model Description
Model Name

MOD_8

Dependent Variable

COHESION

Equation

Linear

Logarithmic

Inverse

Quadratic

Cubic

Compounda

Powera

Sa

Growtha

10

Exponentiala

11

Logistica

Independent Variable

PSSING

Constant

Included

Variable Whose Values Label Observations in Plots

Unspecified

Tolerance for Entering Terms in Equations


a. The model requires all non-missing values to be positive.

Case Processing Summary


N
Total Cases

Excluded Casesa

Forecasted Cases

Newly Created Cases

.0001

a. Cases with a missing value in any


variable are excluded from the
analysis.

Variable Processing Summary


Variables
Dependent

Independent

COHESION

PSSING

Number of Positive Values

Number of Zeros

Number of Negative Values

User-Missing

System-Missing

Number of Missing Values

COHESION
Linear
Model Summary

R Square
.303

Adjusted R

Std. Error of the

Square

Estimate

.092

-.211

3.635

The independent variable is PSSING.

ANOVA
Sum of Squares
Regression

df

Mean Square

4.019

4.019

Residual

39.629

13.210

Total

43.648

The independent variable is PSSING.

Coefficients

Sig.
.304

.620

Standardized
Unstandardized Coefficients
B

Std. Error

PSSING
(Constant)

Coefficients
Beta

-.138

.251

32.579

7.007

t
-.303

Sig.
-.552

.620

4.649

.019

Logarithmic
Model Summary

R Square
.402

Adjusted R

Std. Error of the

Square

Estimate

.161

-.118

3.493

The independent variable is PSSING.

ANOVA
Sum of Squares
Regression

df

Mean Square

7.047

7.047

Residual

36.601

12.200

Total

43.648

Sig.
.578

.503

The independent variable is PSSING.

Coefficients
Standardized
Unstandardized Coefficients
B

Std. Error

Coefficients
Beta

ln(PSSING)

-4.480

5.895

(Constant)

43.471

19.340

t
-.402

Inverse
Model Summary

R Square

Adjusted R

Std. Error of the

Square

Estimate

Sig.
-.760

.503

2.248

.110

.488

.238

-.016

3.330

The independent variable is PSSING.

ANOVA
Sum of Squares

df

Mean Square

Regression

10.384

10.384

Residual

33.264

11.088

Total

43.648

Sig.
.937

.405

The independent variable is PSSING.

Coefficients
Standardized
Unstandardized Coefficients
B

Coefficients

Std. Error

Beta

1 / PSSING

125.144

129.315

(Constant)

23.883

5.315

t
.488

Sig.
.968

.405

4.494

.021

Quadratic
Model Summary

R Square
.821

Adjusted R

Std. Error of the

Square

Estimate

.675

.349

2.665

The independent variable is PSSING.

ANOVA
Sum of Squares

df

Mean Square

Regression

29.446

14.723

Residual

14.202

7.101

Total

43.648

The independent variable is PSSING.

F
2.073

Sig.
.325

Coefficients
Standardized
Unstandardized Coefficients
B
PSSING
PSSING ** 2
(Constant)

Coefficients

Std. Error

Beta

Sig.

-2.802

1.420

-6.148

-1.974

.187

.052

.027

5.895

1.892

.199

64.752

17.761

3.646

.068

Cubic
Model Summary

R Square
.821

Adjusted R

Std. Error of the

Square

Estimate

.675

.349

2.665

The independent variable is PSSING.

ANOVA
Sum of Squares

df

Mean Square

Regression

29.446

14.723

Residual

14.202

7.101

Total

43.648

Sig.

2.073

.325

Sig.

The independent variable is PSSING.

Coefficients
Standardized
Unstandardized Coefficients
B
PSSING
PSSING ** 2
(Constant)

Std. Error

Coefficients
Beta

-2.802

1.420

-6.148

-1.974

.187

.052

.027

5.895

1.892

.199

64.752

17.761

3.646

.068

Excluded Terms

Beta In
PSSING ** 3a

-42.328

Sig.

-1.193

Partial

Minimum

Correlation

Tolerance

.444

-.766

.000

a. The tolerance limit for entering variables is reached.

Compound
Model Summary

Adjusted R

Std. Error of the

Square

Estimate

R Square
.268

.072

-.237

.128

The independent variable is PSSING.

ANOVA
Sum of Squares

df

Mean Square

Regression

.004

.004

Residual

.049

.016

Total

.053

Sig.
.233

.663

The independent variable is PSSING.

Coefficients
Standardized
Unstandardized Coefficients
B
PSSING
(Constant)

Std. Error
.996

.009

32.190

7.952

The dependent variable is ln(COHESION).

Power
Model Summary

Coefficients
Beta

t
.765

Sig.

113.122

.000

4.048

.027

R Square
.367

Adjusted R

Std. Error of the

Square

Estimate

.135

-.154

.124

The independent variable is PSSING.

ANOVA
Sum of Squares

df

Mean Square

Regression

.007

.007

Residual

.046

.015

Total

.053

Sig.
.467

.543

The independent variable is PSSING.

Coefficients
Standardized
Unstandardized Coefficients
B

Std. Error

ln(PSSING)
(Constant)

Coefficients
Beta

-.143

.209

45.721

31.321

t
-.367

Sig.
-.684

.543

1.460

.240

The dependent variable is ln(COHESION).

S
Model Summary

R Square
.454

Adjusted R

Std. Error of the

Square

Estimate

.206

-.058

.119

The independent variable is PSSING.

ANOVA
Sum of Squares

df

Mean Square

Regression

.011

.011

Residual

.042

.014

Sig.
.779

.442

Total

.053

The independent variable is PSSING.

Coefficients
Standardized
Unstandardized Coefficients
B

Coefficients

Std. Error

Beta

1 / PSSING

4.063

4.602

(Constant)

3.195

.189

t
.454

Sig.
.883

.442

16.895

.000

The dependent variable is ln(COHESION).

Growth
Model Summary

Adjusted R

Std. Error of the

Square

Estimate

R Square
.268

.072

-.237

.128

The independent variable is PSSING.

ANOVA
Sum of Squares

df

Mean Square

Regression

.004

.004

Residual

.049

.016

Total

.053

Sig.
.233

.663

The independent variable is PSSING.

Coefficients
Standardized
Unstandardized Coefficients
B

Std. Error

PSSING

-.004

.009

(Constant)

3.472

.247

Coefficients
Beta

t
-.268

Sig.
-.482

.663

14.053

.001

The dependent variable is ln(COHESION).

Exponential
Model Summary

Adjusted R

Std. Error of the

Square

Estimate

R Square
.268

.072

-.237

.128

The independent variable is PSSING.

ANOVA
Sum of Squares

df

Mean Square

Regression

.004

.004

Residual

.049

.016

Total

.053

Sig.
.233

.663

The independent variable is PSSING.

Coefficients
Standardized
Unstandardized Coefficients
B

Std. Error

PSSING
(Constant)

Coefficients
Beta

-.004

.009

32.190

7.952

t
-.268

The dependent variable is ln(COHESION).

Logistic
Model Summary

R Square
.268

Adjusted R

Std. Error of the

Square

Estimate

.072

The independent variable is PSSING.

-.237

.128

Sig.
-.482

.663

4.048

.027

ANOVA
Sum of Squares

df

Mean Square

Regression

.004

.004

Residual

.049

.016

Total

.053

Sig.
.233

.663

The independent variable is PSSING.

Coefficients
Standardized
Unstandardized Coefficients
B
PSSING
(Constant)

Std. Error
1.004

.009

.031

.008

The dependent variable is ln(1 / COHESION).

Coefficients
Beta

t
1.308

Sig.

113.122

.000

4.048

.027

You might also like