DOCUMENT SUBMISSION STATUS: FOR APPROVAL (AP)

20/12/10

REVISED AS PER CS-E1-E-00236

MAKHA

SK CHUA

JHUN

23/08/10

FOR APPROVAL

MAKHA

SK CHUA

JHUN

REV

DATE

DESCRIPTION

DRWN

CHKD

APPD

OWNER

OWNERS CONSULTANT

POYRY ENERGY LTD

VIETNAM OIL AND GAS GROUP (PVN)


EPC CONTRACTOR

EPC CONTRACTORS CONSULTANT

VIETNAM MACHINERY INSTALLATION


CORPORATION (LILAMA)
PROJECT TITLE

VUNG ANG 1 THERMAL POWER PLANT 2 x 600MW


E-LOT 1 SWITCHYARD AND MAIN TRANSFORMER PACKAGE
CONTRACT No.

301009 / LILAMA-ABB
DRAWING/DOCUMENT TITLE

220kV SWITCHYARD PROTECTION SYSTEM


TRIPPING MATRIX
SUB-CONTRACTOR

ABB
ABB PTE LTD
DOCUMENT No.

FUNCTION

NAME

DRWN

MAKHA

20/12/10

CHKD

SK CHUA

20/12/10

APPD

JHUN

20/12/10

VA1-ABB-00ASR-E-E1-DLG-0002

SIGN

DATE

SCALE

REV

NTS

ABB MALAYSIA SDN BHD


Project

Document Number

VUNG ANG 1 THERMAL POWER PLANT 2 X 600MW E-LOT1 SWITCHYARD AND MAIN TRANSFORMERS PACKAGE

VA1-ABB-00ASR-E-E1-DLG-0002

Substation

Division
PSS

VUNG ANG 1 THERMAL POWER PLANT

Sheet/Continue
01/02

Description

Prepared By

Checked By

Date

Rev.

Reason for Revision

TRIPPING MATRIX

CHUAH SEONG BAN

HAU CHOO KIAT

20-DEC-2010

Revised as per CS-E1-E-00236

No.

Title
1 Tripping Matrix for Line Feeder

Sheet No. Rev.


02 - 03
B

Date
20/12/2010

Summary of Current Revision


Revised as per CS-E1-E-00236

2 Tripping Matrix for Generator Transformer

04 - 05

20/12/2010

Revised as per CS-E1-E-00236

3 Tripping Matrix for Station Transformer

06 - 07

20/12/2010

Revised as per CS-E1-E-00236

4 Tripping Matrix for Bypass Feeder


Energize without connected to any feeder
Energize with connected to Line Feeder
Energize with connected to Generator Transformer
Energize with connected to Station Transformer

08 - 09
10 - 11
12 - 13
14 - 15

B
B
B
B

20/12/2010
20/12/2010
20/12/2010
20/12/2010

Revised as per CS-E1-E-00236


Revised as per CS-E1-E-00236
Revised as per CS-E1-E-00236
Revised as per CS-E1-E-00236

5 Tripping Matrix for Bus Section

16

20/12/2010

Revised as per CS-E1-E-00236

ABB MALAYSIA SDN BHD


Project

Document Number

VUNG ANG 1 THERMAL POWER PLANT 2 X 600MW E-LOT1 SWITCHYARD AND MAIN TRANSFORMERS PACKAGE

VA1-ABB-00ASR-E-E1-DLG-0002

Substation

Division
PSS

VUNG ANG 1 THERMAL POWER PLANT

Sheet/Continue
02/03

Description

Prepared By

Checked By

Date

Rev.

Reason for Revision

TRIPPING MATRIX FOR LINE FEEDER

CHUAH SEONG BAN

HAU CHOO KIAT

20-DEC-2010

Revised as per CS-E1-E-00236

Signal To
Master
Trip
Relay1

Master
Trip
Relay2

GS050 Trip
Coil1

GS050 Trip
Coil2

Auto
Reclose
(main 1)

Auto
Reclose
(main 2)

Breaker
Fail
(50BF-1)

Breaker
Fail
(50BF-2)

Remote
CB

Adjacent CB
connected to
same BB

Phase - Neutral Fault

No

No

Yes

No

Initiate

No

Initiate

Initiate

No

No

Phase - Phase Fault

Yes

No

Yes

No

Block

No

Initiate

Initiate

No

No

Yes

No

No

No

No

No

Initiate

Initiate

No

No

Yes

No

No

No

No

No

Initiate

Initiate

No

No

Yes

No

No

No

No

No

Initiate

Initiate

No

No

Yes

No

No

No

No

No

Initiate

Initiate

No

No

Protection
Function
87L

Description
Line Differential (main 1)

(67/67N)-1

Directional overcurrent and earth fault (main 1)


Any Fault

(50/51)-1

Instantaneous and time delay overcurrent (main 1)

(50/51N)-1

Instantaneous and time delay earth fault (main 1)

Any Fault
Any Fault
(27/59)-1

Under/Over voltage (main 1)

21

Distance with PUTT scheme communication logic (main 2)

Any Fault

Zone 1 Phase - Neutral Fault

No

No

No

Yes

No

Initiate

Initiate

Initiate

No

No

Zone 1 Phase - Phase Fault

No

Yes

No

Yes

No

Block

Initiate

Initiate

No

No

Zone 2 Any Fault

No

Yes

No

Yes

No

Block

Initiate

Initiate

No

No

Zone 3 Any Fault

No

Yes

No

Yes

No

Block

Initiate

Initiate

No

No

No

Yes

No

Yes

No

No

Initiate

Initiate

No

No

No

Yes

No

No

No

No

Initiate

Initiate

No

No

No

Yes

No

No

No

No

Initiate

Initiate

No

No

No

Yes

No

No

No

No

Initiate

Initiate

No

No

No

Yes

No

No

No

No

Initiate

Initiate

No

No

21N

Directional earth fault with scheme communication logic

(67/67N)-2

Directional overcurrent and earth fault (main 2)

Any Fault
Any Fault
(50/51)-2

Instantaneous and time delay overcurrent (main 2)

(50/51N)-2

Instantaneous and time delay earth fault (main 2)

Any Fault
Any Fault
(27/59)-2

Under/Over voltage (main 2)


Any Fault

ABB MALAYSIA SDN BHD


Project

Document Number

VUNG ANG 1 THERMAL POWER PLANT 2 X 600MW E-LOT1 SWITCHYARD AND MAIN TRANSFORMERS PACKAGE

VA1-ABB-00ASR-E-E1-DLG-0002

Substation

Division
PSS

VUNG ANG 1 THERMAL POWER PLANT

Sheet/Continue
03/04

Description

Prepared By

Checked By

Date

Rev.

Reason for Revision

TRIPPING MATRIX FOR LINE FEEDER

CHUAH SEONG BAN

HAU CHOO KIAT

20-DEC-2010

Revised as per CS-E1-E-00236

Signal To
Protection
Function
50BF-1

50BF-2

87B

Description

Master
Trip
Relay1

Master
Trip
Relay2

GS050 Trip
Coil1

GS050 Trip
Coil2

Auto
Reclose
(main 1)

Auto
Reclose
(main 2)

Breaker
Fail
(50BF-1)

Breaker
Fail
(50BF-2)

Remote
CB

Adjacent CB
connected to
same BB

Breaker fail (incorporate in BBP)


Any Fault stage 1

Yes

No

No

No

No

No

No

No

No

Any Fault stage 2

No

No

No

No

No

No

No

Yes

Yes

Any Fault stage 1

No

Yes

No

No

No

No

No

No

No

Any Fault stage 2

No

No

No

No

No

No

No

Yes

Yes
Yes

Breaker fail (incorporate in BCU)

Low Impedance busbar protection


Yes

No

Yes

No

No

No

No

No

No

86-1

Master Trip Relay1

No

Yes

Yes

No

No

No

No

No

No

86-2

Master Trip Relay2

No

Yes

Yes

No

No

No

No

No

No

Remark:

Distance Protection is come with SOTF and Power Swing Detection Functions.

Any Fault

ABB MALAYSIA SDN BHD


Project

Document Number

VUNG ANG 1 THERMAL POWER PLANT 2 X 600MW E-LOT1 SWITCHYARD AND MAIN TRANSFORMERS PACKAGE

VA1-ABB-00ASR-E-E1-DLG-0002

Substation

Division
PSS

VUNG ANG 1 THERMAL POWER PLANT

Sheet/Continue
04/05

Description

Prepared By

Checked By

Date

Rev.

Reason for Revision

TRIPPING MATRIX FOR GENERATOR TRANSFORMER

CHUAH SEONG BAN

HAU CHOO KIAT

20-DEC-2010

Revised as per CS-E1-E-00236

Signal To

GCB

LV
Feeder1
CB

LV
Feeder2
CB

Breaker
Fail
(50BF-1)

Breaker
Fail
(50BF-2)

Adjacent CB
connected to
same BB

No

Yes

Yes

Yes

Initiate

Initiate

No

Yes

No

Yes

Yes

Yes

Initiate

Initiate

No

No

No

No

Yes

Yes

Yes

Initiate

Initiate

No

Yes

No

No

No

Yes

Yes

Yes

Initiate

Initiate

No

Yes

No

No

No

Yes

Yes

Yes

Initiate

Initiate

No

Yes

No

No

No

Yes

Yes

Yes

Initiate

Initiate

No

Yes

No

No

No

Yes

Yes

Yes

Initiate

Initiate

No

Zone 1 Phase - Neutral Fault

Yes

No

Yes

No

Yes

Yes

Yes

Initiate

Initiate

No

Zone 1 Phase - Phase Fault

Yes

No

Yes

No

Yes

Yes

Yes

Initiate

Initiate

No

Zone 2 Any Fault

Zone 3 Any Fault

No

Yes

No

Yes

Yes

Yes

Yes

Initiate

Initiate

No

No

Yes

No

Yes

Yes

Yes

Yes

Initiate

Initiate

No

No

Yes

No

No

Yes

Yes

Yes

Initiate

Initiate

No

No

Yes

No

No

Yes

Yes

Yes

Initiate

Initiate

No

Protection
Function
87T-1

Description

87N-1

Any Fault

51NT-1

Yes

No

Yes

Yes

No

Yes

Standby earth fault (main 1)


Any Fault

24-1

Volt/Hertz over fluxing (main 1)


Any Fault

59N-1

Residual over voltage (main 1)


Any Fault

49-1

Thermal overload (main 1)

21

Distance without scheme communication logic (main 1)

Any Phase

Transformer Differential (main 2)


Any Fault
Restricted earth fault (main 2)
Any Fault
Instantaneous and time delay overcurrent (main 2)
Any Fault

51NT-2

GS050 Trip
Coil2

Instantaneous and time delay overcurrent (main 1)


Any Fault

(50/51)-2

GS050 Trip
Coil1

Restricted earth fault (main 1)

(50/51)-1

87N-2

Master
Trip
Relay2

Transformer Differential (main 1)


Any Fault

87T-2

Master
Trip
Relay1

Standby earth fault (main 2)


Any Fault

ABB MALAYSIA SDN BHD


Project

Document Number

VUNG ANG 1 THERMAL POWER PLANT 2 X 600MW E-LOT1 SWITCHYARD AND MAIN TRANSFORMERS PACKAGE

VA1-ABB-00ASR-E-E1-DLG-0002

Substation

Division
PSS

VUNG ANG 1 THERMAL POWER PLANT

Sheet/Continue
05/06

Description

Prepared By

Checked By

Date

Rev.

Reason for Revision

TRIPPING MATRIX FOR GENERATOR TRANSFORMER

CHUAH SEONG BAN

HAU CHOO KIAT

20-DEC-2010

Revised as per CS-E1-E-00236

Signal To
Protection
Function
49-2

Description

GS050 Trip
Coil2

GCB

LV
Feeder1
CB

LV
Feeder2
CB

Breaker
Fail
(50BF-1)

Breaker
Fail
(50BF-2)

Adjacent CB
connected to
same BB

No

Yes

No

No

Yes

Yes

Yes

Initiate

Initiate

No

No

Yes

No

No

Yes

Yes

Yes

Initiate

Initiate

No

No

Yes

No

No

Yes

Yes

Yes

Initiate

Initiate

No

No

Yes

No

No

Yes

Yes

Yes

Initiate

Initiate

No

Instantaneous and time delay overcurrent (BU)


Any Fault

(50/51N)-BU

GS050 Trip
Coil1

Directional overcurrent and earth fault (BU)


Any Fault

(50/51)-BU

Master
Trip
Relay2

Thermal overload (main 2)


Any Phase

(67/67N)-BU

Master
Trip
Relay1

Instantaneous and time delay earth fault (BU)


Any Fault

(27/59)-BU

Under/Over voltage (BU)


Any Fault

No

Yes

No

No

Yes

Yes

Yes

Initiate

Initiate

No

26

Oil temperature protection

Yes

No

No

No

Yes

Yes

Yes

Initiate

Initiate

No

49

Winding temperature protection

Yes

No

No

No

Yes

Yes

Yes

Initiate

Initiate

No

63B

Buchholz relay

Yes

No

No

No

Yes

Yes

Yes

Initiate

Initiate

No

71

Oil level switch

Yes

No

No

No

Yes

Yes

Yes

Initiate

Initiate

No

63P

Pressure relieve device

Yes

No

No

No

Yes

Yes

Yes

Initiate

Initiate

No

50BF-1

Breaker fail (incorporate in BBP)


Any Fault stage 1

Yes

No

No

No

Yes

Yes

Yes

No

No

Any Fault stage 2

No

No

No

No

No

No

No

No

Yes

Any Fault stage 1

No

Yes

No

No

Yes

Yes

Yes

No

No

Any Fault stage 2

No

No

No

No

No

No

No

No

Yes
Yes

50BF-2

87B

Breaker fail (incorporate in BCU)

Low Impedance busbar protection


Yes

No

Yes

No

No

No

No

No

No

86-1

Master Trip Relay1

No

Yes

Yes

No

No

No

No

No

No

86-2

Master Trip Relay2

No

Yes

Yes

No

No

No

No

No

No

Any Fault

ABB MALAYSIA SDN BHD


Project

Document Number

VUNG ANG 1 THERMAL POWER PLANT 2 X 600MW E-LOT1 SWITCHYARD AND MAIN TRANSFORMERS PACKAGE

VA1-ABB-00ASR-E-E1-DLG-0002

Substation

Division
PSS

VUNG ANG 1 THERMAL POWER PLANT

Sheet/Continue
06/07

Description

Prepared By

Checked By

Date

Rev.

Reason for Revision

TRIPPING MATRIX FOR STATION TRANSFORMER

CHUAH SEONG BAN

HAU CHOO KIAT

20-DEC-2010

Revised as per CS-E1-E-00236

Signal To
Protection
Function
87T-1

Description

Any Fault
Instantaneous and time delay overcurrent (main 2)

(50/51N)-2

Instantaneous and time delay earth fault (main 2)

Any Fault
Any Fault

Yes

No

Yes

Yes

Initiate

Initiate

No

Yes

No

Yes

No

Yes

Yes

Initiate

Initiate

No

Yes

No

No

No

Yes

Yes

Initiate

Initiate

No

Yes

No

No

No

Yes

Yes

Initiate

Initiate

No

Yes

No

No

No

Yes

Yes

Initiate

Initiate

No

No

Yes

No

Yes

Yes

Yes

Initiate

Initiate

No

No

Yes

No

Yes

Yes

Yes

Initiate

Initiate

No

No

Yes

No

No

Yes

Yes

Initiate

Initiate

No

No

Yes

No

No

Yes

Yes

Initiate

Initiate

No

No

Yes

No

No

Yes

Yes

Initiate

Initiate

No

No

Yes

No

No

Yes

Yes

Initiate

Initiate

No

No

Yes

No

No

Yes

Yes

Initiate

Initiate

No

No

Yes

No

No

Yes

Yes

Initiate

Initiate

No

No

Yes

No

No

Yes

Yes

Initiate

Initiate

No

Instantaneous and time delay earth fault (BU)


Any Fault

(27/59)-BU

No

Instantaneous and time delay overcurrent (BU)


Any Fault

(50/51N)-BU

Yes

Directional overcurrent and earth fault (BU)


Any Fault

(50/51)-BU

Adjacent CB
connected to
same BB

Thermal overload (main 2)


Any Phase

(67/67N)-BU

Breaker
Fail
(50BF-2)

Restricted earth fault (main 2)

(50/51)-2

49-2

Breaker
Fail
(50BF-1)

Transformer Differential (main 2)


Any Fault

87N-2

LV
Feeder2
CB

Thermal overload (main 1)


Any Phase

87T-2

LV
Feeder1
CB

Instantaneous and time delay earth fault (main 1)


Any Fault

49-1

GS050 Trip
Coil2

Instantaneous and time delay overcurrent (main 1)


Any Fault

(50/51N)-1

GS050 Trip
Coil1

Restricted earth fault (main 1)


Any Fault

(50/51)-1

Master
Trip
Relay2

Transformer Differential (main 1)


Any Fault

87N-1

Master
Trip
Relay1

Under/Over voltage (BU)


Any Fault

ABB MALAYSIA SDN BHD


Project

Document Number

VUNG ANG 1 THERMAL POWER PLANT 2 X 600MW E-LOT1 SWITCHYARD AND MAIN TRANSFORMERS PACKAGE

VA1-ABB-00ASR-E-E1-DLG-0002

Substation

Division
PSS

VUNG ANG 1 THERMAL POWER PLANT

Sheet/Continue
07/08

Description

Prepared By

Checked By

Date

Rev.

Reason for Revision

TRIPPING MATRIX FOR STATION TRANSFORMER

CHUAH SEONG BAN

HAU CHOO KIAT

20-DEC-2010

Revised as per CS-E1-E-00236

Signal To
Protection
Function

Description

Master
Trip
Relay1

Master
Trip
Relay2

GS050 Trip
Coil1

GS050 Trip
Coil2

LV
Feeder1
CB

LV
Feeder2
CB

Breaker
Fail
(50BF-1)

Breaker
Fail
(50BF-2)

Adjacent CB
connected to
same BB

26

Oil temperature protection

Yes

No

No

No

Yes

Yes

Initiate

Initiate

No

49

Winding temperature protection

Yes

No

No

No

Yes

Yes

Initiate

Initiate

No

63B

Buchholz relay

Yes

No

No

No

Yes

Yes

Initiate

Initiate

No

71

Oil level switch

Yes

No

No

No

Yes

Yes

Initiate

Initiate

No

63P

Pressure relieve device

Yes

No

No

No

Yes

Yes

Initiate

Initiate

No

50BF-1

Breaker fail (incorporate in BBP)

50BF-2

87B

Any Fault stage 1

Yes

No

No

No

Yes

Yes

No

No

Any Fault stage 2

No

No

No

No

No

No

No

Yes

Any Fault stage 1

No

Yes

No

No

Yes

Yes

No

No

Any Fault stage 2

No

No

No

No

No

No

No

Yes
Yes

Breaker fail (incorporate in BCU)

Low Impedance busbar protection


Yes

No

Yes

No

No

No

No

No

86-1

Master Trip Relay1

No

Yes

Yes

No

No

No

No

No

86-2

Master Trip Relay2

No

Yes

Yes

No

No

No

No

No

Any Fault

ABB MALAYSIA SDN BHD


Project

Document Number

VUNG ANG 1 THERMAL POWER PLANT 2 X 600MW E-LOT1 SWITCHYARD AND MAIN TRANSFORMERS PACKAGE

VA1-ABB-00ASR-E-E1-DLG-0002

Substation

Division
PSS

VUNG ANG 1 THERMAL POWER PLANT

Sheet/Continue
08/09

Description

Prepared By

Checked By

Date

Rev.

Reason for Revision

TRIPPING MATRIX FOR BYPASS FEEDER

CHUAH SEONG BAN

HAU CHOO KIAT

20-DEC-2010

Revised as per CS-E1-E-00236

Energize without connected to any feeder


Master
Trip
Relay1

Master
Trip
Relay2

GS050 Trip
Coil1

GS050 Trip
Coil2

Auto
Reclose
(main 1)

Auto
Reclose
(main 2)

Breaker
Fail
(50BF-1)

Breaker
Fail
(50BF-2)

Remote
CB

Adjacent CB
connected to
same BB

Phase - Neutral Fault

Yes

No

Yes

No

No

No

Initiate

Initiate

N/A

No

Phase - Phase Fault

Yes

No

Yes

No

No

No

Initiate

Initiate

N/A

No

Yes

No

No

No

No

No

Initiate

Initiate

N/A

No

Yes

No

No

No

No

No

Initiate

Initiate

N/A

No

Yes

No

No

No

No

No

Initiate

Initiate

N/A

No

Yes

No

No

No

No

No

Initiate

Initiate

N/A

No

Protection
Function
87L

(67/67N)-1

Description
Line Differential (main 1)

Directional overcurrent and earth fault (main 1)


Any Fault

(50/51)-1

Instantaneous and time delay overcurrent (main 1)

(50/51N)-1

Instantaneous and time delay earth fault (main 1)

Any Fault
Any Fault
(27/59)-1

Under/Over voltage (main 1)

21

Distance with scheme communication logic (main 2)

Any Fault
Zone 1 Phase - Neutral Fault

No

Yes

No

Yes

No

No

Initiate

Initiate

N/A

No

Zone 1 Phase - Phase Fault

No

Yes

No

Yes

No

No

Initiate

Initiate

N/A

No

Zone 2 Any Fault

No

Yes

No

Yes

No

No

Initiate

Initiate

N/A

No

Zone 3 Any Fault

No

Yes

No

Yes

No

No

Initiate

Initiate

N/A

No

No

Yes

No

Yes

No

No

Initiate

Initiate

N/A

No

No

Yes

No

No

No

No

Initiate

Initiate

N/A

No

No

Yes

No

No

No

No

Initiate

Initiate

N/A

No

No

Yes

No

No

No

No

Initiate

Initiate

N/A

No

No

Yes

No

No

No

No

Initiate

Initiate

N/A

No

21N

Directional earth fault with scheme communication logic

(67/67N)-2

Directional overcurrent and earth fault (main 2)

Any Fault
Any Fault
(50/51)-2

Instantaneous and time delay overcurrent (main 2)

(50/51N)-2

Instantaneous and time delay earth fault (main 2)

Any Fault
Any Fault
(27/59)-2

Signal To

Under/Over voltage (main 2)


Any Fault

ABB MALAYSIA SDN BHD


Project

Document Number

VUNG ANG 1 THERMAL POWER PLANT 2 X 600MW E-LOT1 SWITCHYARD AND MAIN TRANSFORMERS PACKAGE

VA1-ABB-00ASR-E-E1-DLG-0002

Substation

Division
PSS

VUNG ANG 1 THERMAL POWER PLANT

Sheet/Continue
09/10

Description

Prepared By

Checked By

Date

Rev.

Reason for Revision

TRIPPING MATRIX FOR BYPASS FEEDER

CHUAH SEONG BAN

HAU CHOO KIAT

20-DEC-2010

Revised as per CS-E1-E-00236

Energize without connected to any feeder


Protection
Function
50BF-1

50BF-2

87B

Description

Signal To
Master
Trip
Relay1

Master
Trip
Relay2

GS050 Trip
Coil1

GS050 Trip
Coil2

Auto
Reclose
(main 1)

Auto
Reclose
(main 2)

Breaker
Fail
(50BF-1)

Breaker
Fail
(50BF-2)

Remote
CB

Adjacent CB
connected to
same BB

Breaker fail (incorporate in BBP)


Any Fault stage 1

Yes

No

No

No

No

No

No

N/A

No

Any Fault stage 2

No

No

No

No

No

No

No

N/A

Yes

Any Fault stage 1

No

Yes

No

No

No

No

No

N/A

No

Any Fault stage 2

No

No

No

No

No

No

No

N/A

Yes
Yes

Breaker fail (incorporate in BCU)

Low Impedance busbar protection


Yes

No

Yes

No

No

No

No

No

N/A

86-1

Master Trip Relay1

No

Yes

Yes

No

No

No

No

N/A

No

86-2

Master Trip Relay2

No

Yes

Yes

No

No

No

No

N/A

No

Remark:

Distance Protection is come with SOTF and Power Swing Detection Functions.

Any Fault

ABB MALAYSIA SDN BHD


Project

Document Number

VUNG ANG 1 THERMAL POWER PLANT 2 X 600MW E-LOT1 SWITCHYARD AND MAIN TRANSFORMERS PACKAGE

VA1-ABB-00ASR-E-E1-DLG-0002

Substation

Division
PSS

VUNG ANG 1 THERMAL POWER PLANT

Sheet/Continue
10/11

Description

Prepared By

Checked By

Date

Rev.

Reason for Revision

TRIPPING MATRIX FOR BYPASS FEEDER

CHUAH SEONG BAN

HAU CHOO KIAT

20-DEC-2010

Revised as per CS-E1-E-00236

Energize with connected to Line Feeder


Master
Trip
Relay1

Master
Trip
Relay2

GS050 Trip
Coil1

GS050 Trip
Coil2

Auto
Reclose
(main 1)

Auto
Reclose
(main 2)

Breaker
Fail
(50BF-1)

Breaker
Fail
(50BF-2)

Remote
CB

Adjacent CB
connected to
same BB

Phase - Neutral Fault

No

No

Yes

No

Initiate

No

Initiate

Initiate

No

No

Phase - Phase Fault

Yes

No

Yes

No

Block

No

Initiate

Initiate

No

No

Yes

No

No

No

No

No

Initiate

Initiate

No

No

Yes

No

No

No

No

No

Initiate

Initiate

No

No

Yes

No

No

No

No

No

Initiate

Initiate

No

No

Yes

No

No

No

No

No

Initiate

Initiate

No

No

Protection
Function
87L

(67/67N)-1

Description
Line Differential (main 1)

Directional overcurrent and earth fault (main 1)


Any Fault

(50/51)-1

Instantaneous and time delay overcurrent (main 1)

(50/51N)-1

Instantaneous and time delay earth fault (main 1)

Any Fault
Any Fault
(27/59)-1

Under/Over voltage (main 1)

21

Distance with scheme communication logic (main 2)

Any Fault
Zone 1 Phase - Neutral Fault

No

No

No

Yes

No

Initiate

Initiate

Initiate

No

No

Zone 1 Phase - Phase Fault

No

Yes

No

Yes

No

Block

Initiate

Initiate

No

No

Zone 2 Any Fault

No

Yes

No

Yes

No

Block

Initiate

Initiate

No

No

Zone 3 Any Fault

No

Yes

No

Yes

No

Block

Initiate

Initiate

No

No

No

Yes

No

Yes

No

No

Initiate

Initiate

No

No

No

Yes

No

No

No

No

Initiate

Initiate

No

No

No

Yes

No

No

No

No

Initiate

Initiate

No

No

No

Yes

No

No

No

No

Initiate

Initiate

No

No

No

Yes

No

No

No

No

Initiate

Initiate

No

No

21N

Directional earth fault with scheme communication logic

(67/67N)-2

Directional overcurrent and earth fault (main 2)

Any Fault
Any Fault
(50/51)-2

Instantaneous and time delay overcurrent (main 2)

(50/51N)-2

Instantaneous and time delay earth fault (main 2)

Any Fault
Any Fault
(27/59)-2

Signal To

Under/Over voltage (main 2)


Any Fault

ABB MALAYSIA SDN BHD


Project

Document Number

VUNG ANG 1 THERMAL POWER PLANT 2 X 600MW E-LOT1 SWITCHYARD AND MAIN TRANSFORMERS PACKAGE

VA1-ABB-00ASR-E-E1-DLG-0002

Substation

Division
PSS

VUNG ANG 1 THERMAL POWER PLANT

Sheet/Continue
11/12

Description

Prepared By

Checked By

Date

Rev.

Reason for Revision

TRIPPING MATRIX FOR BYPASS FEEDER

CHUAH SEONG BAN

HAU CHOO KIAT

20-DEC-2010

Revised as per CS-E1-E-00236

Energize with connected to Line Feeder


Protection
Function
50BF-1

50BF-2

87B

Description

Signal To
Master
Trip
Relay1

Master
Trip
Relay2

GS050 Trip
Coil1

GS050 Trip
Coil2

Auto
Reclose
(main 1)

Auto
Reclose
(main 2)

Breaker
Fail
(50BF-1)

Breaker
Fail
(50BF-2)

Remote
CB

Adjacent CB
connected to
same BB

Breaker fail (incorporate in BBP)


Any Fault stage 1

Yes

No

No

No

No

No

No

No

No

Any Fault stage 2

No

No

No

No

No

No

No

Yes

Yes

Any Fault stage 1

No

Yes

No

No

No

No

No

No

No

Any Fault stage 2

No

No

No

No

No

No

No

Yes

Yes
Yes

Breaker fail (incorporate in BCU)

Low Impedance busbar protection


Yes

No

Yes

No

No

No

No

No

No

86-1

Master Trip Relay1

No

Yes

Yes

No

No

No

No

No

No

86-2

Master Trip Relay2

No

Yes

Yes

No

No

No

No

No

No

Remark:

Distance Protection is come with SOTF and Power Swing Detection Functions.

Any Fault

ABB MALAYSIA SDN BHD


Project

Document Number

VUNG ANG 1 THERMAL POWER PLANT 2 X 600MW E-LOT1 SWITCHYARD AND MAIN TRANSFORMERS PACKAGE

VA1-ABB-00ASR-E-E1-DLG-0002

Substation

Division
PSS

VUNG ANG 1 THERMAL POWER PLANT

Sheet/Continue
12/13

Description

Prepared By

Checked By

Date

Rev.

Reason for Revision

TRIPPING MATRIX FOR BYPASS FEEDER

CHUAH SEONG BAN

HAU CHOO KIAT

20-DEC-2010

Revised as per CS-E1-E-00236

Energize with connected to Generator Transformer


Protection
Function
87L

Description
Line Differential (main 1)
Phase - Neutral Fault
Phase - Phase Fault

(67/67N)-1

Directional overcurrent and earth fault (main 1)


Any Fault

(50/51)-1

Instantaneous and time delay overcurrent (main 1)

(50/51N)-1

Instantaneous and time delay earth fault (main 1)

Any Fault
Any Fault
(27/59)-1

Under/Over voltage (main 1)


Any Fault

21

Distance with scheme communication logic (main 2)


Zone 1 Phase - Neutral Fault
Zone 1 Phase - Phase Fault
Zone 2 Any Fault
Zone 3 Any Fault

21N

Directional earth fault with scheme communication logic

(67/67N)-2

Directional overcurrent and earth fault (main 2)

Any Fault
Any Fault
(50/51)-2

Instantaneous and time delay overcurrent (main 2)


Any Fault

(50/51N)-2

Instantaneous and time delay earth fault (main 2)


Any Fault

(27/59)-2

Under/Over voltage (main 2)


Any Fault

Signal To
Master
Trip
Relay1

Master
Trip
Relay2

GS050 Trip
Coil1

GS050 Trip
Coil2

GCB

LV
Feeder1
CB

LV
Feeder2
CB

Breaker
Fail
(50BF-1)

Breaker
Fail
(50BF-2)

Adjacent CB
connected to
same BB

ABB MALAYSIA SDN BHD


Project

Document Number

VUNG ANG 1 THERMAL POWER PLANT 2 X 600MW E-LOT1 SWITCHYARD AND MAIN TRANSFORMERS PACKAGE

VA1-ABB-00ASR-E-E1-DLG-0002

Substation

Division
PSS

VUNG ANG 1 THERMAL POWER PLANT

Sheet/Continue
13/14

Description

Prepared By

Checked By

Date

Rev.

Reason for Revision

TRIPPING MATRIX FOR BYPASS FEEDER

CHUAH SEONG BAN

HAU CHOO KIAT

20-DEC-2010

Revised as per CS-E1-E-00236

Energize with connected to Generator Transformer


Protection
Function
50BF-1

50BF-2

87B

Description

Signal To
Master
Trip
Relay1

Master
Trip
Relay2

GS050 Trip
Coil1

GS050 Trip
Coil2

GCB

LV
Feeder1
CB

LV
Feeder2
CB

Breaker
Fail
(50BF-1)

Breaker
Fail
(50BF-2)

Adjacent CB
connected to
same BB

Breaker fail (incorporate in BBP)


Any Fault stage 1

Yes

No

No

No

Yes

Yes

Yes

No

No

Any Fault stage 2

No

No

No

No

No

No

No

No

Yes

Any Fault stage 1

No

Yes

No

No

Yes

Yes

Yes

No

No

Any Fault stage 2

No

No

No

No

No

No

No

No

Yes
Yes

Breaker fail (incorporate in BCU)

Low Impedance busbar protection


Yes

No

Yes

No

No

No

No

No

No

86-1

Master Trip Relay1

No

Yes

Yes

No

No

No

No

No

No

86-2

Master Trip Relay2

No

Yes

Yes

No

No

No

No

No

No

Any Fault

Remark:

Line Differential and Distance Protection will be disable when connected to Generator Transformer.
Transformer main1 and main2 protection will operate follow the proposed tripping matrix for Generator Transformer.

ABB MALAYSIA SDN BHD


Project

Document Number

VUNG ANG 1 THERMAL POWER PLANT 2 X 600MW E-LOT1 SWITCHYARD AND MAIN TRANSFORMERS PACKAGE

VA1-ABB-00ASR-E-E1-DLG-0002

Substation

Division
PSS

VUNG ANG 1 THERMAL POWER PLANT

Sheet/Continue
14/15

Description

Prepared By

Checked By

Date

Rev.

Reason for Revision

TRIPPING MATRIX FOR BYPASS FEEDER

CHUAH SEONG BAN

HAU CHOO KIAT

20-DEC-2010

Revised as per CS-E1-E-00236

Energize with connected to Station Transformer


Protection
Function
87L

Description
Line Differential (main 1)
Phase - Neutral Fault
Phase - Phase Fault

(67/67N)-1

Directional overcurrent and earth fault (main 1)


Any Fault

(50/51)-1

Instantaneous and time delay overcurrent (main 1)

(50/51N)-1

Instantaneous and time delay earth fault (main 1)

Any Fault
Any Fault
(27/59)-1

Under/Over voltage (main 1)


Any Fault

21

Distance with scheme communication logic (main 2)


Zone 1 Phase - Neutral Fault
Zone 1 Phase - Phase Fault
Zone 2 Any Fault
Zone 3 Any Fault

21N

Directional earth fault with scheme communication logic

(67/67N)-2

Directional overcurrent and earth fault (main 2)

Any Fault
Any Fault
(50/51)-2

Instantaneous and time delay overcurrent (main 2)


Any Fault

(50/51N)-2

Instantaneous and time delay earth fault (main 2)


Any Fault

(27/59)-2

Under/Over voltage (main 2)


Any Fault

Signal To
Master
Trip
Relay1

Master
Trip
Relay2

GS050 Trip
Coil1

GS050 Trip
Coil2

LV
Feeder1
CB

LV
Feeder2
CB

Breaker
Fail
(50BF-1)

Breaker
Fail
(50BF-2)

Adjacent CB
connected to
same BB

ABB MALAYSIA SDN BHD


Project

Document Number

VUNG ANG 1 THERMAL POWER PLANT 2 X 600MW E-LOT1 SWITCHYARD AND MAIN TRANSFORMERS PACKAGE

VA1-ABB-00ASR-E-E1-DLG-0002

Substation

Division
PSS

VUNG ANG 1 THERMAL POWER PLANT

Sheet/Continue
15/16

Description

Prepared By

Checked By

Date

Rev.

Reason for Revision

TRIPPING MATRIX FOR BYPASS FEEDER

CHUAH SEONG BAN

HAU CHOO KIAT

20-DEC-2010

Revised as per CS-E1-E-00236

Energize with connected to Station Transformer


Protection
Function
50BF-1

50BF-2

87B

Description

Signal To
Master
Trip
Relay1

Master
Trip
Relay2

GS050 Trip
Coil1

GS050 Trip
Coil2

LV
Feeder1
CB

LV
Feeder2
CB

Breaker
Fail
(50BF-1)

Breaker
Fail
(50BF-2)

Adjacent CB
connected to
same BB

Breaker fail (incorporate in BBP)


Any Fault stage 1

Yes

No

No

No

Yes

Yes

No

No

Any Fault stage 2

No

No

No

No

No

No

No

Yes

Any Fault stage 1

No

Yes

No

No

Yes

Yes

No

No

Any Fault stage 2

No

No

No

No

No

No

No

Yes
Yes

Breaker fail (incorporate in BCU)

Low Impedance busbar protection


Yes

No

Yes

No

No

No

No

No

86-1

Master Trip Relay1

No

Yes

Yes

No

No

No

No

No

86-2

Master Trip Relay2

No

Yes

Yes

No

No

No

No

No

Any Fault

Remark:

Line Differential and Distance Protection will be disable when connected to Generator Transformer.
Transformer main1 and main2 protection will operate follow the proposed tripping matrix for Station Transformer.

ABB MALAYSIA SDN BHD


Project

Document Number

VUNG ANG 1 THERMAL POWER PLANT 2 X 600MW E-LOT1 SWITCHYARD AND MAIN TRANSFORMERS PACKAGE

VA1-ABB-00ASR-E-E1-DLG-0002

Substation

Division
PSS

VUNG ANG 1 THERMAL POWER PLANT

Sheet/Continue
16/nil

Description

Prepared By

Checked By

Date

Rev.

Reason for Revision

TRIPPING MATRIX FOR BUS SECTION

CHUAH SEONG BAN


Signal To

HAU CHOO KIAT

20-DEC-2010

Revised as per CS-E1-E-00236

Signal To
Master
Trip
Relay

GS050 Trip
Coil1

Yes

Yes

No

Initiate

Initiate

No

Yes

No

Yes

Initiate

Initiate

No

Any Fault stage 1

Yes

No

No

No

No

Any Fault stage 2

No

No

No

No

Yes

Protection
Function

Description

50/51

Instantaneous and time delay overcurrent

50/51N

Instantaneous and time delay earth fault

50BF-1

Breaker fail (incorporate in BBP)

Any Fault
Any Fault

50BF-2

Breaker
Breaker
Adjacent CB
GS050 Trip Fail (50BF- Fail (50BF- connected to
Coil2
1)
2)
same BB

Breaker fail (incorporate in BCU)


Any Fault stage 1

Yes

No

No

No

No

Any Fault stage 2

No

No

No

No

Yes

Yes

Yes

No

No

No

Yes

Yes

Yes

No

No

No

87B

Low Impedance busbar protection

86

Master Trip Relay

Any Fault

Remark: During live transfer within main and reserve busbar; signal to Master Trip relay, GS050 Trip Coil1 and GS050 Trip Coil2 will be blocked.