You are on page 1of 4

SYED MUBARAK

Mobile: 00966-507254285
E-mail: syedmub@live.com

Objective:

To work for an esteemed organization and under successful Professionals where in my talents can be
utilized for the betterment of the organization and my career enhancement.

Possessing a wealth of experience as Structured Cabling Technician Supervisor”


And sufficient knowledge of “Fiber Optic Cabling”, consistently achieving significant experiences
and growth, Believing that good team leadership and hard working brings increased standards and profits.

WORK EXPERIENCE: 8+ Years

1) MARAFIQ
Power and Water utility Company Jubail and Yanbu
Yanbu, Kingdom of Saudi Ariba, Contractor with SBM
Position : UTP & Fiber Cabling Site Supervisor
Duration : March 2009 to Still

Responsibilities:

• Pre installation site visit


• Preparing job schedule
• Reporting daily work Progress
• Recording and informing for variation work done or need to be done
• Preparing material requirement and mobilization
• Timely analyzing work plane reporting to manager for any delays or deviation

Cable Termination Part:

• Fiber optic Splicing installation


• UTP Cat-5,Cat-6 installation
• Installation Patch Panels And I/o Connector
• Installation 800 Pairs Telephone cable
• Complete end-to-end Cabling and termination solution
• Preparing test reports for DATA AND FIBER OPTIC [FLUKE NETWORK METER] and other
document ions
2) Systems Applications International L.L.C. Dubai, U.A.E
A Member of Al Moayyed International Group Bahrain
Position : S.C.S Site Supervisor.
Duration : NOV 2007 to FEB 2009
Responsibilities:
• Pre installation site visit
• Fiber optic Splicing installation
• UTP Cat-5,Cat-6 installation
• Installation Patch Panels
• Installation 800 Pairs Telephone cable
• Preparing shop drawings
• Preparing job schedule
• Preparing resources requirement
• Preparing material requirement and mobilization
• Reporting daily work Progress
• Timely analyzing work plane reporting to manager for any delays or deviation
• Recording and informing for variation work done or need to be done
• Timely Certifying completed job form client or contractors
• Preparing test reports for DATA AND FIBER OPTIC [FLUKE NETWORK METER] and other
documentions
• Signing job completion certificates from client or contractors

Project Details :

1. BURJ AL ARAB JUMAIRA BEACH HOTEL: Fiber Optic Splicing and Fluke Network Test Reports 500+points

2. MADINATH JUMAIRA HOTEL : Fiber Splicing and Fluke Network Test Reports 400+Points

3. DUBAI MARINA : B+G+13+P.H.LEVEL RESIDENTIAL & COMM. BUILDING STRUCTURED CABLING,VOICE


AND CABLING FIBER OPTIC, VIDEO INTERCOM.

4. MINISTRY OF JUSTICE ABU DHABI : DATA CENTER PROJECT

5. CITI BANK All Branch in UAE: Fiber optic, Data point ,VoIP and Normal voice 3000+ points

6. ABN AMRO BANK, DUBAI: Complete Structured Cabling along with fiber optic Back bone & Structured Cabling
for 500+ points.

7. MINISTRY OF JUSTICE SHARJAH : DATA CENTER PROJECT

8. SOROUH ABU DHABI MALL EAST TOWER: B+M+G+5 OFFICE TOWER, Complete Structured Cabling
along with fiber optic Back bone, Voice Cabling and Data Center Preparation 1500+points

3) M/s Sublime Solutions India Private Limited: - Bangalore, India.


Position : Site Supervisor
Duration : Sep 2005 to July 2007.
Major responsibilities include:
• Monitoring and Training the new joiners.
• Maintaining and submitting the daily reports to Manager.
• Coordinating and solving queries of new joiners.
• Coordination with client.

4) M/s Silicon Age Management: - Bangalore, India.


Position : Site Supervisor
Duration : Sep 2004 to Aug 2005.
Major responsibilities include:
• Monitoring and Training the new joiners.
• Maintaining and submitting the daily reports to Manager.
• Coordinating and solving queries of new joiners.

5) Prime Telecom Services Sub Contract with Infosys Private Limited: - Bangalore, India.
Position : Maintenance Supervisor
Duration : Sep 2003 to Aug 2004.
Major responsibilities include:
• Maintenance of server rooms.
• Maintaining and submitting the daily reports to Manager.
• Coordinating and solving queries related to Network and Telecommunication.

6) M/s Prime Telecom Services: - Bangalore, India.


Position : Site Technician (Network and Telecommunication Building)
Duration : Aug 2000 to Sep 2003.

Major responsibilities include:


• Erection of cable trays, trunking etc.
• Laying & fixing of PVC conduits.
• Dressing of cables.
• Installation of telephone and data outlets.
• Complete end-to-end Cabling and termination solution.

Worked under various Projects in INDIA

1. Infosys – Software Development Company – Bangalore


2. B+G+7 storey (Wipro) – Bangalore
3. G+M+2 storey (Velankani information systems ) – Bangalore
4. G+3 storey, GE lightning system – Bangalore
5. G+1 storey, ITPL – Bangalore
6. Tata infotech – Bangalore
7. CFTRI (Central Food Technical Research Institute) – Mysore
8. Infosys - Software Development Company - Pune and Chennai, Mangalore
9. Infosys - Software Development Company - Hyderabad and Orissa
10. Infosys - Software Development Company - Mysore

ACHIEVEMENTS

• Completed 2 month project in just 25 days along with dedicated team at Infosys-INDIA
Educational Qualification:

S.S.L.C. (Secondary school leaving certificate) from Karnataka secondary education board.

Certified Course:

DCCE-1106-GA147 D-Link Cable Engineer Course, Goa, India.

Computer Qualification:

Advance level user of Microsoft.

Personal Thrust / Strengths:


• Good interpersonal, written and oral communication skills.
• Team work and managing potential.
• Come up with solutions when team really needs a breakthrough.
• Growth, commitment and professionalism.
• Integrity towards the organization its norms values, beliefs and policies.
• Confident of being successful.
• Willingness to learn and adoptability.

Personal Information:

Date of birth : 27th August 1982


Permanent Address : # 15 Kalanagar Tattekere Road, channapatna - 571501
Karnataka INDIA
Nationality : INDIAN.
Languages Known : Urdu, English, Hindi, Kannada and Tamil
India Mobile : 0091-9632206906

Passport Information:

Passport Number : G1010439


Date of Issue : 22/12/2006
Date of Expiry : 21/12/2016
Place of Issue : Bangalore-India
Driving License : Valid Saudi Driving license up to 2019
Visa status : Employment

You might also like