The next meeting of the Committee will take place on Wednesday 5 March 2007 at 2.00pm in the Boardroom. A new deadline for the Briefs was set for 18 December 2007 and the Project Brief Verification Group met in the first week of January before the term began.
The next meeting of the Committee will take place on Wednesday 5 March 2007 at 2.00pm in the Boardroom. A new deadline for the Briefs was set for 18 December 2007 and the Project Brief Verification Group met in the first week of January before the term began.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
The next meeting of the Committee will take place on Wednesday 5 March 2007 at 2.00pm in the Boardroom. A new deadline for the Briefs was set for 18 December 2007 and the Project Brief Verification Group met in the first week of January before the term began.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
The next meeting of the Committee will take place on Wednesday 5 March 2007 at 2.00pm in the Boardroom.
AGENDA Papers:
08.16 MEMBERSHIP, WELCOMES AND APOLOGIES
The Chair welcomes everyone to the meeting of the Faculty
Committee.
08.17 MINUTES OF THE LAST MEETING
To approve: The minutes of the last meeting held on 20 FCCM08/02/02
November 2007.
08.18 MATTERS ARISING
08.18.01 Project Brief Verification Group (min 08.06 –
20/11/07 refers)
To note: A new deadline for the Briefs was set for 18
December 2007 and the Project Brief Verification meeting took place in the first week of January before the term began.
08.18.02 Any other Business (min 08.14 – 20/11/07
refers)
To note: The Head of ICT has given lists of student names
that have exceeded their network storage quota to Subject Leaders.
08.19 MASTERCLASS EVENTS
To discuss: A proposal to have a dedicated day or several
days for Masterclass Events.
08.20 COURSE COMMITTEE MINUTES
To receive: The unconfirmed minutes from all Course
Committees. Level 0 in Design and Communication FCCM08/02/03a Quality Team First Circulation 1 FCCM - 050308 FCCM08/02/01
FdSc Broadcast Media Technology, FdA FCCM08/02/03b
Broadcast Operations and Production and BSc (Hons) Broadcast Technology FdA Creative Sound Design and FdA Broadcast FCCM08/02/03c Post Production FdA Computer Visualisation and Animation and FCCM08/02/03d BA (Hons) Animation BA (Hons) Content Creation and Broadcast and FCCM08/02/03e BA (Hons) Broadcasting BA (Hons) Design for Moving Image FCCM08/02/03f BA (Hons) Graphic Design FCCM08/02/03g
08.21 PROJECT BRIEF VERIFICATION GROUP
To receive: The notes of the Project Brief Verification Group FCCM08/02/04
from 30 January 2008.
To note: a) Project Briefs for term 3 need to be with Quality by
17 March 2008.
b) The next Project Brief Verification Group will be
held on the 8 April 2008 at 10am in the Boardroom.
08.22 ANNUAL MONITORING REPORT ACTION PLAN
To receive: An update from the Head of Faculty on the Annual FCCM08/02/05
Faculty Monitoring Report Action Plan.
08.23 CONTEXTUAL STUDIES EXTERNAL EXAMINER ACTION PLAN
To receive: An update on the Contextual Studies External FCCM08/02/06
Examiner Action Plan.
08.24 FUTURE COURSE DEVELOPMENTS AND VALIDATIONS
To receive: An update on the Level 0 course development. FCCM08/02/07a
FCCM08/02/07b
To discuss: Future Course Developments
08.25 NATIONAL STUDENT SURVEY
To receive: An update on the progress of response rates for FCCM08/02/08