Professional Documents
Culture Documents
2043.576
2043.6
1.11
1.1
1.25
AH
( Manufacturer temperature discharge curve)
(Assumed)
As per IEEE 485-2000
Required capacity
3200
AH
Volts / cell
220
Volts
Float voltage
2.25
1.81
Volts / cell
245
243.00
108.00
195.00
108
2.25
1.81
142007-SR00-E-2033
REV.
(DMxL1) +
(BIFxAh)
T
X1/(K1*K2)
A=
DM =
L1 =
BIF =
Ah =
K1=
K2=
T=
in battery (Assumed)
Capacity of battery
Derating factor for battery charger due to temperature
Derating factor for battery charger due to altitude
Recharge time
A=
684.91 A
761.02 A
1.1
489.32 A
1.1
3200
1
1
24
142007-SR00-E-2033
Ah
( As per clause 3.2 )
( As per clause 3.2 )
hr
800 A
REV.
ANNEXURE NO - 2
Load Sheet
From To
0
1
Sl. No.
Load Description
20 kv Generator Circuit
Breaker (Unit 1,2&3)
2
3
4
5
6
7
B
1
2
3
4
5
6
C
1
2
3
4
5
D
1
2
3
4
5
E
1
2
3
4
5
Type of
Load
Unit
Load
(A)
Total Nos.
No. of
Per Unit Simultaneous
Operation
Considering all
units
Continuous
0.016
Momentary
Momentary
Continous
Continous
Continuous
Continuous
10.00
3.00
0.10
0.10
0.02
0.02
1
1
15
2
6
11
Momentary
10.000
Continuous
Continuous
Momentary
Continuous
Momentary
0.016
0.08
5.50
0.02
8.00
Momentary
10.000
Continuous
Continuous
Momentary
Continuous
Minute
load
(A)
Minute
load
(A)
Minute
load
(A)
Minute
load
(A)
Continu
ous
Load
(A)
Remarks
15
0.24
0.24
0.24
0.24
0.24
3
3
45
6
18
33
30.00
9.00
4.50
0.60
0.29
0.66
4.50
0.60
0.29
0.66
4.50
0.60
0.29
0.66
30.00
9.00
4.50
0.60
0.29
0.66
4.50
0.60
0.29
0.66
Unit
Unit
Unit
Unit
Unit
Unit
30.00
125
5
2
8
1
150
15
6
24
3
2.40
1.20
33.00
0.48
24.00
2.40
1.20
2.40
1.20
0.48
0.48
10.00
0.016
0.08
5.50
0.02
90
17
3
23
108
17
3
23
1.73
1.36
16.50
0.46
Momentary
Continuous
Continuous
Momentary
Continuous
3.28
0.016
0.08
5.50
0.02
3
180
45
3
12
6
216
135
9
36
19.68
3.46
10.80
49.50
0.72
Momentary
Continuous
Continuous
Momentary
Continuous
3.28
0.016
0.08
5.50
0.02
3
110
50
3
46
2
132
50
3
46
6.56
2.112
4.00
16.50
0.92
30.00
2.40
1.20
33.00
0.48
24.00
1.73
1.36
0.46
0.46
3.46
10.80
3.46
10.80
0.72
0.72
2.11
4.00
2.11
4.00
0.92
0.92
1.73
1.36
16.50
0.46
19.68
3.46
10.80
49.50
0.72
6.56
2.11
4.00
16.50
0.92
assumed
assumed
assumed
assumed
assumed
assumed
10.00
1.73
1.36
load
load
load
load
load
load
Unit
Unit
Unit
Unit
Unit
load
load
load
load
load
assumed
assumed
assumed
assumed
assumed
3.46
10.80
0.72
2.11
4.00
0.92
Unit
Unit
Unit
Unit
load
load
load
load
assumed
assumed
assumed
assumed
Unit
Unit
Unit
Unit
Unit
load
load
load
load
load
assumed
assumed
assumed
assumed
assumed
Unit
Unit
Unit
Unit
Unit
load
load
load
load
load
assumed
assumed
assumed
assumed
assumed
F
1
2
3
4
5
G
1
2
3
4
5
H
1
2
3
4
5
I
1
2
3
4
5
J
1
2
3
4
5
K
1
2
3
4
5
Momentary
3.28
6.56
Continuous
Continuous
Momentary
Continuous
0.016
0.08
5.50
0.02
50
50
3
6
30
50
3
6
0.48
4.00
16.50
0.12
Momentary
3.28
6.56
Continuous
Continuous
Momentary
Continuous
0.016
0.08
5.50
0.02
50
50
3
6
30
50
3
6
0.48
4.00
16.50
0.12
Momentary
3.28
6.56
Continuous
Continuous
Momentary
Continuous
0.016
0.08
5.50
0.02
50
50
3
6
30
50
3
6
0.48
4.00
16.50
0.12
Momentary
3.28
6.56
Continuous
Continuous
Momentary
Continuous
0.016
0.08
5.50
0.02
50
50
3
6
30
50
3
6
0.48
4.00
16.50
0.12
Momentary
3.28
6.56
Continuous
Continuous
Momentary
Continuous
0.016
0.08
5.50
0.02
50
50
3
6
30
50
3
6
0.48
4.00
16.50
0.12
Momentary
3.28
6.56
Continuous
Continuous
Momentary
Continuous
0.016
0.08
5.50
0.02
50
50
3
6
30
50
3
6
0.48
4.00
16.50
0.12
6.56
0.48
4.00
0.48
4.00
0.12
0.12
0.48
4.00
0.48
4.00
0.12
0.12
0.48
4.00
0.48
4.00
0.12
0.12
0.48
4.00
16.50
0.12
6.56
0.48
4.00
16.50
0.12
0.12
0.48
4.00
0.12
0.12
0.48
4.00
0.48
4.00
0.12
0.12
0.48
4.00
16.50
0.12
0.12
0.48
4.00
0.12
0.48
4.00
0.12
0.12
0.48
4.00
16.50
0.12
load
load
load
load
assumed
assumed
assumed
assumed
Unit
Unit
Unit
Unit
load
load
load
load
assumed
assumed
assumed
assumed
Unit
Unit
Unit
Unit
load
load
load
load
assumed
assumed
assumed
assumed
6.56
0.48
4.00
Unit
Unit
Unit
Unit
6.56
0.48
4.00
16.50
0.12
assumed
assumed
assumed
assumed
6.56
0.48
4.00
load
load
load
load
6.56
0.48
4.00
16.50
0.12
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
load
load
load
load
assumed
assumed
assumed
assumed
Unit
Unit
Unit
Unit
load
load
load
load
assumed
assumed
assumed
assumed
L
1
2
3
4
5
M
1
2
3
4
5
N
1
2
3
4
5
O
1
2
3
4
5
P
1
2
3
4
5
Q
1
2
3
4
5
R
1
2
3
4
5
Momentary
3.28
6.56
Continuous
Continuous
Momentary
Continuous
0.016
0.08
5.50
0.02
50
50
3
6
30
50
3
6
0.48
4.00
16.50
0.12
Momentary
3.28
6.56
Continuous
Continuous
Momentary
Continuous
0.016
0.08
5.50
0.02
50
50
3
6
30
50
3
6
0.48
4.00
16.50
0.12
Momentary
3.28
3.28
Continuous
Continuous
Momentary
Continuous
0.016
0.08
5.50
0.02
50
30
1
6
30
30
1
6
0.48
2.40
5.50
0.12
Momentary
3.28
3.28
Continuous
Continuous
Momentary
Continuous
0.016
0.08
5.50
0.02
50
30
1
6
30
30
1
6
0.48
2.40
5.50
0.12
6.56
0.48
4.00
0.48
4.00
0.12
0.12
0.48
4.00
0.48
4.00
0.12
0.12
0.48
4.00
16.50
0.12
6.56
0.48
4.00
16.50
0.12
Unit
Unit
Unit
Unit
load
load
load
load
assumed
assumed
assumed
assumed
Unit
Unit
Unit
Unit
load
load
load
load
assumed
assumed
assumed
assumed
Momentary
3.28
3.28
Continuous
Continuous
Momentary
Continuous
0.016
0.08
5.50
0.02
50
30
1
6
30
30
1
6
0.48
2.40
5.50
0.12
Momentary
3.28
3.28
Continuous
Continuous
Momentary
Continuous
0.016
0.08
5.50
0.02
50
30
1
6
30
30
1
6
0.48
2.40
5.50
0.12
Momentary
3.28
3.28
Continuous
Continuous
Momentary
Continuous
0.016
0.08
5.50
0.02
50
30
1
6
30
30
1
6
0.48
2.40
5.50
0.12
3.28
0.48
2.40
0.48
2.40
0.12
0.12
0.48
2.40
5.50
0.12
3.28
0.48
2.40
0.48
2.40
0.12
0.12
0.48
2.40
0.48
2.40
0.12
0.12
0.48
2.40
0.48
2.40
0.12
0.12
0.48
2.40
5.50
0.12
0.48
2.40
0.12
0.12
0.48
2.40
0.12
0.12
0.48
2.40
5.50
0.12
Unit
Unit
Unit
Unit
load
load
load
load
assumed
assumed
assumed
assumed
Unit
Unit
Unit
Unit
load
load
load
load
assumed
assumed
assumed
assumed
3.28
0.48
2.40
assumed
assumed
assumed
assumed
3.28
0.48
2.40
5.50
0.12
load
load
load
load
3.28
0.48
2.40
5.50
0.12
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
load
load
load
load
assumed
assumed
assumed
assumed
Unit
Unit
Unit
Unit
load
load
load
load
assumed
assumed
assumed
assumed
1
2
3
4
5
T
1
2
3
4
5
U
1
2
3
4
5
V
Momentary
3.28
3.28
Continuous
Continuous
Momentary
Continuous
0.016
0.08
5.50
0.02
50
30
1
6
30
30
1
6
0.48
2.40
5.50
0.12
Momentary
3.28
3.28
Continuous
Continuous
Momentary
Continuous
0.016
0.08
5.50
0.02
50
30
1
6
30
30
1
6
0.48
2.40
5.50
0.12
Momentary
3.28
3.28
Continuous
Continuous
Momentary
Continuous
0.016
0.08
5.50
0.02
50
30
1
6
30
30
1
6
0.48
2.40
5.50
0.12
3.28
0.48
2.40
0.48
2.40
0.12
0.12
0.48
2.40
5.50
0.12
Unit
Unit
Unit
Unit
load
load
load
load
assumed
assumed
assumed
assumed
3.28
0.48
2.40
0.48
2.40
0.12
0.12
0.48
2.40
5.50
0.12
3.28
0.48
2.40
0.48
2.40
0.12
0.12
0.48
2.40
5.50
0.12
Unit
Unit
Unit
Unit
load
load
load
load
assumed
assumed
assumed
assumed
Unit
Unit
Unit
Unit
load
load
load
load
assumed
assumed
assumed
assumed
CLOSING OF BREAKERS
1
2
Momentary
Momentary
23.00
11.50
1
2
1
2
23.00
23.00
Closing coil
Momentary
6.00
6.00
0.11
0.22
0.11
0.016
2
30
6
90
0.66
1.44
0.03
0.18
0.08
12
0.96
0.01
1
0.08
0.08
0.02
3
2
21
4
3
4
6
6
6
9
0.04
6.00
0.48
0.48
0.18
1
2
3
4
5
6
7
8
9
10
Momentary
Continuous
Continuous
Momentary
Continuous
Momentary
Continous
Continous
Continous
Continuous
0.22
0.66
1.44
0.66
1.44
0.66
1.44
0.18
0.96
0.96
6.00
6.00
0.18
0.18
0.96
0.04
6.00
0.48
0.48
0.18
0.96
6.00
0.18
load
load
load
load
load
assumed
assumed
assumed
assumed
assumed
1
2
3
4
5
6
Y
1
2
3
4
5
Z
Continuous
Continuous
Momentary
Continous
Continous
Continuous
0.11
0.016
6
0.08
0.08
0.02
2
30
3
21
4
3
6
90
4
6
6
9
0.66
1.44
24.00
0.48
0.48
0.18
0.66
1.44
0.66
1.44
0.18
Continuous
Continuous
Continuous
Continuous
Continuous
0.016
0.08
0.02
0.08
0.016
2
16
4
3
3
3
24
12
9
9
0.05
1.92
0.24
0.72
0.14
Continuous
AA
Continuous
AB
Continuous
AC
1
2
3
4
5
AD
1
2
3
4
5
AE
AF
0.66
1.44
0.18
0.66
1.44
24.00
0.48
0.48
0.18
0.18
Unit
Unit
Unit
Unit
Unit
Unit
load
load
load
load
load
load
assumed
assumed
assumed
assumed
assumed
assumed
0.05
1.92
0.24
0.72
0.14
0.05
1.92
0.24
0.72
0.14
0.05
1.92
0.24
0.72
0.14
0.05
1.92
0.24
0.72
0.14
Unit
Unit
Unit
Unit
Unit
load
load
load
load
load
assumed
assumed
assumed
assumed
assumed
18.00
18.00
18.00
18.00
18.00
15.00
15.00
15.00
15.00
15.00
9.00
9.00
9.00
9.00
9.00
0.48
2.40
0.48
2.40
0.12
0.12
Momentary
3.28
3.28
Continuous
Continuous
Momentary
Continuous
0.016
0.08
5.50
0.02
50
30
1
6
30
30
1
6
0.48
2.40
5.50
0.12
3.28
Momentary
3.28
3.28
Continuous
Continuous
Momentary
Continuous
0.016
0.08
5.50
0.02
50
30
1
6
30
30
1
6
0.48
2.40
5.50
0.12
0.48
2.40
0.48
2.40
0.12
Continous
320
320
Miscellaneous load
Total Loads ( Amps)
Continous
10
10
10
10
1032.70
0.48
2.40
5.50
0.12
Unit
Unit
Unit
Unit
load
load
load
load
assumed
assumed
assumed
assumed
3.28
0.12
0.48
2.40
5.50
0.12
0.12
Unit
Unit
Unit
Unit
load
load
load
load
assumed
assumed
assumed
assumed
320
320
320
320
10
489.32
10
541.32
10
1032.70
10
489.32
ANNEXURE No - 3
1.0
AH Sizing of Battery
Load Details :
A1 =
A2 =
A3 =
A4=
1032.70
489.32
541.32
1032.70
Amp
Amp
Amp
Amp
Period
Load
(A)
Duration
Change
of
in Load
operatio
(A)
n (min)
1032.7 1032.696
3
4
+ve value
-value
1094.97
TOTAL
1094.973
Section -2 first two periods only if A3 is greater than A2, go to section 3
A1=
A1-0=
t1=
T=t1+t2
2.95
1032.7 1032.696
A2=
A2-A1=
1
t2=
118
T=t2
489.3
-543.4
117
117
A1=
A1-0=
t1=
T=t1+t2
+t3
1
t2=
119
T=t2+t3
3043.56
2.93
-1592.6699
Total
1450.892
Section-3 first three periods only if A4 is greater than A3, go to section 4
1032.7 1032.696
A2=
A2-A1=
489.3
A3=
-543.38
A3-A2=
117
t3=
118
T=t3
541.32
52
A1=
A1-0=
t1=
T=t1+t2+t3
+t4
1
t2=
120
T=t2+t3
2.96
3060.25
2.95
-1601.450
1.06
55.1358515573
Total
1513.934
Section-4 first four periods only if A5 is greater than A4, go to section 5
KT factor
Time to
end of
section
(min)
1032.7 1032.696
A2=
A2-A1=
489.3
A3=
-543.4
A3-A2=
117
t3=
119
T=t3+t4
541.32
A4=
52.0
A4-A3=
1
t4=
2
T=t4
1032.70
491.4
2.98
3076.93
2.96
-1610.230
1.07
55.8586408719
1.06
Total
[Change in load (A) x KT factor]
521.01259112
2043.576
ANNEXURE - 4
Capacity rating factor
For derivation of capacity rating factor, battery type of manufacture Absolyte IIP
Battery(1600 AH for 2 hrs. ) is chosen for calculation purpose.
Rated Capacity in Ampere hours (choosen)
Kt =
1600
AH
The Kt factor for time t is calculated in the table by interpolation using this formula
Kt = Kt2 -
(Kt2-Kt1) x (t2-t)
(t2-t1)
1
1
60
15
120
1509
1509
796
1275
537
1.06
1.06
2.01
1.25
2.98
1.0603
1.0742
2.9310
118
60
120
796
537
2.01
2.98
2.9472
119
60
120
796
537
2.01
2.98
2.9634
120
537
2.98
120
142007-SR00-E-2033
2.9795
REV.
ANNEXURE NO -5
Load Curve
LOAD CURVE
1032.70
LOAD CURRENT
IN AMPERES
541.32
489.32
0
1
118
TIME IN MINUTES
119
120