You are on page 1of 5

FORMAT NO:

TBT / PRE TASK START


Tool Box Talk/Pre Start Task Analysis Risk Reduction
Talks
NO TBT / PRE TASK START!!
Job Details
BMHS
33KV
Specific Location of
task :

Page:

1 of 5

Work Permits Required


Hot works
Space

Technicians skills

Confined

Electricians

Welder

Duct
Fabricator

Plumber

Lifting
Specify

Rigger

Electrical (LOTO)

Others

Suspended Man basket

Insulator
Pipe fitter

Responsible In charge:

02

Date:

NO WORK!!

Resources Required

Rev. No.

Others

Formwork
(casting/striking)

Hazardous materials /
chemicals :

Emergency Contact
Numbers:

33284344
Contact Names &
Numbers:

Plant / Equipment / Power


tools :

Permit to Work Number


(PTW):

Male Nurse :

Mr. Shafeek / Mr.


Sishoy
33277890
Area Safety Officer:

Description of Works :

Before work starts, the following must be in place


Induction

Supervisio
n

Test
Certificates

SELEC
T
HAZAR
DS

Communicati
on

Drinking
Water

Risk
Assessment

Permit To
Work

Area
Lighting

SELECT CONTROLS
( Tick to identify the controls in place)

Fall from
height

Risk
Assessme
nt

Access
Ladder

Access
Handrail

Edge
Protection

Secure
Ladder

Adequate
Work
Platform

Guards
for
Openings

Fall
Arrestor

Life
Lines

Manual
Handling

Risk
Assessme
nt

Check
Weight

Mechanic
al Aids

Access
Route

Training

Team
Lifting

Wrong
method

Right
Method

Others

Power tools

Risk
Assessme
nt

Colour
code
inspectio
n tag

Check
Cable

Guards in
place

Proper
Positionin
g

Proper
Scaffold

Cable
Protection

Ventilatio
n

Dust
extractio
n

TBT / PRE TASK START


Tool Box Talk/Pre Start Task Analysis Risk Reduction
Talks
NO TBT / PRE TASK START!!

NO WORK!!

FORMAT NO:
Rev. No.

02

Page:

2 of 5

Date:

Electricity

Risk
Assessme
nt

Training

Permit to
work

Tag out

Lock out

Warning
Signs

Check
plug tops

Check
Cable

Others

Confined
Space

Risk
Assessme
nt

Survey

Permit to
work

Gas
Detection

Communic
ation

Access/egr
ess

Monitorin
g

Air supply

Rescue
System

SELEC
T
HAZAR
DS

SELECT CONTROLS
( Tick to identify the controls in place)

Risk
Assessme
nt

Clean
Access
route

House
keeping

Check oil
spills

Use
Pedestrian
way

Access/eg
ress

Risk
Assessm
ent

SWL

Tag Lines

Lifting
points /
hooks

Banks
man

Load
stability

Lifting
operations

Weather
condition

Ground
condition
s

Exclusion
zone

Communic
ation

Loading/u
nloading
vehicles

Spreader
Beams

Check
Ground
conditions

Check
outriggers

Others

Compresse
d Gas

Risk
Assessme
nt

Cylinder
storage

Cylinder
Trolley

Permit to
Work

Flash Back
Arrestors

Warning
Signs

Hose/pipe
check

Pressure
Gauges

No
smoking

Fall from
ladder

Risk
Assessme
nt

Dont use
in edges

Check
stability

Secure
Ladder

Over
Reaching

Ladder
anti skid
shoe

Others

Others

Others

Scaffold

Risk
Assessme
nt

Scaffold
Tag

Check
Over head
works

Access
Ladder

Edge
Protection

Weather
condition

Out
riggers

Ground
condition

Adequate
Work
Platform

Industrial
Vehicles

Risk
Assessme
nt

SWL

Load
stability

Route
survey

Speed
Limits

Warning
devices

Banks
man

Secure
Load

Examinati
on /
Inspectio
n

Training

Controlled
access

Chemical
resistant
Hand

Respirator
y
equipmen

Ventilatio
n

Fume
extraction

Trip and fall

Chemical

Risk
Assessme
nt

Check
Label

Adequate
Work
Platform

Check
Lifting
gear

Jumping
manholes
/ trenches

Examinati
on /
Inspection

Others

Packing
Pieces

Others

TBT / PRE TASK START


Tool Box Talk/Pre Start Task Analysis Risk Reduction
Talks
NO TBT / PRE TASK START!!
Gloves

Fire

Excavation

Emergency
Plan

Emergency
Response
Training

Risk
Assessme
nt

Check
slope /
repose
angle

SELECT
HAZAR
DS

ABC Fire
Extinguishe
r

Shoring

CO2 Fire
Extinguishe
r

Access /
egress

NO WORK!!

Rev. No.

02

Page:

3 of 5

Date:

Fire Blanket

Barricade

FORMAT NO:

Fire Hose

Others

Others

Fire Exit

Assembly
point

Others

Others

Ventilatio
n

Barricade
hot work
zone

Leather
apron /
gloves

Proper
Scaffold

Access /
egress

Adequate
Work
Platform

SELECT CONTROLS
( Tick to identify the controls in place)

Risk
Assessme
nt

Permit to
Work

Training

Welding
screens

Welding
face
shield

Risk
Assessm
ent

Permit to
Work

Warning
boards

Fall
Arrestor

Life Lines

Shafts /
Floor
Openings

Training

Overhead
Protection

Opening
guards

Ventilatio
n

Task light

Others

Others

Others

Others

Biological
Hazard

Environm
ent
Assessm
ent

Survey

Wash
rooms /
Toilets

Pest
control

Waste
managem
ent /
Recycling

Waste
removal

Waste
Skip

Others

Others

Others
(Hazard)

Others

Others

Others

Others

Others

Others

Others

Others

Others

Safety
Helmet

Hand
Gloves

Eye
protectio
n

Coveralls

Face
Shield

Hi vest
Jacket

Safety
Shoe

Ear
Protectio
n

Safety
Harness

Dust
mask

Respirator
y
Equipmen
t

Breathin
g
Apparatu
s

Fall
Arrestor

Others

Others

Others

Others

Others

Welding /
Hotworks

PPE

Fume
extraction

Guard
shaft
openings

TBT / PRE TASK START


Tool Box Talk/Pre Start Task Analysis Risk Reduction
Talks
NO TBT / PRE TASK START!!

NO WORK!!

FORMAT NO:
Rev. No.

02

Page:

4 of 5

Date:

Any Others
Observations and
actions taken:

Task Hazard
Analysis
Prepared BY

Name:

Signature:

Attendee Form

TBT / PRE TASK START


Tool Box Talk/Pre Start Task Analysis Risk Reduction
Sl.
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

I.D.
No.

Talks
NO TBT / PRE TASK START!!

Attendee Name

NO WORK!!

Designation

FORMAT NO:
Rev. No.

02

Page:

5 of 5

Date:

Signature

You might also like