Procedure For
MIX DESIGN TRIALS
Project: Kalol Mehsana Gas Pipeline Project
(Job No: GSPL/113)
Rev.
No
20/12/05
Dt. of
Rev
Description
Document
Controller
Prepared
By (HCCNOVA -JV)
Checked By
(Manager QA
HCC-NOVA JV)
Project:
Owner:
Consultant:
TPIA:
Contractor:
HCC-NOVA JV.
Sub-contractor:
Sub-contractor:
Reviewed by
(ABS)
Approved
By
(Dorsch
Consult (I)
Pvt. Ltd /
GSPL)
Doc No: HCC NOVA 46 17 42 Rev No: 0, Dt. Of Rev 31/01/06, Page 1 of 7
Released fo
Constructio
(HCC-NOVA
JV)
TABLE OF CONTENTS
DESCRIPTION
PAGE NO.
1.0
PURPOSE.............................................................................................3
2.0
SCOPE....................................................................................................3
3.0
REFERENCES........................................................................................3
4.0
5.0
METHODOLOGY....................................................................................4
6.0
7.0
APPENDICES / FORMATS.....................................................................6
Doc No: HCC NOVA 46 17 42 Rev No: 0, Dt. Of Rev 31/01/06, Page 2 of 7
PURPOSE:
This procedure describes the steps to be followed during concrete mix
design trials for various grades of concrete for Kalol Mehsana Gas
Pipeline Project.
2.0
SCOPE :
The scope of this procedure covers the requirements for concrete mix
design trials for KMGPP only.
3.0
REFERENCES:
2.
3.
Cube moulds.
4.
Slump cone.
5.
Thermometer.
6.
7.
8.
Doc No: HCC NOVA 46 17 42 Rev No: 0, Dt. Of Rev 31/01/06, Page 3 of 7
Doc No: HCC NOVA 46 17 42 Rev No:0, Dt. Of Rev 31/01/06, Page 4 of 7
6.0
Approved procedures.
System
Doc No: HCC HCC
NOVAManagement
46 17 42 Rev No:
0, Dt. Of Rev 31/01/06, Page 5 of 7
Procedure For
MIX DESIGN TRIALS
Project: Kalol Mehsana Gas Pipeline Project
(Job No: GSPL/113)
7.0
APPENDIX / FORMATS:
Inspection Report
HCC NOVA IR F 46 17 42
NOTE :
"In case any conflict between this procedure and contract specification, the later
shall govern"
Consultant
Revision : 1
TPIA
Date:
Contractor
Project
Weight
Kg
Concrete composition
Remarks
Cement
Water
W/c Ratio
40MM
20 MM
10 MM
Sand
Admixture
Slump
Observation
Name:
Name:
Name:
Sign:
Sign:
Sign:
Date:
Date:
Date:
Page 7 of 7