36140 Federal Register / Vol. 70, No.

119 / Wednesday, June 22, 2005 / Notices

Environmental Mailing List DEPARTMENT OF ENERGY inspection and reproduction at the


Commission in the Public Reference
If you wish to remain on the Federal Energy Regulatory Room, located at 888 First Street, NE.,
environmental mailing list, please Commission Room 2A, Washington, DC 20426, or by
return the Mailing List Retention Form calling (202) 502–8371. This filing may
included in Appendix 2. If you do not Notice Of Application Accepted For also be viewed on the Commission’s
return this form, you will be taken off Filing And Soliciting Motions To Web site at http://www.ferc.gov using
our mailing list. Intervene, Protests, And Comments the ‘‘eLibrary’’ link. Enter the docket
June 15, 2005. number excluding the last three digits in
Availability of Additional Information
Take notice that the following the docket number field to access the
Additional information about the hydroelectric application has been filed document. For assistance, call toll-free
project is available from the with the Commission and is available 1–866–208–3676 or e-mail
Commission’s Office of External Affairs for public inspection: FERCOnlineSupport@ferc.gov. For TTY,
at 1–866–208 FERC (3372) or on the a. Type of Application: Preliminary call (202) 502–8659. A copy is also
FERC Internet Web site at http:// permit. available for inspection and
www.ferc.gov. Using the ‘‘eLibrary’’ link, b. Project No.: 12585–000. reproduction at the address in item h.
c. Date filed: April 27, 2005. above.
select a General Search from the menu,
d. Applicant: Gulf Stream Energy, Inc. m. Individuals desiring to be included
enter the selected date range and Docket and Golden Gate Energy Company. on the Commission’s mailing list should
Number PF05–13–000, and follow the e. Name of Project: San Francisco Bay so indicate by writing to the Secretary
instructions. Searches may also be done Tidal Energy Project. of the Commission.
using the phrase ‘‘SR 91 Widening f. Location: On San Francisco Bay, in n. Competing Preliminary Permit—
Project’’ in the Text Search field. For San Francisco and Marin Counties, Anyone desiring to file a competing
assistance with access to eLibrary, the California. application for preliminary permit for a
helpline can be reached at 1–866–208– g. Filed Pursuant to: Federal Power proposed project must submit the
3676, TTY (202) 502–8659, or at Act, 16 U.S.C. 791(a)–825(r). competing application itself, or a notice
FERCOnlineSupport@ ferc.gov. The h. Applicant Contact: Mr. Joseph A.
of intent to file such an application, to
eLibrary link on the FERC Internet Web Cannon, Pillsbury Winthrop Shaw
the Commission on or before the
site also provides access to the texts of Pittman LLP, 2300 N street, NW.,
specified comment date for the
formal documents issued by the Washington, DC 20037–1128, (202) 663–
particular application (see 18 CFR 4.36).
Commission, such as orders, notices, 8000.
i. FERC Contact: Robert Bell, (202) Submission of a timely notice of intent
and rule makings. allows an interested person to file the
502–6062.
In addition, the FERC now offers a j. Deadline for filing comments, competing preliminary permit
free service called eSubscription that protests, and motions to intervene: 60 application no later than 30 days after
allows you to keep track of all formal days from the issuance date of this the specified comment date for the
issuances and submittals in specific notice. particular application. A competing
dockets. This can reduce the amount of The Commission’s Rules of Practice preliminary permit application must
time you spend researching proceedings and Procedure require all intervenors conform with 18 CFR 4.30(b) and 4.36.
by automatically providing you with filing documents with the Commission o. Competing Development
to serve a copy of that document on Application—Any qualified
notification of these filings, document
each person in the official service list development applicant desiring to file a
summaries, and direct links to the
for the project. Further, if an intervenor competing development application
documents. To register for this service, must submit to the Commission, on or
go to http://www.ferc.gov/ files comments or documents with the
Commission relating to the merits of an before a specified comment date for the
esubscribenow.htm. particular application, either a
issue that may affect the responsibilities
Public meetings or site visits will be of a particular resource agency, they competing development application or a
posted on the Commission’s calendar must also serve a copy of the document notice of intent to file such an
located at http://www.ferc.gov/ on that resource agency. application. Submission of a timely
EventCalendar/EventsList.aspx along k. Description of Project: The notice of intent to file a development
with other related information. proposed project would consist of: (1) application allows an interested person
You can also contact Ms. Beth Porter, Two proposed counter-rotating to file the competing application no
fiberglass blades approximately thirty to later than 120 days after the specified
FGT Right-of-Way Agent by phone at
fifty feet in diameter, (2) proposed comment date for the particular
(800) 381–1477 or by e-mail at
integrated generator, producing 500 application. A competing license
beth.porter@crosscountryenergy.com application must conform with 18 CFR
kilowatts to two megawatts of
with your specific concerns or 4.30(b) and 4.36.
electricity, (3) proposed ballast tanks
comments regarding this project. p. Notice of Intent—A notice of intent
approximately 175 feet in length
Magalie R. Salas, supporting the EPU at varying depth must specify the exact name, business
Secretary. underwater, (4) a proposed mooring address, and telephone number of the
[FR Doc. E5–3241 Filed 6–21–05; 8:45 am] umbilical line to an anchor on the prospective applicant, and must include
seabed, (5) a proposed interconnection an unequivocal statement of intent to
BILLING CODE 6717–01–P
transmission line to shore, and (6) submit, if such an application may be
appurtenant facilities. The project filed, either a preliminary permit
would have an annual generation of 8.7 application or a development
gigawatt-hours, which would be sold to application (specify which type of
a local utility. application). A notice of intent must be
l. Locations of Applications: A copy of served on the applicant(s) named in this
the application is available for public notice.

VerDate jul<14>2003 21:12 Jun 21, 2005 Jkt 205001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\22JNN1.SGM 22JNN1
Federal Register / Vol. 70, No. 119 / Wednesday, June 22, 2005 / Notices 36141

q. Proposed Scope of Studies under agency’s comments must also be sent to determination of whether certain
Permit—A preliminary permit, if issued, the Applicant’s representatives. intended actions constitute the
does not authorize construction. The commencement of construction,
Magalie R. Salas,
term of the proposed preliminary permit reconstruction, or modification. EPA’s
would be 36 months. The work Secretary.
written responses to these inquiries are
proposed under the preliminary permit [FR Doc. E5–3250 Filed 6–21–05; 8:45 am]
broadly termed applicability
would include economic analysis, BILLING CODE 6717–01–P
determinations. See 40 CFR 60.5 and
preparation of preliminary engineering 61.06. Although the part 63 NESHAP
plans, and a study of environmental and section 111(d) of the Clean Air Act
impacts. Based on the results of these ENVIRONMENTAL PROTECTION regulations contain no specific
studies, the Applicant would decide AGENCY regulatory provision that sources may
whether to proceed with the preparation [FRL–7925–5] request applicability determinations,
of a development application to EPA does respond to written inquiries
construct and operate the project. Recent Posting to the Applicability regarding applicability for the part 63
r. Comments, Protests, or Motions to Determination Index (ADI) Database and section 111(d) programs. The NSPS
Intervene—Anyone may submit System of Agency Applicability and NESHAP also allow sources to seek
comments, a protest, or a motion to Determinations, Alternative Monitoring permission to use monitoring or
intervene in accordance with the Decisions, and Regulatory recordkeeping which is different from
requirements of Rules of Practice and Interpretations Pertaining to Standards the promulgated requirements. See 40
Procedure, 18 CFR 385.210, .211, .214. of Performance for New Stationary CFR 60.13(i), 61.14(g), 63.8(b)(1), 63.8(f),
In determining the appropriate action to Sources, National Emission Standards and 63.10(f). EPA’s written responses to
take, the Commission will consider all for Hazardous Air Pollutants, and the
these inquiries are broadly termed
protests or other comments filed, but Stratospheric Ozone Protection
alternative monitoring decisions.
only those who file a motion to Program
Furthermore, EPA responds to written
intervene in accordance with the inquiries about the broad range of NSPS
AGENCY: Environmental Protection
Commission’s Rules may become a and NESHAP regulatory requirements as
Agency (EPA).
party to the proceeding. Any comments,
ACTION: Notice of availability. they pertain to a whole source category.
protests, or motions to intervene must
For example, these inquiries may
be received on or before the specified SUMMARY: This notice announces pertain to the type of sources to which
comment date for the particular applicability determinations, alternative
application. the regulation applies, or to the testing,
monitoring decisions, and regulatory monitoring, recordkeeping or reporting
Comments, protests and interventions interpretations that EPA has made requirements contained in the
may be filed electronically via the under the New Source Performance regulation. EPA’s written responses to
Internet in lieu of paper; see 18 CFR Standards (NSPS); the National these inquiries are broadly termed
385.2001(a)(1)(iii) and the instructions Emission Standards for Hazardous Air regulatory interpretations.
on the Commission’s Web site under ‘‘e- Pollutants (NESHAP); and the
filing’’ link. The Commission strongly Stratospheric Ozone Protection EPA currently compiles EPA-issued
encourages electronic filing. Program. NSPS and NESHAP applicability
determinations, alternative monitoring
s. Filing and Service of Responsive FOR FURTHER INFORMATION CONTACT: An decisions, and regulatory
Documents—Any filings must bear in electronic copy of each complete interpretations, and posts them on the
all capital letters the title document posted on the Applicability Applicability Determination Index (ADI)
‘‘COMMENTS’’, Determination Index (ADI) database on a quarterly basis. In addition, the
‘‘RECOMMENDATIONS FOR TERMS system is available on the Internet ADI contains EPA-issued responses to
AND CONDITIONS’’, ‘‘PROTEST’’, or through the Office of Enforcement and
‘‘MOTION TO INTERVENE’’, as requests pursuant to the stratospheric
Compliance Assurance (OECA) Web site ozone regulations contained in 40 CFR
applicable, and the Project Number of at: http://www.epa.gov/compliance/
the particular application to which the part 82. The ADI is an electronic index
assistance/applicability. The document on the Internet with more than one
filing refers. Any of the above-named may be located by date, author, subpart,
documents must be filed by providing thousand EPA letters and memoranda
or subject search. For questions about
the original and the number of copies pertaining to the applicability,
the ADI or this notice, contact Maria
provided by the Commission’s monitoring, recordkeeping, and
Malave at EPA by phone at: (202) 564–
regulations to: The Secretary, Federal reporting requirements of the NSPS and
7027, or by email at:
Energy Regulatory Commission, 888 NESHAP. The letters and memoranda
malave.maria@epa.gov. For technical
First Street, NE., Washington, DC 20426. may be searched by date, office of
questions about the individual
A copy of any motion to intervene must applicability determinations or issuance, subpart, citation, control
also be served upon each representative monitoring decisions, refer to the number or by string word searches.
of the Applicant specified in the contact person identified in the Today’s notice comprises a summary
particular application. individual documents, or in the absence of 42 such documents added to the ADI
t. Agency Comments—Federal, State, of a contact person, refer to the author on May 20, 2005. The subject, author,
and local agencies are invited to file of the document. recipient, date and header of each letter
comments on the described application. SUPPLEMENTARY INFORMATION: and memorandum are listed in this
A copy of the application may be notice, as well as a brief abstract of the
obtained by agencies directly from the Background letter or memorandum. Complete copies
Applicant. If an agency does not file The General Provisions to the NSPS of these documents may be obtained
comments within the time specified for in 40 CFR part 60 and the NESHAP in from the ADI through the OECA Web
filing comments, it will be presumed to 40 CFR part 61 provide that a source site at: http://www.epa.gov/compliance/
have no comments. One copy of an owner or operator may request a assistance/applicability.

VerDate jul<14>2003 21:12 Jun 21, 2005 Jkt 205001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 E:\FR\FM\22JNN1.SGM 22JNN1

You might also like