You are on page 1of 155

Improvements to Ramarajulanka - Gondi road from km 0/000 to 7/350

(Construction of Low Level Cause Way 4V X 6.37m span ) in E.G.Dt.

Photographs

Bridge Location

Bridge Location

Specification Report to accompany the Estimate


Improvements to Ramarajulanka - Gondi road from km 0/000 to 7/350
(Construction of Low Level Cause Way 4V X 6.37m span ) in E.G.Dt.
Estimate Amount : Rs. 275.00 Lakhs
The designs for construction of low level cause way 4V X 6.37m were approved
vide Memo No. 013263/((D&P)/DCEII/DEE-III/AEE-I/2010, Dt. 28.01.2013 of the Chief
Engineer (R&B), Designs & Planning wing, Errummanzil, Hyderabad. Accordingly the
detailed estimate was prepared based on 2008-09 SSR and submitted vide Lr. No.
Estimates/HC/2010-11, Dt. 25.02.2013.
Now, it is informed by the Engineer-in-Chief (R&B), Rural Roads & LWE,
Errummanzil, Hyderabad vide Circular Memo No. RDF/DCE(RR)/DEE.III/2015, Dt. 05.11.2015
that the work is submitted to the Rural Development Fund Board for approval. In the circular
memo it was requested to submit the estimate for Technical sanction. Further, it was
requested by the D&P Wing, Errumanzil, Hyderabad vide Memo No. 013263/SE/
(D&P)/EE(II)/DEE(I)/AEE-I/2016, Dt. 19.02.2016 to recast the estimate with SSR 2015-16
along with sub-estimates for a) Anchorage arrangements b) Diversion of Drain and cross
bunds c) Provision of pipes in CC approaches.
The low level causeway and the approach lies within the flood bank. During
floods, the causeway and the approaches will be under submergence. Hence 600mm dia.
NP-3 pipes were provided in the non vented portion of the causeway to dissipate the excess
discharge during floods. Badirevu drain is 160m from the Bay of Bengal Ocean. As the cause
way and the approches lie within the flood back, CC pavement is provided for approaches.
Due to the tidal effect of sea, often the direction of flow of water changes. It is required to
divert the drain water by excavating a diversion canal. Cross bunds on u/s and d/s are
essentially required to stop water from the drain and from River Godavari to execute the
foundations for raft and bridge work. The provision of pipes in CC approaches for taking
Utility Services from one side to other side is removed as the length of CC approach on
either side of the causeway is small (200m only on either side). The steel for anchorage
arrangements are clubbed as the main estimate item.
With the explained scenario, and as per the Memos mentioned, the estimate is
prepared by adopting the provisions as stated.

1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
13)
14)
15)
16)
17)
18)
19)
20)

Earth work excavation in all soils upto SDR


Plain cement concrete (1:3:6) nominal mix for leveling course under Raft and
wing
walls.
Vibrated
cement concrete M 20 Grade Concrete for footings.
Vibrated cement concrete M 25 Grade Concrete for Raft foundation
Vibrated cement concrete M 20 Grade for substructure
V.R.C.C. M25 grade concrete for bed blocks and backing walls
Furnishing and placing reinforced cement concrete VRCC M 25 grade for deck slab
Plain cement concrete M 15 Grade Concrete below approach slab
V.R.C.C. M30 grade concrete for approach slab
V.R.C.C. M30 grade concrete for wearing coat
Providing HYSD bars ( Fe-415 ) for foundation as skin reinforcement
Providing HYSD bars ( Fe-415 ) for sub structure
Providing HYSD bars ( Fe-415 ) for super structure
Providing Uncoated Mild Steel bars (Fe-250) for CC pavement
Back filling behind Abutments
Providing and laying filter media
Providing and laying filter material for pitching of slopes
Providing Grouted Revetment with rough stone
Providing rough stone revetment other than granite 300 mm thick
Providing and laying boulders apron on river bed for protecting against scour

21)
22)

Providing 100 mm dia AC pipes for weep holes at 1.00 M C/C


Supplying and fixing of CI drainage spouts

23)
24)
25)
26)
27)
29)

Plain cement concrete (1:3:6) for leveling course under CC pavement


Vibrated cement concrete M35 grade for CC pavement
Providing 25.40mm Mastic Pad
Forming shoulders with barrowed useful selected earth
Forming embankment with borrowed useful earth for CC pavement

30)

Providing, laying Reinforced cement concrete Hume pipes of 600 mm Dia., NP-3 class

1)
2)
3)
4)

1)
2)

1)
2)
3)
4)
5)
6)
7)
8)

Construction of Granular sub-base by providing HBG material confirming to


Grading - III of MoRT&H

Road Safety:Providing and fixing Junction Boards of size 1500 x 1050 mm made out of Type
IV of ASTM D 4956 09 made out of High intensity Retro reflective sheeting
Providing and fixing Village name Boards / Chevron Boards of size 450 x 750 mm
made out of Type IV of ASTM D 4956 09 High intensity Prismatic Retro
reflective
Supplyingsheeting
and installation of Hazard Markers/Delineators using M.S. angle of size
55x55x6 mm and 120cm high
Providing and installation of delineators( Road way Indicators) not less than 800
mm high above ground level.
Diversion of Canal and Cross Bunds :Earthwork excavation in soils upto SDR by mechanical means
Forming embankment with Side earth by mechanical means upto SDR
LS provisions:Provision towards VAT 5%
Provision towards Quality Control charges @1%
Provision towards Price Adjustment @ 4.25%
Provision towards Insurance @ 0.385%
Provision towards Seigniorage Charges
Provision for soil investigation and soil testing
Provision for Avagahana sadassu
Provision for Car hire charges, Xerox, DTP, Pylon construction, unforeseen items
and rounding off

The rates adopted in the estimate are as per SSR 2015-16 and the work will be
carried out as per relevant specifications of MORT&H.

Asst. Executive Engineer (R&B),


R&B Section : Malikipuram

Deputy Executive Engineer (R&B),


R&B Sub-division : Razole

Executive Engineer (R&B),


R&B Division : Amalapuram

Superintending Engineer (R&B),


R&B Circle : Kakinada

Name IMPROVEMENTS TO RAMARAJULANKS-GONDI ROAD FROM KM.0.000


of
TO 7.350 (CONSTRUCTION OF LOW LEVEL CAUSE WAY 4VX6.37M
Work: SPAN ) IN EAST GODAVARI DISTRICT .

GENERAL ABSTRACT
S NO
1

ITEM

AMOUNT

Low level Cause way (4 vents of 6.37 m eff span without


footpaths)

Sub Total

28430650

28430650

L.S Provisions :1

Provision towards VAT 5%

1421533

Provision towards Quality Control charges @1%

Provision towards Price Adjustment @ 4.25%

Provision towards Insurance @ 0.385%

109458

Provision towards Seigniorage Charges

450574

Provision for soil investigation and soil testing

Provision for Avagahana Sadassulu

5000

Provision for Car hire charges, Xerox, DTP, Pylon


construction, unforeseen items and rounding off

4656

284307
1208303

40000

31954480
(Rupees Two Hundred and Seventy Five Lakhs
only)

Asst. Executive Engineer (R&B),


R&B Section : Malikipuram

Deputy Executive Engineer (R&B),


R&B Sub-division : Razole

Executive Engineer (R&B),


R&B Division : Amalapuram

Superintending Engineer (R&B),


R&B Circle : Kakinada

BRIDGE DETAILED CUM ABSTRACT ESTIMATE

Name of work:- IMPROVEMENTS TO RAMARAJULANKS-GONDI ROAD FROM KM.0.000 TO


(CONSTRUCTION OF LOW LEVEL CAUSE WAY 4V X 6.37M SPAN ) IN EAST GO
DISTRICT.
S.No. Description of Item
No.
Length
Breadth
Depth
1
2
3
4
5
6
1 Earthwork in excavation of foundation of structures as per drawing and technical
specification including setting out, construction of shoring and bracing, removal
of stumps and other deleterious matter, dressing sides of bottom, back filling
the excavation earth to the extent required etc., complete including seignioarge
charges for finished item of work as per MoRT&H specification 304 (4th Revision)
Excluding dewatering 0-3.0M DEPTH above sill
level.
Raft
1 x 1 27.880
13.40

Quantity
7

0.60

224.155

Flexible approns
Aprons: U/S side

1 x

27.880

3.00

0.60

50.18

Aprons: D/S side

1 x

27.880

6.00

0.60

100.37

2 x

8.000

3.10

1.60

79.36

2 x

15.000

2.30

1.60

110.4

2 x

26.000

2.30

1.60

191.36

2 x

10.000

1.40

1.10

30.8

5 x

7.000

1.00

1.00

35

4 x

6.751

0.60

0.60

9.72

Body walls on A-side


Non-vented level portion
Body walls on S-side
Non-vented level portion
Body walls on S-side
Non-vented level Ramp
portion
Body walls on S-side
Non-vented level Ramp
portion
Cross walls on S-side
Non-vented level Ramp
portion

Rate
8

For toe walls


2p(4.3)/4=6.751 m

831.349
831.00 107.00
cum

Including dewatering 0-3.0M DEPTH Below sill level.


Raft

1 x

27.880

13.40

2.45

915.3

Cut off walls: U/S side

1 x

27.880

0.60

2.00

33.46

Cut off walls: D/S side


Flexible approns
Aprons: U/S side

1 x

27.880

0.60

2.00

33.46

1 x

27.880

3.00

0.90

Aprons: D/S side

1 x

27.880

6.00

0.90

75.28
150.55
1208
1208.00 112.00
cum

2 Plain cement concrete (1:3:6) nominal mix in foundation with crushed stone
aggregate 40 mm nominal size mechanically mixed, placed in foundation and
compacted by vibration including curing complete as per MoRT&H Specification
2100 (4th Revision) for Levelling course below raft and wing walls
Under Raft
Body walls on A-side
Non-vented level portion
Body walls on S-side
Non-vented level portion
Body walls on S-side
Non-vented level Ramp
portion
Body walls on S-side
Non-vented level Ramp
portion
Cross walls on S-side
Non-vented level Ramp
portion
Cross walls on S-side
Non-vented level Ramp
portion

1 x

27.880

13.40

0.150

56.04

2 x

8.000

3.10

0.100

4.96

2 x

15.000

2.30

0.100

6.90

2 x

26.000

2.30

0.100

11.96

2 x

10.000

1.40

0.100

2.80

2 x

3.000

1.00

0.100

0.60

2 x

6.000

1.00

0.100

1.20
84.46
84.00 5183.00
cum

3 Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and


10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table
1000-1 and fine aggregate conforming to table 1000-2) including
cost,seignorage and conveyance of all materials to site and all labour charges
for machine mixing,laying in position, Compacting , Vibrating and curing
including all other incidental and all other operational charges of T&P required
etc., complete as per MoRT&H Specification 1500,1700, 2100 (4th Revision) for
footings of Abutments and Piers, Raft cut-off walls .
Cut off walls: U/S side
Cut off walls: D/S side
For Abutments

1 x
1 x
2 x

1
1
1

27.88
27.88
12.95

For Pier:1st footing


2nd footing
Body walls on A-side
Non-vented level portion
Trep footing
Body walls on S-side
Non-vented level portion
Trep footing
Body walls on S-side
Non-vented level Ramp
portion
Trep footing
Body walls on S-side
Non-vented level Ramp
portion
Trep footing
Cross walls on S-side
Non-vented level Ramp
portion

2 x
2 x

1
1

13.00
13.00

2 x
2 x

1
1

8.00
8.00

2 x
2 x

1
1

2 x
2 x

(
(
(

0.60
)
0.60
)
3.50 + 2.50
2
3.40
2.40

2.00
2.00
1.00

33.46
33.46
77.70

0.50
0.50

44.20
31.20

3.10
1.70

0.50
1.20

24.80
32.64

15.00
15.00

2.30
1.20

0.50
0.75

34.50
27.00

1
1

26.00
26.00

2.30
1.20

0.50
0.75

59.80
46.80

2 x
2 x

1
1

10.00
10.00

1.40
0.65

0.50
0.50

14.00
6.50

5 x

7.00

1.00

0.50

17.50
483.55

say

4 Vibrated cement concrete M 25 Grade Concrete using 40mm , 20mm and


10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table
1000-1 and fine aggregate conforming to table 1000-2) including
cost,seignorage and conveyance of all materials to site and all labour charges
for machine mixing,laying in position, Compacting , Vibrating and curing
including all other incidental and all other operational charges of T&P required
etc., complete as per MoRT&H Specification 1500,1700, 2100 (4th Revision) for
Raft.
RAFT Foundation
1 x 1
27.88
( 13.40
)
1.00
say

484.00 6648.00
cum

373.59
373.59
374.00 7279.00
cum

5 Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and


10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table
1000-1 and fine aggregate conforming to table 1000-2) including
cost,seignorage and conveyance of all materials to site and all labour charges
for machine mixing, laying in position,Compacting, Vibrating and curing including
all other incidental and all other operational charges of T&P required etc.,
complete as per MoRT&H Specification 1500,1700, 2200 (4th Revision) for Sub
structure of abutments, piers and wing walls.
For Abutments

2 x

12.95

For Pier:

2 x

13.00

For cut waters

2 x

2 x

8.00

2 x

2 x

Body walls on A-side


Non-vented level portion
Body walls on S-side
Non-vented level portion
Body walls on S-side
Non-vented level Ramp
portion
Body walls on S-side
Non-vented level Ramp
portion
Cross walls on S-side
Non-vented level Ramp
portion
Guard Stones

6.96

288.42

6.96

195.44

6.96

13.87

0.88

2.00

28

15.00

0.78

1.45

33.7125

26.00

0.78

1.45

58.435

2 x

10.00

0.53

0.70

7.35

5 x

7.00

0.50

0.50

8.75

0.305

0.205

0.205

1 x 61

0.70 + 2.50 )
2
(
0.76 + 1.40 )
2
( 0.76^2 + 1.40^2)
4
x
2

0
633.98
634.00 7032.00
cum

6 V.R.C.C. M25 grade concrete using 20mm and 10mm size SS5 HBG crushed
stone aggregate including cost and conveyance of all materials to site,
seigniorage charges,labour charges for machine mixing, laying, compacting,
curing etc,including all other incidental and operational charges,T&P charges etc,
complete but excluding cost of steel and its fabrication charges, as per MoRT&H
Specifications 1500,1700,2100(4th Revision)For bed blocks & backing walls
Bed blocks over abutment 2 x
Backingwallsover abutme 2 x

1
1

Bed blocks over pier :

2 x

12.95
12.95
13.00

0.75
0.30

0.300
0.450

5.83
3.50

0.90

0.300

7.02

-- do-- cut waters

2 x

/4 ( 0.9 )2

0.300

0.38
16.73
17.00 7951.00
cum

7 Furnishing and placing reinforced cement concrete VRCC M 25 grade as per


approved drawings and technical specifications as per MoRT&H specification
1500,1600,1700 (4th revision ) and as per M.O.S. DRG No SD/120 excluding cost
of steel and fabrication charges for VRCC M-25 Super structure of deck slabs

For deck slabs: As per


Standard Drg. SD/120

3 x

80.74

m3

per

Span
say

8 Plain cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size
HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and
fine aggregate conforming to table 1000-2) including cost,seignorage and
conveyance of all
materials to site and all labour charges for machine
mixing,laying in position, Compacting , Vibrating and curing including all other
incidental and all other operational charges of T&P required etc., complete as per
MoRT&H Specification 1500,1700, 2100 (4th Revision) for Levelling course
below approach slab.
Levelling course below
approach slab.
2 x 1
3.80
11.00
0.150

242.22
243.00 8710.00
cum

12.54
12.54
13.00 5785.00
cum

9 V.R.C.C. M30 grade concrete using 20mm and 10mm size SS5 HBG crushed
stone aggregate including cost and conveyance of all materials to site,
seigniorage charges,labour charges for machine mixing,laying,compacting,curing
etc,including all other incidental and operational charges,T&P chargesetc,
complete but excluding cost of steel and its fabrication charges, as per MoRT&H
Specifications 1500,1700,2704(4th Revision) for Approach Slab.
For approach slab

2 x

3.80

11.00

0.300

10 V.R.C.C. M30 grade concrete using 20mm and 10mm size SS5 HBG crushed
stone aggregate including cost and conveyance of all materials to site,
seigniorage charges,labour charges for machine mixing,laying,compacting,curing
etc,including all other incidental and operational charges,T&P chargesetc,
complete but excluding cost of steel and its fabrication charges, as per MoRT&H
Specifications 1500,1700,2702(4th Revision). For Wearing coat .
Over deck slabs
3 x 1
8.74
12.00
0.075
Over approach slabs
2 x 1
4.10
11.00
0.075

11 Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars
of all diameters including cost and conveyance of steel to site and all labour
charges for fabrication of reinforcement including cutting, bending, binding rods,
tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges
etc., and including over lapping welding if required etc., complete for all R.C.C
items for finished item of work as per standard drawings, as per the directions of
the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (4th
revision) and as per I.S.1786 of 1985 for Super structure of R.C.C items.

25.08
25.08
26.00 7166.00
cum

23.60
6.77
30.36
30.00 7118.00
cum

etc., and including over lapping welding if required etc., complete for all R.C.C
items for finished item of work as per standard drawings, as per the directions of
the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (4th
revision) and as per I.S.1786 of 1985 for Super structure of R.C.C items.
For deck slabs: As per
Standard Drg. SD/120
Approach slab

3 x

1 ###

1 x

Wearing coat

1 x

kgs

per

Span

14469

25

85

kgs/cum

2131.8

1 ###

60

kgs/cum

1821.78

or say

12

Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars
of all diameters including cost and conveyance of steel to site and all labour
charges for fabrication of reinforcement including cutting, bending, binding rods,
tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges
etc., and including over lapping welding if required etc., complete for all R.C.C
items for finished item of work as per standard drawings, as per the directions of
the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (4th
revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.
Bed
blocks&backing
walls
1 x 1
16.73
100
kgs/cum

1672.70

Skin reinforcement for


abutments

2 x

700

kgs

1400.00

Skin reinforcement for


piers

2 x

700

kgs

1400.00

Body walls on A-side


Non-vented level portion 1 x

200

kgs

200.00

Body walls on S-side


Non-vented
level
portion 1 x
Body walls on
S-side

350

kgs

350.00

Non-vented level Ramp


portion
Body walls on S-side

1 x

520

kgs

520.00

Non-vented level Ramp


portion
Cross walls on S-side

1 x

80

kgs

80.00

Non-vented level Ramp


portion

1 x

50

kgs

50.00

Longitudinal joints for


CC pavement

1 x

1.8

kgs

Guard Stones

1 x

0.00

400
80

720.00
kgs/cum

or say

13

###
18.50
19.00 52475.0
M.T

Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars of
all diameters including cost and conveyance of steel to site and all labour
charges for fabrication of reinforcement including cutting, bending, binding rods,
tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges
etc., and including over lapping welding if required etc., complete for all R.C.C
items for finished item of work as per standard drawings, as per the directions of
the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (4th
revision) and as per I.S.1786 of 1985 for foundations of R.C.C items.

0.00
6392.70
6.40
6.40 51192
M.T

Raft
Skin reinforcement for
abutments
Skin reinforcement for
piers
Body walls on A-side
Non-vented level portion
Body walls on S-side
Body
walls on
S-side
Non-vented
level
portion
Non-vented level Ramp
Body walls on S-side
portion
Non-vented level Ramp
Cross walls on S-side
portion
Non-vented level Ramp
portion

1 x

373.59

50

kgs/cum

###

2 x

200

kgs

400.00

3 x

400

kgs

1200.00

1 x

350

kgs

350.00

1 x

500

kgs

500.00

1 x

900

kgs

900.00

1 x

200

kgs

200.00

1 x

125

kgs

125.00
###
22.36
23.00
M.T

###

14 Providing Uncoated Mild Steel bars ( Fe-250 ) of different diameters, wrought and
put up bars of all diameters including cost and conveyance of steel to site and all
labour charges for fabrication of reinforcement including cutting, bending,
binding rods, tying grills, placing them in position etc., complete including cost
and conveyance of binding wire and all handling charges and operational
charges etc., and including over lapping welding if required etc., complete for all
R.C.C items for finished item of work as per standard drawings, as per the
directions of the Engineer-in-Charge and as per MoRT&H specification 1600
&2200 (4th Revision) and as per I.S.1786 of 1985 .
Approaches

2 x 30

0.500

30.00
#REF!
0.00
0.00
M.T

Kgs
###

15 Back filling behind Abutments with gravel including cost, conveyance and
seigniorage of all materials to site etc., complete as per Clause 710.1.4 of IRC :
78and as per MoRT&H Specification No. 2200 (4th Revision) and as per Drawing
and technical specifications for finished item of work
In between Body walls
on Appanaramuni lanka
side
In between Body walls

1 x

8.00

7.500

1.500

90.00

1 x

51.00

7.500

1.500

573.75

on Sakinetipally side
(15+36)
(in between body walls of non-vented and ramp portion)
or say

663.75
664.00 1666.00
cum

16 Providing and laying filter media with stone crushed aggregate satisfying the
requirements laid down in Clause 2504.2.2 of MORTH specifications to a
thickness of not less than 600 mm with smaller size towards the soil and bigger
size towards the wall and provided over the entire surface behind abutment and
wing wall, to the full height , compacted to a firm condition complete as per
drawing and technical specification No.710.1.1 of IRC 78 and 2200(Sl.No.13.10)
Behind abutment

2 x

8.00

0.60

1.500
or say

14.40
14.40
15.00 1763.00

cum
17 Providing and laying filter material with gravel underneath pitching in slopes
including cost and conveyance of materials to site including labour charges etc,
complete for finished item of work as per MoRTH Specification No.2504(4th
Revision)and as directed by the Engineer-in-Charge.
For pitching of slopes.
Quadrants

4 x

17.760

0.15

10.66
10.66
11.00 1908.00
cum

or say
18 Providing Grouted Revetment with rough stone other than granite of not less
than 300 mm size grouted with 0.20 cum of CC (1:4:8) including cost,
seigniorage charges and conveyance of materials to site and including labour
charges for packing the stones for revetment etc., complete for finished item of
work as per MoRT&H specification 2504 ( 4 th revision ) and as directed by the
Engineer-in-Charge for quadrential revetment.
For quadrants

4 x

17.760

0.30

21.31
21.31
22.00 2349.00
cum

19 Providing rough stone revelment other than granite 300 mm thick using 300
mm ize rough stonne varity including cost ,seigniorage and conveyance of all
materials to site , labour cgarges etc , complete as per MOST specification no.
2504
Toe walls
4 x 1 6.751
0.600
0.600

9.72
9.72
10.00 1578.00
cum

or say

20 Providing and laying boulders apron on river bed for protecting against scour
with jeddy stone of 450mm stone boulders weighing not less than 40 kg each
complete as per MOST specification no. 2504

Aprons: U/S side

1 x

50.88

3.00

0.90

Aprons: D/S side

1 x

50.88

6.00

0.90

21 Providing 100 mm dia AC pipes for weep holes at 1.00 M C/C in both
horizontal and vertical directions so that the weep holes in each horizontal
dirction is staggered from the weep holes lying above and below lines as shown
in drawing for abutments, wing walls, including cost and conveyance of the AC
pipes and labour charges for cutting to required lenghts,placing the pipe with a
slope of 1:20 towards steam side face etc, complete for finished item of work
for weep holes, as per MoRTH Specification No.2706(4th Revision)and as directed
by the Engineer-in-Charge.
For abutments
2 x 8
1.20
3.00
Body walls A-side
1 x 8
0.90
2.00
Body walls S-SIDE
1 x 51
1.00
1.00
or say

137.38
274.75
412.13
413.00 1578.00
cum

57.60
14.40
51.00
123.00
123.00 272.00
R.M.

22 Supplying and fixing of CI drainage spouts complete as per MoRT&H Specification


No.2705 and as per drawing BD / 1-69.
4 x 2
say

8
8 961.00
Nos

23 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed
stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H
including cost, (excluding seigniorage) conveyance of all materials to site and
labour charges, centering, machine mixing, laying,
Vibrating, curing etc.,
including all other incidental and operational charges of all T&P etc., complete
for finished item of work as per MoRT&H specification 1500,1700, 2100 (4th
Revision) and as directed by the Engineer-in-Charge for base coarse.
Appanaramuni lanka -sid
Sakinetipally -SIDE
(in between body walls of
Road work
CC Pavement

1 x 1
3.70
7.50
1 x 1
46.70
7.50
non-vented and ramp portion)

0.10
0.10

2.78
35.03

1 x

0.10

300.00
337.80
338.00
cum

400.00

7.50

or say

4653

24 Vibrated cement concrete M 35 grade using 20mm & 10mm HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine
aggregate conforming to table 1000-2) including cost, (excluding seigniorage)
conveyance of all materials to site and labour charges, centering, machine
mixing, laying, vibrating, curing etc., including all other incidental and
operational charges of all T&P etc., complete for finished item of work as per
MoRT&H specification 1500, 1700, 2100 & 2702 (4th Revision) and as directed
by the Engineer-in-Charge for C.C Pavement (Vaccum Dewatered Flooring
services and Saw cutting of concrete pavement using a self propelled walk
behind, petro / electric powered saw)
Appanaramunilanka side
Sakinetipally -SIDE
(in between body walls of
Road work
CC Pavement

1 x 1
3.70
7.50
1 x 1
46.70
7.50
non-vented and ramp portion)

0.20
0.20

1 x

0.20

400.00

7.00

or say

5.55
70.05

560.00
635.60
636.00 7395.00
cum

25 Providing 25.4 mm mastic pads for Longitudinal joints, Transversal expansion


joints and Construction joints of approved quality including cost, conveyance and
placing in position, etc., complete as directed by the Engineer-in-charge.
Bridge Proper
1 x 5
Appanaramunilanka side 1 x 1
Sakinetipally -SIDE
1 x 1
CC Pavement
1 x 1
1 x 12

7.50
3.70
46.70
400.00
7.00

------

0.52
0.30
0.30
0.20
0.20
or say

3.86
1.11
14.01
80.00
1.40
100.38
101.00 991.00
sqm

26 Forming shoulders with barrowed useful selected earth having MDD of not less
than 1.75 Gms/CC from out side road boundary by mechanical means with all
leads and lifts including prewatering of soil at barrow area, removal of top soil,
excavation of soils at barrowed area, conveyance of soil, depositing the soils on
the embankment, spreading soils, beaking clods, sectioning and consoilidation
with vibratory road roller @ OMC to meet requirement of table 300-2 of
MoRT&H, including all hire and operational charges of T&P and complete for
finished item of work as per MoRT&H specification 305 ( 4th revision) ( Payment
will be made based on levels for finished item of work).
Road work
CC Pavement

1 x

400.00

1.00

0.30
or say

240.00
240.00
240.00 1279.00
cum

27 Forming embankment with borrowed useful earth from outside road boundary
by mechanical means up to SDR with all leads and lifts including pre-watering of
soil at borrow area, removal of top soil, excavation of soils at borrowed area,
conveyance of soil, depositing the soil on the embankment, spreading soil,
breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes
Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H,
including all hire and operational charges of T&P and (excluding seigniorage)
charges, complete for finished item of work as per MoRT&H specification 305
Road work (Under CC Pavement)
1 x 1

400.00 (10.2+9.0
0)/2

0.30

or say

28 Construction of Granular sub-base by providing


HBG material confirming to
Grading - III of MoRT&H Table 400-2 including cost, (excluding seigniorage)
charges and conveyance of all materials to work site and spreading in uniform
layers with motor grader or by approved means, on prepared surface mixing by
mix in place method with Rotavator / approved means at OMC and compacting
with vibratory roller to achieve the desired density etc., complete for finished
item of work as per MoRT&H Specification 401 (4th revision) and as directed by
the Engineer-in-charge. ( Payment will be made based on levels for finished item
of work ).
Road work (Under CC Pavement)
1 x 1 400.00
7.30
0.15
or say

29 Providing, laying Reinforced cement concrete Hume pipes of 600 mm Dia., NP-3
class for pipe culverts including cost and conveyance of Pipes etc., complete
and Labour charges for laying, jointing of 600mm dia. R.C.C Hume pipes in
position including lifting, aligning, lowering and hoisting etc., as per drawing and
as per MoRT&H Specification 2900, 2905 and 2906 (4th Revision) and IRC
Special Publication No: 13 and as directed by the Engineer-in-Charge for finished
item of work.
(in between body walls of non-vented and ramp portion)
3 x 16
7.50
--or say

30 Road Safety Interventions


Sub-estimate enclosed

1152.00
1152.00
1152.00 662.00
cum

438.00
438.00
438.00 2527.32
cum

360.00
360.00
360.00 3019.00
RM

Diversion of Canal and Cross Bunds :31 Earthwork excavation in soils upto SDR by mechanical means including
trimming bottom and side slopes in accordance with requirements of lines ,
grades and cross sections etc., complete for finished item of work for trench
cutting as per MoRT&H specification 301(4th Revision) and as directed by the
Engineer-in-Charge
1 x

140.00

15.00

2.20
or say

4620.00
4620.00
4620.00
cum

66.10

32 Forming embankment with Side earth by mechanical means upto SDR including
pre-watering of soil , removal of top soil, excavation of soils , depositing the soils
on the embankment, spreading soil, breaking clods, sectioning , grading and
consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet
requirement of table 300-2 of MoRT&H, including all hire and operational
charges of T&P, complete for finished item of work as per MoRT&H specification
305 (4th revision) (Payment will be made based on level for finished item of
work).
For Cross Bunds:
U/S Side
D/S Side
In Diversion of Canal for
forming road way

1 x
1 x
1 x

1
1
1

(20+16)/2
(20+16)/2
(15+11)/2

(5+9)/2
(5+9)/2
(7+11)/2

2.20
2.20
2.20

or say

33 Provision towards VAT 5%

277.20
277.20
257.40
811.80
812.00 173.00
cum

on Rs. 28430650

34 Provision towards Quality Control charges @1% on Rs. 28430650


35 Provision towards Price Adjustment @ 4.25%

on Rs. 28430650

36 Provision towards Insurance @ 0.385%

on Rs. 28430650

37 Provision towards Seigniorage Charges


38 Provision for soil investigation and soil testing
39 Provision for Avagahana Sadassulu
40 Provision for Car hire charges, Xerox, DTP, Pylon construction, unforeseen items and rounding off
(RUPEES TWO HUNDRED AND SEVENTY FIVE LAKHS ONLY)

Asst. Executive Engineer (R&B),


R&B Section : Malikipuram

Deputy Executive Engineer (R&B),


R&B Sub-division : Razole

Superintending Engineer (R&B),


R&B Circle : Kakinada

Executive Engineer (R
R&B Division : Amalapu

M.0.000 TO 7.350
N EAST GODAVARI

Per
9

1.00
cum

Amount
10

88917

1.00 135296
cum

1.00 435372
cum

1.00 3E+006
cum

1.00 3E+006
cum

1.00 4E+006
cum

1.00 135167
cum

1.00 2E+006
cum

1.00
cum

75205

1.00 186316
cum

1.00 213540
cum

1.00 997025
M.T

1.00 327629
M.T

1.00 1E+006
M.T

1.00
M.T

1.00 1E+006
cum

1.00

26445

cum

1.00
cum

20988

1.00

51678

cum

1.00
cum

15780

1.00 651714
cum

1.00
R.M

33456

1.00
No.

7688

1.00 2E+006
cum

1.00 5E+006
cum

1.00 100091
sqm

1.00 306960
cum

1.00 762624
cum

1.00 1E+006
cum

1.00 1E+006
RM

148888

1.00 305382
cum

1.00 140476
cum

ONLY)

###
1421533
284307
1208303
109458
450574
40000
5000
4656
###

Engineer (R&B),
on : Amalapuram

DETAILED CUM ABSTRACT ESTIMATE FOR ROAD SAFETY INTERVENTIONS


Name of work :
IMPROVEMENTS TO RAMARAJULANKS-GONDI ROAD FROM KM.0.000 TO 7.350
(CONSTRUCTION OF LOW LEVEL CAUSE WAY 4V X 6.37M SPAN ) IN EAST GODAVARI
DISTRICT.
S.
No.

DESCRIPTION

NO

Contents

Rate

Per

###

Each

4903

Each

Road Safety:
1 Providing and fixing Junction Boards of size 1500 x 1050
mm made out of Type IV of ASTM D 4956 09 High
intensity Prismatic Retro reflective sheeting and
confirming to IRC :67-2012 for full background of Green
color and White fixed over 4mm alluminium composite
material sheet having minimum 0.5mm thick aluminium
skin on both sides with backside painted grey colour &
fixed over back support frame of MS Angle 25x25x3mm
all round fixing with 35x35x4mm and mounted on a MS
Angle post of size 75x75x6 mm with clear
height of not less than 2.10 m from the ground level the
bottom of the board. The sign post should be painted with
one coat of red oxide paint and two coats of synthetic
enamel paint Black & White colour with bands of 30cm
height. the sign post shall be firmly fixed with MS base
angle 35x35x4 mm in to the Ground by M15 Concrete
foundation of size 450x450x600mm including cost,
conveyance of all materials, equipment, machinary,
labour & all leads & lifts, loading charges necessary for
satisfactiry completion of the work as directed by the
Engineer-in-charge.
12

--

--

--

4
4
Nos

2 Providing and fixing Village name Boards / Chevron


Boards of size 450 x 750 mm made out of Type IV of
ASTM D 4956 09 High intensity Prismatic Retro reflective
sheeting and confirming to
IRC :67-2012 for full
background of Green color and White letters and fixed
over 3mm alluminium composite material sheet having
minimum 0.3mm thick aluminium skin on both sides with
backside painted grey colour & fixed over back support
frame of MS Angle 25x25x3mm all round fixing with
35x35x4mm and mounted on a MS Angle post of size
75x75x6 mm with clear height of not less than 2.10 m
from the ground level from the bottom of the board. The
sign post should be painted with one coat of red oxide
paint and two coats of synthetic enamel paint Black &
White colour with bands of 30cm height. the sign post
shall be firmly fixed with MS base angle 35x35x4 mm in
to the Ground by M15 Concrete foundation of size
450x450x600mm including cost, conveyance of all
materials, equipment, machinary, labour & all leads &
lifts, loading charges necessary for satisfactiry completion
of the work as directed by the Engineer-in-charge.

--

--

--

6
6

Nos
3 Supplying and installation of Hazard Markers/Delinators
using M.S. angle of size 55x55x6 mm and 120cm high
above ground level painted with two coats of black &
white stripes of 15cm wide with first quality synthetic
enamel paint over one coat of appropriate primer of
approved brand,colour, with 30cm x 90cm Type IV of
ASTMD 4956-09 High Intensity Prismatic Retro reflective
sheeting of Yellow colour and confirming to IRC 67:2012
fixed over 3MM Alluminium Composite Material having
minimum 0.30 mm thick Aluminium skin on both sides
with standard supports consisting of alternately black and
Yellow with black stripes in screen printing sloping
downward at an angle of 45 degrees towards the side of
the obstruction on which the traffic is to pass and buried
into the ground in a trench of size 30cm x 30cm and
50cm depth filled with CC M-20 including cost and
conveyance of all materials, equipment,
machinery and labour with all leads and lifts, loading and
un-loading charges necessary for successfull completion
of the work on any road in division as directed by
Engineer-in-Charge and conforming to IRC 67-2012
&MORT&H specification No.805 and approved drawings
etc., complete for finished item of work.
4

--

--

--

4
4
Nos

4903

Each

10
10
Nos

2285

Each

4 Providing and installation of delineators( Road way


Indicators) not less than 800 mm high above ground level.
The delineator shall have a core and shell construction
which shall be tough, high impact resistant , injectionmoulded, thermoplastic outerbody. The inner core shall
consist of powder coated or painted Mild steel of
minimum thickness 1.0 mm. The delineator should have
top retro - reflective unit consisting of white color micro
prismatic non metallic retro -reflective sheeting on both
sides having a minimum exposed area of 125 square cm
each side and bottom retro-reflective unit consisting of
red color micro prismatic non metallic retro-reflective
sheeting on both sides having minimum exposed area of
square35 square cm each side confirming to ASTM D4956
type XI standards. The delineator shall be fixed to the
ground by inserting the root of the delineator up to the
marked portion and by firm concrete filling as per the
instructions by Engineer-in-Charge.
10

Asst Executive Engineer (R&B),


R&B Section, Malikipuram

--

--

--

Deputy Executive Engineer (R&B)


R&B Sub-division, Razole

Executive Engineer (R&B),


R&B Division, Amalapuram

Superintending Engineer (R&B),


R&B Circle, Kakinada

ULANKS-GONDI ROAD FROM KM.0.000 TO 7.350


CAUSE WAY 4V X 6.37M SPAN ) IN EAST GODAVARI
DISTRICT.
Amount

77008

29418

19612

22850

148888

Deputy Executive Engineer (R&B),


R&B Sub-division, Razole

Superintending Engineer (R&B),


R&B Circle, Kakinada

Name of work :
Reconstruction of Bridge in km 0/2 of Kothapeta Bridge to Kapileswarapuram Ferry
Road in E.G.Dt.
LEAD STATEMENT
1 HBG Metal from Katheru Quarry :
From
To
MR
CT
Quarry to Lalacheruvu 2 Kms CT = 2x1.10
0.000
2.000
2.000 1.1
NH 16
###
944.805
38.405
NH 16 to Rajavaram - Podalada Road
###
31.735
29.690
NH 214 (115.760 to 125.135)
###
115.760
9.375
Sivakodu - Ramarajulanka Road (1.200 to
1.200
4.200
3.000
4.200)
Ramarajulanka - Gondi Road (0.000 to
6.000
0.000
6.000
6.000)
(Working Reach = (6.600 - 6.000)/2
Or
2 BITUMEN AND EMULSION FROM VISAKHA REFINARY :
From
To
Refinery to V.V. Road NH 16
Visakhapatanam to Kathipudi Junction NH
###
839.600
Kathipudi to Amalapuram NH 216
0.000
125.135
Sivakodu - Ramarajulanka Road (1.200 to
1.200
4.200
4.200)
Ramarajulanka - Gondi Road (0.000 to
6.000
0.000
6.000)
(Working Reach = (6.600 - 6.000)/2

MR

CT

###
###
3.000
6.000

Or
3 Gravel from Kadiyam Quarry :
From
Quarry to Vemagiri
NH 16
NH 16 to Rajavaram - Podalada Road
NH 216 (115.760 to 125.135)
Sivakodu - Ramarajulanka Road (1.200 to
4.200)
Ramarajulanka - Gondi Road (0.000 to
6.000)
(Working Reach = (6.600 - 6.000)/2

To

MR

###
###
###

944.805
61.425
115.760

26.605
29.690
9.375

1.200

4.200

3.000

6.000

0.000

6.000

CT

Or
4 Sand
Sand Quarry at River Godavari at P. Gannavaram
From
River bed to Panchayat road
Panchayat Road
R.P. Road (49.072 to 61.425)
###
NH 216 (115.760 to 125.135)
###
Sivakodu - Ramarajulanka Road (1.200 to
1.200
4.200)
Ramarajulanka - Gondi Road (0.000 to
6.000
6.000)
(Working Reach = (6.600 - 6.000)/2

To

MR

61.425
115.760

12.353
9.375

4.200

3.000

0.000

6.000

CT

Or

Asst. Executive Engineer (R&B)


R&B Section, Malikipuram

Deputy Executive Engineer (R&B)


R&B Sub-division, Razole.

Executive Engineer (R&B),


R&B Division : Amalapuram

Superintending Engineer (R&B),


R&B Circle : Kakinada

pileswarapuram Ferry

Lead
2.200
38.405
29.690
9.375
3.000
6.000
0.300
###
44.000
Kms.
Lead
1.600
120.600
96.300
3.000
6.000
0.300
###
###
Kms.
Lead
4.600
26.605
29.690
9.375
3.000
6.000
0.300
79.570
###
Kms.

Lead
0.110
0.200
12.353
9.375
3.000
6.000
0.300
31.338
2.000
Kms.

ecutive Engineer (R&B)


ub-division, Razole.

nding Engineer (R&B),


Circle : Kakinada

ROAD METAL RATES as per 2008-2009 SSR


Name of the Work::- IMPROVEMENTS TO RAMARAJULANKS-GONDI ROAD FROM KM.0.000 TO 7.350
4VX6.37M SPAN )

Sl. No

Description of Metal

IN EAST GODAVARI DISTRICT .

Source of Supply

Lead in
Kms

Conveyance

Initial cost
less
stacking

44.00

536.90

419.00

A) FOR ROAD WORKS


60 to 63 mm IRC and MoRTH HBG
metal

50 to 55 mm IRC and MoRTH HBG


metal

"

44.00

536.90

456.00

40 to 45 mm IRC and MoRTH HBG


metal

"

44.00

536.90

588.00

HBG Metal from Katheru Quarry :

SS Revetment work 300mm thick


rough stone

"

44.00

536.90

164.00

Quarry spall(Field picked metal)


Av. Of rate 25mm & 40mm

"

44.00

536.90

49.50

150 mm soling stone


HBG metal

"

44.00

536.90

95.00

40 to 45 mm IRC and MoRTH HBG M/C HBG Metal from Katheru Quarry :
metal

44.00

536.90

588.00

25 to 27 mm IRC and MoRTH HBG M/C


metal

"

44.00

536.90

944.00

19 to 22 mm IRC and MoRTH HBG M/C


metal

"

44.00

536.90

984.00

Source of Supply

Lead in
Kms

Conveyance

Initial cost
less
stacking

12 to 14 mm IRC and MoRTH HBG M/C


10 metal

"

44.00

536.90

780.00

9.5 to 11.20 mm IRC and MoRTH HBG


11 M/C metal

"

44.00

536.90

656.00

5 to 7 mm IRC and MoRTH HBG M/C


12 metal

"

44.00

536.90

504.00

2.36 to 5 mm IRC and MoRTH HBG


13 M/C metal

"

44.00

536.90

308.00

"

44.00

536.90

350.00

34.00

902.55

50.50

44.00

536.90

620.00

Description of Metal

Sl. No

14

HBG Stone chips 2.36mm


and below

15 Gravel

Gravel from Kadiyam Quarry :

B) FOR BRIDGE WORK


16 40 mm SS-5 HBG M/C metal

HBG Metal from Katheru Quarry :

17 25 mm SS-5 HBG M/C metal

"

44.00

536.90

994.00

18 20 mm SS-5 HBG M/C metal

"

44.00

536.90

1036.00

19 12 mm SS-5 HBG M/C metal

"

44.00

536.90

822.00

Source of Supply

Lead in
Kms

Conveyance

Initial cost
less
stacking

20 10 mm SS-5 HBG M/C metal

"

44.00

536.90

692.00

21 6 mm SS-5 HBG M/C metal

"

44.00

536.90

532.00

22 Jeddy stone 450 to 600 mm

"

44.00

536.90

190.30

2.00

408.15

610.00

2.00

268.70

460.00

Description of Metal

Sl. No

23 Sand for Mortar


24 Sand for Filling

at River Godavari at P. Gannavaram


at River Godavari at P. Gannavaram

25 HYSD Steel (Fe-415 TMT Bars)

34000.00

26 6mm Mild Steel

"

41500.00

27 Mild Steel

"

41000.00

28 Cement

"

5920.00

Asst. Executive Engineer (R&B),

Deputy Executive Engineer (R&B),

Executive Engineer (R&B),

Sl. No

Description of Metal

R&B Section : Malikipuram

Source of Supply

R&B Sub-division : Razole

Lead in
Kms

Conveyance

Initial cost
less
stacking

R&B Division : Amalapuram

ATES as per 2008-2009 SSR

S-GONDI ROAD FROM KM.0.000 TO 7.350 (CONSTRUCTION OF LOW LEVEL CAUSE WAY
ARI DISTRICT .

Seigniorage
charges

Deduct
13.615% CP
& OH charges
from
conveyance

Toal Cost
per Cum

0.00

0.00

-64.12

961.78

70.00

0.00

0.00

-64.12

998.78

70.00

0.00

0.00

-64.12

1130.78

67.00

0.00

0.00

-64.12

703.78

0.00

0.00

0.00

-64.12

522.28

70.00

0.00

0.00

-64.12

637.78

70.00

0.00

0.00

-64.12

1130.78

70.00

236.00

0.00

-64.12

1722.78

70.00

246.00

0.00

-64.12

1772.78

Blasting
charges

Machine
crushing
charges

70.00

Seigniorage
charges

Deduct
13.615% CP
& OH charges
from
conveyance

Toal Cost
per Cum

195.00

0.00

-64.12

1517.78

70.00

164.00

0.00

-64.12

1362.78

70.00

126.00

0.00

-64.12

1172.78

70.00

77.00

0.00

-64.12

927.78

0.00

0.00

0.00

-64.12

822.78

0.00

0.00

0.00

-107.79

845.26

70.00

155.00

0.00

-64.12

1317.78

70.00

248.50

0.00

-64.12

1785.28

70.00

259.00

0.00

-64.12

1837.78

70.00

205.50

0.00

-64.12

1570.28

Blasting
charges

Machine
crushing
charges

70.00

Seigniorage
charges

Deduct
13.615% CP
& OH charges
from
conveyance

Toal Cost
per Cum

173.00

0.00

-64.12

1407.78

70.00

133.00

0.00

-64.12

1207.78

0.00

0.00

0.00

-64.12

663.08

0.00

0.00

0.00

-48.75

969.40

0.00

0.00

0.00

-32.09

696.61

0.00

0.00

0.00

34000.00

0.00

0.00

0.00

41500.00

Blasting
charges

Machine
crushing
charges

70.00

41000.00
0.00

0.00

0.00

Superintending Engineer (R&B),

5920.00

Blasting
charges

Machine
crushing
charges

Seigniorage
charges

R&B Circle : Kakinada

Deduct
13.615% CP
& OH charges
from
conveyance

Toal Cost
per Cum

LEAD CHARGES
Earth/Gravel/
Metal
Sand
loading
51.40
102.80
unloading
15.70
15.70
stacking
0.00
0.00
0.25 xx
xx
0.5 xx
xx
1
31.00
29.90
2
43.40
41.90
3
57.90
57.90
4
70.30
70.30
5
82.70
82.70
6
95.10
95.10
7
107.50
107.50
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

119.90
132.30
144.70
157.10
169.50
181.90
194.30
206.70
219.10
231.50
243.90
256.30
268.70
281.10
293.50
305.90
318.30
330.70
343.10
355.50
367.90
380.30
392.70
403.00
413.30
423.60
433.90
444.20
454.50
464.80
475.10
485.40
495.70
506.00

119.90
132.30
144.70
157.10
169.50
181.90
194.30
206.70
219.10
231.50
243.90
256.30
268.70
281.10
293.50
305.90
318.30
330.70
343.10
355.50
367.90
380.30
392.70
403.00
413.30
423.60
433.90
444.20
454.50
464.80
475.10
485.40
495.70
506.00

Cost of Materials, Labour


SSR 2015-16
Material Rates
60 to 63 mm IRC & MoRTH HBG metal
50 to 55 mm IRC & MoRTH HBG metal
40 to 45 mm IRC & MoRTH HBG metal
Roughstone 300mm (HBG)for revetment
Roughstone 225mm (HBG)for revetment
SS Revetment work 225mm
SS Revetment work 300mm
SS Revetment work 450mm
Laterite for Revetment 225mm
Laterite for Revetment 300mm
Jeddy stone above 450mm to 600mm
Quarry spall(Field picked metal)
Av. Of rate 25mm & 40mm
150 mm soling stone HBG metal
40 to 45 mm IRC & MoRTH HBG M/C metal
25 to 27 mm IRC & MoRTH HBG M/C metal
19 to 22 mm IRC & MoRTH HBG M/C metal
12 to 14 mm IRC & MoRTH HBG M/C metal
9.5 to 11.20 mm IRC & MoRTH HBG M/C metal
5 to 7 mm IRC & MoRTH HBG M/C metal
2.36 to 5 mm IRC & MoRTH HBG M/C metal
HBG Stone chips 2.36mm and below
Gravel
40 mm SS-5 m/c HBG metal
25 mm SS-5 m/c HBG metal
20 mm SS-5 m/c HBG metal
12 mm SS-5 m/c HBG metal
10 mm SS-5 m/c HBG metal
6 mm SS-5 m/c HBG metal
Sand for Concrete
Sand for Filling
HYSD Steel
Mild Steel
Cement
Mild Steel 6mm
Blasting charges
Blasting charges
Blasting charges for rough stone
Seigniorage charges
Metal
Gravel/earth
Sand
Labour Rates
Mate
Mazdoor skilled (420 x 30% + 375 x 70%)
Mazdoor unskilled

42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91

516.30
526.60
536.90
547.20
557.50
567.80
578.10
588.40
598.70
609.00
619.30
629.60
639.90
650.20
660.50
670.80
681.10
691.40
701.70
712.00
722.30
732.60
742.90
753.20
763.50
773.80
784.10
794.40
804.70
815.00
825.30
835.60
845.90
856.20
866.50
876.80
887.10
897.40
907.70
918.00
928.30
938.60
948.90
959.20
969.50
979.80
990.10
1000.40
1010.70
1021.00

516.30
526.60
536.90
547.20
557.50
567.80
578.10
588.40
598.70
609.00
619.30
629.60
639.90
650.20
660.50
670.80
681.10
691.40
701.70
712.00
722.30
732.60
742.90
753.20
763.50
773.80
784.10
794.40
804.70
815.00
825.30
835.60
845.90
856.20
866.50
876.80
887.10
897.40
907.70
918.00
928.30
938.60
948.90
959.20
969.50
979.80
990.10
1000.40
1010.70
1021.00

Machinery Rates
Dozer 80 HP for spreading @ 200 cum per hour
Motor grader 3.35M Blade @50 cum/Hr
Hydralic excavator
Front end loader 1 cum capacity
Tipper 5 cum
Vibratory roller 8T
smooth wheeled roller 8 Ton
Water tanker 6 KL
Tractor
Tractor with Rotavator
Tractor with ripper attachment @ 60 cum per hour
Air compressor 250 cfm
Wet mix plant of 60 tonne hr. capacity
Mechanical broom @ 1250 sqm/hr.
Bitumen pressure distributor @1750 sqm/hr
Emulsion pressure distributor @1750 sqm/hr
Hot mix plant 40 to 60 TPH
Mechanical Paver finisher 100 TPH
Hydraulic self propelled chip spreader @ 1500 sqm/hr.
Finish rolling with 6-8 tonne smooth wheeled tandem roller.
Pneumatic road Roller
GSB Plant 50 Cum
Generator 250 KVA
Generator set 125 KVA
Generator set 35 KVA
Concrete mixer 0.4/0.28 cum
Tipper 5.50 cum capacity per 10 Tonnes per tkm
Tipper 5 cum capacity for Soil, GSB, WMM, Hot mix
Plate compactor/Power rammer
Sand for Mortar

Tipper 10Tonne capacity for carriage of stone


chips from stock pile on road side to chip
spreader

92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141

1031.30
1041.60
1051.90
1062.20
1072.50
1082.80
1093.10
1103.40
1113.70
1124.00
1134.30
1144.60
1154.90
1165.20
1175.50
1185.80
1196.10
1206.40
1216.70
1227.00
1237.30
1247.60
1257.90
1268.20
1278.50
1288.80
1299.10
1309.40
1319.70
1330.00
1340.30
1350.60
1360.90
1371.20
1381.50
1391.80
1402.10
1412.40
1422.70
1433.00
1443.30
1453.60
1463.90
1474.20
1484.50
1494.80
1505.10
1515.40
1525.70
1536.00

1031.30
1041.60
1051.90
1062.20
1072.50
1082.80
1093.10
1103.40
1113.70
1124.00
1134.30
1144.60
1154.90
1165.20
1175.50
1185.80
1196.10
1206.40
1216.70
1227.00
1237.30
1247.60
1257.90
1268.20
1278.50
1288.80
1299.10
1309.40
1319.70
1330.00
1340.30
1350.60
1360.90
1371.20
1381.50
1391.80
1402.10
1412.40
1422.70
1433.00
1443.30
1453.60
1463.90
1474.20
1484.50
1494.80
1505.10
1515.40
1525.70
1536.00

142
143
144
145
146
147
148
149
150

1546.30
1556.60
1566.90
1577.20
1587.50
1597.80
1608.10
1618.40
1628.70

1546.30
1556.60
1566.90
1577.20
1587.50
1597.80
1608.10
1618.40
1628.70

abour
SSR 2015-16
As per SSR of PR Dept.
419.00 Pg. No.247, Sl.53 (Roads)
456.00 Pg. No.247, Sl.52 (Roads)
588.00 Pg. No.247, Sl.51 (Roads)
172.00 Pg. No.244, Sl.9 (Roads)
177.00 Pg. No.244, Sl.8 (Roads)
144.00 Pg. No.244, Sl.2 (Roads)
164.00 Pg. No.244, Sl.3 (Roads)
156.00 Pg. No.244, Sl.4 (Roads)
136.00 Pg. No.244, Sl.6 (Roads)
159.00 Pg. No.244, Sl.7 (Roads)
206.00 Pg. No.244, Sl.5 (Roads)
(46+53)/2 Pg.249
49.50
Sl. No.84 & 85
95.00 Pg. No.248, Sl.79 (Roads)
588.00 Pg. No.247, Sl.51 (Roads)
944.00 Pg. No.247, Sl.50 (Roads)
984.00 Pg. No.247, Sl.49 (Roads)
780.00 Pg. No.247, Sl.48 (Roads)
656.00 Pg. No.247, Sl.47 (Roads)
504.00 Pg. No.247, Sl.46 (Roads)
308.00 Pg. No.247, Sl.45 (Roads)
350.00 Pg. No.249, Sl.92 (Roads)
103.00 Pg. No.249, Sl.90 (Roads)
620.00 Pg. No.246, Sl.30 (Roads)
994.00 Pg. No.246, Sl.29 (Roads)
1036.00 Pg. No.246, Sl.28 (Roads)
822.00 Pg. No.246, Sl.27 (Roads)
692.00 Pg. No.245, Sl.26 (Roads)
532.00 Pg. No.245, Sl.25 (Roads)
610.00 Pg. No.249, Sl.93 (Roads)
460.00 Pg. No.249, Sl.94 (Roads)
41000.00
42500.00 As per the G.O.s
5920.00 July, 2015 GO RT
42500.00 No.467, dt.10.09.2015

296

5920

70.00 Pg. No.249, Sl.80 (Roads)


xx
50.00
22.00 As per the G.O.s
40.00
375.00
388.50
320.00

Pg. No.241, Sl.71 (Roads)


(385 x 30% + 345 x 70%) = 357
Pg. No.241, Sl.73 (Roads)

2540.90
3220.00
2791.00
1650.00
909.70
2609.10
1101.00
630.00
415.00
425.00
425.00
538.20
1650.00
375.00
1500.00
860.00
19200.00
2250.00
2695.00
1650.00
1347.00
1257.00
1850.00
1320.00
816.80
456.20
7.12
7.12
58.00

Pg. No.256, Sl.1 (Roads)


Pg. No.256, Sl.3 (Roads)
Pg. No.256, Sl.4 (Roads)
Pg. No.256, Sl.5 (Roads)
Pg. No.256, Sl.6 (Roads)
Pg. No.256, Sl.7 (Roads)
Pg. No.256, Sl.8 (Roads)
Pg. No.256, Sl.10 (Roads)
Pg. No.256, Sl.11 (Roads)
Pg. No.256, Sl.12 (Roads)
Pg. No.256, Sl.13 (Roads)
Pg. No.256, Sl.14 (Roads)
Pg. No.256, Sl.15 (Roads)
Pg. No.256, Sl.16 (Roads)
Pg. No.256, Sl.17 (Roads)
Pg. No.256, Sl.18 (Roads)
Pg. No.257, Sl.22 (Roads)
Pg. No.257, Sl.24 (Roads)
Pg. No.257, Sl.25 (Roads)
Pg. No.257, Sl.26 (Roads)
Pg. No.257, Sl.27 (Roads)
Pg. No.257, Sl.30 (Roads)
Pg. No.258, Sl.43 (Roads)
Pg. No.258, Sl.43 (Roads)
Pg. No.258, Sl.43 (Roads)
Pg. No.258, Sl.38 (Roads)

677.00

Pg. No.249, Sl.95 (Roads)

Pg. No.258, Sl.48 (Roads)

345 x 70%) = 357

Bridge portion

Name of Work IMPROVEMENTS


:
TO RAMARAJULANKS-GONDI ROAD FROM KM.0.00
7.350 (CONSTRUCTION OF LOW LEVEL CAUSE WAY 4VX6.37M SPAN
EAST GODAVARI DISTRICT .
Quantity

Description of Item

Rate

per

1 Earthwork in excavation of foundation of structures as per drawing and technical specifi


including setting out, construction of shoring and bracing, removal of stumps and
deleterious matter, dressing sides of bottom, back filling the excavation earth to the
required etc., complete including seignioarge charges for finished item of work as per M
specification 304 (4th Revision)
Unit : Cum
Page 323 of MoRT&H SDB
Taking out put = 240 Cum
a) excluding dewatering charges In all soils upto SDR upto 3.0 m depth using mach
(A) Labour
0.32 day

Mate

8.00 day
0.00 %

Mazdoor unskilled
MAA
Total
(B) Machinery
6.00 hrs
Hydraulic Excavator 1.00 cum bucket
(C) Seigniorage charges
240.00 Cum Seigniorage charges

375.00

day

320.00
2680.00

day

2791.00

hr

0.00

cum

(D) Over head charges @ 19.615% on (A) + (B)+( C)


(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 240 cum (E)+(F)
Rate for 1 cum
Rate to be adopted
b) including dewatering charges In all soils upto SDR upto 3.0 m depth using
machinary
Unit : Cum
Taking out put = 240 Cum
(A) Labour
0.32 day
Mate
375.00
day
8.00 day
Mazdoor unskilled
320.00
day
0.00 %
MAA
2680.00
Total
(B) Machinery
6.00 hrs
Hydraulic Excavator 1.00 cum bucket
2791.00
hr
(C) Seigniorage charges
240.00 Cum Seigniorage charges
0.00
cum
5.00 %
Dewatering charges (labour+machinery)
19426.00
(D) Over head charges @ 19.615% on (A) + (B)+( C)
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 240 cum (E)+(F)

Quantity

Description of Item

Rate

per

Rate for 1 cum


Rate to be adopted

2 Providing PCC(1:3:6) nominal mix in foundation with crushed stone aggregate 40 mm n


size mechanically mixed , placed in foundation and compacted by vibration including curin
including all other incidental and operational charges of all T&P etc., complete for finishe
of work as per MoRT&H specification 2100 (4th Revision) .
Unit = cum
Page 331 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.64 nos
Mate
375.00
1.00 nos
Mason
388.50
15.00 nos
Mazdoor
320.00
0.00 %
MAA
5428.50
Total

(B) Material
13.50 cum
Cost of 40mm SS-5 HBG M/C metal
6.75 cum
Sand at site
3.45 MT
Cement at site
Total

1317.78
969.40
5920.00

Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
456.20
6.00 hr
Generator set 35 KVA
816.80
2.00 hr
Water tanker 6 KL capacity
630.00
Total
(D) Over head charges @ 19.615% (25%-VAT-Insurance)
19.615 %
Add for Over head charges @ 19.615% on (A)+(B)+( C)
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

day
day
day

cum
cum
MT

hr
hr
hr

Note: Vibrator is a part of minor T&P which is already included in over head
charges of the contractor
3 Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm siz
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine agg
conforming to table 1000-2) including cost,seignorage and conveyance of all materials
and all labour charges for machine mixing,laying in position, Compacting , Vibrating and
including all other incidental and all other operational charges of T&P required etc., comp
per MoRT&H Specification 1500,1700, 2100 (4th Revision) VCC M-20 for footings of Abut
Piers ,and Wing walls Cut off walls.
Unit = cum
Page 335 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos
Mate
day
375.00

Quantity

Description of Item

1.50 nos
20.00 nos
0.00 %

Mason
Mazdoor
MAA
Total
(B) Material
5.40 cum
Cost of 40mm SS-5 HBG
5.40 cum
Cost of 20mm SS-5 HBG
2.70 cum
Cost of 10mm SS-5 HBG
6.75 cum
Sand at site
5.16 MT
Cement at site
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28
6.00 hr
Generator set 35 KVA
Total

M/C metal
M/C metal
M/C metal

cum

Rate

per

388.50
320.00
7305.25

day
day

1317.78
1837.78
1407.78
969.40
5920.00

cum
cum
cum
cum
MT

456.20
816.80

hr
hr

(D) Form work


4.00 %
Form work @ 4% on (A)+(B)+( C)
72874.93
(E) Over head charges @ 19.615% (25%-VAT-Insurance)
19.615 %
Add for Over head charges @ 19.615% on (A)+(B)+( C)+(D)
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

Cum

4 Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm siz
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine agg
conforming to table 1000-2) including cost,seignorage and conveyance of all materials
and all labour charges for machine mixing, laying in position,Compacting, Vibrating and
including all other incidental and all other operational charges of T&P required etc., comp
per MoRT&H Specification 1500,1700, 2200 (4th Revision) for Sub structure .VCC M-15 f
structure of Abutments, Piers and wing walls
Unit = cum
Page 335,455 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos
Mate
day
375.00
1.50 nos
Mason
day
388.50
20.00 nos
Mazdoor
day
320.00
0.00 %
MAA
7305.25
Total
(B) Material
5.40 cum
1317.78
cum
Cost of 40mm SS-5 HBG M/C metal
5.40 cum
1837.78
cum
Cost of 20mm SS-5 HBG M/C metal
2.70 cum
1407.78
cum
Cost of 10mm SS-5 HBG M/C metal
6.75 cum
Sand at site
969.40
cum
5.16 MT
Cement at site
5920.00
MT
Total
Machinery

Quantity
6.00 hr
6.00 hr

Description of Item
Concrete mixer 0.4/0.28 cum
Generator set 35 KVA

Rate

per

456.20
816.80

hr
hr

(D) Form work


10.00 %
Form work @ 10% on (A)+(B)+( C)
72874.93
(E) Over head charges @ 19.615% (25%-VAT-Insurance)
19.615 %
Add for Over head charges @ 19.615% on (A)+(B)+( C)+(D)
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

Cum

5 Vibrated Reinforced cement concrete M 25 Grade Concrete in foundations with 20 mm(SS


M/C graded metal with a cube strength of 25 N / mm2 at 28 days work test on 150 X
150 mm cubes and cost and and conveyance of all materials, vibrating centering m
mixing, curing hire and operational charges of all T& P but excluding cost and its fabr
charges of steel etc complete as per MoRT&H Specification 1500,1700, 2100 (4th Revi
VRCC M-25 for RAFT FOUNDATION.
Unit = cum
Page 335 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos
Mate
day
375.00
1.50 nos
Mason
day
388.50
20.00 nos
Mazdoor
day
320.00
0.00 %
MAA
7305.25
Total
(B) Material
8.10 cum
1837.78
cum
Cost of 20mm SS-5 HBG M/C metal
5.40 cum
1407.78
cum
Cost of 10mm SS-5 HBG M/C metal
6.75 cum
Sand at site
969.40
cum
6.05 MT
Cement at site
5920.00
MT
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
456.20
hr
6.00 hr
Generator set 35 KVA
816.80
hr
Total
(D) Form work
4.00 %
Form work @ 4% on (A)+(B)+( C)
79790.73
(E) Over head charges @ 19.615% (25%-VAT-Insurance)
19.615 %
Add for Over head charges @ 19.615% on (A)+(B)+( C)+(D)
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

Cum

Quantity

Description of Item

Rate

per

6 Vibrated Reinforced cement concrete M 25 Grade Concrete in foundations with 20 mm(SS


M/C graded metal with a cube strength of 25 N / mm2 at 28 days work test on 150 X
150 mm cubes and cost and and conveyance of all materials, vibrating centering m
mixing, curing hire and operational charges of all T& P but excluding cost and its fabr
charges of steel etc complete as per MoRT&H Specification 1500,1700, 2100 (4th Revi
VRCC M-25 for RAFT foundation
Unit = cum
Page 335 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos
Mate
day
375.00
1.50 nos
Mason
day
388.50
20.00 nos
Mazdoor
day
320.00
0.00 %
MAA
7305.25
Total
(B) Material
8.10 cum
1837.78
cum
Cost of 20mm SS-5 HBG M/C metal
5.40 cum
1407.78
cum
Cost of 10mm SS-5 HBG M/C metal
6.75 cum
Sand at site
969.40
cum
6.05 MT
Cement at site
5920.00
MT
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
456.20
hr
6.00 hr
Generator set 35 KVA
816.80
hr
Total
(D) Form work
4.00 %
Form work @ 4% on (A)+(B)+( C)
79790.73
(E) Over head charges @ 19.615% (25%-VAT-Insurance)
19.615 %
Add for Over head charges @ 19.615% on (A)+(B)+( C)+(D)
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

Cum

7 V.R.C.C. M25 grade concrete using 20mm and 10mm size SS5 HBG crushed stone agg
including cost and conveyance of all materials to site, seigniorage charges,labour charg
machine mixing, laying, compacting, curing etc,including all other incidental and oper
charges,T&P charges etc, complete but excluding cost of steel and its fabrication charges,
MoRT&H Specifications 1500,1700,2100(4th Revision)For bed blocks & backing walls.
Page 472,457 of MoRT&H SDB
Unit = cum
Taking output = 15 cum
(A) Labour
375.00
0.86 nos
Mate
388.50
1.50 nos
Mason
320.00
20.00 nos
Mazdoor
0.00 %
MAA
7305.25
(B) Material

day
day
day

Quantity
8.10 cum
5.40 cum
6.75 cum
6.05 MT

Description of Item
Cost of 20mm SS-5 HBG M/C metal
Cost of 10mm SS-5 HBG M/C metal
Sand at site
Cement at site

Rate

per

1837.78
1407.78
969.40
5920.00

cum

Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
456.20
6.00 hr
Generator set 35 KVA
816.80
Total
Total A+B+C for 15 cum
a) Height from 5m to 10m
Basic rate for 15 cum of concrete
1.80 %
Add on cost of concrete to cater extra lift
79790.73
11.80 %
Add for Form work on cost of concrete
79790.73
Total
19.615 %
Add for Over head charges
10.00 %

cum
MT

hr
hr

Rs
Rs
Rs

Add for Contractors profit


Rate Per 15 Cum
Rate Per 1 Cum
Rate to be adopted

b) Height upto 5m
Basic rate for 15 cum of concrete
10.00 %
Add for Form work on cost of concrete
19.615 %
10.00 %

79790.73
Total

Rs
Rs

Add for Over head charges


Add for Contractors profit
Rate Per 15 Cum
Rate Per 1 Cum
Rate to be adopted

8 V.R.C.C concrete M - 25 grade for Super Structure with 20 mm(SS5)HBG M/C graded metal
a cube strength of 25 N / mm2 at 28 days work test on 150 X 150 X 150 mm cubes an
and and conveyance of all materials, vibrating centering machine mixing, curing hi
operational charges of all T& P but excluding cost and its fabrication charges of ste
complete as per MoRT&H spcn. No. 1500, 1600 & 1700 as per MOST Drg. No BD/4-74
74FOR VRCC M-25 Super structure of Deck slabs
Unit = cum
Page 472 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
375.00
0.86 nos
Mate
day
388.50
1.50 nos
Mason
day
320.00
20.00 nos
Mazdoor
day
MAA
7305.25
0.00 %
Total

Quantity

Description of Item

(B) Material
Cost of 20mm SS-5 HBG M/C metal
8.10 cum
Cost of 10mm SS-5 HBG M/C metal
5.40 cum
6.75 cum
Sand at site
5.99 MT
Cement at site
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA
Total

Rate

per

1837.78
1407.78
969.40
5920.00

cum

456.20
816.80

hr
hr

cum
MT

Total
a) For form work add the following (Height 0 - 5 m)
for Deck slab slab Super structure
20.00 %
19.615 %
10.00 %

Height upto 5m - 20 percent

79435.53

Add Over Head Charges

95322.64

Add Contractor's Profit

b) For form work add the following (Height 5 - 10 m)


for Deck slab Super structure 25
of Basic rate of concrete
25.00 %
Height above 5m to 10m - 25 percent
19.615 %
10.00 %

Add Over Head Charges


Add Contractor's Profit

114020.18
Rate per 15 cum
Rate per cum
Or Say

79435.53
99294.41
118771.01
Rate per 15 cum
Rate per cum
Or Say

9 V.R.C.C. M30 grade concrete using 20mm and 10mm size SS5 HBG crushed stone agg
including cost and conveyance of all materials to site, seigniorage charges,labour charg
machine mixing,laying,compacting,curing etc,including all other incidental and oper
charges,T&P chargesetc, complete but excluding cost of steel and its fabrication charges,
MoRT&H Specifications 1500,1700,2100 & 2704(4th Revision). For Approach Slab .
Unit = cum
Page 340,501 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos
Mate
375.00
1.50 nos
Mason
388.50

day
day

Quantity
20.00 nos
0.00 %

Description of Item
Mazdoor
MAA
Total

Rate

per

320.00
7305.25

day

(B) Material
8.10 cum
1837.78
Cost of 20mm SS-5 HBG M/C metal
5.40 cum
1407.78
Cost of 10mm SS-5 HBG M/C metal
6.75 cum
Sand at site
969.40
6.10 MT
Cement at site
5920.00
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
456.20
6.00 hr
Generator set 35 KVA
816.80
Total
(D) Form work
2.00 %
Form work @ 2% on (A)+(B)+( C)
80086.73
(E) Over head charges @ 19.615% (25%-VAT-Insurance)
19.615 %
Add for Over head charges @ 19.615% on (A)+(B)+( C)+(D)
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum M 30 Concrete
Rate to be adopted

cum
cum
cum
MT

hr
hr

Cum

10 V.R.C.C. M30 grade concrete using 20mm and 10mm size SS5 HBG crushed stone agg
including cost and conveyance of all materials to site, seigniorage charges,labour charg
machine mixing,laying,compacting,curing etc,including all other incidental and oper
charges,T&P chargesetc, complete but excluding cost of steel and its fabrication charges,
MoRT&H Specifications 1500,1700,2100 & 2702(4th Revision). For Wearing coat over Deck
Unit = cum
Page 477,492 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.90 nos
Mate
375.00
1.50 nos
Mason
388.50
21.00 nos
Mazdoor
320.00
0.00 %
MAA
7640.25
Total
(B) Material
8.10 cum
1837.78
Cost of 20mm SS-5 HBG M/C metal
5.40 cum
1407.78
Cost of 10mm SS-5 HBG M/C metal
6.75 cum
Sand at site
969.40
6.10 MT
Cement at site
5920.00
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
456.20
6.00 hr
Generator set 35 KVA
816.80
(A+B+C) =Rate per 15 cum
Basic Rate per cum

day
day
day

cum
cum
cum
MT

hr
hr

Quantity
0.15 nos
0.00 %

Description of Item

Rate

Labour for cleaning deck slab concrete


MAA

320.00
48.00
Rate per cum
(D) Over head charges @ 19.615% (25%-VAT-Insurance)
Add for Over head charges @ 19.615% on
19.615 %
5409.45
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate to be adopted

per
day

11 Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all diam
including cost and conveyance of steel to site and all labour charges for fabricat
reinforcement including cutting, bending, binding rods, tying grills, placing them in positio
complete including cost and conveyance of binding wire and all handling charges and oper
charges etc., and including over lapping welding if required etc., complete for all R.C.C ite
finished item of work as per standard drawings, as per the directions of the Engineer-in-C
and as per MoRT&H specification 1600 &2200 (4th revision) and as per I.S.1786 of 198
Super structure of R.C.C items.
Unit = MT
Page 489,490 of MoRT&H SDB
Taking output = 1 MT
(A) Labour
0.44 nos
Mate
375.00
3.00 nos
Black smith
375.00
8.00 nos
Mazdoor
320.00
0.00 %
MAA
3850.00
Total
(B) Material
1.05 MT
HYSD bars including overlaps
34000.00
8.00 Kg
Binding wire
41500.00
Total
(C) Over head charges @ 19.615% (25%-VAT-Insurance)
Add for Over head charges @ 19.615% on (A)+(B)
19.615 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Rate for 1 MT (D)+(E)
Rate to be adopted

day
day
day

MT
MT

12 Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all diam
including cost and conveyance of steel to site and all labour charges for fabricat
reinforcement including cutting, bending, binding rods, tying grills, placing them in positio
complete including cost and conveyance of binding wire and all handling charges and oper
charges etc., and including over lapping welding if required etc., complete for all R.C.C ite
finished item of work as per standard drawings, as per the directions of the Engineer-in-C
and as per MoRT&H specification 1600 &2200 (4th revision) and as per I.S.1786 of 198
Sub structure of R.C.C items.
Unit = MT
Page 459,460 of MoRT&H SDB
Taking output = 1 MT
(A) Labour
0.34 nos
Mate
day
375.00
2.00 nos
Black smith
day
375.00
6.50 nos
Mazdoor
day
320.00
0.00 %
MAA
2957.50

Quantity

Description of Item

Rate

Total
(B) Material
1.05 MT
HYSD bars including overlaps
34000.00
6.00 Kg
Binding wire
41500.00
Total
(C) Over head charges @ 19.615% (25%-VAT-Insurance)
Add for Over head charges @ 19.615% on (A)+(B)
19.615 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Rate for 1 MT (D)+(E)
Rate to be adopted

per

MT
MT

13 Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars of all diam
including cost and conveyance of steel to site and all labour charges for fabricat
reinforcement including cutting, bending, binding rods, tying grills, placing them in positio
complete including cost and conveyance of binding wire and all handling charges and oper
charges etc., and including over lapping welding if required etc., complete for all R.C.C ite
finished item of work as per standard drawings, as per the directions of the Engineer-in-C
and as per MoRT&H specification 1600 &2200 (4th revision) and as per I.S.1786 of 19
foundations of R.C.C items.
Unit = MT
Page 448 of MoRT&H SDB
Taking output = 1 MT
(A) Labour
0.40 nos
Mate
375.00
2.00 nos
Black smith
375.00
6.00 nos
Mazdoor
320.00
0.00 %
MAA
2820.00
Total
(B) Material
1.05 MT
HYSD bars including overlaps
34000.00
6.00 Kg
Binding wire
41500.00
Total
(C) Over head charges @ 19.615% (25%-VAT-Insurance)
Add for Over head charges @ 19.615% on (A)+(B)
19.615 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Rate for 1 MT (D)+(E)
Rate to be adopted

day
day
day

MT
MT

14 Back filling behind Abutments with gravel including cost ,conveyance and seigniorage
materials to site etc., complete as per
Clause 710.1.4 of IRC : 78and as per M
Specification No. 2200 (4th Revision) and as per Drawing and technical specifications for fi
item of work
Unit = cum
Page 462 of MoRT&H SDB
Taking output = 10 cum
(A) Labour
0.28 nos
Mate
375.00
day
7.00 nos
Mazdoor
320.00
day
0.00 %
MAA
2345.00
Total

Quantity

Description of Item

Rate

(B) Material
12.00 cum
Cost of Granular material
845.26
Total
Machinery
2.50 hr
Plate compactor/Power rammer/road roller
58.00
0.05 hr
Water tanker 6 KL capacity
630.00
Total
(D) Over head charges @ 19.615% (25%-VAT-Insurance)
19.615 %
Add for Over head charges @ 19.615% on (A)+(B)+( C)
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 10 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

per
cum

hr
hr

15 Providing and laying of filter media with Granular materials / stone crushed aggr
satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thi
of not less than 600mm with smaller size towards the soil and bigger size towards the w
provided over the entire surface behind the abutment, wing wall and return wall to the full
compacted to a firm condition including cost and conveyance of all metal seignorage c
,and all labour charges as directed by the departmental officers as per drawing and Tec
specifications as per clause 710.1.1 of IRC:78 and Clause 2200 of MoRT&H (4 th Revisio
finished item of work.
Unit = cum
Page 463 of MoRT&H SDB
Taking output = 10 cum
(A) Labour
0.32 nos
Mate
day
375.00
7.00 nos
Mazdoor for filling watering, ramming etc
day
320.00
1.00 nos
Mazdoor skilled
day
388.50
0.00 %
MAA
2748.50
Total
(B) Material
Filter media of stone aggregate conforming
to clause 2504.2.2 of MoRT&H
6.00 cum
637.78
cum
Cost of 150mm size IRC soling stone (HBG)
6.00 cum
1130.78
cum
Cost of 40mm size IRC HBG metal
Total
Machinery
0.06 hr
Water tanker 6 KL capacity
630.00
hr
Total
(D) Over head charges @ 19.615% (25%-VAT-Insurance)
19.615 %
Add for Over head charges @ 19.615% on (A)+(B)+( C)
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 10 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

Quantity

Description of Item

Rate

per

16 Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size g
with 0.20 cum of CC (1:4:8) including cost, seigniorage charges and conveyance of mate
site and including labour charges for packing the stones for revetment etc., complete for fi
item of work as per MoRT&H specification 2504 ( 4th revision ) and as directed by the Engin
Charge for quadrential revetment.
Cost of CC(1:4:8) Page 331,522 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.64 nos
Mate
day
375.00
1.00 nos
Mason
day
388.50
15.00 nos
Mazdoor
day
320.00
0.00 %
MAA
5428.50
Total
(B) Material
13.50 cum
1317.78
cum
Cost of 40mm SS-5 HBG M/C metal
6.75 cum
Sand at site
969.40
cum
2.43 MT
Cement at site
5920.00
MT
Total
(c) Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
456.20
hr
6.00 hr
Generator set 35 KVA
816.80
hr
Cost per 15 cum
Rate for 1 cum
Cost of Grouted Revetment
Unit = Cum
Taking output = 1 cum
(A) Labour
0.04 nos
Mate
375.00
0.35 nos
Mason / Stone packer / Cutter
388.50
0.75 nos
Mazdoor for laying stones, filling quarry spall
320.00
0.00 %
MAA
390.98
Total
(B) Material
0.20 cum
Cost of CC(1:4:8)
3452.37
1.00 cum
Cost of Rough stone 300mm thick at work
703.78
Total
(C) Over head charges @ 19.615% (25%-VAT-Insurance)
Add for Over head charges @ 19.615% on (A)+(B)
19.615 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)

day
day
day

cum
cum

1785.23

Rate to be adopted for 1cum

17 Pitching
with 300 mm size rough stone
including cost, seigniorage charge
conveyance of materials to site and including labour charges for packing the ston
revetment etc., complete for finished item of work as per MoRT&H specification 250
revision ) and as directed by the Engineer-in-Charge for Pitching of slopes for Toe wal

Pitching
with 300 mm size rough stone
including cost, seigniorage charge
Quantity of materials to
Description
of Item labour charges
Rate
per the ston
conveyance
site and including
for packing
revetment etc., complete for finished item of work as per MoRT&H specification 250
revision ) and as directed by the Engineer-in-Charge for Pitching of slopes for Toe wal
(A) Labour
Page 522 of MoRT&H SDB
0.04 nos
Mate
375.00
0.35 nos
Mason
388.50
0.75 nos
Mazdoor for laying stones, filling quarry spall
320.00
0.00 %
MAA
390.98
Total
(B) Material
1.00 cum
Cost of Rough stone 300mm thick
703.78
0.20 cum
Cost of stone spalls
522.28
Total
(C) Over head charges @ 19.615% (25%-VAT-Insurance)
Add for Over head charges @ 19.615% on (A)+(B)
19.615 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)

day
day
day

cum
cum

1199.22

Cost per 1 cum


Rate to be adopted

18 Providing and laying filter material with Gravel underneath pitching in slopes inc
cost, seigniorage charges and conveyance of materials to site including labour charges
complete for finished item of work as per MoRT&H Specification 2504 (4th Revision) a
directed by the Engineer-in-Charge under Revetment.
Unit = cum
Page 523 of MoRT&H SDB
Taking output = 1 Cum
(A) Labour
0.05 nos
Mate
375.00
0.25 nos
Mazdoor skilled
388.50
1.00 nos
Mazdoor for laying stones, filling quarry spall
320.00
0.00 %
MAA
435.88
Total
(B) Material
1.20 cum
Cost of gravel
845.26
(C) Over head charges @ 19.615% (25%-VAT-Insurance)
Add for Over head charges @ 19.615% on (A)+(B)+( C)
19.615 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)

day
day
day

cum
1450.19

Cost per 1 cum


Rate to be adopted

19 Providing weep holes in Brick masonry/Plain/Reinforced concrete Abutment/wing wall/Ret


wall with 100mm dia meter A/C pipe extending through the full width of the structure with s
of about 1 V : 20H towards drawing face Complete as per drawing and technical specificati
complete for finished item of work for weep holes as per MORTH specification No 2706 & 22
(4th Revision)

Quantity

Description of Item

Rate

Unit = nos
Taking output = 30 RM
Output = 1 Cum, Material for 1:3 Cement Mortor
(A) Labour
0.04 nos
Mate
375.00
0.90 nos
Mazdoor
320.00
0.00 %
MAA
303.00
Total
(B) Material
0.51 MT
Cost of Cement
5920.00
1.05 Cum Cost of Sand
969.40
Total
Cost per 1 Cum CM (1:3)
(A) Labour
0.03 nos
Mate
375.00
0.50 nos
Mason
388.50
0.25
Mazdoor
320.00
0.00 %
MAA
285.50
Total
(B) Material
31.5 RM
Cost of 100mm dia AC pipe
161.00
including 5% wastage (average length= 1m)
10.00 Nos
Collors for AC pipe (average) taking 10 of pipe 16.10
30.00 Nos
MS clamps
13.00
0.05 cum
Cement mortor (1:3)
4340.07
Total
(C) Over head charges @ 19.615% (25%-VAT-Insurance)
19.615 %
Add for Over head charges @ 19.615% on (A)+(B)+( C)
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost Per 30 RM (D)+(E)
Cost per 1RM
Rate to be adopted

per

day
day

MT
cum

day
day
day

RM
Each
Each
Cum

20 Supplying and fixing CI drianage spoutes complete as per MORTH specification no. 2705
Unit = 1 Nos
Taking output = 1Nos
(a) Material
4 kg
2.00 meter
6.00 each
2.00 each

Corrosion resistant structural steel including


5 percent wastage
G.I Pipe 100mm dia
GI Bolt 10mm dia
Galvanized MS Flat clamp
Total

(b) Labour for fabrication

41.00
161.00
11.00
25.00

kg
meter
each
each

Quantity
0.02 day
0.02 day
0.02 day
0.00 %

Description of Item
Mate
Skilled (Blacksmith, welder etc.)
Mazdoor
MAA
Total

(c) Labour for fixing in position


0.01 day
Mate
0.01 day
Mason
0.20 day
Mazdoor
0.00 %
MAA
Total

5%

Add 5% of cost of material and labour for


electrodes, cutting gas, sealant, anticorrosive bituminous paint, mild steel
grating etc.

Rate

per

375.00
388.50
320.00
21.67

day
day
day

375.00
388.50
320.00
71.64

day
day
day

695.31

(C) Over head charges @ 19.615% (25%-VAT-Insurance)


19.615 %
730.08
Add for Over head charges @ 19.615% on (A)+(B)+(
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 1 Nos (E)+(F)
Rate to be adopted

21 Providing and laying Launching aprons for protection against scour with 450 mm to 60
jeddy stones as per drawing and MoRT&H SpecificationNo.2503.
Unit = cum
Taking output = 1 cum
(A) Labour
0.04 nos
Mate
0.35 nos
Mazdoor for filling watering, ramming etc
0.75 nos
Mazdoor skilled
0.00 %
MAA
Total

375.00
320.00
388.50
418.38

(B) Material
1.00 cum
663.08
Stone (jeddy stone)
0.20 cum
522.28
Stone spalls
Total
Total of (A) + (B)
(C) Over head charges @ 19.615% (25%-VAT-Insurance)
19.615 %
1185.92
Add for Over head charges @ 19.615% on (A)+(B)+(
(D) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 1 cum (E)+(F)
Rate for 1 cum

day
day
day

cum
cum

Quantity

Description of Item

Rate

per

Rate to be adopted

22 Plain cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG c
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conform
table 1000-2) including cost,seignorage and conveyance of all materials to site and all
charges for machine mixing,laying in position, Compacting , Vibrating and curing includ
other incidental and all other operational charges of T&P required etc., complete as per M
Specification 1500,1700, 2100 & 2700 (4th Revision) for Levelling course below approach s
Unit = cum
Page 335
Taking output = 15 cum
(A) Labour
0.86 nos
Mate
1.50 nos
Mason
20.00 nos
Mazdoor
0.00 %
MAA
Total
(B) Material
8.10 cum
Cost of 40mm SS-5 HBG M/C
4.05 cum
Cost of 20mm SS-5 HBG M/C
1.35 cum
Cost of 10mm SS-5 HBG M/C
6.75 cum
Sand at site
4.13 MT
Cement at site
Total

of MoRT&H SDB

metal
metal
metal

375.00
388.50
320.00
7305.25

day
day
day

1317.78
1837.78
1407.78
969.40
5920.00

cum
cum
cum
cum
MT

Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
456.20
6.00 hr
Generator set 35 KVA
816.80
Total
(D) Over head charges @ 19.615% (25%-VAT-Insurance)
65953.83
19.615 %
Add for Over head charges @ 19.615% on (A)+(B)+(
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

hr
hr

23 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone agg
and fine aggregate conforming to table 1000-2 of MoRT&H including cost, (exclu
seigniorage) conveyance of all materials to site and labour charges, centering, machine m
laying, Vibrating, curing etc., including all other incidental and operational charges of a
etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100
Revision) and as directed by the Engineer-in-Charge for base coarse.
Unit = cum
Page 335 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.64 nos
Mate
375.00

day

Quantity

Description of Item

1.00 nos
15.00 nos
0.00 %

Mason
Mazdoor
MAA
Total
(B) Material
13.50 cum
Cost of 40mm SS-5 HBG M/C metal
6.75 cum
Sand at site
2.43 MT
Cement at site
Total

Rate

per

388.50
320.00
5428.50

day
day

1317.78
969.40
5920.00

cum
cum
MT

Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
456.20
6.00 hr
Generator set 35 KVA
816.80
2.00 Hr
Water tanker 6KL capacity
630.00
Total
(D) Over head charges @ 19.615% (25%-VAT-Insurance)
53045.58
19.615 %
Add for Over head charges @ 19.615% on (A)+(B)+(
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

hr
hr
hr

24 Vibrated cement concrete M 35 grade using 20mm & 10mm HBG crushed stone agg
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1
including cost, (excluding seigniorage) conveyance of all materials to site and labour ch
centering, machine mixing, laying, vibrating, curing etc., including all other incident
operational charges of all T&P etc., complete for finished item of work as per M
specification 1500, 1700, 2100 & 2702 (4th Revision) and as directed by the Engin
Charge for C.C Pavement (Vaccum Dewatered Flooring services and Saw cutting of co
pavement using a self propelled walk behind, petro / electric powered saw)
Unit = cum
Page 335 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos
Mate
day
375.00
1.50 nos
Mason
day
388.50
20.00 nos
Mazdoor
day
320.00
0.00 %
MAA
7305.25
Total
(B) Material
1837.78
cum
Cost of 20mm SS-5 HBG M/C metal
8.10 cum
1407.78
cum
Cost of 10mm SS-5 HBG M/C metal
5.40 cum
Sand at site
969.40
cum
6.75 cum
Cement at site
5920.00
MT
6.33 MT
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA

456.20
816.80

hr
hr

Quantity

Description of Item

Rate

Total
3.50
%
81448.33
Form work @ 3.5% on A+B+C
(D) Over head charges @ 19.615% (25%-VAT-Insurance)
84299.02
19.615 %
Add for Over head charges @ 19.615% on (A)+(B)+(
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

per

M KM.0.000 TO
37M SPAN ) IN

Amount

ical specification
umps and other
th to the extent
k as per MoRT&H

ing machinary

120.00
2560.00
0.00
2680.00
16746.00
0.00
3810.41
###
2323.64
###
106.50
107.00
1 Cum

120.00
2560.00
0.00
2680.00
16746.00
0.00
971.3
4000.93
###
2439.82
###

Amount
111.83
112.00
1 Cum

40 mm nominal
uding curing etc.,
for finished item

240.00
388.50
4800.00
0.00
5428.50

17790.03
6543.45
20424.00
44757.48

2737.20
4900.80
1260.00
8898.00
11589.32
###
7067.33
###
5182.71
5183.00
1 Cum

10mm size HBG


d fine aggregate
materials to site
ating and curing
etc., complete as
gs of Abutments,

322.50

Amount
582.75
6400.00
0.00
7305.25
7116.01
9924.01
3801.01
6543.45
30547.20
57931.68
2737.20
4900.80
7638.00
###
2915.00
14866.19
###
9065.61
99721.73
6648.12
6648.00
1 Cum

10mm size HBG


d fine aggregate
materials to site
ating and curing
etc., complete as
CC M-15 for Sub

322.50
582.75
6400.00
0.00
7305.25
7116.01
9924.01
3801.01
6543.45
30547.20
57931.68

Amount
2737.20
4900.80
7638.00
72874.93
7287.49
15723.86
###
9588.63
###
7031.66
7032.00
1 Cum

20 mm(SS5)HBG
t on 150 X 150 X
ntering machine
nd its fabrication
(4th Revision)

322.50
582.75
6400.00
0.00
7305.25
14886.02
7602.01
6543.45
35816.00
64847.48
2737.20
4900.80
7638.00
###
3191.63
16276.99
###
9925.94
109185.29
7279.02
7279.00
1 Cum

Amount

20 mm(SS5)HBG
t on 150 X 150 X
ntering machine
nd its fabrication
(4th Revision)

322.50
582.75
6400.00
0.00
7305.25
14886.02
7602.01
6543.45
35816.00
64847.48
2737.20
4900.80
7638.00
###
3191.63
16276.99
###
9925.94
109185.29
7279.02
7279.00
1 Cum

stone aggregate
bour charges for
and operational
n charges, as per
alls.

322.50
582.75
6400.00
0.00
7305.25

Amount
14886.02
7602.01
6543.45
35816.00
64847.48
2737.20
4900.80
7638.00
79790.73
79790.73
1436.23
9415.31
90642.27
17779.48
###
10842.18
###
7950.93
7951.00
cum
79790.73
7979.07
87769.80
17216.05
###
10498.59
###
7698.96
7699.00
cum

ded metal with


m cubes and cost
curing hire and
ges of steel etc
BD/4-74A & 2-

322.50
582.75
6400.00
0.00
7305.25

Amount
14886.02
7602.01
6543.45
35460.80
64492.28
2737.20
4900.80
7638.00
79435.53

79435.53
15887.11
95322.64
18697.54
###
11402.02
###
8361.48
8361.00

79435.53
19858.88
99294.41
19476.60
###
11877.10
###
8709.87
8710.00
1 Cum

stone aggregate
bour charges for
and operational
n charges, as per
.

322.50
582.75

Amount
6400.00
0.00
7305.25

14886.02
7602.01
6543.45
36112.00
65143.48
2737.20
4900.80
7638.00
1601.73
16023.19
###
9771.17
###
7165.52
7166.00
1 Cum

stone aggregate
bour charges for
and operational
n charges, as per
over Deck slabs

337.50
582.75
6720.00
0.00
7640.25
14886.02
7602.01
6543.45
36112.00
65143.48
2737.20
4900.80
7638.00
80421.73
5361.45

Amount
48.00
0.00
5409.45

1061.06
6470.51
647.05
7117.56
7118.00
1 Cum
of all diameters
or fabrication of
m in position etc.,
s and operational
ll R.C.C items for
ngineer-in-Charge
786 of 1985 for

165.00
1125.00
2560.00
0.00
3850.00
35700.00
332.00
36032.00

7822.85
###
4770.49
52475.34
###
1 MT
of all diameters
or fabrication of
m in position etc.,
s and operational
ll R.C.C items for
ngineer-in-Charge
786 of 1985 for

127.50
750.00
2080.00
0.00

Amount
2957.50
35700.00
249.00
35949.00

7631.51
###
4653.80
51191.81
###
1 MT
of all diameters
or fabrication of
m in position etc.,
s and operational
ll R.C.C items for
ngineer-in-Charge
1786 of 1985 for

150.00
750.00
1920.00
0.00
2820.00
35700.00
249.00
35949.00
7604.54
###
4637.35
51010.89
###
1 MT

eigniorage of all
as per MoRT&H
tions for finished

105.00
2240.00
0.00
2345.00

Amount
10143.12
10143.12
145.00
31.50
176.50
2484.17
###
1514.88
###
1666.37
1666.00
1 Cum

shed aggregates
ns to a thickness
ards the wall and
to the full height
gnorage charges
ng and Technical
(4 th Revision) for

120.00
2240.00
388.50
0.00
2748.50

3826.68
6784.68
10611.36
37.80
37.80
2627.95
###
1602.56
###
1762.82
1763.00
1 Cum

Amount

mm size grouted
e of materials to
plete for finished
y the Engineer-in-

240.00
388.50
4800.00
0.00
5428.50
17790.03
6543.45
14385.60
38719.08
2737.20
4900.80
7638.00
###
3452.37

15.00
135.98
240.00
0.00
390.98
690.47
703.78
1394.25
350.17
2135.40
213.54
2348.94
2348.94
2349.00
1 Cum

ge charges and
the stones for
ation 2504 ( 4 th
r Toe wall.

Amount

15.00
135.98
240.00
0.00
390.98
703.78
104.46
808.24
235.23
1434.45
143.45
1577.90
1577.90
1578.00
1 Cum

slopes including
ur charges etc.,
Revision) and as

18.75
97.13
320.00
0.00
435.88
1014.31
284.45
1734.64
173.46
1908.10
1908.10
1908.00
1 Cum

g wall/Return
cture with slope
specification,
2706 & 2200

Amount

15.00
288.00
0.00
303.00
3019.20
1017.87
4037.07
4340.07
11.25
194.25
80.00
0.00
285.50
5071.50
161.00
390.00
217.00
5839.50
1286.25
7411.25
741.13
8152.38
271.75
272.00
1 RM

n no. 2705

164.00
322.00
66.00
50.00
602.00

Amount
7.50
7.77
6.40
0.00
21.67
3.75
3.89
64.00
0.00
71.64
695.31

34.77
730.08
143.20
873.28
87.33
960.60
961.00
1 Nos
mm to 600 mm

15.00
112.00
291.38
0.00
418.38

663.08
104.46
767.54
1185.92
249.04
1434.96
143.50
1578.46
1578.46

Amount
1578.00
1 Cum

ize HBG crushed


ate conforming to
te and all labour
ring including all
e as per MoRT&H
approach slab.

322.50
582.75
6400.00
0.00
7305.25
10674.02
7443.01
1900.50
6543.45
24449.60
51010.58

2737.20
4900.80
7638.00
12936.84
###
7889.07
###
5785.32
5785.00
1 Cum

stone aggregate
ost, (excluding
machine mixing,
arges of all T&P
00, 2100 (4th

240.00

Amount
388.50
4800.00
0.00
5428.50
17790.03
6543.45
14385.60
38719.08

2737.20
4900.80
1260.00
8898.00
10404.89
###
6345.05
###
4653.03
4653.00
1 Cum

stone aggregate
to table 1000-2)
d labour charges,
r incidental and
as per MoRT&H
the Engineer-inting of concrete

322.50
582.75
6400.00
0.00
7305.25
14886.02
7602.01
6543.45
37473.60
66505.08

2737.20
4900.80

Amount
7638.00
2850.69
16535.25
###
###
###
7394.51
7395.00
1 Cum

Quantity
Description of Item
Rate
per
25 Forming embankment with Side earth by mechanical means upto SDR including prewatering of soil , removal of top soil, excavation of soils , depositing the soils on the
embankment, spreading soil, breaking clods, sectioning , grading and consolidation with 8 to
10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H,
including all hire and operational charges of T&P, complete for finished item of work as per
MoRT&H specification 305 (4th revision) (Payment will be made based on level for finished
item of work).
Unit : Cum
Taking out put = 100 Cum
(A) Labour
0.02 day
Mate

Page 70 of MoRT&H SDB


375.00

day

320.00

day

(B) Machinery
1.67 hr
Hydraulic Excavator1 cum bucket
capacity @ 60 cum per hour

2791.00

hr

1.00 hr
4.00 hr
1.00 hr

3220.00
630.00
2609.10

hr
hr
hr

0.50 day

Mazdoor unskilled

Motor Grador for Grading @ 100 cum


per
hour
Water
tanker 6 KL
Vibratory roller 8T

(C) OH charges @ 19.615% (25%-VAT-insurance) on (A) + (B)


(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 100 cum (D)+(E )
Rate per Cum
Rate per 1 cum

** Note: In case the earth cutting is done by dozer and pushed for filling in the embankment,
the input of dozer in the cost of embankment shall be deleted as the same is already
provided in the cost of excavation. However, if the earth is dumped by tippers from roadway
cutting, the input of dozer for spreading is required to be provided.
26 Earthwork excavation in soils upto SDR by mechanical means including trimming bottom
and side slopes in accordance with requirements of lines , grades and cross sections etc.,
complete for finished item of work for trench cutting as per MoRT&H specification 301(4 th
Revision) and as directed by the Engineer-in-Charge
Unit : Cum
Taking out put = 180 Cum
(A) Labour

Page 50 of MoRT&H SDB

0.08 day

Mate

375.00

day

2.00 day

Mazdoor unskilled

320.00

day

2791.00

hr

(B) Machinery
3.00 hr
Hydraulic Excavator1 cum bucket
capacity @ 60 cum per hour

(C) Over head charges @ 19.615% (25%-VAT-insurance) on (A) + (B


(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)

Cost per 180 cum (D) + (E)


Rate per Cum
Rate per 1 cum

Amount
pto SDR including preositing the soils on the
d consolidation with 8 to
able 300-2 of MoRT&H,
shed item of work as per
sed on level for finished

7.50
160.00
167.50
4651.67
3220.00
2520.00
2609.10
13000.77
2582.96
15751.23
1575.12
17326.35
173.26
173.00
1 Cum

ling in the embankment,


as the same is already
by tippers from roadway

luding trimming bottom


and cross sections etc.,
&H specification 301(4 th

30.00
640.00
670.00
8373.00

1773.78
10816.78
1081.68

11898.46
66.10
66.10
1 Cum

SNo

1
27

0
0
0
0
0
0
0
0
0
0
0

Quantity Unit

Rate

per

Forming embankment with borrowed useful earth from outside road boundary by
mechanical means up to SDR with all leads and lifts including pre-watering of soil at
borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of
soil, depositing the soil on the embankment, spreading soil, breaking clods,
sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @
OMC to meet requirement of table 300-2 of MoRT&H, including all hire and
operational charges of T&P and (excluding seigniorage) charges, complete for
finished item of work as per MoRT&H specification 305
(4th revision) With a lead of 34KM (Payment will be made based on levels
for finished item of work).
Page 68,69 of MoRT&H SDB
Unit : Cum
Taking out put = 100 Cum
(A) Labour
0.04
day
375.00
1.00
Mate
320.00
1.00
1.00
day
Mazdoor unskilled
0.0

335.00

Municipal Area Allowance


TOTAL

1.67
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
8

Description of Item

hr

5440.00 t.km

(B) Machinery
Hydraulic excavator1 cum bucket capacity @ 60
cum per hour
Tipper ( for 34 Km = 160 x 34) t.km
Add 10% of cost of carriage to cover
cost of loading and unloading
Dozer 80 HP for spreading @ 200 cum per hour
Motor Graders for Grading @ 100 cum per hour
Water tanker 6 KL
Vibratory roller 8T
TOTAL
(A + B )

A=

2971.00

1.00

7.12

t.km

2540.90
3220.00
630.00
2609.10

1.00
1.00
1.00
1.00
B=

0.50
1.00
4.00
1.00

hour
hour
hour
hour

4.615

(C) Over Head Charges on (A+B)

57522.20

10.00

(D) Contractors Profit on (A+B+C)

60176.85

100.00 cum

(E ) Seigniorage charges
Earth

0.00

100.00 cum

TOTAL Cost for 100 cum = (A+B+C+D+E)


Rate per 1 cum
Rate per 1 cum

1.00

SNo

1
28

Quantity Unit

Description of Item

Rate

per

Construction of Granular sub-base by providing HBG material confirming to Grading


- III of MoRT&H Table 400-2 including cost, (excluding seigniorage) charges and
conveyance of all materials to work site and spreading in uniform layers with motor
grader or by approved means, on prepared surface mixing by mix in place method
with Rotavator / approved means at OMC and compacting with vibratory roller to
achieve the desired density etc., complete for finished item of work as per MoRT&H
Specification
401 (4th revision) and as directed by the Engineer-in-charge.
( Payment will be made based on levels for finished item of work ).

SNo

1
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
29

29
29
29
29
29
29
29

Quantity Unit

Description of Item

Rate

per

0.40
2.00
8.00

day
day
day

Page 95 of MoRT&H SDB


Unit = cum
Taking output = 300 cum
(A) Labour
Mate
Mazdoor skilled
Mazdoor unskilled

375.00
388.50
320.00

1.00
1.00
1.00

0.0

Municipal Area Allowance

3487.00

6.00
12.00
6.00
3.00

hour
hour
hour
hour

TOTAL
(B) Machinery
Motor grader 3.35M Blade @50 cum/Hr.
3220.00
Tractor - Rotavator (223+11=234)
425.00
Vibratory roller 8T
2609.10
630.00
Water tanker 6 KL
TOTAL

(C) Material
Coarse graded Granular sub-base material as per
Table 400-2 of MORT&H
9.5-4.75mm IRC & MORT&H HBG Chips @ 66%
255.00 cum
Average rate of (9.5-11.2), ( 5-7) & (2.36-5)
1154.45
2.36mm and below @34%
129.00 cum
Rate of 2.36mm & below HBG metal
822.78
TOTAL
(A + B +C)
4.615

(D) Over Head Charges on (A+B+C)

445974.12

10.00

(E) Contractors Profit on (A+B+C+D)

466555.83

(F ) Seigniorage charges
Metal

0.00

384.00 cum
300.00 cum

A=
1.00
1.00
1.00
1.00
B=

1.00
1.00
C=

1.00

TOTAL Cost for 300 cum = (A+B+C+D+E+F)


Rate per 1 cum
Rate per 1 cum

Cost of NP3 class Hume pipes of 600 mm dia. including cost and conveyance to site
including loading unloading transportation and taxes etc. complete .

1.00

RM

1.00

RM

1.00

RM

Cost of 600 mm dia NP3 class Hume Pipes


Initial Cost of Pipes as per SSR
2309.00
S1 = Basic Cost of M.S. Rods a per SSR
S2 = Cost of M.S. rods
at the time of preparation of Estimate
Ws= Weight of M.S. Rods required

41000.00
42500.00

1.00

SNo

1
29
29
29
29
29
29
29
29
29
29
29
29
29
29
29
29
29
29
29
29
29
29
29
29
29
29
29
29
29
29
29
29
30

30
30
30
30
30
30
30
30
30

Quantity Unit

1.00

RM

1.00

RM

1.00

RM

1.00

RM

1.00

RM

1.00

RM

Description of Item

Rate

per

per meter of pipe as per IS:458/2003 (kg)


As per TABLE 3/5 of IS:458-2003 & Note 5
Ws = (1.18+2.20*140/125)
R1= Variation (increase/ decrease) in cost
(Rs. Per meter) due to change in cost of M.S.
Rods
R1 = ( S2- S1)/1000 X Ws
R1 = ( 42500 - 41000 )/ 1000 X 3.644
C1 = Basic Cost of Cement a per SSR
C2 = Cost of Cement
at the time of preparation of Estimate
IS:458-2003
From TABLE 3 Barrel wall Thickness ( mm )
Concrete Qty=/4(0.77*0.77-0.60*0.60) (cum)
From CLAUSE 5.5 Cement Content( kg/cum)
Wc= Weight of Cement required per meter of
pipe
( as per IS:458/2003 (kg) 0.1829*340)
R1= Variation (increase/ decrease) in cost
(Rs. Per meter) due to change in cost of Cement
R2 = ( C2- C1)/1000 X Wc
R2 = ( 5920 - 4000 )/ 1000 X 62.186

3.6440

4000.00
5920.00
85.00
0.1829
340.00
62.186

Revised cost = Initial cost as per Table+R1+R2


=2309+5.47+119.39712

5.00
0.00

km
km

Lead Charges For 5 KM


Lead
Lead charges for First 5 KM Distance
Lead charges for balance Distance
Total Rate:
Rate per RM

5.00
93.45
4.34

KM
5.00
1.00

Providing, laying Reinforced cement concrete Hume pipes of 600 mm Dia., NP-3 class
for pipe culverts including cost and conveyance of Pipes etc., complete and Labour
charges for laying, jointing of 600mm dia. R.C.C Hume pipes in position including
lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H
Specification 2900, 2905 and 2906 (4th Revision) and IRC Special Publication No: 13
and as directed by the Engineer-in-Charge for finished item of work.

0.14
0.50
3.00

no
no
no

Page 272,273 of MoRT&H SDB


Unit = meter
Taking output = 12.5 meter
600 mm Dia.,
(A) Labour
Mate
Mason
Mazdoor

375.00
388.50
320.00

1.00
1.00
1.00

SNo

Quantity Unit

Description of Item

Rate

per

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30

0.0

Municipal Area Allowance

1206.75

RM

(B) Material
Cost of 600 mm Dia pipes

TOTAL
12.50

A=
2527.32

TOTAL
(A + B)
4.615

(D) Over Head Charges on (A+B)

32798.25

10.00

(E) Contractors Profit on (A+B+C)

34311.89

12.50

RM

TOTAL Cost for 12.5 RM = (A+B+C+D)


Rate per 1 RM
Rate per 1 RM

1.00
B=

Amount

15.00
320.00
335.00
0.00
335.00

4961.57
38732.80
3873.28
1270.45
3220.00
2520.00
2609.10
57187.20
57522.20
2654.65
6017.69

0.00
66194.54
661.95
662.00

Amount

Amount

150.00
777.00
2560.00
3487.00
0.00
3487.00
19320.00
5100.00
15654.60
1890.00
41964.60

294383.90
106138.62
###
###
20581.71
46655.58

0.00
513211.41
1710.70
1711.00

2309.00

Amount

5.47

119.40

2433.87

93.45
0.00
2527.32
2527.32

52.50
194.25
960.00
1206.75

Amount

7
0.00
1206.75
31591.50
31591.50
32798.25
1513.64
3431.19
37743.08
3019.45
3019.00

SNo Quantity Unit

Description of Item

Rate

per

31 Forming shoulders with barrowed useful selected earth having MDD of not less
than 1.75 Gms/CC from out side road boundary by mechanical means with all leads
and lifts including prewatering of soil at barrow area, removal of top soil, excavation
of soils at barrowed area, conveyance of soil, depositing the soils on the
embankment, spreading soils, beaking clods, sectioning and consoilidation with
vibratory road roller @ OMC to meet requirement of table 300-2 of MoRT&H,
including all hire and operational charges of T&P and complete for finished item of
work as per MoRT&H specification 305 ( 4th revision) ( Payment will be made based
on levels for finished item of work).
(4th Revision) With a lead of 79.500 km (Payment will be made based on
levels for finished item of work).
0
0
0
0
0
0
0
0
0
0
0

0.04
1.00

day
day

Page 68,69 of MoRT&H SDB


Unit : Cum
Taking out put = 100 Cum
(A) Labour
Mate
Mazdoor unskilled

0.0

Municipal Area Allowance

335.00
TOTAL

1.67
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

375.00
320.00

hr

12720.00 t.km

1.00
1.00

A=

(B) Machinery
Hydraulic excavator1 cum bucket capacity @ 60 2791.00 1.00
cum per hour
Tipper ( for 79.500 km = 160 x 79.500) t.km
7.22
t.km
Add 10% of cost of carriage to cover
cost of loading and unloading
Dozer 80 HP for spreading @ 200 cum per hour
0.00
1.00
0.00
1.00
Motor Graders for Grading @ 100 cum per hour
630.00 1.00
Water tanker 6 KL
2609.10 1.00
Vibratory roller 8T
TOTAL
B=
(A + B )

4.00
1.00

hour
hour
hour
hour

4.615

(C) Over Head Charges on (A+B)

111147.31

10.00

(D) Contractors Profit on (A+B+C)

116276.76

100.00

cum

(E ) Seigniorage charges
Earth

0.00

100.00

cum

TOTAL Cost for 100 cum = (A+B+C+D+E)


Rate per 1 cum
Rate per 1 cum

1.00

SNo Quantity Unit

Description of Item

Rate

per

32 Providing 25.4 mm mastic pads for Longitudinal joints, Transversal expansion


joints and Construction joints of approved quality including cost, conveyance and
placing in position, etc., complete as directed by the Engineer-in-charge.
32

Unit = Sqm.

32

(A) Material

32

1.00

Sqm

Rate as per Building SSR Item No.197

991.00

1.00

Rate per sqm

32

32
33 Providing Uncoated Mild Steel bars ( Fe-250 ) of different diameters, wrought and
put up bars of all diameters including cost and conveyance of steel to site and all
labour charges for fabrication of reinforcement including cutting, bending, binding
rods, tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges etc.,
and including over lapping welding if required etc., complete for all R.C.C items for
finished item of work as per standard drawings, as per the directions of the
Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (4th Revision)
and as per I.S.1786 of 1985 .
33

Page 460 of MoRT&H SDB

33

Unit = MT

33

Taking output = 1 MT

33

(A) Labour

33

0.28

no

Mate

345.00

1.00

33

1.50

no

Black smith

345.00

1.00

33

5.50

no

Mazdoor

295.00

1.00

0.0

Municipal Area Allowance

2236.60

33
33

TOTAL

33
33

TOTAL

33

(B) Material

33

1.05

MT

Mild steel bars including overlaps

33

6.00

Kg

Binding wire ( Building SSR item no.757 )

A=

41000.00 1.00

33

TOTAL

33

(A + B )

70.00

B=

33
33

19.615

(C) Over Head Charges on (A+B)

45706.60

10.00

(D) Contractors Profit on (A+B+C)

54671.95

1.00

MT

TOTAL Cost for 1 MT = (A+B+C+D)

33
33
33
33
33

Rate per 1 MT

33

Rate per 1 MT

33

1.00

SNo Quantity Unit

Description of Item

Asst Executive Engineer (R&B),


R&B Section, Malikipuram

Executive Engineer (R&B),


R&B Division, Amalapuram

Rate

per

Deputy Executive Engineer (R&


R&B Sub-division, Razole

Superintending Engineer (R&B


R&B Circle, Kakinada

Amount

15.00
320.00
335.00
0.00
335.00

4660.97
91838.40
9183.84
0.00
0.00
2520.00
2609.10
110812.31
111147.31
5129.45
11627.68

0.00
127904.44
1279.04
1279.00

Amount

991.00
991.00

96.60
517.50
1622.50
2236.60
0.00
2236.60

43050.00
420.00
43470.00
45706.60
8965.35
5467.20
60139.15
60139.15
60139.00

Amount

Deputy Executive Engineer (R&B),


R&B Sub-division, Razole

Superintending Engineer (R&B),


R&B Circle, Kakinada

Name of Work :- Improvements to Ramarajulanka - Gondi road from km 0/000 to 7/350 (C


of Low Level Cause Way 4V X 6.37m span ) in E.G.Dt.

S.No

Specification in Brief

Unit

Earth/ Gravel

Metal/ Stone

cum

cum

Quantity

Factor Quantity Factor Quantity


1
1
2
3
4
5

2
E/W for Foundation Excluding
dewatering
E/W for Foundation including
dewatering
PCC 1:3:6
VCC M20 for Footings of
Abutments, Piers
VCC M20 for substructure of
Abutments, Piers

1 cum

831.00

1.000

1 cum 1208.00

831.000

1.000 1208.000

1 cum

84.00

0.900

75.60

1 cum

484.00

0.900

435.60

1 cum

634.00

0.900

570.60

VRCC M25 for Raft

1 cum

374.00

0.900

336.60

VRCC M25 for Bedblocks

1 cum

17.00

0.900

15.30

VRCC M25 for Deck Slab

1 cum

243.00

0.900

218.70

VRCC M30 for Approach Slab

1 cum

26.00

0.900

23.40

10 VRCC M30 for Wearing Coat

1 cum

30.00

0.900

27.00

11 Back filling with gravel

1 cum

664.00

12 Filter media using 150 mm ston 1 cum

15.00

1.200

18.00

13 Grouted Revetment with CC(1:4:8)1 cum

22.00

1.180

25.96

1 cum

10.00

1.200

12.00

15 Filter Material with Gravel

1 cum

11.00

0.900

9.90

16 100 mm dia AC Weep holes

413.00

1.200

495.60

14

Stone pitching with 300mm


rough stone

17 Launching apron with Jeddy stone1 cum

1.200

1.200

796.800

13.200

123.00

M15 Grade concrete below


approach slab

1 cum

13.00

0.900

11.70

19 PCC 1:3:6 for Levelling course

1 cum

338.00

0.900

304.20

20 VRCC M30 Grade for CC pavement1 cum

636.00

0.900

572.40

21 Earthen Shoulders

1 cum

240.00

22 Earth Work

1 cum 5772.00

23 GSB

1 cum

438.00

1.280

560.64

24 Forming embankment with side e 1 cum

812.00

18

Total Quantity
Rate
Amount Rs
Total Amount Rs

1.000

240.000

1.000 5772.000
1.000

812.000
9673.00

3713.20

22.00
212806.00

50.00
185660.00

450574.00

Asst Executive Engineer (R&B),Deputy Executive Engineer (R&B), Executive Engineer (R&B), Superintending

R&B Section, Malikipuram

R&B Sub-division, Razole

R&B Division, Amalapuram

R&B Circle

marajulanka - Gondi road from km 0/000 to 7/350 (Construction


ay 4V X 6.37m span ) in E.G.Dt.

Sand
cum
Factor Quantity
9

10

0.450

37.80

0.450

217.80

0.450

285.30

0.450

168.30

0.450

7.65

0.450

109.35

0.450

11.70

0.450

13.50

0.090

1.98

0.450

4.95

0.002

0.220

0.450

5.85

0.450

152.10

0.450

286.20

1302.70
40.00
52108.00

Superintending Engineer (R&B),

R&B Circle, Kakinada

C E R T I F I C A T E
Name of Work:
Improvements to Ramarajulanka - Gondi road from km 0/000 to 7/350
(Construction of Low Level Cause Way 4V X 6.37m span ) in E.G.Dt.
1)

Certified that I have personally inspected the above Road on . and


the provisions made in the estimate for the above work are adequate and
essential.

2)

Certified that the leads provided in the R.M.R of the estimate are shortest and
there is sufficient yield of good quality material from the quarries proposed in
the estimate.

3)

Certified that all the distances in the quarry map are correct.

4)

Certified that the quarries provided are the nearest.

5)

Certified that the routes shown in the quarry map are the
transportation of the materials.

6)

Certified that all the materials can be easily quarried.

7)

Certified that the description of all materials mentioned are correct to the best
of my knowledge.

8)

It is certified that no soil having MDD not less than 17.50 kN/cum and suitable
for shoulders is available within a lead of 79.500 km. Hence a lead of 79.500
km is proposed for selected soil to be used for shoulders.

9)

It is certified that no soil are suitable for forming embankent available within a
lead of 79.500 km. Hence a lead of 79.500 km is proposed for selected soil to
be used for forming embankment.

10)

Certified that the above work is not taken up in any other scheme. Hence there
is no overlap in the execution of work.

shortest for the

Asst Executive Engineer (R&B),


R&B Section, Malikipuram

Deputy Executive Engineer (R&B),


R&B Sub-division, Razole

Executive Engineer (R&B),


R&B Division, Amalapuram

Superintending Engineer (R&B),


R&B Circle, Kakinada

BRIDGE DETAILED CUM ABSTRACT ESTIMATE

Name of work:- IMPROVEMENTS TO RAMARAJULANKS-GONDI ROAD FROM KM.0.000 TO


(CONSTRUCTION OF LOW LEVEL CAUSE WAY 4V X 6.37M SPAN ) IN EAST GO
DISTRICT.
S.No. Description of Item
No.
Length
Breadth
Depth
1
2
3
4
5
6
1 Earthwork in excavation of foundation of structures as per drawing and technical
specification including setting out, construction of shoring and bracing, removal
of stumps and other deleterious matter, dressing sides of bottom, back filling
the excavation earth to the extent required etc., complete including seignioarge
charges for finished item of work as per MoRT&H specification 304 (4th Revision)
Excluding dewatering 0-3.0M DEPTH above sill
level.
Raft
1 x 1 28.260
9.10

Quantity
7

0.60

154.3

Flexible approns
Aprons: U/S side

1 x

28.260

3.00

0.60

50.87

Aprons: D/S side

1 x

28.260

6.00

0.60

101.74

2 x

8.000

3.10

1.60

79.36

2 x

15.000

2.30

1.60

110.4

2 x

26.000

2.30

1.60

191.36

2 x

10.000

1.40

1.10

30.8

5 x

7.000

1.00

1.00

35

4 x

6.751

0.60

0.60

9.72

Body walls on A-side


Non-vented level portion
Body walls on S-side
Non-vented level portion
Body walls on S-side
Non-vented level Ramp
portion
Body walls on S-side
Non-vented level Ramp
portion
Cross walls on S-side
Non-vented level Ramp
portion

Rate
8

For toe walls


2p(4.3)/4=6.751 m

763.545
764.00 107.00
cum

Including dewatering 0-3.0M DEPTH Below sill level.


Raft

1 x

28.260

9.10

1.75

450.041

Cut off walls: U/S side

1 x

28.260

0.60

2.00

33.91

Cut off walls: D/S side


Flexible approns
Aprons: U/S side

1 x

28.260

0.60

2.00

33.91

1 x

28.260

3.00

0.90

Aprons: D/S side

1 x

28.260

6.00

0.90

76.30
152.60
746.771
747.00 112.00
cum

2 Plain cement concrete (1:3:6) nominal mix in foundation with crushed stone
aggregate 40 mm nominal size mechanically mixed, placed in foundation and
compacted by vibration including curing complete as per MoRT&H Specification
2100 (4th Revision) for Levelling course below raft and wing walls
Under Raft
Body walls on A-side
Non-vented level portion
Body walls on S-side
Non-vented level portion
Body walls on S-side
Non-vented level Ramp
portion
Body walls on S-side
Non-vented level Ramp
portion
Cross walls on S-side
Non-vented level Ramp
portion

1 x

28.260

9.10

0.150

38.57

2 x

8.000

3.10

0.100

4.96

2 x

15.000

2.30

0.100

6.90

2 x

26.000

2.30

0.100

11.96

2 x

10.000

1.40

0.100

2.80

5 x

7.000

1.00

0.100

3.50
68.69
69.00 5183.00
cum

3 Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and


10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table
1000-1 and fine aggregate conforming to table 1000-2) including
cost,seignorage and conveyance of all materials to site and all labour charges
for machine mixing,laying in position, Compacting , Vibrating and curing
including all other incidental and all other operational charges of T&P required
etc., complete as per MoRT&H Specification 1500,1700, 2100 (4th Revision) for
footings of Abutments and Piers, Raft cut-off walls .
Cut off walls: U/S side
Cut off walls: D/S side
For Abutments

1 x
1 x
2 x

1
1
1

28.26
28.26
8.45

For Pier:1st footing


2nd footing
Body walls on A-side
Non-vented level portion
Trep footing
Body walls on S-side
Non-vented level portion
Trep footing
Body walls on S-side
Non-vented level Ramp
portion
Trep footing
Body walls on S-side
Non-vented level Ramp
portion
Trep footing
Cross walls on S-side
Non-vented level Ramp
portion

3 x
3 x

1
1

8.50
8.50

2 x
2 x

1
1

8.00
8.00

2 x
2 x

1
1

2 x
2 x

(
(
(

0.60
)
0.60
)
1.70 + 2.70
2
2.60
1.80

2.00
2.00
1.00

33.91
33.91
37.18

0.50
0.50

33.15
22.95

3.10
1.70

0.50
1.20

24.80
32.64

15.00
15.00

2.30
1.20

0.50
0.75

34.50
27.00

1
1

26.00
26.00

2.30
1.20

0.50
0.75

59.80
46.80

2 x
2 x

1
1

10.00
10.00

1.40
0.65

0.50
0.50

14.00
6.50

5 x

7.00

1.00

0.50

say

17.50
424.64
425.00 6648.00
cum

4 Vibrated cement concrete M 25 Grade Concrete using 40mm , 20mm and


10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table
1000-1 and fine aggregate conforming to table 1000-2) including
cost,seignorage and conveyance of all materials to site and all labour charges
for machine mixing,laying in position, Compacting , Vibrating and curing
including all other incidental and all other operational charges of T&P required
etc., complete as per MoRT&H Specification 1500,1700, 2100 (4th Revision) for
Raft.
RAFT Foundation
1 x 1
28.26
(
9.10
)
0.60
say

154.30
154.30
155.00 7279.00
cum

5 Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and


10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table
1000-1 and fine aggregate conforming to table 1000-2) including
cost,seignorage and conveyance of all materials to site and all labour charges
for machine mixing, laying in position,Compacting, Vibrating and curing including
all other incidental and all other operational charges of T&P required etc.,
complete as per MoRT&H Specification 1500,1700, 2200 (4th Revision) for Sub
structure of abutments, piers and wing walls.
For Abutments

2 x

8.45

For Pier:

3 x

7.50

For cut waters

3 x

2 x

8.00

2 x

2 x

Body walls on A-side


Non-vented level portion
Body walls on S-side
Non-vented level portion
Body walls on S-side
Non-vented level Ramp
portion
Body walls on S-side
Non-vented level Ramp
portion
Cross walls on S-side
Non-vented level Ramp
portion
Guard Stones

1.70

3.14

63.68

1.00

3.14

62.17

3.14

5.84

0.88

2.00

28

15.00

0.78

1.45

33.7125

26.00

0.78

1.45

58.435

2 x

10.00

0.53

0.70

7.35

5 x

7.00

0.50

0.50

8.75

0.305

0.205

0.205

1 x 61

0.70 +
2
(
0.76 +
2
( 0.76^2 +
4
x

1.0^2)
2

0.78188
268.72
269.00 7032.00
cum

6 V.R.C.C. M25 grade concrete using 20mm and 10mm size SS5 HBG crushed
stone aggregate including cost and conveyance of all materials to site,
seigniorage charges,labour charges for machine mixing, laying, compacting,
curing etc,including all other incidental and operational charges,T&P charges etc,
complete but excluding cost of steel and its fabrication charges, as per MoRT&H
Specifications 1500,1700,2100(4th Revision)For bed blocks & backing walls
upto 5.0m height
Bed blocks over abutment 2 x
Backingwallsover abutme 2 x

1
1

Bed blocks over pier :


3 x
-- do-- cut waters
3 x
deduct approach slab por 2 x

1
1
1

8.45
8.45
7.50
7.50

0.75
0.30

0.300
0.515

3.80
2.61

0.90
/4 ( 0.9 )2
0.30

0.300
0.300
0.300

6.08
0.57
-1.35
11.71

12.00 7951.00
cum
7 Furnishing and placing reinforced cement concrete VRCC M 25 grade as per
approved drawings and technical specifications as per MoRT&H specification
1500,1600,1700 (4th revision ) and as per M.O.T DRG No BD/1-74 A& 274excluding cost of steel and fabrication charges for VRCC M-25 Super structure
of deck slabs
upto 5.0m height
For deck slabs: As per
Standard Drg. BD/2-74

4 x

28.87

m3

per

Span
say

8 Plain cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size
HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and
fine aggregate conforming to table 1000-2) including cost,seignorage and
conveyance of all
materials to site and all labour charges for machine
mixing,laying in position, Compacting , Vibrating and curing including all other
incidental and all other operational charges of T&P required etc., complete as per
MoRT&H Specification 1500,1700, 2100 (4th Revision) for Levelling course
below approach slab.
Levelling course below
approach slab.
2 x 1
7.50
4.00
0.150

115.48
116.00 8710.00
cum

9.00
9.00
9.00 5785.00
cum

9 V.R.C.C. M30 grade concrete using 20mm and 10mm size SS5 HBG crushed
stone aggregate including cost and conveyance of all materials to site,
seigniorage charges,labour charges for machine mixing,laying,compacting,curing
etc,including all other incidental and operational charges,T&P chargesetc,
complete but excluding cost of steel and its fabrication charges, as per MoRT&H
Specifications 1500,1700,2704(4th Revision) for Approach Slab.
For approach slab

2 x

4.30

7.50

0.300

10 V.R.C.C. M30 grade concrete using 20mm and 10mm size SS5 HBG crushed
stone aggregate including cost and conveyance of all materials to site,
seigniorage charges,labour charges for machine mixing,laying,compacting,curing
etc,including all other incidental and operational charges,T&P chargesetc,
complete but excluding cost of steel and its fabrication charges, as per MoRT&H
Specifications 1500,1700,2702(4th Revision). For Wearing coat .
Over deck slabs
4 x 1
6.74
7.50
0.075
Over approach slabs
2 x 1
4.30
7.50
0.075

11 Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars
of all diameters including cost and conveyance of steel to site and all labour
charges for fabrication of reinforcement including cutting, bending, binding rods,
tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges
etc., and including over lapping welding if required etc., complete for all R.C.C
items for finished item of work as per standard drawings, as per the directions of
the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (4th
revision) and as per I.S.1786 of 1985 for Super structure of R.C.C items.

19.35
19.35
20.00 7166.00
cum

15.17
4.84
20.00
20.00 7118.00
cum

For deck slabs: As per


Standard Drg.BD/4-74
Approach slab

4 x

1 ###

1 x

Wearing coat

1 x

kgs

per

Span

7464

19

85

kgs/cum

1644.75

1 ###

60

kgs/cum

1200.18

or say

12

Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars
of all diameters including cost and conveyance of steel to site and all labour
charges for fabrication of reinforcement including cutting, bending, binding rods,
tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges
etc., and including over lapping welding if required etc., complete for all R.C.C
items for finished item of work as per standard drawings, as per the directions of
the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (4th
revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.
Bed
blocks&backing
walls
1 x 1
11.71
100
kgs/cum

1171.20

Skin reinforcement for


abutments

2 x

350

kgs

700.00

Skin reinforcement for


piers

3 x

350

kgs

1050.00

Body walls on A-side


Non-vented level portion 1 x

200

kgs

200.00

Body walls on S-side


Non-vented
level
portion 1 x
Body walls on
S-side

350

kgs

350.00

Non-vented level Ramp


portion
Body walls on S-side

1 x

520

kgs

520.00

Non-vented level Ramp


portion
Cross walls on S-side

1 x

80

kgs

80.00

Non-vented level Ramp


portion

1 x

50

kgs

50.00

Longitudinal joints for


CC pavement

1 x

1.8

kgs

Guard Stones

1 x

0.78

400
80

720.00
kgs/cum

or say

13

###
10.40
11.00 52475.0
M.T

62.55
4903.75
4.91
5.00 51192
M.T

Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars of
all diameters including cost and conveyance of steel to site and all labour
charges for fabrication of reinforcement including cutting, bending, binding rods,
tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges
etc., and including over lapping welding if required etc., complete for all R.C.C
items for finished item of work as per standard drawings, as per the directions of
the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (4th
revision) and as per I.S.1786 of 1985 for foundations of R.C.C items.
Raft

1 x

154.30

50

kgs/cum

7714.98

Skin reinforcement for


abutments
Skin reinforcement for
piers
Body walls on A-side
Non-vented level portion
Body walls on S-side
Body
walls on
S-side
Non-vented
level
portion
Non-vented level Ramp
Body walls on S-side
portion
Non-vented level Ramp
Cross walls on S-side
portion
Non-vented level Ramp
portion

2 x

150

kgs

300.00

3 x

300

kgs

900.00

1 x

350

kgs

350.00

1 x

500

kgs

500.00

1 x

900

kgs

900.00

1 x

200

kgs

200.00

1 x

125

kgs

125.00
###
10.99
11.00
M.T

###

14 Providing Uncoated Mild Steel bars ( Fe-250 ) of different diameters, wrought and
put up bars of all diameters including cost and conveyance of steel to site and all
labour charges for fabrication of reinforcement including cutting, bending,
binding rods, tying grills, placing them in position etc., complete including cost
and conveyance of binding wire and all handling charges and operational
charges etc., and including over lapping welding if required etc., complete for all
R.C.C items for finished item of work as per standard drawings, as per the
directions of the Engineer-in-Charge and as per MoRT&H specification 1600
&2200 (4th Revision) and as per I.S.1786 of 1985 .
Approaches
CC pavement

Anchorate arrngements
for Deck slab (75mm
dia)

5 x 30
11 x 28

4 x

0.500
0.500

75.00
154.00
229.00
881.65
24.00

1.500

832.56
1714.21
16.80
M.T

RM
kgs
RM
Kgs
###

15 Back filling behind Abutments with gravel including cost ,conveyance and
seigniorage of all materials to site etc., complete as per Clause 710.1.4 of IRC :
78and as per MoRT&H Specification No. 2200 (4th Revision) and as per Drawing
and technical specifications for finished item of work
In between Body walls
on Appanaramuni lanka
side
In between Body walls

1 x

8.00

7.500

1.500

90.00

1 x

51.00

7.500

1.500

573.75

on Sakinetipally side
(15+36)
(in between body walls of non-vented and ramp portion)
or say

16 Providing and laying filter media with stone crushed aggregate satisfying the
requirements laid down in Clause 2504.2.2 of MORTH specifications to a
thickness of not less than 600 mm with smaller size towards the soil and bigger
size towards the wall and provided over the entire surface behind abutment and
wing wall, to the full height , compacted to a firm condition complete as per
drawing and technical specification No.710.1.1 of IRC 78 and 2200(Sl.No.13.10)

663.75
664.00 1666.00
cum

Behind abutment

2 x

8.00

0.60

1.500

14.40
14.40
15.00 1763.00

or say

cum
17 Providing and laying filter material with gravel underneath pitching in slopes
including cost and conveyance of materials to site including labour charges etc,
complete for finished item of work as per MoRTH Specification No.2504(4th
Revision)and as directed by the Engineer-in-Charge.
For pitching of slopes.
Quadrants

4 x

17.760

0.15

10.66
10.66
11.00 1908.00
cum

or say
18 Providing Grouted Revetment with rough stone other than granite of not less
than 300 mm size grouted with 0.20 cum of CC (1:4:8) including cost,
seigniorage charges and conveyance of materials to site and including labour
charges for packing the stones for revetment etc., complete for finished item of
work as per MoRT&H specification 2504 ( 4 th revision ) and as directed by the
Engineer-in-Charge for quadrential revetment.
For quadrants

4 x

17.760

0.30

21.31
21.31
22.00 2349.00
cum

19 Providing rough stone revelment other than granite 300 mm thick using 300
mm ize rough stonne varity including cost ,seigniorage and conveyance of all
materials to site , labour cgarges etc , complete as per MOST specification no.
2504
Toe walls
4 x 1 6.751
0.600
0.600

9.72
9.72
10.00 1578.00
cum

or say

20 Providing and laying boulders apron on river bed for protecting against scour
with jeddy stone of 450mm stone boulders weighing not less than 40 kg each
complete as per MOST specification no. 2504

Aprons: U/S side

1 x

51.26

3.00

0.90

Aprons: D/S side

1 x

51.26

6.00

0.90

21 Providing 100 mm dia AC pipes for weep holes at 1.00 M C/C in both
horizontal and vertical directions so that the weep holes in each horizontal
dirction is staggered from the weep holes lying above and below lines as shown
in drawing for abutments, wing walls, including cost and conveyance of the AC
pipes and labour charges for cutting to required lenghts,placing the pipe with a
slope of 1:20 towards steam side face etc, complete for finished item of work
for weep holes, as per MoRTH Specification No.2706(4th Revision)and as directed
by the Engineer-in-Charge.
For abutments
2 x 8
1.20
3.00
Body walls A-side
1 x 8
0.90
2.00

138.40
276.80
415.21
416.00 1578.00
cum

57.60
14.40

Body walls S-SIDE

1 x 51

1.00

1.00
or say

22 Supplying and fixing of CI drainage spouts complete as per MoRT&H Specification


No.2705 and as per drawing BD / 1-69.
4 x 2
say

51.00
123.00
123.00 272.00
R.M.

8
8 961.00
Nos

23 Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed
stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H
including cost, (excluding seigniorage) conveyance of all materials to site and
labour charges, centering, machine mixing, laying,
Vibrating, curing etc.,
including all other incidental and operational charges of all T&P etc., complete
for finished item of work as per MoRT&H specification 1500,1700, 2100 (4th
Revision) and as directed by the Engineer-in-Charge for base coarse.
Appanaramuni lanka -sid
Sakinetipally -SIDE
(in between body walls of
Road work
CC Pavement

1 x 1
3.70
7.50
1 x 1
46.70
7.50
non-vented and ramp portion)

0.10
0.10

2.78
35.03

1 x

0.10

300.00
337.80
338.00
cum

400.00

7.50

or say

4653

24 Vibrated cement concrete M 35 grade using 20mm & 10mm HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine
aggregate conforming to table 1000-2) including cost, (excluding seigniorage)
conveyance of all materials to site and labour charges, centering, machine
mixing, laying, vibrating, curing etc., including all other incidental and
operational charges of all T&P etc., complete for finished item of work as per
MoRT&H specification 1500, 1700, 2100 & 2702 (4th Revision) and as directed
by the Engineer-in-Charge for C.C Pavement (Vaccum Dewatered Flooring
services and Saw cutting of concrete pavement using a self propelled walk
behind, petro / electric powered saw)
Appanaramunilanka side
Sakinetipally -SIDE
(in between body walls of
Road work
CC Pavement

1 x 1
3.70
7.50
1 x 1
46.70
7.50
non-vented and ramp portion)

0.20
0.20

1 x

0.20

400.00

7.00

or say

5.55
70.05

560.00
635.60
636.00 7395.00
cum

25 Providing 25.4 mm mastic pads for Longitudinal joints, Transversal expansion


joints and Construction joints of approved quality including cost, conveyance and
placing in position, etc., complete as directed by the Engineer-in-charge.
Bridge Proper
1 x 5
Appanaramunilanka side 1 x 1
Sakinetipally -SIDE
1 x 1
CC Pavement
1 x 1
1 x 12

7.50
3.70
46.70
400.00
7.00

------

0.52
0.30
0.30
0.20
0.20
or say

3.86
1.11
14.01
80.00
1.40
100.38
101.00 991.00
sqm

26 Forming shoulders with barrowed useful selected earth having MDD of not less
than 1.75 Gms/CC from out side road boundary by mechanical means with all
leads and lifts including prewatering of soil at barrow area, removal of top soil,
excavation of soils at barrowed area, conveyance of soil, depositing the soils on
the embankment, spreading soils, beaking clods, sectioning and consoilidation
with vibratory road roller @ OMC to meet requirement of table 300-2 of
MoRT&H, including all hire and operational charges of T&P and complete for
finished item of work as per MoRT&H specification 305 ( 4th revision) ( Payment
will be made based on levels for finished item of work).
Road work
CC Pavement

1 x

400.00

1.00

0.30
or say

240.00
240.00
240.00 1279.00
cum

27 Forming embankment with borrowed useful earth from outside road boundary
by mechanical means up to SDR with all leads and lifts including pre-watering of
soil at borrow area, removal of top soil, excavation of soils at borrowed area,
conveyance of soil, depositing the soil on the embankment, spreading soil,
breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes
Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H,
including all hire and operational charges of T&P and (excluding seigniorage)
charges, complete for finished item of work as per MoRT&H specification 305
Road work (Under CC Pavement)
1 x 1

400.00 (10.2+9.0
0)/2

0.30

or say

28 Construction of Granular sub-base by providing


HBG material confirming to
Grading - III of MoRT&H Table 400-2 including cost, (excluding seigniorage)
charges and conveyance of all materials to work site and spreading in uniform
layers with motor grader or by approved means, on prepared surface mixing by
mix in place method with Rotavator / approved means at OMC and compacting
with vibratory roller to achieve the desired density etc., complete for finished
item of work as per MoRT&H Specification 401 (4th revision) and as directed by
the Engineer-in-charge. ( Payment will be made based on levels for finished item
of work ).
Road work (Under CC Pavement)
1 x 1 400.00
7.30
0.15
or say

29 Providing, laying Reinforced cement concrete Hume pipes of 600 mm Dia., NP-3
class for pipe culverts including cost and conveyance of Pipes etc., complete
and Labour charges for laying, jointing of 600mm dia. R.C.C Hume pipes in
position including lifting, aligning, lowering and hoisting etc., as per drawing and
as per MoRT&H Specification 2900, 2905 and 2906 (4th Revision) and IRC
Special Publication No: 13 and as directed by the Engineer-in-Charge for finished
item of work.
(in between body walls of non-vented and ramp portion)
3 x 16
7.50
--or say

30 Road Safety Interventions

1152.00
1152.00
1152.00 662.00
cum

438.00
438.00
438.00 2527.32
cum

360.00
360.00
360.00 3019.00
RM

Sub-estimate enclosed

Diversion of Canal and Cross Bunds :31 Earthwork excavation in soils upto SDR by mechanical means including
trimming bottom and side slopes in accordance with requirements of lines ,
grades and cross sections etc., complete for finished item of work for trench
cutting as per MoRT&H specification 301(4th Revision) and as directed by the
Engineer-in-Charge
1 x

140.00

15.00

2.20
or say

4620.00
4620.00
4620.00
cum

66.10

32 Forming embankment with Side earth by mechanical means upto SDR including
pre-watering of soil , removal of top soil, excavation of soils , depositing the soils
on the embankment, spreading soil, breaking clods, sectioning , grading and
consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet
requirement of table 300-2 of MoRT&H, including all hire and operational
charges of T&P, complete for finished item of work as per MoRT&H specification
305 (4th revision) (Payment will be made based on level for finished item of
work).
For Cross Bunds:
U/S Side
D/S Side
In Diversion of Canal for
forming road way

1 x
1 x
1 x

1
1
1

(20+16)/2
(20+16)/2
(15+11)/2

(5+9)/2
(5+9)/2
(7+11)/2

2.20
2.20
2.20

or say

33 Provision towards VAT 5%

277.20
277.20
257.40
811.80
812.00 173.00
cum

on Rs. 22369318

34 Provision towards Quality Control charges @1% on Rs. 22369318


35 Provision towards Price Adjustment @ 4.25%

on Rs. 22369318

36 Provision towards Insurance @ 0.385%

on Rs. 22369318

37 Provision towards Seigniorage Charges


38 Provision for soil investigation and soil testing
39 Provision for Avagahana Sadassulu
40 Provision for Car hire charges, Xerox, DTP, Pylon construction, unforeseen items and rounding off
(RUPEES TWO HUNDRED AND SEVENTY FIVE LAKHS ONLY)

Asst. Executive Engineer (R&B),


R&B Section : Malikipuram

Deputy Executive Engineer (R&B),


R&B Sub-division : Razole

Superintending Engineer (R&B),


R&B Circle : Kakinada

Executive Engineer (R
R&B Division : Amalapu

M.0.000 TO 7.350
N EAST GODAVARI

Per
9

Amount
10

1.00
cum

81748

1.00
cum

83664

1.00 357627
cum

1.00 3E+006
cum

1.00 1E+006
cum

1.00 2E+006
cum

1.00
cum

95412

1.00 1E+006
cum

1.00
cum

52065

1.00 143320
cum

1.00 142360
cum

1.00 577225
M.T

1.00 255960
M.T

1.00 561121
M.T

1.00 1E+006
M.T

1.00 1E+006
cum

1.00

26445

cum

1.00
cum

20988

1.00
cum

51678

1.00
cum

15780

1.00 656448
cum

1.00
R.M

33456

1.00
No.

7688

1.00 2E+006
cum

1.00 5E+006
cum

1.00 100091
sqm

1.00 306960
cum

1.00 762624
cum

1.00 1E+006
cum

1.00 1E+006
RM

148888

1.00 305382
cum

1.00 140476
cum

ONLY)

###
1118466
223693
950696
86122
450574
40000
5000
4656
###

Engineer (R&B),
on : Amalapuram

Improvements
to Malikipuram
- Kesavadasupalem
Road from
km 0/0per
to 5/886 in
Quantity
Description
of Item
Rate
Godavari District.
25 Provding and filling joints sealing compound
directed by the Engineer in charge.

as per Drawing and Technical specification

Course sand wih bitumen


12.00M long x 10mm wide x 10mm deep
Material
Cost of sand for filling
0.012 cum
Cost of Bitumen 80/100
0.001 MT
Labour
Man Mazdoor for heating bitumen
0.500 cum
Rate for 12 RM
Rate for 1 RM
Rate to be adopted

313.00
###

cum
MT

295.00

each

33.49

26 Supply and fixing of 25mm PVC/HDPE as per BIS N0. 7634 as per drawing and tec
specification and directed by the Engineer-in charge.
1.000 RM

25mm Dia
Part III/75 PVC/HDPE as per BIS N0. 7634
Rate to be adopted

15.84

RM

27 Providing Vaccum Dewatered Flooring services including leveling of the placed concrete
followed by placement of the bottom and top mat , operation of the vaccum machine to r
the excess free water in the concrete , removal of the mat after completion of dewatering pr
conduction of the initial flooting to be followed by finishing using power trowel of pin vibra
the concrete, palcement of the concrete and / or provision of the special topings but includin
and operational charges of generator of adequate capacity and other T&P and labourcharg
all operations etc. complete.
Rate per Sqm
As per the approved rate vide C.R. Agr. No. 59/2007-08 of
Superintendent Engineer (R&B) Kakinada

28 Saw cutting of concrete pavement using a self propelled walk behind, petro / electric powere
of suitable capacity to give a finished groove of 4 mm width and 1/4 to 1/3 depth in the
concrete in the longitudinal and transverse directions along predetermined lines. The
inclusive of the cost of consumable such as dimond blade, masons engaged for the marking
deemed to be included in the rate and poring of sealent in to the performed groove. The
inclusive of cleaning of the groove of the sawing to remove any cementecous particles to
clean surface and surface preperation of the sides of the groove to accommodate the s
material etc. to give neat finished look including cost of sealent , hire and operational char
generator of adequate capacity and T&P and other labour charges for all operations etc. com

Rate per RM
As per the approved rate vide C.R. Agr. No. 59/2007-08 of
Superintendent Engineer (R&B) Kakinada

ompound

Amount
as per Drawing and Technical specification and as

3.76
49.68
147.50
200.93
401.87
33.00
RM

HDPE as per BIS N0. 7634 as per drawing and technical


gineer-in charge.
15.84
16.00
RM

ing services including leveling of the placed concrete to be


m and top mat , operation of the vaccum machine to release
e , removal of the mat after completion of dewatering process,
be followed by finishing using power trowel of pin vibration of
rete and / or provision of the special topings but including hire
or of adequate capacity and other T&P and labourcharges for
40.00
Sqm

sing a self propelled walk behind, petro / electric powered saw


hed groove of 4 mm width and 1/4 to 1/3 depth in the cured
ransverse directions along predetermined lines. The rate is
such as dimond blade, masons engaged for the marking is also
and poring of sealent in to the performed groove. The rate is
of the sawing to remove any cementecous particles to give a
tion of the sides of the groove to accommodate the sealent
ook including cost of sealent , hire and operational charges of
T&P and other labour charges for all operations etc. complete

60.00
RM

Name of Work :-Improvements to Ramarajulanka - Gondi road from km 0/000 to 7/350


(Construction of Low Level Cause Way 4V X 6.37m span ) in E.G.Dt.

Revised Cost of RCC Plain Ended pipes


The rates of RCC Plain ended pipes as per SSR 2008-09 are based on the raw materials costs.
Cement
Steel (MS Rods)

(C1)
(S1)

4,400
41,500

The revised raw materials costs i.e., the rates adopted in the estimate.
Cement
Steel (MS Rods)

(C2)
(S2)

6,400
45,000

G.O. RT No. 269, April 2015, Dt. 28.05.2015

Total quantity of Concrete required (as per IS 458 : 1988 Table 2 & 3 in Pg.7 & 8)
NP3 Class pipes

NP2 Class pipes

NP2 Class Collars

Quantity per 1 RM

Quantity per 1 RM

Quantity per each

300 MM dia

0.04274 Cum.
TTx0.340x1.000x0.040

0.03111 Cum.
TTx0.330x1.000x0.030

0.00424 Cum.
TTx0.300x0.150x0.030

450 MM dia

0.12375 Cum.
TTx0.525x1.000x0.075

0.05335 Cum.
TTx0.485x1.000x0.035

0.00990 Cum.
TTx0.450x0.200x0.035

600 MM dia

0.18299 Cum.
TTx0.685x1.000x0.085

0.09122 Cum.
TTx0.645x1.000x0.045

0.01609 Cum.
TTx0.640x0.200x0.040

Dia

Wc : Weight of Cement required (Kg.) per metre of pipe.


@ 360 Kgs. / Cum. as per IS 458 : 1988 Cl.4.5.1 Pg.3
Dia

NP3 Class pipes

NP2 Class pipes

NP2 Class Collars

300 MM dia

0.04274 x 360 Kgs


15.39 Kgs

0.03111 x 360 Kgs


11.20 Kgs

0.00424 x 360 Kgs


1.53 Kgs

450 MM dia

0.12375 x 360 Kgs


44.55 Kgs

0.05335 x 360 Kgs


19.21 Kgs

0.00990 x 360 Kgs


3.56 Kgs

600 MM dia

0.18299 x 360 Kgs


65.88 Kgs

0.09122 x 360 Kgs


32.84 Kgs

0.01609 x 360 Kgs


5.79 Kgs

Ws : Weight of MS Rods required (Kg.) per metre of pipe


(as per IS 458 : 1988 Table 2 & 3 Pg.7 & 8)
Dia
300 MM dia
450 MM dia
600 MM dia

NP3 Class pipes

NP2 Class pipes

NP2 Class Collars

0.78 + 1.80
2.58 Kgs

0.78 + 0.79
1.57 Kgs

0.71 Kgs

0.78 + 3.79
4.57 Kgs

0.78 + 1.97
2.75 Kgs

1.48 Kgs

1.18 + 7.01
8.19 Kgs

0.78 + 3.47
4.25 Kgs

1.89 Kgs

(Contd)
Revised Cost
Revised Cost R1 : Variation (increase / decrease ) in cost (Rs. per metre)
due to change in the cost of M.S. Rods = (S2-S1)/1000 X Ws.
Dia

NP3 Class pipes

NP2 Class pipes

NP2 Class Collars

300 MM dia

(45,000 -41,500) /1000


x 2.58 Kgs.= Rs 9.03

(45,000 -41,500) /1000


x 1.57 Kgs.= Rs 5.50

(45,000 -41,500) /1000


x 0.71 Kgs.= Rs 2.49

450 MM dia

(45,000 -41,500) /1000


x 4.57 Kgs.= Rs 16.00

(45,000 -41,500) /1000


x 2.75 Kgs.= Rs 9.63

(45,000 -41,500) /1000


x 1.48 Kgs.= Rs 5.18

600 MM dia

(45,000 -41,500) /1000


x 8.19 Kgs.= Rs 28.67

(45,000 -41,500) /1000


x 4.25 Kgs.= Rs 14.88

(45,000 -41,500) /1000


x 1.89 Kgs.= Rs 6.62

Revised Cost R2 : Variation (increase / decrease ) in cost (Rs. per metre)


due to change in the cost of Cement = (C2-C1)/1000 X Wc.
Dia

NP3 Class pipes

NP2 Class pipes

NP2 Class Collars

300 MM dia

(6,400 -4,400) /1000


x15.39 Kgs.= Rs 30.78

(6,400 -4,400) /1000


x11.20 Kgs.= Rs 22.40

(6,400 -4,400) /1000


x1.53 Kgs.= Rs 3.06

450 MM dia

(6,400 -4,400) /1000


x44.55 Kgs.= Rs 89.10

(6,400 -4,400) /1000


x19.21 Kgs.= Rs 38.42

(6,400 -4,400) /1000


x3.56 Kgs.= Rs 7.12

600 MM dia

(6,400 -4,400) /1000


x65.88 Kgs.= Rs 131.76

(6,400 -4,400) /1000


x32.84 Kgs.= Rs 65.68

(6,400 -4,400) /1000


x5.79 Kgs.= Rs 11.58

NP3 Class pipes

NP2 Class pipes

NP2 Class Collars

300 MM dia

724.00
9.03
30.78
= Rs. 763.81

320.00
5.50
22.40
= Rs. 347.90

450 MM dia

1,139.00 16.00
89.10
= Rs. 1,244.10

563.00
9.63
38.42
= Rs. 611.05

167.00
5.18
7.12
= Rs. 179.30

600 MM dia

1,859.00 28.67
131.76
= Rs. 2,019.43

914.00
14.88
65.68
= Rs. 994.56

255.00
6.62
11.58
= Rs. 273.20

Revised Cost = Cost as per the SSR + R1 + R2


Dia

79.00

2.49
3.06
= Rs. 84.55

350MM dia NP2 class RCC Collars


Concrete Qty. =
0.00576 Cum.
TTx0.382x0.150x0.032

Wt. of Cement Wc
0.00576 x 360

R1 : variation in Steel
(45,000 -41,500) /1000
x 0.79 Kgs.= Rs 2.77
Revised Cost=Cost as per the SSR+R1+R2

Asst. Executive Engineer (R&B),

Wt. of Steel Ws
= 2.07 Kgs.

= 0.79
Kgs.

R2 : variation in Cement
(6,400 -4,400) /1000
x 2.07 Kgs.= Rs 4.14
97.00

2.77

4.14

Deputy Executive Engineer (R&B),

= Rs. 103.91

Executive Engineer (R&B),

R&B Section : Malikipuram

R&B Sub-division : Razole

R&B Division : Amalapuram

Quantity

Description of Item

Rate

per

30 Providing, laying Reinforced cement concrete Hume pipes of NP-3 class for pipe culverts including
cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of
300mm/450mm/600mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and
hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (4 th Revision)
and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of
work.
Unit = metre
Page 272,273 of MoRT&H SDB
Taking output = 12.5 metre
300 mm Dia.,
(A) Labour
0.07 nos
Mate
day
188.00
0.25 nos
Mason
day
193.40
1.50 nos
Mazdoor
day
146.00
Total
(B) Material
12.50 RM
Cost of 300mm Dia., pipes
763.81
RM
Total
(C) Over head charges @ 19.615% (25%-VAT-Insurance)
Add for Over head charges @ 19.615% on (A)+(B)
19.615 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 12.5 metre (D)+(E)
Rate for 1 RM
Rate to be adopted
450 mm Dia.,
(A) Labour
0.11 nos
0.38 nos
2.25 nos

Mate
Mason
Mazdoor
Total

188.00
193.40
146.00

(B) Material
12.50 RM
Cost of 450mm Dia., pipes
1244.10
Total
(C) Over head charges @ 19.615% (25%-VAT-Insurance)
Add for Over head charges @ 19.615% on (A)+(B)
19.615 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 12.5 metre (D)+(E)
Rate for 1 RM
Rate to be adopted

day
day
day

RM

600 mm Dia.,
(A) Labour
0.14 nos
0.50 nos
3.00 nos

Mate
Mason
Mazdoor
Total

188.00
193.40
146.00

(B) Material
12.50 RM
Cost of 600mm Dia., pipes
2019.43
Total
(C) Over head charges @ 19.615% (25%-VAT-Insurance)
Add for Over head charges @ 19.615% on (A)+(B)
19.615 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 12.5 metre (D)+(E)
Rate for 1 RM
Rate to be adopted

nos.
nos.
nos.

RM

Amount

pe culverts including
r laying, jointing of
aligning, lowering and
nd 2906 (4 th Revision)
e for finished item of

13.16
48.35
219.00
280.51
9547.63
9547.63
0.00
9828.14
0.00
9828.14
786.25
786.00
1 RM

20.68
73.49
328.50
422.67
15551.25
15551.25
0.00
15973.92
0.00
15973.92
1277.91
1278.00
1 RM

26.32
96.70
438.00
561.02
25242.88
25242.88
0.00
25803.90
0.00
25803.90
2064.31
2064.00

1 RM

LEAD CHARGES (SSR 2014-15)


Earth/Gravel/
Metal
Sand
loading
52.50
105.00
unloading
15.90
15.90
stacking xx
xx
0.25 xx
xx
0.5 xx
xx
1
31.50
30.40
2
44.10
42.60
3
58.90
58.90
4
71.50
71.50
5
84.10
84.10
6
96.70
96.70
7
109.30
109.30
8
9
10

121.90
134.50
147.10

121.90
134.50
147.10

11

159.70

159.70

12

172.30

172.30

13
14
15
16
17
18
19

184.90
197.50
210.10
222.70
235.30
247.90
260.50

184.90
197.50
210.10
222.70
235.30
247.90
260.50

20

273.10

273.10

21

285.70

285.70

22
23
24
25

298.30
310.90
323.50
336.10

298.30
310.90
323.50
336.10

Cost of Materials, Labour


SSR 2014-15
Material Rates
60 to 63 mm IRC & MoRTH HBG metal
50 to 55 mm IRC & MoRTH HBG metal
40 to 45 mm IRC & MoRTH HBG metal
Roughstone 300mm (HBG)for revetment
Roughstone 225mm (HBG)for revetment
SS Revetment work 225mm
SS Revetment work 300mm
SS Revetment work 450mm
Laterite for Revetment 225mm
Laterite for Revetment 300mm
Jeddy stone above 450mm to 600mm
Quarry spall(Field picked metal)
Av. Of rate 25mm & 40mm
150 mm soling stone HBG metal
40 to 45 mm IRC & MoRTH HBG M/C metal

As per SSR of PR Dept.


419.00 Pg. No.17, Sl.53 (Roads)
456.00 Pg. No.17, Sl.52 (Roads)
588.00 Pg. No.16, Sl.51 (Roads)
156.00 Pg. No.13, Sl.9 (Roads)
154.00 Pg. No.13, Sl.8 (Roads)
144.00 Pg. No.13, Sl.2 (Roads)
164.00 Pg. No.13, Sl.3 (Roads)
136.00 Pg. No.13, Sl.4 (Roads)
118.00 Pg. No.13, Sl.6 (Roads)
138.00 Pg. No.13, Sl.7 (Roads)
188.00 Pg. No.13, Sl.5 (Roads)
(42+48)/2 Pg.18
45.00
Sl. No.84 & 85
95.00 Pg. No.18, Sl.79 (Roads)
588.00 Pg. No.16, Sl.51 (Roads)

25 to 27 mm IRC & MoRTH HBG M/C metal

944.00 Pg. No.16, Sl.50 (Roads)

19 to 22 mm IRC & MoRTH HBG M/C metal

984.00 Pg. No.16, Sl.49 (Roads)

12 to 14 mm IRC & MoRTH HBG M/C metal

780.00 Pg. No.16, Sl.48 (Roads)

9.5 to 11.20 mm IRC & MoRTH HBG M/C metal


5 to 7 mm IRC & MoRTH HBG M/C metal
2.36 to 5 mm IRC & MoRTH HBG M/C metal
HBG Stone chips 2.36mm and below
Gravel
40 mm SS-5 m/c HBG metal(Excluding Blasting &

656.00 Pg. No.16, Sl.47 (Roads)


504.00 Pg. No.16, Sl.46 (Roads)
308.00 Pg. No.16, Sl.45 (Roads)
340.00 Pg. No.18, Sl.92 (Roads)
103.00 Pg. No.18, Sl.90 (Roads)
620.00 Pg. No.15, Sl.30 (Roads)

25 mm SS-5 m/c HBG metal ''

994.00 Pg. No.15, Sl.29 (Roads)

20 mm SS-5 m/c HBG metal

''

1036.00 Pg. No.15, Sl.28 (Roads)

12 mm SS-5 m/c HBG metal

''

822.00 Pg. No.15, Sl.27 (Roads)

10 mm SS-5 m/c HBG metal ''


6 mm SS-5 m/c HBG metal ''
Sand for Concrete

692.00 Pg. No.14, Sl.26 (Roads)


532.00 Pg. No.14, Sl.25 (Roads)
462.00 Pg. No.19, Sl.94 (Roads)

26
27
28
29
30
31
32
33

348.70
361.30
373.90
386.50
399.10
409.60
420.10
430.60

348.70
361.30
373.90
386.50
399.10
409.60
420.10
430.60

Sand for Filling


Sand for Masonry
HYSD Steel
Mild Steel
Cement
Mild Steel 6mm
Blasting charges
Blasting charges

342.00 Pg. No.19, Sl.95 (Roads)


606.00 Pg. No.19, Sl.93 (Roads)
44000.00
43000.00 As per the G.O.s
5900.00 October, 2014 GO RT
45000.00 No.869, dt.31.12.2014
70.00 Pg. No.19, Sl.95 (Roads)

34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72

441.10
451.60
462.10
472.60
483.10
493.60
504.10
514.60
525.10
535.60
546.10
556.60
567.10
577.60
588.10
598.60
609.10
619.60
630.10
640.60
651.10
661.60
672.10
682.60
693.10
703.60
714.10
724.60
735.10
745.60
756.10
766.60
777.10
787.60
798.10
808.60
819.10
829.60
840.10

441.10
451.60
462.10
472.60
483.10
493.60
504.10
514.60
525.10
535.60
546.10
556.60
567.10
577.60
588.10
598.60
609.10
619.60
630.10
640.60
651.10
661.60
672.10
682.60
693.10
703.60
714.10
724.60
735.10
745.60
756.10
766.60
777.10
787.60
798.10
808.60
819.10
829.60
840.10

Blasting charges for rough stone


Seigniorage charges
Metal
Gravel/earth
Sand
Labour Rates
Mate
Mazdoor skilled (385 x 30% + 345 x 70%)
Mazdoor unskilled
Machinery Rates
Dozer 80 HP for spreading @ 200 cum per hour
Motor grader 3.35M Blade @50 cum/Hr
Hydralic excavator
Front end loader 1 cum capacity
Tipper 5 cum
Vibratory roller 8T
smooth wheeled roller 8 Ton
Water tanker 6 KL
Tractor
Tractor with Rotavator
Tractor with ripper attachment @ 60 cum per hour
Air compressor 250 cfm
Wet mix plant of 60 tonne hr. capacity
Mechanical broom @ 1250 sqm/hr.
Bitumen pressure distributor @1750 sqm/hr
Emulsion pressure distributor @1750 sqm/hr
Hot mix plant 40 to 60 TPH
Mechanical Paver finisher 100 TPH
Hydraulic self propelled chip spreader @ 1500 sqm/hr.
Finish rolling with 6-8 tonne smooth wheeled tandem roller.
Pneumatic road Roller
GSB Plant 50 Cum
Generator 250 KVA
Generator set 125 KVA
Generator set 35 KVA
Concrete mixer 0.4/0.28 cum
Tipper 5.50 cum capacity per 10 Tonnes per tkm
Tipper 5 cum capacity for Soil, GSB, WMM, Hot mix
Plate compactor/Power rammer

xx
50.00
22.00 As per the G.O.s
40.00
345.00
357.00
295.00

Pg. No.10, Sl.71 (Roads)

2575.60
3216.00
2848.50
1646.00
922.00
2678.30
1146.70
624.00
415.00
422.00
422.00
507.50
1646.00
357.00
1498.00
860.00
19120.00
2249.00
2567.00
1646.00
1283.00
1143.00
1850.00
1320.00
861.70
453.00
4.50
4.50
48.00

Pg. No.25, Sl.1 (Roads)


Pg. No.25, Sl.3 (Roads)
Pg. No.25, Sl.4 (Roads)
Pg. No.25, Sl.5 (Roads)
Pg. No.25, Sl.6 (Roads)
Pg. No.25, Sl.7 (Roads)
Pg. No.25, Sl.8 (Roads)
Pg. No.25, Sl.10 (Roads)
Pg. No.25, Sl.11 (Roads)
Pg. No.25, Sl.12 (Roads)
Pg. No.25, Sl.13 (Roads)
Pg. No.25, Sl.14 (Roads)
Pg. No.26, Sl.15 (Roads)
Pg. No.26, Sl.16 (Roads)
Pg. No.26, Sl.17 (Roads)
Pg. No.26, Sl.18 (Roads)
Pg. No.26, Sl.22 (Roads)
Pg. No.26, Sl.24 (Roads)
Pg. No.26, Sl.25 (Roads)
Pg. No.26, Sl.26 (Roads)
Pg. No.26, Sl.27 (Roads)
Pg. No.26, Sl.30 (Roads)
Pg. No.27, Sl.43 (Roads)
Pg. No.27, Sl.43 (Roads)
Pg. No.28, Sl.43 (Roads)
Pg. No.27, Sl.38 (Roads)
(As per SSR 2008-2009)
(As per SSR 2008-2009)
Pg. No.28, Sl.48 (Roads)

Pg. No.10, Sl.73 (Roads)

73
74
75

850.60
861.10
871.60

850.60
861.10
871.60

Sand for Mortar

606.00

Pg. No.19, Sl.93 (Roads)