Saudi Eiechice COM pany
4.2.11 For the overall Qurayyah Power Plant CONSTRUCTION CONTRACTS, a monthly
analysis of each PROJECT Schedule shall be made by CONSULTANT and
submitted to COMPANY with particular emphasis an the critical and sub critical
paths. The conclusions of this analysis shall be covered in the monthly progress
report to be prepared by CONSULTANT and this report shall include but not
li mited to:
4.2.11.1 Narrative highlights of any changes over the status of the previous
month.
4.2.11.2 Special actions recommended or being implemented to maintain or
i mprove schedule.
4.2.11.3 Outlook for activities to be started or finished during the next
month.
4.2.11.4 Description of all activities performed within the reporting month.
4.2.11.5 Summary of all management manpower by the job description.
4.2.11.6 Revised Progress Payment forecast of the CONSTRUCTION
CONTRACTOR.
4.2.12 CONSULTANT shall prepare and issue, an a monthly basis In conjunction with
CONSTRUCTION CONTRACTOR'S progress report, progress curves showing the
projected actual progress for overall engineering.
4.2.13 CONSULTANT shall review all reports submitted by CONSTRUCTION
CONTRACTOR, and shall present to COMPANY his assessment and evaluation in
a timely manner as determined by COMPANY.
4.2.14 CONSULTANT shall verify Monthfy Progress of the WORK at SITE submitted by
CONSTRUCTION CONTRACTOR. CONSULTANT shall forward to COMPANY
certification of such invoices and advise COMPANY whether the WORK
represented by the invoices was completed in accordance with CONTRACT
requirements.
4.2.15 CONSULTANT shall assist in COMPANY Management Review Meetings and other
special meetings as directed by COMPANY.
4.2.16 All of CONSULTANTS caiculations and documents supporting schedules,
reports, and forecasts shall be made available to COMPANY an request.
4.3 DESIGN REVIEW AND OUT OF KINGDOM HOME OFFICE SUPPORT
4.3.1 CONSULTANT shall perform a detailed review of the CONSTRUCTION
CONTRACTOR'S design, which shall confirm:
4.3.1.1 That the design and material selection are in compliance with the
requirements of Qurayyah Power Plant CONSTRUCTION CONTRACTS
specification, and approved standards;
4.3.1.2 That the CONSTRUCTION CONTRACTOR'S Base Design parameters,
design procedures and formulas follow good engineering practice.
4.3.1.3 That the layout and plant arrangement are in accordance with the
technical specification requirements of Qurayyah Power Plant
CONSTRUCTION CONTRACTS.