Lighting
Scope.............................................................
References.....................................................
Lighting Requirements...................................
Illuminance Levels.......................................
Page 2 of 27
11
SAES-P-123
Lighting
Scope
1.1
1.2
1.3
1.4
Page 3 of 27
SAES-P-123
Lighting
2.1
2.2
References
The selection of material and equipment, and the design, construction,
maintenance, and repair of equipment and facilities covered by this
standard shall comply with the latest edition of the references listed
below unless otherwise noted.
3.1
SAES-B-063
SAES-M-005
SAES-P-123
Lighting
SAES-M-100
SAES-O-113
SAES-O-114
SAES-P-100
NFPA 101
Lighting Handbook
IESNA LEM-3
IESNA LM-5
IESNA LM-64
IESNA RP-1
IESNA RP-7
IESNA RP-8
SAES-P-123
Lighting
IESNA RP-16
IESNA RP-20
IESNA RP-24
IESNA RR-96
AASHTO LTS-2
AASHTO GTB-77
Lighting Requirements
4.1
General
4.1.1
4.1.2
Page 6 of 27
SAES-P-123
4.1.3
Lighting
4.1.4
4.1.5
4.1.6
4.1.7
4.1.8
Page 7 of 27
SAES-P-123
4.1.9
Lighting
Page 8 of 27
SAES-P-123
Lighting
Page 9 of 27
SAES-P-123
Lighting
4.2
Page 10 of 27
SAES-P-123
Lighting
4.2.1
4.2.2
4.2.3
4.2.4
4.2.5
Page 11 of 27
SAES-P-123
Lighting
4.2.6
4.2.7
4.3
Plant Lighting
4.3.1
4.3.2
Page 12 of 27
SAES-P-123
4.4
Lighting
4.3.3
4.3.4
4.3.5
4.3.6
4.3.7
Task Lighting
Page 13 of 27
SAES-P-123
Lighting
Emergency Lighting
4.5.1
4.5.2
4.5.3
4.5.4
Page 14 of 27
SAES-P-123
Lighting
4.5.6
Control Rooms
2.
Process Areas
3.
Switchgear Rooms
4.
In-Plant Buildings
5.
Offshore Platforms
Page 15 of 27
SAES-P-123
4.5.8
4.6
Lighting
4.6.2
4.6.3
Page 16 of 27
SAES-P-123
4.6.4
Lighting
4.7
HPS
0.90
Outdoor Industrial
0.71
MV
0.67
Outdoor Residential
0.77
MH (above 400 W)
0.83
Indoor Non-Industrial
0.86
0.77
Indoor Industrial
0.79
Fluorescent (40 W)
0.86
Incandescent
0.90
Page 17 of 27
SAES-P-123
Lighting
Illuminance Levels
The following minimum maintained (in service) illuminance levels in
Table 2 shall be used. The initial field measurement after installation
shall be no less than the specified illuminance divided by the light loss
factor (LLF) from Table 1 and other factors utilized in the design.
Commentary Note 5:
The illumination levels outlined in Table 2 are the required maintained minimum
lighting levels (e.g. not average values) at the specified work plane for each
location.
Lux
(fc)
_______________________________
___________
500
(50)
(900)
H [1]
General Area
10
(1)
Ground
30
(3)
Ground
200
(20)
Ground
Regular
750
(75)
(760)
Drafting
1500
(150)
Task
500
(50)
(760)
Area Lighting
Piers
Offices
Conference Room
Page 18 of 27
SAES-P-123
Lighting
Elevators
200
(20)
Floor
Corridors
75
(7.5)
Floor
Stairways
75
(7.5)
Floor
150
(15)
(900)
General
500
(50)
Floor
Instrument Panels
500
(50)
(1700)
Consoles
500
(50)
(760)
Back of Panel
100
(10)
(900)
100
(10)
(760)
Washrooms
Control Rooms
Page 19 of 27
V [2]
SAES-P-123
Lighting
Lux
(fc)
_______________________________
___________
Dining Facilities
Dining Area (leisure, light environment)
75
(7.5)
(760)
500
(50)
(760)
Service Area
500
(50)
(900)
Food Preparation
700
(70)
(900)
Entrance Halls
300
(30)
Floor
300
(30)
(1700)
Battery Room
300
(30)
Floor
20
(2)
Ground
20
(2)
Ground
50
(5)
Floor
150
(15)
Floor
500
(50)
460
200
(20)
Floor
Burner Platform
150
(15)
Floor
Control Area
300
(30)
(760)
Electrical Rooms
Powerhouse
Page 20 of 27
SAES-P-123
Lighting
300
(30)
(1700)
Control Desk
750
(75)
(760)
300
(30)
Task
Water Wells
30
(3)
Ground
Control Panel
50
(5)
(1700)
200
(20)
Floor
Garage (non-residential)
Traffic Area
Page 21 of 27
SAES-P-123
Lighting
Lux
(fc)
_______________________________
___________
50
(5)
Floor
50
(5)
Ground
Heat Exchangers
30
(3)
Ground
Separator
50
(5)
Top of Bay
50
(5)
Ground
Compressor Areas
30
(3)
Ground
50
(5)
(1700)
10
(1)
Ground
(0.5)
Floor
10
(1)
Floor
Manifold Area
(0.5)
Ground
50
(5)
Floor
100
(10)
Task
Loading Racks
General Area
Tank Truck (Loading Point)
Page 22 of 27
SAES-P-123
Lighting
Firehouse
General Area (Interior)
200
(20)
(900)
750
Storage (parts)
300
(75)
Task
(30)
Floor
General Aisles
200
Gauges
200
(20)
(900)
(20)
(1700)
300
(30)
(1700)
500
(50)
(900)
300
(30)
(900)
Fume Hoods
300
(30)
Task
Stock Rooms
150
(15)
Floor
Turbine Floor
300
(30)
Floor
200
(20)
Floor
300
(30)
Task
Laboratories
Turbo Generators
Page 23 of 27
SAES-P-123
Lighting
Lux
(fc)
_______________________________
___________
Warehouses
Bulk Storage (outdoor)
(0.5)
Ground
50
(5)
Floor
100
(10)
(760)
200
(20)
(760)
Counter Tops
300
(30)
(1200)
Large Fabrication
200
(20)
Floor
500
(50)
(760)
Crane-way, Aisles
150
(15)
Floor
Small Machine
300
(30)
(760)
Sheet Metal
200
(20)
(760)
Electrical
200
(20)
(760)
Instrument
300
(30)
(760)
100
(10)
Floor
Lavatory (Hammam)
200
(20)
Floor
Change House
(0.2)
Ground
H [3]
(0.1)
Ground
H [3]
Page 24 of 27
SAES-P-123
Lighting
Schools
Classrooms
Manual Training
750
(75)
(760)
1000
(100)
(900)
Library
750
(75)
(760)
Corridors
200
(20)
Floor
100
(10)
Ground
Football
200
(20)
Ground
H [4]
Gymnasiums (general)
300
(30)
Floor
H [5]
Softball (infield)
300
(30)
Ground
H [4]
Softball (outfield)
200
(20)
Ground
H [6]
300
(30)
Ground
H [5]
100
(10)
Ground
50
(5)
Ground
Volleyball (indoor)
100
(10)
Floor
H [4]
Basketball (indoor)
300
(30)
Floor
H [4]
Squash, Racquetball
500
(50)
Floor
H [5]
Handball
150
(15)
Floor
H [4]
Page 25 of 27
SAES-P-123
Lighting
Lux
(fc)
_______________________________
___________
(0.4)
Pavement
(0.2)
Ground
H [7]
(0.2) or
Ground
Centers)
(0.5)
(0.5) or
Bikeways
(0.5)
Sidewalks (Roadside)
Notes:
[1]
[2]
E avg
E min
6.0
3.0
[3]
E max
E min
[4]
Page 26 of 27
1800
Ground
1800
V [8]
H
V [8]
SAES-P-123
E max
E min
2.5
3.5
4.0
Lighting
[5]
E max
E min
[6]
E avg
E min
[7]
[8]
[9]
The letter E in formulas Notes [3] to [6] represents the illumination level.
[10]
Refer to IES Handbook / Chapter 20 / Industrial Lighting/ Fig. 20-11 for Illuminance Values
for Aircraft Maintenance and Manufacturing (Maintained on Tasks).
[11]
Illuminance for other area of activities not mentioned here shall be referred to in
IES Handbook / Chapter 20 / Industrial Lighting / Fig. 20-29.
Revision Summary
30 September, 2002
Revised the "Next Planned Updates." Reaffirmed the contents of the document, and
reissued with no other changes.
30 September, 2003
Minor revisions.
Page 27 of 27