You are on page 1of 255

CLIEN :

CHINA NATIONAL HEAVY MACHINERY


CORPORATION ( CHMC )
LOCATION :

PULANG PISAU
CENTRAL KALIMANTAN

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 No._ Landasan Ulin Banjarbaru
Telp. +62 511 7499150 Fax. +62 511 4705765
E-mail: kalimantansoil@yahoo.co.id

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research

No
Enc
Subject

: 161/KSE/X/2007
: 1 (one) bundle
: Soil Investigation Report

To:
China National Heavy Machinery Corporation ( CHMC )
Att. Mr. Xu Bin

Dear Sir,
Regarding the completed work of topography & soil investigation at project of Pulang Pisau Power
Plant located in Pulang Pisau, Central Kalimantan, herewith we enclose the final of the project.
Thank for your attention, and cooperation.

Banjarbaru, 10 Oktober 2007


Sincerely yours,

A.Roestam Pohan
Director

Office : Jl. A.Yani Km.23,5 Landasan Ulin Banjarbaru


Telp. 0511-7499150 Fax.0511-4705765 e-mail: kalimantansoil@yahoo.co.id

SOIL INVESTIGATION
PROJECT OF PULANG PISAU POWER PLANT
CHINA NATIONAL HEAVY MACHINERY CORPORATION ( CHMC )

INTRODUCTION
Based on agreement in MoU between China National Heavy Machinery Corporation ( CHMC ) and PT.
KALIMANTAN SOIL ENGINEERING (KSE), both parties were agreed to conduct a cooperation in soil
investigation activity as below

A. Field Work
1. 4 (four) deep boring points with 3 (three) point @ 65 m and 1 (one) point with 30 m
2. Standart Penetration Test (SPT) every 2,5 m
3. 16 (sixteen) cylinders of Undisturb Sampling

B. Laboratory Work
Laboratory test, each has 8 (eight) kinds to test : Water Content, Unit Weight, Spesific Gravity, Grain
Size Analysis, Liquid Limit and Plastic Limit, Direct Shear, Unconfined Compressive Strength,
Consolidation.

FIELD WORK
Core Drilling and Standart Penetration Test (SPT)
Drilling was to get undisturb and disturb sample as well as to find out the profile/stratigraphy of soil layer
and the value of SPT reached 50. The SPT was meant to find out the hardness of every soil layer which
correlated with number of hit for every 12-inch penetration (counted at the last 2 x 6 inch).
SPT General Correlation

N value
04
4 - 10
10 30
30 50
> 50

Sand Type Soil


Relative Density
Very Loose
Loose
Medium
Dense
Very Dense

Clay or Silt Type Soil


N value
Consistency
02
Very Soft
2-4
Soft
4-8
Firm
8 15
Stiff
15 30
Very Stiff
> 30
Hard

Tabel 1. Description of soil layers based on the drilling result (BH-1)

Kedalaman (m)
0,00 1,95
1,95 09,80
9,80 12,00
12.00 14.00
14.00 19.50
19.50 21.50
21.50 23.50
23.50 41.00
41.00 43.50

Deskripsi Tanah
Clay brown
Clay grey
Less sandy clay grey
Clay grey
Clay brownish grey
Blackish brown Organic
Clay brown
Sand brown
Sandy clay grey

NSPT
0
0
0
0
0
3
3 19
19 36
12

Relative Density/ Consistency


Very Soft
Very Soft
Very Soft
Very Soft
Very Soft
Very Soft
Firm up to stiff
Medium up to dense
Stiff

1
PT. Kalimantan Soil Engineering
Soil Testing, Foundation, Geotechnic Design and Research

Kedalaman (m)
43.50 46.80
46.80 54.60
54.60 56.95
56.95 58.75
58.75 59.86
59.86 60.50
60.50 65.00

Deskripsi Tanah
Sand brown
Clay grey
Black Organic
Clay brown
Light coal/black organic
Clay, blackish brown
Light coal/black organic

NSPT
27
15 16
16 - 34
34
> 50
> 50
> 50

Relative Density/ Consistency


Medium
Very Stiff
Very stiff up to Hard
Hard
Hard
Hard
Hard

Tabel 2. Description of soil layers based on the drilling result (BH-2)

Kedalaman (m)
0 14.50
14.50 19.50
19.50 20.00
20.00 21.00
21.00 21.50
21.50 23.50
23.50 30.00

Deskripsi Tanah
Clay brown
Less sandy clay grey
Clay and blackish grey organic
Blackish brown Organic
Black Organic
Clay grey
Sand brown

NSPT
0
0
0
0
0
0
12 - 28

Relative Density/ Consistency


Very Soft
Very Soft
Very Soft
Very Soft
Very Soft
Very Soft
Stiff up to very stiff

Tabel 3. Description of soil layers based on the drilling result (BH-3)

Kedalaman (m)
0 0.70
0,70 5.30
5.30 11.50
11.50 19.00
19.00 20.00
20.00 21.00
21.00 25.00
25.00 32.95
32.95 52.00
52.00 53.50
53.50 53.95
53.95 59.00
59.00 59.87
59.87 62.50
62.50 65.00

Deskripsi Tanah
Clay yellowish brown
Clay, brown
Sand grey
Clay brown
Black Organic
Clay + black organic
Clay grey
Sand, brown
Sand greyish brown
Sand yellowish brown
Light coal (black organic)
Clay + blackish brown organic
Light coal (black organic)
Clay blackish brown
Light coal (black organic)

NSPT
0
0
0
0
0
0
3
6 - 32
17 - 35
33
> 50
39 - 50
> 50
> 50
> 50

Relative Density/ Consistency


Very soft
Very soft
Very Loose
Very soft
Very soft
Very soft
Very soft
Loose up to Medium
Medium up to dense
Dense
Hard
Hard
Hard
Hard
Hard

Tabel 4. Description of soil layers based on the drilling result (BH-4)

Kedalaman (m)
0 6.30
6.30 15.00
15.00 19.80
19.80 20.50
20.50 24.50
24.50 44.50
44.50 47.50
47.50 53.00
53.00 55.00
55.00 56.95
56.95 59.00
59.00 65.00

Deskripsi Tanah
Clay brown
Sandy clay, brown
Clay brown
Blackish brown organic
Clay grey
Sand brown
Sand grey
Clay grey
Light coal (black organic)
Clay+organic, blackish brown
Clay, blackish grey
Light coal (black organic)

NSPT
0
0
0
0
0
11 - 32
12
12 -14
> 50
23
23
> 50

Relative Density/ Consistency


Very Soft
Very soft
Very soft
Very soft
Very soft
Medium
Medium
Stiff
Hard
Very Stiff
Very Stiff
Hard

PT. Kalimantan Soil Engineering


Soil Testing, Foundation, Geotechnic Design and Research

LABORATORY WORK
Laboratory test was conducted for every undisturbed sample from the drilling result of soil test in the
laboratory, showed in the following table.

Table 5.Summary of sample geotechnic parameter (BH-1 and BH-2)


SOIL TESTING RESULT
NO

1
2
3
4

6
7
8

KIND of TEST

Gs
LL
PL
PI
No. #
4,75
0,425
0,075
c

qu
cu
Cc
Cs
Cv
k
e

(%)
(Kg/cm3)
(%)
(%)

mm
mm
mm
(Kg/cm2)
()
(Kg/cm2)
(Kg/cm2)

BH-1

BH-1

5,0 - 5,5 m

8,0 - 8,5 m

BH-1

87,28
1,46
2,43
51,20
39,27
11,93

90,20
1,43
2,37
48,80
39,61
9,19

85,17
1,47
2,51
52,00
36,56
15,44

100,00
100,00
100,00
0,01
13,00
0,049
0,025
0,469
0,054
8,17E-03
9,81E-07
2,021

100,00
93,83
29,41
0,08
26,00
0,060
0,030
0,805
0,093
8,17E-03
8,43E-07
2,136

100,00
96,03
22,64
0,15
26,00
0,092
0,046
0,778
0,130
8,17E-03
4,39E-07
2,318

BH-1

BH-2

BH-2

2,0 - 2,5 m

5,0 - 5,5 m

77,42
1,51
2,44
51,00
39,41
11,59

107,20
1,38
2,30
53,40
41,35
12,05

86,90
1,45
2,38
52,00
42,21
9,79

94,72
1,44
2,51
53,60
50,30
3,30

76,67
1,45
2,35
56,00
48,04
7,96

100,00
100,00
100,00
0,19
18,00
0,062
0,031
0,462
0,048
8,17E-03
5,15E-07
1,862

100,00
100,00
100,00
0,045
6,00
0,035
0,025
0,647
0,091
8,12E-03
9,47E-07
2,320

100,00
100,00
100,00
0,035
14,00
0,056
0,041
0,498
0,073
8,17E-03
7,36E-07
1,922

100,00
100,00
100,00
0,045
14,50
0,068
0,049
0,774
0,082
8,17E-03
6,59E-07
2,448

100,00
100,00
100,00
0,055
9,50
0,031
0,027
0,469
0,098
8,12E-03
7,23E-07
1,754

BH-4

BH-4

11,0 - 11,5 m 14,0 - 14,5 m

BH-2

BH-2

11,0 - 11,5 m 14,0 - 14,5 m

Tabel 6. Summary of sample geotechnic parameter (BH-3 and BH-4)

SOIL TESTING RESULT


NO

1
2
3
4

6
7
8

KIND of TEST

Gs
LL
PL
PI
No. #
4,75
0,425
0,075
c

qu
cu
Cc
Cs
Cv
k
e

(%)
(Kg/cm3)
(%)
(%)

mm
mm
mm
(Kg/cm2)
()
(Kg/cm2)
(Kg/cm2)

BH-3

BH-3

5,0 - 5,5 m

8,0 - 8,5 m

BH-3

79,91
1,49
2,29
46,00
35,65
10,35

72,75
1,58
2,57
37,20
31,46
5,74

91,15
1,47
2,46
52,60
43,75
8,85

100,00
100,00
100,00
0,038
11,00
0,031
0,016
0,407
0,350
8,17E-03
7,90E-07
1,503

100,00
100,00
25,00
0,054
7,00
0,028
0,014
0,440
0,045
8,17E-03
6,25E-07
1,888

100,00
100,00
26,05
0,025
19,00
0,063
0,032
0,596
0,106
8,17E-03
6,68E-07
2,084

BH-3

BH-4

BH-4

2,0 - 2,5 m

5,0 - 5,5 m

71,51
1,52
2,55
52,20
39,68
12,52

80,98
1,49
2,29
48,80
34,44
14,36

79,64
1,47
2,15
48,70
39,69
9,01

86,27
1,46
2,44
48,10
38,69
9,41

76,20
1,50
2,51
46,60
39,15
7,45

100,00
100,00
100,00
10,500
0,07
0,071
0,036
0,480
0,051
8,17E-03
5,38E-07
1,866

100,00
100,00
100,00
0,024
11,50
0,025
0,020
0,475
0,049
8,12E-03
8,71E-07
1,750

100,00
100,00
100,00
0,051
10,00
0,035
0,018
0,430
0,058
8,02E-03
9,00E-07
1,588

100,00
100,00
19,87
0,030
11,00
0,045
0,030
0,760
0,122
8,17E-03
6,31E-07
2,323

100,00
100,00
29,59
0,040
9,00
0,051
0,035
0,481
0,087
8,12E-03
7,00E-07
1,949

11,0 - 11,5 m 14,0 - 14,5 m

11,0 - 11,5 m 14,0 - 14,5 m

In general, result of laboratory test for the sample showed that the soil had low bearing capacity, which
indicated by the soils small volume weight, high water content, low pas and 100 percent passed No.200
sieve.

3
PT. Kalimantan Soil Engineering
Soil Testing, Foundation, Geotechnic Design and Research

DESIGN RECOMMENDATION

From the analysis on types of soil layer and result of SPT test for each soil layer, it can be concluded that
soil at the depth at 0,00 m to 25,00 m was very soft and soft. From the depth of 25,00 m to 45,00 m the
soil was sand layer with loose to dense/very dense. From 45,00 m to 65,00 m deep there was layer from
medium to very stiff category and very hard coal/balck organic was found. Layers with SPT > 50 was
average found at the depth of 60,00 m.
From the condition of soil layers and the density/hardness, for primary building the foundation construction it
is recommended to use pile foundation. For the depth or length of embedded pile the alternatives are:
1. Alternative 1 : With foundation depth of 35 m. This foundation depth is taken since this layer is a
sand layer with medium density. However, the bearing capacity is in low/poor category.
2. Alternative 2 : With foundation depth at 50,0 m. This foundation depth is taken since this is a clay
layer with medium to very stiff density category and the bearing capacity is fairly high.
To use pile up to 60,00 m, deep will require a large amount of money, and will create some difficulty in the
implementation. Moreever, there is possibility that the pile can not be embedded up to 60,00 m.
For secondary building, using concrete of minipile with dimension of 20 x 20 or 28 x 28 x 28, the calculation
of bearing capacity using CPT result.

CONCLUSION
Based on the result of soil investigation done :
-

Surface soil of to 25,00 m deep is cohesive soil which has very low soil bearing capacity.

Very stiff/hard soil is relatively deep, from 50,00 m to 60,00 m.

For primary building the foundation conctruction it is recommended to use concrete of pile.

The depth of foundation embedded or the length of pile can be 35,00 m 0r 50,00 m

For secondary building the foundation conctruction it is recommended to use concrete of minipile.

4
PT. Kalimantan Soil Engineering
Soil Testing, Foundation, Geotechnic Design and Research

PT. KALIMANTAN SOIL ENGINEERING

Soil Testing, Foundation, Geotechnic Design and Research


Project
Clien
Location
Total Depth

Power Plant of Pulang Pisau


CHMC
Pulang Pisau, Central Kalimantan
65,00 m

GWL
Start
Finish
Operator

- 00,60 m
September 14, 2007
September 17, 2007
Miskidi

Point No.

BH-1

0,00

10

20

30

40

NOTE

DESCRIPTION

LOG

NO. SAMPLE

SPT GRAPHIC

N - SPT

DEPTH

DATE

KIND OF TEST

BORING LOG

50

Clay, brown, very soft


1,00
1,95
2,50
3,00

1
95
1
50

1
50

UDS 1
SPT 3

1
50

UDS 2
SPT 4

SPT 1
0
SPT 2

Clay, grey, very soft

4,00
5,00
5,50
6,00

September 14, 2007

7,00
8,00
8,50
9,00
9,80
10,00

Less Sandy Clay, grey, very soft


11,00
11,50
12,00

1
50

UDS 3
SPT 5

Clay, grey, very soft

13,00
14,00
14,50
15,00

1
50

1
45

UDS 4
SPT 6

Clay, brownish grey, very soft

16,00
17,00
17,50
18,00

SPT 7

19,00
19,50
20,00

Blackish Brown Organic, very soft

Counted by :

NOTE :

= SPT

Checked by :

= UDS
Bony W Rakhman, SST

Yusti Yudiawati, MT

Technical Report

Geotechnical Engineer

PT. KALIMANTAN SOIL ENGINEERING

Soil Testing, Foundation, Geotechnic Design and Research


Project
Clien
Location
Total Depth

Power Plant of Pulang Pisau


CHMC
Pulang Pisau, Central Kalimantan
65,00 m

GWL
Start
Finish
Operator

- 00,60 m
September 14, 2007
September 17, 2007
Miskidi

Point No.

BH-1

23,00
23,50
23,95

10

1
15

1
15

2
15

20

30

40

NOTE

DESCRIPTION

LOG

NO. SAMPLE

SPT GRAPHIC

N - SPT

DEPTH

DATE

20,00
20,50
20,95
21,50
22,00

KIND OF TEST

BORING LOG

50

Blackish Brown Organic, very soft

3
30

SPT 8
Clay, brown, stiff

2
15

8
15

11
15

19
30

SPT 9
Sand, brown, medium

25,00
26,00
26,50
26,95

Sand, brown, medium

10
15

10
15

11
15

21
30

SPT 10

5
15

12
15

12
15

24
30

SPT 11

10
15

14
15

16
15

30
30

SPT 12

12
15

17
15

19
15

36
30

SPT 13

9
15

15
15

17
15

32
30

SPT 14

September 15, 2007

28,00
29,00
29,55
30,00

Sand, brown, medium

31,00
32,00
32,50
32,95

Sand, brown, dense

34,00
35,00
35,50
35,95

Sand, brown, dense

37,00
38,00
38,50
38,95

Sand, brown, dense

40,00

Counted by :

NOTE :

= SPT

Checked by :

= UDS
Bony W Rakhman, SST

Yusti Yudiawati, MT

Technical Report

Geotechnical Engineer

PT. KALIMANTAN SOIL ENGINEERING

Soil Testing, Foundation, Geotechnic Design and Research


Project
Clien
Location
Total Depth

Power Plant of Pulang Pisau


CHMC
Pulang Pisau, Central Kalimantan
65,00 m

GWL
Start
Finish
Operator

- 00,60 m
September 14, 2007
September 17, 2007
Miskidi

Point No.

BH-1

40,00

10

20

30

40

NOTE

DESCRIPTION

LOG

NO. SAMPLE

SPT GRAPHIC

N - SPT

DEPTH

DATE

KIND OF TEST

BORING LOG

50

Sand, brown, dense


41,00
41,95

1
15

4
15

8
15

12
30

7
15

13
15

14
15

27
30

SPT 16

5
15

7
15

8
15

15
30

SPT 17

6
15

7
15

9
15

16
30

SPT 18

4
15

8
15

8
15

16
30

SPT 19

SPT 15

43,00
43,50
44,00
44,95

sandy clay, stiff

Sand, brown, medium

46,00
46,80

September 16, 2007

47,95

Clay, grey, stiff

49,00
50,00
50,95
52,00
53,00
53,95
54,60
55,00

Black Organic
56,00
56,95

10
15

16
15

18
15

34
30

SPT 20
Clay, brown, hard

58,00
58,75
59,00
59,86

Light coal (black organic)


10
15

27
15

25 > 50
15

SPT 21

Counted by :

NOTE :

= SPT

Checked by :

= UDS
Bony W Rakhman, SST

Yusti Yudiawati, MT

Technical Report

Geotechnical Engineer

PT. KALIMANTAN SOIL ENGINEERING

Soil Testing, Foundation, Geotechnic Design and Research


Project
Clien
Location
Total Depth

Power Plant of Pulang Pisau


CHMC
Pulang Pisau, Central Kalimantan
65,00 m

GWL
Start
Finish
Operator

- 00,60 m
September 14, 2007
September 17, 2007
Miskidi

Point No.

BH-1

10

57
15

20

30

40

NOTE

DESCRIPTION

LOG

NO. SAMPLE

SPT GRAPHIC

N - SPT

DEPTH

DATE
September 17, 2007

59,86
60,50
61,00

KIND OF TEST

BORING LOG

50

Clay, blackish brown, hard

> 50
SPT 22

Light coal (black organic), hard


62,00
63,00
64,00
65,00

54
15

> 50
SPT 23

66,00
67,00
68,00
69,00
70,00
71,00
72,00
73,00
74,00
75,00
76,00
77,00
78,00
79,00
80,00

Counted by :

NOTE :

= SPT

Checked by :

= UDS
Bony W Rakhman, SST

Yusti Yudiawati, MT

Technical Report

Geotechnical Engineer

PT. KALIMANTAN SOIL ENGINEERING

Soil Testing, Foundation, Geotechnic Design and Research


Project
Clien
Location
Total Depth

Power Plant of Pulang Pisau


CHMC
Pulang Pisau, Central Kalimantan
30,00 m

GWL
Start
Finish
Operator

- 00,00 m
September 18, 2007
September 19, 2007
Miskidi

Point No.

BH-2

0,00

10

20

30

40

NOTE

50

Clay, brown, very soft

1,00
2,00
2,50
3,30

DESCRIPTION

LOG

NO. SAMPLE

SPT GRAPHIC

N - SPT

DEPTH

DATE

KIND OF TEST

BORING LOG

1
80

UDS 1
SPT 1

1
60

UDS 2
SPT 2

1
50

1
50

UDS 3
SPT 4

1
50

UDS 4
SPT 5

4,00
5,00
5,50
6,00

September 18, 2007

7,00
8,00
8,50
9,00

SPT 3

10,00
11,00
12,00
13,00
14,00
14,50
15,00

Less sandy clay, grey, very soft


16,00
17,00
17,50
18,00

1
50

0
SPT 6

19,00
19,50
20,00

Clay + blackish grey organic, very soft

Counted by :

NOTE :

= SPT

Checked by :

= UDS
Bony W Rakhman, SST

Yusti Yudiawati, MT

Technical Report

Geotechnical Engineer

PT. KALIMANTAN SOIL ENGINEERING

Soil Testing, Foundation, Geotechnic Design and Research


Project
Clien
Location
Total Depth

Power Plant of Pulang Pisau


CHMC
Pulang Pisau, Central Kalimantan
30,00 m

GWL
Start
Finish
Operator

- 00,00 m
September 18, 2007
September 19, 2007
Miskidi

Point No.

BH-2

10

1
50

20

30

40

NOTE

DESCRIPTION

LOG

NO. SAMPLE

SPT GRAPHIC

N - SPT

DEPTH

DATE

20,00
20,50
21,00
21,50
22,00

KIND OF TEST

BORING LOG

50

Blackish brown organic, very soft

0
SPT 7

Black organic, very soft

September 19, 2007

Clay, grey, very soft


23,00
23,50
24,00

4
15

12
15

16
15

28
30

SPT 8
Sand, brown, medium

25,00
26,00
26,50
26,95

2
15

5
15

10
15

15
30

SPT 9

7
15

5
15

7
15

12
30

SPT 10

28,00
29,00
29,50
30,00
31,00
32,00
33,00
34,00
35,00
36,00
37,00
38,00
39,00
40,00

Counted by :

NOTE :

= SPT

Checked by :

= UDS
Bony W Rakhman, SST

Yusti Yudiawati, MT

Technical Report

Geotechnical Engineer

PT. KALIMANTAN SOIL ENGINEERING

Soil Testing, Foundation, Geotechnic Design and Research


Project
Clien
Location
Total Depth

Power Plant of Pulang Pisau


CHMC
Pulang Pisau, Central Kalimantan
65,00 m

GWL
Start
Finish
Operator

- 00,00 m
September 20, 2007
September 22, 2007
Miskidi

Point No.

BH-3

5,30
5,50
6,30

10

20

30

40

NOTE

DESCRIPTION

LOG

NO. SAMPLE

SPT GRAPHIC

N - SPT

DEPTH

DATE

0,00
0,70
1,00
2,00
2,50
3,00
3,40
4,00

KIND OF TEST

BORING LOG

50

Clay, yellowish brown, very soft


Clay, brown, very soft

1
90

1
80

1
50

UDS 2
SPT 3

1
50

UDS 3
SPT 4

1
50

1
50

UDS 1
SPT 1

SPT 2

Sand, grey, very loose

September 20, 2007

7,00
8,00
8,50
9,00
10,00
11,00
11,50
12,00

Clay, brown, very soft

13,00
14,00
14,50
15,00

UDS 4
SPT 5

16,00
17,00
18,00

SPT 6

19,00
Black organic, very soft
20,00

Counted by :

NOTE :

= SPT

Checked by :

= UDS
Bony W Rakhman, SST

Yusti Yudiawati, MT

Technical Report

Geotechnical Engineer

PT. KALIMANTAN SOIL ENGINEERING

Soil Testing, Foundation, Geotechnic Design and Research


Project
Clien
Location
Total Depth

Power Plant of Pulang Pisau


CHMC
Pulang Pisau, Central Kalimantan
65,00 m

GWL
Start
Finish
Operator

- 00,00 m
September 20, 2007
September 22, 2007
Miskidi

Point No.

BH-3

10

1
50

20

30

40

NOTE

50

Clay + black organic, very soft

0
SPT 7

Clay, grey, very soft

22,00
23,00
23,50
23,95

DESCRIPTION

LOG

NO. SAMPLE

SPT GRAPHIC

N - SPT

DEPTH

DATE
September 20, 2007

20,00
20,50
21,00

KIND OF TEST

BORING LOG

1
15

1
15

2
15

3
30

SPT 8

25,00
Sand, brown, loose
26,00
26,50
26,95

5
15

4
15

2
15

6
30

SPT 9

9
15

12
15

20
15

32
30

SPT 10

8
15

12
15

15
15

27
30

SPT 11

28,00
29,00
29,50
29,95

Sand, brown, dense

September 21, 2007

31,00
32,00
32,50
32,95

Sand, brown, medium


Sand, greyish brown, dense

34,00
35,00
35,50
35,95

Sand, greyish brown, dense

10
15

15
15

18
15

33
30

SPT 12

12
15

16
15

19
15

35
30

SPT 13

37,00
38,00
38,50
38,95

Sand, greyish brown, dense

40,00

Counted by :

NOTE :

= SPT

Checked by :

= UDS
Bony W Rakhman, SST

Yusti Yudiawati, MT

Technical Report

Geotechnical Engineer

PT. KALIMANTAN SOIL ENGINEERING

Soil Testing, Foundation, Geotechnic Design and Research


Project
Clien
Location
Total Depth

Power Plant of Pulang Pisau


CHMC
Pulang Pisau, Central Kalimantan
65,00 m

GWL
Start
Finish
Operator

- 00,00 m
September 20, 2007
September 22, 2007
Miskidi

Point No.

BH-3

10

20

30

40

NOTE

DESCRIPTION

LOG

NO. SAMPLE

SPT GRAPHIC

N - SPT

DEPTH

DATE

40,00
40,50
40,95

KIND OF TEST

BORING LOG

50

Sand, greyish brown, dense

8
15

14
15

17
15

31
30

SPT 14

8
15

8
15

9
15

17
30

SPT 15

Sand, greyish brown, medium

6
15

11
15

17
15

28
30

SPT 16

Sand, greyish brown, medium

9
15

14
15

19
15

33
30

SPT 17

Sand, greyish brown, dense

42,00

September 21, 2007

43,00
44,00
44,50
44,95
46,00
47,00
47,50
47,95
49,00
50,00
50,50
50,95
52,00

September 22, 2007

Sand, yellowish brown, dense


53,00
53,50
53,95

10
15

22
15

31 > 50
15

SPT 18

6
15

7
15

8
15

SPT 19

15
15

34
15

25 > 50
7

Light coal (black organic), hard


Clay + blackish brown organic, stiff

55,00
56,00
56,50
56,95

15
30

58,00
59,00
59,50
59,87

Light coal (black organic), hard


SPT 20

Counted by :

NOTE :

= SPT

Checked by :

= UDS
Bony W Rakhman, SST

Yusti Yudiawati, MT

Technical Report

Geotechnical Engineer

PT. KALIMANTAN SOIL ENGINEERING

Soil Testing, Foundation, Geotechnic Design and Research


Project
Clien
Location
Total Depth

Power Plant of Pulang Pisau


CHMC
Pulang Pisau, Central Kalimantan
65,00 m

GWL
Start
Finish
Operator

- 00,00 m
September 20, 2007
September 22, 2007
Miskidi

Point No.

BH-3

59,87

10

20

30

40

NOTE

DESCRIPTION

LOG

NO. SAMPLE

SPT GRAPHIC

N - SPT

DEPTH

DATE

KIND OF TEST

BORING LOG

50

September 22, 2007

Clay , blackish brown, hard


61,00
62,00
62,50
62,75

31
15

64,00
64,50
65,00

50
14

50
10

> 50
SPT 21

Light coal (black organic), hard

> 50
SPT 22

66,00
67,00
68,00
69,00
70,00
71,00
72,00
73,00
74,00
75,00
76,00
77,00
78,00
79,00
80,00

Counted by :

NOTE :

= SPT

Checked by :

= UDS
Bony W Rakhman, SST

Yusti Yudiawati, MT

Technical Report

Geotechnical Engineer

PT. KALIMANTAN SOIL ENGINEERING

Soil Testing, Foundation, Geotechnic Design and Research


Project
Clien
Location
Total Depth

Power Plant of Pulang Pisau


CHMC
Pulang Pisau, Central Kalimantan
65,00 m

GWL
Start
Finish
Operator

- 00,60 m
September 23, 2007
September 26, 2007
Miskidi

Point No.

BH-4

0,00

10

20

30

40

NOTE

DESCRIPTION

LOG

NO. SAMPLE

SPT GRAPHIC

N - SPT

DEPTH

DATE

KIND OF TEST

BORING LOG

50

Clay, brown, very soft


1,00
2,00
2,50
3,35

1
85

UDS 1
SPT 1

1
80

UDS 2
SPT 2

4,00
5,00
5,50
6,00
6,30
7,00

Less sandy clay, brown, very soft


September 23, 2007

8,00
9,00

1
70

1
50

UDS 3
SPT 4

1
50

UDS 4
SPT 5

SPT 3

10,00
11,00
11,50
12,00
13,00
14,00
14,50
15,00

Clay, brown, very soft

16,00
17,00
17,50
18,00

1
50

0
SPT 6

19,00
19,80

Counted by :

NOTE :

= SPT

Checked by :

= UDS
Bony W Rakhman, SST

Yusti Yudiawati, MT

Technical Report

Geotechnical Engineer

PT. KALIMANTAN SOIL ENGINEERING

Soil Testing, Foundation, Geotechnic Design and Research


Project
Clien
Location
Total Depth

Power Plant of Pulang Pisau


CHMC
Pulang Pisau, Central Kalimantan
65,00 m

GWL
Start
Finish
Operator

- 00,60 m
September 23, 2007
September 26, 2007
Miskidi

Point No.

BH-4

10

1
50

20

30

40

NOTE

DESCRIPTION

LOG

NO. SAMPLE

SPT GRAPHIC

N - SPT

DEPTH

DATE

19,80
20,50
21,00

KIND OF TEST

BORING LOG

50

Blackish brown organic, very soft

0
SPT 7

Clay, grey, very soft


22,00
23,00
23,50
24,10
24,50
25,00

1
60

0
SPT 8

Sand, brown, medium


26,00
26,50
26,95

8
15

11
15

9
15

20
30

SPT 9

10
15

10
15

11
15

21
30

SPT 10

9
15

14
15

15
15

29
30

SPT 11

11
15

15
15

17
15

32
30

SPT 12

Sand, brown, dense

9
15

14
15

14
15

28
30

SPT 13

Sand, brown, medium

September 24, 2007

28,00
29,00
29,50
29,95

Sand, brown, medium

31,00
32,00
32,50
32,95

Sand, brown, medium

34,00
35,00
35,50
35,95
37,00
38,00
38,50
38,95
40,00

Counted by :

NOTE :

= SPT

Checked by :

= UDS
Bony W Rakhman, SST

Yusti Yudiawati, MT

Technical Report

Geotechnical Engineer

PT. KALIMANTAN SOIL ENGINEERING

Soil Testing, Foundation, Geotechnic Design and Research


Project
Clien
Location
Total Depth

Power Plant of Pulang Pisau


CHMC
Pulang Pisau, Central Kalimantan
65,00 m

GWL
Start
Finish
Operator

- 00,60 m
September 23, 2007
September 26, 2007
Miskidi

Point No.

BH-4

10

20

30

40

NOTE

DESCRIPTION

LOG

NO. SAMPLE

SPT GRAPHIC

N - SPT

DEPTH

DATE

40,00
41,00
41,50
41,95

KIND OF TEST

BORING LOG

50

Sand, brown, medium


1
15

3
15

8
15

11
30

SPT 14

2
15

5
15

9
15

14
30

SPT 15

43,00
44,00
44,50
44,95

Sand, grey, medium

46,00

September 25, 2007

47,00
47,50
47,95

Sand, brown, medium

4
15

5
15

7
15

12
30

SPT 16
Clay, grey, stiff

49,00
50,00
50,50
50,95

4
15

6
15

8
15

13
15

25
15

29 > 50
15

14
30

SPT 17

52,00
53,00
53,50
53,88

SPT 18

Light coal (black organic), hard

55,00
Clay + blackish brown organic, very stiff
56,00
56,50
56,95

8
15

10
15

13
15

23
30

SPT 19
Clay, blackish grey, very stiff

58,00
59,00
59,50
59,90

12
15

26
15

Light coal (black organic), hard

30 > 50
15

SPT 20

Counted by :

NOTE :

= SPT

Checked by :

= UDS
Bony W Rakhman, SST

Yusti Yudiawati, MT

Technical Report

Geotechnical Engineer

PT. KALIMANTAN SOIL ENGINEERING

Soil Testing, Foundation, Geotechnic Design and Research


Project
Clien
Location
Total Depth

Power Plant of Pulang Pisau


CHMC
Pulang Pisau, Central Kalimantan
65,00 m

GWL
Start
Finish
Operator

- 00,60 m
September 23, 2007
September 26, 2007
Miskidi

Point No.

BH-4

59,90

10

20

30

40

NOTE

DESCRIPTION

LOG

NO. SAMPLE

SPT GRAPHIC

N - SPT

DEPTH

DATE

KIND OF TEST

BORING LOG

50

Light coal (black organic), hard


61,00

September 26, 2007

62,00
62,50
62,78

29
15

54
13

> 50
SPT 21

64,00
65,00

53
13

> 50
SPT 22

66,00
67,00
68,00
69,00
70,00
71,00
72,00
73,00
74,00
75,00
76,00
77,00
78,00
79,00
80,00

Counted by :

NOTE :

= SPT

Checked by :

= UDS
Bony W Rakhman, SST

Yusti Yudiawati, MT

Technical Report

Geotechnical Engineer

PT. KALIMANTAN SOIL ENGINEERING

Soil Testing, Foundation, Geotechnic Design and Research


Project

Power Plant Pulang Pisau

Location
Total Depth

Pulang Pisau, Central Kalimantan


03,00 m

GWL
Start
Finish
Operator

+ 02,50 m
September 14, 2007
September 14, 2007
Miskidi

BORING LOG
TYPE : IWAN POST HOLE AUGER
Depth
(m)

LOG

DESCRIPTION

3,00
2,50
2,00

Water

1,50
1,00
0,50
0,00
-0,50

Clay, brown

-1,00
-1,50
-2,00
-2,50

Clay + organic, brown


Clay and Silt + organic, brown

-3,00
-3,50
-4,00

Reported by :
Bony W Rakhman, SST
Technical Report

Checked by :
Yusti Yudiawati, MT
Geotechnical Engineer

Point No.

HB-1

PT. KALIMANTAN SOIL ENGINEERING

Soil Testing, Foundation, Geotechnic Design and Research


Project

Power Plant Pulang Pisau

Location
Total Depth

Pulang Pisau, Central Kalimantan


65,50 m

No.

Date

GWL
Start
Finish
Operator

- 00,60 m
Point No.
September 19, 2007
September 23, 2007
Miskidi

BH-1

Elevation

Time

September 19, 2007

07,00
12,00
17,00

60
51
47

centimeter
centimeter
centimeter

September 20, 2007

07,00
11,30
17,15

46
34
18

centimeter
centimeter
centimeter

September 21, 2007

07,30
12,00
16,30

26
20
10

centimeter
centimeter
centimeter

September 22, 2007

07,30
12,20
17,00

17
15
12

centimeter
centimeter
centimeter

September 23, 2007

07,00
11,30
16,40

14
12
10

centimeter
centimeter
centimeter

Reported by :
Bony W Rakhman, SST
Technical Report

Checked by :
Yusti Yudiawati, MT
Geotechnical Engineer

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

CONCLUSION of SOIL INVESTIGATION ( BH-1 )


Project : Power Plant
Client
: China National Heavy Machinery Corporation (CHMC)
Location : Pulang Pisau, Central Kalimantan
INVESTIGATION RESULT
NO

1
2
3
4

KIND of TEST

Water Content
Unit Weight
Specific Gravity
Liquid Limit
Plastic Limit
Indeks Plastic
Gradation
0,75
0,375
4
8
10
40
100
200
Direct Shear

UCS

Consolidation

Gs
LL
PL
PI
19,1
9,5
4,75
2,36
2
0,425
0,15
0,075
c

qu
cu
qr
Sensitivity
Cc
Cs
Cv
k
e
n

(%)
(Kg/cm3)
(%)
(%)
(%)
mm
mm
mm
mm
mm
mm
mm
mm
(Kg/cm2)
()
qu (Kg/cm2)
cu (Kg/cm2)
qr (Kg/cm2)
(St)

cm2/sec
cm/sec

Soil Classification (Unified Soil Classification System)

BH-1

BH-1

BH-1

BH-1

5,00 - 5,50 m

8,00 - 8,50 m

11,0 - 11,5 m

14,0 - 14,5 m

87,28
1,46
2,43
51,20
39,27
11,93

90,20
1,43
2,37
48,80
39,61
9,19

85,17
1,47
2,51
52,00
36,56
15,44

77,42
1,51
2,44
51,00
39,41
11,59

100,00
100,00
100,00
100,00
100,00
100,00
100,00
100,00
0,01
13,00
0,049
0,025
0,038
1,289
0,469
0,054
8,17E-03
9,81E-07
2,021
0,669

100,00
100,00
100,00
100,00
100,00
93,83
58,72
29,41
0,08
26,00
0,060
0,030
0,047
1,277
0,805
0,093
8,17E-03
8,43E-07
2,136
0,681

100,00
100,00
100,00
100,00
100,00
96,03
51,67
22,64
0,15
26,00
0,092
0,046
0,078
1,179
0,778
0,130
8,17E-03
4,39E-07
2,318
0,699

100,00
100,00
100,00
100,00
100,00
100,00
100,00
100,00
0,19
18,00
0,062
0,031
0,045
1,378
0,462
0,048
8,17E-03
5,15E-07
1,862
0,651

OH

CL

MH

OH

September 25, 2007

Yusti Yudiawati, ST, MT


Geotechnical Engineer

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

WATER CONTENT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 17, 2007
Sample No. : BH-1
Depth
: 05,00 - 05,50 m

Container No.
Cont. Weight + Wet Soil
Cont. Weight + Dry Soil
Water Weight
Container Weight
Weight Dry
WATER CONTENT
Average

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
52,90
32,20
20,70
8,90
23,30
88,84

Gr
Gr
Gr
Gr
Gr
%
%

2
51,70
31,90
19,80
8,80
23,10
85,71
87,28

UNIT WEIGHT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 17, 2007
Sample No. : BH-1
Depth
: 05,00 - 05,50 m

Container No.
W Ring + Wet soil
W Ring
W wet soil
Diameter Ring
H Ring
Volume
Unit Weight
Average

Tested by
Counted by
Checked by

Gr
Gr
Gr
Cm
Cm
Cm3
Gr/Cm3
Gr/Cm3

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
258
159,1
98,9
3,5
7,0
67,31
1,47

2
257,4
159,1
98,3
3,5
7,0
67,31
1,46
1,46

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

WATER CONTENT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 15, 2007
Sample No. : BH-1
Depth
: 08,00 - 08,50 m

Container No.
Cont. Weight + Wet Soil
Cont. Weight + Dry Soil
Water Weight
Container Weight
Weight Dry
WATER CONTENT
Average

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
44,00
27,90
16,10
10,10
17,80
90,45

Gr
Gr
Gr
Gr
Gr
%
%

2
48,60
29,80
18,80
8,90
20,90
89,95
90,20

UNIT WEIGHT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 15, 2007
Sample No. : BH-1
Depth
: 08,00 - 08,50 m

Container No.
W Ring + Wet soil
W Ring
W wet soil
Diameter Ring
H Ring
Volume
Unit Weight
Average

Tested by
Counted by
Checked by

Gr
Gr
Gr
Cm
Cm
Cm3
Gr/Cm3
Gr/Cm3

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
255,6
159,1
96,5
3,5
7,0
67,31
1,43

2
255,1
159,1
96,0
3,5
7,0
67,31
1,43
1,43

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

WATER CONTENT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 15, 2007
Sample No. : BH-1
Depth
: 11,00 - 11,50 m

Container No.
Cont. Weight + Wet Soil
Cont. Weight + Dry Soil
Water Weight
Container Weight
Weight Dry
WATER CONTENT
Average

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
35,20
23,00
12,20
8,80
14,20
85,92

Gr
Gr
Gr
Gr
Gr
%
%

2
39,60
25,50
14,10
8,80
16,70
84,43
85,17

UNIT WEIGHT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 15, 2007
Sample No. : BH-1
Depth
: 11,00 - 11,50 m

Container No.
W Ring + Wet soil
W Ring
W wet soil
Diameter Ring
H Ring
Volume
Unit Weight
Average

Tested by
Counted by
Checked by

Gr
Gr
Gr
Cm
Cm
Cm3
Gr/Cm3
Gr/Cm3

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
258,5
159,1
99,4
3,5
7,0
67,31
1,48

2
258
159,1
98,9
3,5
7,0
67,31
1,47
1,47

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

WATER CONTENT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 15, 2007
Sample No. : BH-1
Depth
: 14,00 - 14,50 m

Container No.
Cont. Weight + Wet Soil
Cont. Weight + Dry Soil
Water Weight
Container Weight
Weight Dry
WATER CONTENT
Average

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
40,10
26,60
13,50
8,90
17,70
76,27

Gr
Gr
Gr
Gr
Gr
%
%

2
36,30
24,20
12,10
8,80
15,40
78,57
77,42

UNIT WEIGHT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 15, 2007
Sample No. : BH-1
Depth
: 14,00 - 14,50 m

Container No.
W Ring + Wet soil
W Ring
W wet soil
Diameter Ring
H Ring
Volume
Unit Weight
Average

Tested by
Counted by
Checked by

Gr
Gr
Gr
Cm
Cm
Cm3
Gr/Cm3
Gr/Cm3

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
260,7
159,1
101,6
3,5
7,0
67,31
1,51

2
260,2
159,1
101,1
3,5
7,0
67,31
1,50
1,51

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

SPECIFIC GRAVITY TEST


(ASTM D - 854 - 58)
(AASHTO T - 100 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 19, 2007
Sample No. : BH-1
Depth
: 05,00 - 05,50 m

No
1
2
3
4
5
6
7
8

Tested by
Counted by
Checked by

Picnometer No.
W Picno + Water, W1
W Picno + Soil + Water, W2
W Dry, W3
Temperatur Campuran Air + Tanah, TC
Gs (at TC) = W3 / [(W1 + W3) - W2]
Correction, A
Gs (at 20C) = Gs (at TC) x A
Specific Gravity

Table : Temperatur Correction


TC
TC
Correction
15
1,0009
21
16
1,0007
22
17
1,0006
23
18
1,0004
24
19
1,0002
25
20
1,0000
26
Table : Water Intencity ( w)
TC
w
15
0,999129
16
0,9990
17
0,9988
18
0,9986
19
0,9984
20
0,9982

TC
21
22
23
24
25
26

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Gr
TC
cm3
Gr

1
142,40
171,90
50,00
27,00
2,44
0,9983
2,43

2
142,10
171,60
50,00
27,00
2,44
0,9983
2,43
2,435

Correction
0,9998
0,9996
0,9993
0,9991
0,9988
0,9986

TC
27
28
29
30
31
32

Correction
0,9983
0,9980
0,9977
0,9974

w
0,9980
0,9978
0,9976
0,9973
0,9971
0,9968

TC
27
28
29
30
31
32

w
0,9965
0,9963
0,9960
0,9957

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

SPECIFIC GRAVITY TEST


(ASTM D - 854 - 58)
(AASHTO T - 100 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 21, 2007
Sample No. : BH-1
Depth
: 08,00 - 08,50 m

No
1
2
3
4
5
6
7
8

Tested by
Counted by
Checked by

Picnometer No.
W Picno + Water, W1
W Picno + Soil + Water, W2
W Dry, W3
Temperatur Campuran Air + Tanah, TC
Gs (at TC) = W3 / [(W1 + W3) - W2]
Correction, A
Gs (at 20C) = Gs (at TC) x A
Specific Gravity

Table : Temperatur Correction


TC
TC
Correction
15
1,0009
21
16
1,0007
22
17
1,0006
23
18
1,0004
24
19
1,0002
25
20
1,0000
26
Table : Water Intencity ( w)
TC
w
15
0,999129
16
0,9990
17
0,9988
18
0,9986
19
0,9984
20
0,9982

TC
21
22
23
24
25
26

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Gr
TC
cm3
Gr

1
142,00
170,90
50,00
28,00
2,37
0,9980
2,36

2
142,30
171,30
50,00
28,00
2,38
0,9980
2,38
2,371

Correction
0,9998
0,9996
0,9993
0,9991
0,9988
0,9986

TC
27
28
29
30
31
32

Correction
0,9983
0,9980
0,9977
0,9974

w
0,9980
0,9978
0,9976
0,9973
0,9971
0,9968

TC
27
28
29
30
31
32

w
0,9965
0,9963
0,9960
0,9957

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

SPECIFIC GRAVITY TEST


(ASTM D - 854 - 58)
(AASHTO T - 100 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 20, 2007
Sample No. : BH-1
Depth
: 11,00 - 11,50 m

No
1
2
3
4
5
6
7
8

Tested by
Counted by
Checked by

Picnometer No.
W Picno + Water, W1
W Picno + Soil + Water, W2
W Dry, W3
Temperatur Campuran Air + Tanah, TC
Gs (at TC) = W3 / [(W1 + W3) - W2]
Correction, A
Gs (at 20C) = Gs (at TC) x A
Specific Gravity

Table : Temperatur Correction


TC
TC
Correction
15
1,0009
21
16
1,0007
22
17
1,0006
23
18
1,0004
24
19
1,0002
25
20
1,0000
26
Table : Water Intencity ( w)
TC
w
15
0,999129
16
0,9990
17
0,9988
18
0,9986
19
0,9984
20
0,9982

TC
21
22
23
24
25
26

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Gr
TC
cm3
Gr

1
142,20
172,40
50,00
28,00
2,53
0,9980
2,52

2
142,00
172,00
50,00
28,00
2,50
0,9980
2,50
2,508

Correction
0,9998
0,9996
0,9993
0,9991
0,9988
0,9986

TC
27
28
29
30
31
32

Correction
0,9983
0,9980
0,9977
0,9974

w
0,9980
0,9978
0,9976
0,9973
0,9971
0,9968

TC
27
28
29
30
31
32

w
0,9965
0,9963
0,9960
0,9957

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

SPECIFIC GRAVITY TEST


(ASTM D - 854 - 58)
(AASHTO T - 100 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 18, 2007
Sample No. : BH-1
Depth
: 14,00 - 14,50 m

No
1
2
3
4
5
6
7
8

Tested by
Counted by
Checked by

Picnometer No.
W Picno + Water, W1
W Picno + Soil + Water, W2
W Dry, W3
Temperatur Campuran Air + Tanah, TC
Gs (at TC) = W3 / [(W1 + W3) - W2]
Correction, A
Gs (at 20C) = Gs (at TC) x A
Specific Gravity

Table : Temperatur Correction


TC
TC
Correction
15
1,0009
21
16
1,0007
22
17
1,0006
23
18
1,0004
24
19
1,0002
25
20
1,0000
26
Table : Water Intencity ( w)
TC
w
15
0,999129
16
0,9990
17
0,9988
18
0,9986
19
0,9984
20
0,9982

TC
21
22
23
24
25
26

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Gr
TC
cm3
Gr

1
142,30
171,90
50,00
28,00
2,45
0,9980
2,45

2
142,00
171,50
50,00
28,00
2,44
0,9980
2,43
2,440

Correction
0,9998
0,9996
0,9993
0,9991
0,9988
0,9986

TC
27
28
29
30
31
32

Correction
0,9983
0,9980
0,9977
0,9974

w
0,9980
0,9978
0,9976
0,9973
0,9971
0,9968

TC
27
28
29
30
31
32

w
0,9965
0,9963
0,9960
0,9957

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

ATTERBERG LIMIT TEST


(AASHTO T - 89 - 74 / AASHTO T - 90 - 74)
(ASTM D - 423 - 66 / ASTM D - 424 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 12, 2007
Sample No. : BH-1
Depth
: 05,00 - 05,50 m
LIQUID LIMIT :
Sample No.
(1)
Number of Blows
(2)
Container No.
(3)
W cont + W wet soil
(4)
W cont + dry soil
(5)
W water (3) - (4)
(6)
W Container
(7)
W dry soil (4) - (6)
(8)
Water content (5)/(7)*100

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%

1
14
C1
47,00
34,2
12,8
10,30
23,90
53,56

2
21
C2
47,70
34,5
13,2
9,00
25,50
51,76

3
34
C3
41,80
30,8
11,0
8,80
22,00
50,00

4
48
C4
40,10
29,9
10,2
8,80
21,10
48,34

LIQUID LIMIT GRAPH

Water content (%)

54

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

PLASTIC LIMIT :
Sample No.
(1) Container No.
(2) W cont + W wet soil
(3) W cont + dry soil
(4) W water (2) - (3)
(5) W Container
(6) W dry soil (3) - (5)
(7) Water content (4)/(6)*100
(8) Plastic limit

Gr
Gr
Gr
Gr
Gr
%
%

1
C.1
35,60
28,10
7,50
9,00
19,10
39,267
39,27

LL

PL

PI

51,2

39,27

11,93

53
52

Silt anorganic with high compresibility

51
50

and Clay organic

49
48
1

10
Blows

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

ATTERBERG LIMIT TEST


(AASHTO T - 89 - 74 / AASHTO T - 90 - 74)
(ASTM D - 423 - 66 / ASTM D - 424 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 18, 2007
Sample No. : BH-1
Depth
: 08,00 - 08,50 m
LIQUID LIMIT :
Sample No.
(1)
Number of Blows
(2)
Container No.
(3)
W cont + W wet soil
(4)
W cont + dry soil
(5)
W water (3) - (4)
(6)
W Container
(7)
W dry soil (4) - (6)
(8)
Water content (5)/(7)*100

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%

1
14
C1
51,4
37,7
13,7
10,30
27,40
50,00

2
21
C2
44,9
33,0
11,9
8,90
24,10
49,38

3
30
C3
44,5
33,3
11,2
10,30
23,00
48,70

4
47
C4
41,8
31,3
10,5
8,80
22,50
46,67

LIQUID LIMIT GRAPH

Water content (%)

52

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

PLASTIC LIMIT :
Sample No.
(1) Container No.
(2) W cont + W wet soil
(3) W cont + dry soil
(4) W water (2) - (3)
(5) W Container
(6) W dry soil (3) - (5)
(7) Water content (4)/(6)*100
(8) Plastic limit

Gr
Gr
Gr
Gr
Gr
%
%

1
C.1
39,20
31,00
8,20
10,30
20,70
39,614
39,61

LL

PL

PI

48,8

39,61

9,19

50

Silt organic with medium compressibility

48

and silt organic

46
1

10
Blows

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

ATTERBERG LIMIT TEST


(AASHTO T - 89 - 74 / AASHTO T - 90 - 74)
(ASTM D - 423 - 66 / ASTM D - 424 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 15, 2007
Sample No. : BH-1
Depth
: 11,00 - 11,50 m
LIQUID LIMIT :
Sample No.
(1)
Number of Blows
(2)
Container No.
(3)
W cont + W wet soil
(4)
W cont + dry soil
(5)
W water (3) - (4)
(6)
W Container
(7)
W dry soil (4) - (6)
(8)
Water content (5)/(7)*100
56

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%

1
14
C1
45,10
32,4
12,7
8,90
23,50
54,04

2
24
C2
50,40
36,4
14,0
10,40
26,00
53,85

3
36
C3
42,00
31,0
11,0
8,90
22,10
49,77

4
48
C4
39,10
29,3
9,8
8,90
20,40
48,04

LIQUID LIMIT GRAPH

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

PLASTIC LIMIT :
Sample No.
(1) Container No.
(2) W cont + W wet soil
(3) W cont + dry soil
(4) W water (2) - (3)
(5) W Container
(6) W dry soil (3) - (5)
(7) Water content (4)/(6)*100
(8) Plastic limit

Gr
Gr
Gr
Gr
Gr
%
%

1
C.1
34,20
27,40
6,80
8,80
18,60
36,559
36,56

LL

PL

PI

52

36,56

15,44

Water content (%)

55
54
53

Silt anorganic with high compresibility

52
51

and Clay organic

50
49
48
47
1

10
Blows

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

ATTERBERG LIMIT TEST


(AASHTO T - 89 - 74 / AASHTO T - 90 - 74)
(ASTM D - 423 - 66 / ASTM D - 424 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 15, 2007
Sample No. : BH-1
Depth
: 14,00 - 14,50 m
LIQUID LIMIT :
Sample No.
(1)
Number of Blows
(2)
Container No.
(3)
W cont + W wet soil
(4)
W cont + dry soil
(5)
W water (3) - (4)
(6)
W Container
(7)
W dry soil (4) - (6)
(8)
Water content (5)/(7)*100

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%

1
15
C1
46,50
34,1
12,4
10,30
23,80
52,10

2
21
C2
46,20
33,4
12,8
8,90
24,50
52,24

3
36
C3
42,20
31,2
11,0
8,80
22,40
49,11

4
46
C4
36,80
27,5
9,3
8,90
18,60
50,00

LIQUID LIMIT GRAPH

Water content (%)

55

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

PLASTIC LIMIT :
Sample No.
(1) Container No.
(2) W cont + W wet soil
(3) W cont + dry soil
(4) W water (2) - (3)
(5) W Container
(6) W dry soil (3) - (5)
(7) Water content (4)/(6)*100
(8) Plastic limit

Gr
Gr
Gr
Gr
Gr
%
%

1
C.1
37,20
29,20
8,00
8,90
20,30
39,409
39,41

LL

PL

PI

51

39,41

11,59

Silt anorganic with high compresibility


50

and Clay organic


45
1

10
Blows

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

HYDROMETER TEST
(AASHTO T - 88 - 72)
(ASTM D - 422 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 18, 2007
Sample No. : BH-1
Depth
: 05,00 - 05,50 m

Tested by
Counted by
Checked by

W dry soil
Specific Gravity

:
:

50 gram
2,43

Meniscus Correction, Fm
Zero Reading Correction, Fz
Temperature Correction, Ft
Specifik Gravity Correction (a)

:
:
:
=

1
4
2,15
1,662

Temp.
T C

Rcp

(minute)

0,25
0,5
1
2
5
15
30
60
240
1440
2880

29
29
29
29
29
29
29
28
28
28
28

25
25
25
24
23
21
19
17
15
13
11

23,15
23,15
23,15
22,15
21,15
19,15
17,15
15,15
13,15
11,15
9,15

90

% of fine grain
a Rcp x 100
50
76,9623
76,9623
76,9623
73,6377
70,3132
63,6642
57,0152
50,3662
43,7172
37,0682
30,4192

Rcl

L
(cm)

D
(mm)

26
26
26
25
24
22
20
18
16
14
12

12,20
12,20
12,20
12,40
12,50
12,90
13,20
13,50
13,80
14,20
14,50

0,0129
0,0129
0,0129
0,0129
0,0129
0,0129
0,0129
0,0130
0,0130
0,0130
0,0130

0,0901
0,0637
0,0451
0,0321
0,0204
0,0120
0,0086
0,0062
0,0031
0,0013
0,0009

Curve: Distribution Grain Size

80
70
Total passes sieve (%)

Time

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

60
50
40
30
20
10
0
100,000

10,000

1,000

0,100

0,010

0,001
0,000
Diameter
(mm)

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

HYDROMETER TEST
(AASHTO T - 88 - 72)
(ASTM D - 422 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 18, 2007
Sample No. : BH-1
Depth
: 14,00 - 14,50 m

Tested by
Counted by
Checked by

W dry soil
Specific Gravity

:
:

50 gram
2,44

Meniscus Correction, Fm
Zero Reading Correction, Fz
Temperature Correction, Ft
Specifik Gravity Correction (a)

:
:
:
=

1
4
2,15
1,662

Temp.
T C

Rcp

(minute)

0,25
0,5
1
2
5
15
30
60
240
1440
2880

29
29
29
29
29
29
29
29
28
28
28

30
30
30
29
28
27
25
23
21
19
16

28,15
28,15
28,15
27,15
26,15
25,15
23,15
21,15
19,15
17,15
14,15

100

% of fine grain
a Rcp x 100
50
93,5848
93,5848
93,5848
90,2603
86,9358
83,6113
76,9623
70,3132
63,6642
57,0152
47,0417

Rcl

L
(cm)

D
(mm)

31
31
31
30
29
28
26
24
22
20
17

11,40
11,40
11,40
11,50
11,70
11,90
12,20
12,50
12,90
13,20
13,70

0,0129
0,0129
0,0129
0,0129
0,0129
0,0129
0,0129
0,0129
0,0130
0,0130
0,0130

0,0871
0,0616
0,0436
0,0309
0,0197
0,0115
0,0082
0,0059
0,0030
0,0012
0,0009

Curve: Distribution Grain Size

90
80
Total passes sieve (%)

Time

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

70
60
50
40
30
20
10
0
100,000

10,000

1,000

0,100

0,010

0,001
0,000
Diameter
(mm)

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

SEIVE ANALISYS
(AASHTO T - 27 - 74)
(ASTM C - 136 - 46)
: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 18, 2007
Sample No. : BH-1
Depth
: 08,00 - 08,50 m

Sieve
No.
3/4
3/8
4
8
10
40
100
200
Pan

(mm)
19,10
9,500
4,750
2,360
2,000
0,425
0,150
0,075

W soil
(gr)
0,00
0,00
0,00
0,00
0,00
22,60
128,70
107,40
107,80

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

% Kumulatif
retained
passes
0,00
100,000
0,00
100,000
0,00
100,000
0,00
100,000
0,00
100,000
6,17
93,834
41,28
58,718
70,59
29,413

% weight
retained
0,00
0,00
0,00
0,00
0,00
6,17
35,12
29,30
29,41

366,50

Total weight

0,0

Tested by
Counted by
Checked by

0,1

1,0

10,0

Curve: Distribution Grain Size

Diameter
(mm)
100,0
100
90
80
70

Total passes sieve (%)

Project
Location

60
50
40
30
20
10
0

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

SEIVE ANALISYS
(AASHTO T - 27 - 74)
(ASTM C - 136 - 46)
: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 18, 2007
Sample No. : BH-1
Depth
: 11,00 - 11,50 m

Sieve
No.
3/4
3/8
4
8
10
40
100
200
Pan

(mm)
19,10
9,500
4,750
2,360
2,000
0,425
0,150
0,075

Total weight

0,0

Tested by
Counted by
Checked by

W soil
(gr)
0,00
0,00
0,00
0,00
0,00
12,60
140,70
92,10
71,80

% weight
retained
0,00
0,00
0,00
0,00
0,00
3,97
44,36
29,04
22,64

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

% Kumulatif
retained
passes
0,00
100,000
0,00
100,000
0,00
100,000
0,00
100,000
0,00
100,000
3,97
96,028
48,33
51,671
77,36
22,636

317,20

0,1 Curve: Distribution


1,0
10,0
Grain Size

Diameter
100,0(mm)

100
90
80
70
60
50
40
30
20
10
0

Total passes sieve (%)

Project
Location

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

DIRECT SHEAR TEST


( AASHTO T - 236 - 72 )
( ASTM D - 3080 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 17, 2007


: BH-1
: 05,00 - 05,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Time

Horizontal

Load N

3,167

Load N

6,324

Load N

9,491

(minute)

Deformation

Reading

Shear

Reading

Shear

Reading

Shear

0,00
0,25
0,50
1,00
1,50
2,00
2,50
3,00
3,50
4,00
4,50
5,00
6,00
7,00
8,00
9,00
10,00
11,00
12,00
13,00
14,00
15,00

0,000
0,158
0,316
0,361
0,947
1,262
1,578
1,893
2,209
2,524
2,840
3,155
3,786
4,417
5,048
5,679
6,310
6,941
7,572
8,203
8,834
9,465

0,00
0,60
1,00
1,80
2,60
3,20
3,20
3,20

0,00
0,25
0,42
0,76
1,09
1,34
1,34
1,34

0,00
0,40
0,80
1,80
2,80
3,40
4,20
4,20
4,20

0,00
0,17
0,34
0,76
1,18
1,43
1,76
1,76
1,76

0,00
0,50
1,00
1,60
2,00
2,80
3,40
4,00
4,60
5,20
5,60
5,60
5,60

0,00
0,21
0,42
0,67
0,84
1,18
1,43
1,68
1,93
2,19
2,35
2,35
2,35

0,450

= N/A

DIRECT SHEAR GRAPH

0,400

0,350

Shear Stress (Kg/Cm2)

0,300

0,250

0,200

0,150

0,100

6,5 o
0,050

0,000
0,00

0,05

0,10

0,15Normal
0,20
Stress 0,25
(Kg/Cm2)0,30

0,35

0,40

0,45

Tool

Diameter 63.1 mm, height 20 mm, Areas 31.25 cm2


prov. ring calibration 0.1610 kg/10-4

Result

c = 0,025 kg/cm2

Sample

= 6,5

= P/A

0,101

0,043

0,202

0,056

0,304

0,075

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

DIRECT SHEAR TEST


( AASHTO T - 236 - 72 )
( ASTM D - 3080 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 15, 2007


: BH-1
: 08,00 - 08,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Time

Horizontal

Load N

3,167

Load N

6,324

Load N

9,491

(minute)

Deformation

Reading

Shear

Reading

Shear

Reading

Shear

0,00
0,25
0,50
1,00
1,50
2,00
2,50
3,00
3,50
4,00
4,50
5,00
6,00
7,00
8,00
9,00
10,00
11,00
12,00
13,00
14,00
15,00

0,000
0,158
0,316
0,361
0,947
1,262
1,578
1,893
2,209
2,524
2,840
3,155
3,786
4,417
5,048
5,679
6,310
6,941
7,572
8,203
8,834
9,465

0,00
0,60
1,00
2,00
3,00
3,80
4,60
5,40
6,80
6,80
6,80

0,00
0,25
0,42
0,84
1,26
1,60
1,93
2,27
2,86
2,86
2,86

0,00
1,20
2,40
3,40
5,00
6,00
7,40
8,60
9,20
10,00
10,80
11,40
11,40
11,40

0,00
0,50
1,01
1,43
2,10
2,52
3,11
3,61
3,87
4,20
4,54
4,79
4,79
4,79

0,00
2,00
3,00
4,00
5,00
6,00
8,00
9,00
10,00
11,40
12,60
13,40
14,00
15,40
16,60
16,60
16,60

0,00
0,84
1,26
1,68
2,10
2,52
3,36
3,78
4,20
4,79
5,29
5,63
5,88
6,47
6,98
6,98
6,98

0,400

= N/A

0,101

0,091

0,202

0,153

0,304

0,223

DIRECT SHEAR GRAPH

0,350

0,300

Shear (Kg/Cm2)

0,250

0,200

29,5 o
0,150

0,100

0,050

0,000
0,000

0,050

0,100

0,150 Normal
0,200
0,250
0,300
Stress (Kg/Cm2)

0,350

0,400

Tool

Diameter 63.1 mm, height 20 mm, Areas 31.25 cm2


prov. ring calibration 0.1610 kg/10-4

Result

c = 0,025 kg/cm2

Sample

= 29,5

= P/A

0,450

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

DIRECT SHEAR TEST


( AASHTO T - 236 - 72 )
( ASTM D - 3080 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 15, 2007


: BH-1
: 11,00 - 11,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Time

Horizontal

Load N

3,167

Load N

6,324

Load N

9,491

(minute)

Deformation

Reading

Shear

Reading

Shear

Reading

Shear

0,00
0,25
0,50
1,00
1,50
2,00
2,50
3,00
3,50
4,00
4,50
5,00
6,00
7,00
8,00
9,00
10,00
11,00
12,00
13,00
14,00
15,00

0,000
0,158
0,316
0,361
0,947
1,262
1,578
1,893
2,209
2,524
2,840
3,155
3,786
4,417
5,048
5,679
6,310
6,941
7,572
8,203
8,834
9,465

0,00
2,80
4,60
5,60
6,40
7,00
7,80
7,80
7,80

0,00
1,18
1,93
2,35
2,69
2,94
3,28
3,28
3,28

0,00
3,00
6,00
7,80
8,60
9,40
10,60
10,60
10,60

0,00
1,26
2,52
3,28
3,61
3,95
4,45
4,45
4,45

0,00
2,00
4,00
7,00
8,80
12,50
14,00
15,00
16,00
16,00
16,00

0,00
0,84
1,68
2,94
3,70
5,25
5,88
6,30
6,72
6,72
6,72

0,450

= N/A

DIRECT SHEAR GRAPH

0,400

0,350

Shear (Kg/Cm2)

0,300

0,250

0,200

22 o

0,150

0,100

0,050

0,000
0,00

0,05

0,10

0,15Normal
0,20
0,25
0,30
Stress (Kg/Cm2)

0,35

0,40

Tool

Diameter 63.1 mm, height 20 mm, Areas 31.25 cm2


prov. ring calibration 0.1610 kg/10-4

Result

c = 0,045 kg/cm2

Sample

= 22

0,45

= P/A

0,101

0,105

0,202

0,143

0,304

0,215

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

DIRECT SHEAR TEST


( AASHTO T - 236 - 72 )
( ASTM D - 3080 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 15, 2007


: BH-1
: 14,00 - 14,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Time

Horizontal

Load N

3,167

Load N

6,324

Load N

9,491

(minute)

Deformation

Reading

Shear

Reading

Shear

Reading

Shear

0,00
0,25
0,50
1,00
1,50
2,00
2,50
3,00
3,50
4,00
4,50
5,00
6,00
7,00
8,00
9,00
10,00
11,00
12,00
13,00
14,00
15,00

0,000
0,158
0,316
0,361
0,947
1,262
1,578
1,893
2,209
2,524
2,840
3,155
3,786
4,417
5,048
5,679
6,310
6,941
7,572
8,203
8,834
9,465

0,00
1,00
1,60
2,20
3,00
6,00
7,00
8,00
8,80
8,80
8,80

0,00
0,42
0,67
0,92
1,26
2,52
2,94
3,36
3,70
3,70
3,70

0,00
1,00
1,80
2,60
3,60
5,00
6,00
7,00
8,20
9,00
10,20
10,20
10,20

0,00
0,42
0,76
1,09
1,51
2,10
2,52
2,94
3,45
3,78
4,29
4,29
4,29

0,00
1,00
2,00
3,00
5,00
6,20
7,00
7,60
8,60
9,80
10,40
11,60
11,60
11,60

0,00
0,42
0,84
1,26
2,10
2,61
2,94
3,19
3,61
4,12
4,37
4,87
4,87
4,87

0,500

= N/A

DIRECT SHEAR GRAPH

0,450

0,400

Shear (Kg/Cm2)

0,350

0,300

0,250

0,200

7,5 o

0,150

0,100

0,050

0,000
0,00

0,05

0,10

0,15
0,20 (Kg/Cm2)
0,25
Normal Stress

0,30

0,35

0,40

Tool

Diameter 63.1 mm, height 20 mm, Areas 31.25 cm2


prov. ring calibration 0.1610 kg/10-4

Result

c = 0,095 kg/cm2

Sample

= 7,5

= P/A

0,101

0,118

0,202

0,137

0,304

0,156

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 17, 2007
Sample No. : BH-1
Depth
: 05,00 - 05,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(minute) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
98,9
1,47

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,6
0,35
0,8
0,70
1,0
1,05
1,2
1,40
1,4
1,75
1,6
2,10
1,8
2,45
1,6
4,90
1,4
3,15
1,2
3,50

Tested by
Counted by
Checked by

Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
strain
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,053
0,034
0,038

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Undisturb

C
qu
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,947
0,966
0,962

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,697
18,333
18,405

0,0245
Kg/Cm2
0,049
Kg/Cm3
1,289
0,549496
Total
Load
(P)
0,0
0,3
0,4
0,5
0,7
0,8
0,9
1,0
0,9
0,8
0,7

Compression
Stress
0,000
0,019
0,025
0,031
0,037
0,043
0,049
0,054
0,047
0,042
0,036

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 17, 2007
Sample No. : BH-1
Depth
: 05,00 - 05,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Stress (Kg/Cm2)

Undisturb (qu)

Remoulded (qr)

0,06

0,06

0,05

0,05

0,04

0,04

0,03

0,03

0,02

0,02

0,01

0,01

0,00
0,000

0,020

0,040

0,060

Strain (Kg/Cm2)

0,080

0,100

0,00
0,000

0,020

0,040

0,060

Strain (Kg/Cm2)

0,080

0,100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 17, 2007
Sample No. : BH-1
Depth
: 05,00 - 05,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(menit) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
98,30
1,46

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,4
0,35
0,5
0,70
0,7
1,05
0,8
1,40
1,0
1,75
1,2
2,10
1,4
2,45
1,2
2,80
1,0
3,15

Tested by
Counted by
Checked by

Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
Tense
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,030
0,034

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Remoulded

C
qr
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,970
0,966

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,262
18,333

0,019
Kg/Cm2
0,038
Kg/Cm3
1,289
0,549496
Load
Total
(P)
0,0
0,2
0,3
0,4
0,4
0,5
0,7
0,8
0,7
0,5

Compression
Strain
0,000
0,012
0,015
0,021
0,024
0,030
0,036
0,042
0,036
0,030

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 15, 2007
Sample No. : BH-1
Depth
: 08,00 - 08,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(minute) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
96,5
1,43

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,5
0,35
0,8
0,70
1,0
1,05
1,2
1,40
1,4
1,75
1,6
2,10
1,8
2,45
2,2
4,90
2,0
3,15
1,8
3,50
1,6
3,85

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
strain
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,053
0,034
0,038
0,041

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Undisturb

C
qu
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,947
0,966
0,962
0,959

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,697
18,333
18,405
18,477

0,03
Kg/Cm2
0,060
Kg/Cm3
1,277
0,549496
Total
Load
(P)
0,0
0,3
0,4
0,5
0,7
0,8
0,9
1,0
1,2
1,1
1,0
0,9

Compression
Stress
0,000
0,015
0,025
0,031
0,037
0,043
0,049
0,054
0,065
0,060
0,054
0,048

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 15, 2007
Sample No. : BH-1
Depth
: 08,00 - 08,50 m

Tested by
Counted by
Checked by

Stress (Kg/Cm2)

Kondisi Undisturb (qu)

Kondisi Remoulded (qr)

0,070

0,070

0,060

0,060

0,050

0,050

0,040

0,040

0,030

0,030

0,020

0,020

0,010

0,010

0,000
0,000

0,010

0,020

0,030

0,040

Strain (Kg/Cm2)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,050

0,060

0,000
0,000

0,010

0,020

0,030

0,040

Strain (Kg/Cm2)

0,050

0,060

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 15, 2007
Sample No. : BH-1
Depth
: 08,00 - 08,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(menit) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
96
1,43

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,2
0,35
0,5
0,70
0,8
1,05
1,0
1,40
1,2
1,75
1,4
2,10
1,6
2,45
1,8
2,80
1,6
3,15
1,4
3,50
1,2
3,85

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
Tense
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,030
0,034
0,038
0,041

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Remoulded

C
qr
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,970
0,966
0,962
0,959

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,262
18,333
18,405
18,477

0,0235
Kg/Cm2
0,047
Kg/Cm3
1,277
0,549496
Load
Total
(P)
0,0
0,1
0,3
0,4
0,5
0,7
0,8
0,9
1,0
0,9
0,8
0,7

Compression
Strain
0,000
0,006
0,015
0,025
0,031
0,037
0,042
0,048
0,054
0,048
0,042
0,036

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 15, 2007
Sample No. : BH-1
Depth
: 11,00 - 11,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(minute) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
99,4
1,48

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,5
0,35
1,0
0,70
1,2
1,05
1,6
1,40
2,0
1,75
2,5
2,10
2,8
2,45
3,0
4,90
3,2
3,15
3,3
3,50
3,0
3,85
2,8
4,20
2,6
4,55

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
strain
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,053
0,034
0,038
0,041
0,045
0,049

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Undisturb

C
qu
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,947
0,966
0,962
0,959
0,955
0,951

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,697
18,333
18,405
18,477
18,550
18,623

0,046
Kg/Cm2
0,092
Kg/Cm3
1,179
0,549496
Total
Load
(P)
0,0
0,3
0,5
0,7
0,9
1,1
1,4
1,5
1,6
1,8
1,8
1,6
1,5
1,4

Compression
Stress
0,000
0,015
0,031
0,037
0,049
0,061
0,076
0,085
0,088
0,096
0,099
0,089
0,083
0,077

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 15, 2007
Sample No. : BH-1
Depth
: 11,00 - 11,50 m

Tested by
Counted by
Checked by

Stress (Kg/Cm2)

Kondisi Undisturb (qu)

Kondisi Remoulded (qr)

0,12

0,12

0,10

0,10

0,08

0,08

0,06

0,06

0,04

0,04

0,02

0,02

0,00
0,000

0,010

0,020

0,030

0,040

Strain (Kg/Cm2)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,050

0,060

0,00
0,000

0,010

0,020

0,030

0,040

Strain (Kg/Cm2)

0,050

0,060

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 15, 2007
Sample No. : BH-1
Depth
: 11,00 - 11,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(menit) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
98,9
1,47

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,3
0,35
0,8
0,70
1,0
1,05
1,2
1,40
1,4
1,75
1,6
2,10
2,0
2,45
2,8
2,80
3,0
3,15
2,8
3,50
2,6
3,85
2,2
4,20

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
Tense
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,030
0,034
0,038
0,041
0,045

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Remoulded

C
qr
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,970
0,966
0,962
0,959
0,955

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,262
18,333
18,405
18,477
18,550

0,039
Kg/Cm2
0,078
Kg/Cm3
1,179
0,549496
Load
Total
(P)
0,0
0,2
0,4
0,5
0,7
0,8
0,9
1,1
1,5
1,6
1,5
1,4
1,2

Compression
Strain
0,000
0,009
0,025
0,031
0,037
0,043
0,049
0,060
0,084
0,090
0,084
0,077
0,065

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 15, 2007
Sample No. : BH-1
Depth
: 14,00 - 14,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(minute) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
101,6
1,51

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,2
0,35
0,5
0,70
0,8
1,05
1,0
1,40
1,4
1,75
1,8
2,10
2,0
2,45
2,2
4,90
2,2
3,15
2,0
3,50
1,8
3,85
1,6
4,20

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
strain
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,053
0,034
0,038
0,041
0,045

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Undisturb

C
qu
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,947
0,966
0,962
0,959
0,955

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,697
18,333
18,405
18,477
18,550

0,031
Kg/Cm2
0,062
Kg/Cm3
1,378
0,549496
Total
Load
(P)
0,0
0,1
0,3
0,4
0,5
0,8
1,0
1,1
1,2
1,2
1,1
1,0
0,9

Compression
Stress
0,000
0,006
0,015
0,025
0,031
0,043
0,055
0,060
0,065
0,066
0,060
0,054
0,047

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 15, 2007
Sample No. : BH-1
Depth
: 14,00 - 14,50 m

Tested by
Counted by
Checked by

Undisturb (qu)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Remoulded (qr)

0,08

0,08

0,07

0,06

Stress (Kg/Cm2)

0,06

0,05

0,04

0,04

0,03

0,02

0,02

0,01

0,00
0,000

0,010

0,020

0,030

0,040

Strain (Kg/Cm2)

0,050

0,060

0,00
0,000

0,010

0,020

0,030

0,040

Strain (Kg/Cm2)

0,050

0,060

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 15, 2007
Sample No. : BH-1
Depth
: 14,00 - 14,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(menit) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
101,1
1,50

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,2
0,35
0,4
0,70
0,6
1,05
0,8
1,40
1,0
1,75
1,4
2,10
1,6
2,45
1,8
2,80
1,6
3,15
1,4
3,50
1,2
3,85

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
Tense
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,030
0,034
0,038
0,041

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Remoulded

C
qr
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,970
0,966
0,962
0,959

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,262
18,333
18,405
18,477

0,0225
Kg/Cm2
0,045
Kg/Cm3
1,378
0,549496
Load
Total
(P)
0,0
0,1
0,2
0,3
0,4
0,5
0,8
0,9
1,0
0,9
0,8
0,7

Compression
Strain
0,000
0,006
0,012
0,018
0,024
0,030
0,042
0,048
0,054
0,048
0,042
0,036

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 17, 2007


: BH-1
: 05,00 - 05,50 m

Water Content & Unit Weight


W wet soil + ring
W ring
W wet soil
W dry soil (Ws)
W water
Water content (w)
Unit Weight

Load
Pressure
0
9,6
21,4
38,4
1
2,25
4
9
16
25
36
49
24

(Kg)
(Kg/Cm2)
detik
detik
detik
detik
menit
menit
menit
menit
menit
menit
menit
menit
jam

0,5
0,25
0,000
0,200
0,280
0,370
0,450
0,670
0,840
1,110
1,310
1,400
1,450
1,470
1,620

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%
Gr/Cm3

Before
76,3
16,9
59,4
22,5
36,9
164,000
2,128

After

33,8
22,5
11,3
50,222
1,211

1,0
0,5
1,620
1,640
1,650
1,660
1,670
1,690
1,710
1,740
1,770
1,790
1,800
1,820
2,120

2,0
1
2,120
2,150
2,160
2,170
2,190
2,220
2,250
2,290
2,320
2,350
2,360
2,380
2,510

4,0
2
2,510
2,650
2,720
2,770
2,830
2,950
3,040
3,160
3,210
3,250
3,270
3,290
3,430

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Before
After
Height (Ho)
Cm
1,4
0,96
e = (H0-Ht)/Ht
2,021
1,067
Void ratio
Water content (w)
% 164,000
50,222
Saturated
S = (w*Gs)
% 197,583 114,581
2,43
Specific Gravity (Gs)
Gr/Cm3
Coefficient compression
Cc
0,469
Coefficient swelling
Cs
0,054

8,0
4
3,430
3,500
3,540
3,570
3,600
3,660
3,700
3,750
3,780
3,800
3,820
3,830
3,990

16,0
8
3,990
4,100
4,160
4,210
4,260
4,380
4,480
4,600
4,650
4,690
4,710
4,730
4,890

4,0
2
4,890

0,5
0,25
4,740

A
Ht

4,740

4,420

=
=
=

19,94
Ws/A.G
0,463

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)

Pressure
2
(kg/cm )

Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 17, 2007


: BH-1
: 05,00 - 05,50 m

End of
Dial Reading
(cm)

H (cm)

0,0000

Tested by
Counted by
Checked by

Height of soil
sample at end
of every dial reading
Ht (cm)

Void Height
(Hv)
(cm)

1,4000

0,9366

Void Ratio
at end of
every reading
(e)

0,1620

1,2380

0,2120

0,7746
0,7246

1,5636

1,1490

0,3430

0,6856

1,4794

1,0570

0,3990

0,5936

1,2809

1,0010

0,4890

0,5376

1,1600

0,9110

0,4740

0,4476

0,9658
0,9185

0,9260

0,4626

0,9982

0,9580

0,4946

1,0672

(0,0320)
0,25

0,4420
(0,4420)

49,840

0,0083

51,875

0,0080

49,840

0,0083

51,875

0,0080

0,9560

(0,0150)
2

0,0080

1,0290

0,0900
8

51,875

1,1030

0,0560
4

0,0083

1,1685

0,0920
2

49,840
1,2130

1,1880

0,2510

Cm2/detik
Cv
Tv.Hdr^2
t90

0,000

1,6714

0,0390
1

Fitting
time
t90

1,3190

0,0500
0,5

Ht(av) (cm)

2,0210

0,1620
0,25

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,9420
0,4790

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 17, 2007


: BH-1
: 05,00 - 05,50 m

Pressure

H (cm)

Tested by
Counted by
Checked by

H (cm)
H /H
(4) = (3) / (2)

(kg/cm )
(1)

(2)
0,00

(3)

mv
(cm2/kg)
(5) = (4) : (1)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Cv
cm2/det
(6)

k=mv.Cv.
(cm/det)
-3
(7) = (5) x (6) x 10

1,4000

0,25

1,2380

0,50

1,1880

1,00

1,1490

2,00

1,0570

4,00

1,0010

8,00

0,9110

0,1620

0,1309

0,5234

0,0083

4,36E-06

0,0500

0,0421

0,0842

0,0080

6,74E-07

0,0390

0,0339

0,0339

0,0083

2,83E-07

0,0920

0,0870

0,0435

0,0080

3,49E-07

0,0560

0,0559

0,0140

0,0083

1,17E-07

0,0900

0,0988

0,0123

0,0080

9,89E-08

0,1186

0,0082

9,81E-07

Rata-rata

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 17, 2007


: BH-1
: 05,00 - 05,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Pressure Vs e

1,9
1,7
1,5
1,3
1,1
0,9
0,7
0,5

Cv (Cm2/detik)

0,1

10

0,009

0,008

0,007
Pressure (Kg/Cm2)

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 15, 2007


: BH-1
: 08,00 - 08,50 m

Water Content & Unit Weight


W wet soil + ring
W ring
W wet soil
W dry soil (Ws)
W water
Water content (w)
Unit Weight

Load
Pressure
0
9,6
21,4
38,4
1
2,25
4
9
16
25
36
49
24

(Kg)
(Kg/Cm2)
detik
detik
detik
detik
menit
menit
menit
menit
menit
menit
menit
menit
jam

0,5
0,25
0,000
0,070
0,100
0,130
0,170
0,260
0,340
0,530
0,670
0,790
0,870
0,910
1,140

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%
Gr/Cm3

Before
75,3
16,9
58,4
21,1
37,3
176,777
2,092

After

32,8
21,1
11,7
55,450
1,175

1,0
0,5
1,140
1,160
1,170
1,190
1,200
1,220
1,240
1,290
1,330
1,360
1,390
1,410
1,600

2,0
1
1,600
1,650
1,660
1,680
1,700
1,740
1,780
1,860
1,870
1,980
2,010
2,040
2,250

4,0
2
2,250
2,320
2,340
2,370
2,390
2,460
2,510
2,630
2,720
2,790
2,830
2,850
3,180

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Before
After
Height (Ho)
Cm
1,4
0,94
e = (H0-Ht)/Ht
2,136
1,099
Void ratio
Water content (w)
% 176,777
55,450
Saturated
S = (w*Gs)
% 196,156 119,593
Specific Gravity (Gs)
Gr/Cm3
2,37
Coefficient compression
Cc
0,805
Coefficient swelling
Cs
0,093

8,0
4
3,180
3,530
3,560
3,580
3,610
3,780
3,900
4,090
5,210
5,290
5,320
5,360
5,570

16,0
8
5,570
5,700
5,740
5,770
5,810
5,910
5,980
6,040
6,100
6,180
6,270
6,340
6,550

4,0
2
6,550

0,5
0,25
6,300

A
Ht

6,300

4,630

=
=
=

19,94
Ws/A.G
0,446

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)

Pressure
2
(kg/cm )

Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 15, 2007


: BH-1
: 08,00 - 08,50 m

End of
Dial Reading
(cm)

H (cm)

0,0000

Tested by
Counted by
Checked by

Height of soil
sample at end
of every dial reading
Ht (cm)

Void Height
(Hv)
(cm)

1,4000

0,9536

Void Ratio
at end of
every reading
(e)

0,1140

1,2860

0,1600

0,8396
0,7936

1,7779

1,1750

0,3180

0,7286

1,6323

1,0820

0,5570

0,6356

1,4240

0,8430

0,6550

0,3966

0,8885

0,7450

0,6300

0,2986

0,6690
0,7575

0,7700

0,3236

0,7250

0,9370

0,4906

1,0991

(0,1670)
0,25

0,4630
(0,4630)

51,875

0,0080

49,840

0,0083

51,875

0,0080

49,840

0,0083

0,7940

(0,0250)
2

0,0080

0,9625

0,0980
8

51,875

1,1285

0,2390
4

0,0083

1,2075

0,0930
2

49,840
1,2630

1,2400

0,2250

Cm2/detik
Cv
Tv.Hdr^2
t90

0,000

1,8810

0,0650
1

Fitting
time
t90

1,3430

0,0460
0,5

Ht(av) (cm)

2,1364

0,1140
0,25

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,8535
0,4685

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 15, 2007


: BH-1
: 08,00 - 08,50 m

Pressure

H (cm)

Tested by
Counted by
Checked by

H (cm)
H /H
(4) = (3) / (2)

(kg/cm )
(1)

(2)
0,00

(3)

mv
(cm2/kg)
(5) = (4) : (1)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Cv
cm2/sec
(6)

k=mv.Cv.
(cm/sec)
-3
(7) = (5) x (6) x 10

1,4000

0,25

1,2860

0,50

1,2400

1,00

1,1750

2,00

1,0820

4,00

0,8430

8,00

0,7450

0,1140

0,0886

0,3546

0,0083

2,96E-06

0,0460

0,0371

0,0742

0,0080

5,94E-07

0,0650

0,0553

0,0553

0,0080

4,43E-07

0,0930

0,0860

0,0430

0,0083

3,58E-07

0,2390

0,2835

0,0709

0,0080

5,68E-07

0,0980

0,1315

0,0164

0,0083

1,37E-07

0,1024

0,0082

8,43E-07

Rata-rata

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 15, 2007


: BH-1
: 08,00 - 08,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Pressure Vs e

1,5
1
0,5
0

Cv (Cm2/detik)

0,1

10

0,009

0,008

0,007
Pressure (Kg/Cm2)

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 15, 2007


: BH-1
: 11,00 - 11,50 m

Water Content & Unit Weight


W wet soil + ring
W ring
W wet soil
W dry soil (Ws)
W water
Water content (w)
Unit Weight

Load
Pressure
0
9,6
21,4
38,4
1
2,25
4
9
16
25
36
49
24

(Kg)
(Kg/Cm2)
detik
detik
detik
detik
menit
menit
menit
menit
menit
menit
menit
menit
jam

0,5
0,25
0,000
0,070
0,090
0,110
0,130
0,180
0,220
0,280
0,310
0,340
0,370
0,380
0,420

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%
Gr/Cm3

Before
75,3
16,9
58,4
21,1
37,3
176,777
2,092

After

31,7
21,1
10,6
50,237
1,136

1,0
0,5
0,420
0,430
0,440
0,450
0,460
0,470
0,480
0,500
0,520
0,530
0,540
0,550
0,660

2,0
1
0,660
0,700
0,720
0,740
0,760
0,810
0,840
0,915
0,980
1,020
1,060
1,080
1,360

4,0
2
1,360
1,420
1,450
1,470
1,500
1,590
1,650
1,790
1,920
2,020
2,090
2,140
2,530

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Before
After
Height (Ho)
Cm
1,4
0,97
e = (H0-Ht)/Ht
2,318
1,301
Void ratio
Water content (w)
% 176,777
50,237
Saturated
S = (w*Gs)
% 191,263
96,825
Specific Gravity (Gs)
Gr/Cm3
2,51
0,778
Coefficient compression
Cc
0,130
Coefficient swelling
Cs

8,0
4
2,530
2,600
2,640
2,680
2,730
2,810
2,900
3,170
3,210
3,320
3,390
3,420
3,820

16,0
8
3,820
3,950
4,190
4,260
4,330
4,490
4,610
4,800
4,940
5,030
5,090
5,130
5,360

4,0
2
5,360

0,5
0,25
5,030

A
Ht

5,030

4,290

=
=
=

19,94
Ws/A.G
0,422

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)

Pressure
2
(kg/cm )

Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 15, 2007


: BH-1
: 11,00 - 11,50 m

End of
Dial Reading
(cm)

H (cm)

0,0000

Tested by
Counted by
Checked by

Height of soil
sample at end
of every dial reading
Ht (cm)

Void Height
(Hv)
(cm)

1,4000

0,9780

Void Ratio
at end of
every reading
(e)

0,0420

1,3580

0,0660

0,9360
0,9120

2,1613

1,2640

0,2530

0,8420

1,9954

1,1470

0,3820

0,7250

1,7181

1,0180

0,5360

0,5960

1,4124

0,8640

0,5030

0,4420

1,0475
0,8805

0,8970

0,4750

1,1257

0,9710

0,5490

1,3010

(0,0740)
0,25

0,4290
(0,4290)

49,840

0,0083

51,875

0,0080

49,840

0,0083

51,875

0,0080

0,9410

(0,0330)
2

0,0080

1,0825

0,1540
8

51,875

1,2055

0,1290
4

0,0083

1,2990

0,1170
2

49,840
1,3460

1,3340

0,1360

Cm2/sec
Cv
Tv.Hdr^2
t90

0,000

2,2182

0,0700
1

Fitting
time
t90

1,3790

0,0240
0,5

Ht(av) (cm)

2,3177

0,0420
0,25

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,9340
0,4855

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 15, 2007


: BH-1
: 11,00 - 11,50 m

Pressure

H (cm)

Tested by
Counted by
Checked by

H (cm)
H /H
(4) = (3) / (2)

(kg/cm )
(1)

(2)
0,00

(3)

mv
(cm2/kg)
(5) = (4) : (1)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Cv
cm2/sec
(6)

k=mv.Cv.
(cm/sec)
-3
(7) = (5) x (6) x 10

1,4000

0,25

1,3580

0,50

1,3340

1,00

1,2640

2,00

1,1470

4,00

1,0180

8,00

0,8640

0,0420

0,0309

0,1237

0,0083

1,03E-06

0,0240

0,0180

0,0360

0,0080

2,88E-07

0,0700

0,0554

0,0554

0,0083

4,62E-07

0,1170

0,1020

0,0510

0,0080

4,09E-07

0,1290

0,1267

0,0317

0,0083

2,64E-07

0,1540

0,1782

0,0223

0,0080

1,78E-07

0,0533

0,0082

4,39E-07

Rata-rata

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 15, 2007


: BH-1
: 11,00 - 11,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Pressure Vs e

2,6

2,1
1,6
1,1
0,6

Cv (Cm2/detik)

0,1

10

0,009

0,008

0,007
Pressure (Kg/Cm2)

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 15, 2007


: BH-1
: 14,00 - 14,50 m

Water Content & Unit Weight


W wet soil + ring
W ring
W wet soil
W dry soil (Ws)
W water
Water content (w)
Unit Weight

Load
Pressure
0
9,6
21,4
38,4
1
2,25
4
9
16
25
36
49
24

(Kg)
(Kg/Cm2)
detik
detik
detik
detik
menit
menit
menit
menit
menit
menit
menit
menit
jam

0,5
0,25
0,000
0,120
0,160
0,180
0,200
0,280
0,330
0,460
0,570
0,630
0,670
0,700
0,810

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%
Gr/Cm3

Before
76,6
16,9
59,7
23,8
35,9
150,840
2,139

After

36,1
23,8
12,3
51,681
1,293

1,0
0,5
0,810
0,830
0,840
0,850
0,856
0,860
0,870
0,900
0,920
0,935
0,950
0,970
1,060

2,0
1
1,060
1,110
1,120
1,130
1,140
1,170
1,200
1,250
1,290
1,310
1,325
1,340
1,460

4,0
2
1,460
1,530
1,550
1,570
1,590
1,640
1,690
1,770
1,830
1,870
1,890
1,910
2,060

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Before
After
Height (Ho)
Cm
1,4
1,03
e = (H0-Ht)/Ht
1,862
1,112
Void ratio
Water content (w)
% 150,840
51,681
Saturated
S = (w*Gs)
% 197,658 113,420
2,44
Specific Gravity (Gs)
Gr/Cm3
0,462
Coefficient compression
Cc
0,048
Coefficient swelling
Cs

8,0
4
2,060
2,170
2,230
2,270
2,320
2,450
2,540
2,750
2,890
2,980
3,030
3,060
3,280

16,0
8
3,280
3,370
3,410
3,440
3,470
3,570
3,650
3,790
3,890
3,950
3,980
4,020
4,210

4,0
2
4,210

0,5
0,25
4,070

A
Ht

4,070

3,670

=
=
=

19,94
Ws/A.G
0,489

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)

Pressure
2
(kg/cm )

Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 15, 2007


: BH-1
: 14,00 - 14,50 m

End of
Dial Reading
(cm)

H (cm)

0,0000

Tested by
Counted by
Checked by

Height of soil
sample at end
of every dial reading
Ht (cm)

Void Height
(Hv)
(cm)

1,4000

0,9109

Void Ratio
at end of
every reading
(e)

0,0810

1,3190

0,1060

0,8299
0,8049

1,6454

1,2540

0,2060

0,7649

1,5637

1,1940

0,3280

0,7049

1,4410

1,0720

0,4210

0,5829

1,1916

0,9790

0,4070

0,4899

1,0015
0,9860

0,9930

0,5039

1,0301

1,0330

0,5439

1,1119

(0,0400)
0,25

0,3670
(0,3670)

51,875

0,0080

49,840

0,0083

49,840

0,0083

51,875

0,0080

1,0255

(0,0140)
2

0,0083

1,1330

0,0930
8

49,840

1,2240

0,1220
4

0,0080

1,2740

0,0600
2

51,875
1,3065

1,2940

0,1460

Cm2/sec
Cv
Tv.Hdr^2
t90

0,000

1,6965

0,0400
1

Fitting
time
t90

1,3595

0,0250
0,5

Ht(av) (cm)

1,8621

0,0810
0,25

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1,0130
0,5165

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 15, 2007


: BH-1
: 14,00 - 14,50 m

Pressure

H (cm)

Tested by
Counted by
Checked by

H (cm)
H /H
(4) = (3) / (2)

(kg/cm )
(1)

(2)
0,00

(3)

mv
(cm2/kg)
(5) = (4) : (1)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Cv
cm2/sec
(6)

k=mv.Cv.
(cm/sec)
-3
(7) = (5) x (6) x 10

1,4000

0,25

1,3190

0,50

1,2940

1,00

1,2540

2,00

1,1940

4,00

1,0720

8,00

0,9790

0,0810

0,0614

0,2456

0,0080

1,97E-06

0,0250

0,0193

0,0386

0,0083

3,22E-07

0,0400

0,0319

0,0319

0,0080

2,56E-07

0,0600

0,0503

0,0251

0,0083

2,09E-07

0,1220

0,1138

0,0285

0,0083

2,37E-07

0,0930

0,0950

0,0119

0,0080

9,51E-08

0,0636

0,0082

5,15E-07

Rata-rata

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 15, 2007


: BH-1
: 14,00 - 14,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Pressure Vs e
1,90
1,70

1,50
1,30
1,10
0,90
0,70

Cv (Cm2/detik)

0,1

10

0,009

0,008

0,007
Pressure (Kg/Cm2)

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

CONCLUSION of SOIL INVESTIGATION ( BH-2 )


Project

: Power Plant

Location : Pulang Pisau, Central Kalimantan


INVESTIGATION RESULT
NO

KIND of TEST

BH-2

BH-2

02,00 - 02,50 m 05,00 - 05,50 m

1
2
3
4

6
7

Water Content
Unit Weight
Specifyc Gravity
Liquid Limit
Plastic Limit
Indeks Plastic
Gradation
0,75
0,375
4
8
10
40
100
200
Direct Shear

(%)
(Kg/cm3)
Gs
(%)
(%)

19,1
mm
9,5
mm
4,75
mm
2,36
mm
2
mm
0,425
mm
0,15
mm
0,075
mm
c
(Kg/cm2)

()
Unconfined Compresive Strenght
qu (Kg/cm2)
qr (Kg/cm2)
Sensitivity (St)
Consolidation
Cc
Cs
Cv
k
e
Porocity ( n )

Soil Classification (Unified Soil Classification System)

BH-2

BH-2

11,00 - 11,50 m

14,00 - 14,500 m

107,20
1,38
2,30
53,40
41,35
12,05

86,90
1,45
2,38
52,00
42,21
9,79

94,72
1,44
2,51
53,60
50,30
3,30

76,67
1,45
2,35
56,00
48,04
7,96

100,00
100,00
100,00
100,00
100,00
100,00
100,00
100,00
0,045
6,00
0,035
0,025
1,386
0,647
0,091
8,12E-03
9,47E-07
2,320
0,699

100,00
100,00
100,00
100,00
100,00
100,00
100,00
100,00
0,035
14,00
0,056
0,041
1,366
0,498
0,073
8,17E-03
7,36E-07
1,922
0,658

100,00
100,00
100,00
100,00
100,00
100,00
100,00
100,00
0,045
14,50
0,068
0,049
1,388
0,774
0,082
8,17E-03
6,59E-07
2,448
0,710

100,00
100,00
100,00
100,00
100,00
100,00
100,00
100,00
0,055
9,50
0,031
0,027
1,148
0,469
0,098
8,12E-03
7,23E-07
1,754
0,637

MH

MH

MH

OH

October 01, 2007

Yusti Yudiawati, ST, MT


Geotechnical Engineer

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

WATER CONTENT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-2
Depth
: 02,00 - 02,50 m

Container No.
Cont. Weight + Wet Soil
Cont. Weight + Dry Soil
Water Weight
Container Weight
Weight Dry
WATER CONTENT
Average

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
45,10
26,90
18,20
10,00
16,90
107,69

Gr
Gr
Gr
Gr
Gr
%
%

2
42,70
25,20
17,50
8,80
16,40
106,71
107,20

UNIT WEIGHT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-2
Depth
: 02,00 - 02,50 m

Container No.
W Ring + Wet soil
W Ring
W wet soil
Diameter Ring
H Ring
Volume
Unit Weight
Average

Tested by
Counted by
Checked by

Gr
Gr
Gr
Cm
Cm
Cm3
Gr/Cm3
Gr/Cm3

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
251,9
159,1
92,8
3,5
7,0
67,31
1,38

2
251,5
159,1
92,4
3,5
7,0
67,31
1,37
1,38

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

WATER CONTENT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-2
Depth
: 05,00 - 05,50 m

Container No.
Cont. Weight + Wet Soil
Cont. Weight + Dry Soil
Water Weight
Container Weight
Weight Dry
WATER CONTENT
Average

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
49,50
30,60
18,90
8,80
21,80
86,70

Gr
Gr
Gr
Gr
Gr
%
%

2
49,40
30,50
18,90
8,80
21,70
87,10
86,90

UNIT WEIGHT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-2
Depth
: 05,00 - 05,50 m

Container No.
W Ring + Wet soil
W Ring
W wet soil
Diameter Ring
H Ring
Volume
Unit Weight
Average

Tested by
Counted by
Checked by

Gr
Gr
Gr
Cm
Cm
Cm3
Gr/Cm3
Gr/Cm3

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
256,7
159,1
97,6
3,5
7,0
67,31
1,45

2
256,2
159,1
97,1
3,5
7,0
67,31
1,44
1,45

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

WATER CONTENT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-2
Depth
: 11,00 - 11,50 m

Container No.
Cont. Weight + Wet Soil
Cont. Weight + Dry Soil
Water Weight
Container Weight
Weight Dry
WATER CONTENT
Average

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
48,90
29,50
19,40
8,70
20,80
93,27

Gr
Gr
Gr
Gr
Gr
%
%

2
39,60
24,50
15,10
8,80
15,70
96,18
94,72

UNIT WEIGHT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-2
Depth
: 11,00 - 11,50 m

Container No.
W Ring + Wet soil
W Ring
W wet soil
Diameter Ring
H Ring
Volume
Unit Weight
Average

Tested by
Counted by
Checked by

Gr
Gr
Gr
Cm
Cm
Cm3
Gr/Cm3
Gr/Cm3

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
256,3
159,1
97,2
3,5
7,0
67,31
1,44

2
256
159,1
96,9
3,5
7,0
67,31
1,44
1,44

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

WATER CONTENT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-2
Depth
: 14,00 - 14,50 m

Container No.
Cont. Weight + Wet Soil
Cont. Weight + Dry Soil
Water Weight
Container Weight
Weight Dry
WATER CONTENT
Average

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
55,00
34,90
20,10
8,70
26,20
76,72

Gr
Gr
Gr
Gr
Gr
%
%

2
49,60
31,90
17,70
8,80
23,10
76,62
76,67

UNIT WEIGHT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-2
Depth
: 14,00 - 14,50 m

Container No.
W Ring + Wet soil
W Ring
W wet soil
Diameter Ring
H Ring
Volume
Unit Weight
Average

Tested by
Counted by
Checked by

Gr
Gr
Gr
Cm
Cm
Cm3
Gr/Cm3
Gr/Cm3

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
256,9
159,1
97,8
3,5
7,0
67,31
1,45

2
256,2
159,1
97,1
3,5
7,0
67,31
1,44
1,45

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

SPECIFIC GRAVITY TEST


(ASTM D - 854 - 58)
(AASHTO T - 100 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 27, 2007
Sample No. : BH-2
Depth
: 02,00 - 02,50 m

No
1
2
3
4
5
6
7
8

Tested by
Counted by
Checked by

Picnometer No.
W Picno + Water, W1
W Picno + Soil + Water, W2
W Dry, W3
Temperatur Campuran Air + Tanah, TC
Gs (at TC) = W3 / [(W1 + W3) - W2]
Correction, A
Gs (at 20C) = Gs (at TC) x A
Specific Gravity

Table : Temperatur Correction


TC
TC
Correction
15
1,0009
21
16
1,0007
22
17
1,0006
23
18
1,0004
24
19
1,0002
25
20
1,0000
26
Table : Water Intencity ( w)
TC
w
15
0,999129
16
0,9990
17
0,9988
18
0,9986
19
0,9984
20
0,9982

TC
21
22
23
24
25
26

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Gr
TC
cm3
Gr

1
141,90
170,00
50,00
27,00
2,28
0,9983
2,28

2
142,10
170,50
50,00
27,00
2,31
0,9983
2,31
2,295

Correction
0,9998
0,9996
0,9993
0,9991
0,9988
0,9986

TC
27
28
29
30
31
32

Correction
0,9983
0,9980
0,9977
0,9974

w
0,9980
0,9978
0,9976
0,9973
0,9971
0,9968

TC
27
28
29
30
31
32

w
0,9965
0,9963
0,9960
0,9957

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

SPECIFIC GRAVITY TEST


(ASTM D - 854 - 58)
(AASHTO T - 100 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 28, 2007
Sample No. : BH-2
Depth
: 05,00 - 05,50 m

No
1
2
3
4
5
6
7
8

Tested by
Counted by
Checked by

Picnometer No.
W Picno + Water, W1
W Picno + Soil + Water, W2
W Dry, W3
Temperatur Campuran Air + Tanah, TC
Gs (at TC) = W3 / [(W1 + W3) - W2]
Correction, A
Gs (at 20C) = Gs (at TC) x A
Specific Gravity

Table : Temperatur Correction


TC
TC
Correction
15
1,0009
21
16
1,0007
22
17
1,0006
23
18
1,0004
24
19
1,0002
25
20
1,0000
26
Table : Water Intencity ( w)
TC
w
15
0,999129
16
0,9990
17
0,9988
18
0,9986
19
0,9984
20
0,9982

TC
21
22
23
24
25
26

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Gr
TC
cm3
Gr

1
141,80
170,80
50,00
28,00
2,38
0,9980
2,38

2
142,00
171,00
50,00
28,00
2,38
0,9980
2,38
2,376

Correction
0,9998
0,9996
0,9993
0,9991
0,9988
0,9986

TC
27
28
29
30
31
32

Correction
0,9983
0,9980
0,9977
0,9974

w
0,9980
0,9978
0,9976
0,9973
0,9971
0,9968

TC
27
28
29
30
31
32

w
0,9965
0,9963
0,9960
0,9957

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

SPECIFIC GRAVITY TEST


(ASTM D - 854 - 58)
(AASHTO T - 100 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 20, 2007
Sample No. : BH-2
Depth
: 11,00 - 11,50 m

No
1
2
3
4
5
6
7
8

Tested by
Counted by
Checked by

Picnometer No.
W Picno + Water, W1
W Picno + Soil + Water, W2
W Dry, W3
Temperatur Campuran Air + Tanah, TC
Gs (at TC) = W3 / [(W1 + W3) - W2]
Correction, A
Gs (at 20C) = Gs (at TC) x A
Specific Gravity

Table : Temperatur Correction


TC
TC
Correction
15
1,0009
21
16
1,0007
22
17
1,0006
23
18
1,0004
24
19
1,0002
25
20
1,0000
26
Table : Water Intencity ( w)
TC
w
15
0,999129
16
0,9990
17
0,9988
18
0,9986
19
0,9984
20
0,9982

TC
21
22
23
24
25
26

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Gr
TC
cm3
Gr

1
142,20
172,40
50,00
28,00
2,53
0,9980
2,52

2
142,00
172,00
50,00
28,00
2,50
0,9980
2,50
2,508

Correction
0,9998
0,9996
0,9993
0,9991
0,9988
0,9986

TC
27
28
29
30
31
32

Correction
0,9983
0,9980
0,9977
0,9974

w
0,9980
0,9978
0,9976
0,9973
0,9971
0,9968

TC
27
28
29
30
31
32

w
0,9965
0,9963
0,9960
0,9957

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

SPECIFIC GRAVITY TEST


(ASTM D - 854 - 58)
(AASHTO T - 100 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 29, 2007
Sample No. : BH-2
Depth
: 14,00 - 14,50 m

No
1
2
3
4
5
6
7
8

Tested by
Counted by
Checked by

Picnometer No.
W Picno + Water, W1
W Picno + Soil + Water, W2
W Dry, W3
Temperatur Campuran Air + Tanah, TC
Gs (at TC) = W3 / [(W1 + W3) - W2]
Correction, A
Gs (at 20C) = Gs (at TC) x A
Specific Gravity

Table : Temperatur Correction


TC
TC
Correction
15
1,0009
21
16
1,0007
22
17
1,0006
23
18
1,0004
24
19
1,0002
25
20
1,0000
26
Table : Water Intencity ( w)
TC
w
15
0,999129
16
0,9990
17
0,9988
18
0,9986
19
0,9984
20
0,9982

TC
21
22
23
24
25
26

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Gr
TC
cm3
Gr

1
142,60
171,30
50,00
28,00
2,35
0,9980
2,34

2
142,30
171,10
50,00
28,00
2,36
0,9980
2,35
2,348

Correction
0,9998
0,9996
0,9993
0,9991
0,9988
0,9986

TC
27
28
29
30
31
32

Correction
0,9983
0,9980
0,9977
0,9974

w
0,9980
0,9978
0,9976
0,9973
0,9971
0,9968

TC
27
28
29
30
31
32

w
0,9965
0,9963
0,9960
0,9957

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

ATTERBERG LIMIT TEST


(AASHTO T - 89 - 74 / AASHTO T - 90 - 74)
(ASTM D - 423 - 66 / ASTM D - 424 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 12, 2007
Sample No. : BH-2
Depth
: 02,00 - 02,50 m
LIQUID LIMIT :
Sample No.
(1)
Number of Blows
(2)
Container No.
(3)
W cont + W wet soil
(4)
W cont + dry soil
(5)
W water (3) - (4)
(6)
W Container
(7)
W dry soil (4) - (6)
(8)
Water content (5)/(7)*100

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%

1
13
C1
42,20
30,2
12,0
8,90
21,30
56,34

2
21
C2
38,00
27,8
10,2
8,80
19,00
53,68

3
31
C3
44,10
31,9
12,2
8,90
23,00
53,04

4
43
C4
42,60
31,2
11,4
8,80
22,40
50,89

Water content (%)

LIQUID LIMIT GRAPH


57
56
55
54
53
52
51
50

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

PLASTIC LIMIT :
Sample No.
(1) Container No.
(2) W cont + W wet soil
(3) W cont + dry soil
(4) W water (2) - (3)
(5) W Container
(6) W dry soil (3) - (5)
(7) Water content (4)/(6)*100
(8) Plastic limit

Gr
Gr
Gr
Gr
Gr
%
%

1
C.1
38,20
29,60
8,60
8,80
20,80
41,346
41,35

LL

PL

PI

53,4

41,35

12,05

Silt anorganic with high compresibility


and Clay organic

10
Blows

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

ATTERBERG LIMIT TEST


(AASHTO T - 89 - 74 / AASHTO T - 90 - 74)
(ASTM D - 423 - 66 / ASTM D - 424 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 18, 2007
Sample No. : BH-2
Depth
: 05,00 - 05,50 m
LIQUID LIMIT :
Sample No.
(1)
Number of Blows
(2)
Container No.
(3)
W cont + W wet soil
(4)
W cont + dry soil
(5)
W water (3) - (4)
(6)
W Container
(7)
W dry soil (4) - (6)
(8)
Water content (5)/(7)*100

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%

1
16
C1
47,4
34,3
13,1
10,20
24,10
54,36

2
10
C2
41,7
30,2
11,5
8,90
21,30
53,99

3
30
C3
39,0
29,1
9,9
10,30
18,80
52,66

4
41
C4
43,6
32,1
11,5
8,90
23,20
49,57

LIQUID LIMIT GRAPH

Water content (%)

56

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

PLASTIC LIMIT :
Sample No.
(1) Container No.
(2) W cont + W wet soil
(3) W cont + dry soil
(4) W water (2) - (3)
(5) W Container
(6) W dry soil (3) - (5)
(7) Water content (4)/(6)*100
(8) Plastic limit

Gr
Gr
Gr
Gr
Gr
%
%

1
C.1
37,30
28,90
8,40
9,00
19,90
42,211
42,21

LL

PL

PI

52

42,21

9,79

54

Silt anorganic with high compresibility


52

and Clay organic

50
48
1

10
Blows

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

ATTERBERG LIMIT TEST


(AASHTO T - 89 - 74 / AASHTO T - 90 - 74)
(ASTM D - 423 - 66 / ASTM D - 424 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-2
Depth
: 11,00 - 11,50 m
LIQUID LIMIT :
Sample No.
(1)
Number of Blows
(2)
Container No.
(3)
W cont + W wet soil
(4)
W cont + dry soil
(5)
W water (3) - (4)
(6)
W Container
(7)
W dry soil (4) - (6)
(8)
Water content (5)/(7)*100

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%

1
14
C1
39,60
28,6
11,0
8,80
19,80
55,56

2
26
C2
42,70
30,9
11,8
8,90
22,00
53,64

3
33
C3
44,30
32,1
12,2
8,80
23,30
52,36

4
46
C4
42,80
31,3
11,5
8,80
22,50
51,11

LIQUID LIMIT GRAPH

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

PLASTIC LIMIT :
Sample No.
(1) Container No.
(2) W cont + W wet soil
(3) W cont + dry soil
(4) W water (2) - (3)
(5) W Container
(6) W dry soil (3) - (5)
(7) Water content (4)/(6)*100
(8) Plastic limit

Gr
Gr
Gr
Gr
Gr
%
%

1
C.1
34,40
25,90
8,50
9,00
16,90
50,296
50,30

LL

PL

PI

53,6

50,30

3,30

Water content (%)

56
55
54

Silt anorganic with high compresibility

53
52

and Clay organic

51
50
1

10
Blows

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

ATTERBERG LIMIT TEST


(AASHTO T - 89 - 74 / AASHTO T - 90 - 74)
(ASTM D - 423 - 66 / ASTM D - 424 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-2
Depth
: 14,00 - 14,50 m
LIQUID LIMIT :
Sample No.
(1)
Number of Blows
(2)
Container No.
(3)
W cont + W wet soil
(4)
W cont + dry soil
(5)
W water (3) - (4)
(6)
W Container
(7)
W dry soil (4) - (6)
(8)
Water content (5)/(7)*100

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%

1
13
C1
35,20
25,1
10,1
8,80
16,30
61,96

2
24
C2
42,30
30,5
11,8
8,80
21,70
54,38

3
34
C3
44,20
32,0
12,2
8,80
23,20
52,59

4
46
C4
43,00
31,1
11,9
8,80
22,30
53,36

LIQUID LIMIT GRAPH

Water content (%)

65

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

PLASTIC LIMIT :
Sample No.
(1) Container No.
(2) W cont + W wet soil
(3) W cont + dry soil
(4) W water (2) - (3)
(5) W Container
(6) W dry soil (3) - (5)
(7) Water content (4)/(6)*100
(8) Plastic limit

Gr
Gr
Gr
Gr
Gr
%
%

1
C.1
35,40
26,80
8,60
8,90
17,90
48,045
48,04

LL

PL

PI

56

48,04

7,96

60

Silt anorganic with high compresibility

55

and Clay organic

50
1

10
Blows

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

HYDROMETER TEST
(AASHTO T - 88 - 72)
(ASTM D - 422 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 26, 2007
Sample No. : BH-2
Depth
: 02,00 - 02,50 m

Tested by
Counted by
Checked by

W dry soil
Specific Gravity

:
:

50 gram
2,30

Meniscus Correction, Fm
Zero Reading Correction, Fz
Temperature Correction, Ft
Specifik Gravity Correction (a)

:
:
:
=

1
4
2,15
1,662

Time
(menit)

Temp.
T C

Rcp

0,25
0,5
1
2
5
15
30
60
240
1440
2880

29
29
29
29
29
29
29
29
28
28
28

28
28
28
27
26
24
21
19
16
14
12

26,15
26,15
26,15
25,15
24,15
22,15
19,15
17,15
14,15
12,15
10,15

100

% refined grain
a Rcp x 100
50
86,9358
86,9358
86,9358
83,6113
80,2868
73,6377
63,6642
57,0152
47,0417
40,3927
33,7437

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Rcl

L
(cm)

D
(mm)

29
29
29
28
27
25
22
20
17
15
13

11,70
11,70
11,70
11,90
12,00
12,40
12,90
13,20
13,70
14,00
14,30

0,0129
0,0129
0,0129
0,0129
0,0129
0,0129
0,0129
0,0129
0,0130
0,0130
0,0130

0,0882
0,0624
0,0441
0,0315
0,0200
0,0117
0,0085
0,0061
0,0031
0,0013
0,0009

Curve: Distribute Grain Size

90

Total slip off sieve (%)

80
70
60
50
40
30
20
10
0
100,000

10,000

1,000

0,100

0,010

Diameter
(mm)
0,001
0,000

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

HYDROMETER TEST
(AASHTO T - 88 - 72)
(ASTM D - 422 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 28, 2007
Sample No. : BH-2
Depth
: 14,00 - 14,50 m

Tested by
Counted by
Checked by

W dry soil
Specific Gravity

:
:

50 gram
2,38

Meniscus Correction, Fm
Zero Reading Correction, Fz
Temperature Correction, Ft
Specifik Gravity Correction (a)

:
:
:
=

1
4
2,15
1,662

Time
(menit)

Temp.
T C

Rcp

0,25
0,5
1
2
5
15
30
60
240
1440
2880

28
28
28
28
28
28
28
28
28
27
27

29
29
29
29
28
26
24
22
19
17
14

27,15
27,15
27,15
27,15
26,15
24,15
22,15
20,15
17,15
15,15
12,15

100

% refined grain
a Rcp x 100
50
90,2603
90,2603
90,2603
90,2603
86,9358
80,2868
73,6377
66,9887
57,0152
50,3662
40,3927

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Rcl

L
(cm)

D
(mm)

30
30
30
30
29
27
25
23
20
18
15

11,50
11,50
11,50
11,50
11,70
12,00
12,40
12,70
13,20
13,50
14,00

0,0130
0,0130
0,0130
0,0130
0,0130
0,0130
0,0130
0,0130
0,0130
0,0132
0,0132

0,0882
0,0623
0,0441
0,0312
0,0199
0,0116
0,0084
0,0060
0,0030
0,0013
0,0009

Curve: Distribute Grain Size

90

Total slip off sieve (%)

80
70
60
50
40
30
20
10
0
100,000

10,000

1,000

0,100

0,010

Diameter
(mm)
0,001
0,000

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

HYDROMETER TEST
(AASHTO T - 88 - 72)
(ASTM D - 422 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-2
Depth
: 11,00 - 11,50 m

Tested by
Counted by
Checked by

W dry soil
Specific Gravity

:
:

50 gram
2,51

Meniscus Correction, Fm
Zero Reading Correction, Fz
Temperature Correction, Ft
Specifik Gravity Correction (a)

:
:
:
=

1
4
2,15
1,662

Time
(menit)

Temp.
T C

Rcp

0,25
0,5
1
2
5
15
30
60
240
1440
2880

29
29
29
29
29
29
29
29
28
28
28

27
27
27
26
25
24
23
22
21
19
16

25,15
25,15
25,15
24,15
23,15
22,15
21,15
20,15
19,15
17,15
14,15

% refined grain
a Rcp x 100
50
83,6113
83,6113
83,6113
80,2868
76,9623
73,6377
70,3132
66,9887
63,6642
57,0152
47,0417

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Rcl

L
(cm)

D
(mm)

28
28
28
27
26
25
24
23
22
20
17

11,90
11,90
11,90
12,00
12,20
12,40
12,50
12,70
12,90
13,20
13,50

0,0129
0,0129
0,0129
0,0129
0,0129
0,0129
0,0129
0,0129
0,0130
0,0130
0,0130

0,0890
0,0629
0,0445
0,0316
0,0202
0,0117
0,0083
0,0059
0,0030
0,0012
0,0009

Curve: Distribute Grain Size

100

Total slip off sieve (%)

90
80
70
60
50
40
30
20
10
0
100,000

10,000

1,000

0,100

0,010

0,001 (mm)
0,000
Diameter

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

HYDROMETER TEST
(AASHTO T - 88 - 72)
(ASTM D - 422 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 18, 2007
Sample No. : BH-2
Depth
: 14,00 - 14,50 m

Tested by
Counted by
Checked by

W dry soil
Specific Gravity

:
:

50 gram
2,35

Meniscus Correction, Fm
Zero Reading Correction, Fz
Temperature Correction, Ft
Specifik Gravity Correction (a)

:
:
:
=

1
4
2,15
1,662

Time
(menit)

Temp.
T C

Rcp

0,25
0,5
1
2
5
15
30
60
240
1440
2880

29
29
29
29
29
29
29
29
28
28
28

29
29
29
28
27
25
23
20
18
16
13

27,15
27,15
27,15
26,15
25,15
23,15
21,15
18,15
16,15
14,15
11,15

100

% refined grain
a Rcp x 100
50
90,2603
90,2603
90,2603
86,9358
83,6113
76,9623
70,3132
60,3397
53,6907
47,0417
37,0682

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Rcl

L
(cm)

D
(mm)

30
30
30
29
28
26
24
21
19
17
14

11,50
11,50
11,50
11,70
11,90
12,20
12,50
13,00
13,30
13,70
14,20

0,0129
0,0129
0,0129
0,0129
0,0129
0,0129
0,0129
0,0129
0,0130
0,0130
0,0130

0,0875
0,0619
0,0437
0,0312
0,0199
0,0116
0,0083
0,0060
0,0031
0,0013
0,0009

Curve: Distribute Grain Size

Total slip off sieve (%)

90
80
70
60
50
40
30
20
10
0
100,000 10,000

1,000

0,100

0,010

0,001 (mm)
0,000
Diameter

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

DIRECT SHEAR TEST


( AASHTO T - 236 - 72 )
( ASTM D - 3080 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-2
: 02,00 - 02,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Time

Horizontal

Load N

3,167

Load N

6,324

Load N

9,491

(menit)

Deformation

Reading

Shear

Reading

Shear

Reading

Shear

0,00
0,25
0,50
1,00
1,50
2,00
2,50
3,00
3,50
4,00
4,50
5,00
6,00
7,00
8,00
9,00
10,00
11,00
12,00
13,00
14,00
15,00

0,000
0,158
0,316
0,361
0,947
1,262
1,578
1,893
2,209
2,524
2,840
3,155
3,786
4,417
5,048
5,679
6,310
6,941
7,572
8,203
8,834
9,465

0,00
0,20
0,40
0,60
1,00
1,80
2,40
3,00
3,60
4,20
4,20
4,20

0,00
0,08
0,17
0,25
0,42
0,76
1,01
1,26
1,51
1,76
1,76
1,76

0,00
0,10
0,20
0,40
0,80
1,60
2,20
3,20
4,20
5,00
5,00
5,00

0,00
0,04
0,08
0,17
0,34
0,67
0,92
1,34
1,76
2,10
2,10
2,10

0,00
0,20
0,40
0,70
1,00
2,00
2,80
3,80
4,40
5,20
6,00
6,00
6,00

0,00
0,08
0,17
0,29
0,42
0,84
1,18
1,60
1,85
2,19
2,52
2,52
2,52

0,450

= N/A

DIRECT SHEAR GRAPH

0,400

0,350

Shear Stress (Kg/Cm2)

0,300

0,250

0,200

0,150

0,100

6o
0,050

0,000
0,00

0,05

0,10

0,15Normal
0,20
Stress 0,25
(Kg/Cm2)0,30

0,35

0,40

0,45

Tool

Diameter 63.1 mm, height 20 mm, Areas 31.25 cm2


prov. ring calibration 0.1610 kg/10-4

Result

c = 0,045 kg/cm2

Sample

= 6

= P/A

0,101

0,056

0,202

0,067

0,304

0,081

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

DIRECT SHEAR TEST


( AASHTO T - 236 - 72 )
( ASTM D - 3080 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-2
: 05,00 - 05,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Time

Horizontal

Load N

3,167

Load N

6,324

Load N

9,491

(menit)

Deformation

Reading

Shear

Reading

Shear

Reading

Shear

0,00
0,25
0,50
1,00
1,50
2,00
2,50
3,00
3,50
4,00
4,50
5,00
6,00
7,00
8,00
9,00
10,00
11,00
12,00
13,00
14,00
15,00

0,000
0,158
0,316
0,361
0,947
1,262
1,578
1,893
2,209
2,524
2,840
3,155
3,786
4,417
5,048
5,679
6,310
6,941
7,572
8,203
8,834
9,465

0,00
1,00
2,00
2,80
3,60
4,00
4,60
5,20
5,20
5,20

0,00
0,42
0,84
1,18
1,51
1,68
1,93
2,19
2,19
2,19

0,00
1,40
2,40
3,80
4,60
5,80
6,60
6,60
6,60

0,00
0,59
1,01
1,60
1,93
2,44
2,77
2,77
2,77

0,00
1,80
3,20
4,80
5,60
6,60
7,80
8,40
9,60
9,60
9,60

0,00
0,76
1,34
2,02
2,35
2,77
3,28
3,53
4,03
4,03
4,03

0,400

= N/A

0,101

0,070

0,202

0,089

0,304

0,129

DIRECT SHEAR GRAPH

0,350

0,300

Shear (Kg/Cm2)

0,250

0,200

0,150

14 o
0,100

0,050

0,000
0,000

0,050

0,100

0,150 Normal
0,200
0,250
0,300
Stress (Kg/Cm2)

0,350

0,400

Tool

Diameter 63.1 mm, height 20 mm, Areas 31.25 cm2


prov. ring calibration 0.1610 kg/10-4

Result

c = 0,035 kg/cm2

Sample

= 14

= P/A

0,450

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

DIRECT SHEAR TEST


( AASHTO T - 236 - 72 )
( ASTM D - 3080 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-2
: 11,00 - 11,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Time

Horizontal

Load N

3,167

Load N

6,324

Load N

9,491

(menit)

Deformation

Reading

Shear

Reading

Shear

Reading

Shear

0,00
0,25
0,50
1,00
1,50
2,00
2,50
3,00
3,50
4,00
4,50
5,00
6,00
7,00
8,00
9,00
10,00
11,00
12,00
13,00
14,00
15,00

0,000
0,158
0,316
0,361
0,947
1,262
1,578
1,893
2,209
2,524
2,840
3,155
3,786
4,417
5,048
5,679
6,310
6,941
7,572
8,203
8,834
9,465

0,00
1,60
2,40
3,60
4,20
5,30
5,80
5,80
5,80

0,00
0,67
1,01
1,51
1,76
2,23
2,44
2,44
2,44

0,00
1,30
2,60
4,20
5,00
6,00
6,60
7,00
7,00
7,00

0,00
0,55
1,09
1,76
2,10
2,52
2,77
2,94
2,94
2,94

0,00
2,00
4,00
3,00
7,40
8,60
9,20
10,00
10,00
10,00

0,00
0,84
1,68
1,26
3,11
3,61
3,87
4,20
4,20
4,20

0,450

= N/A

DIRECT SHEAR GRAPH

0,400

0,350

Shear (Kg/Cm2)

0,300

0,250

0,200

0,150

14,5
0,100

0,050

0,000
0,00

0,05

0,10

0,15Normal
0,20
0,25
0,30
Stress (Kg/Cm2)

0,35

0,40

Tool

Diameter 63.1 mm, height 20 mm, Areas 31.25 cm2


prov. ring calibration 0.1610 kg/10-4

Result

c = 0,045 kg/cm2

Sample

= 14,5

0,45

= P/A

0,101

0,078

0,202

0,094

0,304

0,134

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

DIRECT SHEAR TEST


( AASHTO T - 236 - 72 )
( ASTM D - 3080 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-2
: 14,00 - 14,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Time

Horizontal

Load N

3,167

Load N

6,324

Load N

9,491

(menit)

Deformation

Reading

Shear

Reading

Shear

Reading

Shear

0,00
0,25
0,50
1,00
1,50
2,00
2,50
3,00
3,50
4,00
4,50
5,00
6,00
7,00
8,00
9,00
10,00
11,00
12,00
13,00
14,00
15,00

0,000
0,158
0,316
0,361
0,947
1,262
1,578
1,893
2,209
2,524
2,840
3,155
3,786
4,417
5,048
5,679
6,310
6,941
7,572
8,203
8,834
9,465

0,00
1,80
2,20
3,40
4,60
5,40
6,00
6,60
6,60
6,60

0,00
0,76
0,92
1,43
1,93
2,27
2,52
2,77
2,77
2,77

0,00
1,60
2,80
4,40
5,60
7,20
8,40
8,40
8,40

0,00
0,67
1,18
1,85
2,35
3,03
3,53
3,53
3,53

0,00
2,00
4,00
5,80
7,60
8,20
9,00
9,80
10,60
11,20
11,20
11,20

0,00
0,84
1,68
2,44
3,19
3,45
3,78
4,12
4,45
4,71
4,71
4,71

= N/A

DIRECT SHEAR GRAPH

0,500

0,450

0,400

Shear (Kg/Cm2)

0,350

0,300

0,250

0,200

0,150

9,5 o
0,100

0,050

0,000
0,00

0,05

0,10

0,15
0,20 (Kg/Cm2)
0,25
Normal Stress

0,30

0,35

0,40

Tool

Diameter 63.1 mm, height 20 mm, Areas 31.25 cm2


prov. ring calibration 0.1610 kg/10-4

Result

c = 0,055 kg/cm2

Sample

= 9,5

= P/A

0,101

0,089

0,202

0,113

0,304

0,151

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-2
Depth
: 02,00 - 02,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(menit) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
92,8
1,38

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,2
0,35
0,3
0,70
0,5
1,05
0,8
1,40
0,9
1,75
1,0
2,10
1,2
2,45
1,4
4,90
1,2
3,15
1,0
3,50
0,8
3,85

Tested by
Counted by
Checked by

Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
Strain
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,053
0,034
0,038
0,041

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Undisturb

C
qu
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,947
0,966
0,962
0,959

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,697
18,333
18,405
18,477

0,0176
Kg/Cm2
0,0352
Kg/Cm3
1,386
0,549496
Load
Total
(P)
0,0
0,1
0,2
0,3
0,4
0,5
0,5
0,7
0,8
0,7
0,5
0,4

Compression
Stress
0,000
0,006
0,009
0,015
0,024
0,027
0,030
0,036
0,041
0,036
0,030
0,024

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-2
Depth
: 02,00 - 02,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Undisturb (qu)

Remoulded (qr)

0,045

0,050

0,040

0,045
0,040

0,035

Stress (Kg/Cm2)

0,035
0,030

0,030
0,025

0,025
0,020

0,020
0,015

0,015
0,010

0,010

0,005

0,000
0,000

0,005

0,020

0,040

0,060

Strain (Kg/Cm2)

0,080

0,100

0,000
0,000

0,020

0,040

0,060

Strain (Kg/Cm2)

0,080

0,100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-2
Depth
: 02,00 - 02,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(menit) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
92,40
1,37

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,2
0,35
0,3
0,70
0,4
1,05
0,6
1,40
0,8
1,75
0,9
2,10
1,0
2,45
0,8
2,80
0,6
3,15
0,5
3,50

Tested by
Counted by
Checked by

Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
Strain
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,030
0,034
0,038

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Remoulded

C
qr
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,970
0,966
0,962

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,262
18,333
18,405

0,0127
Kg/Cm2
0,0254
Kg/Cm3
1,386
0,549496
Load
Total
(P)
0,0
0,1
0,2
0,2
0,3
0,4
0,5
0,5
0,4
0,3
0,3

Compression
Stress
0,000
0,006
0,009
0,012
0,018
0,024
0,027
0,030
0,024
0,018
0,015

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-2
Depth
: 05,00 - 05,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(menit) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
97,6
1,45

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,4
0,35
0,7
0,70
0,8
1,05
1,0
1,40
1,2
1,75
1,4
2,10
1,6
2,45
1,8
4,90
2,0
3,15
2,2
3,50
2,0
3,85
1,8
4,20
1,5
4,55

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
Strain
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,053
0,034
0,038
0,041
0,045
0,049

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Undisturb

C
qu
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,947
0,966
0,962
0,959
0,955
0,951

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,697
18,333
18,405
18,477
18,550
18,623

0,028
Kg/Cm2
0,056
Kg/Cm3
1,366
0,549496
Load
Total
(P)
0,0
0,2
0,4
0,4
0,5
0,7
0,8
0,9
1,0
1,1
1,2
1,1
1,0
0,8

Compression
Stress
0,000
0,012
0,022
0,025
0,031
0,037
0,042
0,048
0,053
0,060
0,066
0,059
0,053
0,044

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-2
Depth
: 05,00 - 05,50 m

Tested by
Counted by
Checked by

Stress (Kg/Cm2)

Kondisi Undisturb (qu)

Kondisi Remoulded (qr)

0,070

0,070

0,060

0,060

0,050

0,050

0,040

0,040

0,030

0,030

0,020

0,020

0,010

0,010

0,000
0,000

0,010

0,020

0,030

0,040

Strain (Kg/Cm2)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,050

0,060

0,000
0,000

0,010

0,020

0,030

0,040

Strain (Kg/Cm2)

0,050

0,060

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-2
Depth
: 05,00 - 05,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(menit) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
97,1
1,44

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,2
0,35
0,4
0,70
0,6
1,05
0,7
1,40
0,8
1,75
1,0
2,10
1,2
2,45
1,4
2,80
1,6
3,15
1,6
3,50
1,4
3,85
1,2
4,20
1,0
4,55

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
Strain
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,030
0,034
0,038
0,041
0,045
0,049

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Remoulded

C
qr
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,970
0,966
0,962
0,959
0,955
0,951

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,262
18,333
18,405
18,477
18,550
18,623

0,0205
Kg/Cm2
0,041
Kg/Cm3
1,366
0,549496
Load
Total
(P)
0,0
0,1
0,2
0,3
0,4
0,4
0,5
0,7
0,8
0,9
0,9
0,8
0,7
0,5

Compression
Stress
0,000
0,006
0,012
0,018
0,021
0,024
0,030
0,036
0,042
0,048
0,048
0,042
0,036
0,030

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-2
Depth
: 11,00 - 11,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(menit) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
97,2
1,44

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,4
0,35
0,6
0,70
0,8
1,05
1,0
1,40
1,2
1,75
1,4
2,10
1,6
2,45
1,8
4,90
2,0
3,15
2,2
3,50
2,4
3,85
2,6
4,20
2,8
4,55
2,5
4,90
2,2
5,25
2,0
5,60

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
Strain
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,053
0,034
0,038
0,041
0,045
0,049
0,053
0,056
0,060

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Undisturb

C
qu
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,947
0,966
0,962
0,959
0,955
0,951
0,947
0,944
0,940

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,697
18,333
18,405
18,477
18,550
18,623
18,697
18,772
18,847

0,034
Kg/Cm2
0,068
Kg/Cm3
1,388
0,549496
Load
Total
(P)
0,0
0,2
0,3
0,4
0,5
0,7
0,8
0,9
1,0
1,1
1,2
1,3
1,4
1,5
1,4
1,2
1,1

Compression
Stress
0,000
0,012
0,018
0,025
0,031
0,037
0,042
0,048
0,053
0,060
0,066
0,071
0,077
0,083
0,073
0,064
0,058

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-2
Depth
: 11,00 - 11,50 m

Tested by
Counted by
Checked by

Stress (Kg/Cm2)

Kondisi Undisturb (qu)

Kondisi Remoulded (qr)

0,09

0,09

0,08

0,08

0,07

0,07

0,06

0,06

0,05

0,05

0,04

0,04

0,03

0,03

0,02

0,02

0,01

0,01

0,00
0,000

0,010

0,020

0,030

0,040

0,050

Strain (Kg/Cm2)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,060

0,070

0,00
0,000

0,010

0,020

0,030

0,040

0,050

Strain (Kg/Cm2)

0,060

0,070

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-2
Depth
: 11,00 - 11,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(menit) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
96,9
1,44

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,2
0,35
0,5
0,70
0,7
1,05
0,8
1,40
1,0
1,75
1,2
2,10
1,4
2,45
1,6
2,80
1,8
3,15
2,0
3,50
1,7
3,85
1,5
4,20
1,2
4,55

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
Strain
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,030
0,034
0,038
0,041
0,045
0,049

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Remoulded

C
qr
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,970
0,966
0,962
0,959
0,955
0,951

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,262
18,333
18,405
18,477
18,550
18,623

0,0245
Kg/Cm2
0,049
Kg/Cm3
1,388
0,549496
Load
Total
(P)
0,0
0,1
0,3
0,4
0,4
0,5
0,7
0,8
0,9
1,0
1,1
0,9
0,8
0,7

Compression
Stress
0,000
0,006
0,015
0,021
0,024
0,030
0,036
0,042
0,048
0,054
0,060
0,051
0,044
0,035

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-2
Depth
: 14,00 - 14,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(menit) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
97,8
1,45

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,2
0,35
0,3
0,70
0,6
1,05
0,8
1,40
0,9
1,75
1,0
2,10
1,2
2,45
1,0
4,90
0,8
3,15
0,6
3,50

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
Strain
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,053
0,034
0,038

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Undisturb

C
qu
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,947
0,966
0,962

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,697
18,333
18,405

0,0155
Kg/Cm2
0,031
Kg/Cm3
1,148
0,549496
Load
Total
(P)
0,0
0,1
0,2
0,3
0,4
0,5
0,5
0,7
0,5
0,4
0,3

Compression
Stress
0,000
0,006
0,009
0,018
0,024
0,027
0,030
0,036
0,029
0,024
0,018

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-2
Depth
: 14,00 - 14,50 m

Tested by
Counted by
Checked by

Stress (Kg/Cm2)

Undisturb (qu)

Remoulded (qr)

0,040

0,040

0,035

0,035

0,030

0,030

0,025

0,025

0,020

0,020

0,015

0,015

0,010

0,010

0,005

0,005

0,000
0,000

0,010

0,020

0,030

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,040

Strain (Kg/Cm2)

0,050

0,060

0,000
0,000

0,010

0,020

0,030

0,040

Strain (Kg/Cm2)

0,050

0,060

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-2
Depth
: 14,00 - 14,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(menit) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
97,1
1,44

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,1
0,35
0,2
0,70
0,4
1,05
0,6
1,40
0,7
1,75
0,8
2,10
1,0
2,45
0,8
2,80
0,6
3,15
0,4
3,50

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
Strain
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,030
0,034
0,038

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Remoulded

C
qr
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,970
0,966
0,962

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,262
18,333
18,405

0,0135
Kg/Cm2
0,027
Kg/Cm3
1,148
0,549496
Load
Total
(P)
0,0
0,1
0,1
0,2
0,3
0,4
0,4
0,5
0,4
0,3
0,2

Compression
Stress
0,000
0,003
0,006
0,012
0,018
0,021
0,024
0,030
0,024
0,018
0,012

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-2
: 02,00 - 02,50 m

Water Content & Unit Weight


W wet soil + ring
W ring
W wet soil
W dry soil (Ws)
W water
Water content (w)
Unit Weight

Load
Pressure
0
9,6
21,4
38,4
1
2,25
4
9
16
25
36
49
24

(Kg)
(Kg/Cm2)
detik
detik
detik
detik
menit
menit
menit
menit
menit
menit
menit
menit
jam

0,5
0,25
0,000
0,110
0,160
0,220
0,270
0,420
0,560
0,850
1,070
1,210
1,280
1,330
1,520

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%
Gr/Cm3

Before
73,7
16,9
56,8
19,3
37,5
194,301
2,035

After

29,8
19,3
10,5
54,404
1,067

1,0
0,5
1,520
1,540
1,550
1,560
1,570
1,590
1,620
1,660
1,690
1,720
1,750
1,770
1,930

2,0
1
1,930
1,980
1,990
2,010
2,030
2,070
2,120
2,200
2,250
2,300
2,330
2,350
2,570

4,0
2
2,570
2,680
2,770
2,820
2,880
2,990
3,070
3,210
3,300
3,360
3,400
3,430
3,650

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

e + saturated
Before
After
Height (Ho)
Cm
1,4
0,93
e = (H0-Ht)/Ht
2,320
1,200
e
Water content (w)
% 194,301
54,404
Saturated
S = (w*Gs)
% 192,239 104,010
Specify Gravity (Gs)
Gr/Cm3
2,30
0,647
Coefficient compression
Cc
0,091
Coefficient swelling
Cs

8,0
4
3,650
3,740
3,780
3,820
3,860
3,950
4,050
4,190
4,280
4,350
4,390
4,420
4,630

16,0
8
4,630
4,760
4,800
4,850
4,890
5,000
5,080
5,240
5,320
5,380
5,410
5,430
5,630

4,0
2
5,630

0,5
0,25
5,400

A
Ht

5,400

4,720

=
=
=

19,94
Ws/A.G
0,422

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-2
: 02,00 - 02,50 m

Pressure
(tegangan)
2
(kg/cm )

End
Dial Reading
(cm)

H (cm)

0,0000

Tested by
Counted by
Checked by
Height at
end dial
every reading
Ht (cm)
1,4000

Void Height
(Hv)
(cm)

0,9783

end of
every reading
(e)

0,1520

1,2480

0,1930

0,8263
0,7853

1,8620

1,1430

0,3650

0,7213

1,7103

1,0350

0,4630

0,6133

1,4542

0,9370

0,5630

0,5153

1,2218

0,8370

0,5400

0,4153

0,9847
0,8485

0,8600

0,4383

1,0392

0,9280

0,5063

1,2005

(0,0680)
0,25

0,4720
(0,4720)

51,875

0,0080

49,840

0,0083

51,875

0,0080

51,875

0,0080

0,8870

(0,0230)
2

0,0083

0,9860

0,1000
8

49,840

1,0890

0,0980
4

0,0080

1,1750

0,1080
2

51,875
1,2275

1,2070

0,2570

Cm2/detik
Cv
Tv.Hdr^2
t90

0,000

1,9592

0,0640
1

Fitting
time
t90

1,3240

0,0410
0,5

Ht(av) (cm)

2,3197

0,1520
0,25

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,8940
0,4640

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-2
: 02,00 - 02,50 m

Pressure

H (cm)

Tested by
Counted by
Checked by

H (cm)
H /H
(4) = (3) / (2)

(kg/cm )
(1)

(2)
0,00

(3)

mv
(cm2/kg)
(5) = (4) : (1)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Cv
cm2/det
(6)

k=mv.Cv.
(cm/det)
-3
(7) = (5) x (6) x 10

1,4000

0,25

1,2480

0,50

1,2070

1,00

1,1430

2,00

1,0350

4,00

0,9370

8,00

0,8370

0,1520

0,1218

0,4872

0,0080

3,90E-06

0,0410

0,0340

0,0679

0,0083

5,66E-07

0,0640

0,0560

0,0560

0,0080

4,49E-07

0,1080

0,1043

0,0522

0,0083

4,35E-07

0,0980

0,1046

0,0261

0,0080

2,09E-07

0,1000

0,1195

0,0149

0,0080

1,20E-07

0,1174

0,0081

9,47E-07

Rata-rata

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-2
: 02,00 - 02,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Pressure Vs e

2,1
1,9
1,7
1,5
1,3
1,1
0,9
0,7
0,5

Cv (Cm2/detik)

0,1

10

0,009

0,008

0,007
Pressure (Kg/Cm2)

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-2
: 05,00 - 05,50 m

Water Content & Unit Weight


W wet soil + ring
W ring
W wet soil
W dry soil (Ws)
W water
Water content (w)
Unit Weight

Load
Pressure
0
9,6
21,4
38,4
1
2,25
4
9
16
25
36
49
24

(Kg)
(Kg/Cm2)
detik
detik
detik
detik
menit
menit
menit
menit
menit
menit
menit
menit
jam

0,5
0,25
0,000
0,090
0,130
0,170
0,210
0,350
0,450
0,680
0,860
0,960
1,030
1,060
1,220

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%
Gr/Cm3

Before
76,3
16,9
59,4
22,7
36,7
161,674
2,128

After

33,9
22,7
11,2
49,339
1,214

1,0
0,5
1,220
1,230
1,240
1,250
1,260
1,270
1,300
1,330
1,350
1,380
1,390
1,410
1,540

2,0
1
1,540
1,570
1,590
1,600
1,610
1,650
1,680
1,740
1,790
1,820
1,850
1,870
2,040

4,0
2
2,040
2,100
2,120
2,140
2,170
2,230
2,290
2,390
2,460
2,510
2,540
2,560
2,760

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

e + saturated
Before
After
Height (Ho)
Cm
1,4
1,07
e = (H0-Ht)/Ht
1,922
1,231
e
Water content (w)
% 161,674
49,339
Saturated
S = (w*Gs)
% 199,856
95,214
2,38
Specify Gravity (Gs)
Gr/Cm3
0,498
Coefficient compression
Cc
0,073
Coefficient swelling
Cs

8,0
4
2,760
2,920
2,990
3,040
3,100
3,210
3,330
3,470
3,570
3,630
3,660
3,690
3,890

16,0
8
3,890
3,900
4,000
4,040
4,080
4,240
4,330
4,470
4,540
4,580
4,610
4,630
4,810

4,0
2
4,810

0,5
0,25
4,600

A
Ht

4,600

3,310

=
=
=

19,94
Ws/A.G
0,479

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-2
: 05,00 - 05,50 m

Pressure
(tegangan)
2
(kg/cm )

End
Dial Reading
(cm)

H (cm)

0,0000

Tested by
Counted by
Checked by
Height at
end dial
every reading
Ht (cm)
1,4000

Void Height
(Hv)
(cm)

0,9209

end of
every reading
(e)

0,1220

1,2780

0,1540

0,7989
0,7669

1,6008

1,1960

0,2760

0,7169

1,4964

1,1240

0,3890

0,6449

1,3461

1,0110

0,4810

0,5319

1,1103

0,9190

0,4600

0,4399

0,9182
0,9295

0,9400

0,4609

0,9621

1,0690

0,5899

1,2313

(0,1290)
0,25

0,3310
(0,3310)

51,875

0,0080

49,840

0,0083

51,875

0,0080

49,840

0,0083

0,9650

(0,0210)
2

0,0083

1,0675

0,0920
8

49,840

1,1600

0,1130
4

0,0080

1,2210

0,0720
2

51,875
1,2620

1,2460

0,2040

Cm2/detik
Cv
Tv.Hdr^2
t90

0,000

1,6676

0,0500
1

Fitting
time
t90

1,3390

0,0320
0,5

Ht(av) (cm)

1,9222

0,1220
0,25

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1,0045
0,5345

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-2
: 05,00 - 05,50 m

Pressure

H (cm)

Tested by
Counted by
Checked by

H (cm)
H /H
(4) = (3) / (2)

(kg/cm )
(1)

(2)
0,00

(3)

mv
(cm2/kg)
(5) = (4) : (1)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Cv
cm2/det
(6)

k=mv.Cv.
(cm/det)
-3
(7) = (5) x (6) x 10

1,4000

0,25

1,2780

0,50

1,2460

1,00

1,1960

2,00

1,1240

4,00

1,0110

8,00

0,9190

0,1220

0,0955

0,3818

0,0080

3,06E-06

0,0320

0,0257

0,0514

0,0083

4,28E-07

0,0500

0,0418

0,0418

0,0080

3,35E-07

0,0720

0,0641

0,0320

0,0083

2,67E-07

0,1130

0,1118

0,0279

0,0080

2,24E-07

0,0920

0,1001

0,0125

0,0083

1,04E-07

0,0913

0,0082

7,36E-07

Rata-rata

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-2
: 05,00 - 05,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Pressure Vs e

1,9
1,7
1,5
1,3
1,1
0,9
0,7
0,5

Cv (Cm2/detik)

0,1

10

0,009

0,008

0,007
Pressure (Kg/Cm2)

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-2
: 11,00 - 11,50 m

Water Content & Unit Weight


W wet soil + ring
W ring
W wet soil
W dry soil (Ws)
W water
Water content (w)
Unit Weight

Load
Pressure
0
9,6
21,4
38,4
1
2,25
4
9
16
25
36
49
24

(Kg)
(Kg/Cm2)
detik
detik
detik
detik
menit
menit
menit
menit
menit
menit
menit
menit
jam

0,5
0,25
0,000
0,080
0,100
0,130
0,150
0,230
0,290
0,410
0,510
0,580
0,620
0,670
0,860

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%
Gr/Cm3

Before
74,7
16,9
57,8
20,3
37,5
184,729
2,070

After

32,5
20,3
12,2
60,099
1,164

1,0
0,5
0,860
0,870
0,880
0,890
0,900
0,910
0,930
0,960
0,990
1,010
1,030
1,040
1,180

2,0
1
1,180
1,210
1,220
1,240
1,260
1,300
1,340
1,400
1,450
1,500
1,530
1,570
1,730

4,0
2
1,730
2,020
2,080
2,120
2,170
2,270
2,360
2,540
2,680
2,800
2,880
2,950
3,280

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

e + saturated
Before
After
Height (Ho)
Cm
1,4
0,91
e = (H0-Ht)/Ht
2,448
1,251
e
Water content (w)
% 184,729
60,099
Saturated
S = (w*Gs)
% 189,194 120,434
2,51
Specify Gravity (Gs)
Gr/Cm3
Coefficient compression
Cc
0,774
Coefficient swelling
Cs
0,082

8,0
4
3,280
3,510
3,570
3,620
3,670
3,780
3,890
4,060
4,200
4,310
4,370
4,420
4,680

16,0
8
4,680
4,780
4,810
4,850
4,880
4,960
5,030
5,180
5,280
5,350
5,390
5,420
5,590

4,0
2
5,590

0,5
0,25
5,390

A
Ht

5,390

4,860

=
=
=

19,94
Ws/A.G
0,406

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-2
: 11,00 - 11,50 m

Pressure
(tegangan)
2
(kg/cm )

End
Dial Reading
(cm)

H (cm)

0,0000

Tested by
Counted by
Checked by
Height at
end dial
every reading
Ht (cm)
1,4000

Void Height
(Hv)
(cm)

0,9940

end of
every reading
(e)

0,0860

1,3140

0,1180

0,9080
0,8760

2,1578

1,2270

0,3280

0,8210

2,0223

1,0720

0,4680

0,6660

1,6405

0,9320

0,5590

0,5260

1,2957

0,8410

0,5390

0,4350

1,0715
0,8510

0,8610

0,4550

1,1208

0,9140

0,5080

1,2513

(0,0530)
0,25

0,4860
(0,4860)

49,840

0,0083

51,875

0,0080

49,840

0,0083

51,875

0,0080

0,8865

(0,0200)
2

0,0080

1,0020

0,0910
8

51,875

1,1495

0,1400
4

0,0083

1,2545

0,1550
2

49,840
1,2980

1,2820

0,1730

Cm2/detik
Cv
Tv.Hdr^2
t90

0,000

2,2366

0,0550
1

Fitting
time
t90

1,3570

0,0320
0,5

Ht(av) (cm)

2,4484

0,0860
0,25

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,8875
0,4570

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-2
: 11,00 - 11,50 m

Pressure

H (cm)

Tested by
Counted by
Checked by

H (cm)
H /H
(4) = (3) / (2)

(kg/cm )
(1)

(2)
0,00

(3)

mv
(cm2/kg)
(5) = (4) : (1)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Cv
cm2/det
(6)

k=mv.Cv.
(cm/det)
-3
(7) = (5) x (6) x 10

1,4000

0,25

1,3140

0,50

1,2820

1,00

1,2270

2,00

1,0720

4,00

0,9320

8,00

0,8410

0,0860

0,0654

0,2618

0,0083

2,18E-06

0,0320

0,0250

0,0499

0,0080

4,00E-07

0,0550

0,0448

0,0448

0,0083

3,74E-07

0,1550

0,1446

0,0723

0,0080

5,79E-07

0,1400

0,1502

0,0376

0,0083

3,13E-07

0,0910

0,1082

0,0135

0,0080

1,08E-07

0,0800

0,0082

6,59E-07

Rata-rata

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-2
: 11,00 - 11,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Pressure Vs e

2,6

2,1
1,6
1,1
0,6

Cv (Cm2/detik)

0,1

10

0,009

0,008

0,007
Pressure (Kg/Cm2)

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-2
: 14,00 - 14,50 m

Water Content & Unit Weight


W wet soil + ring
W ring
W wet soil
W dry soil (Ws)
W water
Water content (w)
Unit Weight

Load
Pressure
0
9,6
21,4
38,4
1
2,25
4
9
16
25
36
49
24

(Kg)
(Kg/Cm2)
detik
detik
detik
detik
menit
menit
menit
menit
menit
menit
menit
menit
jam

0,5
0,25
0,000
0,210
0,240
0,270
0,300
0,370
0,430
0,550
0,670
0,760
0,840
0,900
1,160

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%
Gr/Cm3

Before
76,6
16,9
59,7
23,8
35,9
150,840
2,139

After

36,1
23,8
12,3
51,681
1,293

1,0
0,5
1,160
1,180
1,190
1,200
1,210
1,220
1,240
1,270
1,300
1,320
1,340
1,360
1,510

2,0
1
1,510
1,550
1,560
1,570
1,590
1,610
1,640
1,690
1,740
1,800
1,830
1,850
2,050

4,0
2
2,050
2,200
2,230
2,260
2,290
2,360
2,410
2,490
2,590
2,660
2,700
2,740
2,950

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

e + saturated
Before
After
Height (Ho)
Cm
1,4
1,01
e = (H0-Ht)/Ht
1,754
0,989
e
Water content (w)
% 150,840
51,681
Saturated
S = (w*Gs)
% 201,899 122,701
Specify Gravity (Gs)
Gr/Cm3
2,35
Coefficient compression
Cc
0,469
Coefficient swelling
Cs
0,098

8,0
4
2,950
3,030
3,060
3,080
3,110
3,170
3,240
3,350
3,440
3,510
3,570
3,600
3,820

16,0
8
3,820
3,930
3,950
3,990
4,100
4,170
4,210
4,310
4,400
4,470
4,520
4,550
4,750

4,0
2
4,750

0,5
0,25
4,450

A
Ht

4,450

3,890

=
=
=

19,94
Ws/A.G
0,508

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-2
: 14,00 - 14,50 m

Pressure
(tegangan)
2
(kg/cm )

End
Dial Reading
(cm)

H (cm)

0,0000

Tested by
Counted by
Checked by
Height at
end dial
every reading
Ht (cm)
1,4000

Void Height
(Hv)
(cm)

0,8917

end of
every reading
(e)

0,1160

1,2840

0,1510

0,7757
0,7407

1,4573

1,1950

0,2950

0,6867

1,3511

1,1050

0,3820

0,5967

1,1740

1,0180

0,4750

0,5097

1,0028

0,9250

0,4450

0,4167

0,8199
0,9400

0,9550

0,4467

0,8789

1,0110

0,5027

0,9891

(0,0560)
0,25

0,3890
(0,3890)

51,875

0,0080

49,840

0,0083

51,875

0,0080

51,875

0,0080

0,9715

(0,0300)
2

0,0083

1,0615

0,0930
8

49,840

1,1500

0,0870
4

0,0080

1,2220

0,0900
2

51,875
1,2665

1,2490

0,2050

Cm2/detik
Cv
Tv.Hdr^2
t90

0,000

1,5262

0,0540
1

Fitting
time
t90

1,3420

0,0350
0,5

Ht(av) (cm)

1,7544

0,1160
0,25

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,9830
0,5055

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-2
: 14,00 - 14,50 m

Pressure

H (cm)

Tested by
Counted by
Checked by

H (cm)
H /H
(4) = (3) / (2)

(kg/cm )
(1)

(2)
0,00

(3)

mv
(cm2/kg)
(5) = (4) : (1)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Cv
cm2/det
(6)

k=mv.Cv.
(cm/det)
-3
(7) = (5) x (6) x 10

1,4000

0,25

1,2840

0,50

1,2490

1,00

1,1950

2,00

1,1050

4,00

1,0180

8,00

0,9250

0,1160

0,0903

0,3614

0,0080

2,89E-06

0,0350

0,0280

0,0560

0,0083

4,67E-07

0,0540

0,0452

0,0452

0,0080

3,62E-07

0,0900

0,0814

0,0407

0,0083

3,40E-07

0,0870

0,0855

0,0214

0,0080

1,71E-07

0,0930

0,1005

0,0126

0,0080

1,01E-07

0,0895

0,0081

7,23E-07

Rata-rata

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-2
: 14,00 - 14,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Pressure Vs e
1,70
1,50

1,30
1,10
0,90
0,70

Cv (Cm2/detik)

0,1

10

0,009

0,008

0,007
Pressure (Kg/Cm2)

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

CONCLUSION of SOIL INVESTIGATION ( BH-3 )


Project : Power Plant
Client
: China National Heavy Machinery Corporation (CHMC)
Location : Pulang Pisau, Central Kalimantan
INVESTIGATION RESULT
NO

1
2
3
4

KIND of TEST

Water Content
Unit Weight
Specific Gravity
Liquid Limit
Plastic Limit
Indeks Plastic
Gradation
0,75
0,375
4
8
10
40
100
200
Direct Shear

UCS

Consolidation

Gs
LL
PL
PI
19,1
9,5
4,75
2,36
2
0,425
0,15
0,075
c

qu
cu
qr
Sensitivity
Cc
Cs
Cv
k
e
n

(%)
(Kg/cm3)
(%)
(%)
(%)
mm
mm
mm
mm
mm
mm
mm
mm
(Kg/cm2)
()
qu (Kg/cm2)
cu (Kg/cm2)
qr (Kg/cm2)
(St)

cm2/sec
cm/sec

Soil Classification (Unified Soil Classification System)

BH-3

BH-3

BH-3

BH-3

5,0 - 5,5 m

8,0 - 8,5m

11,0 - 11,5 m

14,0 - 14,5m

79,91
1,49
2,29
46,00
35,65
10,35

72,75
1,58
2,57
37,20
31,46
5,74

91,15
1,47
2,46
52,60
43,75
8,85

71,51
1,52
2,55
52,20
39,68
12,52

100,00
100,00
100,00
100,00
100,00
100,00
100,00
100,00
0,038
11,00
0,031
0,016
0,024
1,292
0,407
0,172
8,17E-03
7,90E-07
1,503
0,600

100,00
100,00
100,00
100,00
100,00
100,00
70,19
25,00
0,054
7,00
0,028
0,014
0,024
1,146
0,440
0,045
8,17E-03
6,25E-07
1,888
0,654

100,00
100,00
100,00
100,00
100,00
100,00
56,09
26,05
0,025
19,00
0,063
0,032
0,047
1,340
0,596
0,106
8,17E-03
6,68E-07
2,085
0,676

100,00
100,00
100,00
100,00
100,00
100,00
100,00
100,00
0,038
10,50
0,071
0,036
0,040
1,797
0,480
0,051
8,17E-03
5,38E-07
1,866
0,651

ML

ML

MH

OH

October 09, 2007

Yusti Yudiawati, ST, MT


Geotechnical Engineer

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

WATER CONTENT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-3
Depth
: 02,00 - 02,50 m

Container No.
Cont. Weight + Wet Soil
Cont. Weight + Dry Soil
Water Weight
Container Weight
Weight Dry
WATER CONTENT
Average

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
44,30
29,40
14,90
10,30
19,10
78,01

Gr
Gr
Gr
Gr
Gr
%
%

2
42,80
27,50
15,30
8,80
18,70
81,82
79,91

UNIT WEIGHT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-3
Depth
: 02,00 - 02,50 m

Container No.
W Ring + Wet soil
W Ring
W wet soil
Diameter Ring
H Ring
Volume
Unit Weight
Average

Tested by
Counted by
Checked by

Gr
Gr
Gr
Cm
Cm
Cm3
Gr/Cm3
Gr/Cm3

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
259,6
159,1
100,5
3,5
7,0
67,31
1,49

2
259,1
159,1
100,0
3,5
7,0
67,31
1,49
1,49

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

WATER CONTENT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-3
Depth
: 08,00 - 08,50 m

Container No.
Cont. Weight + Wet Soil
Cont. Weight + Dry Soil
Water Weight
Container Weight
Weight Dry
WATER CONTENT
Average

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
43,00
28,90
14,10
8,90
20,00
70,50

Gr
Gr
Gr
Gr
Gr
%
%

2
38,20
25,60
12,60
8,80
16,80
75,00
72,75

UNIT WEIGHT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-3
Depth
: 08,00 - 08,50 m

Container No.
W Ring + Wet soil
W Ring
W wet soil
Diameter Ring
H Ring
Volume
Unit Weight
Average

Tested by
Counted by
Checked by

Gr
Gr
Gr
Cm
Cm
Cm3
Gr/Cm3
Gr/Cm3

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
265,4
159,1
106,3
3,5
7,0
67,31
1,58

2
265
159,1
105,9
3,5
7,0
67,31
1,57
1,58

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

WATER CONTENT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-3
Depth
: 11,00 - 11,50 m

Container No.
Cont. Weight + Wet Soil
Cont. Weight + Dry Soil
Water Weight
Container Weight
Weight Dry
WATER CONTENT
Average

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
44,00
27,10
16,90
8,70
18,40
91,85

Gr
Gr
Gr
Gr
Gr
%
%

2
38,70
24,50
14,20
8,80
15,70
90,45
91,15

UNIT WEIGHT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-3
Depth
: 11,00 - 11,50 m

Container No.
W Ring + Wet soil
W Ring
W wet soil
Diameter Ring
H Ring
Volume
Unit Weight
Average

Tested by
Counted by
Checked by

Gr
Gr
Gr
Cm
Cm
Cm3
Gr/Cm3
Gr/Cm3

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
258,6
159,1
99,5
3,5
7,0
67,31
1,48

2
258,1
159,1
99,0
3,5
7,0
67,31
1,47
1,47

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

WATER CONTENT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-3
Depth
: 14,00 - 14,50 m

Container No.
Cont. Weight + Wet Soil
Cont. Weight + Dry Soil
Water Weight
Container Weight
Weight Dry
WATER CONTENT
Average

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
40,10
27,10
13,00
8,80
18,30
71,04

Gr
Gr
Gr
Gr
Gr
%
%

2
41,40
28,30
13,10
10,10
18,20
71,98
71,51

UNIT WEIGHT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-3
Depth
: 14,00 - 14,50 m

Container No.
W Ring + Wet soil
W Ring
W wet soil
Diameter Ring
H Ring
Volume
Unit Weight
Average

Tested by
Counted by
Checked by

Gr
Gr
Gr
Cm
Cm
Cm3
Gr/Cm3
Gr/Cm3

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
261,6
159,1
102,5
3,5
7,0
67,31
1,52

2
261
159,1
101,9
3,5
7,0
67,31
1,51
1,52

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

SPECIFIC GRAVITY TEST


(ASTM D - 854 - 58)
(AASHTO T - 100 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 06, 2007
Sample No. : BH-3
Depth
: 02,00 - 02,50 m

No
1
2
3
4
5
6
7
8

Tested by
Counted by
Checked by

Picnometer No.
W Picno + Water, W1
W Picno + Soil + Water, W2
W Dry, W3
Temperatur Campuran Air + Tanah, TC
Gs (at TC) = W3 / [(W1 + W3) - W2]
Correction, A
Gs (at 20C) = Gs (at TC) x A
Specific Gravity

Table : Temperatur Correction


TC
TC
Correction
15
1,0009
21
16
1,0007
22
17
1,0006
23
18
1,0004
24
19
1,0002
25
20
1,0000
26
Table : Water Intencity ( w)
TC
w
15
0,999129
16
0,9990
17
0,9988
18
0,9986
19
0,9984
20
0,9982

TC
21
22
23
24
25
26

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Gr
TC
cm3
Gr

1
142,00
170,30
50,00
27,00
2,30
0,9983
2,30

2
142,40
170,60
50,00
27,00
2,29
0,9983
2,29
2,295

Correction
0,9998
0,9996
0,9993
0,9991
0,9988
0,9986

TC
27
28
29
30
31
32

Correction
0,9983
0,9980
0,9977
0,9974

w
0,9980
0,9978
0,9976
0,9973
0,9971
0,9968

TC
27
28
29
30
31
32

w
0,9965
0,9963
0,9960
0,9957

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

SPECIFIC GRAVITY TEST


(ASTM D - 854 - 58)
(AASHTO T - 100 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 03, 2007
Sample No. : BH-3
Depth
: 08,00 - 08,50 m

No
1
2
3
4
5
6
7
8

Tested by
Counted by
Checked by

Picnometer No.
W Picno + Water, W1
W Picno + Soil + Water, W2
W Dry, W3
Temperatur Campuran Air + Tanah, TC
Gs (at TC) = W3 / [(W1 + W3) - W2]
Correction, A
Gs (at 20C) = Gs (at TC) x A
Specific Gravity

Table : Temperatur Correction


TC
TC
Correction
15
1,0009
21
16
1,0007
22
17
1,0006
23
18
1,0004
24
19
1,0002
25
20
1,0000
26
Table : Water Intencity ( w)
TC
w
15
0,999129
16
0,9990
17
0,9988
18
0,9986
19
0,9984
20
0,9982

TC
21
22
23
24
25
26

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Gr
TC
cm3
Gr

1
142,20
172,80
50,00
28,00
2,58
0,9980
2,57

2
142,20
172,70
50,00
28,00
2,56
0,9980
2,56
2,566

Correction
0,9998
0,9996
0,9993
0,9991
0,9988
0,9986

TC
27
28
29
30
31
32

Correction
0,9983
0,9980
0,9977
0,9974

w
0,9980
0,9978
0,9976
0,9973
0,9971
0,9968

TC
27
28
29
30
31
32

w
0,9965
0,9963
0,9960
0,9957

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

SPECIFIC GRAVITY TEST


(ASTM D - 854 - 58)
(AASHTO T - 100 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 04, 2007
Sample No. : BH-3
Depth
: 11,00 - 11,50 m

No
1
2
3
4
5
6
7
8

Tested by
Counted by
Checked by

Picnometer No.
W Picno + Water, W1
W Picno + Soil + Water, W2
W Dry, W3
Temperatur Campuran Air + Tanah, TC
Gs (at TC) = W3 / [(W1 + W3) - W2]
Correction, A
Gs (at 20C) = Gs (at TC) x A
Specific Gravity

Table : Temperatur Correction


TC
TC
Correction
15
1,0009
21
16
1,0007
22
17
1,0006
23
18
1,0004
24
19
1,0002
25
20
1,0000
26
Table : Water Intencity ( w)
TC
w
15
0,999129
16
0,9990
17
0,9988
18
0,9986
19
0,9984
20
0,9982

TC
21
22
23
24
25
26

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Gr
TC
cm3
Gr

1
142,00
171,80
50,00
28,00
2,48
0,9980
2,47

2
142,30
172,00
50,00
28,00
2,46
0,9980
2,46
2,464

Correction
0,9998
0,9996
0,9993
0,9991
0,9988
0,9986

TC
27
28
29
30
31
32

Correction
0,9983
0,9980
0,9977
0,9974

w
0,9980
0,9978
0,9976
0,9973
0,9971
0,9968

TC
27
28
29
30
31
32

w
0,9965
0,9963
0,9960
0,9957

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

SPECIFIC GRAVITY TEST


(ASTM D - 854 - 58)
(AASHTO T - 100 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 05, 2007
Sample No. : BH-3
Depth
: 14,00 - 14,50 m

No
1
2
3
4
5
6
7
8

Tested by
Counted by
Checked by

Picnometer No.
W Picno + Water, W1
W Picno + Soil + Water, W2
W Dry, W3
Temperatur Campuran Air + Tanah, TC
Gs (at TC) = W3 / [(W1 + W3) - W2]
Correction, A
Gs (at 20C) = Gs (at TC) x A
Specific Gravity

Table : Temperatur Correction


TC
TC
Correction
15
1,0009
21
16
1,0007
22
17
1,0006
23
18
1,0004
24
19
1,0002
25
20
1,0000
26
Table : Water Intencity ( w)
TC
w
15
0,999129
16
0,9990
17
0,9988
18
0,9986
19
0,9984
20
0,9982

TC
21
22
23
24
25
26

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Gr
TC
cm3
Gr

1
142,40
172,90
50,00
28,00
2,56
0,9980
2,56

2
142,10
172,40
50,00
28,00
2,54
0,9980
2,53
2,546

Correction
0,9998
0,9996
0,9993
0,9991
0,9988
0,9986

TC
27
28
29
30
31
32

Correction
0,9983
0,9980
0,9977
0,9974

w
0,9980
0,9978
0,9976
0,9973
0,9971
0,9968

TC
27
28
29
30
31
32

w
0,9965
0,9963
0,9960
0,9957

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

ATTERBERG LIMIT TEST


(AASHTO T - 89 - 74 / AASHTO T - 90 - 74)
(ASTM D - 423 - 66 / ASTM D - 424 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 06, 2007
Sample No. : BH-3
Depth
: 02,00 - 02,50 m
LIQUID LIMIT :
Sample No.
(1)
Number of Blows
(2)
Container No.
(3)
W cont + W wet soil
(4)
W cont + dry soil
(5)
W water (3) - (4)
(6)
W Container
(7)
W dry soil (4) - (6)
(8)
Water content (5)/(7)*100

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%

1
13
C1
43,50
32,6
10,9
10,30
22,30
48,88

2
21
C2
36,60
28,1
8,5
10,10
18,00
47,22

3
30
C3
43,80
33,2
10,6
9,90
23,30
45,49

4
48
C4
50,10
38,2
11,9
10,40
27,80
42,81

Water content (%)

LIQUID LIMIT GRAPH


50
49
48
47
46
45
44
43
42

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

PLASTIC LIMIT :
Sample No.
(1) Container No.
(2) W cont + W wet soil
(3) W cont + dry soil
(4) W water (2) - (3)
(5) W Container
(6) W dry soil (3) - (5)
(7) Water content (4)/(6)*100
(8) Plastic limit

Gr
Gr
Gr
Gr
Gr
%
%

1
C.1
39,30
31,60
7,70
10,00
21,60
35,648
35,65

LL

PL

PI

46

35,65

10,35

Silt organic with medium compressibility


and silt organic

10
Blows

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

ATTERBERG LIMIT TEST


(AASHTO T - 89 - 74 / AASHTO T - 90 - 74)
(ASTM D - 423 - 66 / ASTM D - 424 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 05, 2007
Sample No. : BH-3
Depth
: 08,00 - 08,50 m
LIQUID LIMIT :
Sample No.
(1)
Number of Blows
(2)
Container No.
(3)
W cont + W wet soil
(4)
W cont + dry soil
(5)
W water (3) - (4)
(6)
W Container
(7)
W dry soil (4) - (6)
(8)
Water content (5)/(7)*100

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%

1
16
C1
48,1
36,8
11,3
8,90
27,90
40,50

2
22
C2
44,6
35,1
9,5
8,90
26,20
36,26

3
31
C3
43,1
34,0
9,1
8,80
25,20
36,11

4
46
C4
43,6
34,6
9,0
8,90
25,70
35,02

Water content (%)

LIQUID LIMIT GRAPH


41
40
39
38
37
36
35
34

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

PLASTIC LIMIT :
Sample No.
(1) Container No.
(2) W cont + W wet soil
(3) W cont + dry soil
(4) W water (2) - (3)
(5) W Container
(6) W dry soil (3) - (5)
(7) Water content (4)/(6)*100
(8) Plastic limit

Gr
Gr
Gr
Gr
Gr
%
%

1
C.1
36,90
30,20
6,70
8,90
21,30
31,455
31,46

LL

PL

PI

37,2

31,46

5,74

Silt organic with medium compressibility


and silt organic

10
Blows

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

ATTERBERG LIMIT TEST


(AASHTO T - 89 - 74 / AASHTO T - 90 - 74)
(ASTM D - 423 - 66 / ASTM D - 424 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 05, 2007
Sample No. : BH-3
Depth
: 11,00 - 11,50 m
LIQUID LIMIT :
Sample No.
(1)
Number of Blows
(2)
Container No.
(3)
W cont + W wet soil
(4)
W cont + dry soil
(5)
W water (3) - (4)
(6)
W Container
(7)
W dry soil (4) - (6)
(8)
Water content (5)/(7)*100

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%

1
15
C1
48,50
35,0
13,5
10,30
24,70
54,66

2
27
C2
47,70
34,8
12,9
10,40
24,40
52,87

3
37
C3
47,10
34,8
12,3
10,30
24,50
50,20

4
48
C4
40,50
30,1
10,4
8,80
21,30
48,83

Water content (%)

LIQUID LIMIT GRAPH


56
55
54
53
52
51
50
49
48

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

PLASTIC LIMIT :
Sample No.
(1) Container No.
(2) W cont + W wet soil
(3) W cont + dry soil
(4) W water (2) - (3)
(5) W Container
(6) W dry soil (3) - (5)
(7) Water content (4)/(6)*100
(8) Plastic limit

Gr
Gr
Gr
Gr
Gr
%
%

1
C.1
34,20
26,50
7,70
8,90
17,60
43,750
43,75

LL

PL

PI

52,6

43,75

8,85

Silt anorganic with high compresibility


and Clay organic

10
Blows

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

ATTERBERG LIMIT TEST


(AASHTO T - 89 - 74 / AASHTO T - 90 - 74)
(ASTM D - 423 - 66 / ASTM D - 424 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 06, 2007
Sample No. : BH-3
Depth
: 14,00 - 14,50 m
LIQUID LIMIT :
Sample No.
(1)
Number of Blows
(2)
Container No.
(3)
W cont + W wet soil
(4)
W cont + dry soil
(5)
W water (3) - (4)
(6)
W Container
(7)
W dry soil (4) - (6)
(8)
Water content (5)/(7)*100

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%

1
17
C1
48,30
35,0
13,3
10,30
24,70
53,85

2
26
C2
39,40
29,4
10,0
10,00
19,40
51,55

3
37
C3
41,50
30,9
10,6
9,90
21,00
50,48

4
48
C4
42,90
32,1
10,8
10,20
21,90
49,32

LIQUID LIMIT GRAPH

Water content (%)

55
54
53

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

PLASTIC LIMIT :
Sample No.
(1) Container No.
(2) W cont + W wet soil
(3) W cont + dry soil
(4) W water (2) - (3)
(5) W Container
(6) W dry soil (3) - (5)
(7) Water content (4)/(6)*100
(8) Plastic limit

Gr
Gr
Gr
Gr
Gr
%
%

1
C.1
45,40
35,40
10,00
10,20
25,20
39,683
39,68

LL

PL

PI

52,2

39,68

12,52

Silt anorganic with high compresibility

52
51

and Clay organic

50
49
1

10
Blows

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

HYDROMETER TEST
(AASHTO T - 88 - 72)
(ASTM D - 422 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 07, 2007
Sample No. : BH-3
Depth
: 02,00 - 02,50 m

Tested by
Counted by
Checked by

W dry soil
Specific Gravity

:
:

50 gram
2,29

Meniscus Correction, Fm
Zero Reading Correction, Fz
Temperature Correction, Ft
Specifik Gravity Correction (a)

:
:
:
=

1
4
2,15
1,662

Time
(minute)

Temp.
T C

Rcp

0,25
0,5
1
2
5
15
30
60
240
1440
2880

28
28
28
28
28
28
28
28
28
27
27

28
28
28
27
25
22
19
17
14
12
10

26,15
26,15
26,15
25,15
23,15
20,15
17,15
15,15
12,15
10,15
8,15

100

% of fine grain
a Rcp x 100
50
86,9358
86,9358
86,9358
83,6113
76,9623
66,9887
57,0152
50,3662
40,3927
33,7437
27,0947

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Rcl

L
(cm)

D
(mm)

29
29
29
28
26
23
20
18
15
13
11

11,70
11,70
11,70
11,70
11,70
11,70
11,70
11,70
11,70
11,90
11,90

0,0130
0,0130
0,0130
0,0132
0,0135
0,0140
0,0145
0,0149
0,0151
0,0151
0,0151

0,0889
0,0629
0,0445
0,0319
0,0207
0,0124
0,0091
0,0066
0,0033
0,0014
0,0010

Curve: Distribution Grain Size

90

Total passes sieve (%)

80
70
60
50
40
30
20
10
0
100,000

10,000

1,000

0,100

0,010

0,001
0,000
Diameter
(mm)

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

HYDROMETER TEST
(AASHTO T - 88 - 72)
(ASTM D - 422 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 04, 2007
Sample No. : BH-3
Depth
: 14,00 - 14,50 m

Tested by
Counted by
Checked by

W dry soil
Specific Gravity

:
:

50 gram
2,55

Meniscus Correction, Fm
Zero Reading Correction, Fz
Temperature Correction, Ft
Specifik Gravity Correction (a)

:
:
:
=

1
4
2,15
1,662

Time
(minute)

Temp.
T C

Rcp

0,25
0,5
1
2
5
15
30
60
240
1440
2880

28
28
28
28
28
28
28
28
28
27
27

29
29
29
28
27
26
25
24
21
19
16

27,15
27,15
27,15
26,15
25,15
24,15
23,15
22,15
19,15
17,15
14,15

100

% of fine grain
a Rcp x 100
50
90,2603
90,2603
90,2603
86,9358
83,6113
80,2868
76,9623
73,6377
63,6642
57,0152
47,0417

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Rcl

L
(cm)

D
(mm)

30
30
30
29
28
27
26
25
22
20
17

11,70
11,70
11,70
11,70
11,70
11,70
11,70
11,70
11,70
11,90
11,90

0,0129
0,0129
0,0129
0,0130
0,0132
0,0133
0,0135
0,0137
0,0141
0,0145
0,0151

0,0882
0,0624
0,0441
0,0314
0,0202
0,0117
0,0084
0,0060
0,0031
0,0013
0,0010

Curve: Distribution Grain Size

90

Total passes sieve (%)

80
70
60
50
40
30
20
10
0
100,000

10,000

1,000

0,100

0,010

0,001
0,000
Diameter
(mm)

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

SEIVE ANALISYS
(AASHTO T - 27 - 74)
(ASTM C - 136 - 46)
: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 03, 2007
Sample No. : BH-3
Depth
: 08,00 - 08,50 m

Tested by
Counted by
Checked by

Sieve
No.
3/4
3/8
4
8
10
40
100
200
Pan

(mm)
19,10
9,500
4,750
2,360
2,000
0,425
0,150
0,075

% weight
retained
0,00
0,00
0,00
0,00
0,00
0,00
29,81
45,19
25,00

% Kumulatif
retained
passes
0,00
100,000
0,00
100,000
0,00
100,000
0,00
100,000
0,00
100,000
0,00
100,000
29,81
70,192
75,00
25,000

457,60

Total weight

0,0

W soil
(gr)
0,00
0,00
0,00
0,00
0,00
0,00
136,40
206,80
114,40

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,1

1,0

10,0

Curve: Distribution Grain Size

Diameter
(mm)
100,0
100
90
80
70

Percent passing (%)

Project
Location

60
50
40
30
20
10
0

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

SEIVE ANALISYS
(AASHTO T - 27 - 74)
(ASTM C - 136 - 46)
: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 03, 2007
Sample No. : BH-3
Depth
: 11,00 - 11,50 m

Sieve
No.
3/4
3/8
4
8
10
40
100
200
Pan

(mm)
19,10
9,500
4,750
2,360
2,000
0,425
0,150
0,075

Total weight

0,0

Tested by
Counted by
Checked by

W soil
(gr)
0,00
0,00
0,00
0,00
0,00
0,00
189,00
129,30
112,10

% weight
retained
0,00
0,00
0,00
0,00
0,00
0,00
43,91
30,04
26,05

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

% Kumulatif
retained
passes
0,00
100,000
0,00
100,000
0,00
100,000
0,00
100,000
0,00
100,000
0,00
100,000
43,91
56,087
73,95
26,046

430,40

0,1 Curve: Distribution


1,0
10,0
Grain Size

Diameter
100,0(mm)

100
90
80
70
60
50
40
30
20
10
0

Percent pasiing (%)

Project
Location

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

DIRECT SHEAR TEST


( AASHTO T - 236 - 72 )
( ASTM D - 3080 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-3
: 02,00 - 02,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Time

Horizontal

Load N

3,167

Load N

6,324

Load N

9,491

(minute)

Deformation

Reading

Shear

Reading

Shear

Reading

Shear

0,00
0,25
0,50
1,00
1,50
2,00
2,50
3,00
3,50
4,00
4,50
5,00
6,00
7,00
8,00
9,00
10,00
11,00
12,00
13,00
14,00
15,00

0,000
0,158
0,316
0,361
0,947
1,262
1,578
1,893
2,209
2,524
2,840
3,155
3,786
4,417
5,048
5,679
6,310
6,941
7,572
8,203
8,834
9,465

0,00
1,40
2,20
3,20
5,00
5,60
5,60
5,60

0,00
0,59
0,92
1,34
2,10
2,35
2,35
2,35

0,00
1,40
2,60
4,20
5,00
6,20
6,80
6,80
6,80

0,00
0,59
1,09
1,76
2,10
2,61
2,86
2,86
2,86

0,00
2,00
4,00
5,60
7,60
8,80
9,20
9,80
10,40
10,40
10,40

0,00
0,84
1,68
2,35
3,19
3,70
3,87
4,12
4,37
4,37
4,37

0,450

= N/A

DIRECT SHEAR GRAPH

0,400

0,350

Shear Stress (Kg/Cm2)

0,300

0,250

0,200

0,150

11 o

0,100

0,050

0,000
0,00

0,05

0,10

0,15Normal
0,20
Stress 0,25
(Kg/Cm2)0,30

0,35

0,40

0,45

Tool

Diameter 63.1 mm, height 20 mm, Areas 31.25 cm2


prov. ring calibration 0.1610 kg/10-4

Result

c = 0,038 kg/cm2

Sample

= 11

= P/A

0,101

0,075

0,202

0,091

0,304

0,140

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

DIRECT SHEAR TEST


( AASHTO T - 236 - 72 )
( ASTM D - 3080 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-3
: 08,00 - 08,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Time

Horizontal

Load N

3,167

Load N

6,324

Load N

9,491

(minute)

Deformation

Reading

Shear

Reading

Shear

Reading

Shear

0,00
0,25
0,50
1,00
1,50
2,00
2,50
3,00
3,50
4,00
4,50
5,00
6,00
7,00
8,00
9,00
10,00
11,00
12,00
13,00
14,00
15,00

0,000
0,158
0,316
0,361
0,947
1,262
1,578
1,893
2,209
2,524
2,840
3,155
3,786
4,417
5,048
5,679
6,310
6,941
7,572
8,203
8,834
9,465

0,00
1,00
2,00
3,50
4,20
4,90
5,60
5,60
5,60

0,00
0,42
0,84
1,47
1,76
2,06
2,35
2,35
2,35

0,00
0,80
1,00
1,80
1,80
1,10
2,50
3,10
3,80
4,20
4,80
5,00
5,90
5,90
5,90

0,00
0,34
0,42
0,76
0,76
0,46
1,05
1,30
1,60
1,76
2,02
2,10
2,48
2,48
2,48

0,00
2,00
4,00
4,80
5,60
6,40
7,20
7,80
7,80
7,80

0,00
0,84
1,68
2,02
2,35
2,69
3,03
3,28
3,28
3,28

0,400

= N/A

0,101

0,075

0,202

0,079

0,304

0,105

DIRECT SHEAR GRAPH

0,350

0,300

Shear (Kg/Cm2)

0,250

0,200

0,150

7o

0,100

0,050

0,000
0,000

0,050

0,100

0,150 Normal
0,200
0,250
0,300
Stress (Kg/Cm2)

0,350

0,400

Tool

Diameter 63.1 mm, height 20 mm, Areas 31.25 cm2


prov. ring calibration 0.1610 kg/10-4

Result

c = 0,054 kg/cm2

Sample

= 7

= P/A

0,450

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

DIRECT SHEAR TEST


( AASHTO T - 236 - 72 )
( ASTM D - 3080 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-3
: 11,00 - 11,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Time

Horizontal

Load N

3,167

Load N

6,324

Load N

9,491

(minute)

Deformation

Reading

Shear

Reading

Shear

Reading

Shear

0,00
0,25
0,50
1,00
1,50
2,00
2,50
3,00
3,50
4,00
4,50
5,00
6,00
7,00
8,00
9,00
10,00
11,00
12,00
13,00
14,00
15,00

0,000
0,158
0,316
0,361
0,947
1,262
1,578
1,893
2,209
2,524
2,840
3,155
3,786
4,417
5,048
5,679
6,310
6,941
7,572
8,203
8,834
9,465

0,00
1,20
2,00
3,00
4,20
4,60
5,00
5,00
5,00

0,00
0,50
0,84
1,26
1,76
1,93
2,10
2,10
2,10

0,00
1,60
2,40
4,00
5,00
6,00
6,80
7,20
7,20
7,20

0,00
0,67
1,01
1,68
2,10
2,52
2,86
3,03
3,03
3,03

0,00
2,00
4,00
6,00
7,20
8,40
9,40
10,00
10,60
10,60
10,60

0,00
0,84
1,68
2,52
3,03
3,53
3,95
4,20
4,45
4,45
4,45

0,450

= N/A

DIRECT SHEAR GRAPH

0,400

0,350

Shear (Kg/Cm2)

0,300

0,250

0,200

0,150

19 o

0,100

0,050

0,000
0,00

0,05

0,10

0,15Normal
0,20
0,25
0,30
Stress (Kg/Cm2)

0,35

0,40

Tool

Diameter 63.1 mm, height 20 mm, Areas 31.25 cm2


prov. ring calibration 0.1610 kg/10-4

Result

c = 0,025 kg/cm2

Sample

= 19

0,45

= P/A

0,101

0,067

0,202

0,097

0,304

0,143

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

DIRECT SHEAR TEST


( AASHTO T - 236 - 72 )
( ASTM D - 3080 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-3
: 14,00 - 14,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Time

Horizontal

Load N

3,167

Load N

6,324

Load N

9,491

(minute)

Deformation

Reading

Shear

Reading

Shear

Reading

Shear

0,00
0,25
0,50
1,00
1,50
2,00
2,50
3,00
3,50
4,00
4,50
5,00
6,00
7,00
8,00
9,00
10,00
11,00
12,00
13,00
14,00
15,00

0,000
0,158
0,316
0,361
0,947
1,262
1,578
1,893
2,209
2,524
2,840
3,155
3,786
4,417
5,048
5,679
6,310
6,941
7,572
8,203
8,834
9,465

0,00
1,00
2,00
3,00
3,60
4,40
5,40
6,20
6,20
6,20

0,00
0,42
0,84
1,26
1,51
1,85
2,27
2,61
2,61
2,61

0,00
1,60
2,60
3,80
4,80
6,00
7,00
8,00
8,50
8,50
8,50

0,00
0,67
1,09
1,60
2,02
2,52
2,94
3,36
3,57
3,57
3,57

0,00
2,00
4,00
5,00
6,00
6,80
7,60
8,80
9,40
10,60
11,40
12,20
12,20
12,20

0,00
0,84
1,68
2,10
2,52
2,86
3,19
3,70
3,95
4,45
4,79
5,13
5,13
5,13

0,500

= N/A

DIRECT SHEAR GRAPH

0,450

0,400

Shear (Kg/Cm2)

0,350

0,300

0,250

0,200

0,150

10,5
0,100

0,050

0,000
0,00

0,05

0,10

0,15
0,20 (Kg/Cm2)
0,25
Normal Stress

0,30

0,35

0,40

Tool

Diameter 63.1 mm, height 20 mm, Areas 31.25 cm2


prov. ring calibration 0.1610 kg/10-4

Result

c = 0,038 kg/cm2

Sample

= 10,5

= P/A

0,101

0,083

0,202

0,114

0,304

0,164

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-3
Depth
: 02,00 - 02,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(minute) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
100,5
1,49

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,2
0,35
0,4
0,70
0,6
1,05
0,8
1,40
1,0
1,75
1,1
2,10
1,2
2,45
1,0
4,90
0,8
3,15
0,6
3,50

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
strain
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,053
0,034
0,038

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Undisturb

C
qu
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,947
0,966
0,962

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,697
18,333
18,405

0,0155
Kg/Cm2
0,031
Kg/Cm3
1,292
0,549496
Total
Load
(P)
0,0
0,1
0,2
0,3
0,4
0,5
0,6
0,7
0,5
0,4
0,3

Compression
Stress
0,000
0,006
0,012
0,018
0,024
0,030
0,033
0,036
0,029
0,024
0,018

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-3
Depth
: 02,00 - 02,50 m

Tested by
Counted by
Checked by

Stress (Kg/Cm2)

Undisturb (qu)

Remoulded (qr)

0,040

0,040

0,035

0,035

0,030

0,030

0,025

0,025

0,020

0,020

0,015

0,015

0,010

0,010

0,005

0,005

0,000
0,000

0,010

0,020

0,030

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,040

Strain (Kg/Cm2)

0,050

0,060

0,000
0,000

0,010

0,020

0,030

0,040

Strain (Kg/Cm2)

0,050

0,060

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-3
Depth
: 02,00 - 02,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(menit) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
100,00
1,49

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,2
0,35
0,3
0,70
0,5
1,05
0,7
1,40
0,8
1,75
1,0
2,10
0,8
2,45
0,6
2,80
0,5
3,15

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
Tense
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,030
0,034

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Remoulded

C
qr
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,970
0,966

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,262
18,333

0,012
Kg/Cm2
0,024
Kg/Cm3
1,292
0,549496
Load
Total
(P)
0,0
0,1
0,2
0,3
0,4
0,4
0,5
0,4
0,3
0,3

Compression
Strain
0,000
0,006
0,009
0,015
0,021
0,024
0,030
0,024
0,018
0,015

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-3
Depth
: 08,00 - 08,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(minute) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
106,3
1,58

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,1
0,35
0,3
0,70
0,4
1,05
0,6
1,40
0,7
1,75
0,8
2,10
0,9
2,45
1,0
4,90
0,8
3,15
0,6
3,50

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
strain
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,053
0,034
0,038

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Undisturb

C
qu
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,947
0,966
0,962

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,697
18,333
18,405

0,01375 Kg/Cm2
0,028
Kg/Cm3
1,146
0,549496
Total
Load
(P)
0,0
0,1
0,2
0,2
0,3
0,4
0,4
0,5
0,5
0,4
0,3

Compression
Stress
0,000
0,003
0,009
0,012
0,018
0,021
0,024
0,027
0,029
0,024
0,018

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-3
Depth
: 08,00 - 08,50 m

Tested by
Counted by
Checked by

Stress (Kg/Cm2)

Kondisi Undisturb (qu)

Kondisi Remoulded (qr)

0,035

0,035

0,030

0,030

0,025

0,025

0,020

0,020

0,015

0,015

0,010

0,010

0,005

0,005

0,000
0,000

0,010

0,020

0,030

0,040

Strain (Kg/Cm2)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,050

0,060

0,000
0,000

0,010

0,020

0,030

0,040

Strain (Kg/Cm2)

0,050

0,060

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-3
Depth
: 08,00 - 08,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(menit) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
105,9
1,57

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,2
0,35
0,3
0,70
0,4
1,05
0,6
1,40
0,7
1,75
0,9
2,10
0,8
2,45
0,6
2,80
0,4
3,15

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
Tense
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,030
0,034

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Remoulded

C
qr
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,970
0,966

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,262
18,333

0,012
Kg/Cm2
0,024
Kg/Cm3
1,146
0,549496
Load
Total
(P)
0,0
0,1
0,2
0,2
0,3
0,4
0,5
0,4
0,3
0,2

Compression
Strain
0,000
0,006
0,009
0,012
0,018
0,021
0,027
0,024
0,018
0,012

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-3
Depth
: 11,00 - 11,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(minute) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
99,5
1,48

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,2
0,35
0,8
0,70
1,2
1,05
1,6
1,40
1,8
1,75
2,0
2,10
2,2
2,45
2,0
4,90
1,8
3,15
1,5
3,50

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
strain
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,053
0,034
0,038

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Undisturb

C
qu
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,947
0,966
0,962

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,697
18,333
18,405

0,0315
Kg/Cm2
0,063
Kg/Cm3
1,340
0,549496
Total
Load
(P)
0,0
0,1
0,4
0,7
0,9
1,0
1,1
1,2
1,1
1,0
0,8

Compression
Stress
0,000
0,006
0,025
0,037
0,049
0,055
0,061
0,066
0,059
0,054
0,045

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-3
Depth
: 11,00 - 11,50 m

Tested by
Counted by
Checked by

Stress (Kg/Cm2)

Kondisi Undisturb (qu)

Kondisi Remoulded (qr)

0,07

0,07

0,06

0,06

0,05

0,05

0,04

0,04

0,03

0,03

0,02

0,02

0,01

0,01

0,00
0,000

0,010

0,020

0,030

0,040

Strain (Kg/Cm2)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,050

0,060

0,00
0,000

0,010

0,020

0,030

0,040

Strain (Kg/Cm2)

0,050

0,060

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-3
Depth
: 11,00 - 11,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(menit) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
99
1,47

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,2
0,35
0,5
0,70
0,8
1,05
1,0
1,40
1,2
1,75
1,5
2,10
1,6
2,45
1,8
2,80
1,6
3,15
1,4
3,50
1,1
3,85

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
Tense
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,030
0,034
0,038
0,041

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Remoulded

C
qr
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,970
0,966
0,962
0,959

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,262
18,333
18,405
18,477

0,0235
Kg/Cm2
0,047
Kg/Cm3
1,340
0,549496
Load
Total
(P)
0,0
0,1
0,3
0,4
0,5
0,7
0,8
0,9
1,0
0,9
0,8
0,6

Compression
Strain
0,000
0,006
0,015
0,025
0,031
0,037
0,045
0,048
0,054
0,048
0,042
0,033

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-3
Depth
: 14,00 - 14,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(minute) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
102,5
1,52

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,3
0,35
0,6
0,70
0,8
1,05
1,0
1,40
1,2
1,75
1,6
2,10
2,0
2,45
2,3
4,90
2,5
3,15
2,8
3,50
2,6
3,85
2,3
4,20
2,1
4,55

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
strain
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,053
0,034
0,038
0,041
0,045
0,049

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Undisturb

C
qu
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,947
0,966
0,962
0,959
0,955
0,951

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,697
18,333
18,405
18,477
18,550
18,623

0,0355
Kg/Cm2
0,071
Kg/Cm3
1,797
0,549496
Total
Load
(P)
0,0
0,2
0,3
0,4
0,5
0,7
0,9
1,1
1,3
1,4
1,5
1,4
1,3
1,2

Compression
Stress
0,000
0,009
0,018
0,025
0,031
0,037
0,049
0,060
0,068
0,075
0,084
0,077
0,068
0,062

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-3
Depth
: 14,00 - 14,50 m

Tested by
Counted by
Checked by

Stress (Kg/Cm2)

Undisturb (qu)

Remoulded (qr)

0,09

0,09

0,08

0,08

0,07

0,07

0,06

0,06

0,05

0,05

0,04

0,04

0,03

0,03

0,02

0,02

0,01

0,01

0,00
0,000

0,010

0,020

0,030

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,040

Strain (Kg/Cm2)

0,050

0,060

0,00
0,000

0,010

0,020

0,030

0,040

Strain (Kg/Cm2)

0,050

0,060

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-3
Depth
: 14,00 - 14,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(menit) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
101,9
1,51

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,2
0,35
0,4
0,70
0,6
1,05
0,8
1,40
1,1
1,75
1,3
2,10
1,6
2,45
1,4
2,80
1,2
3,15
1,0
3,50

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
Tense
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,030
0,034
0,038

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Remoulded

C
qr
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,970
0,966
0,962

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,262
18,333
18,405

0,01975 Kg/Cm2
0,0395
Kg/Cm3
1,797
0,549496
Load
Total
(P)
0,0
0,1
0,2
0,3
0,4
0,6
0,7
0,9
0,8
0,7
0,5

Compression
Strain
0,000
0,006
0,012
0,018
0,024
0,033
0,039
0,048
0,042
0,036
0,030

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-3
: 02,00 - 02,50 m

Water Content & Unit Weight


W wet soil + ring
W ring
W wet soil
W dry soil (Ws)
W water
Water content (w)
Unit Weight

Load
Pressure
0
9,6
21,4
38,4
1
2,25
4
9
16
25
36
49
24

(Kg)
(Kg/Cm2)
detik
detik
detik
detik
menit
menit
menit
menit
menit
menit
menit
menit
jam

0,5
0,25
0,000
0,170
0,270
0,340
0,410
0,590
0,730
0,970
1,080
1,130
1,160
1,180
1,300

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%
Gr/Cm3

Before
78,7
16,9
61,8
25,6
36,2
141,406
2,214

After

36,9
25,6
11,3
44,141
1,322

1,0
0,5
1,300
1,330
1,340
1,350
1,360
1,380
1,400
1,430
1,450
1,470
1,480
1,490
1,590

2,0
1
1,590
1,630
1,650
1,670
1,700
1,760
1,790
1,860
1,900
1,930
1,950
1,970
2,100

4,0
2
2,100
2,220
2,320
2,370
2,430
2,530
2,590
2,700
2,750
2,790
2,810
2,830
2,990

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Before
After
Height (Ho)
Cm
1,4
1,09
e = (H0-Ht)/Ht
1,503
0,940
Void ratio
Water content (w)
% 141,406
44,141
S = (w*Gs)/e
% 215,972 107,822
Saturated
Specific Gravity (Gs)
Gr/Cm3
2,29
0,407
Coefficient compression
Cc
0,172
Coefficient swelling
Cs

8,0
4
2,990
3,080
3,140
3,180
3,230
3,350
3,430
3,530
3,590
3,620
3,650
3,670
3,820

16,0
8
3,820
3,940
4,000
4,050
4,110
4,230
4,320
4,430
4,480
4,510
4,550
4,580
4,730

4,0
2
4,730

0,5
0,25
4,150

A
Ht

4,150

3,150

=
=
=

19,94
Ws/A.G
0,559

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)

Pressure
2
(kg/cm )

Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-3
: 02,00 - 02,50 m

End of
Dial Reading
(cm)

H (cm)

0,0000

Tested by
Counted by
Checked by
Height of soil
sample at end
of every dial reading
Ht (cm)

Void Height
(Hv)
(cm)

1,4000

0,8406

Void Ratio
at end of
every reading
(e)

0,1300

1,2700

0,1590

0,7106
0,6816

1,2184

1,1900

0,2990

0,6306

1,1272

1,1010

0,3820

0,5416

0,9681

1,0180

0,4730

0,4586

0,8198

0,9270

0,4150

0,3676

0,6571
0,9560

0,9850

0,4256

0,7608

1,0850

0,5256

0,9395

(0,1000)
0,25

0,3150
(0,3150)

49,840

0,0083

51,875

0,0080

49,840

0,0083

51,875

0,0080

0,9725

(0,0580)
2

0,0080

1,0595

0,0910
8

51,875

1,1455

0,0830
4

0,0083

1,2155

0,0890
2

49,840
1,2555

1,2410

0,2100

Cm2/sec
Cv
Tv.Hdr^2
t90

0,000

1,2702

0,0510
1

Fitting
time
t90

1,3350

0,0290
0,5

Ht(av) (cm)

1,5026

0,1300
0,25

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1,0350
0,5425

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-3
: 02,00 - 02,50 m

Pressure

H (cm)

Tested by
Counted by
Checked by

H (cm)
H /H
(4) = (3) / (2)

(kg/cm )
(1)

(2)
0,00

(3)

mv
(cm2/kg)
(5) = (4) : (1)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Cv
Cm2/sec
(6)

k=mv.Cv.
Cm/sec
-3
(7) = (5) x (6) x 10

1,4000

0,25

1,2700

0,50

1,2410

1,00

1,1900

2,00

1,1010

4,00

1,0180

8,00

0,9270

0,1300

0,1024

0,4094

0,0083

3,41E-06

0,0290

0,0234

0,0467

0,0080

3,74E-07

0,0510

0,0429

0,0429

0,0083

3,57E-07

0,0890

0,0808

0,0404

0,0080

3,24E-07

0,0830

0,0815

0,0204

0,0083

1,70E-07

0,0910

0,0982

0,0123

0,0080

9,83E-08

0,0954

0,0082

7,90E-07

Rata-rata

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-3
: 02,00 - 02,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Pressure Vs e

1,4
1,2

1
0,8
0,6
0,4

Cv (Cm2/detik)

0,1

10

0,009

0,008

0,007
Pressure (Kg/Cm2)

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-3
: 08,00 - 08,50 m

Water Content & Unit Weight


W wet soil + ring
W ring
W wet soil
W dry soil (Ws)
W water
Water content (w)
Unit Weight

Load
Pressure
0
9,6
21,4
38,4
1
2,25
4
9
16
25
36
49
24

(Kg)
(Kg/Cm2)
detik
detik
detik
detik
menit
menit
menit
menit
menit
menit
menit
menit
jam

0,5
0,25
0,000
0,100
0,140
0,200
0,260
0,430
0,530
0,710
0,820
0,880
0,910
0,920
1,010

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%
Gr/Cm3

Before
78
16,9
61,1
24,8
36,3
146,371
2,189

After

36,7
24,8
11,9
47,984
1,315

1,0
0,5
1,010
1,030
1,040
1,050
1,060
1,070
1,090
1,120
1,140
1,150
1,160
1,170
1,270

2,0
1
1,270
1,300
1,320
1,340
1,360
1,400
1,430
1,480
1,520
1,540
1,560
1,580
1,660

4,0
2
1,660
1,760
1,820
1,870
1,910
2,030
2,100
2,210
2,290
2,340
2,370
2,400
2,560

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Before
After
Height (Ho)
Cm
1,4
1,03
e = (H0-Ht)/Ht
1,888
1,133
Void ratio
Water content (w)
% 146,371
47,984
S = (w*Gs)/e
% 198,905 108,658
Saturated
2,57
Specific Gravity (Gs)
Gr/Cm3
0,440
Coefficient compression
Cc
0,045
Coefficient swelling
Cs

8,0
4
2,560
2,720
2,790
2,840
2,880
2,980
3,030
3,130
3,190
3,220
3,240
3,260
3,410

16,0
8
3,410
3,520
3,580
3,620
3,660
3,760
3,820
3,920
3,970
4,000
4,020
4,040
4,220

4,0
2
4,220

0,5
0,25
4,090

A
Ht

4,090

3,660

=
=
=

19,94
Ws/A.G
0,485

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)

Pressure
2
(kg/cm )

Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-3
: 08,00 - 08,50 m

End of
Dial Reading
(cm)

H (cm)

0,0000

Tested by
Counted by
Checked by
Height of soil
sample at end
of every dial reading
Ht (cm)

Void Height
(Hv)
(cm)

1,4000

0,9152

Void Ratio
at end of
every reading
(e)

0,1010

1,2990

0,1270

0,8142
0,7882

1,6260

1,2340

0,2560

0,7492

1,5455

1,1440

0,3410

0,6592

1,3599

1,0590

0,4220

0,5742

1,1845

0,9780

0,4090

0,4932

1,0174
0,9845

0,9910

0,5062

1,0443

1,0340

0,5492

1,1330

(0,0430)
0,25

0,3660
(0,3660)

51,875

0,0080

49,840

0,0083

51,875

0,0080

49,840

0,0083

1,0185

(0,0130)
2

0,0080

1,1015

0,0810
8

51,875

1,1890

0,0850
4

0,0083

1,2535

0,0900
2

49,840
1,2860

1,2730

0,1660

Cm2/sec
Cv
Tv.Hdr^2
t90

0,000

1,6796

0,0390
1

Fitting
time
t90

1,3495

0,0260
0,5

Ht(av) (cm)

1,8880

0,1010
0,25

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1,0125
0,5170

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-3
: 08,00 - 08,50 m

Pressure

H (cm)

Tested by
Counted by
Checked by

H (cm)
H /H
(4) = (3) / (2)

(kg/cm )
(1)

(2)
0,00

(3)

mv
(cm2/kg)
(5) = (4) : (1)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Cv
Cm2/sec
(6)

k=mv.Cv.
Cm/sec
-3
(7) = (5) x (6) x 10

1,4000

0,25

1,2990

0,50

1,2730

1,00

1,2340

2,00

1,1440

4,00

1,0590

8,00

0,9780

0,1010

0,0778

0,3110

0,0083

2,59E-06

0,0260

0,0204

0,0408

0,0080

3,27E-07

0,0390

0,0316

0,0316

0,0080

2,53E-07

0,0900

0,0787

0,0393

0,0083

3,28E-07

0,0850

0,0803

0,0201

0,0080

1,61E-07

0,0810

0,0828

0,0104

0,0083

8,63E-08

0,0755

0,0082

6,25E-07

Rata-rata

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-3
: 08,00 - 08,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Pressure Vs e

1,9
1,7
e

1,5
1,3
1,1
0,9

Cv (Cm2/detik)

0,1

10

0,009

0,008

0,007
Pressure (Kg/Cm2)

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-3
: 11,00 - 11,50 m

Water Content & Unit Weight


W wet soil + ring
W ring
W wet soil
W dry soil (Ws)
W water
Water content (w)
Unit Weight

Load
Pressure
0
9,6
21,4
38,4
1
2,25
4
9
16
25
36
49
24

(Kg)
(Kg/Cm2)
detik
detik
detik
detik
menit
menit
menit
menit
menit
menit
menit
menit
jam

0,5
0,25
0,000
0,070
0,100
0,130
0,160
0,240
0,310
0,480
0,610
0,710
0,770
0,810
0,970

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%
Gr/Cm3

Before
76,4
16,9
59,5
22,3
37,2
166,816
2,131

After

34,3
22,3
12
53,812
1,229

1,0
0,5
0,970
0,980
0,990
1,000
1,010
1,030
1,050
1,080
1,110
1,140
1,160
1,170
1,320

2,0
1
1,320
1,360
1,370
1,380
1,400
1,440
1,470
1,540
1,600
1,640
1,670
1,700
1,900

4,0
2
1,900
1,970
1,990
2,020
2,040
2,100
2,150
2,250
2,360
2,430
2,490
2,540
2,780

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Before
After
Height (Ho)
Cm
1,4
0,98
e = (H0-Ht)/Ht
2,085
1,164
Void ratio
Water content (w)
% 166,816
53,812
S = (w*Gs)/e
% 197,172 113,941
Saturated
2,46
Specific Gravity (Gs)
Gr/Cm3
Coefficient compression
Cc
0,596
Coefficient swelling
Cs
0,106

8,0
4
2,780
2,960
3,030
3,090
3,140
3,260
3,340
3,540
3,640
3,720
3,770
3,810
3,980

16,0
8
3,980
4,130
4,170
4,210
4,240
4,340
4,420
4,550
4,670
4,730
4,770
4,820
5,040

4,0
2
5,040

0,5
0,25
4,750

A
Ht

4,750

4,180

=
=
=

19,94
Ws/A.G
0,454

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)

Pressure
2
(kg/cm )

Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-3
: 11,00 - 11,50 m

End of
Dial Reading
(cm)

H (cm)

0,0000

Tested by
Counted by
Checked by
Height of soil
sample at end
of every dial reading
Ht (cm)

Void Height
(Hv)
(cm)

1,4000

0,9462

Void Ratio
at end of
every reading
(e)

0,0970

1,3030

0,1320

0,8492
0,8142

1,7940

1,2100

0,2780

0,7562

1,6662

1,1220

0,3980

0,6682

1,4723

1,0020

0,5040

0,5482

1,2079

0,8960

0,4750

0,4422

0,9743
0,9105

0,9250

0,4712

1,0382

0,9820

0,5282

1,1638

(0,0570)
0,25

0,4180
(0,4180)

49,840

0,0083

51,875

0,0080

49,840

0,0083

51,875

0,0080

0,9490

(0,0290)
2

0,0080

1,0620

0,1060
8

51,875

1,1660

0,1200
4

0,0083

1,2390

0,0880
2

49,840
1,2855

1,2680

0,1900

Cm2/detik
Cv
Tv.Hdr^2
t90

0,000

1,8711

0,0580
1

Fitting
time
t90

1,3515

0,0350
0,5

Ht(av) (cm)

2,0848

0,0970
0,25

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,9535
0,4910

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-3
: 11,00 - 11,50 m

Pressure

H (cm)

Tested by
Counted by
Checked by

H (cm)
H /H
(4) = (3) / (2)

(kg/cm )
(1)

(2)
0,00

(3)

mv
(cm2/kg)
(5) = (4) : (1)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Cv
cm2/sec
(6)

k=mv.Cv.
Cm/sec
-3
(7) = (5) x (6) x 10

1,4000

0,25

1,3030

0,50

1,2680

1,00

1,2100

2,00

1,1220

4,00

1,0020

8,00

0,8960

0,0970

0,0744

0,2978

0,0083

2,48E-06

0,0350

0,0276

0,0552

0,0080

4,42E-07

0,0580

0,0479

0,0479

0,0083

4,00E-07

0,0880

0,0784

0,0392

0,0080

3,14E-07

0,1200

0,1198

0,0299

0,0083

2,50E-07

0,1060

0,1183

0,0148

0,0080

1,18E-07

0,0808

0,0082

6,68E-07

Rata-rata

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-3
: 11,00 - 11,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Pressure Vs e

2
1,8
1,6
1,4
1,2
1
0,8
0,6

Cv (Cm2/detik)

0,1

10

0,009

0,008

0,007
Pressure (Kg/Cm2)

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-3
: 14,00 - 14,50 m

Water Content & Unit Weight


W wet soil + ring
W ring
W wet soil
W dry soil (Ws)
W water
Water content (w)
Unit Weight

Load
Pressure
0
9,6
21,4
38,4
1
2,25
4
9
16
25
36
49
24

(Kg)
(Kg/Cm2)
detik
detik
detik
detik
menit
menit
menit
menit
menit
menit
menit
menit
jam

0,5
0,25
0,000
0,150
0,200
0,220
0,240
0,290
0,340
0,430
0,500
0,580
0,630
0,660
0,820

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%
Gr/Cm3

Before
78,1
16,9
61,2
24,8
36,4
146,774
2,192

After

37,6
24,8
12,8
51,613
1,347

1,0
0,5
0,820
0,830
0,840
0,845
0,850
0,860
0,880
0,910
0,930
0,960
0,970
0,980
1,120

2,0
1
1,120
1,140
1,150
1,160
1,170
1,190
1,220
1,270
1,310
1,340
1,370
1,390
1,550

4,0
2
1,550
1,610
1,630
1,640
1,660
1,670
1,760
1,840
1,920
1,990
2,030
2,070
2,290

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Before
After
Height (Ho)
Cm
1,4
1,04
e = (H0-Ht)/Ht
1,866
1,121
Void ratio
Water content (w)
% 146,774
51,613
S = (w*Gs)/e
% 200,269 117,245
Saturated
Specific Gravity (Gs)
Gr/Cm3
2,55
Coefficient compression
Cc
0,480
Coefficient swelling
Cs
0,051

8,0
4
2,290
2,430
2,480
2,520
2,560
2,650
2,720
2,850
2,950
3,030
3,080
3,110
3,310

16,0
8
3,310
3,390
3,470
3,500
3,530
3,620
3,700
3,860
3,990
4,060
4,110
4,190
4,350

4,0
2
4,350

0,5
0,25
4,200

A
Ht

4,200

3,640

=
=
=

19,94
Ws/A.G
0,489

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)

Pressure
2
(kg/cm )

Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-3
: 14,00 - 14,50 m

End of
Dial Reading
(cm)

H (cm)

0,0000

Tested by
Counted by
Checked by
Height of soil
sample at end
of every dial reading
Ht (cm)

Void Height
(Hv)
(cm)

1,4000

0,9115

Void Ratio
at end of
every reading
(e)

0,0820

1,3180

0,1120

0,8295
0,7995

1,6366

1,2450

0,2290

0,7565

1,5486

1,1710

0,3310

0,6825

1,3971

1,0690

0,4350

0,5805

1,1883

0,9650

0,4200

0,4765

0,9754
0,9725

0,9800

0,4915

1,0061

1,0360

0,5475

1,1208

(0,0560)
0,25

0,3640
(0,3640)

51,875

0,0080

49,840

0,0083

49,840

0,0083

51,875

0,0080

1,0170

(0,0150)
2

0,0083

1,1200

0,1040
8

49,840

1,2080

0,1020
4

0,0080

1,2665

0,0740
2

51,875
1,3030

1,2880

0,1550

Cm2/sec
Cv
Tv.Hdr^2
t90

0,000

1,6981

0,0430
1

Fitting
time
t90

1,3590

0,0300
0,5

Ht(av) (cm)

1,8659

0,0820
0,25

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1,0080
0,5180

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-3
: 14,00 - 14,50 m

Pressure

H (cm)

Tested by
Counted by
Checked by

H (cm)
H /H
(4) = (3) / (2)

(kg/cm )
(1)

(2)
0,00

(3)

mv
(cm2/kg)
(5) = (4) : (1)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Cv
cm2/sec
(6)

k=mv.Cv.
Cm/sec
-3
(7) = (5) x (6) x 10

1,4000

0,25

1,3180

0,50

1,2880

1,00

1,2450

2,00

1,1710

4,00

1,0690

8,00

0,9650

0,0820

0,0622

0,2489

0,0080

1,99E-06

0,0300

0,0233

0,0466

0,0083

3,88E-07

0,0430

0,0345

0,0345

0,0080

2,77E-07

0,0740

0,0632

0,0316

0,0083

2,63E-07

0,1020

0,0954

0,0239

0,0083

1,99E-07

0,1040

0,1078

0,0135

0,0080

1,08E-07

0,0665

0,0082

5,38E-07

Rata-rata

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-3
: 14,00 - 14,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Pressure Vs e
1,90
1,70

1,50
1,30
1,10
0,90
0,70

Cv (Cm2/detik)

0,1

10

0,009

0,008

0,007
Pressure (Kg/Cm2)

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

CONCLUSION of SOIL INVESTIGATION ( BH-4 )


Project

: Power Plant

Location : Pulang Pisau, Central Kalimantan


INVESTIGATION RESULT
NO

KIND of TEST

BH-4

BH-4

02,00 - 02,50 m 05,00 - 05,50 m

1
2
3
4

Water Content
Unit Weight
Specific Gravity
Liquid Limit
Plastic Limit
Indeks Plastic
Gradation
0,75
0,375
4
8
10
40
100
200
Direct Shear

UCS

Consolidation

Gs
LL
PL
PI
19,1
9,5
4,75
2,36
2
0,425
0,15
0,075
c

qu
cu
qr
Sensitivity
Cc
Cs
Cv
k
e
n

(%)
(Kg/cm3)
(%)
(%)
(%)
mm
mm
mm
mm
mm
mm
mm
mm
(Kg/cm2)
()
qu (Kg/cm2)
cu (Kg/cm2)
qr (Kg/cm2)
(St)

cm2/sec
cm/sec

Soil Classification (Unified Soil Classification System)

BH-4

BH-4

11,00 - 11,50 m

14,00 - 14,500 m

80,98
1,49
2,29
48,80
34,44
14,36

79,64
1,47
2,15
48,70
39,69
9,01

86,27
1,46
2,44
48,10
38,69
9,41

76,20
1,50
2,51
46,60
39,15
7,45

100,00
100,00
100,00
100,00
100,00
100,00
100,00
100,00
0,024
11,50
0,025

100,00
100,00
100,00
100,00
100,00
100,00
100,00
100,00
0,051
10,00
0,035

100,00
100,00
100,00
100,00
100,00
100,00
38,16
19,87
0,030
11,00
0,045

100,00
100,00
100,00
100,00
100,00
92,87
58,08
29,59
0,040
9,00
0,051

0,020
1,282
0,475
0,049
8,12E-03
8,71E-07
1,750
0,636

0,018
1,944
0,430
0,058
8,02E-03
9,00E-07
1,588
0,614

0,030
1,500
0,760
0,122
8,17E-03
6,31E-07
2,323
0,699

0,035
1,457
0,481
0,087
8,12E-03
7,00E-07
1,949
0,661

ML

ML

ML

CL

October 09, 2007

Yusti Yudiawati, ST, MT


Geotechnical Engineer

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

WATER CONTENT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-4
Depth
: 02,00 - 02,50 m

Container No.
Cont. Weight + Wet Soil
Cont. Weight + Dry Soil
Water Weight
Container Weight
Weight Dry
WATER CONTENT
Average

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
44,00
29,10
14,90
10,30
18,80
79,26

Gr
Gr
Gr
Gr
Gr
%
%

2
42,60
27,30
15,30
8,80
18,50
82,70
80,98

UNIT WEIGHT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-4
Depth
: 02,00 - 02,50 m

Container No.
W Ring + Wet soil
W Ring
W wet soil
Diameter Ring
H Ring
Volume
Unit Weight
Average

Tested by
Counted by
Checked by

Gr
Gr
Gr
Cm
Cm
Cm3
Gr/Cm3
Gr/Cm3

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
259,8
159,1
100,7
3,5
7,0
67,31
1,50

2
259,2
159,1
100,1
3,5
7,0
67,31
1,49
1,49

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

WATER CONTENT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-4
Depth
: 05,00 - 05,50 m

Container No.
Cont. Weight + Wet Soil
Cont. Weight + Dry Soil
Water Weight
Container Weight
Weight Dry
WATER CONTENT
Average

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
39,80
26,50
13,30
10,00
16,50
80,61

Gr
Gr
Gr
Gr
Gr
%
%

2
46,60
30,00
16,60
8,90
21,10
78,67
79,64

UNIT WEIGHT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-4
Depth
: 05,00 - 05,50 m

Container No.
W Ring + Wet soil
W Ring
W wet soil
Diameter Ring
H Ring
Volume
Unit Weight
Average

Tested by
Counted by
Checked by

Gr
Gr
Gr
Cm
Cm
Cm3
Gr/Cm3
Gr/Cm3

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
258,4
159,1
99,3
3,5
7,0
67,31
1,48

2
257,8
159,1
98,7
3,5
7,0
67,31
1,47
1,47

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

WATER CONTENT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-4
Depth
: 11,00 - 11,50 m

Container No.
Cont. Weight + Wet Soil
Cont. Weight + Dry Soil
Water Weight
Container Weight
Weight Dry
WATER CONTENT
Average

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
40,70
25,80
14,90
8,90
16,90
88,17

Gr
Gr
Gr
Gr
Gr
%
%

2
50,10
31,20
18,90
8,80
22,40
84,38
86,27

UNIT WEIGHT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 25, 2007
Sample No. : BH-4
Depth
: 11,00 - 11,50 m

Container No.
W Ring + Wet soil
W Ring
W wet soil
Diameter Ring
H Ring
Volume
Unit Weight
Average

Tested by
Counted by
Checked by

Gr
Gr
Gr
Cm
Cm
Cm3
Gr/Cm3
Gr/Cm3

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
257,3
159,1
98,2
3,5
7,0
67,31
1,46

2
256,8
159,1
97,7
3,5
7,0
67,31
1,45
1,46

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

WATER CONTENT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-4
Depth
: 14,00 - 14,50 m

Container No.
Cont. Weight + Wet Soil
Cont. Weight + Dry Soil
Water Weight
Container Weight
Weight Dry
WATER CONTENT
Average

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
34,60
24,20
10,40
10,40
13,80
75,36

Gr
Gr
Gr
Gr
Gr
%
%

2
32,70
22,30
10,40
8,80
13,50
77,04
76,20

UNIT WEIGHT
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-4
Depth
: 14,00 - 14,50 m

Container No.
W Ring + Wet soil
W Ring
W wet soil
Diameter Ring
H Ring
Volume
Unit Weight
Average

Tested by
Counted by
Checked by

Gr
Gr
Gr
Cm
Cm
Cm3
Gr/Cm3
Gr/Cm3

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

1
260,1
159,1
101
3,5
7,0
67,31
1,50

2
259,4
159,1
100,3
3,5
7,0
67,31
1,49
1,50

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

SPECIFIC GRAVITY TEST


(ASTM D - 854 - 58)
(AASHTO T - 100 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 04, 2007
Sample No. : BH-4
Depth
: 02,00 - 02,50 m

No
1
2
3
4
5
6
7
8

Tested by
Counted by
Checked by

Picnometer No.
W Picno + Water, W1
W Picno + Soil + Water, W2
W Dry, W3
Temperatur Campuran Air + Tanah, TC
Gs (at TC) = W3 / [(W1 + W3) - W2]
Correction, A
Gs (at 20C) = Gs (at TC) x A
Specific Gravity

Table : Temperatur Correction


TC
TC
Correction
15
1,0009
21
16
1,0007
22
17
1,0006
23
18
1,0004
24
19
1,0002
25
20
1,0000
26
Table : Water Intencity ( w)
TC
w
15
0,999129
16
0,9990
17
0,9988
18
0,9986
19
0,9984
20
0,9982

TC
21
22
23
24
25
26

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Gr
TC
cm3
Gr

1
142,10
170,30
50,00
27,00
2,29
0,9983
2,29

2
142,30
170,60
50,00
27,00
2,30
0,9983
2,30
2,295

Correction
0,9998
0,9996
0,9993
0,9991
0,9988
0,9986

TC
27
28
29
30
31
32

Correction
0,9983
0,9980
0,9977
0,9974

w
0,9980
0,9978
0,9976
0,9973
0,9971
0,9968

TC
27
28
29
30
31
32

w
0,9965
0,9963
0,9960
0,9957

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

SPECIFIC GRAVITY TEST


(ASTM D - 854 - 58)
(AASHTO T - 100 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 29, 2007
Sample No. : BH-4
Depth
: 05,00 - 05,50 m

No
1
2
3
4
5
6
7
8

Tested by
Counted by
Checked by

Picnometer No.
W Picno + Water, W1
W Picno + Soil + Water, W2
W Dry, W3
Temperatur Campuran Air + Tanah, TC
Gs (at TC) = W3 / [(W1 + W3) - W2]
Correction, A
Gs (at 20C) = Gs (at TC) x A
Specific Gravity

Table : Temperatur Correction


TC
TC
Correction
15
1,0009
21
16
1,0007
22
17
1,0006
23
18
1,0004
24
19
1,0002
25
20
1,0000
26
Table : Water Intencity ( w)
TC
w
15
0,999129
16
0,9990
17
0,9988
18
0,9986
19
0,9984
20
0,9982

TC
21
22
23
24
25
26

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Gr
TC
cm3
Gr

1
142,00
167,70
50,00
28,00
2,06
0,9980
2,05

2
142,40
170,20
50,00
28,00
2,25
0,9980
2,25
2,151

Correction
0,9998
0,9996
0,9993
0,9991
0,9988
0,9986

TC
27
28
29
30
31
32

Correction
0,9983
0,9980
0,9977
0,9974

w
0,9980
0,9978
0,9976
0,9973
0,9971
0,9968

TC
27
28
29
30
31
32

w
0,9965
0,9963
0,9960
0,9957

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

SPECIFIC GRAVITY TEST


(ASTM D - 854 - 58)
(AASHTO T - 100 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 28, 2007
Sample No. : BH-4
Depth
: 11,00 - 11,50 m

No
1
2
3
4
5
6
7
8

Tested by
Counted by
Checked by

Picnometer No.
W Picno + Water, W1
W Picno + Soil + Water, W2
W Dry, W3
Temperatur Campuran Air + Tanah, TC
Gs (at TC) = W3 / [(W1 + W3) - W2]
Correction, A
Gs (at 20C) = Gs (at TC) x A
Specific Gravity

Table : Temperatur Correction


TC
TC
Correction
15
1,0009
21
16
1,0007
22
17
1,0006
23
18
1,0004
24
19
1,0002
25
20
1,0000
26
Table : Water Intencity ( w)
TC
w
15
0,999129
16
0,9990
17
0,9988
18
0,9986
19
0,9984
20
0,9982

TC
21
22
23
24
25
26

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Gr
TC
cm3
Gr

1
142,40
171,90
50,00
28,00
2,44
0,9980
2,43

2
142,10
171,70
50,00
28,00
2,45
0,9980
2,45
2,440

Correction
0,9998
0,9996
0,9993
0,9991
0,9988
0,9986

TC
27
28
29
30
31
32

Correction
0,9983
0,9980
0,9977
0,9974

w
0,9980
0,9978
0,9976
0,9973
0,9971
0,9968

TC
27
28
29
30
31
32

w
0,9965
0,9963
0,9960
0,9957

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

SPECIFIC GRAVITY TEST


(ASTM D - 854 - 58)
(AASHTO T - 100 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 05, 2007
Sample No. : BH-4
Depth
: 14,00 - 14,50 m

No
1
2
3
4
5
6
7
8

Tested by
Counted by
Checked by

Picnometer No.
W Picno + Water, W1
W Picno + Soil + Water, W2
W Dry, W3
Temperatur Campuran Air + Tanah, TC
Gs (at TC) = W3 / [(W1 + W3) - W2]
Correction, A
Gs (at 20C) = Gs (at TC) x A
Specific Gravity

Table : Temperatur Correction


TC
TC
Correction
15
1,0009
21
16
1,0007
22
17
1,0006
23
18
1,0004
24
19
1,0002
25
20
1,0000
26
Table : Water Intencity ( w)
TC
w
15
0,999129
16
0,9990
17
0,9988
18
0,9986
19
0,9984
20
0,9982

TC
21
22
23
24
25
26

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Gr
TC
cm3
Gr

1
142,00
172,20
50,00
28,00
2,53
0,9980
2,52

2
142,20
172,30
50,00
28,00
2,51
0,9980
2,51
2,514

Correction
0,9998
0,9996
0,9993
0,9991
0,9988
0,9986

TC
27
28
29
30
31
32

Correction
0,9983
0,9980
0,9977
0,9974

w
0,9980
0,9978
0,9976
0,9973
0,9971
0,9968

TC
27
28
29
30
31
32

w
0,9965
0,9963
0,9960
0,9957

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

ATTERBERG LIMIT TEST


(AASHTO T - 89 - 74 / AASHTO T - 90 - 74)
(ASTM D - 423 - 66 / ASTM D - 424 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 05, 2007
Sample No. : BH-4
Depth
: 02,00 - 02,50 m
LIQUID LIMIT :
Sample No.
(1)
Number of Blows
(2)
Container No.
(3)
W cont + W wet soil
(4)
W cont + dry soil
(5)
W water (3) - (4)
(6)
W Container
(7)
W dry soil (4) - (6)
(8)
Water content (5)/(7)*100

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%

1
16
C1
56,70
40,5
16,2
8,80
31,70
51,10

2
28
C2
48,90
36,4
12,5
10,40
26,00
48,08

3
32
C3
43,20
32,1
11,1
8,90
23,20
47,84

4
47
C4
45,50
34,1
11,4
8,90
25,20
45,24

Water content (%)

LIQUID LIMIT GRAPH


52
51
50
49
48
47
46
45
44

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

PLASTIC LIMIT :
Sample No.
(1) Container No.
(2) W cont + W wet soil
(3) W cont + dry soil
(4) W water (2) - (3)
(5) W Container
(6) W dry soil (3) - (5)
(7) Water content (4)/(6)*100
(8) Plastic limit

Gr
Gr
Gr
Gr
Gr
%
%

1
C.1
33,00
26,80
6,20
8,80
18,00
34,444
34,44

LL

PL

PI

48,8

34,44

14,36

Silt anorganic with medium compresibility


and silt organic

10
Blows

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

ATTERBERG LIMIT TEST


(AASHTO T - 89 - 74 / AASHTO T - 90 - 74)
(ASTM D - 423 - 66 / ASTM D - 424 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 28, 2007
Sample No. : BH-4
Depth
: 05,00 - 05,50 m
LIQUID LIMIT :
Sample No.
(1)
Number of Blows
(2)
Container No.
(3)
W cont + W wet soil
(4)
W cont + dry soil
(5)
W water (3) - (4)
(6)
W Container
(7)
W dry soil (4) - (6)
(8)
Water content (5)/(7)*100

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%

1
13
C1
51,0
37,4
13,6
10,30
27,10
50,18

2
26
C2
47,6
35,3
12,3
10,40
24,90
49,40

3
37
C3
43,2
32,1
11,1
8,80
23,30
47,64

4
46
C4
42,0
31,6
10,4
8,80
22,80
45,61

LIQUID LIMIT GRAPH

Water content (%)

52

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

PLASTIC LIMIT :
Sample No.
(1) Container No.
(2) W cont + W wet soil
(3) W cont + dry soil
(4) W water (2) - (3)
(5) W Container
(6) W dry soil (3) - (5)
(7) Water content (4)/(6)*100
(8) Plastic limit

Gr
Gr
Gr
Gr
Gr
%
%

1
C.1
37,40
29,70
7,70
10,30
19,40
39,691
39,69

LL

PL

PI

48,7

39,69

9,01

50

Silt anorganic with medium compresibility


48

and silt organic

46
44
1

10
Blows

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

ATTERBERG LIMIT TEST


(AASHTO T - 89 - 74 / AASHTO T - 90 - 74)
(ASTM D - 423 - 66 / ASTM D - 424 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 28, 2007
Sample No. : BH-4
Depth
: 11,00 - 11,50 m
LIQUID LIMIT :
Sample No.
(1)
Number of Blows
(2)
Container No.
(3)
W cont + W wet soil
(4)
W cont + dry soil
(5)
W water (3) - (4)
(6)
W Container
(7)
W dry soil (4) - (6)
(8)
Water content (5)/(7)*100

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%

1
14
C1
51,40
37,9
13,5
10,40
27,50
49,09

2
28
C2
47,80
35,6
12,2
10,40
25,20
48,41

3
36
C3
43,50
32,3
11,2
8,80
23,50
47,66

4
47
C4
42,10
31,7
10,4
8,80
22,90
45,41

LIQUID LIMIT GRAPH

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

PLASTIC LIMIT :
Sample No.
(1) Container No.
(2) W cont + W wet soil
(3) W cont + dry soil
(4) W water (2) - (3)
(5) W Container
(6) W dry soil (3) - (5)
(7) Water content (4)/(6)*100
(8) Plastic limit

Gr
Gr
Gr
Gr
Gr
%
%

1
C.1
37,80
30,10
7,70
10,20
19,90
38,693
38,69

LL

PL

PI

48,1

38,69

9,41

Water content (%)

50
49
48

Silt anorganic with medium compresibility

47

and silt organic

46
45
1

10
Blows

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

ATTERBERG LIMIT TEST


(AASHTO T - 89 - 74 / AASHTO T - 90 - 74)
(ASTM D - 423 - 66 / ASTM D - 424 - 74)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-4
Depth
: 14,00 - 14,50 m
LIQUID LIMIT :
Sample No.
(1)
Number of Blows
(2)
Container No.
(3)
W cont + W wet soil
(4)
W cont + dry soil
(5)
W water (3) - (4)
(6)
W Container
(7)
W dry soil (4) - (6)
(8)
Water content (5)/(7)*100

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%

1
16
C1
48,90
35,8
13,1
8,80
27,00
48,52

2
28
C2
43,50
32,5
11,0
8,80
23,70
46,41

3
38
C3
39,30
29,8
9,5
8,80
21,00
45,24

4
47
C4
36,60
28,5
8,1
8,80
19,70
41,12

LIQUID LIMIT GRAPH

Water content (%)

50

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

PLASTIC LIMIT :
Sample No.
(1) Container No.
(2) W cont + W wet soil
(3) W cont + dry soil
(4) W water (2) - (3)
(5) W Container
(6) W dry soil (3) - (5)
(7) Water content (4)/(6)*100
(8) Plastic limit

Gr
Gr
Gr
Gr
Gr
%
%

1
C.1
39,60
31,30
8,30
10,10
21,20
39,151
39,15

LL

PL

PI

46,6

39,15

7,45

48

Silt anorganic with medium compresibility

46
44

and silt organic

42
40
1

10
Blows

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

HYDROMETER TEST
(AASHTO T - 88 - 72)
(ASTM D - 422 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-4
Depth
: 02,00 - 02,50 m

Tested by
Counted by
Checked by

W dry soil
Specific Gravity

:
:

50 gram
2,29

Meniscus Correction, Fm
Zero Reading Correction, Fz
Temperature Correction, Ft
Specifik Gravity Correction (a)

:
:
:
=

1
4
2,15
1,662

Time
(menit)

Temp.
T C

Rcp

0,25
0,5
1
2
5
15
30
60
240
1440
2880

28
28
28
28
28
28
28
28
28
27
27

28
28
28
27
26
23
21
18
16
13
10

26,15
26,15
26,15
25,15
24,15
21,15
19,15
16,15
14,15
11,15
8,15

100

% refined grain
a Rcp x 100
50
86,9358
86,9358
86,9358
83,6113
80,2868
70,3132
63,6642
53,6907
47,0417
37,0682
27,0947

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Rcl

L
(cm)

D
(mm)

29
29
29
28
27
24
22
19
17
14
11

11,70
11,70
11,70
11,70
11,70
11,70
11,70
11,70
11,70
11,90
11,90

0,0130
0,0130
0,0130
0,0132
0,0133
0,0138
0,0141
0,0148
0,0151
0,0151
0,0151

0,0889
0,0629
0,0445
0,0319
0,0203
0,0122
0,0088
0,0065
0,0033
0,0014
0,0010

Curve: Distribute Grain Size

90

Total slip off sieve (%)

80
70
60
50
40
30
20
10
0
100,000

10,000

1,000

0,100

0,010

0,001
0,000
Diameter
(mm)

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

HYDROMETER TEST
(AASHTO T - 88 - 72)
(ASTM D - 422 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 28, 2007
Sample No. : BH-4
Depth
: 05,00 - 05,50 m

Tested by
Counted by
Checked by

W dry soil
Specific Gravity

:
:

50 gram
2,15

Meniscus Correction, Fm
Zero Reading Correction, Fz
Temperature Correction, Ft
Specifik Gravity Correction (a)

:
:
:
=

1
4
2,15
1,662

Time
(menit)

Temp.
T C

Rcp

0,25
0,5
1
2
5
15
30
60
240
1440
2880

29
29
29
29
29
29
29
29
28
28
28

30
30
30
29
28
27
25
24
22
19
17

28,15
28,15
28,15
27,15
26,15
25,15
23,15
22,15
20,15
17,15
15,15

100

% refined grain
a Rcp x 100
50
93,5848
93,5848
93,5848
90,2603
86,9358
83,6113
76,9623
73,6377
66,9887
57,0152
50,3662

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Rcl

L
(cm)

D
(mm)

31
31
31
30
29
28
26
25
23
20
18

11,40
11,40
11,40
11,50
11,70
11,90
12,20
12,40
12,70
13,20
13,50

0,0129
0,0129
0,0129
0,0129
0,0129
0,0129
0,0129
0,0129
0,0130
0,0130
0,0130

0,0871
0,0616
0,0436
0,0309
0,0197
0,0115
0,0082
0,0059
0,0030
0,0012
0,0009

Curve: Distribute Grain Size

90

Total slip off sieve (%)

80
70
60
50
40
30
20
10
0
100,000

10,000

1,000

0,100

0,010

Diameter
(mm)
0,001
0,000

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

SEIVE ANALISYS
(AASHTO T - 27 - 74)
(ASTM C - 136 - 46)
: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 26, 2007
Sample No. : BH-4
Depth
: 02,00 - 02,50 m

Tested by
Counted by
Checked by

Sieve
No.
3/4
3/8
4
8
10
40
100
200
Pan

W soil
(gr)
0,00
0,00
0,00
0,00
0,00
0,00
77,80
23,00
25,00

(mm)
19,10
9,500
4,750
2,360
2,000
0,425
0,150
0,075

% Kumulatif
retained
slip off
0,00
100,000
0,00
100,000
0,00
100,000
0,00
100,000
0,00
100,000
0,00
100,000
61,84
38,156
80,13
19,873

125,80

Total weight

0,0

% weight
retained
0,00
0,00
0,00
0,00
0,00
0,00
61,84
18,28
19,87

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,1

1,0

Curve: Distribute Grain Size

10,0

Diameter
100,0(mm)
100
90
80
70
60
50
40
30
20
10
0

Total slip off Sieve (%)

Project
Location

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

SEIVE ANALISYS
(AASHTO T - 27 - 74)
(ASTM C - 136 - 46)
: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 03, 2007
Sample No. : BH-4
Depth
: 05,00 - 05,50 m

Tested by
Counted by
Checked by

W soil
(gr)
0,00
0,00
0,00
0,00
0,00
26,20
127,80
104,70
108,70

Sieve
No.
3/4
3/8
4
8
10
40
100
200
Pan

(mm)
19,10
9,500
4,750
2,360
2,000
0,425
0,150
0,075

% Kumulatif
retained
slip off
0,00
100,000
0,00
100,000
0,00
100,000
0,00
100,000
0,00
100,000
7,13
92,869
41,92
58,084
70,41
29,586

367,40

Total weight

0,0

% weight
retained
0,00
0,00
0,00
0,00
0,00
7,13
34,78
28,50
29,59

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,1

1,0

Curve: Distribute Grain Size

10,0

Diameter
100,0(mm)
100
90
80
70
60
50
40
30
20
10
0

Total slip off Sieve (%)

Project
Location

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

DIRECT SHEAR TEST


( AASHTO T - 236 - 72 )
( ASTM D - 3080 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-4
: 02,00 - 02,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Time

Horizontal

Load N

3,167

Load N

6,324

Load N

9,491

(menit)

Deformation

Reading

Shear

Reading

Shear

Reading

Shear

0,00
0,25
0,50
1,00
1,50
2,00
2,50
3,00
3,50
4,00
4,50
5,00
6,00
7,00
8,00
9,00
10,00
11,00
12,00
13,00
14,00
15,00

0,000
0,158
0,316
0,361
0,947
1,262
1,578
1,893
2,209
2,524
2,840
3,155
3,786
4,417
5,048
5,679
6,310
6,941
7,572
8,203
8,834
9,465

0,00
1,00
2,00
3,00
3,60
4,40
4,40
4,40

0,00
0,42
0,84
1,26
1,51
1,85
1,85
1,85

0,00
1,60
2,40
3,80
5,00
6,00
6,50
6,50
6,50

0,00
0,67
1,01
1,60
2,10
2,52
2,73
2,73
2,73

0,00
1,80
3,80
5,00
6,60
7,40
8,80
9,40
9,40
9,40

0,00
0,76
1,60
2,10
2,77
3,11
3,70
3,95
3,95
3,95

0,450

= N/A

DIRECT SHEAR GRAPH

0,400

0,350

Shear Stress (Kg/Cm2)

0,300

0,250

0,200

0,150

0,100

11,5

0,050

0,000
0,00

0,05

0,10

0,15Normal
0,20
Stress 0,25
(Kg/Cm2)0,30

0,35

0,40

0,45

Tool

Diameter 63.1 mm, height 20 mm, Areas 31.25 cm2


prov. ring calibration 0.1610 kg/10-4

Result

c = 0,024 kg/cm2

Sample

= 11,5

= P/A

0,101

0,059

0,202

0,087

0,304

0,126

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

DIRECT SHEAR TEST


( AASHTO T - 236 - 72 )
( ASTM D - 3080 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 26, 2007


: BH-4
: 05,00 - 05,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Time

Horizontal

Load N

3,167

Load N

6,324

Load N

9,491

(menit)

Deformation

Reading

Shear

Reading

Shear

Reading

Shear

0,00
0,25
0,50
1,00
1,50
2,00
2,50
3,00
3,50
4,00
4,50
5,00
6,00
7,00
8,00
9,00
10,00
11,00
12,00
13,00
14,00
15,00

0,000
0,158
0,316
0,361
0,947
1,262
1,578
1,893
2,209
2,524
2,840
3,155
3,786
4,417
5,048
5,679
6,310
6,941
7,572
8,203
8,834
9,465

0,00
1,00
2,00
3,20
4,00
4,60
4,60
4,60

0,00
0,42
0,84
1,34
1,68
1,93
1,93
1,93

0,00
1,40
2,80
5,20
5,80
6,60
7,40
7,40
7,40

0,00
0,59
1,18
2,19
2,44
2,77
3,11
3,11
3,11

0,00
2,00
3,60
5,40
6,80
7,40
8,60
9,40
9,40
9,40

0,00
0,84
1,51
2,27
2,86
3,11
3,61
3,95
3,95
3,95

0,400

= N/A

0,101

0,062

0,202

0,100

0,304

0,126

DIRECT SHEAR GRAPH

0,350

0,300

Shear (Kg/Cm2)

0,250

0,200

0,150

11 o
0,100

0,050

0,000
0,000

0,050

0,100

0,150 Normal
0,200
0,250
0,300
Stress (Kg/Cm2)

0,350

0,400

Tool

Diameter 63.1 mm, height 20 mm, Areas 31.25 cm2


prov. ring calibration 0.1610 kg/10-4

Result

c = 0,030 kg/cm2

Sample

= 11

= P/A

0,450

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

DIRECT SHEAR TEST


( AASHTO T - 236 - 72 )
( ASTM D - 3080 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 26, 2007


: BH-4
: 11,00 - 11,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Time

Horizontal

Load N

3,167

Load N

6,324

Load N

9,491

(menit)

Deformation

Reading

Shear

Reading

Shear

Reading

Shear

0,00
0,25
0,50
1,00
1,50
2,00
2,50
3,00
3,50
4,00
4,50
5,00
6,00
7,00
8,00
9,00
10,00
11,00
12,00
13,00
14,00
15,00

0,000
0,158
0,316
0,361
0,947
1,262
1,578
1,893
2,209
2,524
2,840
3,155
3,786
4,417
5,048
5,679
6,310
6,941
7,572
8,203
8,834
9,465

0,00
1,40
2,20
3,40
4,00
5,20
5,60
5,60
5,60

0,00
0,59
0,92
1,43
1,68
2,19
2,35
2,35
2,35

0,00
1,50
2,80
3,80
4,80
6,60
7,20
7,20
7,20

0,00
0,63
1,18
1,60
2,02
2,77
3,03
3,03
3,03

0,00
1,80
3,20
5,40
7,20
8,60
8,60
8,60

0,00
0,76
1,34
2,27
3,03
3,61
3,61
3,61

0,450

= N/A

DIRECT SHEAR GRAPH

0,400

0,350

Shear (Kg/Cm2)

0,300

0,250

0,200

0,150

10 o
0,100

0,050

0,000
0,00

0,05

0,10

0,15Normal
0,20
0,25
0,30
Stress (Kg/Cm2)

0,35

0,40

Tool

Diameter 63.1 mm, height 20 mm, Areas 31.25 cm2


prov. ring calibration 0.1610 kg/10-4

Result

c = 0,051 kg/cm2

Sample

= 10

0,45

= P/A

0,101

0,075

0,202

0,097

0,304

0,116

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

DIRECT SHEAR TEST


( AASHTO T - 236 - 72 )
( ASTM D - 3080 - 72)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-4
: 14,00 - 14,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Time

Horizontal

Load N

3,167

Load N

6,324

Load N

9,491

(menit)

Deformation

Reading

Shear

Reading

Shear

Reading

Shear

0,00
0,25
0,50
1,00
1,50
2,00
2,50
3,00
3,50
4,00
4,50
5,00
6,00
7,00
8,00
9,00
10,00
11,00
12,00
13,00
14,00
15,00

0,000
0,158
0,316
0,361
0,947
1,262
1,578
1,893
2,209
2,524
2,840
3,155
3,786
4,417
5,048
5,679
6,310
6,941
7,572
8,203
8,834
9,465

0,00
1,00
2,00
2,60
3,20
4,40
5,20
6,00
6,00
6,00

0,00
0,42
0,84
1,09
1,34
1,85
2,19
2,52
2,52
2,52

0,00
1,40
2,60
3,80
5,00
6,00
7,00
7,60
8,20
8,20
8,20

0,00
0,59
1,09
1,60
2,10
2,52
2,94
3,19
3,45
3,45
3,45

0,00
2,00
4,00
6,00
7,00
8,60
9,20
10,00
10,60
11,00
11,60
11,60
11,60

0,00
0,84
1,68
2,52
2,94
3,61
3,87
4,20
4,45
4,62
4,87
4,87
4,87

0,500

= N/A

DIRECT SHEAR GRAPH

0,450

0,400

Shear (Kg/Cm2)

0,350

0,300

0,250

0,200

0,150

9o
0,100

0,050

0,000
0,00

0,05

0,10

0,15
0,20 (Kg/Cm2)
0,25
Normal Stress

0,30

0,35

0,40

Tool

Diameter 63.1 mm, height 20 mm, Areas 31.25 cm2


prov. ring calibration 0.1610 kg/10-4

Result

c = 0,040 kg/cm2

Sample

= P/A

0,101

0,081

0,202

0,110

0,304

0,156

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-4
Depth
: 02,00 - 02,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(menit) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
100,7
1,50

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,2
0,35
0,3
0,70
0,4
1,05
0,6
1,40
0,8
1,75
0,9
2,10
1,0
2,45
0,8
4,90
0,6
3,15
0,5
3,50

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
Strain
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,053
0,034
0,038

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Undisturb

C
qu
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,947
0,966
0,962

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,697
18,333
18,405

0,0125
Kg/Cm2
0,0250
Kg/Cm3
1,282
0,549496
Load
Total
(P)
0,0
0,1
0,2
0,2
0,3
0,4
0,5
0,5
0,4
0,3
0,3

Compression
Stress
0,000
0,006
0,009
0,012
0,018
0,024
0,027
0,030
0,024
0,018
0,015

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-4
Depth
: 02,00 - 02,50 m

Tested by
Counted by
Checked by

Stress (Kg/Cm2)

Undisturb (qu)

Remoulded (qr)

0,035

0,035

0,030

0,030

0,025

0,025

0,020

0,020

0,015

0,015

0,010

0,010

0,005

0,005

0,000
0,000

0,010

0,020

0,030

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,040

Strain (Kg/Cm2)

0,050

0,060

0,000
0,000

0,010

0,020

0,030

0,040

Strain (Kg/Cm2)

0,050

0,060

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-4
Depth
: 02,00 - 02,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(menit) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
100,10
1,49

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,1
0,35
0,2
0,70
0,3
1,05
0,5
1,40
0,7
1,75
0,8
2,10
0,7
2,45
0,5
2,80
0,4
3,15

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
Strain
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,030
0,034

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Remoulded

C
qr
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,970
0,966

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,262
18,333

0,00975 Kg/Cm2
0,0195
Kg/Cm3
1,282
0,549496
Load
Total
(P)
0,0
0,1
0,1
0,2
0,3
0,4
0,4
0,4
0,3
0,2

Compression
Stress
0,000
0,003
0,006
0,009
0,015
0,021
0,024
0,021
0,015
0,012

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 26, 2007
Sample No. : BH-4
Depth
: 05,00 - 05,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(menit) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
99,3
1,48

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,2
0,35
0,4
0,70
0,6
1,05
0,8
1,40
0,9
1,75
1,0
2,10
1,2
2,45
1,3
4,90
1,2
3,15
1,0
3,50
0,8
3,85

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
Strain
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,053
0,034
0,038
0,041

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Undisturb

C
qu
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,947
0,966
0,962
0,959

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,697
18,333
18,405
18,477

0,0175
Kg/Cm2
0,035
Kg/Cm3
1,944
0,549496
Load
Total
(P)
0,0
0,1
0,2
0,3
0,4
0,5
0,5
0,7
0,7
0,7
0,5
0,4

Compression
Stress
0,000
0,006
0,012
0,018
0,024
0,027
0,030
0,036
0,038
0,036
0,030
0,024

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 26, 2007
Sample No. : BH-4
Depth
: 05,00 - 05,50 m

Tested by
Counted by
Checked by

Stress (Kg/Cm2)

Kondisi Undisturb (qu)

Kondisi Remoulded (qr)

0,045

0,045

0,040

0,040

0,035

0,035

0,030

0,030

0,025

0,025

0,020

0,020

0,015

0,015

0,010

0,010

0,005

0,005

0,000
0,000

0,010

0,020

0,030

0,040

Strain (Kg/Cm2)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,050

0,060

0,000
0,000

0,010

0,020

0,030

0,040

Strain (Kg/Cm2)

0,050

0,060

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 26, 2007
Sample No. : BH-4
Depth
: 05,00 - 05,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(menit) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
98,7
1,47

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,2
0,35
0,3
0,70
0,4
1,05
0,6
1,40
0,8
1,75
0,6
2,10
0,4
2,45

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
Strain
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Remoulded

C
qr
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191

0,009
Kg/Cm2
0,018
Kg/Cm3
1,944
0,549496
Load
Total
(P)
0,0
0,1
0,2
0,2
0,3
0,4
0,3
0,2

Compression
Stress
0,000
0,006
0,009
0,012
0,018
0,024
0,018
0,012

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 26, 2007
Sample No. : BH-4
Depth
: 11,00 - 11,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(menit) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
98,2
1,46

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,2
0,35
0,5
0,70
0,8
1,05
1,0
1,40
1,2
1,75
1,3
2,10
1,5
2,45
1,2
4,90
1,0
3,15

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
Strain
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,053
0,034

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Undisturb

C
qu
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,947
0,966

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,697
18,333

0,0225
Kg/Cm2
0,045
Kg/Cm3
1,500
0,549496
Load
Total
(P)
0,0
0,1
0,3
0,4
0,5
0,7
0,7
0,8
0,7
0,5

Compression
Stress
0,000
0,006
0,015
0,025
0,031
0,037
0,039
0,045
0,035
0,030

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 26, 2007
Sample No. : BH-4
Depth
: 11,00 - 11,50 m

Tested by
Counted by
Checked by

Stress (Kg/Cm2)

Kondisi Undisturb (qu)

Kondisi Remoulded (qr)

0,05

0,05

0,05

0,05

0,04

0,04

0,04

0,04

0,03

0,03

0,03

0,03

0,02

0,02

0,02

0,02

0,01

0,01

0,01

0,01

0,00
0,000

0,010

0,020

0,030

0,040

Strain (Kg/Cm2)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,050

0,060

0,00
0,000

0,010

0,020

0,030

0,040

Strain (Kg/Cm2)

0,050

0,060

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: September 26, 2007
Sample No. : BH-4
Depth
: 11,00 - 11,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(menit) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
97,7
1,45

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,2
0,35
0,4
0,70
0,6
1,05
0,7
1,40
0,8
1,75
1,0
2,10
1,2
2,45
1,0
2,80
0,8
3,15

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
Strain
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,030
0,034

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Remoulded

C
qr
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,970
0,966

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,262
18,333

0,015
Kg/Cm2
0,03
Kg/Cm3
1,500
0,549496
Load
Total
(P)
0,0
0,1
0,2
0,3
0,4
0,4
0,5
0,7
0,5
0,4

Compression
Stress
0,000
0,006
0,012
0,018
0,021
0,024
0,030
0,036
0,030
0,024

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-4
Depth
: 14,00 - 14,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(menit) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
101
1,50

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,2
0,35
0,3
0,70
0,5
1,05
0,7
1,40
0,9
1,75
1,0
2,10
1,4
2,45
1,8
4,90
2,0
3,15
1,8
3,50
1,6
3,85
1,3
4,20

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
Strain
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,053
0,034
0,038
0,041
0,045

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Undisturb

C
qu
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,947
0,966
0,962
0,959
0,955

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,697
18,333
18,405
18,477
18,550

0,0255
Kg/Cm2
0,051
Kg/Cm3
1,457
0,549496
Load
Total
(P)
0,0
0,1
0,2
0,3
0,4
0,5
0,5
0,8
1,0
1,1
1,0
0,9
0,7

Compression
Stress
0,000
0,006
0,009
0,015
0,021
0,027
0,030
0,042
0,053
0,060
0,054
0,048
0,039

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-4
Depth
: 14,00 - 14,50 m

Tested by
Counted by
Checked by

Stress (Kg/Cm2)

Undisturb (qu)

Remoulded (qr)

0,070

0,070

0,060

0,060

0,050

0,050

0,040

0,040

0,030

0,030

0,020

0,020

0,010

0,010

0,000
0,000

0,010

0,020

0,030

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,040

Strain (Kg/Cm2)

0,050

0,060

0,000
0,000

0,010

0,020

0,030

0,040

Strain (Kg/Cm2)

0,050

0,060

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

UNCONFINED COMPRESSIVE STRENGTH


(AASHTO T - 208 - 70)
(ASTM D - 2166 - 66)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
: October 02, 2007
Sample No. : BH-4
Depth
: 14,00 - 14,50 m
Diameter
Height of sample
Area
Volume
Weight
Unit Weight
Dial
Reading
(menit) (*0.01)
0,0
0
0,5
35
1,0
70
1,5
105
2,0
140
2,5
175
3,0
210
3,5
245
4,0
280
4,5
315
5,0
350
5,5
385
6,0
420
6,5
455
7,0
490
7,5
525
8,0
560
9,0
630
10,0
700
11,0
770
12,0
840
13,0
910
14,0
980
15,0
1050
16,0
1120
17,0
1190
18,0
1260
19,0
1330
20,0
1400
Time

:
:
:
:
:
:

3,5
7,0
9,616
67,314
100,3
1,49

Soil
Load Deformation
( Kg )
h (mm)
0,0
0,00
0,2
0,35
0,4
0,70
0,5
1,05
0,6
1,40
0,8
1,75
0,9
2,10
1,0
2,45
1,2
2,80
1,5
3,15
1,2
3,50
1,1
3,85
0,9
4,20

Tested by
Counted by
Checked by
Cm
Cm
Cm2
Cm3
Gr
Gr/Cm3
Axial
Strain
= h/h
0,000
0,004
0,008
0,011
0,015
0,019
0,023
0,026
0,030
0,034
0,038
0,041
0,045

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT
Remoulded

C
qr
St
LCR
Factor Area
Corrected
1-
0,000
0,996
0,992
0,989
0,985
0,981
0,977
0,974
0,970
0,966
0,962
0,959
0,955

:
:
:
:
Area
Corrected
A'=A0/(1-)
17,712
17,779
17,846
17,914
17,983
18,052
18,121
18,191
18,262
18,333
18,405
18,477
18,550

0,0175
Kg/Cm2
0,035
Kg/Cm3
1,457
0,549496
Load
Total
(P)
0,0
0,1
0,2
0,3
0,3
0,4
0,5
0,5
0,7
0,8
0,7
0,6
0,5

Compression
Stress
0,000
0,006
0,012
0,015
0,018
0,024
0,027
0,030
0,036
0,045
0,036
0,033
0,027

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-4
: 02,00 - 02,50 m

Water Content & Unit Weight


W wet soil + ring
W ring
W wet soil
W dry soil (Ws)
W water
Water content (w)
Unit Weight

Load
Pressure
0
9,6
21,4
38,4
1
2,25
4
9
16
25
36
49
24

(Kg)
(Kg/Cm2)
detik
detik
detik
detik
menit
menit
menit
menit
menit
menit
menit
menit
jam

0,5
0,25
0,000
0,150
0,230
0,310
0,380
0,530
0,720
1,070
1,250
1,310
1,340
1,350
1,470

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%
Gr/Cm3

Before
76,6
16,9
59,7
23,3
36,4
156,223
2,139

After

33,8
23,3
10,5
45,064
1,211

1,0
0,5
1,470
1,490
1,500
1,510
1,520
1,540
1,560
1,590
1,610
1,620
1,640
1,650
1,750

2,0
1
1,750
1,790
1,820
1,840
1,850
1,900
1,940
2,020
2,080
2,120
2,150
2,170
2,340

4,0
2
2,340
2,520
2,610
2,670
2,730
2,880
3,000
3,150
3,250
3,290
3,310
3,320
3,420

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Before
After
Height (Ho)
Cm
1,4
0,94
e = (H0-Ht)/Ht
1,750
0,852
Void ratio
Water content (w)
% 156,223
45,064
S = (w*Gs)/e
% 204,913 121,374
Saturated
Specific Gravity (Gs)
Gr/Cm3
2,29
0,475
Coefficient compression
Cc
0,049
Coefficient swelling
Cs

8,0
4
3,420
3,490
3,520
3,550
3,580
3,660
3,710
3,790
3,850
3,890
3,930
3,950
4,140

16,0
8
4,140
4,240
4,290
4,330
4,380
4,500
4,570
4,650
4,830
4,880
4,920
4,940
5,110

4,0
2
5,110

0,5
0,25
4,960

A
Ht

4,960

4,570

=
=
=

19,94
Ws/A.G
0,509

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)

Pressure
2
(kg/cm )

Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-4
: 02,00 - 02,50 m

End of
Dial Reading
(cm)

H (cm)

0,0000

Tested by
Counted by
Checked by
Height of soil
sample at end
of every dial reading
Ht (cm)

Void Height
(Hv)
(cm)

1,4000

0,8908

Void Ratio
at end of
every reading
(e)

0,1470

1,2530

0,1750

0,7438
0,7158

1,4059

1,1660

0,3420

0,6568

1,2901

1,0580

0,4140

0,5488

1,0779

0,9860

0,5110

0,4768

0,9365

0,8890

0,4960

0,3798

0,7460
0,8965

0,9040

0,3948

0,7755

0,9430

0,4338

0,8521

(0,0390)
0,25

0,4570
(0,4570)

51,875

0,0080

49,840

0,0083

51,875

0,0080

51,875

0,0080

0,9375

(0,0150)
2

0,0083

1,0220

0,0970
8

49,840

1,1120

0,0720
4

0,0080

1,1955

0,1080
2

51,875
1,2390

1,2250

0,2340

Cm2/sec
Cv
Tv.Hdr^2
t90

0,000

1,4609

0,0590
1

Fitting
time
t90

1,3265

0,0280
0,5

Ht(av) (cm)

1,7496

0,1470
0,25

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,9235
0,4715

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-4
: 02,00 - 02,50 m

Pressure

H (cm)

Tested by
Counted by
Checked by

H (cm)
H /H
(4) = (3) / (2)

(kg/cm )
(1)

(2)
0,00

(3)

mv
(cm2/kg)
(5) = (4) : (1)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Cv
cm2/sec
(6)

k=mv.Cv.
(cm/sec)
-3
(7) = (5) x (6) x 10

1,4000

0,25

1,2530

0,50

1,2250

1,00

1,1660

2,00

1,0580

4,00

0,9860

8,00

0,8890

0,1470

0,1173

0,4693

0,0080

3,76E-06

0,0280

0,0229

0,0457

0,0083

3,81E-07

0,0590

0,0506

0,0506

0,0080

4,05E-07

0,1080

0,1021

0,0510

0,0083

4,26E-07

0,0720

0,0730

0,0183

0,0080

1,46E-07

0,0970

0,1091

0,0136

0,0080

1,09E-07

0,1081

0,0081

8,71E-07

Rata-rata

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-4
: 02,00 - 02,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Pressure Vs e

1,7
1,5

1,3
1,1
0,9
0,7
0,5

Cv (Cm2/detik)

0,1

10

0,009

0,008

0,007
Pressure (Kg/Cm2)

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-4
: 05,00 - 05,50 m

Water Content & Unit Weight


W wet soil + ring
W ring
W wet soil
W dry soil (Ws)
W water
Water content (w)
Unit Weight

Load
Pressure
0
9,6
21,4
38,4
1
2,25
4
9
16
25
36
49
24

(Kg)
(Kg/Cm2)
detik
detik
detik
detik
menit
menit
menit
menit
menit
menit
menit
menit
jam

0,5
0,25
0,000
0,220
0,280
0,340
0,390
0,540
0,660
0,930
1,130
1,250
1,320
1,350
1,520

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%
Gr/Cm3

Before
76,4
16,9
59,5
23,2
36,3
156,466
2,131

After

34
23,2
10,8
46,552
1,218

1,0
0,5
1,520
1,550
1,570
1,580
1,590
1,610
1,640
1,680
1,710
1,730
1,750
1,760
1,910

2,0
1
1,910
1,970
1,990
2,010
2,020
2,070
2,110
2,170
2,220
2,260
2,290
2,310
2,460

4,0
2
2,460
2,640
2,700
2,750
2,790
2,880
2,930
3,050
3,110
3,160
3,180
3,210
3,370

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Before
After
Height (Ho)
Cm
1,4
0,96
e = (H0-Ht)/Ht
1,588
0,771
Void ratio
Water content (w)
% 156,466
46,552
S = (w*Gs)/e
% 211,924 129,883
Saturated
2,15
Specific Gravity (Gs)
Gr/Cm3
0,430
Coefficient compression
Cc
0,058
Coefficient swelling
Cs

8,0
4
3,370
3,470
3,500
3,540
3,570
3,660
3,730
3,850
3,920
3,960
3,980
4,000
4,180

16,0
8
4,180
4,280
4,320
4,360
4,410
4,520
4,590
4,710
4,770
4,810
4,840
4,860
5,020

4,0
2
5,020

0,5
0,25
4,830

A
Ht

4,830

4,420

=
=
=

19,94
Ws/A.G
0,541

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)

Pressure
2
(kg/cm )

Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-4
: 05,00 - 05,50 m

End of
Dial Reading
(cm)

H (cm)

0,0000

Tested by
Counted by
Checked by

Height of soil
sample at end
of every dial reading
Ht (cm)

Void Height
(Hv)
(cm)

1,4000

0,8590

Void Ratio
at end of
every reading
(e)

0,1520

1,2480

0,1910

0,7070
0,6680

1,2348

1,1540

0,3370

0,6130

1,1331

1,0630

0,4180

0,5220

0,9649

0,9820

0,5020

0,4410

0,8152

0,8980

0,4830

0,3570

0,6599
0,9075

0,9170

0,3760

0,6950

0,9580

0,4170

0,7708

(0,0410)
0,25

0,4420
(0,4420)

49,840

0,0083

51,875

0,0080

49,840

0,0083

53,833

0,0077

0,9400

(0,0190)
2

0,0077

1,0225

0,0840
8

53,833

1,1085

0,0810
4

0,0080

1,1815

0,0910
2

51,875
1,2285

1,2090

0,2460

Cm2/sec
Cv
Tv.Hdr^2
t90

0,000

1,3069

0,0550
1

Fitting
time
t90

1,3240

0,0390
0,5

Ht(av) (cm)

1,5878

0,1520
0,25

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,9375
0,4790

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-4
: 05,00 - 05,50 m

Pressure

H (cm)

Tested by
Counted by
Checked by

H (cm)
H /H
(4) = (3) / (2)

(kg/cm )
(1)

(2)
0,00

(3)

mv
(cm2/kg)
(5) = (4) : (1)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Cv
cm2/sec
(6)

k=mv.Cv.
(cm/sec)
-3
(7) = (5) x (6) x 10

1,4000

0,25

1,2480

0,50

1,2090

1,00

1,1540

2,00

1,0630

4,00

0,9820

8,00

0,8980

0,1520

0,1218

0,4872

0,0080

3,90E-06

0,0390

0,0323

0,0645

0,0077

4,98E-07

0,0550

0,0477

0,0477

0,0083

3,97E-07

0,0910

0,0856

0,0428

0,0080

3,43E-07

0,0810

0,0825

0,0206

0,0083

1,72E-07

0,0840

0,0935

0,0117

0,0077

9,03E-08

0,1124

0,0080

9,00E-07

Rata-rata

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-4
: 05,00 - 05,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Pressure Vs e

1,5
1,3
e

1,1
0,9
0,7
0,5

Cv (Cm2/detik)

0,1

10

0,009

0,008

0,007
Pressure (Kg/Cm2)

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-4
: 11,00 - 11,50 m

Water Content & Unit Weight


W wet soil + ring
W ring
W wet soil
W dry soil (Ws)
W water
Water content (w)
Unit Weight

Load
Pressure
0
9,6
21,4
38,4
1
2,25
4
9
16
25
36
49
24

(Kg)
(Kg/Cm2)
detik
detik
detik
detik
menit
menit
menit
menit
menit
menit
menit
menit
jam

0,5
0,25
0,000
0,120
0,160
0,180
0,210
0,290
0,340
0,450
0,540
0,600
0,630
0,650
0,800

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%
Gr/Cm3

Before
75
16,9
58,1
20,5
37,6
183,415
2,081

After

32,8
20,5
12,3
60,000
1,175

1,0
0,5
0,800
0,820
0,830
0,840
0,850
0,860
0,880
0,900
0,930
0,950
0,960
0,970
1,130

2,0
1
1,130
1,180
1,190
1,210
1,230
1,260
1,300
1,380
1,450
1,510
1,550
1,600
1,890

4,0
2
1,890
1,940
1,960
1,980
2,010
2,070
2,150
2,280
2,390
2,510
2,590
2,660
3,050

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Before
After
Height (Ho)
Cm
1,4
0,93
e = (H0-Ht)/Ht
2,323
1,217
Void ratio
Water content (w)
% 183,415
60,000
S = (w*Gs)/e
% 192,671 120,318
Saturated
2,44
Specific Gravity (Gs)
Gr/Cm3
Coefficient compression
Cc
0,760
Coefficient swelling
Cs
0,122

8,0
4
3,050
3,270
3,360
3,430
3,490
3,650
3,760
3,990
4,190
4,340
4,400
4,450
4,610

16,0
8
4,610
4,700
4,730
4,760
4,800
4,890
4,960
5,100
5,230
5,310
5,360
5,380
5,620

4,0
2
5,620

0,5
0,25
5,310

A
Ht

5,310

4,660

=
=
=

19,94
Ws/A.G
0,421

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)

Pressure
2
(kg/cm )

Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-4
: 11,00 - 11,50 m

End of
Dial Reading
(cm)

H (cm)

0,0000

Tested by
Counted by
Checked by

Height of soil
sample at end
of every dial reading
Ht (cm)

Void Height
(Hv)
(cm)

1,4000

0,9787

Void Ratio
at end of
every reading
(e)

0,0800

1,3200

0,1130

0,8987
0,8657

2,0547

1,2110

0,3050

0,7897

1,8743

1,0950

0,4610

0,6737

1,5990

0,9390

0,5620

0,5177

1,2287

0,8380

0,5310

0,4167

0,9890
0,8535

0,8690

0,4477

1,0626

0,9340

0,5127

1,2168

(0,0650)
0,25

0,4660
(0,4660)

49,840

0,0083

51,875

0,0080

49,840

0,0083

51,875

0,0080

0,8885

(0,0310)
2

0,0083

1,0170

0,1010
8

49,840

1,1530

0,1560
4

0,0080

1,2490

0,1160
2

51,875
1,3035

1,2870

0,1890

Cm2/sec
Cv
Tv.Hdr^2
t90

0,000

2,1330

0,0760
1

Fitting
time
t90

1,3600

0,0330
0,5

Ht(av) (cm)

2,3229

0,0800
0,25

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,9015
0,4670

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-4
: 11,00 - 11,50 m

Pressure

H (cm)

Tested by
Counted by
Checked by

H (cm)
H /H
(4) = (3) / (2)

(kg/cm )
(1)

(2)
0,00

(3)

mv
(cm2/kg)
(5) = (4) : (1)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Cv
cm2/sec
(6)

k=mv.Cv.
(cm/sec)
-3
(7) = (5) x (6) x 10

1,4000

0,25

1,3200

0,50

1,2870

1,00

1,2110

2,00

1,0950

4,00

0,9390

8,00

0,8380

0,0800

0,0606

0,2424

0,0080

1,94E-06

0,0330

0,0256

0,0513

0,0083

4,28E-07

0,0760

0,0628

0,0628

0,0083

5,23E-07

0,1160

0,1059

0,0530

0,0080

4,24E-07

0,1560

0,1661

0,0415

0,0083

3,46E-07

0,1010

0,1205

0,0151

0,0080

1,21E-07

0,0777

0,0082

6,31E-07

Rata-rata

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: September 25, 2007


: BH-4
: 11,00 - 11,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Pressure Vs e

2,6

2,1
1,6
1,1
0,6

Cv (Cm2/detik)

0,1

10

0,009

0,008

0,007
Pressure (Kg/Cm2)

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-4
: 14,00 - 14,50 m

Water Content & Unit Weight


W wet soil + ring
W ring
W wet soil
W dry soil (Ws)
W water
Water content (w)
Unit Weight

Load
Pressure
0
9,6
21,4
38,4
1
2,25
4
9
16
25
36
49
24

(Kg)
(Kg/Cm2)
detik
detik
detik
detik
menit
menit
menit
menit
menit
menit
menit
menit
jam

0,5
0,25
0,000
0,100
0,130
0,160
0,180
0,250
0,330
0,440
0,580
0,700
0,800
0,870
1,130

Tested by
Counted by
Checked by

Gr
Gr
Gr
Gr
Gr
%
Gr/Cm3

Before
77,3
16,9
60,4
23,8
36,6
153,782
2,164

After

35,6
23,8
11,8
49,580
1,275

1,0
0,5
1,130
1,170
1,180
1,190
1,200
1,210
1,230
1,270
1,290
1,320
1,350
1,370
1,510

2,0
1
1,510
1,540
1,550
1,560
1,570
1,600
1,620
1,680
1,730
1,780
1,810
1,840
2,010

4,0
2
2,010
2,060
2,080
2,090
2,110
2,160
2,200
2,290
2,370
2,430
2,480
2,520
2,710

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Before
After
Height (Ho)
Cm
1,4
1,03
e = (H0-Ht)/Ht
1,949
1,167
Void ratio
Water content (w)
% 153,782
49,580
Saturated
S = (w*Gs)
% 198,386 106,777
Specific Gravity (Gs)
Gr/Cm3
2,51
Coefficient compression
Cc
0,481
Coefficient swelling
Cs
0,087

8,0
4
2,710
2,870
2,900
2,940
2,970
3,060
3,130
3,260
3,360
3,450
3,500
3,540
3,720

16,0
8
3,720
3,800
3,820
3,850
3,870
3,950
4,020
4,140
4,240
4,310
4,350
4,380
4,570

4,0
2
4,570

0,5
0,25
4,320

A
Ht

4,320

3,710

=
=
=

19,94
Ws/A.G
0,475

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)

Pressure
2
(kg/cm )

Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-4
: 14,00 - 14,50 m

End of
Dial Reading
(cm)

H (cm)

0,0000

Tested by
Counted by
Checked by
Height of soil
sample at end
of every dial reading
Ht (cm)

Void Height
(Hv)
(cm)

1,4000

0,9252

Void Ratio
at end of
every reading
(e)

0,1130

1,2870

0,1510

0,8122
0,7742

1,6306

1,1990

0,2710

0,7242

1,5253

1,1290

0,3720

0,6542

1,3779

1,0280

0,4570

0,5532

1,1652

0,9430

0,4320

0,4682

0,9861
0,9555

0,9680

0,4932

1,0388

1,0290

0,5542

1,1673

(0,0610)
0,25

0,3710
(0,3710)

51,875

0,0080

49,840

0,0083

51,875

0,0080

51,875

0,0080

0,9855

(0,0250)
2

0,0083

1,0785

0,0850
8

49,840

1,1640

0,1010
4

0,0080

1,2240

0,0700
2

51,875
1,2680

1,2490

0,2010

Cm2/sec
Cv
Tv.Hdr^2
t90

0,000

1,7107

0,0500
1

Fitting
time
t90

1,3435

0,0380
0,5

Ht(av) (cm)

1,9487

0,1130
0,25

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

0,9985
0,5145

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-4
: 14,00 - 14,50 m

Pressure

H (cm)

Tested by
Counted by
Checked by

H (cm)
H /H
(4) = (3) / (2)

(kg/cm )
(1)

(2)
0,00

(3)

mv
(cm2/kg)
(5) = (4) : (1)

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Cv
cm2/sec
(6)

k=mv.Cv.
(cm/sec)
-3
(7) = (5) x (6) x 10

1,4000

0,25

1,2870

0,50

1,2490

1,00

1,1990

2,00

1,1290

4,00

1,0280

8,00

0,9430

0,1130

0,0878

0,3512

0,0080

2,81E-06

0,0380

0,0304

0,0608

0,0083

5,07E-07

0,0500

0,0417

0,0417

0,0080

3,34E-07

0,0700

0,0620

0,0310

0,0083

2,58E-07

0,1010

0,0982

0,0246

0,0080

1,97E-07

0,0850

0,0901

0,0113

0,0080

9,03E-08

0,0868

0,0081

7,00E-07

Rata-rata

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research
Jln. A.Yani Km.23,5 Landasan Ulin Banjarbaru
Telp. 0511-7499150 Fax. 0511-4705765 E-mail: kalimantansoil@yahoo.co.id

K O N S O L I D A S I
(AASHTO T - 216 - 74)
(ASTM D - 2435 - 70)
Project
Location

: Power Plant
: Pulang Pisau, Central Kalimantan

Date
Sample No.
Depth

: October 02, 2007


: BH-4
: 14,00 - 14,50 m

Tested by
Counted by
Checked by

: Mashudi, SST
: Bony W Rakhman, SST
: Yusti Yudiawati, MT

Pressure Vs e
1,90
1,70

1,50
1,30
1,10
0,90
0,70

Cv (Cm2/detik)

0,1

10

0,009

0,008

0,007
Pressure (Kg/Cm2)

100

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research

TEST RESULT CERTIFICATE


No.256.a /JOB.1.28.1.5/PG/2007

Sender
: Lina Selvia / PT.KALIMANTAN SOIL ENGINEERING
Ref
: IX.07.006
Total/Kind of Sample : 1 / Water
Accepted
: September 18, 2007
Finish
: October 05, 2007
Result Analysis
: Biologi

No
1
2

Parameter
BOD
COD

Unit
mgO2/L
mgO2/L

Code
Pulang Pisau River Mouth
1,1
22,13

Method
Titrimetri
Titrimetri

October 22, 2007


Manager Technic Biologi

Rini Fariani, A.Md


NIP.132 295 632

Office : Jl. A.Yani Km.23,5 Landasan Ulin Banjarbaru


Telp. 0511-7499150 Fax.0511-4705765 e-mail: kalimantansoil@yahoo.co.id

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research

TEST RESULT CERTIFICATE


No.256.b /JOB.1.28.1.5/PG/2007

Sender
: Lina Selvia / PT.KALIMANTAN SOIL ENGINEERING
Ref
: IX.07.006
Total/Kind of Sample : 1 / Water
Accepted
: September 18, 2007
Finish
: October 05, 2007
Result Analysis
: Biologi

No
1
2
3
4
5
6
7
8
9
10
11

Parameter
K
Na
Ca
Mg
Fe
Al
NH4
ClSO4
pH
Acidity

Unit
ppm
ppm
mg/L
ppm
ppm
mg/L
mg/L
mg/L
ppm
mg/L

Code
Pulang Pisau River Mouth
0,789
0,398
10,339
0,130
0,380
2,308
0,784
3,330
4,000
6,450
1,550

Method
AAS
AAS
Titrasi
AAS
AAS
Titrasi
Titrasi
Titrasi
Spektrofotometer
Elektroda
Titrasi

October 22, 2007


Manager Technic Biologi

Rini Fariani, A.Md


NIP.132 295 632

Office : Jl. A.Yani Km.23,5 Landasan Ulin Banjarbaru


Telp. 0511-7499150 Fax.0511-4705765 e-mail: kalimantansoil@yahoo.co.id

DOCOMENTATION OF SOIL INVESTIGATION


Project Pulang Pisau Power Plant
CHINA NATIONAL HEAVY MACHINERY CORPORATION ( CHMC )
SITE: Pulang Pisau, Central Kalimantan

BORING ACTIVITY AT BOREHOLES BH.1

CORE DRILLING BH.1 ( 00.00 10.00 M )

DOCOMENTATION OF SOIL INVESTIGATION


Project Pulang Pisau Power Plant
CHINA NATIONAL HEAVY MACHINERY CORPORATION ( CHMC )
SITE: Pulang Pisau, Central Kalimantan

CORE DRILLING BH.1 ( 10.00 20.00 M )

CORE DRILLING BH.1 ( 20.00 30.00 M )

DOCOMENTATION OF SOIL INVESTIGATION


Project Pulang Pisau Power Plant
CHINA NATIONAL HEAVY MACHINERY CORPORATION ( CHMC )
SITE: Pulang Pisau, Central Kalimantan

CORE DRILLING BH.1 ( 30.00 40.00 M )

CORE DRILLING BH.1 ( 40.00 50.00 M )

DOCOMENTATION OF SOIL INVESTIGATION


Project Pulang Pisau Power Plant
CHINA NATIONAL HEAVY MACHINERY CORPORATION ( CHMC )
SITE: Pulang Pisau, Central Kalimantan

CORE DRILLING BH.1 ( 50.00 60.00 M )

CORE DRILLING BH.1 ( 60.00 65.00 M )

DOCOMENTATION OF SOIL INVESTIGATION


Project Pulang Pisau Power Plant
CHINA NATIONAL HEAVY MACHINERY CORPORATION ( CHMC )
SITE: Pulang Pisau, Central Kalimantan

BORING ACTIVITY AT BOREHOLES BH.2

CORE DRILLING BH.2 ( 00.00 10.00 M )

DOCOMENTATION OF SOIL INVESTIGATION


Project Pulang Pisau Power Plant
CHINA NATIONAL HEAVY MACHINERY CORPORATION ( CHMC )
SITE: Pulang Pisau, Central Kalimantan

CORE DRILLING BH.2 ( 10.00 20.00 M )

CORE DRILLING BH.2 ( 20.00 30.00 M )

DOCOMENTATION OF SOIL INVESTIGATION


Project Pulang Pisau Power Plant
CHINA NATIONAL HEAVY MACHINERY CORPORATION ( CHMC )
SITE: Pulang Pisau, Central Kalimantan

BORING ACTIVITY AT BOREHOLES BH.3

CORE DRILLING BH.3 ( 00.00 10.00 M )

DOCOMENTATION OF SOIL INVESTIGATION


Project Pulang Pisau Power Plant
CHINA NATIONAL HEAVY MACHINERY CORPORATION ( CHMC )
SITE: Pulang Pisau, Central Kalimantan

CORE DRILLING BH.3 ( 10.00 20.00 M )

CORE DRILLING BH.3 ( 20.00 30.00 M )

DOCOMENTATION OF SOIL INVESTIGATION


Project Pulang Pisau Power Plant
CHINA NATIONAL HEAVY MACHINERY CORPORATION ( CHMC )
SITE: Pulang Pisau, Central Kalimantan

CORE DRILLING BH.3 ( 30.00 40.00 M )

CORE DRILLING BH.3 ( 40.00 50.00 M )

DOCOMENTATION OF SOIL INVESTIGATION


Project Pulang Pisau Power Plant
CHINA NATIONAL HEAVY MACHINERY CORPORATION ( CHMC )
SITE: Pulang Pisau, Central Kalimantan

CORE DRILLING BH.3 ( 50.00 60.00 M )

CORE DRILLING BH.3 ( 60.00 65.00 M )

DOCOMENTATION OF SOIL INVESTIGATION


Project Pulang Pisau Power Plant
CHINA NATIONAL HEAVY MACHINERY CORPORATION ( CHMC )
SITE: Pulang Pisau, Central Kalimantan

BORING ACTIVITY AT BOREHOLES BH.4

CORE DRILLING BH.4 ( 00.00 10.00 M )

DOCOMENTATION OF SOIL INVESTIGATION


Project Pulang Pisau Power Plant
CHINA NATIONAL HEAVY MACHINERY CORPORATION ( CHMC )
SITE: Pulang Pisau, Central Kalimantan

CORE DRILLING BH.4 ( 10.00 20.00 M )

CORE DRILLING BH.4 ( 20.00 30.00 M )

DOCOMENTATION OF SOIL INVESTIGATION


Project Pulang Pisau Power Plant
CHINA NATIONAL HEAVY MACHINERY CORPORATION ( CHMC )
SITE: Pulang Pisau, Central Kalimantan

CORE DRILLING BH.4 ( 30.00 40.00 M )

CORE DRILLING BH.4 ( 40.00 50.00 M )

DOCOMENTATION OF SOIL INVESTIGATION


Project Pulang Pisau Power Plant
CHINA NATIONAL HEAVY MACHINERY CORPORATION ( CHMC )
SITE: Pulang Pisau, Central Kalimantan

CORE DRILLING BH.4 ( 50.00 60.00 M )

CORE DRILLING BH.4 ( 60.00 65.00 M )

DESIGN RECOMMENDATION
PROJECT OF PULANG PISAU POWER PLANT
CHINA NATIONAL HEAVY MACHINERY CORPORATION ( CHMC )

CALCULATION OF DEEP FOUNDATION BASED ON SPT RESULT

Based on formula :

Qu = 40 N b . Ap + 0,2 N . As
Which :

Qa =

Qu

= ultimate bearing capacity of pile (ton)

= Value of average N-SPT

Nb

=Value of N-SPT at pile tip elevation

Ap

= Area of pile tip (m2)

As

= Area of pile shaft (m2)

Qu
SF
Qa

= allowable bearing capacity of pile ( ton )

SF

= Safety Factor

Using pile foundation (precast or prestress concrete) :


For primary building, with dimension 40 x 40 or 50 x 50.
For secondary building, to calculation of bearing capacity using result Cone Penetrometer Test
using concrete minipile with dimension 20 x 20 or 28 x 28 x 28.

PT. Kalimantan Soil Engineering


Soil Testing, Foundation, Geotechnic Design and Research

Boreholes

: BH-1

Dimension of Pile

: 40 x 40 cm

Kedalaman
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50

N
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,1
0,5
1,0
1,8
2,4
3,1
3,8
4,4
5,1
5,7
6,3
7,0
7,7
8,4
9,1
9,9
10,5
11,1
11,6
12,0
12,4
12,5
12,5
12,6
12,8
13,1
13,3
13,4
13,4
13,4

Nb
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
3,0
8,0
12,0
19,0
19,0
20,0
21,0
22,0
23,0
24,0
25,0
27,0
30,0
32,0
34,0
36,0
34,0
33,0
32,0
27,0
27,0
19,0
12,0
16,0
20,0
27,0
22,0
18,0
15,0
15,0

Ap
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16

As
0,00
0,80
1,60
2,40
3,20
4,00
4,80
5,60
6,40
7,20
8,00
8,80
9,60
10,40
11,20
12,00
12,80
13,60
14,40
15,20
16,00
16,80
17,60
18,40
19,20
20,00
20,80
21,60
22,40
23,20
24,00
24,80
25,60
26,40
27,20
28,00
28,80
29,60
30,40
31,20
32,00
32,80
33,60
34,40
35,20
36,00
36,80
37,60
38,40
39,20
40,00

Qu (ton)
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
19,680
52,960
80,480
128,320
131,360
140,960
150,720
160,640
170,720
180,960
191,360
208,480
232,480
250,400
268,640
287,200
279,840
278,720
277,440
249,760
254,080
205,920
163,040
191,200
220,000
269,120
240,640
217,920
201,120
203,520

Qa = Qu/3 (ton)
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
6,560
17,653
26,827
42,773
43,787
46,987
50,240
53,547
56,907
60,320
63,787
69,493
77,493
83,467
89,547
95,733
93,280
92,907
92,480
83,253
84,693
68,640
54,347
63,733
73,333
89,707
80,213
72,640
67,040
67,840

PT. Kalimantan Soil Engineering


Soil Testing, Foundation, Geotechnic Design and Research

Bore holes

: BH-1

Dimension of Pile

: 50 x 50 cm

Kedalaman
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50

N
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,1
0,5
1,0
1,8
2,4
3,1
3,8
4,4
5,1
5,7
6,3
7,0
7,7
8,4
9,1
9,9
10,5
11,1
11,6
12,0
12,4
12,5
12,5
12,6
12,8
13,1
13,3
13,4
13,4
13,4

Nb
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
3,0
8,0
12,0
19,0
19,0
20,0
21,0
22,0
23,0
24,0
25,0
27,0
30,0
32,0
34,0
36,0
34,0
33,0
32,0
27,0
27,0
19,0
12,0
16,0
20,0
27,0
22,0
18,0
15,0
15,0

Ap
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25

As
0,00
1,00
2,00
3,00
4,00
5,00
6,00
7,00
8,00
9,00
10,00
11,00
12,00
13,00
14,00
15,00
16,00
17,00
18,00
19,00
20,00
21,00
22,00
23,00
24,00
25,00
26,00
27,00
28,00
29,00
30,00
31,00
32,00
33,00
34,00
35,00
36,00
37,00
38,00
39,00
40,00
41,00
42,00
43,00
44,00
45,00
46,00
47,00
48,00
49,00
50,00

Qu (ton)
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
30,600
82,200
124,600
198,400
202,200
216,200
230,400
244,800
259,400
274,200
289,200
314,600
350,600
377,000
403,800
431,000
417,800
414,400
410,800
366,200
371,600
295,400
227,800
271,000
315,000
390,400
344,800
308,400
281,400
284,400

Qa = Qu/3 (ton)
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
10,200
27,400
41,533
66,133
67,400
72,067
76,800
81,600
86,467
91,400
96,400
104,867
116,867
125,667
134,600
143,667
139,267
138,133
136,933
122,067
123,867
98,467
75,933
90,333
105,000
130,133
114,933
102,800
93,800
94,800

PT. Kalimantan Soil Engineering


Soil Testing, Foundation, Geotechnic Design and Research

Boreholes

: BH-2

Dimension of Pile

: 40 x 40 cm

Kedalaman
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

N
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,4
1,1
2,2
3,0
3,6
4,0
4,4
4,7
4,9

Nb
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
8,0
17,0
28,0
22,0
19,0
15,0
14,0
13,0
12,0

Ap
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16

As
0,00
0,80
1,60
2,40
3,20
4,00
4,80
5,60
6,40
7,20
8,00
8,80
9,60
10,40
11,20
12,00
12,80
13,60
14,40
15,20
16,00
16,80
17,60
18,40
19,20
20,00
20,80
21,60
22,40
23,20
24,00

Qu (ton)
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
52,480
112,800
187,680
152,800
136,640
113,440
109,280
104,960
100,480

Qa = Qu/3 (ton)
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
17,493
37,600
62,560
50,933
45,547
37,813
36,427
34,987
33,493

PT. Kalimantan Soil Engineering


Soil Testing, Foundation, Geotechnic Design and Research

Boreholes

: BH-2

Dimension of Pile

: 50 x 50 cm

Kedalaman
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

N
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,4
1,1
2,2
3,0
3,6
4,0
4,4
4,7
4,9

Nb
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
8,0
17,0
28,0
22,0
19,0
15,0
14,0
13,0
12,0

Ap
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25

As
0,00
1,00
2,00
3,00
4,00
5,00
6,00
7,00
8,00
9,00
10,00
11,00
12,00
13,00
14,00
15,00
16,00
17,00
18,00
19,00
20,00
21,00
22,00
23,00
24,00
25,00
26,00
27,00
28,00
29,00
30,00

Qu (ton)
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
81,600
175,000
290,600
235,000
208,800
171,800
164,600
157,200
149,600

Qa = Qu/3 (ton)
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
27,200
58,333
96,867
78,333
69,600
57,267
54,867
52,400
49,867

PT. Kalimantan Soil Engineering


Soil Testing, Foundation, Geotechnic Design and Research

Boreholes

: BH-3

Dimension of Pile

: 40 x 40 cm

Kedalaman
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50

N
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,1
0,3
0,4
0,6
0,8
1,2
1,9
2,9
3,8
4,6
5,2
5,9
6,6
7,3
8,1
8,8
9,4
10,0
10,5
11,0
11,3
11,5
11,6
11,8
12,0
12,3
12,7
13,0

Nb
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
1,0
2,0
3,0
4,0
5,0
6,0
13,0
22,0
32,0
30,0
28,0
27,0
28,0
30,0
33,0
34,0
35,0
35,0
33,0
31,0
28,0
24,0
20,0
17,0
20,0
23,0
28,0
29,0
31,0

Ap
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16

As
0,00
0,80
1,60
2,40
3,20
4,00
4,80
5,60
6,40
7,20
8,00
8,80
9,60
10,40
11,20
12,00
12,80
13,60
14,40
15,20
16,00
16,80
17,60
18,40
19,20
20,00
20,80
21,60
22,40
23,20
24,00
24,80
25,60
26,40
27,20
28,00
28,80
29,60
30,40
31,20
32,00
32,80
33,60
34,40
35,20
36,00
36,80
37,60
38,40
39,20
40,00

Qu (ton)
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
6,560
13,280
20,160
27,200
34,400
41,760
88,640
149,760
218,880
210,880
202,560
200,480
211,360
228,960
253,440
265,280
277,280
282,880
275,360
267,520
252,800
231,040
208,640
192,160
214,560
237,440
273,920
284,960
302,720

Qa = Qu/3 (ton)
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
2,187
4,427
6,720
9,067
11,467
13,920
29,547
49,920
72,960
70,293
67,520
66,827
70,453
76,320
84,480
88,427
92,427
94,293
91,787
89,173
84,267
77,013
69,547
64,053
71,520
79,147
91,307
94,987
100,907

PT. Kalimantan Soil Engineering


Soil Testing, Foundation, Geotechnic Design and Research

Boreholes

: BH-3

Dimension of Pile

: 50 x 50 cm

Kedalaman
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50

N
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,1
0,3
0,4
0,6
0,8
1,2
1,9
2,9
3,8
4,6
5,2
5,9
6,6
7,3
8,1
8,8
9,4
10,0
10,5
11,0
11,3
11,5
11,6
11,8
12,0
12,3
12,7
13,0

Nb
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
1,0
2,0
3,0
4,0
5,0
6,0
13,0
22,0
32,0
30,0
28,0
27,0
28,0
30,0
33,0
34,0
35,0
35,0
33,0
31,0
28,0
24,0
20,0
17,0
20,0
23,0
28,0
29,0
31,0

Ap
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25

As
0,00
1,00
2,00
3,00
4,00
5,00
6,00
7,00
8,00
9,00
10,00
11,00
12,00
13,00
14,00
15,00
16,00
17,00
18,00
19,00
20,00
21,00
22,00
23,00
24,00
25,00
26,00
27,00
28,00
29,00
30,00
31,00
32,00
33,00
34,00
35,00
36,00
37,00
38,00
39,00
40,00
41,00
42,00
43,00
44,00
45,00
46,00
47,00
48,00
49,00
50,00

Qu (ton)
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
10,200
20,600
31,200
42,000
53,000
64,200
136,800
231,200
337,600
323,600
309,200
304,600
320,200
346,200
382,800
399,600
416,600
423,600
410,200
396,400
372,000
336,800
300,800
274,200
308,200
342,800
398,400
414,200
440,400

Qa = Qu/3 (ton)
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
3,400
6,867
10,400
14,000
17,667
21,400
45,600
77,067
112,533
107,867
103,067
101,533
106,733
115,400
127,600
133,200
138,867
141,200
136,733
132,133
124,000
112,267
100,267
91,400
102,733
114,267
132,800
138,067
146,800

PT. Kalimantan Soil Engineering


Soil Testing, Foundation, Geotechnic Design and Research

Boreholes

: BH-4

Dimension of Pile

: 40 x 40 cm

Kedalaman
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50

N
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,2
0,7
1,4
2,1
2,7
3,3
4,0
4,7
5,4
6,1
6,9
7,6
8,2
8,7
9,2
9,5
9,7
9,7
9,8
9,9
10,0
10,0
10,1
10,1
10,2
10,2

Nb
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
6,0
12,0
20,0
20,0
20,0
21,0
24,0
27,0
29,0
30,0
31,0
32,0
30,0
29,0
28,0
20,0
19,0
11,0
12,0
13,0
14,0
13,0
13,0
12,0
13,0
13,0

Ap
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16
0,16

As
0,00
0,80
1,60
2,40
3,20
4,00
4,80
5,60
6,40
7,20
8,00
8,80
9,60
10,40
11,20
12,00
12,80
13,60
14,40
15,20
16,00
16,80
17,60
18,40
19,20
20,00
20,80
21,60
22,40
23,20
24,00
24,80
25,60
26,40
27,20
28,00
28,80
29,60
30,40
31,20
32,00
32,80
33,60
34,40
35,20
36,00
36,80
37,60
38,40
39,20
40,00

Qu (ton)
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
39,360
79,680
134,080
137,280
140,480
150,240
173,280
196,800
214,240
225,440
236,800
248,320
240,320
238,560
236,640
188,640
185,280
135,840
144,160
152,640
161,280
156,960
159,040
154,560
163,040
165,120

Qa = Qu/3 (ton)
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
13,120
26,560
44,693
45,760
46,827
50,080
57,760
65,600
71,413
75,147
78,933
82,773
80,107
79,520
78,880
62,880
61,760
45,280
48,053
50,880
53,760
52,320
53,013
51,520
54,347
55,040

PT. Kalimantan Soil Engineering


Soil Testing, Foundation, Geotechnic Design and Research

Boreholes

: BH-4

Dimension of Pile

: 50 x 50 cm

Kedalaman
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50

N
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,2
0,7
1,4
2,1
2,7
3,3
4,0
4,7
5,4
6,1
6,9
7,6
8,2
8,7
9,2
9,5
9,7
9,7
9,8
9,9
10,0
10,0
10,1
10,1
10,2
10,2

Nb
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
0,0
6,0
12,0
20,0
20,0
20,0
21,0
24,0
27,0
29,0
30,0
31,0
32,0
30,0
29,0
28,0
20,0
19,0
11,0
12,0
13,0
14,0
13,0
13,0
12,0
13,0
13,0

Ap
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25
0,25

As
0,00
1,00
2,00
3,00
4,00
5,00
6,00
7,00
8,00
9,00
10,00
11,00
12,00
13,00
14,00
15,00
16,00
17,00
18,00
19,00
20,00
21,00
22,00
23,00
24,00
25,00
26,00
27,00
28,00
29,00
30,00
31,00
32,00
33,00
34,00
35,00
36,00
37,00
38,00
39,00
40,00
41,00
42,00
43,00
44,00
45,00
46,00
47,00
48,00
49,00
50,00

Qu (ton)
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
61,200
123,600
207,600
211,600
215,600
229,800
264,600
300,000
325,800
341,800
358,000
374,400
360,400
356,200
351,800
275,800
269,600
191,800
204,200
216,800
229,600
222,200
224,800
217,200
229,800
232,400

Qa = Qu/3 (ton)
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
0,000
20,400
41,200
69,200
70,533
71,867
76,600
88,200
100,000
108,600
113,933
119,333
124,800
120,133
118,733
117,267
91,933
89,867
63,933
68,067
72,267
76,533
74,067
74,933
72,400
76,600
77,467

PT. Kalimantan Soil Engineering


Soil Testing, Foundation, Geotechnic Design and Research

REFERENSI :

Bowles, J.E, 1993, Foundation Analysis and Design, Mc Graw Hill


Das, Braja, M., 1999, Principle of Foundation Engineering,
4th edition, PWS Kent
Rahardjo, P.P., 1995, Uji Sondir, Interpretasi dan Aplikasinya untuk
Perancangan Pondasi, Publikasi GEC, Unpar
Sardjono HS.,1991, Pondasi Tiang Pancang, Sinar Wijaya Surabaya
Wahyudi, H., 1999,Daya Dukung Pondasi Dalam, Publikasi Jurusan
Teknik Sipil FTSP, ITS Surabaya

10

PT. Kalimantan Soil Engineering


Soil Testing, Foundation, Geotechnic Design and Research

PT. KALIMANTAN SOIL ENGINEERING


Soil Testing, Foundation, Geotechnic Design and Research

You might also like