You are on page 1of 15

Drinking Water Supply Scheme

VILL.- piprsana
ESTIMATE COST RS
sno

Proposed work

29.26 LAKH
quantity Work
done

Balance
work

1 Tublewell(DTH150)

2 Submersible motar pump

3 Pump house

0
0
0

4 GI pipe rising main 80


5 OHT 46 KL
6 Electric connection
7 Distribution pipe line
Pvcpipe110mmdia
Pvcpipe90mmdia

800
200

800
200
100

matreils
GI pipe rising main 80mm@219.15/mt
Pvcpipe110mmdia@232.18/mt
Pvcpipe90mmdia@157.24/mt

0
800
200

219.15
232.18
157.24

Total

Sub-Engineer
P.H.E SUB Division Gohad

Assistant Engineer
P.H.E SUB Division Gohad

ESTIMATE

Name of work:-Detaile estimate for laying & jointing ofGI pipe line80mm dia-for rising main

VILL.- piprsana
SN

(As per SOR: UAD Bhopal w.e.f. 10th may 2012)& E-N-C PHED Bhopal w.e.f.301/15-10-20
ITEMS
QUANTITY RATE
UNIT
1 Earth work in excavation for pipe trench in all
kinds of soil in area including dressing watering
and disposal of excavation earth lead up
to50mt and up to1.5 mt disposal to be
leveled ;neatly dressed

1750

875

129.1 CUM

1750

39 R/m

2 Labour for laying &jointing following


Glavanised iron(ms) pipe with specials(such as
bend , elbos,teeetc)class light, medium& heavy
i/c testing of joints&cost of jointing materials
but excluding cost of pipe & specials

G.I.pipe80mm dia
3 Labour for cutting following Galvanised iron(ms)
pipe of any type&class

35

20 each

875

19 cum

4 Filling available excavated in trench lead lead


up to
50mt and lift up to 1.5mt in all kinds of soil
excluding watering and remming

As Per Exacavation

Total Rs.

Sub-Engineer
P.H.E SUB Division Gohad

Assistant Engineer
P.H.E SUB Division Gohad

Schedule of quantity for laying &jointing ofG.I.pipe line80mmdia


VILL.- piparsana
SN

(As per SOR: UAD Bhopal w.e.f. 10th may 2012)& E-N-C PHED Bhopal w.e.f.301/15-10-20
ITEMS
QUANTITY UNIT
1 Earth work in excavation for pipe trench in all
kinds of soil in area including dressing watering
and disposal of excavation earth lead up
to50mt and up to1.5 mt disposal to be
leveled ;neatly dressed

2 Labour for laying &jointing following


Glavanised iron(ms) pipe with specials(such as
bend , elbos,teeetc)class light, medium& heavy
i/c testing of joints&cost of jointing materials
but excluding cost of pipe & specials

3 Labour for cutting following Galvanised iron(ms)


pipe of any type&class

4 Filling available excavated in trench lead lead


up to
50mt and lift up to 1.5mt in all kinds of soil
excluding watering and remming

875 CUM

1750 R/M

35 Each

875 CUM

Sub-Engineer
P.H.E SUB Division Gohad

Assistant Engineer
P.H.E SUB Division Gohad

ESTIMATE
Name of work:-Detailed estimate for laying&jointing PVC 160,110 & 90 mm dia p

VILL.- PIPRSANA
s.n.
1

Items

quantiy

rate

unit

Dismantling CC Manualy/by mechanical


means
1:3:6 or richer mix width 50 cm and 20 cm
depth
850X.55X0.1=42.5
2 Earth work in excavation for pipe trench in all
kinds of soil in area including dressing watering
and disposal of excavation earth lead up
to50mt and up to1.5 mt disposal to be
leveled ;neatly dressed
200X.55X1==110

42.5

703 cum

462

129.1 cum

800X.55X.8=352
Total=4462
3 Labour laying in position following PVC pipe
of6,8&10kg/sqcmpressur
(a)PVC PIPE110mmdia

800

4 r/m

(b)PVC PIPE90mm dia

200

4 Providing solvent cement


join6,8&10kg/sqcmpressur i/ctesting of joint &
cost of jointing materials (i.e. socket coupler &
solvent cement
(a) PVC PIPE110mmdia

90

16 each

(b)PVC PIPE90mm dia

80

14 each

22.5

3 each

20

3 each

340

19 cum

5 Labour for laying in position following all type of


PVC fitting such as bend tee plugesetc for
following pvc pipe
(a)PVC PIPE110mmdia
(b)PVC PIPE90mm dia
6 Filling available excavated in trench lead lead
up to
50mt and lift up to 1.5mt in all kinds of soil
excluding watering and remming
7

Providing and laying mechanically mixed


cement concrete with crushed stone
aggregated excluding centering and
shuttering (with 20 mm nominal size) M-10

Sub-Engineer
P.H.E SUB Division Gohad

42.5 Cum
4321
Total Rs.
Assistant Engineer
P.H.E SUB Division Gohad

cheme
BLOCK

GOHAD

Senction
cost

Present
estimate
cost
103000
25000
187000

200000

269961.5
A

2204081

0
185744
31448
B
A+B

722013.5
2926094.5

Executive Engineer
P.H.E Division Bhind (M.P)

m dia-for rising main line

BLOCK
GOHAD
al w.e.f.301/15-10-2014)
AMOUNT
Remarks
As per UAD
SOR 2012item
no15.1 p-151

112962.5
As per UAD
SOR 2012item
no7p-88

68250
As per UAD
SOR 2012item
no16.4 p-162
700
As per UAD
SOR 2012item
no15.18 p-153

16625
198537.50

Executive Engineer
P.H.E Division Bhind (M.P)

e line80mmdia

BLOCK
GOHAD
al w.e.f.301/15-10-2014)
Remarks
As per PWD
SOR 2009
item no15.2.1
p-114

As per PWD
SOR 2009
item no15.2.1
p-114

As per PWD
SOR 2009
item no15.2.1
p-114

As per PWD
SOR 2009
item no15.2.1
p-114

Executive Engineer
P.H.E Division Bhind (M.P)

0,110 & 90 mm dia pipe line


BLOCK
amount

GOHAD

29877.5

0
59644.2

0
3200
800

0
1440
1120

0
67.5
60
0
0
6460
SOR: E-NC PHED
Bhopal
2009) item
no12.17 p156

183642.5
269961.5
Executive Engineer
P.H.E Division Bhind (M.P)

GI pipe rising main 80mm@219.15/mt


Pvcpipe110mmdia@232.18/mt
Pvcpipe90mmdia@157.24/mt

1750
800
200

219.15 383512.5
232.18
157.24

185744
31448

You might also like