Overview of industry and their requirement of electrical systems.

Role, Importance, Responsibility of Electrical engineer in industry.

Knowing client requirements & collection of specific data for projects.

Understanding various phases of projects

Use of International Standards, Design Basis, std. practices/procedures and specifications.

Understanding Basic Design requirement based on the type of various plants.

Intra-Discipline co-ordination with civil, process, mechanical, piping, telecom HVAC etc...

Cable Selection and Sizing and cable laying methods.

Selection and Sizing electrical equipments used in various projects.

Preparation of equipments specification.

High voltage system requirements including substation design.

Design of Earthlings system, Lightning system and lightning protection system.

Design of power distribution system.

Equipment vendor drawing review and approval.

Procurement Requirements and installation standards.

query@mecciengineers.com
www.mecciengineers.com
A Engineering Procurement & Construction Based Training Company

Module 1

2Hrs

Module 4

Basics of Electrical Engineering

Development of Single Line Diagrams (SLD)

Different types of Electrical system and their Importance


Power Generation, Transmission, Distribution and Utilization

Types of SLD and their study with Legend sheet


Detail SLD

Introduction of key electrical equipments used in projects

Lighting system SLD

Introduction to EBOD Electrical Basis of Designing

Small power SLD, Key SLD

4Hrs

Metering and Control diagram

Module 2

2Hrs

Module 5

Coordination with Other Disciplines

Control Schematics

Process Engineers

Introduction

Mechanical Engineers

Block Diagram

Civil Engineers

Typical Schematics for Motor Feeder

Instrument Engineers

Typical Schematics for Power Feeder

Communication and safety Engineers.

Typical Schematics for Transformer Feeder

Module 6
Module 3

4 Hrs

Estimation of Plant Electrical Load

6Hrs

10 Hrs

Selection and Sizing of Electrical Equipments


Emergency Generator

Preparation of Load Schedule

Transformer and CT/PT

Determination of power Supply Capacity

Neutral Grounding Resistor (NGR)

Standby Capacity consideration

HV/MV Switchgears

Rating of generators in Relation to their Prime Movers

LV Switchgears

Rating Of Motors In Relation To Their Driven Machines

HV/MV/LV Capacitor Bank


DC Battery & Battery Charger
AC UPS
AC/DC Machines

query@mecciengineers.com
www.mecciengineers.com
A Engineering Procurement & Construction Based Training Company

Module 7

2 Hrs

Module 9

Hazardous Area Classification and Selection of Equipments

Cable Routing

Zone /Division Classification

Cable routing Layout

Types of Protection for Hazardous Areas

Cable Tagging

Hazardous source List Preparation

Installation details

2 Hrs

Certification of Hazardous Area Equipment


Marking Of Equipment Nameplates

Module 10

Hazardous Area Drawings / Layouts Preparation


Different Code and Standards used in Hazardous Area

4 Hrs

Earthing & Lightening Protection Design


Requirement of Earthing in Industrial Plants

Module 8
Cable Selection and Sizing
Power and Control cable Introduction
Cable selection
Cable sizing for Low voltage system
Cable sizing for High voltage system
Voltage Drop Consideration

6 Hrs

Earthing Design Calculations


Type of Earthing and Details
Earthing Installation Details
Earthing Layout Design
Lightening Protection Requirement
Lightening Protection Calculation
Lightening Installation Details
Lightening Layout Design

Let through Energy consideration


Earth fault Loop Impedance consideration
Cable Schedule
Cable interconnection Schedule
Selection and Sizing of Cable Tray
Cable tray schedule
Cable Drum schedule
Conduit Selection
Conduit Sizing

Module 11

4 Hrs

Illumination Design
Introduction
Type of Lighting Fixtures
Selection of Lighting Fixtures
Preparation of Fixture Schedule
Indoor Illumination Calculation
Outdoor Illumination Calculation

query@mecciengineers.com
www.mecciengineers.com
A Engineering Procurement & Construction Based Training Company

Module 12

2 Hrs

Assignments

Sub-Station/ Switch Yard Layout and Design

To be submitted by Every Candidates

Introduction

Auto Practice Sheets

Type of Sub-Stations and Layouts

SLD and other Layouts

General arrangement of substation

Different Calculations

Equipment Layout

Load list
Illumination layout and Lux Calculation

Module 13

2 Hrs

Procurement details of Electrical Equipment and Specification


Transformer
Diesel Generator
HV /MV Switchgears
LV Switchgear
HV/LV Capacitor Bank
DC Battery Charger
AC UPS
Battery
VFD
Power Cables
Control Cables
Earthing and Lightening Protection
Etc.

query@mecciengineers.com
www.mecciengineers.com
A Engineering Procurement & Construction Based Training Company

Training also includes following features:


Exclusive Study Material and documents
2 years free Membership
100 % Placement Assistance
Autocad Program for 2D and 3D
Resume Updation
PDP Classes
Mock Interview & Interview Preparation
Certification
Projects and assignments

Registration Process
You can register by Demand Draft of Rs 5,000 in favour of MECCI Engineers Pvt Ltd
payable @ Noida or directly by Cash at our office.
Discounts Schemes:
10 % Discount on Group Registration
************************************************************************************

Address:
MECCI Engineers Pvt Ltd.
E 46, Sec 3
Near Sec 16 Metro Station, Near to HCL Comnnet Building
Noida, U.P
Pin: 201301

Contact:
Mobile no: +91- 9211788623, +91-9211798623
+91 - 9910988623, +91 - 9910988493
Landline no: +91 - 120 - 6543853
Email Id: query@mecciengineers.com
Website: www.mecciengineers.com

query@mecciengineers.com
www.mecciengineers.com
A Engineering Procurement & Construction Based Training Company

You might also like