UOP 5241B-01
Agenda
UOP 5241B-02
Overview of the
Amine Guard FS Process
Licensed amine technology
Removal of CO2 & H2S to low levels or
Selective H2S Removal
Low H2S spec, with as much as 75% CO2 slip
UCARSOL Formulated Solvent from Dow
Several flow scheme options available
UOP MD Trays or Raschig Super Rings to maximize
performance
UOP 5241B-04
& H2S
Selective H2S removal
Natural Gas to pipeline
specs
Natural Gas to LNG
specs
Downstream of a
membrane for CO2/H2S
polishing
Treat Synthesis gas for
H2, NH3 or other
applications
Don'ts
Mercaptan Removal
UOP 4375A-19
Overview of the
Amine Guard FS Process
Markets served include:
Synthesis gas treating for CO2 removal in synthesis
gas plants, such as direct iron ore reduction
Synthesis gas treating for selective H2S removal in
integrated gasification combined cycle (IGCC)
plants
Natural gas treating for selective removal of H2S
and partial removal of CO2 for pipeline
specifications
High CO2 partial pressure service for reduced
energy consumption compared with conventional
amines, such as steam reformed ammonia plants
UOP 5241B-03
Agenda
UOP 5241B-05
UOP 5241B-06
UOP 5241B-07
Agenda
UOP 5241B-08
UOP 5241B-09
UOP 5241B-10
Make-Up
Water
XXXXXXX
Acid
Gas
Amine
Absorber
XXXXXXX
XXXXXXX
Flash Gas
to Fuel
Header
Make-Up
Water
Feed
Gas
Rich
Solution
Heater
Acid
Gas
Cooler
Acid Gas
KO Drum
Filtration
System
xxxx
Reflux
Pump
Rich
Flash Drum
XXXXX
Rich
Flash Drum
or Column
Lean Solution
Pump
Make-Up
Water
UOP 5241B-11
UOP 5241B-12
Acid Gas
KO Drum
Amine
Absorber
Feed
Gas
XXXXXXX
Make-Up
Water
XXXXXXX
XXXXXXX
Lean
Solution
Pump
Flash Gas
to Fuel
Header
Make-Up
Water
Acid Gas
Cooler
Lean
Solution
Cooler
XXXXXX
Filtration
System
Reflux
Pump
Amine Make-Up
Stripper Water
xxxx
Rich
Flash Drum
Lean/Rich
Exchanger
Amine
Reboiler
Lean Solution
Booster Pump UOP 5241B-13
XXXXXXX
Amine
Absorber
Feed
Gas
Lean
Lean
Solution Solution
Cooler
Pump
Flash Gas
to Fuel
Acid
Header
Gas
Cooler
Make-Up
xxxx
xxxx
Water
Rich
Flash Drum
Rich
Flash
Column
Acid
Gas
XXXXXXX
XXXXXXX
Acid Gas
KO Drum
Filtration
System
XXXXXX
Amine
Stripper
Reflux
Pump
XXXXX
Make-Up
Water
Rich Solution
Pump
Amine
Reboiler
Lean/Rich Lean Solution
Exchanger Booster Pump
UOP 5241B-14
UOP 5241B-15
XXXXXXX
Amine
Absorber
Feed
Gas
Lean
Lean
Solution Solution
Cooler
Pump
Flash Gas
to Fuel
Acid
Header
Gas
Cooler
Make-Up
Water xxxx
xxxx
Rich
Flash Drum
Rich
Flash
Column
Semi-Lean
Solution Pump
Acid
Gas
XXXXXXX
XXXXXXX
Acid Gas
KO Drum
Filtration
System
XXXXXX
Amine
Stripper
Reflux
Pump
XXXXX
Make-Up
Water
Rich Solution
Pump
Amine
Reboiler
Lean/Rich Lean Solution
Exchanger Booster Pump
UOP 5241B-16
UOP 5241B-17
UOP 5241B-17
45-60
1-stage
32-40
2-stage
12-18
Flash only
8-10
2-Stage
250
12.1
600
2280
1378
-----
7924
1010
3372
101
59
9.5
12.5
UOP 5241B-19
2-Stage
410
18.0
1070
6251
2835
-----
9676
235
125
4071
7389
12.0
14.0
UOP 5241B-20
Agenda
UOP 5241B-21
UOP 5241B-23
UOP 5241B-24
Agenda
UOP 5241B-25
Process Estimates,
Plant Visits
Schedule A
Detailed Design
Consultation
and Review
Construction
Inspection
Catalyst Loading
Startup
Services
Startup
Test Run
Operation
Ongoing Services
20+ Years
Process Estimates,
Plant Visits
Schedule A
Detailed Design
Consultation
and Review
Construction
Inspection
Catalyst Loading
Startup
Services
Startup
Test Run
Operation
Ongoing Services
20+ Years
UOP 5241B-28
UOP 5241B-28
UOP 5241B-30
UOP 5241B-31
Agenda
UOP 5241B-32
Commercial Experience
Process
No. of Units
Amine Guard II
220+
Amine Guard FS
30+
Dow UCARSOL
550+
UOP 5241B-33
Capacity
Feed
MMSCFD CO2/ H2S ppmv
Product
CO2/ H2S ppmv S/U Date
Operating
Mid East
Mid East
Far East
Mid East
Mid East
Mid East
Mid East
750
195
51
520
52
122
93
23,000/8,000
72,000/15,000
30,000/60
83,000/10
143,000/17,900
52,000/540
40,000/6,000
50/3
500/50
80/4
29,000/4
5,000/4
30,000/8
100/4
2004
2002
2002
2000
1999
1994
1998
UOP 5241B-34
Capacity
Feed
MMSCFD CO2/ H2S ppmv
Product
CO2/ H2S ppmv S/U Date
In Design / Construction
Mid East
Mid East
Far East
Mid East
Mid East
Mid East
Mid East
Mid East
Far East
750 x 2
750
425
1,262
3,200
128
1,530 x 2
794
800
23,000/8,000
23,000/8,000
230,000/55
40,000/10,300
23,100/8,000
80,000/75
25,200/8,220
46,000/30,000
230,000/38
50/3
50/3
40,000/5
5,500/20
8,000/3
50/7
25/2
9,400/20
3,000/1
2005
2006
2005
2006
2006
2006
2007
2007
2008
UOP 5241B-35
Technical Service
Guaranteed Performance
Project Design
Training & Start-up
On-going Optimization & Innovation
Before
Design Checks
Training
HAZOP
During
Unit Checkout
On-Site Training
Test Run
After
Continuing Services
Data Link Access
to Process Experts
Remote Process
Monitoring
Analytical Support
Symposia
Process Training
Turnaround Service
Inspection
UOP 5241B-36
UOP 5241B-38