You are on page 1of 3

Curriculum Vitae

RINO ERMAWAN
Pondok Ungu Permai Blok AD.5 No. 22
Kel. Bahagia Kec. Babelan. Kab. Bekasi
Jawa Barat
Mobile Phone : +62 85210767769
Email : rinoermawan.inti@gmail.com

PERSONAL DETAILS
Full Name
Place / Date of Birth
Gender
Religion
Marital Status
Nationality & Citizenship
Contact Address
Mobile Phone Number
Email

: RINO ERMAWAN, Ir.


: Kediri / September 25, 1970
: Male
: Moslem
: Married
: Indonesian
: Pondok Ungu Permai Blok AD5 No. 22
Kel. Bahagia Kec. Babelan Bekas Jawa Barat
: +62 81328225970, 085210767769
: rino@nipindo.com; rinoermawan.inti@gmail.com

FORMAL EDUCATION
Bachelor of Engineering (B.Eng.) : S1 in Geodesy
Department of Geodesy & Geomatics Engineering,
Faculty of Engineering, Gadjah Mada University
Thesis Defence, December 1995

COMPUTER SKILL
Software
Operating System
Civil Software
Mining Software

: Ms Office Suite, Autocad Map, Adobe Photoshop, Ulead Visual


Studio, CorelDraw 11
: Advanced use, installation and trouble shooting of Windows
Operating System e.g.: Windows 98, Windows 2000, Windows
Me, Windows XP
: Land Desktop Development (LDD), R2V, Diolkos (road design),
Topocad, Softdesk., Map Info, Map Source, Autocad
: Minescape 4.118, Surpac 6.20

Curriculum Vitae

Rino Ermawan

Survey soffware

: Laplink for TS Sokkia, 12D, Transit for TS Nikon,Trimble Office


for GPS Trimble, Mapsource for GPS Hand Held, Geocal, Surfer,
LISCAD.
Geologist Software
: Global mapper , Surfer
Network
: Lan, wireles Lan Brigde, Appoint

INSTRUMENT SKILL
GPS Trimble 4000SST/SSE, GPS Leica System 500, Total Station Sokkia Set 310, Digital
Theodolite Sokkia DT510.

WORK EXPERIENCES

NIPINDO GROUP
Present.
Engineering & Exploration Dept Head

NUSANTARA INTI PRATAMA


2011.
Senior Mine Planer
Project : Coal Mining BATARA Site Muara Teweh
Project : Coal Mining Penajam Site Mitra Tani

Januari 2012

September 2010 Des

Make Short term and Longterm.

NIPINDO PRIMA MESIN


September 2010
Geodetic Engineer
Project : Coal Mining Pipit Mutiara Jaya Site Sesayap

September 2004

Coal mining boundary polygon/main traverse & installation GPS benchmark.


Processing & Transformation all local coordinates to UTM coordinate system
Topographic survey 1:1000 scale coal mining site with area over 1500 ha.
Data processing and drawing digital topographic map and cross-section with Land Development
Software v2000i and Soft desk v.8 software.
Shooting survey bore holes, outcrop, river and structure position in coalmine area.
Survey, processing and drawing boundary parcel area for calculation budget to need for land
compensation.
Design, drawing and calculation volume cut & fill planning road hauling from pit area to jetty
area, Stockpile area, camp and crushing plan area.
Supporting mine planning and geologist section for to calculation mine reserve area, geology
modelling and mine design plan.
Intensive Safety talk and Technical meeting in office or field every Monday morning.
Supervisor and evaluation earthwork contractor and joint survey every month to calculation
volume progress cut and fill for report to survey manager.
Discussion, advice about field activity and reporting all data to survey manager.
.

NIPPON Koe JO
September 2004
Geodetic Engineer
Project : Lemah Abang Irigation

August 2003 -

Irigation area boundary polygon/main traverse using Total Station.


Processing & Transformation all local coordinates to UTM coordinate system
Topographic survey 1:500 scale with area over 500 ha.
Page 2 of 3

Curriculum Vitae

Rino Ermawan

Data processing and drawing digital topographic map and cross-section with Land
Development Software v2000i and Soft desk v.8 software.
Design, drawing and calculation volume cut & fill planning.
Supervision and evaluation earthwork contractor and joint survey every month to
calculation volume progress cut and fill for report to survey manager.
Discussion, advice about field activity and reporting all data to survey manager.

KUMAGAI WIKA JO

June 1998 - September

2002
Geodetic/Survey Engineer
Project : Hydro Electric Power Plant ( PLTA)

Project area boundary polygon/main traverse & installation GPS benchmark.

Processing & Transformation all local coordinates to UTM coordinate system

Topographic survey 1:1000 scale with area over 1500 ha.

Data processing and drawing digital topographic map and cross-section with Land Development

Software v2000i and Soft desk v.8 software.


Stake out dam site, tunnel position, drilling position and road position.
Drawing and calculation volume cut & fill planning acces road.
Intensive Safety talk and Technical meeting in office or field every Monday morning .
Supervisor and evaluation earthwork contractor and joint survey every month to calculation
volume progress cut and fill for report to survey manager.

Barunadri Consultant Engineering


Chief Surveyor
Project : Land Administration

May 1997 - May 1998

GPS Control Point Survey for National Third Order, Semarang), Client: Agrarian National Board
(BPN).
Main traverse/polygon measurement using Total Station
Survey, processing and drawing boundary parcel area.
Discussion, and reporting all data and progress to owner.

Others

Freelance lecturer/instructure at Non degree Geomatic Engineering, Gadjah Mada University


Site Manager For Land Clearing and Civil work contractor at Wings group Bank Ekonomi

TRAINING / COURSES
Mei 1997 Licensed Surveyor Held by Gadjah Mada University.
April 2006 Leadership Skill, Held by Nipindo Prima Mesin