A REPORT

ON
NFL
Manjot Brar
brar.khalistan@gmail.com

PREPARED IN THE PARTIAL FULFILLMENT OF


INDUSTRIAL TRAINING
AT
NATIONAL FERTILIZERS Ltd., BATHINDA

Submitted to

SANT LONGOWAL INSTITUTEOF ENGINEERING &


TECHNOLOGY
LONGOWAL, DISTT. SANGRUR

June-July 2010

ACKNOWLEDGEMENT
I am very grateful to Dr. S.C Sharma (Head & Professor Training & Placement
Department, and all other professors and lecturers of Electronic and communication
engineering department who guided me time to time by providing me desired guidance.
The industrial training in an industry / project site is an essential part of
curriculum for completion of B.E. degree. I am grateful to authorities at National
Fertilizers Limited, Bathinda for permitting me to undergo six months Industrial training
in their esteemed organization. During this training I have learnt a lot, for which I pay my
heartiest gratitude to the HRD Manager Mr. D.K. Bora and other staff members of
National Fertilizers Limited, Bathinda who helped me in all respects in fulfilling my
cherished desire of getting a successful Industrial training.
I am very thankful to Er. Nirlep singh(D.G.M INST.), Er. B.B Grover (MGR),
Er. R.C Sharma (A.M), and all the supervisors and other officials for providing me
complete process details of their respective plants.

Manjot Brar

ABSTRACT
The training report on the working of National Fertilizers Limited, Bathinda
has been prepared in accordance with the requirement of scheme of three year B.E.
degree course in Instrumentation and control engineering being taught at Sant Longowal
Institute of Engineering & Technology.
In this course industrial training is an integral part of the curriculum and can
be undertaken in any reputed industry. I have done this training at National Fertilizers
Limited, Bathinda which is situated on Bathinda Goniana road and is very well
connected with rail and road. It is very well known for its excellent performance over the
past years. I have studied whole plant with Captive Power Plant in detail.
It is pleasure to face the Industrial life that helped me to convert my
theoretical concepts into practical knowledge. During this training I came across many
emergency situations in the plant that surely explained me, actual industrial life.

Manjot Brar

Table of Contents

TOPIC

PAGE NO.

INTRODUCTION

34

COMPANY PROFILE

UREA PLANT

6-10

STEAM GENERATION PLANT

11 - 13

CAPTIVE POWER PLANT

14 - 20

PROJECT STUDY

20 22

INTRODUCTION
NFL is known in the industry for its work culture; value added human resources, safety,
environment, concern for ecology and its commitment to social upliftment. All NFL
plants have been certified for ISO-9002 for conforming to international quality standards
and International Environmental Standard i.e. ISO-14001.

With the certification of

Corporate Office/Marketing operations under ISO-9001:2000, NFL has become the first
Fertilizer Company in the country to have its total business covered under ISO-9001
Certification. On 23rd August 1974, NFL was formed and registered to set up two modern
large capacity Nitrogenous Fertilizers plants.
NFL, Bathinda (Punjab)
NFL, Panipat (Haryana)
NFL was incorporated on 23 rd August 1974 in order to implement this project
contract were entered into with M/s " TOYO ENGINEERING CORPORATION " a well
known Japanese Engg. Company and Engg. India Ltd (EIL), a public sector and Engg.
Organization .This contract becomes effective on September 26, 1974 with a guaranteed
Feed in on the Bathinda Fertilizers project to implement within 36 months from the
zero date.
Due to the power requirements and some other factors, later on it was planned to
set up its own power house known as Captive Power Plant (CPP) with 2 turbo generators
of 15 MW each.
National Fertilizers Limited (N.F.L.) is the largest manufacturer of nitrogenous
fertilizers in the Northern India. It is presently operating four large fertilizers plants, two
of which are located at Nangal and Bathinda in the Punjab State, one at Panipat in
Haryana and one at Guna in M.P. While plants at Nangal, Bathinda and Panipat are fueloil based, the one at Guna is gas-oil based. The overall installed capacity of NFL plants is
10.42 lakh MT per annum.
The old plant at Nangal was commissioned in 1961 followed by expansion which
was commissioned in 1978. Bathinda and Panipat plants were commissioned in 1979.
5

Guna Plant which is the latest plant of NFL was commissioned in Dec, 1978 and is now
in full production.

NFL was incorporated on 23rd August, 1974 with two


manufacturing Units at Bathinda and Panipat.
Subsequently, on the reorganization of Fertilizer group
of Companies in 1978,
The Nangal Unit of Fertilizer Corporation of India came
under the NFL fold. The Company expanded its
installed capacity in 1984 by installing and
commissioning of its Vijaipur gas based Plant in
Madhya Pradesh.

NFL Corporate office:


Noida

The Vijaipur Plant was a land mark achievement in project management in India. The
plant was completed well within time and approved project cost. In recognition of this
achievement, the project was awarded the First Prize in Excellence in Project
Management by Govt. of India. Subsequently the Vijaipur plant doubled its capacity to
14.52 lakh MTs by commissioning Vijaipur Expansion Unit i.e. Vijaipur-II in 1997. The
plant annual capacities have now been re-rated w.e.f. 1.4.2000 from 7.26 lakh MT of
Urea to 8.64 lakh MT for Vijaipur-I & Vijaipur-II Plants each.
Three of the Units are strategically located in the high consumption areas of Punjab and
Haryana. The Company has an installed capacity of 35.49 lakh MTs of Nitrogenous
Fertilizers and has recorded an annual sales turnover of Rs.3, 474 crores during 2004-05.

Strategically Located - Urea Plants

Leading

Producer

of

Nitrogenous

Fertilizers

in

the

Country.

PRODUCTION

Capital

Cost,

Feed

Stock

&

Capital Cost
(Rs.Crore)
Feed Stock

Plants

Plants

Capacity

Existing Capacity
MT/Year
(Lakh MT/Yr.)
Ammonia

Nangal-I

91.26

Nangal-II
Panipat

299.19
338.41

Bathinda

349.41

Vijaipur-I
Vijaipur-II
Indore

516.00
1071.00
1.42

Total

Naptha
F.Oil/LSHS
F.Oil/LSHS
F.Oil/LSHS
Natural Gas
Natural Gas
Strains

2666.55

Urea

CAN

Bio-Fert.

0.66

3.181

2.97

4.785**

2.97

5.115

2.97

5.115

5.016*

8.646*

5.016*

8.646*

100

19.602

32.307

3.181

100

UREA PLANT

TYPES OF PROCESS

CONVENTIONAL

MOLE RATIO
NH3:CO2

4:1
8

H20:CO2

0.54:1

%CONVERSION

70%

REACTION CONDITION:

PRESSURE:
250 kg/cm2
250 kg/cm2
250 kg/cm2

CO2
Carbamate
Ammonia

2000 C

TEMPERATURE:

UREA PROCESS CLASSIFIED IN FOUR SECTION


1.
2.
3.
4.

Synthesis section.
Decomposition section.
Crystallization & Prilling section.
Recovery section.

PRESSURE MEASUREMENT
(PNEUMATIC SYSTEM)
For the measurement of pressure the single control loops method. The no. of component
used for this are:

Pressure gauge

Pressure transmitter

Pneumatic controller

Actuator

Positioner

Control valves

OPERATION

PRESSURE GAUGE measures the actual pressure in the pipeline.

PRESSURE TRANSMITTER takes actual pressure in its primary and secondary


part converts this pressure into 0.2 ~1.0 kg/cm2 signal.

A 1.4 kg/cm2 supply is providedto pneumatic controller.

Controller follows pressure transmitter signal and with set point value.

Controller gives output according to desired set point value and produces a output
signal of 0.2 ~ 1.0 kg/cm2.

Positioner accepts this signal and produces output signal i.e. given to the actuator.

Positioner acts according to controller signal.

Actuator diaphragm moves up & down according to positioner signal and control
valves moves accordingly.
10

In this way pressure in a pipeline is controlled.

ACTUATOR
A fluid powered or electrically powered device that supplies and motion to a valve
closure member.
DIAPHRAGM
A flexible pressure responsive element that transmits force to the diaphragm plate and
actuator stem.
FORCE PLATE
The support plate which gives support to the diaphragm and exerts force uniformly.
CONTROL VALVE
A valve with actuator that automatically, fully or partially opens or closers that valve to a
position dictated by signals transmitted from controlling instruments can be called as
CONTROL VALVE.
The control valve is most important and widely used final element in auto control loop. A
control valve functions as a variable resistance in a pipeline. So by controlling the flow,
the valve indirectly controls the process variables that may be level, temperature, pressure
etc.

11

VIBRATION MEASUREMENT
If the observed surface is rotating and rapidly changing the gap distance the RF envelope
is not constant amplitude but varies in direct proportion to the peak to peak movement of
the observed surface. This peak to peak movement of the observed surface causes the RF
envelope to be amplitude modulated.
VIBRATION AND AXIAL DISPLACEMENT
Transducer system is non contacting shaft vibration and relation position measurement
system. The system include a probe with an integral cable, extension cable and
proximate. The transducer system measurement the gap between the probe fit and an
absorbed metal surface and convert this distance to a proportional negative voltage.
The system measures both static and dynamic system probe tips are also each calibrated
to a specific probe type cable electrical length and temperature range. The scale factor is
200MV/mil(1mil=1/1000inch).
GAP MEASUREMENT
24 volts normally drive the proximator from an external source such as a power supply or
monitoring device. The proximator converts the DC drive voltage into an RF signal that
is applied to the probe through 95 ohm coaxial extension probe radiates the RF signal
into surrounding area as a magnetic field. If there is no conductive material within a
specified distance to intercept magnetic field. There is no power loss in RF signal the
output signal of proximator output terminals is max. 16volts. When a conductive material
approaches the probe tip, eddy current generated on the surfaces on the material resulting
power loss in RF signal. As a power loss is developed in RF signal, the output at
proximator output terminal is reduced proportionately. As the conserved conductive
surface come closer to the probe tab, the eddy currents on the surface of material
12

observed more power. When the gap reached specified minimum distance from the
conductive material surface. The material absorbs the total RF energy radiated by the
probe. This is reflected as the maximum power loss the RF signal resulting a minimum
DC output signal at the proximator output terminal. The proximator measure the
magnetic of the RF envelopes and provide a DC output signal proportional to the packs
of envelopes. Thrust measurement and eccentricity measurement are the merely gap
measurement at the slow rate of change in the gap.
LEVEL MEASUREMENT
WHAT IS LEVEL?
The level may be expressed in term of pressure exerted over a datum level or in term of
the length of the liquid column.
WHY IT IS MEASURED?
To ensure that right amount of liquid/solid are added to the vessel at right time and for
safe operation.
WHY ITS MEASUREMENT IS IMPORTANT?
Level measurement is one of the important parameter in any process industry like our
fertilizer plant. The level has a significant effect on process quality, controllability,
process stability and optimization. Hence precise, accurate and reliable level
measurement is necessary. A wide variety of level measurement techniques are available
to meet the diverse level requirement of the process industry evolved over the years.

13

STEAM GENERATION PLANT


Steam Generation plant is mainly installed for production of steam and then
distributed to various parts of the plant.
Here this section of plant installed in National Fertilizers Limited, Bathinda unit
produces and supplies steam at 100 Kg / cm 2 pressure and nearly 480C temperature to
Ammonia Plant.
In todays world steam has gained importance in Industries. It may be used for
power processes and heating purposes as well.
BENEFITS OF STEAM
It is colorless, odourless and tasteless.
Very economical
Non-polluting
Can be used as heat exchanger.
It can be easily distributed to various sections of plant.
Steam is generated in Boilers (Water tube boilers mounted on common base fitted
with mountings and fittings) and then distributed to other parts of plants. For governing
the quantity of fuel to be burned and for maintaining the required pressure their are many
automatic fuel feeders, equipments and auxiliaries like pressure gauge etc.
In the Boilers used at National Fertilizers Limited (Bathinda unit); coal, oil natural
gas are used as a fuel for production of steam.
NFL , Bathinda is using steam for two purposes ; first and the main reason is for
running prime mover and other reason is to exchange heat in the processes taking place
their.
There are three boilers capable of producing steam at the rate of 150 Tonnes/hr
installed in CPP which were supplied and erected b BHEL. Generally two boilers are
enough to meet the requirements but third boiler is simultaneously running because if

14

steam load consumption increases then the third boiler plays its part in order to avoid any
faulty condition.
FUELS USED:
Coal :
To obtain steam of desired Temperature and pressure, coal is burned to give major
source of heat.
Initially coal is stored at Coal Handling plant brought from coal sites. It is this
section of plant where coal is crushed by crushers in order to make small pieces of coal,
then after crushing it the coal pieces rare passed through heavy electromagnet where iron
is separated from coal if present. Coal is then sent to Bunkers from where it goes to
Grinding mill. Grinding mill is grinding coal into powder form.
Conveyor Belts are being used in the whole plant for transportation of Coal. The powder
form of coal is sent to the Boilers through pump as pump sucks the coal from grinding
mills and throws it into the boiler for combustion.
Fuel Oil :
As the Boilers are designed to work on both Coal as well as Fuel Oil so fuel oil can
also be pumped to Boiler for combustion.
Generally coal alone is not burnt Initially but Fuel Oil (LSHS) is mixed coal and then
sent to the furnace for combustion in order to get desired temperature .
WHY AND WHERE STEAM IS REQUIRED
As National Fertilizers Ltd, Bathinda unit has its own Steam Generation Plant
where steam is produced which is used for driving Turbo Compressors, Heating
Purposes, for various reactions taking place in the plant itself.
Steam is mainly consumed in the Ammonia Plant as nearly 6 to 7 tonne of steam is
required to produce 1 tonne of Ammonia. High Pressure Turbines are being used where
high pressure and temperature is to be maintained so SGP section plays a important role
for maintaining the said condition.

15

There are three boilers (VU-40 type supplied by M/S BHEL) of 150 tonne/hr
capacity .These boilers are Water Tube Boilers i.e. water is inside the tubes and hot air
surrounds it when coal is burnt, this makes the water in the tubes boil and steam
formation takes place. In the beginning coal is burnt with fuel oil in order to get desired
temperature.
WATER AND STEAM SYSTEM
As the steam being used should be free from impurities like minerals, silica,
oxygen, Iron etc. in order to insure Safe and Efficient working of Steam turbines and
Boilers. For this purpose Raw Water is physically and chemically treated and finally
supplied to Steam Generation Plant from Ammonia plant. This water is called Boiler
Feed water which is further heated to 240 C by the flue Gases and taken to Steam Drum.
Steam Drum Acts as storage tank and also separates water from the steam at 315 C and
106 kg/cm2 pressure water then enters the Ring Header formed at on the bottom of
outside the furnace and rises by gravity through water wall tubes on the all the four sides,
taken heat from furnace and enters steam drum as a mixture of steam and water.
FLUE GAS SYSTEM
The products of combustion in the furnace consist of carbon-di-oxide, nitrogen,
ash, oxygen and sulphur-di-oxide. After leaving the furnace the heat
Of these gases called FLUE GASES, is utilized at various levels.
First the steam from steam drum is heated in two super heaters to get the required
temperatures of 4950C and then feed water in BANK TUBES is also heated and the gases
leave bank tubes at around 4970C next the heat is utilized to heat feed water in the
ECONOMIZER and gases are cooled down to 3200C. These gases are further cooled
down to 1500C in ROTARY AIR HEATER where the air is required for combustion and
conveying the coal is heated up. Temperature is not reduced further because at lower
temperature oxides of sulphur present in flue gases are converted to ACID which
damages the down stream equipments. These gases then pass through ELECTRO
STATIC PRECIPITATOR (ESP) where ash is removed.

16

CAPTIVE POWER PLANT


INTRODUCTION:
National Fertilizers Limited has set a Captive Power Plant (CPP) at their complex
at BATHINDA, to ensure availability of stable, uninterrupted power and stream to the
Ammonia and Urea plant. This will minimize the tripping of the Fertilizer Plant due to
transit voltage dips and power cuts.
Since inception, Bathinda unit was drawing electric power from Punjab State
Electricity Board (P.S.E.B). Electricity is the main driving force after steam in the plant,
being used for moving auxiliary equipments. The unit requires 27MW of power/hr when
running at full load. There are two 15 MW turbo-generators to generate power. Under
normal running conditions of the plant and healthiness of the P.S.E.B. grid, we generally
run in synchronism with the grid merely drawing the power corresponding to the
minimum charges to be paid to state electricity board. In case of any disturbance in the
grid, our system gets isolated from the grid automatically. With both generators running,
we are able to feed power to the whole plant, thus production is not affected. In case only
one turbo generator is in line and grid cuts off, urea plant is cut off automatically to
balance the load with one generator. As soon as the grid becomes stable, the generators
are again synchronized with it. The power generation of each generator can be varied
with 2 MW to 15 MW maximum, provision exists to run the generator on 10 % extra load
continuously for one hour only.
Operation of C.P.P. is based upon microprocessor based computerized
instrumentation which allows automatic operation, start up, shut down of the whole or
part of the plant.

17

Latest instrumentation has been used in this plant. It allows controlling process
variables like flow, pressure, temperature, power factor, voltage, frequency, etc. There is
operator interface unit (IOU) Like a TV screen on which various parameters can be
displayed and controlled. It allows fully automatic start-up, shut-down of boiler, turbine
and other auxiliaries.

NEED FOR C.P.P:


It was thought to install a captive power plant in which electric power for our
requirement shall be generated in a COAL FIRED BOILER. The benefits envisaged
were:
1. Any disturbance in the PSEB grid used to trip the whole plant. Lot of money was
lost due to this as each re-startup costs around 40 to 50 lakhs rupees. Moreover,
frequent trippings had an ill effect on machines and equipments extending the restartup period.
2. Three boilers of 150Te/hr steam capacity were initially installed in SGP to keep 25
boilers running and one stand by as designed steam requirement was less than 300Te/hr.
but in actual operation steam requirement was more and all three boilers had to be run
and there was no breathing time for their maintenance. As new boiler was to be installed
for CPP, its capacity was so designed that it could export around 60Te of steam for
process requirement so that only 2 boilers of SGP would be run keeping the 3 rd as stand
by.
With these points in mind CPP was installed. The functioning of CPP can be subdivided into parts:
BOILER AND ITS AUXILIARIES: For generation of high pressure superheated steam.
TURBO-GENERATOR AND ITS AUXILIARIES: To generate power, using steam
from the boiler.

18

Operation of CPP is based upon microprocessor based computerized instrumentation


which allows automatic operation, start up, shut down of the whole or the part of the
plant.

BOILER
The basic principle of this boiler is the same as discussed earlier for SGP boiler that
is formation of steam by heating boiler feed water inside furnace fired by coal and heavy
oil, utilization of heat of the gases and venting these gases at a safe height. Main
differences between the two boilers are:
SGP boiler is tangentially fired where as CPP boiler is front fired with 6 coal
burners and 6 oil gun fixed inside the coal housing.
SGP boiler can be loaded up to 30% load with oil firing only whereas CPP boiler
can be fully loaded with oil alone.
Height of combustible zone in CPP boiler is more and it has residence time of 1.5 sec
where SGP boiler has 1.0 sec.
Mills used for pulverizations of coal in SGP are negative pressure bowl mills whereas in
CPP ball tube mill are used which are positive pressure mills.
Due to more residence time and better pulverization the efficiency of CPP boiler is
about 4%

higher.

Boiler feed water required for steam generation can be fully generated in CPP itself.
A part of the steam generated is exported for process use in ammonia plant and rest
is utilized for power generation in turbo generators as described below:

DESCRIPTION
MITSUI RILEY TYPE BOILER
Maximum evaporation

2, 30,000kg/hr

Design process for boiler

124 kg/cm2G

Steam temp at outlet

4950C

Heating surface

1250M2
19

POWER GENERATION:
In C.P.P. two generators of 15MW capacity generate a voltage of 11KV which is
fed to the two transformers in the yard. The rating of the transformers is 31.5/25 KVA,
these two values depend upon the cooling which we provide, as here 25KVA capacity is
when cooling is oil natural air natural and 31.5KVA capacity is when cooling is oil
natural air forced. Both these transformers step up the voltage level to 132KV. From the
transformers the three phases pass through the lightning arrestors (LA). After this they
pass on to the isolator. After this the two lines pass on to the TRANSMISSION pole
called DOUBLE CIRCUIT TRANSMISSION. Then these lines go to the M.R.S. i.e.
main receiving station.
TURBINE:
The turbine used is supplied by M/S SGP of AUSTRIA. It is condensing cum
extraction turbine designed as single casing reaction turbine with single control stage and
high pressure (HP), mild pressure (MP) and low pressure (LP) reaction parts.
The turbine is fed with high pressure steam at 100kg from boiler and flows through
various control valves for normal and emergency operation. It gets high velocity through
the nozzle group and then passes over the impellers fixed on to the rotor and fixed
diffusers thus rotating the turbine. The enthalpy of steam is utilized in steps. Steam is also
extracted from various stages. HP1 at 10.4kg/cm2, HP2 at 8.1kg/cm2, feed water bleed at
4.3kg/cm2 and LP bleed at 0.9kg/cm2.
The exhaust steam from the turbine is condensed in a condenser maintained under
vacuum to extract maximum steam enthalpy. The output of the turbine depends on flow
of steam and heat difference that is on condition of steam at the main steam valve and the
pressure at the turbine outlet or condenser pressure. The turbine is connected to the
generator through speed reducing gears.
20

The exhaust steam is condensed in a condenser using cooling water. The resulting
condensate can be fed back to LP heater but is normally sent to the polishing water plant.
As shall be clear from the attached block diagram various bleeds from the turbine
are utilized for heating purpose. HP1 and HP2 are used for heating boiler feed water in
HP1 and HP2 heaters. Feed water bleeds is used for heating the feed water tank and LP
bleed is used for heating the polish water make up to the feed water tank.
A lubrication system is also there to lubricate the various bearings of the turbine,
gears and generator. Normally the oil pump driven by the turbine shaft supplies oil but
auxiliary motor driven pumps are used for start up and during shutdown. A turning gear
has been provided for slow cooling of turbine rotor.
Latest instrumentation has been used in this plant. Baileys net work-90
microprocessor based instrumentation system is being used. The NETWORK 90
SYSTEM is a distributed process control system. Using a series of integrated control
nodes. The network 90 system allows controlling process variables like flow, pressure
and temperature according to a control configuration. There is operator interface unit
(OIU) like a TV screen on which various parameters can be displayed and controlled. It
allows fully automatic start-up/shut-down of boiler, turbine and other auxiliaries.
DESCRIPTION:Make

Simmering Graz Panker, Austria

Type

Multifunction (28 stages)

Capacity

65 T/H at 15 MW

RPM

6789 at 50 Hz

Critical speed

3200-3600 RPM

GENERATORS
CPP is having two number turbo generators of capacity 15MW each. The
generators are type SAT three phase, 50Hz, 11kV, 984amps, at 0.8 power factor rating
supplied by M/S JEUMONT SCHNEIDER OF FRANCE. These are totally enclosed self
ventilated type with two lateral airs to water coolers for cooling. The alternators are able
to bear 10% overload for one hr with an increase in temp. of 10 0C while maintaining the
21

voltage as near as possible to the rated one. The excitation is compound and brush less
with exciter rotor and Rectifier Bridge mounted on the extended main shaft on non
driving end. The excitation is controlled automatically with automatic voltage regulator
and a PLC controller. All protection relays installed for protection of generator are solid
state having high accuracy, quick response and low power consumption.
Under normal running conditions of the plant and healthiness of the PSEB grid, we
generally run in synchronism with the grid merely drawing the power corresponding to
minimum charges to be paid to state electricity board. In case of any disturbance in the
grid measured by higher low frequency, high rate of change of frequency, low voltage etc.
our system gets isolated from the grid automatically. With both generators running, we
are able to feed power to the whole plant, thus production is not affected.

UNINTERRUPTED POWER SUPPLY: The uninterruptible power supply system is connected between a critical load, such
as digital drives & automation, distributed digital process control system, telecom
equipment, programmable logic controller, mission critical applications, computer and its
three phase mains power supply under all rated load and input supply conditions.
The system offers the user with the following advantages: Increased power supply: The UPS has its own internal voltage and frequency regulator circuits which ensure
that its output is maintained within close tolerances independent of voltage and frequency
variations on the mains power lines.
REDUNDANT Vs NON REDUNDANT CONFIGURATIONS:In a non-redundant configuration the system is sized such that both UPS modules
are required to feed the potential load and if one of the two modules develops a fault or
for some reason shut down, the other module also automatically shuts down.
In such an event the load is transferred to an unprocessed bypass supply.
22

In a redundant module configuration the system is sized such that the potential load can
be provided by just one of the two modules. Under normal circumstances both modules
are operational and share the load current equally; but if one module develops a fault, or

is shut down, the second module is able to take over the full load demand and continue to
provide it with processed, backed-up power.
7400 Module Design:The UPS basically operates as an AC- DC-AC converter. The first conversion stage
(from AC to DC) uses a 3 phase fully controlled silicon controlled rectifier (SCR) bridge
rectifier to convert the incoming mains supply into a regulated 432V DC bus bar.
The DC bus bar produced by the rectifier provides both battery charging power and
power to the inverter section-which is of a transistorized / IGBT based pulse width
modulation (PWM) design and provides the second conversion phase i.e. reconverting
the DC bus bar voltage back into an AC voltage waveform.

AMMONIA PLANT
Ammonia is the major constituent in the production of urea and separately in the
ammonia plant. This plant has production capacity of 900 M.T. of liquid ammonia per
day. We can easily divide the whole process into following different section and discuss.
Then separately according of function of these section:
1. AIR SEPARATION UNIT (A.S.U.)
2. SHELL GASSIFICATION AND CARBON RECOVERY
3. DE-SULPHURION (RECOVERY-1)
4. SHIFT CONVERTOR (CO SHIFT CONVERSION)
5. CARBIN DIOXIDE REMOVAL
6. NITROGEN WASH UNIT (N.W.U.)
7. AMMONIA SYNTHESIS SECTION

23

1. AIR SEPARATION UNIT (A.S.U.)


Air has following composition:
Nitrogen

78.03%

Oxygen

20.93%

Argon

0.93%

Carbon

0.93%

It is provided for getting oxygen and nitrogen required for production of NH3 from air is
the first section from atmosphere and is pre-cooled. Then further cooled in air chiller.
Then moisture and dust etc. are removed by passing through alumunia molecular seves.
Final products i.e. N2 and O2 are obtained when air is rectified in the rectifying
column.
Product O2 is the first compressed and then led to reactors in shell gasification process.
For partial oxidation of food stock for producing raw gas is separated toH2, H2S and CO2,
CO2 is send to the urea plant, H2S is sent to sulphur recovery plant. On the other hand N2
and H2 are given to N.W.U. in the ratio of 1:3 to get pure synthesis gas to manufacture
NH3.
2. SHELL GASIFICATION AND CARBON RECOVERY
Lines of O2 feedback and stream led to the gasifier column where in the presence of high
temperature of the order 13500 C produce raw gas containing CO, H2S, HCN, heat is
generated in this unit. This heat is not washed but utilized to produce steam in the waste
boiler.
Some unburnt carbon is also present along with other gases in raw gas, as it can check the
line. It is removed by stages water wash and there is final scrubbing stage. HCN is also
removed in this stage.
3. DE-SULPHURISATION

24

Sulphur compound are removed in this section because otherwise these poison the
catalyst present in the next section. Methanol has a property of absorbing different gases
at different temp. Absorption process is carried out at low temp. and high pressure, H2O
and COS are removed in the raw gas to only 0.1 PPM in this unit by absorbing with
MeOH. MeOH is regenerated by N2 by stripping and H2S is sent to sulphur recovery
plant.
4. SHIFT CONVERTOR
In this unit get CO2 and H2 from CO and steam at high temp. by passing the gas catalyst
as per the following reaction:
CO(g) +H2O(steam) ......... H2 + CO2
In this industrial method of producing H2 as per le chatlier principle for high
concentration of product excess is to be introduced and temp. should kept low and
reaction rate is high. So compromise is made and temp. is around 350-500 oC. Fe is used
as catalyst in reaction.
5. CO2 REMOVAL
In this unit we get a mixture of gas(H2, CO2) from shift conversion and CO2 is removed
from H2 by absorbing CO2 with methanol of low temp. This mixture of MeOH and CO2 is
stripped by N2 where CO2 is regenerated and send to UREA PLANT, in this unit we get
98% of H2 and send to N.W.U.
6. NITROGEN WASH UNIT (N.W.U.)
Even a little of CO still remains in raw gas after the shift convertor process. This is
removed in N.W.U. where liquid N2 is sprayed on raw gas of 98% H2 from the top of the
tank. Before leaving this section, purified H2 gas is mixed with N2 in the ratio 3:1 and
forms an admixture without reaction, it is called synthesis gas.
7. AMMONIA SYNTHESIS SECTION
The synthesis gas from N.W.U. is compressed from 37 kg/cm2 to 230 kg/cm2 in the
centrifugal type synthesis compressor. Then the gas enters the synthesis hot exchanger
25

with hot effluent gas from synthesis economizer. At the outlet of the compressor the gas
contains 16% ammonia.
N2 + 3H2 2NH3

26