PLANNING FOR LOCAL INDUSTRIAL

INVOLVEMENT FOR NEW NPP


DEVELOPMENT IN INDONESIA
Jupiter Sitorus Pane, Dharu Dewi, Yarianto
National Nuclear Energy Agency of indonesia
Presented at

Technical Meeting on Industrial Involvement and Localization for New Nuclear


Power Plant Construction.
Crowne Plaza Hotel, Qingdao, China,
26 to 29 August 2014

Outline

Introduction
Localization/National Participation
Criteria for Selecting National Participation
Assessment of Quality and local content
Supply chain of Civil Construction Industires
Estimation of National Industrial
Participation
Conclusion

Introduction
Indonesia has experienced constructing three
research reactors and performing various PreFeasibility Studies for the preparation of first
nuclear power plant.
One of the benefit for constructing Nuclear
Power Plant in developing countries like
Indonesia include local industrial participation
or involvement that could provide positive
social impact to industry and public.
This presentation provide information
regarding Indonesian experiences in
estimating local industrial participation and
supply chains.

Localization /
National Participation
Manufacturing using foreign engineering in
the local area.
Manufacturing through technology
transferring in the local areas
Manufacturing through technical
collaboration in the local areas

Localization/
National Participation
Manufacturing through joint venture with
co brand in the local areas
Manufacturing using by imported parts or
raw material in the local areas
National labor participation to services and
construction

Criteria for Selecting Local


Industrial Participation
Are their profiles relevant to NPPs
construction?
Are there potential investment capability
to participate in a NPP Project?
Are there relevant experiences of the
national industries in high technology
project?
Are there national industries experiences
in the large conventional power plants?

Assessment of Quality and


local content
Local Industries shall fulfill:
SNI (Indonesia National Standard )
requirement: for safety.
ISO with other certified special
requirements such as SNI, ASME NQA-1,
OHSAS 18000, ISO14000 and NBBI for
civil works.
Portland V for building material

Assessment of Quality and


Local Content
Architecture: ISO 9001:2002, OHSAS
18001:1999, ASME NQA-1 (quality
control)
Manufacturing industries: ISO 9001, ISO
14001 ASMe Stamp (U, U2,S,R,NB, PP)
and BS 5500

Supply Chain of Civil


Construction Industries
NPP Construction

Civil Construction

Steel Structure
Industries

Civil Construction
Industries

Steel Industries

Cement Industry

Supporting
Material Industries

Civil Construction Industries

PT. Adhi Karya


PT. Waskita Karya
PT. Hutama Karya
PT. Wijaya Karya
PT. Nindya Karya
PT. Pembangunan Perumahan
PT. Krakatau Engineering
PT. Bangun Total Persada

Civil Construction
Industries Supply Chain
NPP Construction

Civil Construction
Industries

PT. Adhi Karya

Experiences :
Port of Inalum
Bride of
Suramadu
Tn. Abang
Market
Istiqlal Mousque
etc

PT. Waskita Karya

PT. Hutama Karya

Experiences :
Lahendong
Geothermal PP
Muara Karang
CPP
Port
Research Reactor
Serpong
Port and dam

Experiences :
Segara Mini
Hydro
Cirompang Mini
Hidro
Kendari CPP
Ampana CPP
Port
Building

PT. Pembangunan
Perumahan

PT. Krakatau
Engineering

Experiences :
KDL CCPP 3x40
GPP 90MW
Talang Duku
GPP 65 MW
Port and Dum
Building

Experiences
EPO GPP 2x40
Gunung Megang
Sumatra Selatan
WHRG Power
Plant 2 x 14 MW
PT. Meratus jaya
Urea dan
Amonia Plant

PT. Total Bangun


Persada

Experiences :
Building
Hotel & Office
Apartment
Etc.

Steel And Steel Structure


Industries

PT. Krakatau Steel


PT. Gunung Garuda (PT. Gunung Steel Group)
PT. Cilegon Fabricators
PT. Ometraco Arya Samantha
PT. Amarta Karya
PT. Arkon Prima Indonesia
PT. Gunawan Dian Jaya Steel

Civil Construction
Industries Supply Chain
NPP Construction

Steel and Steel Structure

PT. Krakatau Steel


Experiences :
Build PT
Krakatau Daya
Listrik (Power
Plant)

PT. Gunung Steel


Group
Experiences :
Supply the
project of PT.
Krakatau
Engineering
Supply the
project of PT.
Krakatau Posco

PT. Cilegon
Fabrication
Experiences :
Suralaya CPP
Bukit Asam CPP
Belawan CPP
PLTGU Cilegon,
Muara Karang
dan Tg. Periok

PT. Ometraco
Arya Samanta
Experiences
CCPP Tambal
Lorok project ,
Semarang.
Paison-Besuki
CPP
Gresik CPP
Petero Kimia
Gresik
Kamojang , Jabar

Cement Industries

PT. Semen Padang


PT. Semen Gresik
PT. Semen Tonasa
PT. Semen Baturaja
PT. Semen Holchim Indonesia
PT. Indocement Tunggal Perkasa TBk
PT. Semen Andalas
PT. Semen Bosowa
PT. Semen Kupang

Civil Construction
Industries Supply Chain
NPP Construction

Cement

PT. Semen Padang

Experiences :
Waste heat
recovery power
generation at
Indarung
CPP
construction at
teluk sirih

PT. Semen
Baturaja
Palembang

PT. Semen
Holchim
Indonesia

Experiences :
No information
to build
electrical
generation plant

Experiences :
Cilacap
CPP(2006)
Paiton CPP
Labuan CPP
Indramayu CPP
Muara Tawar
CPP

PT.. Semen Gresik

Experiences
Sudimoro CPP
Pacitan
Paiton CPP
Probolinggo
Sluke CPP
Rembang

Civil Construction
Industries Supply Chain
NPP Construction

Cement

PT. Semen Padang

Product type and capacity


Type I Portland Cement
(ordinary Portlant Ceme
Nt
Type II Portland Cement
Type III Portland
Cement
Type V Portland Cement
Oil Weld Cement

PT. Semen Baturaja


Palembang

PT. Semen Holchiim


Indonesia

Product type and capacity


Type I Portland Cement
(about 375000 ton/year
Portland Cement
Composite 875000
ton/year

Product type and capacity


Portland Ceomposite
Cement (about 3169.97
ton/year)
Ordinary Portland
Cement1.328.312 ton
Concrete Ready Mix 45
million m

PT.. Semen Gresik

Product type and


capacity
Ordinary Portland
Cement (about
2.876.3000 box
Portland Cement
8.763.700 Cement
Special Blended
Cement (with order)

Estimation of Local
Industrial Involvement

O
il

O
il

C
oa
l

C
oa
l

O
il

O
il

C
oa
l

C
oa
l

19

Energy Projection with High Scenario


(without limited unit of NPP*)
MW

180000
160000

Capacity of NPP (MW)

140000
120000
100000
80000
60000
40000

2050

2048

2046

2044

2042

2040

2038

2036

2034

2032

2030

2028

2026

2024

2022

2020

2018

2016

2014

2012

2010

20000

* PLTN dibebaskan muncul kapan dan dengan jumlah berapa saja

Energy Projection with High Scenario


(with limit 2 unit of NPP per year**)
MW

14000

Capacity of NPP (MW)


12000
10000
8000
6000
4000
2000
0
2010

2017

2024

2031

2038

2045

** PLTN ditasi waktu (mulai 2027) dan jumlah kemunculan (2 unit/tahun)

Estimation of Local
Industrial Involvement
Road map of construction:

NPP (unit#)

#1,#2

#3,#4

#5,#6

#7,#8

#9,#10

Year of
construction

2027

2034

2037

2040

2043

Contract type

Turn-key

Turn-key

Split
package

Split
package

Split
package

Local content

30

35

40

60

80

Conclusion
Indonesia has already identify industries that
fulfill criteria to participate on civil
construction of new nuclear Power Plant
since they have experiences to build
conventional power plant and
implemented national and international
code and standard.
Depend on the national nuclear energy
policy, the participation of local industries
could increase with the increase of number
of NPP construction.

Thank You for Your Kind Attention

Thank you