This sheet is not to be printed. RC COL input Sheet for pier.

1 AT PIER BASE
Pier grade
E
m = 280/fck
Dia of Pier
Cover
Dia of Link
Layer 1
Layer 2
Layer 3

1
2.1
2.2
2.3
2.4
2.5
2.6
3

=
=
=
=
=
=
Bar dia =
Bar dia =
Bar dia =
SLS Cases
11801.6
6684.0
10327.9
9594.3
10327.9
13904.2
11282.7
4095.7
9373.1
3717.0
10327.9
10327.9
10327.9

3905.3
3905.3
5822.5

50.0
34000.0
5.6
2100.0
50.0
20.0
25.0 mm
25.0 mm
32.0 mm

100
100
100
100
100
100
100
100

steel
% steel

39270
1.134
0
0

No. =
No. =
No. =

1
2.1a
2.2a
2.3a
2.4a
2.5a
2.6a
2.1b
2.2b
2.3b
2.4b
2.5b
2.6b

0
40.0
40.0
0.0

ULS Cases
17089.5
14510.6
14510.6
15704.1
13317.1

10392.5
12385.4
17994.7
5743.0
5268.3

14510.6
14510.6
12791.3
12791.3
14318.9
11263.6
12791.3
12791.3

5504.5
5504.5
11729.7
19077.4
3283.3
2618.2
2950.3
2950.3

2 AT 2.6 m from PIER BASE


Pier grade
E
m = 280/fck
Dia of Pier
Cover
Dia of Link
Layer 1
Layer 2
Layer 3

1
2.1
2.2
2.3
2.4
2.5
2.6
3

=
=
=
=
=
=
Bar dia =
Bar dia =
Bar dia =
SLS Cases
11576.4
5462.1
10389.2
6228.1
9816.3
10459.7
10389.2
3638.7
9816.3
3239.6
11057.5
3438.5
9148.0
3438.5
10102.8
4290.7

50.0
34000.0
5.6
2100.0
50.0
20.0
25.0 mm
25.0 mm
0.0 mm

100
100
100
100
100
100
100
100

steel
% steel

39270
1.134
0
0

No. =
No. =
No. =

1
2.1a
2.2a
2.3a
2.4a
2.5a
2.6a
2.1b
2.2b

0
40.0
40.0
0.0

ULS Cases
16808.1
14587.2
13871.1
14587.2
13871.1
15422.6
13035.7
12968.2
12051.6

8417.8
8159.6
13630.8
5105.6
4605.8
4855.0
4855.0
7109.5
14157.6

2.3b
2.4b
2.5b
2.6b

12968.2
12051.6
14037.5
10982.2

3283.3
2618.2
2950.3
2950.3

3 AT 3.6 m from PIER BASE


Pier grade
E
m = 280/fck
Dia of Pier
Cover
Dia of Link
Layer 1
Layer 2
Layer 3

1
2.1
2.2
2.3
2.4
2.5
2.6
3

=
=
=
=
=
=
Bar dia =
Bar dia =
Bar dia =
SLS Cases
11489.9
5026.7

10302.6
9729.7
10302.6
9729.7
10971.0
9061.4
10016.2

5050.2
9157.4
3480.8
3074.6
3277.2
3277.2
3783.8

50.0
34000.0
5.6
2100.0
50.0
20.0
25.0 mm
25.0 mm
0.0 mm

100
100
100
100
100
100
100
100

steel
% steel

39270
1.134
0
0

No. =
No. =
No. =

0
40.0
40.0
0.0

ULS Cases
16699.9
7711.1

1
2.1a
2.2a
2.3a
2.4a
2.5a
2.6a
2.1b
2.2b
2.3b
2.4b
2.5b
2.6b

14479.0
13762.9
14479.0
13762.9
15314.4
12927.4
12859.9
11943.3
12859.9
11943.3
13929.3
10874.0

6699.5
11981.4
4885.7
4377.1
4630.9
4630.9
5477.7
12297.9
3283.3
2618.2
2950.3
2950.3

4 AT 4 m from PIER BASE


Pier grade
E
m = 280/fck
Dia of Pier
Cover
Dia of Link
Layer 1
Layer 2
Layer 3

1
2.1
2.2
2.3
2.4

=
=
=
=
=
=
Bar dia =
Bar dia =
Bar dia =
SLS Cases
11455.2
4859.9
10268.0
4612.0
9695.1
8640.3
10268.0
3421.0
9695.1
3012.1

50.0
34000.0
5.6
2100.0
50.0
20.0
25.0 mm
0.0 mm
0.0 mm

100
100
100
100
100

steel
% steel

19635
0.567
0
0

No. =
No. =
No. =

1
2.1a
2.2a
2.3a
2.4a

0
40.0
0.0
0.0

ULS Cases
16656.6
14435.7
13719.6
14435.7
13719.6

7439.9
6161.2
11326.7
4802.4
4290.6

2.5
2.6
3

10936.3
9026.7
9981.5

3216.2
3216.2
3601.3

100
100
100

2.5a
2.6a
2.1b
2.2b
2.3b
2.4b
2.5b
2.6b

15271.1
12884.1
12816.6
11900.0
12816.6
11900.0
13886.0
10830.7

4546.1
4546.1
4869.9
11559.2
3283.3
2618.2
2950.3
2950.3

5 AT 4.5 m from PIER BASE


Pier grade
E
m = 280/fck
Dia of Pier
Cover
Dia of Link
Layer 1

=
=
=
=
=
=
Bar dia =

Layer 2
Layer 3

1
2.1
2.2
2.3
2.4
2.5
2.6
3

Bar dia =
Bar dia =
SLS Cases
11411.9
4658.2
10224.7
4102.5
9651.8
7997.0
10224.7
3349.1
9651.8
2937.3
10893.0
3142.9
8983.5
3142.9
9938.2
3393.9

50.0
34000.0
5.6
2100.0
50.0
20.0
25.0 mm

steel
% steel
0
0

25.0 mm
0.0 mm

100
100
100
100
100
100
100
100

19635
0.567

No. =

40.0

No. =
No. =

0.0
0.0
ULS Cases
16602.5
14381.6
13665.5
14381.6
13665.5
15217.0
12830.0
12762.5
11845.9
12762.5
11845.9
13831.9
10776.6

1
2.1a
2.2a
2.3a
2.4a
2.5a
2.6a
2.1b
2.2b
2.3b
2.4b
2.5b
2.6b

7111.6
5540.2
10512.5
4702.3
4186.9
4444.3
4444.3
4167.8
10640.0
3283.3
2618.2
2950.3
2950.3

6 AT 4.663 m from PIER BASE


Pier grade
E
m = 280/fck
Dia of Pier
Cover
Dia of Link
Layer 1
Layer 2
Layer 3

=
=
=
=
=
=
Bar dia =
Bar dia =
Bar dia =
SLS Cases
11397.8
4594.3

50.0
34000.0
5.6
2100.0
50.0
20.0
25.0 mm
25.0 mm
0.0 mm

100

steel
% steel

19635
0.567

Lap1
32
No. =
No. =
No. =

0
40.0
0.0
0.0

ULS Cases
16584.8
7007.5

2.1
2.2
2.3
2.4
2.5
2.6
3

10210.6
9637.7
10210.6
9637.7
10878.9
8969.3
9924.1

3947.9
7788.2
3326.4
2913.6
3119.8
3119.8
3332.0

100
100
100
100
100
100
100

2.1a
2.2a
2.3a
2.4a
2.5a
2.6a
2.1b
2.2b
2.3b
2.4b
2.5b
2.6b

14363.9
13647.8
14363.9
13647.8
15199.4
12812.4
12744.9
11828.3
12744.9
11828.3
13814.2
10758.9

5353.0
10248.1
4670.7
4154.2
4412.2
4412.2
3957.5
10341.4
3283.3
2618.2
2950.3
2950.3

7 AT 4.663 m from PIER BASE


Pier grade
E
m = 280/fck

=
=
=

Dia of Pier
Cover
Dia of Link
Layer 1
Layer 2
Layer 3

1
2.1
2.2
2.3
2.4
2.5
2.6
3

=
=
=
Bar dia =
Bar dia =
Bar dia =
SLS Cases
11397.8
4594.3
10210.6
3947.9
9637.7
7788.2
10210.6
3326.4
9637.7
2913.6
10878.9
3119.8
8969.3
3119.8
9924.1
3332.0

50.0
34000.0
5.6

steel
% steel

2100.0
50.0
20.0
32.0 mm
25.0 mm
0.0 mm

100
100
100
100
100
100
100
100

0
0.000

Lap2
0
No. =
No. =
No. =

0.0
0.0
0.0
ULS Cases
16584.8
14363.9
13647.8
14363.9
13647.8
15199.4
12812.4
12744.9
11828.3
12744.9
11828.3
13814.2
10758.9

1
2.1a
2.2a
2.3a
2.4a
2.5a
2.6a
2.1b
2.2b
2.3b
2.4b
2.5b
2.6b

7007.5
5353.0
10248.1
4670.7
4154.2
4412.2
4412.2
3957.5
10341.4
3283.3
2618.2
2950.3
2950.3

8 AT 4.66299999999999 m from PIER BASE


Pier grade
E
m = 280/fck
Dia of Pier
Cover
Dia of Link
Layer 1

=
=
=
=
=
=
Bar dia =

50.0
34000.0
5.6
2100.0
50.0
20.0
32.0 mm

steel
% steel

0
0.000

Lap3
0
No. =

0
0.0

Layer 2
Layer 3

1
2.1
2.2
2.3
2.4
2.5
2.6
3

Bar dia =
Bar dia =
SLS Cases
11397.8
4594.3
10210.6
3947.9
9637.7
7788.2
10210.6
3326.4
9637.7
2913.6
10878.9
3119.8
8969.3
3119.8
9924.1
3332.0

25.0 mm
0.0 mm

100
100
100
100
100
100
100
100

No. =
No. =

0.0
0.0
ULS Cases
16584.8
14363.9
13647.8
14363.9
13647.8
15199.4
12812.4
12744.9
11828.3
12744.9
11828.3
13814.2
10758.9

1
2.1a
2.2a
2.3a
2.4a
2.5a
2.6a
2.1b
2.2b
2.3b
2.4b
2.5b
2.6b

7007.5
5353.0
10248.1
4670.7
4154.2
4412.2
4412.2
3957.5
10341.4
3283.3
2618.2
2950.3
2950.3

9 AT 4.66299999999999 m from PIER BASE


Pier grade
E
m = 280/fck
Dia of Pier
Cover
Dia of Link
Layer 1
Layer 2
Layer 3

1
2.1
2.2
2.3
2.4
2.5
2.6
3

=
=
=
=
=
=
Bar dia =
Bar dia =
Bar dia =
SLS Cases
11397.8
4594.3
10210.6
3947.9
9637.7
7788.2
10210.6
3326.4
9637.7
2913.6
10878.9
3119.8
8969.3
3119.8
9924.1
3332.0

50.0
34000.0
5.6
2100.0
50.0
20.0
0.0 mm
25.0 mm
0.0 mm

100
100
100
100
100
100
100
100

steel
% steel

0
0.000

Lap4
0
No. =
No. =
No. =

1
2.1a
2.2a
2.3a
2.4a
2.5a
2.6a
2.1b
2.2b
2.3b
2.4b
2.5b
2.6b

0
0.0
0.0
0.0

ULS Cases
16584.8
14363.9
13647.8
14363.9
13647.8
15199.4
12812.4
12744.9
11828.3
12744.9
11828.3
13814.2
10758.9

7007.5
5353.0
10248.1
4670.7
4154.2
4412.2
4412.2
3957.5
10341.4
3283.3
2618.2
2950.3
2950.3

0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663

2.1c
2.2c
2.3c
2.4c
2.5c
2.6c

2.1c
2.2c

7396.6
7396.6
8828.8
5964.4
7396.6
7396.6

7623.6
6764.3

11101.1
16817.4
1975.4
1351.6
1662.8
1662.8

6623.2
12201.6

SLS1
SLS2
SLS3
SLS4
SLS5
SLS6
190 SLS7
203 SLS8
216 ULS1
229 ULS2
242 ULS3
255 ULS4
ULS5
ULS6
ULS7
ULS8
ULS9
ULS10
ULS11
ULS12
ULS13
ULS14
ULS15

SLS1
SLS2
SLS3
SLS4
SLS5
SLS6
191 SLS7
204 SLS8

1 Section
2 Section
3 Section
4 Section
5 Section
6 Section
7 Section
8 Section
9 Section
10 Section
11 Section
12 Section
13 Section
14 Section
15 Section
16 Section
17 Section
18 Section
19 Section
20 Section
21 Section
22 Section
23 Section

For
For
For
For
For
For
For
For
For
For
For
For
For
For
For
For
For
For
For
For
For
For
For

11801.6
10327.9
10327.9
11282.7
9373.1
10327.9
10327.9
10327.9
17089.5
14510.6
14510.6
15704.1
13317.1
14510.6
14510.6
12791.3
12791.3
14318.9
11263.6
7396.6
7396.6
8828.8
5964.4

11576.4
10389.2
9816.3
10389.2
9816.3
11057.5
9148.0
10102.8

2.3c
2.4c
2.5c
2.6c

2.1c
2.2c
2.3c
2.4c
2.5c
2.6c

7623.6
6764.3
8626.2
5761.8

7545.7
6686.4
7545.7
6686.4
8548.2
5683.9

1975.4
1351.6
1662.8
1662.8

4973.4
10456.1
1975.4
1351.6
1662.8
1662.8

217 ULS1
230 ULS2
243 ULS3
256 ULS4
ULS5
ULS6
ULS7
ULS8
ULS9
ULS10
ULS11
ULS12
ULS13
ULS14
ULS15

16808.1
14587.2
13871.1
14587.2
13871.1
15422.6
13035.7
12968.2
12051.6
12968.2
12051.6
7623.6
6764.3
7623.6
6764.3

SLS1
SLS2
SLS3
SLS4
SLS5
SLS6
192 SLS7
205 SLS8
218 ULS1
231 ULS2
244 ULS3
257 ULS4
ULS5
ULS6
ULS7
ULS8
ULS9
ULS10
ULS11
ULS12
ULS13
ULS14
ULS15

11489.9
10302.6
9729.7
10302.6
9729.7
10971.0
9061.4
10016.2
16699.9
14479.0
13762.9
14479.0
13762.9
15314.4
12927.4
12859.9
11943.3
12859.9
11943.3
7545.7
6686.4
7545.7
6686.4

11455.2
10268.0
9695.1
10268.0

2.1c
2.2c
2.3c
2.4c
2.5c
2.6c

7514.5
6655.2
7514.5
6655.2
8517.1
5652.7

4333.4
9762.6
1975.4
1351.6
1662.8
1662.8

9695.1
10936.3
9026.7
9981.5
16656.6
14435.7
13719.6
14435.7
13719.6
15271.1
12884.1
12816.6
11900.0
12816.6
11900.0
7514.5
6655.2
7514.5
6655.2

6684.0
9594.3
13904.2
4095.7
3717.0
3905.3
3905.3
5822.5
10392.5
12385.4
17994.7
5743.0
5268.3
5504.5
5504.5
11729.7
19077.4
3283.3
2618.2
11101.1
16817.4
1975.4
1351.6

5462.1
6228.1
10459.7
3638.7
3239.6
3438.5
3438.5
4290.7

8417.8
8159.6
13630.8
5105.6
4605.8
4855.0
4855.0
7109.5
14157.6
3283.3
2618.2
6623.2
12201.6
1975.4
1351.6

5026.7
5050.2
9157.4
3480.8
3074.6
3277.2
3277.2
3783.8
7711.1
6699.5
11981.4
4885.7
4377.1
4630.9
4630.9
5477.7
12297.9
3283.3
2618.2
4973.4
10456.1
1975.4
1351.6

4859.9
4612.0
8640.3
3421.0

3012.1
3216.2
3216.2
3601.3
7439.9
6161.2
11326.7
4802.4
4290.6
4546.1
4546.1
4869.9
11559.2
3283.3
2618.2
4333.4
9762.6
1975.4
1351.6

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148

Prepared

Harjot

AECOM/CC28/PF148

Checked

R P Sharma

10761.372

Verified

Sumant

INDEX
S.No
Ref Drawing No.

1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0

Appendix-1
Appendix-2
Appendix-3
Appendix-5
Appendix-5a
Appendix-6
Appendix-7

Item
AECOM-CC28-112-R41
AECOM-CC28-770-R0
AECOM-CC28-371-R0
AECOM-CC28-271-R0

Span Arrangement
Pier details
Pile Cap details
Pile Foundation details

Introduction
Input Data
Load Calculations
SLS Load Cases for Pier
ULS Load Cases for Pier
Design checks for Pier
Load Calculations for Pile Design
Vertical Pile Load Check
Design Checks for Pile
Pile Cap : ULS Design
Pile Cap : SLS Checks
Pile Cap : Truss Analogy
Appendices
Calculation of spring stiffness
Staad Input and Output for Time Period Calculation
RCCol/Oasys output for Pier
Staad Input for Pile Design
Staad Input for Pile Load
Pile Design Check RC Col/Oasys
Vertical Pile Capacity & Bore hole Log

CC-28
L&T
of Substructure P148
Project Code

Date

2/21/2013

Rev

Page No

1
8
17
26
43
46
51
51
59
75
75

89
90
103
111
126
139
149

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

Introduction
This Design note presents design of Pier, Pile Cap & Pile Foundation for P148 with following details:

Pier No.

P148
P40
P41
P42

Chainage

Left Span

Right Span

10761.372
7179.889
7210.889
7241.889

31
31
31
31

37
37
37
37

Fixity Side
at Pier

LEFT
LEFT
LEFT
LEFT

Curve Radius
Pier No.

Pier Dia

Bore Hole
No.

m
P148

2.100

NBH-26

Left Curve

Right
Curve

404.1

404.1

Rail level

Ground level

221.833
234.711
235.294
235.547

212.891
214.713
214.729
214.839

C-28
&T
bstructure P148
2/21/2013
0

Project Code
Date
Rev

Height of Pier
with pier cap
m
6.463
17.519
18.086
18.229

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

1.0 Input Data


1.1 Geometry
Pier No.
Chainage
Span length

Left span
Right span

Rail level
Ground level
Rail pad depth
Segment height
Bearing + pedestal height
Depth of pile cap top below ground
Pier cap top level to rail level = 0.479+2.25+0.25
Pier cap top level = 221.833 - 2.979
Pile cap top level = 212.891 - 0.5
Ht of pier from pier cap top to pile cap top
Plan Curve radius
Left side
Right Side
Transverse Eccentricity (Cantilever eccentricity)
Cover in Pier
Cover in Pile

2100

20

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

P 148
10761.372
31.000
37.000
221.833
212.891
0.479
2.250
0.250
0.500
2.979
218.854
212.391
6.463
404.1
404.1
0.000
0.050
0.075

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

Pier dimensions
Dia
Ht excluding cap = 6.463 - 1.8
Pier cap dimensions
along track
3.35 m at top &
across track
4.1 m at top &
Depth
C.G. of pier cap from top (Long.)
C.G. of pier cap from top (Trans.)
Transverse ecc of pier cap =
Shear key dimensions
along track
across track
Depth
Tie bar Center
No
Pedestal dimensions
Length
Width
Depth
No
c/c distance along track
c/c distance across track
Crash Barrier dimensions
Height
Top Thickness
Bottom Thickness
Gap
Pile cap arrangement
No. of piles
Dia of piles
Corner Piles Spacing
along track
across track
Pile cap Length
along track
across track
Middle Piles (along track)
Pile Spacing (from corner piles) =
No of Piles
Thickness of pile cap
Pier ecc from to pile cap center

21

=
=

2.100
4.663

=
=

2.000
2.000
1.800
0.750
0.750
0.000

=
=
=
=
=

1.150
1.100
0.850
0.550
1

=
=
=
=
=
=

0.900
0.900
0.175
4
1.700
2.600

=
=
=
=

1.500
0.225
0.225
0.025

=
=

6
1.000

=
=

6.000
3.000

=
=

7.500
4.500

3.000
2

=
=

1.500
0.000
0.000

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

1.2 Material Properties


Density of concrete

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

25 kN/m3

Density of steel

78.5 kN/m3

Density of Soil

20 kN/m3

Pier & Pier cap Concrete


Pile & Pile cap Concrete
Grade of Steel

=
=
=

m = 280/fck
m = 280/fck

=
=

M 50
E=
34000
M 35
E=
29500
Fe 500
Fe 415 (for shear link)
5.6 for Pier
(as per Cl. 2.2.1 (b) of DBR)
8.0 for pile
(as per Cl. 2.2.1 (b) of DBR)

1.3 Loads
1.3a Superstructure Dead Load

Typical Cross Section of Segment

Wt of superstructure as given by DMRC:

Dead Load of Box _girder


Span Length (m)
19
22
25
28
31
34
37

Weight (T)
297.2
335.2
373.1
413.3
451.2
489.1
527.0

CG of Superstructure from top

0.956 m

3m segment wt
0m segment wt

=
=

37.9 t
0.00 t

22

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Wt for 31m span

1
2
3
4
5
6
7
8
9

Checked
Verified

1.3b Super Imposed Dead Loads

Harjot
R P Sharma
Sumant

Prepared

451.2 t

(Clause 2.10 of Design Basis Report)

Rails+pads
Cables
Cable trough cell
Cable trays
Hand rail
Plinth
Light wt deck drainage concrete
Parapet
Miscellaneous (OCS, signaling)
Total

1.3c Live Loads


Vertical train live load
All axle Loads

0.30
0.07
0.74
0.01
0.08
3.40
0.24
3.26
0.40
8.5

t/m
t/m
t/m
t/m
t/m
t/m
t/m
t/m
t/m
t/m

(Clause 2.8 of Design Basis Report)


17 t

One Bogi Length


Configuration

22.1
Alt 1
a=
b=
c=

CG of LL from rail level


Impact Factor

=
m

Alt 2

2.250
2.500
12.600
=
=

2.605
2.290
12.310
1.83 m
1.2

Horizontal train live load


Braking Load
Traction Load
In seismic condition, long. Load

18 % of unfactored vertical load


20 % of unfactored vertical load
50 % of normal condition

Centrifugal force
Design Speed

1.3d Rail Structure Interaction


LWR Intensity

80 kmph
60 kmph

above
below

(Clause 2.6 of Design Basis Report)


1.6 t/m
=

300
300

15.696

1.3e Seismic Loads


(Clause 2.5 of Design Basis Report)
Seismic Zone
IV (Delhi lies in Seismic Zone IV)
Z
0.24
R
2.5 (with ductile detailing for Pier)
I
1.5
Sa/g
1.36 /T (As per Cl.2.5.1.2 of DBR, medium soil site, Type II soil)
Minimum Ah
0.1
% of LL taken in Time period calculations=
25 %
% of seismic force on LL taken in trans. direction=
50 %

23

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Checked
Verified

% of seismic force on LL taken in long. direction=


Type of Structure (Regular/ Irregular) =

1.4 Load Combinations


SLS Combinations
Load

Harjot
R P Sharma
Sumant

Prepared

0%
Regular

(Clause 2.18 of Design Basis Report)


GI
Cracking +
stresses
1.00

G II a

G II b

G III

Stresses

Stresses

Stresses

1.00

1.00

1.00

Shrinkage & Creep SC

1.00

1.00

1.00

1.00

Prestressing
SIDL
Earthquake
Overall T
Diff. Temp

PR
SIDL
EQ
OT
DT

1.00
1.20

1.00
1.20
1.00

1.00
1.20
1.00

1.00
1.20

Diff. Settlement

DS

1.00

Live Load

LL

1.10

Derailment Load

DR

Dead Load

ULS Combinations
Load
Dead Load
Prestressing

Symbol

DL

Symbol
DL
PR

SIDL
Earthquake
Live Load

SIDL
EQ
LL

Derailment Load

DR

1.00
0.80

GI
1.25
1.15
0.87
2.00

1.00

1.00

G II a
1.25
1.15
0.87
2.00
1.60

G II b
1.25
1.15
0.87
2.00
1.25
1.40

G II c
0.90
1.15
0.87
0.80
1.50

50.00

1.75

% of LL for G III comb.


1.5 Effective Length Calculations

Pier dim. h
=
2.10
Effective length Le
Cl. 3.1.2 of DBR
=
14.86
As per Cl. 15.6.1.1, IRS CBC, Slenderness ratio:
Le/ h
=
7.08
Calculation for additional moments in longitudinal direction: (as per Cl. 15.6.5 of IRS:CBC)
MR_Slender = MRi +
1.6 Anchorage Length
Steel Grade =
Concrete Grade

(as per IRS, CBC:Table 21)


Fe 500
Ultimate Anchorage Bond Stress

24

0.000

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

N/mm2
M40 and more
M30
M35

2.66
2.10
2.38

1.7 Reinforcement detail


Span Arrangement
Pier Height
Pier Dia
Pier Concrete
m = 280/fck
Xa
Xb
2 X1
3 X2
4 X3
5 X4
6 X5
7 X6
8 X7
9 X8
Lap 1
Lap 2
Lap 3
Lap 4
Lap in shear link =
BM
1
1a
2
2a
3
3a
4
4a
8
8a
5
5a
5b
6
7

= 31m + 37m
=
6.463 m
=
2.100 m
=
M 50
=
5.60
1.150 m
1.500 m
6.163 m
6.163 m
6.163 m
6.163 m
6.163 m
6.163 m
6.163 m
6.163 m
1.31 m
1.31 m
0.0 m
0m

No
0
0
20
20
20
20
0
0
0
0
54
22
5
5
0

600 mm
Dia
0
0
25
25
25
25
32
32
0
0
20
20
20
25
0

1,2,3,4,8 are main steel bars.


5 is shear link.

25

Concrete Volume =
Reinforcement =
=

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

6,7 are spacer bars.


Spacer bar spacing (60.d) for "6"=
1.5 m
Spacer bar spacing (60.d) for "7"=
0m

Shear links spacing for Pier=


Bar Mark
5
5a
5b

Spacing
65 mm up to
70 mm up to
70 mm up to top

26

Height
3.150 m from bottom (as special confinement reinf.)
4.663 m from bottom

28
T
tructure P148
Project Code
Date
Rev

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

2/21/2013
0

Fixed
Free

27

28
T
tructure P148
Project Code
Date
Rev

2/21/2013
0

m
m
m at bottom
m at bottom
m
m
m
m
m
m
m
m from pier cap top

m
m
m
m
m
m
m
m
m

m
m
m
m
m
m

m
m across the track
m along the track

28

28
T
tructure P148
Project Code
Date
Rev

2/21/2013
0

MPa
MPa

s per Cl. 2.2.1 (b) of DBR)


s per Cl. 2.2.1 (b) of DBR)

29

28
T
tructure P148
Project Code
Date
Rev

2/21/2013
0

83.385 kN/m

166.77 kN

m radius
m radius

kN/m

ium soil site, Type II soil)

30

28
T
tructure P148
Project Code
Date
Rev

2/21/2013
0

GV
Stresses
1.00
1.00
1.00
1.20

1.00

GV
1.25
1.15
0.87
2.00

1.75

m
m ( 2.3 *L)
<12, Short Column

xP

Anchorage Length

31

28
T
tructure P148
2/21/2013
0

Project Code
Date
Rev

x dia of bar
40.9
51.8
45.7

16 cu m
3.92 t
243 kg/ cum

32

28
T
tructure P148
Project Code
Date
Rev

2/21/2013
0

s special confinement reinf.)

33

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Prepared
Checked
Verified

2.0 Load Calculations


2.1 Super Structure Dead Loads

S1

S2

S3

S4 S5 S6 S7

S6

S5

S3 S2 S1

S4

Left Span
A
Idealization Of Segmental Loads
Vertical Reaction's Due to Segment Loads
Wt. of left span
Wt. of right span
Reaction on A
Reaction on B
Total Reaction

=
=

451.2 t
527 t
= 225.6 t =
= 263.5 t =
= 489.1 t =

2213.1 kN
2584.9 kN
4798.1 kN

2.2 Super Imposed Dead Load

29.3 m

30.950 m

Sidl Loading On Left & Right Spans

TOTAL SIDL
REACTION ON PIER

LEFT SPAN (A)


263.3 t
131.6 t
1291.4 kN

34

RIGHT SPAN (B)


314.3 t
+
+

157.1 t
1541.6 kN

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

35

Prepared
Checked
Verified

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Prepared
Checked
Verified

2.3 Live Loads


Possible Combinations of Live Train Loads
1. One Span One track Loaded
2. One Span Both tracks Loaded
3. Both Spans One track Loaded
4. Both Spans Both track Loaded
Case 4. Gives maximum Reactions and therefore maximum moments.

17t 17t

17t 17t

17t 17t

17t

29.3 m

17t

17t

30.95 m
Schematic Representation of Train Axle Position (Exact spacing are given in Tables below)
CG of LL from rail level
Impact Factor

=
=

Alternate 1
Maximum ReactionsLeft Span - Taking moment about C
Load
Distance
(t)
(m)
VA
29.3
17 X
30.1
17 X
27.6
17 X
23.1
17 X
20.6
17 X
8.0
17 X
5.5
17 X
1.0
0 X
0.0
0 X
0.0
0 X
0.0
0 X
0.0
0 X
0.0
0 X
0.0
119 t
VA=
= 1167kN
VC=

1.83 m
1.2

Moment
(t-m)

Axle Distance (m)

512.1
469.6
393.1
350.6
136.4
93.9
17.4
0.0
0.0
0.0
0.0
0.0
0.0
67 t
52 t

0.00
2.50
4.50
2.50
12.60
2.50
4.50
2.50
12.60
2.50
4.50
2.50
12.60
x2=
x2=

36

134.7 t
103.3 t

Cumulative Distance (m)

2.5
7
9.5
22.1
24.6
29.1
31.6
44.2
46.7
51.2
53.7
66.3
= 1321.4
= 1013.4

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

37

Prepared
Checked
Verified

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Table - Right Span - Taking moment about D


Load
Distance
Moment
(t)
(m)
(t-m)
VB
35.30
17 X
23.58
400.775
17 X
21.08
358.275
17 X
16.58
281.775
17 X
14.08
239.275
17 X
1.48
25.075
0 X
0.00
0
0 X
0.00
0
0 X
0.00
0
0 X
0.00
0
0 X
0.00
0
0 X
0.00
0
0 X
0.00
0
0 X
0.00
0
85 t
VB =
37 t
= 833.9kN
VD=
48 t

Prepared
Checked
Verified

Axle Distance (m)

Cumulative Distance (m)

0.00
11.73
2.50
4.50
2.50
12.60
2.50
4.50
2.50
12.60
2.50
4.50
2.50
12.60
x2=
x2=

73.9 t
96.1 t

12.6
15.1
19.6
22.1
34.7
37.2
41.7
44.2
56.8
59.3
63.8
66.3
78.9
= 725.4
= 942.3

Alternate 2
Maximum ReactionsLeft Span - Taking moment about C
Load
Distance
(t)
(m)
VA
29.3
17 X
30.1
17 X
27.8
17 X
22.6
17 X
20.3
17 X
8.0
17 X
5.7
0 X
0.0
0 X
0.0
0 X
0.0
0 X
0.0
0 X
0.0
0 X
0.0
0 X
0.0
102 t
VA=
= 1001kN
VC=

Moment
(t-m)

Axle Distance (m)

512.1
473.2
384.6
345.7
136.4
97.5
0.0
0.0
0.0
0.0
0.0
0.0
0.0
67 t
35 t

0.00
2.29
5.21
2.29
12.31
2.29
5.21
2.29
12.31
2.29
5.21
2.29
12.31
x2=
x2=

38

133.1 t
70.9 t

Cumulative Distance (m)

2.29
7.5
9.79
22.1
24.39
29.6
31.89
44.2
46.49
51.7
53.99
66.3
= 1305.5
= 695.8

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

39

Prepared
Checked
Verified

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

Table - Right Span - Taking moment about D


Load
Distance
Moment
(t)
(m)
(t-m)
VB
35.30
17 X
23.58
400.775
17 X
21.29
361.845
17 X
16.08
273.275
17 X
13.79
234.345
17 X
1.48
25.075
17 X
-0.82
-13.855
0 X
0.00
0
0 X
0.00
0
0 X
0.00
0
0 X
0.00
0
0 X
0.00
0
0 X
0.00
0
0 X
0.00
0
102 t
VB =
36 t
= 1000.62kN
VD=
66 t

Prepared
Checked
Verified

Axle Distance (m)


0.00
11.73
2.29
5.21
2.29
12.31
2.29
5.21
2.29
12.31
2.29
5.21
2.29
12.31
x2=
x2=

40

72.6 t
131.4 t

Cumulative Distance (m)


12.6
14.8
20.1
22.3
34.7
36.9
42.2
44.4
56.8
59.0
64.3
66.5
78.9
= 712.2
= 1289.0

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

41

Prepared
Checked
Verified

CC-28
L&T
esign of Substructure P148
Harjot
R P Sharma
Sumant

S1

IGHT SPAN (B)

S2

Project Code
Date

2/21/2013

Rev

S3 S4 S5

S6

Right Span
B

35.3 m
36.95 m

Total

= 288.8 t
= 2833.0 kN

42

CC-28
L&T
esign of Substructure P148
Harjot
R P Sharma
Sumant

Project Code

Date

2/21/2013

Rev

43

CC-28
L&T
esign of Substructure P148
Harjot
R P Sharma
Sumant

17t 17t

35.3 m

Project Code
Date

2/21/2013

Rev

17t

17t

17t

36.95 m

re given in Tables below)

Cumulative Distance (m)

2.5
7
9.5
22.1
24.6
29.1
31.6
44.2
46.7
51.2
53.7
66.3
kN
kN

44

CC-28
L&T
esign of Substructure P148
Harjot
R P Sharma
Sumant

Project Code

Date

2/21/2013

Rev

45

CC-28
L&T
esign of Substructure P148
Harjot
R P Sharma
Sumant

Project Code

Date

2/21/2013

Rev

Cumulative Distance (m)


12.6
15.1
19.6
22.1
34.7
37.2
41.7
44.2
56.8
59.3
63.8
66.3
78.9
kN
kN

Cumulative Distance (m)

2.29
7.5
9.79
22.1
24.39
29.6
31.89
44.2
46.49
51.7
53.99
66.3
kN
kN

46

CC-28
L&T
esign of Substructure P148
Harjot
R P Sharma
Sumant

Project Code

Date

2/21/2013

Rev

47

CC-28
L&T
esign of Substructure P148
Harjot
R P Sharma
Sumant

Project Code

Date

2/21/2013

Rev

Cumulative Distance (m)


12.6
14.8
20.1
22.3
34.7
36.9
42.2
44.4
56.8
59.0
64.3
66.5
78.9
kN
kN

48

CC-28
L&T
esign of Substructure P148
Harjot
R P Sharma
Sumant

Project Code

Date

2/21/2013

Rev

49

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

2.4 Estimation of Weight of Substructure


2.4a Weight of Pier Cap

1.15 m

A
Quantity

12.91

2.60 m

SHEAR
KEY

Train
C

CG of Pier cap from top =


Qty of Concrete
Unit Weight of Concrete =
Weight of Pier Cap =
Transverse ecc of pier cap wt =

0.750 m
=
18.05

25 kN/m3 =
25.00
0m

2.55
=

Shear Key height

0.85 mm

Shear Key Concrete Quantity =

1.08 m3

Wt of Shear Key =

1.08

Assumption - Bearing & Pad are made of concrete block


Weight of Pedestal
A
B
C
Quantity
0.203
0.203
0.203
Wt (kN)
5.06
5.06
5.06

25.00

D
0.203
5.06

2.4b Weight of Pier

Pier Diameter D
Pier Concrete

=
=

Cross Sectional Area of Pier

Pier Cap height


Pier height Excluding Cap

=
=

Volume of Pier
Weight of Pier

=
=

Height
Top Thickness

=
=

Crash Barrier
2.4c Weight of Crash Barrier

50

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

Bottom Thickness
Gap

=
=

Cross Sectional Area


Outer Periphery
Inner Periphery
Mean Periphery
Weight of Crash Barrier for Pier

=
=
=
=
=

2.4d Weight of Pile Cap

4.5

7.5
Thickness of Pile Cap

Area of Pile Cap

Volume of Pile cap


Wt of Pile cap

=
=

Pier

Soil Layer
GL

Pile Cap

Pile

2.4e Weight of soil above pile cap


Depth of Pile Cap Below Ground

Soil Density

Pier Area

Quantity of Pier Concrete from G.L to Pile Cap Top

Total Quantity of Soil & Pier Concrete Above Pile Cap

Net Quantity of Soil Above Pile Cap


Wt. of Soil Above Pile Cap

=
=

51

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

52

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

ucture P148
-

Project Code
Date

2/21/2013

Rev

B
SHEAR
KEY

1.1 m

18.05 m3
t/m3
451.3 kN

26.9 kN

2.1 m
M 50
3.46 m2
1.8 m
4.7 m
16.2 m3
403.8 kN

1.5 m
0.225 m

53

ucture P148
-

Project Code
Date

2/21/2013

Rev

0.225 m
0.025 m
0.338 m2
8.17 m
6.75 m
7.46 m
63.0 kN

1.5 m
33.75 m2
50.625 m3
1265.6 kN

0.5 m
20.00 kN/m3
3.63 m2
1.82 m3
16.9 m3
15.1 m3
301.2 kN

54

ucture P148
Project Code

Date

2/21/2013

Rev

55

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

2.5 Longitudinal Forces


Estimation of Braking & Tractive Forces
As per Clause 2.8.2.1 of Design Basis Report
Braking Force
Tractive Force

=
=

18 %
20 %

since both the tracks are supported by a single box girder, hence tractive force of one track and braking
force of another track will be taken in the same direction to produce worst condition of loading.
Governing Condition

Axle Load

Braking Force Tractive Force

kN
1167

Case -4 Both Spans Both Track Loaded

kN
210.1

kN
233.5

2.6 Estimation of LWR Force


As per Clause 2.6.1 Design Basis Report
LWR Intensity
Fixed Span Length
LWR FORCE

=
=
=

1.6
31.00
486.6

2.7 Effects due to Centrifugal Forces


Eccentricity of Dead Loads due to Curvature Effect
Radius of Curvature Left R1
Radius of Curvature Right R2
Length of span at left of Pier L1
Length of span at right of Pier L2

=
=
=
=

Angle (1) (Left Span) = L1/(2R1)


Angle (2) (Right Span) = L2/(2R2)
Eccentricity (e1) = R1 { (Sin 1)/ 1 - Cos 1}
=
Eccentricity (e2) = R2 { (Sin 2)/ 2 - Cos 2}
=

404.1 m
404.1 m
30.95 m
36.95 m

2.19
2.62

Left

0.20 m
0.28 m

Centrifugal Force for Spans in Curvature


Both Spans one track loaded
Velocity
(V)

Radius of curvature (m)


Left

Right

56

Left Span
W

Right Span
CF

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

(km/hr)
80

(m)
404.1

(m)
404.1

57

Prepared
Checked
Verified

(kN)
1321

(kN)
164.78

Harjot
R P Sharma
Sumant

(kN)
725

8
T
ucture P148
-

Project Code
Date

2/21/2013

Rev

Total
kN
443.6

t/m
m
kN

Right

Right Span
CF

58

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

(kN)
90.46

59

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

2.8 Estimation of Seismic Forces for Pier


(As per IITK-RDSO Guidelines for Seismic Design of Railway Bridges)
(z/2).(Sa/g)h
h
=
(R/I)
(2/3)(z/2).(Sa/g)v
v
=
(R/I)
Where
Zone Factor

0.24

Response Reduction Factor


Importance Factor
Average Response Acceleration coefficient

(Delhi lies in Seismic Zone IV)

R
=
2.5
I
=
1.5
(Sa/g)h
=
1.36 /T
(As per Cl.2.5.1.2 of DBR, medium soil site, Type II soil)

Estimation of Time Period

Time period is calculated with "Rayleigh Frequency" from STAAD. Pier, pile cap and piles are modeled with soil stiffness as spri
are lumped in longitudinal (x) and transverse (z) directions. 75% of inertia (as cracked section) is taken for pier and pile. Dynami
are taken. Soil springs are calculated in Appendix-1. STAAD Input and Output files are attached in Appendix-2.
Summary of Longitudinal Seismic Coefficients
Loads at top of Loads at bot. of
Height (L)
Pier
Pier
Pier No.
m
kN
kN
148
6.463
7631.1
63.0
Loads at top of pier = Wt. of (DL of Superstr+SIDL)
Loads at bottom of pier = Wt of (Crash barrier)

Frequency
from Staad
1/sec
1.530

Time period

Sa/g

sec
0.65

2.08

Summary of Transverse Seismic Coefficients


Loads at top of Loads at bot. of
Frequency
Height (L)
Time period
Pier
Pier
from Staad
Pier No.
m
kN
kN
1/sec
sec
148
6.463
8142.8
63.0
1.280
0.78
% of LL taken in calculations =
25 %
Loads at top of pier = Wt. of (DL of Superstr+SIDL+LL), Pier cap wt is applied at its CG.
Loads at bottom of pier = Wt of (Crash barrier)

Shear Key

Loads
26.9 kN

Level (m)
0.550

Pedestal

20.25 kN

0.125
0.00

Sa/g
1.74

Pier Cap Top

(Wt of DL, SIDL, LL are applied at shear key, other weights are applied at their CG.)

60

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

As per 8.8 IITK-RDSO - The seismic zone factor for vertical ground motions, when required (see clause
6.8.1), may be taken as two-thirds of that for horizontal motions given table 3.
6.8.1 - Vertical Component of Seismic Action
In some cases, the effect of vertical component of ground motion has to be specifically considered. The
effect of vertical component is particularly imortant in following components/situations:
a. Prestressed concrete decks.
b. Bearings, hold down devices, and linkages.
c. Horizontal cantilever structural elements such as cantilevers of deck slabs and cantilever bridges.
d. Situations where stability (overturning / sliding ) become critical.
e. Bridge sites located near fault.
In pile foundation Stability is not critical (and other cases are not applicable) therefore
v

0.0999

Estimation of Seismic Forces


Seismic Forces from Superstructure
Load Type

DL
SIDL
LIVE

Reaction from
Left Span
kN
2213.1
1291.4
1321.4

Longitudinal Seismic (r1)

Right Span
kN
2584.9
1541.6
725.4

Transverse Seismic (r2)

Left Span
kN
663.3
387.1
0.0

Right Span
kN
0.0
0.0
0.0

Left Span
kN
277.5
161.9
82.8

Non Seismic
Weights

Longitudinal
Seismic (r1)

Transverse
Seismic (r2)

Vertical
Seismic (r3)

kN
26.9
20.25
451.3
403.8
63.0
301.2
1265.6

kN
4.03
3.03
67.63
60.51
9.43
45.14
189.67

kN
3.37
2.54
56.58
50.63
7.89
37.76
158.69

kN
2.69
2.02
45.08
40.34
6.29
30.09
126.45

Seismic Forces Due to Substructure

Load Type

Shear Key
Pedestal
Pier Cap
Pier
Pier Crash Barrier
Soil above Pile cap
Pile cap
2.9 Wind Load
Intensity given in D.B.R
Exposed Area

1.609 kN/m3
3.5 m
1.6 m

Train height
Parapet height

61

Right Span
kN
324.1
193.3
45.5

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

Prepared
Checked
Verified

Segments
2.25 m
Span
=
34 m Both Side
Wind Load
=
402.1 kN
Seismic Transverse Reaction
=
4743.4 kN
Governing Case - Transverse Seismic, So wind is not considered in further calculations.

62

Harjot
R P Sharma
Sumant

cture P148
Project Code

Date

2/21/2013

Rev

smic Zone IV)

um soil site, Type II soil)

deled with soil stiffness as springs. Loads


aken for pier and pile. Dynamic soil springs
Appendix-2.

hL
0.150

hT
0.125

63

cture P148
Project Code

Date

2/21/2013

Rev

Vertical Seismic (r3)


Left Span
kN
221.1
129.0
66.0

Right Span
kN
258.3
154.0
36.2

64

cture P148
Project Code

Date

2/21/2013

Rev

65

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

3.0 SLS Cases


3.1 SLS Case
Factors:

G-I
DL
SIDL
LL
Temp.
Earthquake

(Cracking + Stresses)
1.0
1.2
1.1
0.0
0.0

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

(Normal Case)

FORCES AT PIER BOTTOM

1. DEAD LOADS
DL Left Span
DL Right Span
Shear Key
Pedestal
A
B
C
D
Pier Cap
Pier
2. SIDL
SIDL Left Span
SIDL Right Span

V
kN
2213.1
2584.9
26.9

eL
m
0.85
-0.85
0.00

eT
m
0.20
0.28
0.00

ML
kN.m
1881.2
-2197.2
0.0

MT
kN.m
437.1
727.6
0.0

5.1
5.1
5.1
5.1
451.3
403.8

0.85
-0.85
0.85
-0.85
0.00
0.00

1.30
1.30
-1.30
-1.30
0.00
0.00

4.3
-4.3
4.3
-4.3
0.0
0.0

21.8
-21.8
21.8
-21.8
0.0
0.0

1549.7
1849.9
9099.8

0.85
-0.85

0.20
0.28

1317.3
-1572.4
-571.2

306.1
520.7
1991.6

V
kN
1744.2
957.6

eL
m
0.85
-0.85

eT
m
0.20
0.28
HL
kN
488.0
0.0
HT
kN
181.3
99.5

ML
kN.m
1482.6
-813.9
eL1
m
6.7
6.7
eT1
m
11.3
11.3

MT
kN.m
344.5
269.5
ML1
kN.m
3275.7
0.0
MT1
kN.m
2043.1
1121.7

3. LIVE LOADS
Case IV - Both Spans Both tracks

Live Left Span


Live Right Span
braking, Tractive & LWR Forces
Case IV - Both Spans Both tracks
LWR Force
Centrifugal Forces (Pier)
Case IV - Both Spans Both tracks

66

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

Forces at Different Heights from Pier Base


Lever arm for
Ht from Pier Reduction in
Longitud.
Centrifugal
Base
Pier Wt.
Loads
force
m
kN
m
m
0
0.0
6.7
11.3
2.6
225.1
4.1
8.7
3.6
311.7
3.1
7.7
4
346.4
2.7
7.3
4.5
389.7
2.2
6.8
4.66
403.8
2.1
6.6
4.66
403.8
2.1
6.6
4.663
403.8
2.1
6.6
4.663
403.8
2.1
6.6

Forces for Comb. SLS G I


Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.66
4.66
4.663
4.663

Prepared
Checked
Verified

(ML1) Moment due to


Braking/
LWR
Tractive
kN.m
kN.m
3275.7
0.0
2007.0
0.0
1519.0
0.0
1323.9
0.0
1079.9
0.0
1000.3
0.0
1000.3
0.0
1000.3
0.0
1000.3
0.0

Harjot
R P Sharma
Sumant

(MT1) Moment due to


CF (Span1)
kN.m
2043.1
1571.9
1390.6
1318.1
1227.5
1197.9
1197.9
1197.9
1197.9

MR = (ML^2+MT^2)^0.5
HR = (HL^2+HT^2)^0.5
Vertical Load,
P
kN
11801.6
11576.4
11489.9
11455.2
11411.9
11397.8
11397.8
11397.8
11397.8

HL

HT

ML

MT

kN
488.0
488.0
488.0
488.0
488.0
488.0
488.0
488.0
488.0

kN
280.8
280.8
280.8
280.8
280.8
280.8
280.8
280.8
280.8

kN.m
3373.2
2104.5
1616.5
1421.3
1177.3
1097.8
1097.8
1097.8
1097.8

kN.m
5770.5
5040.5
4759.7
4647.4
4507.0
4461.2
4461.2
4461.2
4461.2

67

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

68

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

cture P148
Project Code

Date

2/21/2013

Rev

69

cture P148
Project Code

Date

2/21/2013

Rev

MT1) Moment due to


CF (Span2)
kN.m
1121.7
863.0
763.5
723.6
673.9
657.7
657.7
657.7
657.7

MR
kN.m
6684.0
5462.1
5026.7
4859.9
4658.2
4594.3
4594.3
4594.3
4594.3

70

cture P148
Project Code

Date

2/21/2013

Rev

71

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

3.2 SLS Case


Factors:

G-II b
DL
SIDL
LL
Temp.
Earthquake

( Stresses)
1.0
1.2
1.0
0.0
1.0

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

(Seismic Case)

Non Seismic Forces at Pier Bottom

1. DEAD LOADS
DL Left Span
DL Right Span
Shear Key
Pedestal
A
B
C
D
Pier Cap
Pier
2. SIDL
SIDL Left Span
SIDL Right Span

V
kN
2213.1
2584.9
26.9

eL
m
0.85
-0.85
0.00

eT
m
0.20
0.28
0.00

ML
kN.m
1881.2
-2197.2
0.0

MT
kN.m
437.1
727.6
0.0

5.1
5.1
5.1
5.1
451.3
403.8

0.85
-0.85
0.85
-0.85
0.00
0.00

1.30
1.30
-1.30
-1.30
0.00
0.00

4.3
-4.3
4.3
-4.3
0.0
0.0

21.8
-21.8
21.8
-21.8
0.0
0.0

1549.7
1849.9
9099.8

0.85
-0.85

0.20
0.28

1317.3
-1572.4
-571.2

306.1
520.7
1991.6

V
kN
1585.6
870.5

eL
m
0.85
-0.85

eT
m
0.20
0.28
HL
kN
443.6
0.0
HT
kN
164.8
90.5

ML
kN.m
1347.8
-739.9
eL1
m
6.7
6.7
eT1
m
11.3
11.3

MT
kN.m
313.2
245.0
ML1
kN.m
2977.9
0.0
MT1
kN.m
1857.4
1019.7

3. LIVE LOADS
Case IV - Both Spans Both tracks

Live Left Span


Live Right Span
braking, Tractive & LWR Forces
Case IV - Both Spans Both tracks
LWR Force
Centrifugal Forces (Pier)
Case IV - Both Spans Both tracks

72

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

Seismic Forces at Pier Bottom


Vertical Seismic Forces (r3)
FY
kN
221.1
129.0
258.3
154.0
2.7
66.0
36.2
0.51
0.51
0.51
0.51
45.1
40.3

DL Left Span
SIDL Left Span
DL Right Span
SIDL Right Span
Shear Key
Live Left Span
Live Right Span
Pedestal
A
B
C
D
Pier Cap
Pier

eL
m
0.85
0.85
-0.85
-0.85
0.00
0.85
-0.85
0.85
-0.85
0.85
-0.85
0.0
0.0

eT
m
0.20
0.20
0.28
0.28
0.00
0.20
0.28
1.30
1.30
-1.30
-1.30
0.0
0.0

954.8
Horizontal Seismic Forces
DL
SIDL
Live Load
Shear Key
Pedestal
Pier Cap
Pier
Total

Longitudinal Seismic Forces (r1)


HL-r1
eL1
ML-r1
kN
m
kN.m
663.33
6.71
4452.95
387.07
6.71
2598.42
0.00
11.27
0.00
4.03
6.89
27.75
3.03
6.59
19.99
67.63
5.71
386.34
60.51
2.33
141.08
1185.6

7626.5

ML-r3
kN.m
187.9
109.7
-219.5
-130.9
0.0
56.1
-30.8
0.43
-0.43
0.43
-0.43
0.0
0.0

MT-r3
kN.m
43.67
25.48
72.70
43.35
0.00
13.0
10.2
0.66
0.66
-0.66
-0.66
0.0
0.0

-27.5

208.4

Transverse Seismic Forces (r2)


HT-r2
eT1
kN
m
601.60
8.01
355.21
9.56
128.32
11.27
3.37
6.89
2.54
6.59
56.58
5.71
50.63
2.33
1198.2

Non Seismic Forces at Different Heights


Ht from Pier
Base

Reduction in
Pier Wt.

m
0
2.6
3.6
4
4.5
4.663
4.663
4.663

kN
0.0
225.1
311.7
346.4
389.7
403.8
403.8
403.8

Lever arm for


(ML) Moment due to
Longitud.
Centrifugal
Braking/
LWR
Loads
force
Tractive
m
m
kN.m
kN.m
6.7
11.3
2977.9
0.0
4.1
8.7
1824.6
0.0
3.1
7.7
1381.0
0.0
2.7
7.3
1203.5
0.0
2.2
6.8
981.7
0.0
2.1
6.6
909.4
0.0
2.1
6.6
909.4
0.0
2.1
6.6
909.4
0.0

73

(MT) Moment due to


CF (Span1)
kN.m
1857.4
1429.0
1264.2
1198.3
1115.9
1089.0
1089.0
1089.0

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

4.663

403.8

2.1

6.6

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

909.4

0.0

1089.0

Lever Arm For


Shear Key
m
6.9
4.3
3.3
2.9
2.4
2.2
2.2
2.2
2.2

Bearings
m
6.6
4.0
3.0
2.6
2.1
1.9
1.9
1.9
1.9

Pier Cap
m
5.7
3.1
2.1
1.7
1.2
1.1
1.1
1.1
1.1

Moment (ML-r1) due to


Shear Key
Bearings
kN.m
kN.m
27.7
20.0
17.3
12.1
13.2
9.1
11.6
7.9
9.6
6.3
9.0
5.8
9.0
5.8
9.0
5.8
9.0
5.8

Pier Cap
kN.m
386.3
210.5
142.9
115.8
82.0
71.0
71.0
71.0
71.0

Longitudinal Seismic Forces (r1) at Different Heights


Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663

DL
m
6.7
4.1
3.1
2.7
2.2
2.1
2.1
2.1
2.1

SIDL
m
6.7
4.1
3.1
2.7
2.2
2.1
2.1
2.1
2.1

LL
m
11.3
8.7
7.7
7.3
6.8
6.6
6.6
6.6
6.6

Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663

DL
kN.m
4453.0
2728.3
2065.0
1799.6
1468.0
1359.8
1359.8
1359.8
1359.8

SIDL
kN.m
2598.4
1592.0
1205.0
1050.1
856.6
793.5
793.5
793.5
793.5

LL
kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Transverse Seismic Forces (r2) at Different Heights


Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663

DL
m
8.0
5.4
4.4
4.0
3.5
3.3
3.3
3.3
3.3

SIDL
m
9.6
7.0
6.0
5.6
5.1
4.9
4.9
4.9
4.9

LL
m
11.3
8.7
7.7
7.3
6.8
6.6
6.6
6.6
6.6

74

Lever Arm For


Shear Key
m
6.9
4.3
3.3
2.9
2.4
2.2
2.2
2.2
2.2

Bearings
m
6.6
4.0
3.0
2.6
2.1
1.9
1.9
1.9
1.9

Pier Cap
m
5.7
3.1
2.1
1.7
1.2
1.1
1.1
1.1
1.1

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663

DL
kN.m
4817.0
3252.8
2651.2
2410.6
2109.8
2011.7
2011.7
2011.7
2011.7

SIDL
kN.m
3396.5
2473.0
2117.8
1975.7
1798.1
1740.2
1740.2
1740.2
1740.2

Seismic Combinations:

LL
kN.m
1446.4
1112.8
984.4
933.1
869.0
848.0
848.0
848.0
848.0
Comb.1
Comb.2
Comb.3
Comb.4

Prepared
Checked
Verified

Moment (MT-r2) due to


Shear Key
Bearings
kN.m
kN.m
23.2
16.7
14.5
10.1
11.1
7.6
9.7
6.6
8.0
5.3
7.5
4.9
7.5
4.9
7.5
4.9
7.5
4.9

Harjot
R P Sharma
Sumant

Pier Cap
kN.m
323.2
176.1
119.6
96.9
68.6
59.4
59.4
59.4
59.4

r1
r2
r3
- r3

MR = (ML^2+MT^2)^0.5
HR = (HL^2+HT^2)^0.5
SLS G IIb Comb.1
Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663

Vertical Load,
P
kN
10327.9
10389.2
10302.6
10268.0
10224.7
10210.6
10210.6
10210.6
10210.6

SLS G IIb Comb.2


Ht from Pier
Base
m
0
2.6

Vertical Load,
P
kN
10327.9
9816.3

HL

HT

ML

MT

kN
1407.4
1373.7
1360.7
1355.5
1349.0
1346.9
1346.9
1346.9
1346.9

kN
127.6
127.6
127.6
127.6
127.6
127.6
127.6
127.6
127.6

kN.m
8848.2
5232.8
3865.7
3322.4
2646.3
2426.6
2426.6
2426.6
2426.6

kN.m
3709.2
3377.4
3249.8
3198.8
3134.9
3114.1
3114.1
3114.1
3114.1

HL

HT

ML

MT

kN
221.8
221.8

kN
1325.9
1297.6

kN.m
1221.7
645.0

kN.m
13850.4
10439.8

75

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

3.6
4
4.5
4.663
4.663
4.663
4.663

9729.7
9695.1
9651.8
9637.7
9637.7
9637.7
9637.7

SLS G IIb Comb.3


Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663

Vertical Load,
P
kN
11282.7
10389.2
10302.6
10268.0
10224.7
10210.6
10210.6
10210.6
10210.6

SLS G IIb Comb.4


Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663

Vertical Load,
P
kN
9373.1
9816.3
9729.7
9695.1
9651.8
9637.7
9637.7
9637.7
9637.7

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

221.8
221.8
221.8
221.8
221.8
221.8
221.8

1286.8
1282.4
1277.0
1275.2
1275.2
1275.2
1275.2

423.2
334.5
223.6
187.4
187.4
187.4
187.4

9147.6
8633.8
7993.9
7785.9
7785.9
7785.9
7785.9

HL

HT

ML

MT

kN
221.8
221.8
221.8
221.8
221.8
221.8
221.8
221.8
221.8

kN
127.6
127.6
127.6
127.6
127.6
127.6
127.6
127.6
127.6

kN.m
1194.2
617.5
395.7
307.0
196.1
159.9
159.9
159.9
159.9

kN.m
3917.7
3585.9
3458.2
3407.2
3343.4
3322.6
3322.6
3322.6
3322.6

HL

HT

ML

MT

kN
221.8
221.8
221.8
221.8
221.8
221.8
221.8
221.8
221.8

kN
127.6
127.6
127.6
127.6
127.6
127.6
127.6
127.6
127.6

kN.m
1249.2
672.5
450.7
362.0
251.1
214.9
214.9
214.9
214.9

kN.m
3500.8
3169.0
3041.4
2990.3
2926.5
2905.7
2905.7
2905.7
2905.7

76

8
T
ructure P148
Project Code

Date

2/21/2013

Rev

77

8
T
ructure P148
Project Code

Date

2/21/2013

Rev

MT-r2
kN.m
4817.01
3396.54
1446.38
23.22
16.73
323.24
118.03
10141.1

MT) Moment due to


CF (Span2)
kN.m
1019.7
784.5
694.0
657.9
612.6
597.9
597.9
597.9

78

8
T
ructure P148
Project Code

Date

2/21/2013

Rev

597.9

Pier
m
2.3
1.0
0.5
0.3
0.1
0.0
0.0
0.0
0.0

Pier
kN.m
141.1
27.6
7.3
2.9
0.2
0.0
0.0
0.0
0.0

Pier
m
2.3
1.0
0.5
0.3
0.1
0.0
0.0
0.0
0.0

HL-r1 for pier


kN
60.5
26.8
13.8
8.6
2.1
0.0
0.0
0.0
0.0
Total Moment
kN.m
7626.5
4587.8
3442.5
2987.9
2422.7
2239.1
2239.1
2239.1
2239.1

HL-r1 for pier


kN
50.6
22.4
11.5
7.2
1.8
0.0
0.0
0.0
0.0

79

8
T
ructure P148
Project Code

Date

2/21/2013

Rev

Pier
kN.m
118.0
23.1
6.1
2.4
0.1
0.0
0.0
0.0
0.0

Total Moment
kN.m
10141.1
7062.4
5897.8
5435.0
4859.0
4671.8
4671.8
4671.8
4671.8

MR
kN.m
9594.3
6228.1
5050.2
4612.0
4102.5
3947.9
3947.9
3947.9
3947.9

MR
kN.m
13904.2
10459.7

80

8
T
ructure P148
Project Code

Date

2/21/2013

Rev

9157.4
8640.3
7997.0
7788.2
7788.2
7788.2
7788.2

MR
kN.m
4095.7
3638.7
3480.8
3421.0
3349.1
3326.4
3326.4
3326.4
3326.4

MR
kN.m
3717.0
3239.6
3074.6
3012.1
2937.3
2913.6
2913.6
2913.6
2913.6

81

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

3.3 SLS Case


Factors:

G-III
DL
SIDL
LL
Temp.
Earthquake

( Stresses)
1.0
1.2
1.0
1.0
0.0

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

(LWR Case)

FORCES AT PIER BOTTOM

1. DEAD LOADS
DL Left Span
DL Right Span
Shear Key
Pedestal
A
B
C
D
Pier Cap
Pier
2. SIDL
SIDL Left Span
SIDL Right Span

V
kN
2213.1
2584.9
26.9

eL
m
0.85
-0.85
0.00

eT
m
0.20
0.28
0.00

ML
kN.m
1881.2
-2197.2
0.0

MT
kN.m
437.1
727.6
0.0

5.1
5.1
5.1
5.1
451.3
403.8

0.85
-0.85
0.85
-0.85
0.00
0.00

1.30
1.30
-1.30
-1.30
0.00
0.00

4.3
-4.3
4.3
-4.3
0.0
0.0

21.8
-21.8
21.8
-21.8
0.0
0.0

1549.7
1849.9
9099.8

0.85
-0.85

0.20
0.28

1317.3
-1572.4
-571.2

306.1
520.7
1991.6

V
kN
792.8
435.3

eL
m
0.85
-0.85

eT
m
0.20
0.28
HL
kN
221.8
486.6
HT
kN
82.4
45.2

ML
kN.m
673.9
-370.0
eL1
m
6.7
6.7
eT1
m
11.3
11.3

MT
kN.m
156.6
122.5
ML1
kN.m
1489.0
3266.4
MT1
kN.m
928.7
509.9

3. LIVE LOADS
Case IV - Both Spans Both tracks

Live Left Span


Live Right Span
braking, Tractive & LWR Forces
Case IV - Both Spans Both tracks
LWR Force
Centrifugal Forces (Pier)
Case IV - Both Spans Both tracks

82

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

Forces at Different Heights from Pier Base


Lever arm for
Ht from Pier Reduction in
Longitude.
Centrifugal
Base
Pier Wt.
Loads
force
m
kN
m
m
0
0.0
6.7
11.3
2.6
225.1
4.1
8.7
3.6
311.7
3.1
7.7
4
346.4
2.7
7.3
4.5
389.7
2.2
6.8
4.66
403.8
2.1
6.6
4.66
403.8
2.1
6.6
4.663
403.8
2.1
6.6
4.663
403.8
2.1
6.6

Forces for Comb. SLS G III


Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663

Prepared
Checked
Verified

(ML1) Moment due to


Braking/
LWR
Tractive
kN.m
kN.m
1489.0
3266.4
912.3
2001.3
690.5
1514.7
601.8
1320.1
490.9
1076.8
454.7
997.5
454.7
997.5
454.7
997.5
454.7
997.5

Harjot
R P Sharma
Sumant

(MT1) Moment due to


CF (Span1)
kN.m
928.7
714.5
632.1
599.1
557.9
544.5
544.5
544.5
544.5
MR = (ML^2+MT^2)^0.5
HR = (HL^2+HT^2)^0.5

Vertical Load,
P
kN
10327.9
10102.8
10016.2
9981.5
9938.2
9924.1
9924.1
9924.1
9924.1

HL

HT

ML

MT

kN
708.4
708.4
708.4
708.4
708.4
708.4
708.4
708.4
708.4

kN
127.6
127.6
127.6
127.6
127.6
127.6
127.6
127.6
127.6

kN.m
4488.1
2646.3
1937.9
1654.6
1300.4
1184.9
1184.9
1184.9
1184.9

kN.m
3709.2
3377.4
3249.8
3198.8
3134.9
3114.1
3114.1
3114.1
3114.1

83

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

84

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

8
T
ucture P148
Project Code
Date
Rev

2/21/2013
0

85

8
T
ucture P148
Project Code
Date
Rev

2/21/2013
0

MT1) Moment due to


CF (Span2)
kN.m
509.9
392.3
347.0
328.9
306.3
298.9
298.9
298.9
298.9

R = (ML^2+MT^2)^0.5
R = (HL^2+HT^2)^0.5
MR
kN.m
5822.5
4290.7
3783.8
3601.3
3393.9
3332.0
3332.0
3332.0
3332.0

86

8
T
ucture P148
Project Code
Date
Rev

2/21/2013
0

87

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

4.0 ULS Cases


4.1 ULS Case
Factors:

G-I
DL
SIDL
LL
Temp.
Earthquake

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

(Normal Case)
1.25
2.00
1.75
0.00

FORCES AT PIER BOTTOM

1. DEAD LOADS
DL Left Span
DL Right Span
Shear Key
Pedestal
A
B
C
D
Pier Cap
Pier
2. SIDL
SIDL Left Span
SIDL Right Span

V
kN
2766.4
3231.2
33.6

eL
m
0.85
-0.85
0.00

eT
m
0.20
0.28
0.00

ML
kN.m
2351.5
-2746.5
0.0

MT
kN.m
546.4
909.6
0.0

6.3
6.3
6.3
6.3
564.1
504.7

0.85
-0.85
0.85
-0.85
0.00
0.00

1.30
1.30
-1.30
-1.30
0.00
0.00

5.4
-5.4
5.4
-5.4
0.0
0.0

34.0
-34.0
34.0
-34.0
0.0
0.0

2582.9
3083.2
12791.3

0.85
-0.85

0.20
0.28

2195.4
-2620.7
-820.3

510.1
867.9
2834.0

V
kN
2774.8
1523.4

eL
m
0.85
-0.85

eT
m
0.20
0.28
HL
kN
776.3
0.0
HT
kN
288.4
158.3

ML
kN.m
2358.6
-1294.9
eL1
m
6.7
6.7
eT1
m
11.3
11.3

MT
kN.m
548.1
428.8
ML1
kN.m
5211.4
0.0
MT1
kN.m
3250.5
1784.5

3. LIVE LOADS
Case IV - Both Spans Both tracks

Live Left Span


Live Right Span
braking, Tractive & LWR Forces
Case IV - Both Spans Both tracks
LWR Force
Centrifugal Forces (Pier)
Case IV - Both Spans Both tracks

88

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Forces at Different Heights from Pier Base


Lever arm for
Ht from Pier Reduction in
Longitud.
Centrifugal
Base
Pier Wt.
Loads
force
m
kN
m
m
0
0.0
6.7
11.3
2.6
281.4
4.1
8.7
3.6
389.7
3.1
7.7
4
433.0
2.7
7.3
4.5
487.1
2.2
6.8
4.663
504.7
2.1
6.6
4.663
504.7
2.1
6.6
4.663
504.7
2.1
6.6
4.663
504.7
2.1
6.6

Prepared
Checked
Verified

(ML1) Moment due to


Braking/
LWR
Tractive
kN.m
kN.m
5211.4
0.0
3193.0
0.0
2416.7
0.0
2106.1
0.0
1718.0
0.0
1591.4
0.0
1591.4
0.0
1591.4
0.0
1591.4
0.0

Forces for Comb. ULS G I


Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663

Vertical Load,
P
kN
17089.5
16808.1
16699.9
16656.6
16602.5
16584.8
16584.8
16584.8
16584.8

Harjot
R P Sharma
Sumant

(MT1) Moment due to


CF (Span1)
kN.m
3250.5
2500.7
2212.3
2097.0
1952.8
1905.8
1905.8
1905.8
1905.8

HR = (HL^2+HT^2)^0.5
MR = (ML^2+MT^2)^0.5 + MR_slender
MR_slender

HL

HT

ML

MT

kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

kN
776.3
776.3
776.3
776.3
776.3
776.3
776.3
776.3
776.3

kN
446.7
446.7
446.7
446.7
446.7
446.7
446.7
446.7
446.7

kN.m
5454.8
3436.4
2660.1
2349.6
1961.4
1834.9
1834.9
1834.9
1834.9

kN.m
8845.8
7684.5
7237.8
7059.1
6835.8
6763.0
6763.0
6763.0
6763.0

89

ucture P148
Project Code

Date

2/21/2013

Rev

90

ucture P148
Project Code

Date

2/21/2013

Rev

MT1) Moment due to


CF (Span2)
kN.m
1784.5
1372.9
1214.6
1151.3
1072.1
1046.3
1046.3
1046.3
1046.3

T^2)^0.5 + MR_slender
MR

HR

kN.m
10392.5
8417.8
7711.1
7439.9
7111.6
7007.5
7007.5
7007.5
7007.5

kN
895.6
895.6
895.6
895.6
895.6
895.6
895.6
895.6
895.6

91

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

4.2 ULS Case


Factors:

G-II a
DL
SIDL
LL
Temp.
Earthquake

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

(Seismic Case)
1.25
2.00
0.00
1.60

Non Seismic Forces at Pier Bottom

1. DEAD LOADS
DL Left Span
DL Right Span
Shear Key
Pedestal
A
B
C
D
Pier Cap
Pier
2. SIDL
SIDL Left Span
SIDL Right Span

V
kN
2766.4
3231.2
33.6

eL
m
0.85
-0.85
0.00

eT
m
0.20
0.28
0.00

ML
kN.m
2351.5
-2746.5
0.0

MT
kN.m
546.4
909.6
0.0

6.3
6.3
6.3
6.3
564.1
504.7

0.85
-0.85
0.85
-0.85
0.00
0.00

1.30
1.30
-1.30
-1.30
0.00
0.00

5.4
-5.4
5.4
-5.4
0.0
0.0

34.0
-34.0
34.0
-34.0
0.0
0.0

2582.9
3083.2
12791.3

0.85
-0.85

0.20
0.28

2195.4
-2620.7
-820.3

510.1
867.9
2834.0

V
kN
0.0
0.0

eL
m
0.85
-0.85

eT
m
0.20
0.28
HL
kN
0.0
0.0
HT
kN
0.0
0.0

ML
kN.m
0.0
0.0
eL1
m
6.7
6.7
eT1
m
11.3
11.3

MT
kN.m
0.0
0.0
ML1
kN.m
0.0
0.0
MT1
kN.m
0.0
0.0

3. LIVE LOADS
Case IV - Both Spans Both tracks

Live Left Span


Live Right Span
braking, Tractive & LWR Forces
Case IV - Both Spans Both tracks
LWR Force
Centrifugal Forces (Pier)
Case IV - Both Spans Both tracks

92

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

Seismic Forces at Pier Bottom


Vertical Seismic Forces (r3)
Forces-Seismic (Pier)
DL Left Span
SIDL Left Span
DL Right Span
SIDL Right Span
Shear Key
Live Left Span
Live Right Span
Pedestal
A
B
C
D
Pier Cap
Pier

FY
kN
353.8
206.4
413.2
246.4
4.3
105.6
58.0
0.81
0.81
0.81
0.81
72.1
64.5

eL
m
0.85
0.85
-0.85
-0.85
0.00
0.85
-0.85
0.85
-0.85
0.85
-0.85
0.0
0.0

eT
m
0.20
0.20
0.28
0.28
0.00
0.20
0.28
1.30
1.30
-1.30
-1.30
0.0
0.0

1527.7
Horizontal Seismic Forces
DL
SIDL
Live Load
Shear Key
Pedestal
Pier Cap
Pier
Total

Longitudinal Seismic Forces (r1)


HL-r1
eL1
ML-r1
kN
m
kN.m
1061.33
6.71
7124.73
619.32
6.71
4157.47
0.00
11.27
0.00
6.45
6.89
44.40
4.86
6.59
31.99
108.20
5.71
618.15
96.82
2.33
225.73
1897.0

12202.5

ML-r3
kN.m
300.7
175.5
-351.2
-209.5
0.0
89.8
-49.3
0.69
-0.69
0.69
-0.69
0.0
0.0

MT-r3
kN.m
69.87
40.77
116.32
69.37
0.00
20.9
16.3
1.05
1.05
-1.05
-1.05
0.0
0.0

-44.0

333.5

Transverse Seismic Forces (r2)


HT-r2
eT1
kN
m
962.56
8.01
568.34
9.56
205.31
11.27
5.39
6.89
4.06
6.59
90.53
5.71
81.00
2.33
1917.2

Non Seismic Forces at Different Heights


Ht from Pier
Base

Reduction in
Pier Wt.

m
0
2.6
3.6
4
4.5
4.663
4.663
4.663

kN
0.0
281.4
389.7
433.0
487.1
504.7
504.7
504.7

Lever arm for


(ML) Moment due to
Longitud.
Centrifugal
Braking/
LWR
Loads
force
Tractive
m
m
kN.m
kN.m
6.7
11.3
0.0
0.0
4.1
8.7
0.0
0.0
3.1
7.7
0.0
0.0
2.7
7.3
0.0
0.0
2.2
6.8
0.0
0.0
2.1
6.6
0.0
0.0
2.1
6.6
0.0
0.0
2.1
6.6
0.0
0.0

93

(MT) Moment due to


CF (Span1)
kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

4.663

504.7

2.1

6.6

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

0.0

0.0

0.0

Lever Arm For


Shear Key
m
6.9
4.3
3.3
2.9
2.4
2.2
2.2
2.2
2.2

Bearings
m
6.6
4.0
3.0
2.6
2.1
1.9
1.9
1.9
1.9

Pier Cap
m
5.7
3.1
2.1
1.7
1.2
1.1
1.1
1.1
1.1

Moment (ML-r1) due to


Shear Key
Bearings
kN.m
kN.m
44.4
32.0
27.6
19.4
21.2
14.5
18.6
12.6
15.4
10.1
14.3
9.3
14.3
9.3
14.3
9.3
14.3
9.3

Pier Cap
kN.m
618.2
336.8
228.6
185.3
131.2
113.6
113.6
113.6
113.6

Longitudinal Seismic Forces (r1) at Different Heights


Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.66
4.66
4.663
4.663

DL
m
6.7
4.1
3.1
2.7
2.2
2.1
2.1
2.1
2.1

SIDL
m
6.7
4.1
3.1
2.7
2.2
2.1
2.1
2.1
2.1

LL
m
11.3
8.7
7.7
7.3
6.8
6.6
6.6
6.6
6.6

Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663

DL
kN.m
7124.7
4365.3
3303.9
2879.4
2348.7
2175.7
2175.7
2175.7
2175.7

SIDL
kN.m
4157.5
2547.2
1927.9
1680.2
1370.5
1269.6
1269.6
1269.6
1269.6

LL
kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Transverse Seismic Forces (r2) at Different Heights


Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663

DL
m
8.0
5.4
4.4
4.0
3.5
3.3
3.3
3.3
3.3

SIDL
m
9.6
7.0
6.0
5.6
5.1
4.9
4.9
4.9
4.9

LL
m
11.3
8.7
7.7
7.3
6.8
6.6
6.6
6.6
6.6

94

Lever Arm For


Shear Key
m
6.9
4.3
3.3
2.9
2.4
2.2
2.2
2.2
2.2

Bearings
m
6.6
4.0
3.0
2.6
2.1
1.9
1.9
1.9
1.9

Pier Cap
m
5.7
3.1
2.1
1.7
1.2
1.1
1.1
1.1
1.1

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663

DL
kN.m
7707.2
5204.6
4242.0
3857.0
3375.7
3218.8
3218.8
3218.8
3218.8

SIDL
kN.m
5434.5
3956.8
3388.4
3161.1
2876.9
2784.3
2784.3
2784.3
2784.3

Seismic Combinations:

LL
kN.m
2314.2
1780.4
1575.1
1493.0
1390.3
1356.9
1356.9
1356.9
1356.9
Comb.1
Comb.2
Comb.3
Comb.4

Prepared
Checked
Verified

Moment (MT-r2) due to


Shear Key
Bearings
kN.m
kN.m
37.1
26.8
23.1
16.2
17.7
12.1
15.6
10.5
12.9
8.5
12.0
7.8
12.0
7.8
12.0
7.8
12.0
7.8

Harjot
R P Sharma
Sumant

Pier Cap
kN.m
517.2
281.8
191.3
155.1
109.8
95.1
95.1
95.1
95.1

r1
r2
r3
- r3

MR = (ML^2+MT^2)^0.5 + MR_slender

ULS G IIa Comb.1


Ht from Pier Vertical Load,
Base
P
m
kN
0
12791.3
2.6
12968.2
3.6
12859.9
4
12816.6
4.5
12762.5
4.663
12744.9
4.663
12744.9
4.663
12744.9
4.663
12744.9
ULS G IIa Comb.2
Ht from Pier Vertical Load,
Base
P
m
kN
0
12791.3
2.6
12051.6

HR = (HL^2+HT^2)^0.5
MR_slender

HL

HT

ML

MT

kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

kN
1897.0
1843.0
1822.2
1813.9
1803.5
1800.2
1800.2
1800.2
1800.2

kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

kN.m
11382.2
6520.2
4687.6
3960.4
3056.0
2762.3
2762.3
2762.3
2762.3

kN.m
2834.0
2834.0
2834.0
2834.0
2834.0
2834.0
2834.0
2834.0
2834.0

MR_slender

HL

HT

ML

MT

kN.m
0.0
0.0

kN
0.0
0.0

kN
1917.2
1872.0

kN.m
-820.3
-820.3

kN.m
19059.8
14133.8

95

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

3.6
4
4.5
4.663
4.663
4.663
4.663

11943.3
11900.0
11845.9
11828.3
11828.3
11828.3
11828.3

ULS G IIa Comb.3


Ht from Pier Vertical Load,
Base
P
m
kN
0
14318.9
2.6
12968.2
3.6
12859.9
4
12816.6
4.5
12762.5
4.663
12744.9
4.663
12744.9
4.663
12744.9
4.663
12744.9
ULS G IIa Comb.4
Ht from Pier Vertical Load,
Base
P
m
kN
0
11263.6
2.6
12051.6
3.6
11943.3
4
11900.0
4.5
11845.9
4.663
11828.3
4.663
11828.3
4.663
11828.3
4.663
11828.3

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

1854.7
1847.7
1839.0
1836.2
1836.2
1836.2
1836.2

-820.3
-820.3
-820.3
-820.3
-820.3
-820.3
-820.3

12270.5
11530.0
10608.3
10308.8
10308.8
10308.8
10308.8

MR_slender

HL

HT

ML

MT

kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

kN.m
-864.3
-864.3
-864.3
-864.3
-864.3
-864.3
-864.3
-864.3
-864.3

kN.m
3167.5
3167.5
3167.5
3167.5
3167.5
3167.5
3167.5
3167.5
3167.5

MR_slender

HL

HT

ML

MT

kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

kN.m
-776.3
-776.3
-776.3
-776.3
-776.3
-776.3
-776.3
-776.3
-776.3

kN.m
2500.5
2500.5
2500.5
2500.5
2500.5
2500.5
2500.5
2500.5
2500.5

96

ucture P148
Project Code

Date

2/21/2013

Rev

97

ucture P148
Project Code

Date

2/21/2013

Rev

MT-r2
kN.m
7707.21
5434.47
2314.21
37.15
26.76
517.18
188.86
16225.8

MT) Moment due to


CF (Span2)
kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

98

ucture P148
Project Code

Date

2/21/2013

Rev

0.0

Pier
m
2.3
1.0
0.5
0.3
0.1
0.0
0.0
0.0
0.0

HL-r1 for
pier
kN
96.8
42.8
22.1
13.8
3.4
0.0
0.0
0.0
0.0

Pier
kN.m
225.7
44.2
11.7
4.6
0.3
0.0
0.0
0.0
0.0

Total
Moment
kN.m
12202.5
7340.5
5507.9
4780.7
3876.3
3582.6
3582.6
3582.6
3582.6

Pier
m
2.3
1.0
0.5
0.3
0.1
0.0
0.0
0.0
0.0

HL-r1 for
pier
kN
81.0
35.8
18.5
11.5
2.8
0.0
0.0
0.0
0.0

99

ucture P148
Project Code

Date

2/21/2013

Rev

Pier
kN.m
188.9
37.0
9.8
3.8
0.2
0.0
0.0
0.0
0.0

Total
Moment
kN.m
16225.8
11299.9
9436.5
8696.0
7774.4
7474.8
7474.8
7474.8
7474.8

T^2)^0.5 + MR_slender

MR

HR

kN.m
11729.7
7109.5
5477.7
4869.9
4167.8
3957.5
3957.5
3957.5
3957.5

kN
1897.0
1843.0
1822.2
1813.9
1803.5
1800.2
1800.2
1800.2
1800.2

MR

HR

kN.m
19077.4
14157.6

kN
1917.2
1872.0

100

ucture P148
Project Code

Date

2/21/2013

Rev

12297.9
11559.2
10640.0
10341.4
10341.4
10341.4
10341.4

1854.7
1847.7
1839.0
1836.2
1836.2
1836.2
1836.2

MR

HR

kN.m
3283.3
3283.3
3283.3
3283.3
3283.3
3283.3
3283.3
3283.3
3283.3

kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

MR

HR

kN.m
2618.2
2618.2
2618.2
2618.2
2618.2
2618.2
2618.2
2618.2
2618.2

kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

101

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

4.3 ULS Case


Factors:

G-II b
DL
SIDL
LL
Temp.
Earthquake

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

(Seismic Case)
1.25
2.00
1.40
1.25

Non Seismic Forces at Pier Bottom

1. DEAD LOADS
DL Left Span
DL Right Span
Shear Key
Pedestal
A
B
C
D
Pier Cap
Pier
2. SIDL
SIDL Left Span
SIDL Right Span

V
kN
2766.4
3231.2
33.6

eL
m
0.85
-0.85
0.00

eT
m
0.20
0.28
0.00

ML
kN.m
2351.5
-2746.5
0.0

MT
kN.m
546.4
909.6
0.0

6.3
6.3
6.3
6.3
564.1
504.7

0.85
-0.85
0.85
-0.85
0.00
0.00

1.30
1.30
-1.30
-1.30
0.00
0.00

5.4
-5.4
5.4
-5.4
0.0
0.0

34.0
-34.0
34.0
-34.0
0.0
0.0

2582.9
3083.2
12791.3

0.85
-0.85

0.20
0.28

2195.4
-2620.7
-820.3

510.1
867.9
2834.0

V
kN
2219.9
1218.7

eL
m
0.85
-0.85

eT
m
0.20
0.28
HL
kN
621.1
0.0
HT
kN
230.7
126.7

ML
kN.m
1886.9
-1035.9
eL1
m
6.7
6.7
eT1
m
11.3
11.3

MT
kN.m
438.4
343.1
ML1
kN.m
4169.1
0.0
MT1
kN.m
2600.4
1427.6

3. LIVE LOADS
Case IV - Both Spans Both tracks

Live Left Span


Live Right Span
braking, Tractive & LWR Forces
Case IV - Both Spans Both tracks
LWR Force
Centrifugal Forces (Pier)
Case IV - Both Spans Both tracks

102

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

Seismic Forces at Pier Bottom


Vertical Seismic Forces (r3)
Forces-Seismic (Pier)
DL Left Span
SIDL Left Span
DL Right Span
SIDL Right Span
Shear Key
Live Left Span
Live Right Span
Pedestal
A
B
C
D
Pier Cap
Pier

FY
kN
276.4
161.3
322.8
192.5
3.4
82.5
45.3
0.63
0.63
0.63
0.63
56.4
50.4

eL
m
0.85
0.85
-0.85
-0.85
0.00
0.85
-0.85
0.85
-0.85
0.85
-0.85
0.0
0.0

eT
m
0.20
0.20
0.28
0.28
0.00
0.20
0.28
1.30
1.30
-1.30
-1.30
0.0
0.0

1193.5
Horizontal Seismic Forces
DL
SIDL
Live Load
Shear Key
Pedestal
Pier Cap
Pier
Total

Longitudinal Seismic Forces (r1)


HL-r1
eL1
ML-r1
kN
m
kN.m
829.17
6.71
5566.19
483.84
6.71
3248.02
0.00
11.27
0.00
5.04
6.89
34.69
3.79
6.59
24.99
84.53
5.71
482.93
75.64
2.33
176.35
1482.0

9533.2

ML-r3
kN.m
234.9
137.1
-274.4
-163.6
0.0
70.1
-38.5
0.54
-0.54
0.54
-0.54
0.0
0.0

MT-r3
kN.m
54.59
31.85
90.87
54.19
0.00
16.3
12.8
0.82
0.82
-0.82
-0.82
0.0
0.0

-34.4

260.6

Transverse Seismic Forces (r2)


HT-r2
eT1
kN
m
752.00
8.01
444.02
9.56
160.40
11.27
4.21
6.89
3.17
6.59
70.72
5.71
63.28
2.33
1497.8

Non Seismic Forces at Different Heights


Ht from Pier
Base

Reduction in
Pier Wt.

m
0
2.6
3.6
4
4.5
4.663
4.663
4.663

kN
0.0
281.4
389.7
433.0
487.1
504.7
504.7
504.7

Lever arm for


(ML) Moment due to
Longitud.
Centrifugal
Braking/
LWR
Loads
force
Tractive
m
m
kN.m
kN.m
6.7
11.3
4169.1
0.0
4.1
8.7
2554.4
0.0
3.1
7.7
1933.3
0.0
2.7
7.3
1684.9
0.0
2.2
6.8
1374.4
0.0
2.1
6.6
1273.2
0.0
2.1
6.6
1273.2
0.0
2.1
6.6
1273.2
0.0

103

(MT) Moment due to


CF (Span1)
kN.m
2600.4
2000.6
1769.9
1677.6
1562.3
1524.7
1524.7
1524.7

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

4.663

504.7

2.1

6.6

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

1273.2

0.0

1524.7

Lever Arm For


Shear Key
m
6.9
4.3
3.3
2.9
2.4
2.2
2.2
2.2
2.2

Bearings
m
6.6
4.0
3.0
2.6
2.1
1.9
1.9
1.9
1.9

Pier Cap
m
5.7
3.1
2.1
1.7
1.2
1.1
1.1
1.1
1.1

Moment (ML-r1) due to


Shear Key
Bearings
kN.m
kN.m
34.7
25.0
21.6
15.1
16.6
11.3
14.5
9.8
12.0
7.9
11.2
7.3
11.2
7.3
11.2
7.3
11.2
7.3

Pier Cap
kN.m
482.9
263.1
178.6
144.8
102.5
88.8
88.8
88.8
88.8

Longitudinal Seismic Forces (r1) at Different Heights


Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663

DL
m
6.7
4.1
3.1
2.7
2.2
2.1
2.1
2.1
2.1

SIDL
m
6.7
4.1
3.1
2.7
2.2
2.1
2.1
2.1
2.1

LL
m
11.3
8.7
7.7
7.3
6.8
6.6
6.6
6.6
6.6

Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663

DL
kN.m
5566.2
3410.4
2581.2
2249.5
1834.9
1699.8
1699.8
1699.8
1699.8

SIDL
kN.m
3248.0
1990.0
1506.2
1312.7
1070.7
991.9
991.9
991.9
991.9

LL
kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Transverse Seismic Forces (r2) at Different Heights


Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663

DL
m
8.0
5.4
4.4
4.0
3.5
3.3
3.3
3.3
3.3

SIDL
m
9.6
7.0
6.0
5.6
5.1
4.9
4.9
4.9
4.9

LL
m
11.3
8.7
7.7
7.3
6.8
6.6
6.6
6.6
6.6

104

Lever Arm For


Shear Key
m
6.9
4.3
3.3
2.9
2.4
2.2
2.2
2.2
2.2

Bearings
m
6.6
4.0
3.0
2.6
2.1
1.9
1.9
1.9
1.9

Pier Cap
m
5.7
3.1
2.1
1.7
1.2
1.1
1.1
1.1
1.1

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663

DL
kN.m
6021.3
4066.1
3314.1
3013.3
2637.3
2514.7
2514.7
2514.7
2514.7

SIDL
kN.m
4245.7
3091.2
2647.2
2469.6
2247.6
2175.2
2175.2
2175.2
2175.2

Seismic Combinations:

LL
kN.m
1808.0
1390.9
1230.6
1166.4
1086.2
1060.1
1060.1
1060.1
1060.1
Comb.1
Comb.2
Comb.3
Comb.4

Prepared
Checked
Verified

Moment (MT-r2) due to


Shear Key
Bearings
kN.m
kN.m
29.0
20.9
18.1
12.7
13.9
9.5
12.2
8.2
10.1
6.6
9.4
6.1
9.4
6.1
9.4
6.1
9.4
6.1

Harjot
R P Sharma
Sumant

Pier Cap
kN.m
404.0
220.2
149.4
121.2
85.8
74.3
74.3
74.3
74.3

r1
r2
r3
- r3

MR = (ML^2+MT^2)^0.5 + MR_slender
HR = (HL^2+HT^2)^0.5
ULS G IIb Comb.1
Ht from Pier Vertical Load,
Base
P
m
kN
0
14510.6
2.6
14587.2
3.6
14479.0
4
14435.7
4.5
14381.6
4.663
14363.9
4.663
14363.9
4.663
14363.9
4.663
14363.9
ULS G IIb Comb.2
Ht from Pier Vertical Load,
Base
P
m
kN
0
14510.6
2.6
13871.1

MR_slender

HL

HT

ML

MT

kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

kN
1792.5
1750.4
1734.1
1727.6
1719.5
1716.9
1716.9
1716.9
1716.9

kN
178.7
178.7
178.7
178.7
178.7
178.7
178.7
178.7
178.7

kN.m
11222.9
6617.2
4874.9
4182.6
3320.8
3040.7
3040.7
3040.7
3040.7

kN.m
5238.7
4774.2
4595.5
4524.0
4434.7
4405.6
4405.6
4405.6
4405.6

MR_slender

HL

HT

ML

MT

kN.m
0.0
0.0

kN
310.5
310.5

kN
1676.5
1641.2

kN.m
1689.8
882.4

kN.m
17915.1
13602.2

105

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

3.6
4
4.5
4.663
4.663
4.663
4.663

13762.9
13719.6
13665.5
13647.8
13647.8
13647.8
13647.8

ULS G IIb Comb.3


Ht from Pier Vertical Load,
Base
P
m
kN
0
15704.1
2.6
14587.2
3.6
14479.0
4
14435.7
4.5
14381.6
4.663
14363.9
4.663
14363.9
4.663
14363.9
4.663
14363.9
ULS G IIb Comb.4
Ht from Pier Vertical Load,
Base
P
m
kN
0
13317.1
2.6
13871.1
3.6
13762.9
4
13719.6
4.5
13665.5
4.663
13647.8
4.663
13647.8
4.663
13647.8
4.663
13647.8

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

0.0
0.0
0.0
0.0
0.0
0.0
0.0

310.5
310.5
310.5
310.5
310.5
310.5
310.5

1627.6
1622.2
1615.4
1613.2
1613.2
1613.2
1613.2

571.9
447.6
292.4
241.8
241.8
241.8
241.8

11967.8
11317.8
10508.4
10245.3
10245.3
10245.3
10245.3

MR_slender

HL

HT

ML

MT

kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

kN
310.5
310.5
310.5
310.5
310.5
310.5
310.5
310.5
310.5

kN
178.7
178.7
178.7
178.7
178.7
178.7
178.7
178.7
178.7

kN.m
1655.4
848.0
537.5
413.3
258.0
207.4
207.4
207.4
207.4

kN.m
5499.3
5034.7
4856.1
4784.6
4695.2
4666.1
4666.1
4666.1
4666.1

MR_slender

HL

HT

ML

MT

kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

kN
310.5
310.5
310.5
310.5
310.5
310.5
310.5
310.5
310.5

kN
178.7
178.7
178.7
178.7
178.7
178.7
178.7
178.7
178.7

kN.m
1724.1
916.8
606.3
482.0
326.8
276.2
276.2
276.2
276.2

kN.m
4978.2
4513.6
4334.9
4263.5
4174.1
4145.0
4145.0
4145.0
4145.0

106

ucture P148
Project Code

Date

2/21/2013

Rev

107

ucture P148
Project Code

Date

2/21/2013

Rev

MT-r2
kN.m
6021.26
4245.68
1807.98
29.02
20.91
404.05
147.54
12676.4

MT) Moment due to


CF (Span2)
kN.m
1427.6
1098.3
971.7
921.0
857.7
837.0
837.0
837.0

108

ucture P148
Project Code

Date

2/21/2013

Rev

837.0

Pier
m
2.3
1.0
0.5
0.3
0.1
0.0
0.0
0.0
0.0

HL-r1 for
pier
kN
75.6
33.5
17.2
10.8
2.6
0.0
0.0
0.0
0.0

Pier
kN.m
176.3
34.5
9.2
3.6
0.2
0.0
0.0
0.0
0.0

Total
Moment
kN.m
9533.2
5734.8
4303.1
3734.9
3028.4
2798.9
2798.9
2798.9
2798.9

Pier
m
2.3
1.0
0.5
0.3
0.1
0.0
0.0
0.0
0.0

HL-r1 for
pier
kN
63.3
28.0
14.4
9.0
2.2
0.0
0.0
0.0
0.0

109

ucture P148
Project Code

Date

2/21/2013

Rev

Pier
kN.m
147.5
28.9
7.7
3.0
0.2
0.0
0.0
0.0
0.0

Total
Moment
kN.m
12676.4
8828.0
7372.3
6793.8
6073.7
5839.7
5839.7
5839.7
5839.7

T^2)^0.5 + MR_slender

MR

HR

kN.m
12385.4
8159.6
6699.5
6161.2
5540.2
5353.0
5353.0
5353.0
5353.0

kN
1801.4
1759.5
1743.3
1736.9
1728.8
1726.2
1726.2
1726.2
1726.2

MR

HR

kN.m
17994.7
13630.8

kN
1705.0
1670.3

110

ucture P148
Project Code

Date

2/21/2013

Rev

11981.4
11326.7
10512.5
10248.1
10248.1
10248.1
10248.1

1657.0
1651.6
1645.0
1642.8
1642.8
1642.8
1642.8

MR

HR

kN.m
5743.0
5105.6
4885.7
4802.4
4702.3
4670.7
4670.7
4670.7
4670.7

kN
358.3
358.3
358.3
358.3
358.3
358.3
358.3
358.3
358.3

MR

HR

kN.m
5268.3
4605.8
4377.1
4290.6
4186.9
4154.2
4154.2
4154.2
4154.2

kN
358.3
358.3
358.3
358.3
358.3
358.3
358.3
358.3
358.3

111

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

4.3 ULS Case


Factors:

G-II b
DL
SIDL
LL
Temp.
Earthquake

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

(Seismic Case)
0.90
0.80
0.00
1.50

Non Seismic Forces at Pier Bottom

1. DEAD LOADS
DL Left Span
DL Right Span
Shear Key
Pedestal
A
B
C
D
Pier Cap
Pier
2. SIDL
SIDL Left Span
SIDL Right Span

V
kN
1991.8
2326.4
24.2

eL
m
0.85
-0.85
0.00

eT
m
0.20
0.28
0.00

ML
kN.m
1693.0
-1977.5
0.0

MT
kN.m
393.4
654.9
0.0

4.6
4.6
4.6
4.6
406.1
363.4

0.85
-0.85
0.85
-0.85
0.00
0.00

1.30
1.30
-1.30
-1.30
0.00
0.00

3.9
-3.9
3.9
-3.9
0.0
0.0

17.6
-17.6
17.6
-17.6
0.0
0.0

1033.1
1233.3
7396.6

0.85
-0.85

0.20
0.28

878.2
-1048.3
-454.5

204.1
347.2
1599.5

V
kN
0.0
0.0

eL
m
0.85
-0.85

eT
m
0.20
0.28
HL
kN
0.0
0.0
HT
kN
0.0
0.0

ML
kN.m
0.0
0.0
eL1
m
6.7
6.7
eT1
m
11.3
11.3

MT
kN.m
0.0
0.0
ML1
kN.m
0.0
0.0
MT1
kN.m
0.0
0.0

3. LIVE LOADS
Case IV - Both Spans Both tracks

Live Left Span


Live Right Span
braking, Tractive & LWR Forces
Case IV - Both Spans Both tracks
LWR Force
Centrifugal Forces (Pier)
Case IV - Both Spans Both tracks

112

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

Seismic Forces at Pier Bottom


Vertical Seismic Forces (r3)
Forces-Seismic (Pier)
DL Left Span
SIDL Left Span
DL Right Span
SIDL Right Span
Shear Key
Live Left Span
Live Right Span
Pedestal
A
B
C
D
Pier Cap
Pier

FY
kN
331.7
193.5
387.4
231.0
4.0
99.0
54.4
0.76
0.76
0.76
0.76
67.6
60.5

eL
m
0.85
0.85
-0.85
-0.85
0.00
0.85
-0.85
0.85
-0.85
0.85
-0.85
0.0
0.0

eT
m
0.20
0.20
0.28
0.28
0.00
0.20
0.28
1.30
1.30
-1.30
-1.30
0.0
0.0

1432.2
Horizontal Seismic Forces
DL
SIDL
Live Load
Shear Key
Pedestal
Pier Cap
Pier
Total

Longitudinal Seismic Forces (r1)


HL-r1
eL1
ML-r1
kN
m
kN.m
995.00
6.71
6679.43
580.61
6.71
3897.63
0.00
11.27
0.00
6.04
6.89
41.62
4.55
6.59
29.99
101.44
5.71
579.52
90.77
2.33
211.62
1778.4

11439.8

ML-r3
kN.m
281.9
164.5
-329.3
-196.4
0.0
84.2
-46.2
0.64
-0.64
0.64
-0.64
0.0
0.0

MT-r3
kN.m
65.51
38.23
109.05
65.03
0.00
19.6
15.3
0.99
0.99
-0.99
-0.99
0.0
0.0

-41.3

312.7

Transverse Seismic Forces (r2)


HT-r2
eT1
kN
m
902.40
8.01
532.82
9.56
192.47
11.27
5.06
6.89
3.81
6.59
84.87
5.71
75.94
2.33
1797.4

Non Seismic Forces at Different Heights


Ht from Pier
Base

Reduction in
Pier Wt.

m
0
2.6
3.6
4
4.5
4.663
4.663
4.663

kN
0.0
202.6
280.6
311.7
350.7
363.4
363.4
363.4

Lever arm for


(ML) Moment due to
Longitud.
Centrifugal
Braking/
LWR
Loads
force
Tractive
m
m
kN.m
kN.m
6.7
11.3
0.0
0.0
4.1
8.7
0.0
0.0
3.1
7.7
0.0
0.0
2.7
7.3
0.0
0.0
2.2
6.8
0.0
0.0
2.1
6.6
0.0
0.0
2.1
6.6
0.0
0.0
2.1
6.6
0.0
0.0

113

(MT) Moment due to


CF (Span1)
kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

4.663

363.4

2.1

6.6

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

0.0

0.0

0.0

Lever Arm For


Shear Key
m
6.9
4.3
3.3
2.9
2.4
2.2
2.2
2.2
2.2

Bearings
m
6.6
4.0
3.0
2.6
2.1
1.9
1.9
1.9
1.9

Pier Cap
m
5.7
3.1
2.1
1.7
1.2
1.1
1.1
1.1
1.1

Moment (ML-r1) due to


Shear Key
Bearings
kN.m
kN.m
41.6
30.0
25.9
18.2
19.9
13.6
17.5
11.8
14.4
9.5
13.4
8.8
13.4
8.8
13.4
8.8
13.4
8.8

Pier Cap
kN.m
579.5
315.8
214.3
173.8
123.0
106.5
106.5
106.5
106.5

Longitudinal Seismic Forces (r1) at Different Heights


Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663

DL
m
6.7
4.1
3.1
2.7
2.2
2.1
2.1
2.1
2.1

SIDL
m
6.7
4.1
3.1
2.7
2.2
2.1
2.1
2.1
2.1

LL
m
11.3
8.7
7.7
7.3
6.8
6.6
6.6
6.6
6.6

Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663

DL
kN.m
6679.4
4092.4
3097.4
2699.4
2201.9
2039.7
2039.7
2039.7
2039.7

SIDL
kN.m
3897.6
2388.0
1807.4
1575.2
1284.9
1190.2
1190.2
1190.2
1190.2

LL
kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Transverse Seismic Forces (r2) at Different Heights


Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663

DL
m
8.0
5.4
4.4
4.0
3.5
3.3
3.3
3.3
3.3

SIDL
m
9.6
7.0
6.0
5.6
5.1
4.9
4.9
4.9
4.9

LL
m
11.3
8.7
7.7
7.3
6.8
6.6
6.6
6.6
6.6

114

Lever Arm For


Shear Key
m
6.9
4.3
3.3
2.9
2.4
2.2
2.2
2.2
2.2

Bearings
m
6.6
4.0
3.0
2.6
2.1
1.9
1.9
1.9
1.9

Pier Cap
m
5.7
3.1
2.1
1.7
1.2
1.1
1.1
1.1
1.1

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663

DL
kN.m
7225.5
4879.3
3976.9
3615.9
3164.7
3017.6
3017.6
3017.6
3017.6

SIDL
kN.m
5094.8
3709.5
3176.7
2963.5
2697.1
2610.3
2610.3
2610.3
2610.3

Seismic Combinations:

LL
kN.m
2169.6
1669.1
1476.7
1399.7
1303.4
1272.1
1272.1
1272.1
1272.1
Comb.1
Comb.2
Comb.3
Comb.4

Prepared
Checked
Verified

Moment (MT-r2) due to


Shear Key
Bearings
kN.m
kN.m
34.8
25.1
21.7
15.2
16.6
11.4
14.6
9.9
12.1
8.0
11.2
7.3
11.2
7.3
11.2
7.3
11.2
7.3

Harjot
R P Sharma
Sumant

Pier Cap
kN.m
484.9
264.2
179.3
145.4
102.9
89.1
89.1
89.1
89.1

r1
r2
r3
- r3

MR = (ML^2+MT^2)^0.5 + MR_slender
HR = (HL^2+HT^2)^0.5
ULS G IIc Comb.1
Ht from Pier Vertical Load,
Base
P
m
kN
0
7396.6
2.6
7623.6
3.6
7545.7
4
7514.5
4.5
7475.6
4.663
7462.9
4.663
7462.9
4.663
7462.9
4.663
7462.9
ULS G IIc Comb.2
Ht from Pier Vertical Load,
Base
P
m
kN
0
7396.6
2.6
6764.3

MR_slender

HL

HT

ML

MT

kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

kN
1778.4
1727.8
1708.3
1700.5
1690.8
1687.6
1687.6
1687.6
1687.6

kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

kN.m
10985.3
6427.2
4709.1
4027.4
3179.5
2904.2
2904.2
2904.2
2904.2

kN.m
1599.5
1599.5
1599.5
1599.5
1599.5
1599.5
1599.5
1599.5
1599.5

MR_slender

HL

HT

ML

MT

kN.m
0.0
0.0

kN
0.0
0.0

kN
1797.4
1755.0

kN.m
-454.5
-454.5

kN.m
16811.2
12193.1

115

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

3.6
4
4.5
4.663
4.663
4.663
4.663

6686.4
6655.2
6616.3
6603.6
6603.6
6603.6
6603.6

ULS G IIc Comb.3


Ht from Pier Vertical Load,
Base
P
m
kN
0
8828.8
2.6
7623.6
3.6
7545.7
4
7514.5
4.5
7475.6
4.663
7462.9
4.663
7462.9
4.663
7462.9
4.663
7462.9
ULS G IIc Comb.4
Ht from Pier Vertical Load,
Base
P
m
kN
0
5964.4
2.6
6764.3
3.6
6686.4
4
6655.2
4.5
6616.3
4.663
6603.6
4.663
6603.6
4.663
6603.6
4.663
6603.6

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

1738.7
1732.2
1724.1
1721.4
1721.4
1721.4
1721.4

-454.5
-454.5
-454.5
-454.5
-454.5
-454.5
-454.5

10446.2
9752.0
8888.0
8607.1
8607.1
8607.1
8607.1

MR_slender

HL

HT

ML

MT

kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

kN.m
-495.8
-495.8
-495.8
-495.8
-495.8
-495.8
-495.8
-495.8
-495.8

kN.m
1912.2
1912.2
1912.2
1912.2
1912.2
1912.2
1912.2
1912.2
1912.2

MR_slender

HL

HT

ML

MT

kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

kN.m
-413.3
-413.3
-413.3
-413.3
-413.3
-413.3
-413.3
-413.3
-413.3

kN.m
1286.8
1286.8
1286.8
1286.8
1286.8
1286.8
1286.8
1286.8
1286.8

116

ucture P148
Project Code

Date

2/21/2013

Rev

117

ucture P148
Project Code

Date

2/21/2013

Rev

MT-r2
kN.m
7225.51
5094.81
2169.57
34.82
25.09
484.86
177.05
15211.7

MT) Moment due to


CF (Span2)
kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

118

ucture P148
Project Code

Date

2/21/2013

Rev

0.0

Pier
m
2.3
1.0
0.5
0.3
0.1
0.0
0.0
0.0
0.0

HL-r1 for
pier
kN
90.8
40.2
20.7
12.9
3.2
0.0
0.0
0.0
0.0

Pier
kN.m
211.6
41.4
11.0
4.3
0.3
0.0
0.0
0.0
0.0

Total
Moment
kN.m
11439.8
6881.7
5163.7
4481.9
3634.1
3358.7
3358.7
3358.7
3358.7

Pier
m
2.3
1.0
0.5
0.3
0.1
0.0
0.0
0.0
0.0

HL-r1 for
pier
kN
75.9
33.6
17.3
10.8
2.7
0.0
0.0
0.0
0.0

119

ucture P148
Project Code

Date

2/21/2013

Rev

Pier
kN.m
177.1
34.7
9.2
3.6
0.2
0.0
0.0
0.0
0.0

Total
Moment
kN.m
15211.7
10593.6
8846.7
8152.5
7288.5
7007.7
7007.7
7007.7
7007.7

T^2)^0.5 + MR_slender

MR

HR

kN.m
11101.1
6623.2
4973.4
4333.4
3559.2
3315.5
3315.5
3315.5
3315.5

kN
1778.4
1727.8
1708.3
1700.5
1690.8
1687.6
1687.6
1687.6
1687.6

MR

HR

kN.m
16817.4
12201.6

kN
1797.4
1755.0

120

ucture P148
Project Code

Date

2/21/2013

Rev

10456.1
9762.6
8899.6
8619.1
8619.1
8619.1
8619.1

1738.7
1732.2
1724.1
1721.4
1721.4
1721.4
1721.4

MR

HR

kN.m
1975.4
1975.4
1975.4
1975.4
1975.4
1975.4
1975.4
1975.4
1975.4

kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

MR

HR

kN.m
1351.6
1351.6
1351.6
1351.6
1351.6
1351.6
1351.6
1351.6
1351.6

kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

121

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

5.0 Design checks for Pier

5.1 SLS and ULS design of pier is checked with software RC Col / Oasys- ADSEC. Output of Oasys is attached in Appendix-3. As pe
IITK-RDSO Guidelines, longitudinal reinforcement shall be more than 0.8% and less than 6%. Reinforcement provided at differe
as under.
SLS Cases
Load Case
1
2
3
4
5
6
7
8

Description
GI, (Crack and Stresses)
GII,Seismic
r1
GII,Seismic
r2
GII,Seismic
r3
GII,Seismic
- r3
Not Considered
Not Considered
GIII, LWR

Where:
r1
r2
r3

Longitudinal Seismic
Transverse Seismic
Vertical Seismic

Pier Area=

ULS Cases
Load Case
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Description
GI, Normal Case
GIIb,Seis.
r1
GIIb,Seis.
r2
GIIb,Seis.
r3
GIIb,Seis.
- r3
Not Considered
Not Considered
GIIa,Seis.
r1
GIIa,Seis.
r2
GIIa,Seis.
r3
GIIa,Seis.
- r3
GIIc,Seis.
r1
GIIc,Seis.
r2
GIIc,Seis.
r3
GIIc,Seis.
- r3

3463606 mm2

Ht from Pier
Base

% of Min.
Reinf.
Required

Min. Reinf.
Required.

Area of Reinf.
Provided

% of Reinf.
Provided

m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663

%
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80

mm2
27709
27709
27709
27709
27709
27709
27709
27709
27709

mm2
39270
39270
39270
39270
39270
39270
39270
39270
39270

%
1.13
1.13
1.13
1.13
1.13
1.13
1.13
1.13
1.13

Check

OK
OK
OK
OK
OK
OK
OK
OK
OK

Stresses are checked with R C Col /Oasys Adsec (Appendix-3) for different load cases at different sections. Stress limitations for
SLS check are taken as per Table-11 of IRS: Concrete Bridge Code as follow:
Permissible stress in concrete = 0.5 fck
Permissible stress in steel in tension = 0.75 fck
Design Crack Width for "Moderate" condition

=
=
=

122

25 MPa
375 MPa
0.2 mm as per Table 10 of IRS:CBC

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

5.2 Shear Check for Piers


As per AASHTO, Clause 5.8.2.9
dv = 0.9 * de
where Dr = dia of the circle passing through the centers of longitudinal reinforcement.
bv = dia of the section
de = D/2 + Dr /
D
=
2100 mm
bv
=

2100

Ht from Pier
Base

Maximum HR

Dr

dv

Depth factor, s Shear stress, v % of Reinf, Pt

m
0
2.6
3.6
4
4.5
4.7
4.7
4.7
4.7

kN
1917.19
1872.02
1854.65
1847.70
1839.02
1836.19
1836.19
1836.19
1836.19

mm
1885
1885
1910
1910
1960
1960
1928
1928
1960

mm
1485
1485
1492
1492
1506
1506
1497
1497
1506

N/mm2
0.61
0.60
0.59
0.59
0.58
0.58
0.58
0.58
0.58

0.76
0.76
0.76
0.76
0.76
0.76
0.76
0.76
0.76

%
0.57
0.57
0.57
0.57
0.57
0.57
0.57
0.57
0.57

Increase in shear stress (1 + 0.05P/Ac) is done as per IRS:CBC, Clause 15.6.6.


Ht from Pier
Base

P (ULS)

m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663

kN
11264
10982
10874
10831
10777
10759
10759
10759
10759

Inc_factor n= (s.vc1)= s.vc *


(1+0.05 P/ Ac)
n
N/mm2
1.16
1.16
1.16
1.16
1.16
1.16
1.16
1.16
1.16

N/mm2
0.54
0.54
0.54
0.54
0.54
0.53
0.54
0.54
0.53

Minimum shear reinf. is provided as per CALTRANS as under:

123

Shear Check Shear Link dia

links req.
links req.
links req.
links req.
links req.
links req.
links req.
links req.
links req.

mm
20
20
20
20
20
20
20
20
20

Max. sv if
v<svc1
mm
270
270
270
270
270
270
270
270
270

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

D
mm
2100

D'
mm
1980

link dia
mm
20

max. spacing (mm)


fyh=415 MPA
387

124

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

5.3 Special Confining Reinforcement

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

(As per Cl. C-5 of IITK-RDSO Guidelines)

Area of cross section of the bar forming circular hoop

(Clause C5.5.1 of IITK-RDSO Guidelines for Seismic Design of Railway Bridges)


Spacing of hoops, S =

min. of

1/5 of D =
6xdia of main reinf. =

&
S
Diameter of the core, Dk
fck
fy
Ag
Ak
Ash, required

=
=
=
=
=
=
=
=
=
=

(a)
(b)

Dia of Shear link taken


Ash, Provided

420 mm
150 mm
65 mm
65 mm
2000 mm
50 MPa
500 MPa
3463606 mm2
3141593 mm2
120 mm2
312 mm2
20 mm
314 mm2

Shear reinf. is OK.

5.4 C-6.1 Column Shear and Transverse Reinforcement.


To avoid a brittle shear failure design shear force for pier shall be based on overstrength moment
capacities of the plastic hinges and given by:
Ultimate Moment Capacity
=
17170
kNm
Plastic Moment
=
1.3
x
17170
=
Shear Force
Vu
=
22321
=
M o
4.663

Oasys

4786.8

Ht from Pier
Base

Vu

Dr

dv

Depth factor, s Shear stress, v % of Reinf, Pt

m
0.0

kN
4786.83

mm
1885

mm
1485

N/mm2
1.53

0.76

%
0.57

Increase in shear stress (1 + 0.05P/Ac) is done as per IRS:CBC, Clause 15.6.6.


Shear Check
Ht from Pier
Base

P (ULS)

m
0.0

N/mm2
7397.00

sv provided (Ductile Region

Inc_factor n= (s.vc1)= s.vc *


(1+0.05 P/ Ac)
n
1.11

N/mm2
0.51

sv provided (Non Ductile


Region)

125

Shear Check Shear Link dia

links req.

mm
20

Max. sv if
v<svc1
mm
270

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

mm
65.00

mm
70.00

126

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

attached in Appendix-3. As per Cl. C-3 of


nforcement provided at different depths are

sections. Stress limitations for

m as per Table 10 of IRS:CBC

127

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

mm
Shear
resistance, vc

s.vc

N/mm2
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61

N/mm2
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46

sv required if
v>svc1

sv provided

mm
227.00
233.00
237.00
238.00
242.00
242.00
241.00
241.00
242.00

mm
65.00
65.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00

128

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

129

8
T
ucture P148
-

Project Code
Date

2/21/2013

Rev

(a)

(b)

hear reinf. is OK.

22321 kNm
kN

Shear
resistance, vc

s.vc

N/mm2
0.61

N/mm2
0.46

sv required if
v>svc1
mm
76.00

130

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

131

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

6.0 Load Calculations for Pile Design


Estimation of Seismic Forces for Foundation
As per IITK RDSO Guidelines, for foundation design seismic force shall be lesser of :
1- force using R=1.5
2- Force developed when overstrength plastic moment hinges are formed in substructure.
As per Cl. C-5.3, over strength plastic moment capacity shall be taken as 1.3 times the ultimate moment capacity.

Governing moment in Pier


=
19077 kN.m
Moment Capacity of Pier
=
17170 kN.m
Over str. Plastic mom. Capacity
=
22321 kN.m
(1.3 times)
Equivalent Response reduction factor is calculated to get moment in pier equal to over strength plastic moment capacity. Max.
of this R and R=1.5 is taken for foundation design.
Equivalent R

2.0832

(As per IITK-RDSO Guidelines for Seismic Design of Railway Bridges)


(z/2).(Sa/g)h
h
=
(R/I)
(2/3)(z/2).(Sa/g)v
v
=
(R/I)
Where
Zone Factor

0.24

Equivalent Response Reduction Factor


Importance Factor
Average Response Acceleration coefficient

(Delhi lies in Seismic Zone IV)

R
=
2.083
I
=
1.5
(Sa/g)h
=
1.36 /T
(As per Cl.2.5.1.2 of DBR, medium soil site, Type II soil)

Summary of Longitudinal Seismic Coefficients


Loads at top of Loads at bot. of
Frequency
Height (L)
Time period
Pier
Pier
from Staad
Pier No.
m
kN
kN
1/sec
sec
148
6.463
8129.5
63.0
1.530
0.65
Loads at top of pier = Wt. of (DL of Superstr+SIDL+Shear key+Pedestal+Pier cap)
Loads at bottom of pier = Wt of (Crash barrier)
Summary of Transverse Seismic Coefficients
Loads at top of Loads at bot. of
Frequency
Height (L)
Time period
Pier
Pier
from Staad
Pier No.
m
kN
kN
1/sec
sec
148
6.463
8641.2
63.0
1.280
0.78
% of LL taken in calculations =
25 %
Loads at top of pier = Wt. of (DL of Superstr+SIDL+LL+Shear key+Pedestal+Pier cap)
Loads at bottom of pier = Wt of (Crash barrier)

132

Sa/g
2.08

Sa/g
1.74

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

As per 8.8 IITK-RDSO - The seismic zone factor for vertical ground motions, when required (see clause
6.8.1), may be taken as two-thirds of that for horizontal motions given table 3.
6.8.1 - Vertical Component of Seismic Action
In some cases, the effect of vertical component of ground motion has to be specifically considered. The
effect of vertical component is particularly imortant in following components/situations:
a. Prestressed concrete decks.
b. Bearings, hold down devices, and linkages.
c. Horizontal cantilever structural elements such as cantilevers of deck slabs and cantilever bridges.
d. Situations where stability (overturning / sliding ) become critical.
e. Bridge sites located near fault.
In pile foundation Stability is not critical (and other cases are not applicable) therefore
v

0.120

Estimation of Seismic Forces for Pile Foundation


Seismic Forces from Superstructure
Load Type

DL
SIDL
LIVE

Reaction from
Left Span
kN
2213.1
1291.4
1321.4

Right Span
kN
2584.9
1541.6
725.4

Longitudinal Seismic (r1)

Transverse Seismic (r2)

Left Span
kN
796.0
464.5
0.0

Right Span
kN
0.0
0.0
0.0

Left Span
kN
333.0
194.3
99.4

Non Seismic
Weights

Longitudinal
Seismic (r1)

Transverse
Seismic (r2)

Vertical
Seismic (r3)

kN
26.9
20.25
451.3
403.8
63.0
301.2
1265.6

kN
4.83
3.64
81.15
36.31
11.32
54.17
227.61

kN
4.04
3.05
67.90
30.38
9.47
45.32
190.44

kN
3.22
2.43
54.10
48.41
7.55
36.11
151.74

Seismic Forces Due to Substructure

Load Type

Shear Key
Pedestal
Pier Cap
Pier
Pier Crash Barrier
Soil above Pile cap
Pile cap

133

Right Span
kN
388.9
232.0
54.6

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

134

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

cture P148
Project Code

Date

2/21/2013

Rev

ment capacity.

stic moment capacity. Max.

smic Zone IV)

um soil site, Type II soil)

hL
0.180

hT
0.150

135

cture P148
Project Code

Date

2/21/2013

Rev

Vertical Seismic (r3)


Left Span
kN
265.3
154.8
79.2

Right Span
kN
309.9
184.8
43.5

136

cture P148
Project Code

Date

2/21/2013

Rev

137

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

6.1 Load Calculations

A space model is created in STAAD with pier, pier cap and soil stiffness as springs. Soil Spring calculations are given i
Unfactored loads are applied at pier cap top and pile cap top. Static stiffness springs are taken for static loads (viz. Dead load, S
load) and dynamic stiffness springs are taken for other loads (viz. Live load, seismic loads). Load combinations are created in
SLS and ULS factors. Staad file is attached in Appendix-4.

Non Seismic Forces


1. DEAD LOADS

DL Left Span
SIDL Left Span
DL Right Span
SIDL Right Span
Shear Key
Pedestal
A
B
C
D
Pier Cap
Pier
Crash Barrier
Soil above Pile cap
Pile cap

V
kN
2213.1
1291.4
2584.9
1541.6
26.9

eL
m
0.85
0.85
-0.85
-0.85
0.00

eT
m
0.20
0.20
0.28
0.28
0.00

ML
kN.m
1881.2
1097.7
-2197.2
-1310.3
0.0

MT
kN.m
437.1
255.1
727.6
433.9
0.0

5.1
5.1
5.1
5.1
451.3
403.8
63.0
301.2
1265.6
10163.0

0.85
-0.85
0.85
-0.85
0.00
0.00
0.00
0.00
0.00

1.30
1.30
-1.30
-1.30
0.00
0.00
0.00
0.00
0.00

4.3
-4.3
4.3
-4.3
0.0
0.0
0.0
0.0
0.0
-528.7

21.8
-21.8
21.8
-21.8
0.0
0.0
0.0
0.0
0.0
1853.8

V
kN
1321.4
725.4

eL
m
0.85
-0.85

eT
m
0.20
0.28
HL
kN
443.6
486.6
HT
kN
164.8
90.5

ML
kN.m
1123.2
-616.6
eL1
m
0.55
0.55
eT1
m
4.8
4.8

MT
kN.m
261.0
204.2
ML1
kN.m
244.0
267.6
MT1
kN.m
792.4
435.0

2. LIVE LOADS
Case IV - Both Spans Both tracks

Live Left Span


Live Right Span
braking, Tractive & LWR Forces
Case IV - Both Spans Both tracks
LWR Force
Centrifugal Forces (Pier)
Case IV - Both Spans Both tracks

138

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

V
Non Seismic Loads at Pier
cap top
kN
Dead Load
5296.5
SIDL
2833.0
Live Load
2046.8
LWR
Non Seismic Loads at Pile cap top
Dead Load
2033.5

Prepared
Checked
Verified

HL
kN

HT
kN

443.6
486.6

255.2

Harjot
R P Sharma
Sumant

ML
kN.m
-316.0
-212.6
750.5
267.6

MT
kN.m
1164.8
689.0
1692.7

0.0

0.0

ML-r3
kN.m
225.5
131.6
-263.4
-157.1
0.0
67.3
-37.0
0.5
-0.5
0.5
-0.5
0.0
0.0
0.0
0.0
0.0
-33.0

MT-r3
kN.m
52.4
30.6
87.2
52.0
0.0
15.6
12.2
0.8
0.8
-0.8
-0.8
0.0
0.0
0.0
0.0
0.0
250.1

Seismic Forces
Vertical Seismic Forces (r3)
Forces-Seismic (Pier)
DL Left Span
SIDL Left Span
DL Right Span
SIDL Right Span
Shear Key
Live Left Span
Live Right Span
Pedestal
A
B
C
D
Pier Cap
Pier
Crash Barrier
Soil above Pile cap
Pile cap

DL
SIDL
Live Load
Shear Key
Pedestal
Pier Cap
Loads at Pier cap top
Pier
Crash Barrier
Soil above Pile cap

FY
kN
265.3
154.8
309.9
184.8
3.2
79.2
43.5
0.61
0.61
0.61
0.61
54.1
48.4
7.5
36.1
151.7
1341.2

eL
m
0.85
0.85
-0.85
-0.85
0.00
0.85
-0.85
0.85
-0.85
0.85
-0.85
0.0
0.0
0.0
0.0
0.0

Longitudinal Seismic Forces (r1)


HL-r1
eL1
kN
m
796.04
0.55
464.51
0.55
0.00
4.81
4.83
0.43
3.64
0.13
81.15
-0.75
1350.2
36.31
2.33
0.00
0.75
0.00
0.25

139

eT
m
0.20
0.20
0.28
0.28
0.00
0.20
0.28
1.30
1.30
-1.30
-1.30
0.0
0.0
0.0
0.0
0.0

ML-r1
kN.m
437.82
255.48
0.00
2.05
0.46
-60.87
634.9
84.65
0.00
0.00

Transverse Seismic Forces (r2)


HT-r2
eT1
kN
m
721.95
1.54
426.28
3.10
153.99
4.81
4.04
0.43
3.05
0.13
67.90
-0.75
1377.2
30.38
2.33
0.00
0.75
0.00
0.25

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

Pile cap
Loads at Pile cap top

0.00
36.3

-0.75

0.00
84.7

0.00
30.4

-0.75

Seismic Loads at Pier cap top

V
kN

HL
kN
1350.2

HT
kN

ML
kN.m
634.9

MT
kN.m

Long. Seis. Forces (r1)


Trans. Seis. Forces (r2)
Ver. Seis. Forces (r3)
Seismic Loads at Pile cap top
Long. Seis. Forces (r1)
Trans. Seis. Forces (r2)
Ver. Seis. Forces (r3)

1377.2
1145.8

-33.0
36.3

3127.4
250.1

84.7
30.4

195.4

0.0

70.8
0.0

201
202
203
204
205
206
207
208
209
210
211
212
213

ULS G-I
ULS G-IIa (r1)
ULS G-IIa (r2)
ULS G-IIa (r3)
ULS G-IIa (+ r3)
ULS G-IIb (- r3)
ULS G-IIb (r1)
ULS G-IIb (r2)
ULS G-IIb (- r3)
ULS G-IIc (r1)
ULS G-IIc (r2)
ULS G-IIc (+ r3)
ULS G-IIc (- r3)

Load Combinations
SLS:

101
102
103
104
105
106
107
108
109
110

SLS G-I
SLS G-IIa (r1 )
SLS G-IIa (r2)
SLS G-IIa (r3)
SLS G-IIa (- r3)
SLS G-IIb (r1)
SLS G-IIb (r2)
SLS G-IIb (r3)
SLS G-IIb (- r3)
SLS G-III

ULS:

140

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

141

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

8
T
ructure P148
Project Code
Date
Rev

2/21/2013
0

pring calculations are given in Appendix-1.


r static loads (viz. Dead load, SIDL and LWR
ad combinations are created in STAAD with

142

8
T
ructure P148
Project Code
Date
Rev

2/21/2013
0

MT-r2
kN.m
1114.70
1321.03
740.52
1.72
0.38
-50.92
3127.4
70.82
0.00
0.00

143

8
T
ructure P148
Project Code
Date
Rev

2/21/2013
0

0.00
70.8

LS G-IIa (+ r3)
LS G-IIb (- r3)

LS G-IIb (- r3)

LS G-IIc (+ r3)
LS G-IIc (- r3)

144

8
T
ructure P148
Project Code
Date
Rev

2/21/2013
0

145

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Prepared
Checked
Verified

7.0 Vertical Pile Load Check


Reaction envelope from STAAD

Node
145

Env
+ve

145

-ve

146

+ve

146

-ve

147

+ve

147

-ve

148

+ve

148

-ve

149

+ve

149

-ve

150

+ve

150

-ve

Max Load
Min Load
Factor of Safety for

Normal Case
Vertical
Fy kN
2050.82
101 SLS G-I
0.00
2957.12
101 SLS G-I
0.00
1787.74
101 SLS G-I
0.00
881.44
101 SLS G-I
0.00
2866.96
101 SLS G-I
0.00
1665.70
101 SLS G-I
0.00
2957.1
0.0

Seismic Case
Vertical
Fy kN
3363.99
107 SLS G-IIB (R2)
0.00
3858.73
107 SLS G-IIB (R2)
0.00
2659.50
106 SLS G-IIB (R1)
-11.15
103 SLS G-IIA (R2)
1548.81
104 SLS G-IIA (R3)
-341.91
107 SLS G-IIB (R2)
3979.84
107 SLS G-IIB (R2)
0.00
1906.06
104 SLS G-IIA (R3)
0.00
3979.8
-341.9
1.15
1.5

LWR
Seismic

Max. Vertical reaction


=
Min. Vertical Reaction
=
Pile Capacity is calculated in Appendix-6.
Vertical Load Capacity in Compression
Vertical Load Capacity in Tension
8.0 SLS Pile Force Summary from STAAD
Beam
L/C
Max Fx
23
107 SLS G-IIB
Min Fx
22
107 SLS G-IIB
Max Fy
20
106 SLS G-IIB
Min Fy
19
103 SLS G-IIA
Max Fz
23
104 SLS G-IIA (
Min Fz
24
107 SLS G-IIB
Max Mx
19
107 SLS G-IIB
Min Mx
20
107 SLS G-IIB
Max My
24
107 SLS G-IIB

2957.1 kN =
-227.9 kN =

Node
29
22
20
19
23
24
19
20
24

146

=
=
(at 4m from pile cut off level)
Fx kN
Fy kN
4806.5
3.8
-490.6
-19.5
3594.3
100.4
3397.6
-50.6
2796.7
-0.9
172.4
3.8
3536.8
-48.9
4045.6
63.0
172.4
3.8

301.4
-23.2
3018 kN =
-1000
Fz kN
-14.6
-13.5
3.1
-0.8
7.3
-43.2
-3.3
-1.9
-43.2

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Min My
Max Mz
Min Mz

23
20
19

105 SLS G-IIA (


103 SLS G-IIA
106 SLS G-IIB

23
20
25

SLS Pile Force Summary from STAAD

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

Beam
41
40
38
37
41
42
37
38
38
42
37
38

L/C
107 SLS G-IIB
107 SLS G-IIB
103 SLS G-IIA
106 SLS G-IIB
105 SLS G-IIA (
107 SLS G-IIB
107 SLS G-IIB
107 SLS G-IIB
107 SLS G-IIB
104 SLS G-IIA (
103 SLS G-IIA
106 SLS G-IIB

Beam
53
52
49
50
54
50
49
50
50
54
49
50

L/C
107 SLS G-IIB
107 SLS G-IIB
103 SLS G-IIA
106 SLS G-IIB
104 SLS G-IIA (
107 SLS G-IIB
107 SLS G-IIB
107 SLS G-IIB
107 SLS G-IIB
101 SLS G-I
103 SLS G-IIA
110 SLS G-III

Node
47
40
38
37
41
42
37
38
38
48
43
38

Beam
23
22
20
19
23
24
19
20

L/C
203 ULS G-IIA
211 ULS G-IIC
206 ULS G-IIB
203 ULS G-IIA
202 ULS G-IIA
207 ULS G-IIB
203 ULS G-IIA
203 ULS G-IIA

Verified

-1.1
50.0
12.3

6.0
-0.6
-4.7

Fx kN
4859.5
-437.6
3541.8
781.9
2232.7
225.4
3589.8
4098.6
4098.6
2376.0
3468.2
3647.3

Fy kN
-10.1
-22.7
14.2
-80.3
-0.9
-10.1
-24.8
5.4
5.4
-0.8
-15.3
-51.1

Fz kN
-107.2
-111.5
-97.5
-14.0
-0.9
-116.9
-107.7
-107.6
-107.6
-12.1
-97.6
-13.6

(9m from pile cut off level to end of pile)


Node
59
52
49
50
54
50
49
50
50
60
49
50

ULS Pile Force Summary from STAAD

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx

Checked

(7m from pile cut off level)

SLS Pile Force Summary from STAAD

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

2179.7
3488.8
746.5

Prepared

Fx kN
4894.9
-402.3
3485.9
3682.7
2393.7
4133.9
3625.2
4133.9
4133.9
2120.9
3485.9
2945.7

Fy kN
-6.1
-7.1
3.6
-48.6
-0.4
-11.7
-1.6
-11.7
-11.7
-13.1
3.6
-29.1

Fz kN
-52.8
-55.1
-50.9
-9.2
-2.6
-55.8
-55.5
-55.8
-55.8
-11.5
-50.9
-8.6

(at 4m from pile cut off level)


Node
29
22
20
19
23
24
19
20

147

Fx kN
6442.6
-1282.6
4825.0
5048.9
3440.7
467.9
5048.9
5180.0

Fy kN
-1.4
-12.0
132.5
-72.5
55.2
5.2
-72.5
71.7

Fz kN
-20.1
-10.2
3.6
-1.7
8.9
-57.7
-1.7
-1.4

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Max My
Min My
Max Mz
Min Mz

24
23
20
19

203 ULS G-IIA


213 ULS G-IIC
203 ULS G-IIA
202 ULS G-IIA

24
23
20
25

ULS Pile Force Summary from STAAD

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

Beam
41
40
38
37
41
42
37
38
38
42
37
38

L/C
203 ULS G-IIA
211 ULS G-IIC
203 ULS G-IIA
202 ULS G-IIA
213 ULS G-IIC
203 ULS G-IIA
203 ULS G-IIA
203 ULS G-IIA
203 ULS G-IIA
212 ULS G-IIC
203 ULS G-IIA
202 ULS G-IIA

Beam
53
52
49
50
51
50
49
50
50
54
49
50

L/C
203 ULS G-IIA
211 ULS G-IIC
203 ULS G-IIA
202 ULS G-IIA
210 ULS G-IIC
203 ULS G-IIA
203 ULS G-IIA
203 ULS G-IIA
203 ULS G-IIA
201 ULS G-I
203 ULS G-IIA
202 ULS G-IIA

Checked
Verified

-1.4
-0.9
71.7
25.3

-55.5
4.7
-1.4
-4.0

(7m from pile cut off level)


Node
47
40
38
37
41
42
37
38
38
48
43
38

ULS Pile Force Summary from STAAD

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

-160.8
1591.5
5180.0
578.3

Prepared

Fx kN
6508.9
-1234.9
5246.2
622.4
1639.3
-94.5
5115.2
5246.2
5246.2
2148.1
5137.2
4524.3

Fy kN
-1.2
-10.7
19.8
-110.1
-0.7
-1.2
-21.3
19.8
19.8
-0.6
-21.3
-70.6

Fz kN
-155.0
-146.9
-155.4
-5.6
-0.1
-168.2
-155.6
-155.4
-155.4
-10.4
-155.6
-5.0

(9m from pile cut off level to end of pile)


Node
59
52
49
50
51
50
49
50
50
60
49
50

Fx kN
6553.1
-1203.1
5159.3
4568.4
3081.5
5290.4
5159.3
5290.4
5290.4
2893.6
5159.3
4568.4

Fy kN
-0.5
-2.7
5.4
-65.6
-60.5
-6.5
5.4
-6.5
-6.5
-20.7
5.4
-65.6

Fz kN
-76.5
-73.4
-80.8
-6.3
-1.7
-80.8
-80.8
-80.8
-80.8
-17.9
-80.8
-6.3

SLS and ULS design of pile is checked with software Oasys. Output of Oasys is attached in Appendix 5.
Pile Dia
Reinf. Provided

=
8
8

No. of
No. of

% of reinforcement
Reinf. Provided

dia bar
dia bar

25
16

dia bar
dia bar

=
8
8

No. of
No. of

% of reinforcement
Reinf. Provided

1000 mm
25
25

No. of

16

148

(8.14m to 10.14m from pile cut off level)


0.70 %

=
16

(Up to 8.14 m from Pile cut off Level)


1.00 %

dia bar

(10.14m from pile cut off level to end of p

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Prepared
Checked
Verified

% of reinforcement

0.41 %

Permissible stress in concrete in SLS


Permissible stress in reinf. in SLS

=
=

17.5 MPa
375 MPa

Following cases are considered and found safe in SLS


Forces for SLS Check
Beam

Load Case

23
22
24

107 SLS G-IIB (R2)


107 SLS G-IIB (R2)
107 SLS G-IIB (R2)

Axial Force
kN
4806.5
-490.6
172.4

Forces for SLS Check


Beam

Load Case

41
40
38

107 SLS G-IIB (R2)


107 SLS G-IIB (R2)
107 SLS G-IIB (R2)

Axial Force
kN
4859.5
-437.6
4098.6

Forces for SLS Check


Beam

Load Case

53
52
50

107 SLS G-IIB (R2)


107 SLS G-IIB (R2)
110 SLS G-III

Axial Force
kN
4894.9
-402.3
2945.7

Forces for ULS Design


Beam

Load Case

23
22
24

203 ULS G-IIA (R2)


211 ULS G-IIC (R2)
203 ULS G-IIA (R2)

41
40
38

kN.m
441.3
465.4
517.6

kN.m
-40.2
-99.4
-36.4

(7m from pile cut off level)


BM My
BM Mz
kN.m
151.6
264.3
266.5

kN.m
-17.4
-29.3
-44.5

(9m from pile cut off level to end of pile)


BM My
BM Mz
kN.m
10.6
60.5
14.8

kN.m
-2.0
9.7
-104.6

(at 4m from pile cut off level)


Axial Force
BM My
BM Mz
kN
6442.6
-1282.6
-160.8

Forces for ULS Design


Beam

(at 4m from pile cut off level)


BM My
BM Mz

Axial Force

Load Case

kN
6508.9
-1234.9
5246.2

203 ULS G-IIA (R2)


211 ULS G-IIC (R2)
203 ULS G-IIA (R2)

149

kN.m
637.6
603.1
737.2

kN.m
-5.1
-44.9
-6.6

(7m from pile cut off level)


BM My
BM Mz
kN.m
219.6
351.6
385.7

kN.m
-1.2
-7.5
-21.2

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Forces for ULS Design


Beam

Load Case

53
52
50

203 ULS G-IIA (R2)


211 ULS G-IIC (R2)
202 ULS G-IIA (R1)

Axial Force
kN
6553.1
-1203.1
4568.4

Forces for ULS Design


Load Case

50
52
50

203 ULS G-IIA (R2)


211 ULS G-IIC (R2)
202 ULS G-IIA (R1)
3

Checked
Verified

(9m from pile cut off level to end of pile)


BM My
BM Mz
kN.m
15.3
82.5
15.1

kN.m
0.2
10.6
-130.3

(9m from pile cut off level to end of pile)

Beam

FOS

Prepared

Axial Force

BM My

BM Mz

kN
5290.4
-1203.1
4568.4

kN.m
99.0
82.5
15.1

kN.m
-46.3
10.6
-130.3

IS 2911 Part 1/sec2 : 2010

Clause 6.3.2

Ultimate Shaft Resistance


kN
0.0
122.0
386.0
690.0

At Pile Cut off Level


At 4 m from Pile Cut off Level
At 7 m from Pile Cut off Level
At 9 m from Pile Cut off Level

Safe Shaft Resistance


kN
0.0
40.7
128.7
230.0

After taking Shaft resistance at corresponding Levels axial loads and moments : Forces for ULS Design

(at 4m from pile cut off level)

Beam

Load Case

23
22
24

203 ULS G-IIA (R2)


211 ULS G-IIC (R2)
203 ULS G-IIA (R2)

Axial Force

BM My

BM Mz

kN
6483.3
-1241.9
-120.1

kN.m
637.6
603.1
737.2

kN.m
-5.1
-44.9
-6.6

Forces for ULS Design

(7m from pile cut off level)

Beam

Load Case

41
40
38

203 ULS G-IIA (R2)


211 ULS G-IIC (R2)
203 ULS G-IIA (R2)

Forces for ULS Design

Axial Force

BM My

BM Mz

kN
6637.6
-1106.2
5374.9

kN.m
219.6
351.6
385.7

kN.m
-1.2
-7.5
-21.2

(9m from pile cut off level to end of pile)

150

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Beam

Load Case

50
52
50

203 ULS G-IIA (R2)


211 ULS G-IIC (R2)
202 ULS G-IIA (R1)

Prepared
Checked
Verified

Axial Force

BM My

BM Mz

kN
5520.4
-973.1
4798.4

kN.m
99.0
82.5
15.1

kN.m
-46.3
10.6
-130.3

Crack Width Check


For SLS G-I, Pile Force Summary from STAAD

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

Beam
23
4
2
19
5
24
1
2
12
5
2
7

L/C
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I

(Upto 4m from pile cut off level)


Node
29
4
2
19
5
24
1
2
18
5
2
13

Fx kN
3470.0
778.9
3031.0
2074.3
3399.3
2014.9
2021.3
3031.0
1997.2
3399.3
3031.0
2056.6

For SLS G-I, Pile Force Summary from STAAD

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

Beam
143
28
26
25
72
30
25
26
30
60
49
25

L/C
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I

Fz kN
-0.3
43.5
62.0
-4.5
62.4
-32.5
57.2
62.0
9.2
62.4
62.0
48.9

(4m from pile cut off level to end of pile)


Node
149
28
26
25
72
30
25
26
30
66
55
25

Fx kN
3823.4
849.6
3101.7
2092.0
2156.3
2032.6
2092.0
3101.7
2032.6
2138.6
2180.3
2092.0

SLS Check for Crack Width


Beam

Fy kN
9.5
27.1
158.0
-35.0
74.1
9.5
11.9
158.0
66.1
74.1
158.0
4.9

Axial Force

Load Case

kN

151

Fy kN
0.0
-36.1
34.5
-42.3
0.6
-8.1
-42.3
34.5
-8.1
-6.1
-10.2
-42.3

Fz kN
0.0
-27.0
-17.1
-18.9
3.5
-39.9
-18.9
-17.1
-39.9
-2.1
-13.9
-18.9

(Upto 4m from pile cut off level)


BM My
BM Mz
kN.m

kN.m

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

23
4
2

101 SLS G-I


101 SLS G-I
101 SLS G-I

3470.0
778.9
3031.0

SLS Check for Crack Width


Beam

Load Case

143
28
28

101 SLS G-I


101 SLS G-I
101 SLS G-I

Prepared
Checked
Verified

105.2
51.7
-28.1

-84.1
-112.0
454.8

(4m from pile cut off level to end of pile)


Axial Force
BM My
BM Mz
kN
3823.4
849.6
849.6

kN.m
0.0
124.0
124.0

kN.m
0.0
-128.0
-128.0

Crack width of pile is checked with software Oasys. Output of Oasys is attached in Appendix 5.
Shear Check for Pile
ULS:

201
202
203
204
205
206
207

ULS G-I
ULS G-IIa (r1)
ULS G-IIa (r2)
ULS G-IIa (r3)
ULS G-IIa (- r3)
ULS G-IIb (r1)
ULS G-IIb (r2)

208
209
210
211
212
213

ULS G-IIb (r3)


ULS G-IIb (-r3)
ULS G-IIc (r1)
ULS G-IIc (r2)
ULS G-IIc (r3)
ULS G-IIc (- r3)

ULS Pile Force Envelope from STAAD (1m from pile cut off level)

Max Fy
Min Fy
Max Fz
Min Fz

Beam
2
1
2
6

L/C
202 ULS G-IIA
203 ULS G-IIA
203 ULS G-IIA
202 ULS G-IIA

Node
2
1
2
6

Fx kN
4391.7
4982.6
5113.7
2752.8

Fy kN
460.3
-104.2
105.1
349.8

Fz kN
20.1
407.2
407.6
-26.2

Fy kN
423.0
-102.6
103.2
314.3

Fz kN
18.8
353.5
354.0
-26.8

ULS Pile Force Envelope from STAAD (2m from pile cut off level)

Max Fy
Min Fy
Max Fz
Min Fz

Beam
8
7
8
12

L/C
202 ULS G-IIA
203 ULS G-IIA
203 ULS G-IIA
202 ULS G-IIA

Node
8
7
8
12

Fx kN
4413.8
5004.7
5135.8
2774.9

ULS Pile Force Envelope from STAAD (2m from pile cut off level to end of pile)

Max Fy
Min Fy
Max Fz
Min Fz

Beam
14
37
14
36

Shear Link Provided

L/C
202 ULS G-IIA
202 ULS G-IIA
203 ULS G-IIA
203 ULS G-IIA

Node
14
37
14
36

Dia
mm

Spacing
mm

152

Fx kN
4435.9
622.4
5157.9
-116.6

Fy kN
277.1
-110.1
90.4
-1.4

Fz kN
13.0
-5.6
165.7
-172.6

Distance from Pile cut off level


mm

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

10
8

130
190

153

Prepared
Checked
Verified

2000
2000 to end of pile

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Prepared
Checked
Verified

As per AASHTO, Clause 5.8.2.9


dv = 0.9 * de
where Dr = dia of the circle passing through the centers of longitudinal reinforcement.
bv = dia of the section
de = D/2 + Dr /
D
=
1000 mm
bv
=
Pile Area
=

Beam

2
8
14

Depth below
cutoff level

0
2
3

Maximum
HR= (Fy2 +
Fz2)0.5

Dr

dv

kN
460.75
423.43
277.42

mm
730
730
734

mm
659
659
660

Depth
factor, s

0.93
0.93
0.93

1000
785398

Shear stress, v
N/mm2
0.70
0.64
0.42

Increase in shear stress is done as per IRS:CBC, Clause 15.6.6.

Beam

P (ULS)

2
8
14

kN
4392
4414
4436

Inc_factor n= (s.vc1)= s.vc *


Shear Link
Shear Check
(1+0.05 P/ Ac)
n
dia
N/mm2
1.28
1.28
1.28

N/mm2
0.67
0.58
0.49

154

links req.
links req.
OK

mm
10
10
8

No. of legs

2
2
2

CC-28
L&T
Substructure P148
Harjot
R P Sharma
Sumant

Project Code

Date

2/21/2013

Rev

LWR Case
Vertical
Fy kN
1555.33
110 SLS G-III
0.00
2930.35
110 SLS G-III
0.00
2139.62
110 SLS G-III
0.00
764.60
110 SLS G-III
0.00
2587.69
110 SLS G-III
0.00
1775.40
110 SLS G-III
0.00
2930.3
-6.0

t
t

kN

307.7 t OK
OK

Mx kNm
0.0
0.7
-0.1
0.7
0.0
0.0
0.7
-0.7
0.0

My kNm
441.3
465.4
56.8
398.8
8.8
517.6
442.4
440.3
517.6

Mz kNm
-40.2
-99.4
-104.2
-105.1
-4.3
-36.4
-141.2
78.9
-36.4

155

CC-28
L&T
Substructure P148
Harjot
R P Sharma
Sumant

Project Code

0.0
-0.7
0.1

4.7
398.2
62.9

-4.8
99.1
-304.7

Mx kNm
0.0
0.7
-0.7
0.1
0.0
0.0
0.7
-0.7
-0.7
0.0
0.7
-0.1

My kNm
151.6
264.3
242.9
37.7
15.3
253.4
265.8
266.5
266.5
1.6
145.3
42.0

Mz kNm
-17.4
-29.3
-14.2
-189.7
-1.7
-27.5
-13.4
-44.5
-44.5
-0.8
26.0
-207.0

Mx kNm
0.0
0.7
0.7
-0.1
0.0
-0.7
0.7
-0.7
-0.7
0.0
0.7
-0.1

My kNm
10.6
60.5
62.8
15.7
-5.9
68.2
67.4
68.2
68.2
-9.8
62.8
14.8

Mz kNm
-2.0
9.7
31.1
-97.0
-0.2
-44.5
24.7
-44.5
-44.5
-4.6
31.1
-104.6

Mx kNm
0.0
1.0
-0.1
1.1
0.0
0.0
1.1
-1.1

My kNm
637.6
603.1
81.1
635.0
10.8
664.3
635.0
634.3

Mz kNm
-5.1
-44.9
-122.3
-149.1
-305.6
-51.1
-149.1
140.4

Date

2/21/2013

Rev

156

CC-28
L&T
Substructure P148
Harjot
R P Sharma
Sumant

Project Code

0.0
0.0
-1.1
0.0

737.2
1.6
634.3
31.3

-6.6
-4.1
140.4
-416.3

Mx kNm
0.0
1.0
-1.1
0.0
0.0
0.0
1.1
-1.1
-1.1
0.0
1.1
0.0

My kNm
219.6
351.6
385.7
20.7
10.8
369.5
385.7
385.7
385.7
0.5
230.1
26.5

Mz kNm
-1.2
-7.5
-21.2
-265.9
-1.4
-2.4
16.2
-21.2
-21.2
-0.7
37.5
-281.2

Mx kNm
0.0
1.0
1.1
0.0
0.0
-1.1
1.1
-1.1
-1.1
0.0
1.1
0.0

My kNm
15.3
82.5
98.8
15.1
-1.0
99.0
98.8
99.0
99.0
-14.0
98.8
15.1

Mz kNm
0.2
10.6
44.3
-130.3
-108.1
-46.3
44.3
-46.3
-46.3
-7.3
44.3
-130.3

Date

2/21/2013

Rev

in Appendix 5.

p to 8.14 m from Pile cut off Level)

14m to 10.14m from pile cut off level)

0.14m from pile cut off level to end of pile)

157

CC-28
L&T
Substructure P148

le cut off level)

Harjot
R P Sharma
Sumant

Project Code

Date

2/21/2013

Rev

Bending
Moment
kN
443.1
475.9
518.9

(Max. Axial Load)


(Min. Axial Load)
(Max. Moment)

Bending
Moment
kN
152.6
266.0
270.2

(Max. Axial Load)


(Min. Axial Load)
(Max. Moment)

cut off level to end of pile)


Bending
Moment

le cut off level)

kN
10.8
61.3
105.6

(Max. Axial Load)


(Min. Axial Load)
(Max. Moment)

Bending
Moment
kN
637.6
604.8
737.2

(Max. Axial Load)


(Min. Axial Load)
(Max. Moment)

Bending
Moment
kN
219.6
351.7
386.3

(Max. Axial Load)


(Min. Axial Load)
(Max. Moment)

158

CC-28
L&T
Substructure P148
Harjot
R P Sharma
Sumant

Project Code

Date

2/21/2013

Rev

cut off level to end of pile)


Bending
Moment
kN
15.3
83.1
131.1

(Max. Axial Load)


(Min. Axial Load)
(Max. Moment)

cut off level to end of pile)


Bending
Moment
kN
109.3
83.1
131.1

(Max. Axial Load)


(Min. Axial Load)
(Max. Moment)

fe Shaft Resistance
kN
0.0
40.7
128.7
230.0

le cut off level)


Bending
Moment
kN
637.6
604.8
737.2

(Max. Axial Load)


(Min. Axial Load)
(Max. Moment)

Bending
Moment
kN
219.6
351.7
386.3

(Max. Axial Load)


(Min. Axial Load)
(Max. Moment)

cut off level to end of pile)

159

CC-28
L&T
Substructure P148
Harjot
R P Sharma
Sumant

Project Code

Date

2/21/2013

Rev

Bending
Moment
kN
109.3
83.1
131.1

(Max. Axial Load)


(Min. Axial Load)
(Max. Moment)

pile cut off level)


Mx kNm
0.0
0.1
-0.1
0.1
0.0
0.0
0.1
-0.1
0.0
0.0
-0.1
0.1

My kNm
105.2
51.7
-28.1
115.7
-36.2
172.2
-10.8
-28.1
186.8
-36.2
-28.1
95.3

Mz kNm
-84.1
-112.0
454.8
-168.5
102.5
-74.6
-169.3
454.8
-37.7
102.5
454.8
-186.2

My kNm
0.0
124.0
110.0
111.2
-9.5
139.7
111.2
110.0
139.7
-11.9
5.2
111.2

Mz kNm
0.0
-128.0
-28.0
-133.6
3.1
-84.1
-133.6
-28.0
-84.1
1.5
21.3
-133.6

ut off level to end of pile)


Mx kNm
0.0
0.1
-0.1
0.1
0.0
0.0
0.1
-0.1
0.0
0.0
0.1
0.1

pile cut off level)

Bending
Moment
kN

160

CC-28
L&T
Substructure P148
Harjot
R P Sharma
Sumant

134.6
123.3
455.6

Project Code

Date

2/21/2013

Rev

(Max. Axial Load)


(Min. Axial Load)
(Max. Moment)

ut off level to end of pile)


Bending
Moment
kN
0.0
178.2
178.2

(Max. Axial Load)


(Min. Axial Load)
(Max. Moment)

Mx kNm
0.0
1.1
-1.1
0.0

My kNm
-31.3
-290.9
-293.0
171.0

Mz kNm
1007.8
-446.4
439.1
539.9

Mx kNm
0.0
1.1
-1.1
0.0

My kNm
-11.1
116.2
114.6
144.9

Mz kNm
547.5
-342.2
334.0
190.1

Mx kNm
0.0
0.0
-1.1
0.0

My kNm
7.6
20.7
468.6
542.0

Mz kNm
124.5
-265.9
230.8
-3.7

161

CC-28
L&T
Substructure P148
Harjot
R P Sharma
Sumant

Project Code

Date

2/21/2013

Rev

162

CC-28
L&T
Substructure P148
Harjot
R P Sharma
Sumant

Project Code

Date

2/21/2013

Rev

mm
mm2
Shear
% of Reinf, Pt resistance,
vc
%
0.50
0.35
0.20

Max. sv if
v<svc1
mm
141
-

N/mm2
0.56
0.49
0.41

s.vc
N/mm2
0.52
0.46
0.38

sv required
sv provided
if v>svc1
mm
131.00
123.00
-

mm
130.00
130.00
190.00

163

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

9.0 Pile Cap : ULS Design


In Pilecap design, loads from center pile is not considered as it is coming just under pier. Pile cap is designed based on
Beam Theory. Inscribed square is taken for pier . ULS pile loads from pile design model are taken for getting maximum
load for pile cap design.
ULS Pile forces from pile design model (as in Appendix-4)
Beam
1

L/C
Node
201 ULS G1
7
202 ULS G1
7
203 ULS G1
7
204 ULS G1
7
205 ULS G1
7
206 ULS G1
7
207 ULS G1
7
208 ULS G1
7
209 ULS G1
7
210 ULS G1
7
211 ULS G1
7
212 ULS G1
7
213 ULS G1
7
201 ULS G2
8
202 ULS G2
8
203 ULS G2
8
204 ULS G2
8
205 ULS G2
8
206 ULS G2
8
207 ULS G2

Fx kN
2862.615
-2884.704
489.894
-511.984
4982.623
-5004.712
4982.623
-5004.712
2012.727
-2034.816
1097.258
-1119.347
4607.201
-4629.291
4607.201
-4629.291
2286.971
-2309.06
-353.767
337.863
3858.166
-3874.07
1753.662
-1769.567
1073.888
-1089.793
4454.882
-4476.972
4391.726
-4413.815
5113.697
-5135.786
5113.697
-5135.786
2152.312
-2174.401
4758.713
-4780.803
5322.753

Fy kN
29.554
-29.554
318.934
-318.934
-104.202
104.202
-104.202
104.202
-54.072
54.072
273.721
-273.721
-56.853
56.853
-56.853
56.853
-17.69
17.69
322.932
-322.932
-73.758
73.758
-57.092
57.092
-26.761
26.761
240.69
-240.69
460.314
-460.314
105.084
-105.084
105.084
-105.084
55.046
-55.046
443.004
-443.004
165.481

164

Fz kN
89.422
-89.422
1.611
-1.611
407.185
-407.185
407.185
-407.185
8.11
-8.11
35.098
-35.098
351.953
-351.953
351.953
-351.953
40.176
-40.176
-2.139
2.139
378.087
-378.087
8.702
-8.702
3.955
-3.955
96.977
-96.977
20.124
-20.124
407.634
-407.634
407.634
-407.634
8.606
-8.606
52.502
-52.502
355.245

Mx kNm
0.216
-0.216
0.012
-0.012
1.08
-1.08
1.08
-1.08
0.002
-0.002
0.095
-0.095
0.93
-0.93
0.93
-0.93
0.088
-0.088
0.01
-0.01
1.012
-1.012
0.003
-0.003
0.001
-0.001
-0.211
0.211
0.005
-0.005
-1.08
1.08
-1.08
1.08
-0.002
0.002
-0.079
0.079
-0.928

My kNm
-16.119
-73.304
34.847
-36.458
-290.949
-116.236
-290.949
-116.236
3.011
-11.122
20.266
-55.364
-234.262
-117.691
-234.262
-117.691
-4.606
-35.57
30.148
-28.009
-275.286
-102.801
-0.059
-8.644
0.301
-4.256
-43.408
-53.569
-31.262
11.138
-293.003
-114.632
-293.003
-114.632
0.792
-9.398
-41.926
-10.576
-246.41

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

208 ULS G209 ULS G210 ULS G211 ULS G212 ULS G213 ULS G3

201 ULS G202 ULS G203 ULS G204 ULS G205 ULS G206 ULS G207 ULS G208 ULS G209 ULS G210 ULS G211 ULS G212 ULS G213 ULS G-

201 ULS G202 ULS G203 ULS G204 ULS G205 ULS G206 ULS G-

8
2
8
2
8
2
8
2
8
2
8
2
8
3
9
3
9
3
9
3
9
3
9
3
9
3
9
3
9
3
9
3
9
3
9
3
9
3
9
4
10
4
10
4
10
4
10
4
10
4

-5344.843
5322.753
-5344.843
3009.171
-3031.26
3253.947
-3269.851
3930.794
-3946.699
1818.313
-1834.217
1154.496
-1170.4
2541.067
-2563.156
3860.736
-3882.825
-631.992
609.903
-631.992
609.903
1695.686
-1717.775
3674.593
-3696.682
164.649
-186.738
164.649
-186.738
1983.148
-2005.237
2954.256
-2970.16
-1257.676
1241.772
1448.906
-1464.81
924.522
-940.426
948.799
-970.889
-41.096
19.007
-763.067
740.977
-763.067
740.977
1556.101
-1578.19
13.137

-165.481
165.481
-165.481
126.388
-126.388
407.275
-407.275
74.247
-74.247
57.495
-57.495
27.336
-27.336
217.117
-217.117
455.405
-455.405
32.269
-32.269
32.269
-32.269
51.239
-51.239
430.629
-430.629
100.054
-100.054
100.054
-100.054
114.875
-114.875
404.504
-404.504
7.814
-7.814
53.692
-53.692
25.598
-25.598
53.127
-53.127
323.843
-323.843
-31.386
31.386
-31.386
31.386
-50.264
50.264
286.096

165

Prepared
Checked
Verified

-355.245
355.245
-355.245
43.504
-43.504
15.045
-15.045
378.336
-378.336
8.908
-8.908
4.247
-4.247
62.969
-62.969
-17.565
17.565
388.01
-388.01
388.01
-388.01
-6.627
6.627
13.012
-13.012
329.867
-329.867
329.867
-329.867
21.557
-21.557
-13.6
13.6
366.625
-366.625
-6.92
6.92
-3.346
3.346
70.524
-70.524
0.949
-0.949
388.459
-388.459
388.459
-388.459
-6.131
6.131
30.416

0.928
-0.928
0.928
-0.086
0.086
0.006
-0.006
-1.012
1.012
-0.003
0.003
-0.001
0.001
-0.203
0.203
-0.002
0.002
-1.071
1.071
-1.071
1.071
0.005
-0.005
-0.084
0.084
-0.919
0.919
-0.919
0.919
-0.079
0.079
-0.004
0.004
-1.006
1.006
0.005
-0.005
0.002
-0.002
0.197
-0.197
-0.015
0.015
1.071
-1.071
1.071
-1.071
-0.005
0.005
0.069

Harjot
R P Sharma
Sumant

-108.834
-246.41
-108.834
-16.884
-26.62
-31.043
15.998
-276.424
-101.912
-1.041
-7.867
-0.992
-3.255
97.573
-160.543
122.423
-104.858
-203.373
-184.636
-203.373
-184.636
74.66
-68.033
118.288
-131.3
-136.24
-193.627
-136.24
-193.627
80.973
-102.53
82.494
-68.893
-222.94
-143.685
67.219
-60.299
37.716
-34.37
70.284
-140.807
56.313
-57.262
-205.427
-183.032
-205.427
-183.032
72.44
-66.309
56.096

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

207 ULS G208 ULS G209 ULS G210 ULS G211 ULS G212 ULS G213 ULS G5

201 ULS G202 ULS G203 ULS G204 ULS G205 ULS G206 ULS G207 ULS G208 ULS G209 ULS G210 ULS G211 ULS G212 ULS G213 ULS G-

201 ULS G202 ULS G203 ULS G204 ULS G205 ULS G-

10
4
10
4
10
4
10
4
10
4
10
4
10
4
10
5
11
5
11
5
11
5
11
5
11
5
11
5
11
5
11
5
11
5
11
5
11
5
11
5
11
6
12
6
12
6
12
6
12
6

-35.227
-550.902
528.813
-550.902
528.813
1260.947
-1283.037
-653.458
637.554
-1330.305
1314.401
1384.255
-1400.16
843.914
-859.818
4908.215
-4930.305
3374.435
-3396.524
6354.285
-6376.375
6354.285
-6376.375
2880.777
-2902.866
3987.947
-4010.036
6315.955
-6338.044
6315.955
-6338.044
3602.277
-3624.366
2006.632
-2022.536
4800.242
-4816.147
2469.437
-2485.341
1543.828
-1559.732
2694.796
-2716.885
2752.814
-2774.903
-227.037
204.948
-227.037
204.948
2346.458

-286.096
8.573
-8.573
8.573
-8.573
-6.176
6.176
325.702
-325.702
-7.325
7.325
-53.289
53.289
-25.023
25.023
117.915
-117.915
349.848
-349.848
-0.883
0.883
-0.883
0.883
-0.974
0.974
320.645
-320.645
46.636
-46.636
46.636
-46.636
46.565
-46.565
328.321
-328.321
-0.489
0.489
-0.403
0.403
-0.575
0.575
117.915
-117.915
349.848
-349.848
-0.883
0.883
-0.883
0.883
-0.974

166

Prepared
Checked
Verified

-30.416
333.158
-333.158
333.158
-333.158
24.885
-24.885
3.583
-3.583
366.874
-366.874
-6.714
6.714
-3.054
3.054
96.046
-96.046
21.06
-21.06
374.256
-374.256
374.256
-374.256
16.134
-16.134
51.054
-51.054
326.988
-326.988
326.988
-326.988
47.206
-47.206
12.674
-12.674
343.794
-343.794
17.292
-17.292
8.055
-8.055
30.749
-30.749
-26.179
26.179
327.016
-327.016
327.016
-327.016
-20.093

-0.069
0.917
-0.917
0.917
-0.917
0.077
-0.077
-0.012
0.012
1.006
-1.006
-0.005
0.005
-0.002
0.002
0.004
-0.004
0.01
-0.01
0
0
0
0
0
0
0.009
-0.009
0.002
-0.002
0.002
-0.002
0.002
-0.002
0.009
-0.009
0
0
0
0
0
0
-0.004
0.004
-0.01
0.01
0
0
0
0
0

Harjot
R P Sharma
Sumant

-86.512
-148.388
-184.77
-148.388
-184.77
68.695
-93.58
21.303
-24.887
-224.078
-142.796
66.237
-59.523
36.422
-33.368
-48.729
-47.317
-44.783
23.723
-176.583
-197.673
-176.583
-197.673
-35.991
19.857
-46.361
-4.693
-149.33
-177.659
-149.33
-177.659
-39.493
-7.713
-28.872
16.198
-152.434
-191.36
-37.114
19.822
-20.629
12.574
231.923
-262.672
171.03
-144.851
39.231
-366.247
39.231
-366.247
140.28

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

206 ULS G207 ULS G208 ULS G209 ULS G210 ULS G211 ULS G212 ULS G213 ULS G-

12
6
12
6
12
6
12
6
12
6
12
6
12
6
12
6
12

-2368.548
2729.607
-2751.696
401.598
-423.688
401.598
-423.688
2412.142
-2434.231
1655.79
-1671.694
-1137.82
1121.916
2036.748
-2052.652
1274.832
-1290.736

Prepared
Checked
Verified

0.974
320.645
-320.645
46.636
-46.636
46.636
-46.636
46.565
-46.565
328.321
-328.321
-0.489
0.489
-0.403
0.403
-0.575
0.575

20.093
-3.408
3.408
272.526
-272.526
272.526
-272.526
1.347
-1.347
-15.563
15.563
315.558
-315.558
-21.268
21.268
-9.857
9.857

0
-0.009
0.009
-0.002
0.002
-0.002
0.002
-0.002
0.002
-0.009
0.009
0
0
0
0
0
0

Harjot
R P Sharma
Sumant

-120.186
195.387
-191.98
92.419
-364.945
92.419
-364.945
171.363
-172.71
100.126
-84.563
-23.437
-292.122
128.954
-107.686
71.297
-61.44

Grade of concrete

35 N/mm2

Grade of steel
Depth of Pile Cap
Diameter of Pile
Density of Soil
Thickness of soil layer
Dia of Pier
Area of pier
Equivalent square side of pier
Area of Pile cap

=
=
=
=
=
=
=
=
=

500 N/mm2
1.5 m
1m
20 kN/m3
0.5 m
2100 mm
3463605.9006 mm2
1484 mm
33.75 m2

P5

P6

167

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

Lever arm for moment along long. Direc. (from face of inscribed square to pile center) =
Length for calculating downward moment along long. Dir. (from face of inscribed square) =
Lever arm for moment along trans. direc. (from face of inscribed square to pile center) =
Length for calculating downward moment along trans. dir. (from face of inscribed square) =

Loads for Designing Pile Cap

ULS Load Case


201 ULS G-I

202 ULS G-IIA (R1)

203 ULS G-IIA (R2)

204 ULS G-IIA (R3)

205 ULS G-IIA (- R3)

206 ULS G-IIB (R1)

Beam / Pile
No.
P1
P2
P3
P4
P5
P6
P1
P2
P3
P4
P5
P6
P1
P2
P3
P4
P5
P6
P1
P2
P3
P4
P5
P6
P1
P2
P3
P4
P5
P6
P1
P2
P3
P4

Pile load
kN
2862.6
4454.9
2541.1
948.8
4908.2
2694.8
489.9
4391.7
3860.7
-41.1
3374.4
2752.8
4982.6
5113.7
-632.0
-763.1
6354.3
-227.0
4982.6
5113.7
-632.0
-763.1
6354.3
-227.0
2012.7
2152.3
1695.7
1556.1
2880.8
2346.5
1097.3
4758.7
3674.6
13.1

168

Load for Longitudinal Steel


Design
P1 + P4
P2 + P3
kN
kN
3811.4
6995.9

Load for Transverse Steel


Design
P1 + P2 + P5

kN
12225.7

448.8

8252.5

8256.1

4219.6

4481.7

16450.6

4219.6

4481.7

16450.6

3568.8

3848.0

7045.8

1110.4

8433.3

9843.9

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

207 ULS G-IIB (R2)

208 ULS G-IIB (R3)

209 ULS G-IIB (- R3)

210 ULS G-IIC (R1)

211 ULS G-IIC (R2)

212 ULS G-IIC ( R3)

213 ULS G-IIC (- R3)

Pier P148
AECOM/CC28/PF148
10761.372

P5
P6
P1
P2
P3
P4
P5
P6
P1
P2
P3
P4
P5
P6
P1
P2
P3
P4
P5
P6
P1
P2
P3
P4
P5
P6
P1
P2
P3
P4
P5
P6
P1
P2
P3
P4
P5
P6
P1
P2
P3
P4
P5
P6

3987.9
2729.6
4607.2
5322.8
164.6
-550.9
6316.0
401.6
4607.2
5322.8
164.6
-550.9
6316.0
401.6
2287.0
3009.2
1983.1
1260.9
3602.3
2412.1
-353.8
3253.9
2954.3
-653.5
2006.6
1655.8
3858.2
3930.8
-1257.7
-1330.3
4800.2
-1137.8
1818.3
-632.0
1448.9
1384.3
2469.4
2036.7
1154.5
-632.0
924.5
843.9
1543.8
1274.8

For Bottom Steel of Pilecap


Max. ULS Load for Longitudinal Steel Design
Max. ULS Load for Transverse Steel Design

Prepared
Checked
Verified

4056.3

5487.4

16245.9

4056.3

5487.4

16245.9

3547.9

4992.3

8898.4

-1007.2

6208.2

4906.8

2527.9

2673.1

12589.2

3202.6

816.9

3655.8

1998.4

292.5

2066.3

=
=

For Top Steel of Pilecap

169

Harjot
R P Sharma
Sumant

8433.3
16450.6

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

Max. ULS Load for Longitudinal Steel Design


Max. ULS Load for Transverse Steel Design

=
=

1007.2
3725.8

x 2.258 m =

19042.4

=
=

Longitudinal Reinforcement at Bottom of Pilecap


Total hogging moment

8433.3

Area of pile cap for calculating sagging moment

Total sagging moment

=
=

3.008
13.54
25.0 x
763.4
20.0 x
0.0
763.4

Net moment for pile cap design


Width of pile cap

=
=

18279.0
4.5

Sagging moment due to pile cap weight =

13.54 x

1.50 x
=

Sagging moment due to soil weight =

Mu =
Mu =

0.15fckbd2

13.54 x

0.00 x

(Cl. 15.4.2.2 of IRS CBC 1997)


(Cl. 15.4.2.2 of IRS CBC 1997)

0.87fyAsz

Depth Required
35

18279
x 4500

x 1.0E+06
x 0.15

880 mm
< 1500 hence Safe

Assumed As'

32429 mm2

As - As'

1-

d1

1409

1.1
1409

- 1409

1.1fy As d
fck bd
x 32429
x 35

d2

As =

Mu
0.87fy z

< 0.95 d

x 500
x 4500

1296 mm

0.95 d
=
Minimum z =

1339 mm
1296 mm

32429 mm2

Area of steel required

32429 mm2

Dia of bar used


32 mm
Area of 1 bar
804 mm2
No. of Bars required
41
Provide 46 bars of 32 mm dia at bottom in longitudinal direction
Total provided reinforcement
=

46

170

x 804

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

36995

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

mm2

>

32429
O.K.

Transverse Reinforcement at Bottom of Pile cap


Total hogging moment

16450.6

x 0.758 m =

12469.6

=
=

Total sagging moment

=
=

1.508
11.31
25.0 x
319.8
20.0 x
0.0
319.8

Net moment for pile cap design


Width of pile cap

=
=

12149.8
7.5

Area of pile cap for calculating sagging moment


Sagging moment due to pile cap weight =

11.31 x

1.50 x
=

Sagging moment due to soil weight =

Mu =
Mu =

0.15fckbd2
0.87fyAsz

11.31 x

0.00 x

(Cl. 15.4.2.2 of IRS CBC 1997)


(Cl. 15.4.2.2 of IRS CBC 1997)

Depth Required
35

12150
x 7500

x 1.0E+06
x 0.15

555 mm
< 1500 hence Safe

Assumed As'

21297 mm2

As - As'
1.1fy As d
fck bd

1-

d1

1381

1.1
1381

- 1381

x 21297
x 35

d2

As =

Mu
0.87fy z

< 0.95 d

x 500
x 7500

1336 mm

0.95 d
=
Minimum d =

1311 mm
1311 mm

21297 mm2

Area of steel required

21297 mm2

Dia of bar used


Area of 1 bar
No. of Bars required

25 mm
491 mm2
44

Provide 70 bars of 25 mm dia at bottom in transverse direction.


Total provided reinforcement
=

70

171

x 491

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

34361

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

mm2

>

21297
O.K.

Longitudinal Reinforcement at Top of Pilecap


Total sagging moment

1007.2

x 2.258 m =

2274.3

=
=

Total hogging moment

=
=

3.008
13.54
25.0 x
763.4
20.0 x
203.6
967.0

Net moment for pile cap design


Width of pile cap

=
=

3241.3
4.5

Area of pile cap for calculating hogging moment


Hogging moment due to pile cap weight =

13.54 x

1.50 x
=

Hogging moment due to soil weight =

Mu =
Mu =

0.15fckbd2
0.87fyAsz

13.54 x

0.50 x

(Cl. 15.4.2.2 of IRS CBC 1997)


(Cl. 15.4.2.2 of IRS CBC 1997)

Depth Required
35

3241
x 4500

x 1.0E+06
x 0.15

370 mm
< 1500 hence Safe

Assumed As'

5535 mm2

As - As'

1-

d1

1417

- 1417

1.1
1417

1.1fy As d
fck bd
x 5535
x 35

d2

As =

Mu
0.87fy z

0
< 0.95 d

x 500
x 4500

1398 mm

0.95 d
=
Minimum z =

1346 mm
1346 mm

5535 mm2

Area of steel required

5535 mm2

Min. Reinf. required (=0.2*415/500=0.166%)

10585 mm2

Dia of bar used


16 mm
Area of 1 bar
201 mm2
No. of Bars required
53
Provide 23 bars of 16 mm dia at top in longitudinal direction +
Provide 23 bars of 20 mm dia at top in longitudinal direction.
Total provided reinforcement

172

20 mm

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

=
=

23
11850

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

x 201
mm2

+
>

23
10585
O.K.

Transverse Reinforcement at Top of Pile cap


Total sagging moment

3725.8

x 0.758 m =

2824.2

=
=

Total hogging moment

=
=

1.508
11.31
25.0 x
319.8
20.0 x
85.3
405.1

Net moment for pile cap design


Width of pile cap

=
=

3229.2
7.5

Area of pile cap for calculating hogging moment


Hogging moment due to pile cap weight =

11.31 x

1.50 x
=

Hogging moment due to soil weight =

Mu =
Mu =

0.15fckbd2
0.87fyAsz

11.31 x

0.50 x

(Cl. 15.4.2.2 of IRS CBC 1997)


(Cl. 15.4.2.2 of IRS CBC 1997)

Depth Required
35

3229
x 7500

x 1.0E+06
x 0.15

286 mm
< 1500 hence Safe

Assumed As'

5578 mm2

As - As'

1-

d1

1401

1.1
1401

- 1401

1.1fy As d
fck bd
x 5578
x 35

d2

As =

Mu
0.87fy z

< 0.95 d

x 500
x 7500

1389 mm

0.95 d
=
Minimum d =

1331 mm
1331 mm

5578 mm2

Area of steel required

5578 mm2

Min. Reinf. required (=0.2*415/500=0.166%)


Dia of bar used
16 mm
Area of 1 bar
201 mm2
No. of Bars required
87.0
Provide 35 bars of 16 mm dia at top in transverse direction +
Provide 35 bars of 20 mm dia at top in transverse direction.

17442 mm2
+

20 mm

Total provided reinforcement


=

35

173

x 201

35

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Shear Check

18033

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

mm2

>

17442
O.K.

(as per Cl. 5.7.3.2 of BS:5400-4)

As per Cl. 15.8.3.2 (a), shear shall be checked at a distance effective depth from the face of pier.
Longitudinal Direction Bottom Reinforcement (Compression)
Shear Force
Width at Critical Section for Shear
Effective depth distance from the face of pier loaded area

=
=
=
Critical section at
effective d

Face of inscribed pier


Pier

8433 kN
742
1758

Length from face of inscribed square to edge


Length for calculating wt. of soil and pile cap =
Area of pile cap =
4.500 x
Force due to pile cap weight =
Force due to soil weight =
Design Shear Force, V
Shear Stress (longitudinal reinf.)

3008 1.599
7.20 x
7.20 x

-349
1409
1000

=
1409 =
=
1.50 x
0.00 x
=
=

25.0 =
20.0 =

Shear strength of pile cap:


Distance between Pile Cap edge and Face of inscribed pier, x
0.2 times dia of pile
av

=
=
=

% Ast

=
IRS->

As per Note below Table 16 of IRS:CBC-1997


depth Factor
s=
500
0.25
d
=
0.772
Permissible Shear Stress ( Table 15 of IRS:CBC-1997)
vc =
0.583 N/mm2
s vc =
0.450 N/mm2
2d/av =
2.00
(2d/av) (s vc)=
0.000 N/mm2
Shear strength of the section, Vc =
=

( 0.000 x
0 kN +

174

Ast %
0.15
0.25
0.5
1
2
3
0.5
1

2000 +

0.450 x
1586 kN

2500 )x

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

1586 kN

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

<

11107 kN Provide Shear Stirrups.

Shear Stirrups:
Shear Force for shear stirrups Vs = V - Vc + 0.4 b.d
Vs
=
Required Asv s Vs / (0.87fyv . d)
Spacing of Stirrups, s
=
fyv
=
Required Asv
No. of legs
Dia of links
Area of links provided

=
=
=
=

12057 kN
100 mm
415 N/mm2
2370 mm2
23
12 mm
2601 mm2

>
Safe.

Transverse Direction Bottom Reinforcement (Compression)


Shear Force
Width at Critical Section for Shear
Effective depth distance from the face of pier lorded area

=
=
=
Critical section at
effective d

Face of inscribed pier


Pier

16451 kN
742
258

Length from face of inscribed square to edge


Length for calculating wt. of soil and pile cap =
Area of pile cap =
7.500 x
Force due to pile cap weight =
Force due to soil weight =
Design Shear Force, V
Shear Stress (transverse reinf.)

1508 0.128
0.96 x
0.96 x

Shear strength of pile cap:

175

=
1381 =
=
1.50 x
0.00 x
=
=

1123
1381
1000

25.0 =
20.0 =

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

Distance between Pile Cap edge and Face of inscribed pier, x


0.2 times dia of pile
av

=
=
=

% Ast

=
Ast %
0.15
0.25
0.5
1
2
3

As per Note below Table 16 of IRS:CBC-1997


depth Factor
s=
500
0.25
d
=
0.776
Permissible Shear Stress ( Table 15 of IRS:CBC-1997)
vc =
0.479 N/mm2
s vc =
0.372 N/mm2
2d/av =
2.00
(2d/av) (s vc)=
0.744 N/mm2
Shear strength of the section, Vc =

0.25
0.5

( 0.744 x
2000 +
2053 kN +
4876 kN
>

=
=

0.372 x
5500 )x
2823 kN
0 kN Safe in Shear

Shear Stirrups:
Shear Force for shear stirrups Vs = V - Vc + 0.4 b.d
Vs
=
Required Asv s Vs / (0.87fyv . d)
Spacing of Stirrups, s
=
fyv
=
Required Asv
No. of legs
Dia of links
Area of links provided

=
=
=
=

-735 kN
120 mm
415 N/mm2
-177 mm2
22
8 mm
1106 mm2

>
Safe.

Longitudinal Direction Top Reinforcement (Tension)


(Shear Check is done at face pf inscribed pier)
Shear Force
Width at Critical Section for Shear
Effective depth distance from the face of pier loaded area

=
=
=
Critical section

Face of inscribed pier


Pier

1007 kN
742
1758

Length from face of inscribed square to edge

500
2258
1000
=

176

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Length for calculating wt. of soil and pile cap =


Area of pile cap =
4.500 x
Force due to pile cap weight =
Force due to soil weight =
Design Shear Force, V
Shear Stress (longitudinal reinf.)

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

3008 3.008
13.54 x
13.54 x

0=
=
1.50 x
0.50 x
=
=

25.0 =
20.0 =

Shear strength of pile cap:


Distance between Pile Cap edge and Face of inscribed pier, x
0.2 times dia of pile
av = x + 0.2 * Dia of pile

=
=
=

% Ast

=
IRS->

As per Note below Table 16 of IRS:CBC-1997


depth Factor
s=
500
0.25
d
=
0.771
Permissible Shear Stress ( Table 15 of IRS:CBC-1997)
vc =
0.395 N/mm2
s vc =
0.305 N/mm2
2d/av =
(2d/av) (s vc)=

0.15
0.25

1.00
0.305 N/mm2

Shear strength of the section, Vc =

( 0.305 x
2000 +
863 kN +
1942 kN
>

=
=

Ast %
0.15
0.25
0.5
1
2
3

0.305 x
2500 )x
1079 kN
1650 kN Safe in Shear

Shear Stirrups:
Shear Force for shear stirrups Vs = V - Vc + 0.4 b.d
Vs
=
Required Asv s Vs / (0.87fyv . d)
Spacing of Stirrups, s
=
fyv
=
Required Asv
No. of legs
Dia of links
Area of links provided

=
=
=
=

177

2259 kN
110 mm
415 N/mm2
486 mm2
12
8 mm
578 mm2

>
Safe.

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

Transverse Direction Top Reinforcement (Tension)


(Shear Check is done at face pf inscribed pier)
Shear Force
Width at Critical Section for Shear
Effective depth distance from the face of pier lorded area

=
=
=
Critical section

Face of inscribed pier


Pier

3726 kN
742
258

Length from face of inscribed square to edge


Length for calculating wt. of soil and pile cap =
Area of pile cap =
7.500 x
Force due to pile cap weight =
Force due to soil weight =
Design Shear Force, V
Shear Stress (transverse reinf.)

1508 1.508
11.31 x
11.31 x

500
758
1000

=
0=
=
1.50 x
0.50 x
=
=

25.0 =
20.0 =

Shear strength of pile cap:


Distance between Pile Cap edge and Face of inscribed pier, x
0.2 times dia of pile
av = x + 0.2 * Dia of pile

=
=
=

% Ast

As per Note below Table 16 of IRS:CBC-1997


depth Factor
s=
500
0.25
d
=
0.773
Permissible Shear Stress ( Table 15 of IRS:CBC-1997)
vc =
0.385 N/mm2
s vc =
0.298 N/mm2
2d/av =
(2d/av) (s vc)=

1.00
0.298 N/mm2

Shear strength of the section, Vc =


=
=

( 0.298 x
2000 +
834 kN +
3128 kN
<

178

Ast %
0.15
0.25
0.5
1
2
3
0.15
0.25

0.298 x
5500 )x
2294 kN
4263 kN Provide Shear Stirrups.

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

Shear Stirrups:
Shear Force for shear stirrups Vs = V - Vc + 0.4 b.d
Vs
=
Required Asv s Vs / (0.87fyv . d)
Spacing of Stirrups, s
=
fyv
=
Required Asv
No. of legs
Dia of links
Area of links provided

Check for Punching Shear

=
=
=
=

5338 kN
120 mm
415 N/mm2
1266 mm2
18
10 mm
1374 mm2

>
Safe.

(as per Cl. 5.7.3.2 of BS5400-4)

For Pier
For Pier, critical section is checked at 1.5d from the face of inscribed square.
deff in longitudinal direction dx
deff in transverse direction dy
1.5dmin
Distance from the face of inscribed square of pier to edge of pile cap
Since critical section is falling outside the pilecap edge, punching shear shall not govern.
For Pile (In compression)
Max. load in a pile
As per Fig.6 if IRS CBC, Case (c-ii)

=
=
=
=

=
=
=

b
bs
Reinf. in long. Dir. =
100As/(bs.d)

23 x

804 =
=
=

sx
for 2d/av , av = dia of pile/2
=
2dL/av
=
dL = Depth in Longitudinal Direction
Reinf. in tran. Dir. =
34 x
491 =
100As/(bs.d)

sy
=
for 2d/av , av = dia of pile/2
=
2dT/av
=
dT = Depth in Transverse Direction
Steel % for vc
=

179

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

Checked
Verified

vc

Ultimate shear resistance

Harjot
R P Sharma
Sumant

Prepared

=
2d/av =

(2d/av) (sx +sy)/2. vc b . (dx+dy)/2 =

>
Hence OK
For Pile (In tension)
Min. load in a pile
As per Fig.6 if IRS CBC, Case (c-ii)

=
=
=

b
bs
Reinf. in long. Dir. =
100As/(bs.d)

11 x

Reinf. in tran. Dir. =


100As/(bs.d)

17 x

201 =

=
vc
=
s
=
s vc
=
for 2d/av , av = dia of pile/2
=
2d/av
=
(2d/av) (s vc) =
201 =

=
vc
=
s
=
s vc
=
for 2d/av , av = dia of pile/2
=
2d/av
=
(2d/av) (s vc) =

Ultimate shear resistance

(2d/av) (sx +sy)/2. vc b . (dx+dy)/2 =

>
Hence OK

180

re P148
Project Code
Date
Rev

2/21/2013
0

ap is designed based on
ken for getting maximum

Mz kNm
-220.517
250.071
361.674
-42.74
-446.38
342.179
-446.38
342.179
-269.028
214.956
253.568
20.153
-377.725
320.871
-377.725
320.871
-239.168
221.479
450.61
-127.678
-306.942
233.184
-248.831
191.739
-140.674
113.913
675.43
-434.739
1007.847
-547.533
439.129
-334.045
439.129
-334.045
261.202
-206.156
999.65
-556.646
555.339

181

re P148
Project Code
Date
Rev

2/21/2013
0

-389.859
555.339
-389.859
416.334
-289.945
836.097
-428.822
302.924
-228.677
245.353
-187.857
136.117
-108.781
586.85
-369.733
985.416
-530.012
177.362
-145.093
177.362
-145.093
242.728
-191.489
950.76
-520.131
319.467
-219.413
319.467
-219.413
370.535
-255.66
823.437
-418.933
65.886
-58.072
228.983
-175.291
127.167
-101.568
-131.938
185.064
384.105
-60.262
-184.613
153.227
-184.613
153.227
-250.554
200.29
302.458

182

re P148
Project Code
Date
Rev

2/21/2013
0

-16.362
-141.853
150.426
-141.853
150.426
-193.369
187.194
463.269
-137.567
-69.904
62.579
-232.462
179.173
-131.724
106.7
164.124
-46.21
539.914
-190.066
-9.675
8.792
-9.675
8.792
-10.456
9.482
489.211
-168.567
59.845
-13.209
59.845
-13.209
59.234
-12.67
509.879
-181.558
-5.361
4.872
-4.629
4.225
-6.093
5.518
164.124
-46.21
539.914
-190.066
-9.675
8.792
-9.675
8.792
-10.456

183

re P148
Project Code
Date
Rev

2/21/2013
0

9.482
489.211
-168.567
59.845
-13.209
59.845
-13.209
59.234
-12.67
509.879
-181.558
-5.361
4.872
-4.629
4.225
-6.093
5.518

BL=
BT=

7.500 m
4.500 m

d1 =
d2 =
d3 =
d4=
ET=
EL=

0.742 m
1.758 m
0.250 m
0.258 m
0.000 m
0.000 m

184

re P148
Project Code
Date
Rev

2/21/2013
0

2.258 m
3.008 m
0.758 m
1.508 m

Load for Transverse Steel


Design
P4 + P6 + P3

kN
6184.7

6572.5

-1622.1

-1622.1

5598.2

6417.3

185

re P148
Project Code
Date
Rev

2/21/2013
0

15.3

15.3

5656.2

3956.6

-3725.8

4869.9

3043.3

kN
kN

186

re P148
Project Code
Date
Rev

2/21/2013
0

kN
kN

kN.m
x 4.50
m

1.504
kN.m
1.504
kN.m
kN.m
kN.m
m

< 1500 hence Safe

187

re P148
Project Code
Date
Rev

2/21/2013
0

mm2

kN.m
x 7.50
m2
0.754
kN.m
0.754
kN.m
kN.m
kN.m
m

< 1500 hence Safe

x 201.1

188

re P148
Project Code
Date
Rev

2/21/2013
0

mm2

kN.m
x 4.50
m2
1.504
kN.m
1.504
kN.m
kN.m
kN.m
m

< 1500 hence Safe

189

re P148
Project Code
Date
Rev

2/21/2013
0

x 314.2
mm2

kN.m
x 7.50
m2
0.754
kN.m
0.754
kN.m
kN.m
kN.m
m

< 1500 hence Safe

x 314.2

190

re P148
Project Code
Date
Rev

2/21/2013
0

mm2

8433 kN
4500 mm
1409 mm

11377 kN
0 kN

mm Pile dia
3008 mm
1599 mm
7.20 m2
270 kN
0 kN
11107 kN
1.752 N/mm2

1758 mm
200 mm
1409 mm
0.58 %
M0
0.37
0.44
0.56
0.7
0.89
1.01
0.56
0.70

1409 /

1.00E+03

191

re P148
Project Code
Date
Rev

2/21/2013
0

Provide Shear Stirrups.

2370 mm2

16451 kN
7500 mm
1381 mm

0 kN
0 kN

mm Pile dia
1508 mm
128 mm
0.96 m2
36 kN
0 kN
0 kN
0.000 N/mm2

192

re P148
Project Code
Date
Rev

2/21/2013
0

258 mm
200 mm
1381 mm
0.33 %
M 35
0.37
0.44
0.56
0.7
0.89
1.01
0.44
0.56

1381 /

1.00E+03

-177 mm2

1007 kN
4500 mm
1417 mm

504 kN
0 kN

mm Pile dia
3008 mm

193

re P148
2/21/2013
0

Project Code
Date
Rev

3008 mm
13.54 m2
508 kN
135 kN
1650 kN
0.259 N/mm2

1758 mm
200 mm
1958 mm
0.19 %
M 35
0.37
0.44
0.56
0.7
0.89
1.01
0.37
0.44

1417 /

1.00E+03

486 mm2

194

re P148
2/21/2013
0

Project Code
Date
Rev

3726 kN
7500 mm
1401 mm

1863 kN
0 kN

mm Pile dia
1508 mm
1508 mm
11.31 m2
424 kN
113 kN
4263 kN
0.406 N/mm2

258 mm
200 mm
458 mm
0.17 %
M 35
0.37
0.44
0.56
0.7
0.89
1.01
0.37
0.44

1401 /

1.00E+03

Provide Shear Stirrups.

195

re P148
Project Code
Date
Rev

2/21/2013
0

1266 mm2

1409 mm
1381 mm
2071 mm
1508 mm

6354.3 kN
3121 mm
2207 mm
18497.7 mm2
0.59 %
0.772
500
5.636

ongitudinal Direction
16689.7 mm2
0.55 %
0.776
500 mm
5.522

ransverse Direction
0.57

196

re P148
Project Code
Date
Rev

2/21/2013
0

0.580 N/mm2
5.58

10899 kN
6354 kN

-1330.3 kN
3121 mm
2207 mm
2211.7 mm2
0.07 %
0.370 N/mm2
0.771
0.285 N/mm2
500 mm
5.636
1.61 N/mm2
3418.1 mm2
0.11 %
0.370 N/mm2
0.773
0.286 N/mm2
500 mm
5.522
1.58 N/mm2
6935 kN
1330 kN

197

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

10.0 Pile Cap : SLS Checks

Pile cap is designed based on Beam Theory. Inscribed square is taken for pier . SLS pile loads from pile design model are
taken for getting maximum load for pile cap design.

SLS Pile forces from pile design model (as in Appendix-4)


Beam
1

L/C
1 DEAD L

Node
1
7
2 SIDL
1
7
3 LIVE LO
1
7
101 SLS G1
7
102 SLS G1
7
103 SLS G1
7
104 SLS G1
7
105 SLS G-I
1
7
106 SLS G1
7
107 SLS G1
7
108 SLS G1
7
109 SLS G-I
1
7
110 SLS G-I
1
7
1 DEAD L
2
8
2 SIDL
2
8
3 LIVE LO
2
8
101 SLS G2
8
102 SLS G2
8
103 SLS G2
8
104 SLS G2

Fx kN
1159.166
-1176.837
463.158
-463.158
278.481
-278.481
2021.284
-2038.956
536.594
-554.265
3344.549
-3362.22
1941.547
-1959.218
1488.364
-1506.035
675.834
-693.505
3483.789
-3501.46
2080.787
-2098.458
1627.604
-1645.276
1412.855
-1430.526
1209.663
-1227.335
497.134
-497.134
1113.449
-1113.449
3031.018
-3048.689
2984.586
-3002.258
3435.818
-3453.489
2027.497

Fy kN
-34.569
34.569
-13.519
13.519
57.03
-57.03
11.942
-11.942
192.448
-192.448
-72.012
72.012
-60.901
60.901
-40.681
40.681
220.963
-220.963
-43.497
43.497
-32.387
32.387
-12.166
12.166
60.503
-60.503
34.909
-34.909
13.748
-13.748
96.891
-96.891
157.986
-157.986
294.645
-294.645
72.627
-72.627
61.459

198

Fz kN
5.179
-5.179
2.085
-2.085
45.017
-45.017
57.199
-57.199
2.035
-2.035
255.519
-255.519
9.263
-9.263
6.098
-6.098
24.544
-24.544
278.028
-278.028
31.771
-31.771
28.606
-28.606
28.903
-28.903
5.352
-5.352
2.201
-2.201
49.077
-49.077
61.978
-61.978
13.638
-13.638
255.832
-255.832
9.547

Mx kNm
0.002
-0.002
0.001
-0.001
0.122
-0.122
0.136
-0.136
0.008
-0.008
0.675
-0.675
0.003
-0.003
0.002
-0.002
0.069
-0.069
0.736
-0.736
0.064
-0.064
0.063
-0.063
0.065
-0.065
-0.002
0.002
-0.001
0.001
-0.119
0.119
-0.133
0.133
0.003
-0.003
-0.676
0.676
-0.003

My kNm
-2.516
-2.663
2.982
-5.067
-10.822
-34.195
-10.841
-46.358
21.08
-23.115
-182.543
-72.977
0.943
-10.206
1.183
-7.28
15.669
-40.213
-187.953
-90.074
-4.468
-27.303
-4.228
-24.378
1.469
-30.372
-3.307
-2.045
2.45
-4.651
-25.242
-23.835
-28.134
-33.844
-20.385
6.747
-183.973
-71.859
-0.384

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

105 SLS G-I


106 SLS G107 SLS G108 SLS G109 SLS G-I
110 SLS G-I
3

1 DEAD L
2 SIDL
3 LIVE LO
101 SLS G102 SLS G103 SLS G104 SLS G105 SLS G-I
106 SLS G107 SLS G108 SLS G109 SLS G-I
110 SLS G-I

1 DEAD L
2 SIDL
3 LIVE LO
101 SLS G102 SLS G103 SLS G-

8
2
8
2
8
2
8
2
8
2
8
2
8
3
9
3
9
3
9
3
9
3
9
3
9
3
9
3
9
3
9
3
9
3
9
3
9
3
9
4
10
4
10
4
10
4
10
4
10
4

-2045.168
1584.952
-1602.623
3541.31
-3558.982
3992.542
-4010.213
2584.221
-2601.892
2141.676
-2159.348
2804.289
-2821.961
991.427
-1009.098
368.037
-368.037
323.263
-323.263
1788.66
-1806.332
2611.433
-2629.104
-196.522
178.851
1607.866
-1625.537
1258.276
-1275.948
2773.064
-2790.736
-34.891
17.219
1769.497
-1787.168
1419.908
-1437.579
2036.043
-2053.715
940.929
-958.6
334.061
-334.061
-511.705
511.705
778.927
-796.598
163.44
-181.112
-287.791

-61.459
41.353
-41.353
343.09
-343.09
121.072
-121.072
109.904
-109.904
89.798
-89.798
182.63
-182.63
32.891
-32.891
12.554
-12.554
86.226
-86.226
142.805
-142.805
291.195
-291.195
26.735
-26.735
57.321
-57.321
38.591
-38.591
334.308
-334.308
69.848
-69.848
100.434
-100.434
81.704
-81.704
173.848
-173.848
-32.551
32.551
-12.325
12.325
67.695
-67.695
27.123
-27.123
195.898
-195.898
-26.121

199

Prepared
Checked
Verified

-9.547
6.44
-6.44
38.177
-38.177
280.371
-280.371
34.085
-34.085
30.978
-30.978
33.817
-33.817
-4.3
4.3
-1.579
1.579
40.858
-40.858
38.75
-38.75
-11.84
11.84
241.644
-241.644
-7.386
7.386
-5.003
5.003
8.59
-8.59
262.074
-262.074
13.043
-13.043
15.426
-15.426
12.949
-12.949
-4.127
4.127
-1.462
1.462
44.918
-44.918
43.529
-43.529
-0.237
0.237
241.957

0.003
-0.002
0.002
-0.056
0.056
-0.735
0.735
-0.062
0.062
-0.061
0.061
-0.06
0.06
0.003
-0.003
0.001
-0.001
-0.119
0.119
-0.127
0.127
-0.001
0.001
-0.669
0.669
0.005
-0.005
0.004
-0.004
-0.061
0.061
-0.728
0.728
-0.054
0.054
-0.056
0.056
-0.057
0.057
-0.003
0.003
-0.001
0.001
0.116
-0.116
0.124
-0.124
-0.01
0.01
0.669

Harjot
R P Sharma
Sumant

-9.163
-0.351
-6.088
-33.006
-5.171
-196.594
-83.777
-13.005
-21.081
-12.972
-18.006
-18.806
-15.012
40.774
-36.474
19.714
-18.135
4.102
-44.96
68.942
-107.692
84.448
-72.608
-119.175
-122.47
74.265
-66.879
54.596
-49.593
86.499
-95.088
-117.124
-144.95
76.316
-89.359
56.647
-72.073
72.298
-85.248
39.983
-35.856
19.181
-17.719
-10.319
-34.6
51.65
-95.179
42.983
-42.746
-120.605

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

104 SLS G105 SLS G-I


106 SLS G107 SLS G108 SLS G109 SLS G-I
110 SLS G-I
5

1 DEAD L
2 SIDL
3 LIVE LO
101 SLS G102 SLS G103 SLS G104 SLS G105 SLS G-I
106 SLS G107 SLS G108 SLS G109 SLS G-I
110 SLS G-I

1 DEAD L
2 SIDL
3 LIVE LO
101 SLS G102 SLS G-

10
4
10
4
10
4
10
4
10
4
10
4
10
4
10
5
11
5
11
5
11
5
11
5
11
5
11
5
11
5
11
5
11
5
11
5
11
5
11
5
11
6
12
6
12
6
12
6
12
6

270.12
1521.916
-1539.587
1161.688
-1179.36
-92.412
74.741
-543.644
525.972
1266.063
-1283.735
905.836
-923.507
644.609
-662.28
1642.146
-1659.817
660.876
-660.876
876.446
-876.446
3399.288
-3416.959
2435.197
-2452.869
4297.604
-4315.275
2743.734
-2761.405
2126.661
-2144.333
2873.42
-2891.092
4735.827
-4753.499
3181.957
-3199.628
2564.884
-2582.556
2873.42
-2891.092
1386.66
-1404.332
509.744
-509.744
-33.153
33.153
1961.885
-1979.557
1998.353

26.121
-56.763
56.763
-37.919
37.919
229.745
-229.745
7.727
-7.727
-22.916
22.916
-4.072
4.072
69.285
-69.285
-0.34
0.34
-0.229
0.229
67.884
-67.884
74.058
-74.058
218.592
-218.592
-0.615
0.615
-0.557
0.557
-0.672
0.672
252.534
-252.534
33.327
-33.327
33.385
-33.385
33.27
-33.27
111.06
-111.06
-0.34
0.34
-0.229
0.229
67.884
-67.884
74.058
-74.058
218.592

200

Prepared
Checked
Verified

-241.957
-7.102
7.102
-4.661
4.661
22.223
-22.223
264.417
-264.417
15.357
-15.357
17.798
-17.798
17.863
-17.863
10.624
-10.624
3.89
-3.89
42.849
-42.849
62.426
-62.426
15.292
-15.292
236.039
-236.039
18.371
-18.371
12.213
-12.213
36.716
-36.716
257.464
-257.464
39.795
-39.795
33.638
-33.638
36.716
-36.716
-12.728
12.728
-5.135
5.135
32.531
-32.531
16.894
-16.894
-18.889

-0.669
-0.005
0.005
-0.003
0.003
0.048
-0.048
0.727
-0.727
0.053
-0.053
0.055
-0.055
0.052
-0.052
0
0
0
0
0.002
-0.002
0.003
-0.003
0.006
-0.006
0
0
0
0
0
0
0.007
-0.007
0.001
-0.001
0.001
-0.001
0.001
-0.001
0.003
-0.003
0
0
0
0
-0.002
0.002
-0.003
0.003
-0.006

Harjot
R P Sharma
Sumant

-121.353
72.939
-65.837
53.062
-48.401
37.824
-60.046
-125.764
-138.652
67.779
-83.137
47.903
-65.701
52.024
-69.887
-27.396
16.773
-5.269
1.378
-2.255
-40.594
-36.199
-26.227
-33.719
18.427
-116.094
-119.946
-39.214
20.843
-28.224
16.011
-34.846
-1.87
-117.221
-140.243
-40.341
0.546
-29.351
-4.286
-34.846
-1.87
79.284
-66.556
35.963
-30.828
34.796
-67.326
160.714
-177.609
122.439

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

103 SLS G104 SLS G105 SLS G-I


106 SLS G107 SLS G108 SLS G109 SLS G-I
110 SLS G-I

12
6
12
6
12
6
12
6
12
6
12
6
12
6
12
6
12

-2016.025
135.947
-153.618
2252.325
-2269.997
1744.381
-1762.053
1981.777
-1999.448
119.37
-137.042
2235.749
-2253.42
1727.805
-1745.476
1981.777
-1999.448

Prepared
Checked
Verified

-218.592
-0.615
0.615
-0.557
0.557
-0.672
0.672
252.534
-252.534
33.327
-33.327
33.385
-33.385
33.27
-33.27
111.06
-111.06

18.889
201.858
-201.858
-22.693
22.693
-15.086
15.086
-2.624
2.624
218.123
-218.123
-6.428
6.428
1.18
-1.18
-2.624
2.624

0.006
0
0
0
0
0
0
-0.007
0.007
-0.001
0.001
-0.001
0.001
-0.001
0.001
-0.003
0.003

Harjot
R P Sharma
Sumant

-103.55
40.064
-241.922
141.658
-118.965
103.22
-88.134
139.837
-137.213
57.462
-275.585
159.056
-152.628
120.618
-121.797
139.837
-137.213

Grade of concrete

35 N/mm2

Grade of steel
Depth of Pile Cap
Diameter of Pile
Density of Soil
Thickness of soil layer
Dia of Pier
Area of pier
Equivalent square side of pier
Area of Pile cap

=
=
=
=
=
=
=
=
=

500 N/mm2
1.5 m
1m
20 kN/m3
0.5 m
2100 mm
3463605.9006 mm2
1484 mm
33.75 m2

P5

P6

201

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

Lever arm for moment along long. Direc. (from face of inscribed square to pile center) =
Length for calculating downward moment along long. Dir. (from face of inscribed square) =
Lever arm for moment along trans. direc. (from face of inscribed square to pile center) =
Length for calculating downward moment along trans. dir. (from face of inscribed square) =

Loads for Designing Pile Cap

SLS Load Case


1 DEAD LOAD

2 SIDL

3 LIVE LOAD

101 SLS G-I

102 SLS G-IIA (R1)

103 SLS G-IIA (R2)

Beam No.

Pile load

B1
B2
B3
B4
B5
B6
B1
B2
B3
B4
B5
B6
B1
B2
B3
B4
B5
B6
B1
B2
B3
B4
B5
B6
B1
B2
B3
B4
B5
B6
B1
B2
B3
B4

kN
1159.2
1209.7
991.4
940.9
1642.1
1386.7
463.2
497.1
368.0
334.1
660.9
509.7
278.5
1113.4
323.3
-511.7
876.4
-33.2
2021.3
3031.0
1788.7
778.9
3399.3
1961.9
536.6
2984.6
2611.4
163.4
2435.2
1998.4
3344.5
3435.8
-196.5
-287.8

202

Load for Longitudinal Steel


Design
B1 + B4
B2 + B3
kN
kN
2100.1
2201.1

Load for Transverse Steel


Design
B1 + B2 + B5

kN
4011.0

797.2

865.2

1621.2

-233.2

1436.7

2268.4

2800.2

4819.7

8451.6

700.0

5596.0

5956.4

3056.8

3239.3

11078.0

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

104 SLS G-IIA ( R3)

105 SLS G-IIA (- R3)

106 SLS G-IIB (R1)

107 SLS G-IIB (R2)

108 SLS G-IIB (R3)

109 SLS G-IIB (- R3)

110 SLS G-III

Pier P148
AECOM/CC28/PF148
10761.372

B5
B6
B1
B2
B3
B4
B5
B6
B1
B2
B3
B4
B5
B6
B1
B2
B3
B4
B5
B6
B1
B2
B3
B4
B5
B6
B1
B2
B3
B4
B5
B6
B1
B2
B3
B4
B5
B6
B1
B2
B3
B4
B5
B6

4297.6
135.9
1941.5
2027.5
1607.9
1521.9
2743.7
2252.3
1488.4
1585.0
1258.3
1161.7
2126.7
1744.4
675.8
3541.3
2773.1
-92.4
2873.4
1981.8
3483.8
3992.5
-34.9
-543.6
4735.8
119.4
2080.8
2584.2
1769.5
1266.1
3182.0
2235.7
2141.7
323.3
1419.9
905.8
2564.9
1727.8
2804.3
1788.7
2036.0
644.6
2873.4
1981.8

203

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

3463.5

3635.4

6712.8

2650.1

2843.2

5200.0

583.4

6314.4

7090.6

2940.1

3957.7

12212.2

3346.9

4353.7

7847.0

3047.5

1743.2

5029.8

3448.9

3824.7

7466.4

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

For Bottom Steel of Pilecap


Max. SLS Load for Longitudinal Steel Design
Max. SLS Load for Transverse Steel Design
SLS G-I Load for Longitudinal Steel Design
SLS G-I Load for Transverse Steel Design
Permanent Load (Dl + 1.2 SIDL)

=
=
=
=
=

6314.4
12212.2
4819.7
8451.6
3239.3

For Top Steel of Pilecap


Max. SLS Load for Longitudinal Steel Design
Max. SLS Load for Transverse Steel Design

=
=

583.4
459.2

x 2.258 m =

14257.9

=
=

Total Downward moment

=
=

3.008
13.54
25.0 x
763.4
20.0 x
0.0
763.4

Net moment for pile cap design

13494.4

SLS Moment for Longitudinal Reinforcement at Bottom of Pilecap


Total upward moment

6314.4

Area of pile cap for calculating downward moment


Downward moment due to pile cap weight =

13.54 x

1.50 x
=

Downward moment due to soil weight =

13.54 x

204

0.00 x

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

Width of pile cap

4.5

x 0.758 m =

9256.8

=
=

Total Downward moment

=
=

1.508
11.31
25.0 x
319.8
20.0 x
0.0
319.8

Net moment for pile cap design


Width of pile cap

=
=

8937.0
7.5

x 2.258 m =

1317.4

=
=

Total Downward moment

=
=

3.008
13.54
25.0 x
763.4
20.0 x
203.6
967.0

Net moment for pile cap design


Width of pile cap

=
=

2284.4
4.5

x 0.758 m =

348.0

=
=

Total Downward moment

=
=

1.508
11.31
25.0 x
319.8
20.0 x
85.3
405.1

Net moment for pile cap design


Width of pile cap

=
=

753.1
7.5

SLS Moment for Transverse Reinforcement at Bottom of Pile cap

1-

Total upward moment

12212.2

Area of pile cap for calculating downward moment


Downward moment due to pile cap weight =

11.31 x

1.50 x
=

Downward moment due to soil weight =

11.31 x

0.00 x

SLS Moment for Longitudinal Reinforcement at Top of Pilecap

1-

Total downward moment

583.4

Area of pile cap for calculating downward moment


Downward moment due to pile cap weight =

13.54 x

Downward moment due to soil weight =

13.54 x

1.50 x
=
0.50 x

SLS Moment for Transverse Reinforcement at Top of Pile cap

1-

Total downward moment

459.2

Area of pile cap for calculating downward moment


Downward moment due to pile cap weight =

11.31 x

1.50 x
=

Downward moment due to soil weight =

11.31 x

1SLS G-I Moment for Longitudinal Reinforcement


at Bottom of Pilecap

205

0.50 x

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Total upward moment

4819.7

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

x 2.258 m =

10882.8

=
=

Total Downward moment

=
=

3.008
13.54
25.0 x
763.4
20.0 x
0.0
763.4

Net moment for pile cap design


Width of pile cap

=
=

10119.4
4.5

x 0.758 m =

6406.3

=
=

Total Downward moment

=
=

1.508
11.31
25.0 x
319.8
20.0 x
0.0
319.8

Net moment for pile cap design


Width of pile cap

=
=

6086.5
7.5

Area of pile cap for calculating downward moment


Downward moment due to pile cap weight =

13.54 x

Downward moment due to soil weight =

13.54 x

1.50 x
=
0.00 x

SLS G-I Moment for Transverse Reinforcement at Bottom of Pile cap


Total upward moment

8451.6

Area of pile cap for calculating downward moment


Downward moment due to pile cap weight =

11.31 x

1.50 x
=

Downward moment due to soil weight =

11.31 x

0.00 x

Moment due to Permanent Load for Longitudinal Reinforcement at Bottom of Pilecap


Total upward moment

3239.3

x 2.258 m =

7314.3

=
=

Total Downward moment

=
=

3.008
13.54
25.0 x
763.4
20.0 x
0.0
763.4

Net moment for pile cap design


Width of pile cap

=
=

6550.9
4.5

Area of pile cap for calculating downward moment


Downward moment due to pile cap weight =

13.54 x

Downward moment due to soil weight =

13.54 x

1.50 x
=
0.00 x

Moment due to Permanent Load for Transverse Reinforcement at Bottom of Pilecap


Total downward moment

3239.3

Area of pile cap for calculating downward moment

206

x 0.758 m =

2455.4

1.508

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

Total Downward moment

=
=

11.31
25.0 x
319.8
20.0 x
0.0
319.8

Net moment for pile cap design


Width of pile cap

=
=

2135.6
7.5

Downward moment due to pile cap weight =

11.31 x

1.50 x
=

Downward moment due to soil weight =

11.31 x

207

0.00 x

re P148
Project Code
Date
Rev

2/21/2013
0

rom pile design model are

Mz kNm
-160.17
125.601
-63.25
49.731
60.683
-3.653
-169.318
181.26
194.172
-1.724
-310.862
238.85
-272.122
211.221
-200.017
159.336
224.513
-3.55
-280.521
237.024
-241.781
209.394
-169.676
157.51
-5.705
66.208
157.376
-122.467
61.37
-47.623
203.411
-106.52
454.772
-296.786
661.262
-366.617
305.813
-233.187
267.432

208

re P148
Project Code
Date
Rev

2/21/2013
0

-205.973
194.609
-153.256
762.967
-419.877
407.519
-286.447
369.138
-259.233
296.314
-206.516
532.749
-350.119
148.157
-115.266
55.917
-43.363
165.611
-79.386
397.43
-254.625
645.499
-354.304
140.465
-113.729
249.196
-191.876
181.318
-142.727
728.305
-393.996
223.27
-153.422
332.002
-231.568
264.124
-182.42
498.086
-324.238
-150.951
118.4
-57.797
45.471
98.482
-30.787
-111.976
139.099
209.935
-14.037
-145.514

209

re P148
Project Code
Date
Rev

2/21/2013
0

119.393
-253.886
197.123
-186.727
148.807
259.176
-29.431
-96.273
103.999
-204.645
181.729
-137.486
133.414
28.958
40.327
-3.727
3.387
-2.508
2.279
99.314
-31.43
102.509
-28.451
336.757
-118.164
-6.737
6.122
-6.249
5.691
-7.225
6.553
386.414
-133.879
42.92
-9.593
43.408
-10.024
42.432
-9.162
219.788
-108.728
-3.727
3.387
-2.508
2.279
99.314
-31.43
102.509
-28.451
336.757

210

re P148
Project Code
Date
Rev

2/21/2013
0

-118.164
-6.737
6.122
-6.249
5.691
-7.225
6.553
386.414
-133.879
42.92
-9.593
43.408
-10.024
42.432
-9.162
219.788
-108.728

BL=
BT=

7.500 m
4.500 m

d1 =
d2 =
d3 =
d4=
ET=
EL=

0.742 m
1.758 m
0.250 m
0.258 m
0.000 m
0.000 m

211

re P148
Project Code
Date
Rev

2/21/2013
0

2.258 m
3.008 m
0.758 m
1.508 m

Load for Transverse Steel


Design
B3 + B4 + B6

kN
3319.0

1211.8

-221.6

4529.5

4773.2

-348.4

212

re P148
Project Code
Date
Rev

2/21/2013
0

5382.1

4164.3

4662.4

-459.2

5271.3

4053.5

4662.4

213

re P148
Project Code
Date
Rev

2/21/2013
0

kN
kN
kN
kN
kN

kN
kN

kN.m
x 4.50
m

1.504
kN.m
1.504
kN.m
kN.m
kN.m

214

re P148
Project Code
Date
Rev

2/21/2013
0

kN.m
x 7.50
m2
0.754
kN.m
0.754
kN.m
kN.m
kN.m
m

kN.m
x 4.50
m

1.504
kN.m
1.504
kN.m
kN.m
kN.m
m

kN.m
x 7.50
m2
0.754
kN.m
0.754
kN.m
kN.m
kN.m
m

215

re P148
Project Code
Date
Rev

2/21/2013
0

kN.m
x 4.50
m

1.504
kN.m
1.504
kN.m
kN.m
kN.m
m

kN.m
x 7.50
m2
0.754
kN.m
0.754
kN.m
kN.m
kN.m
m

kN.m
x 4.50
m

1.504
kN.m
1.504
kN.m
kN.m
kN.m
m

kN.m
x 7.50

216

re P148
Project Code
Date
Rev

2/21/2013
0

m2
0.754
kN.m
0.754
kN.m
kN.m
kN.m
m

217

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Drawing Ref
Chainage

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

Project Code
Date
Revision

Check for Crack Width for serviceability of Longitudinal Reinf. at Bottom of Pilecap
Crackwidth limited to main reinforcement is =
Design surface crack width

0.2 mm
Table 10 of (IRS:CBC) - Moderate
(as per IRS:CBC Cl.15.9.8.2.1)

Wcr =

Where,
but not greater than e1

where, 1 =

fck
fy

=
=

s =

(h-x) fst
(d-x) Es

( d -x ) 1
( h- x )

c = fc / Ec

35 MPa
500 MPa
x

Total depth, h
Width of section,b
Clear Cover
Dia of main rebar
Spacing of rebar
Number of rebars
Effective cover
Effective depth
SLS G-I moment
Permanent moment
Transient moment
Ratio Mq /Mg

=
=
=
=
=
=
=
=
=
=
=
=

1500 mm
4500 mm
75 mm
32 mm
97 mm
46
91.0 mm
1409 mm
10119 kN.m
6551 kN.m
3569 kN.m
0.545

d
h

fs / Es

Area of steel in tension, Ast


Young's Modulus of Steel,Es

36995 mm2

2E+05 MPa

Modulus of elasticity of Concrete, Ec


Modular Ratio
m=
280 / fck
pt / 100 = Ast / bd
=

29500 MPa

=
=
=
=

xm
k=

2 m + ( m )2 - x m

xu = k d

8.0
0.005834776
0.046678205
0.26240959
370 mm

4.0E+11 mm3

Tensile Stress in steel under service loads : fst < 0.75fy


& stress in concrete fc < 0.5 fck (as per IRS-CBC)
fst =

m M ( d-xu ) / Ic r

212.7 <

375 MPa

fc =

M (xu) / Icr

9.5 <

17.5 MPa

218

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Drawing Ref
Chainage

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

=
=

62 mm
0.00116

0.00106

0.0009

m =

min of

0.00116 &

0.0009

Wcr = (3 acr m)/[1 + 2 (acr - Cnom)/(h - dc)]

Project Code
Date
Revision

(With

Cnom

0.155 <
0.2 mm
Crack width is within allowable limits.

Check for Stress for serviceability of Longitudinal Reinf. at Bottom of Pilecap


Maximum Moment from all SLS loadcases

13494.4 kN.m

fst =

m M ( d-xu ) / Ic r

283.7 <

375 MPa

fc =

M (xu) / Icr

12.6 <

17.5 MPa

Check for Crack Width for serviceability of Transverse Reinf. at Bottom of Pilecap
Crackwidth limited to main reinforcement is =
Design surface crack width

0.2 mm
Table 10 of (IRS:CBC) - Severe
(as per IRS:CBC Cl.15.9.8.2.1)

Wcr =

Where,
but not greater than e1

where, 1 =

fck
fy

=
=

(h-x) fst
(d-x) Es

s =

( d -x ) 1
( h- x )

c = fc / Ec

35 MPa
500 MPa
x

Total depth, h
Width of section,b
Clear Cover
Dia of main rebar
Spacing of rebar
Number of rebars
Effective cover
Effective depth
Service BM, M
Permanent moment
Transient moment
Ratio Mq /Mg

=
=
=
=
=
=
=
=
=
=
=
=

1500 mm
7500 mm
75 mm
25 mm
107 mm
70
120 mm
1381 mm
6087 kN.m
2136 kN.m
3951 kN.m
1.9

d
h

fs / Es

Area of steel in tension, Ast


Young's Modulus of Steel,Es

34361 mm2

2E+05 MPa

Modulus of elasticity of Concrete, Ec


Modular Ratio
m=
280 / fck

29500 MPa

219

8.0

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Drawing Ref
Chainage

pt / 100 = Ast / bd

Prepared
Checked
Verified

220

0.003318717

Harjot
R P Sharma
Sumant

Project Code
Date
Revision

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Drawing Ref
Chainage

xm
k=

Checked
Verified

=
=

2 m + ( m )2 - x m

xu = k d

Harjot
R P Sharma
Sumant

Prepared

Project Code
Date
Revision

0.026549739
0.205407943

284 mm

3.9E+11 mm3

Tensile Stress in steel under service loads : fst < 0.75fy


& stress in concrete fc < 0.5 fck (as per IRS-CBC)
fst =

m M ( d-xu ) / Ic r

137.7 <

375 MPa

fc =

M (xu) / Icr

4.5 <

17.5 MPa

=
=

92 mm
0.00076

0.00069

0.0008

m =

min of

0.00076 &

0.0023

Wcr = (3 acr m)/[1 + 2 (acr - Cnom)/(h - dc)]

(With

Cnom

0.195 <
0.2 mm
Crack width is within allowable limits.

Check for Stress for serviceability of Transverse Reinf. at Bottom of Pilecap


Maximum Moment from all SLS loadcases

fst =

m M ( d-xu ) / Ic r

202.3 <

375 MPa

fc =

M (xu) / Icr

6.5 <

17.5 MPa

221

8937.0 kN.m

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Drawing Ref
Chainage

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

Project Code
Date
Revision

Check for Stress for serviceability of Longitudinal Reinf. at Top of Pilecap


Crackwidth limited to main reinforcement is =
Design surface crack width

0.2 mm
Table 10 of (IRS:CBC) - Moderate
(as per IRS:CBC Cl.15.9.8.2.1)

Wcr =

Where,
but not greater than e1

where, 1 =

fck
fy

=
=

s =

(h-x) fst
(d-x) Es

( d -x ) 1
( h- x )

c = fc / Ec

35 MPa
500 MPa
x

Total depth, h
Width of section,b
Clear Cover
Dia of main rebar
Spacing of rebar
Number of rebars
Effective cover
Effective depth
SLS G-I moment
Permanent moment
Transient moment
Ratio Mq /Mg

=
=
=
=
=
=
=
=
=
=
=
=

1500 mm
4500 mm
75 mm
16 mm
198 mm
23
83.0 mm
1417 mm
10119 kN.m
6551 kN.m
3569 kN.m
0.5

d
h

fs / Es

Area of steel in tension, Ast


Young's Modulus of Steel,Es

4624 mm2

2E+05 MPa

Modulus of elasticity of Concrete, Ec


Modular Ratio
m=
280 / fck
pt / 100 = Ast / bd
=

29500 MPa

=
=
=
=

xm
k=

2 m + ( m )2 - x m

xu = k d

=
=

Maximum Moment from all SLS loadcases

222

8.0
0.000725229
0.005801834
0.102074621
145 mm
6.4E+10 mm3

2284.4 kN.m

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Drawing Ref
Chainage

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

Project Code
Date
Revision

fst =

m M ( d-xu ) / Ic r

360.9 <

375 MPa

fc =

M (xu) / Icr

5.1 <

17.5 MPa

Check for Stress for serviceability of Transverse Reinf. at Top of Pilecap


Crackwidth limited to main reinforcement is =
Design surface crack width

0.2 mm
Table 10 of (IRS:CBC) - Severe
(as per IRS:CBC Cl.15.9.8.2.1)

Wcr =

Where,
but not greater than e1

where, 1 =

fck
fy

=
=

(h-x) fst
(d-x) Es

s =

( d -x ) 1
( h- x )

c = fc / Ec

35 MPa
500 MPa
x

Total depth, h
Width of section,b
Clear Cover
Dia of main rebar
Spacing of rebar
Number of rebars
Effective cover
Effective depth
Service BM, M
Permanent moment
Transient moment
Ratio Mq /Mg

=
=
=
=
=
=
=
=
=
=
=
=

1500 mm
7500 mm
75 mm
16 mm
216 mm
35
99 mm
1401 mm
6087 kN.m
2136 kN.m
3951 kN.m
1.9

d
h

fs / Es

Area of steel in tension, Ast


Young's Modulus of Steel,Es

7037 mm2

2E+05 MPa

Modulus of elasticity of Concrete, Ec


Modular Ratio
m=
280 / fck

29500 MPa

8.0

pt / 100 = Ast / bd

=
=
=

0.000669728
0.005357824
0.098297157

xm
k=

2 m + ( m )2 - x m

xu = k d

223

138 mm

9.6E+10 mm3

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Drawing Ref
Chainage

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

Project Code
Date
Revision

Maximum Moment from all SLS loadcases

fst =

m M ( d-xu ) / Ic r

79.0 <

375 MPa

fc =

M (xu) / Icr

1.1 <

17.5 MPa

224

753.1 kN.m

CC-28
L&T
n of Substructure P148
2/21/2013
0

Project Code
Date
Revision

BC) - Moderate

MPa

OK

MPa

OK

225

CC-28
L&T
n of Substructure P148
2/21/2013
0

Project Code
Date
Revision

Cnom

45 mm )

allowable limits.

MPa

OK

MPa

OK

226

CC-28
L&T
n of Substructure P148
Project Code
Date
Revision

2/21/2013
0

227

CC-28
L&T
n of Substructure P148
2/21/2013
0

Project Code
Date
Revision

MPa

OK

MPa

OK

Cnom

45 mm )

allowable limits.

MPa

OK

MPa

OK

228

CC-28
L&T
n of Substructure P148
Project Code
Date
Revision

2/21/2013
0

BC) - Moderate

229

CC-28
L&T
n of Substructure P148
2/21/2013
0

Project Code
Date
Revision

MPa

OK

MPa

OK

230

CC-28
L&T
n of Substructure P148
2/21/2013
0

Project Code
Date
Revision

MPa

OK

MPa

OK

231

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

11.0 Pile Cap Design (Truss Analogy)


Pile cap is checked based on Truss Analogy. Center pile is ignored as it is just under pier. Inscribed square pier is taken
in model. 4 Node for the four piles and 4 nodes for the square pier are modeled. All nodes of pier are connected by each
and every node of pile. Pier nodes are pinned supported. ULS pile loads from pile design model are applied at pile
nodes. STAAD input for pile cap model is given in Appendix-4.
Dia of Pier
Area of pier
Equivalent square side of pier

=
=
=

2100 mm
3463605.901 mm2
1484 mm (side taken in the model for pier)

ULS Pile Forces from pile design model (Appendix-4) (also given in Section 9.0, Pile Cap: ULS Design)
Loads for Designing Pile Cap:

ULS Load Case


201 ULS G-I

202 ULS G-IIA (R1)

203 ULS G-IIA (R2)

204 ULS G-IIA (R3)

205 ULS G-IIA (- R3)

206 ULS G-IIB (R1)

207 ULS G-IIB (R2)

Beam / Pile
No.
P1
P2
P3
P4
P1
P2
P3
P4
P1
P2
P3
P4
P1
P2
P3
P4
P1
P2
P3
P4
P1
P2
P3
P4
P1
P2
P3
P4

Pile load
kN
2862.6
4454.9
2541.1
948.8
489.9
4391.7
3860.7
-41.1
4982.6
5113.7
-632.0
-763.1
4982.6
5113.7
-632.0
-763.1
2012.7
2152.3
1695.7
1556.1
1097.3
4758.7
3674.6
13.1
4607.2
5322.8
164.6
-550.9

232

ULS Load Case


208 ULS G-IIB (R3)

209 ULS G-IIB (- R3)

210 ULS G-IIC (R1)

211 ULS G-IIC (R2)

212 ULS G-IIC ( R3)

213 ULS G-IIC (- R3)

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

ULS Tie Member Forces from pile cap design model (Appendix-7):
Beam
1

L/C
201 ULS G
202 ULS G203 ULS G204 ULS G205 ULS G206 ULS G207 ULS G208 ULS G209 ULS G210 ULS G211 ULS G212 ULS G213 ULS G-

201 ULS G
202 ULS G203 ULS G204 ULS G205 ULS G206 ULS G207 ULS G208 ULS G209 ULS G-

Node
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
3
2
3
2
3
2
3
2
3
2
3
2
3
2
3
2
3

Fx kN
-6593.217
6593.217
-4326.758
4326.758
-10192
10192
-10192
10192
-3550.048
3550.048
-5233.342
5233.342
-9815.556
9815.556
-9815.556
9815.556
-4626.542
4626.542
-2579.985
2579.985
-8078.638
8078.638
-483.494
483.494
281.261
-281.261
-3172.736
3172.736
-4216.196
4216.196
-1987.246
1987.246
-1987.246
1987.246
-1624.885
1624.885
-4202.811
4202.811
-2461.44
2461.44
-2461.44
2461.44
-2178.352

Fy kN
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

233

Fz kN
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Mx kNm
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

My kNm
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

210 ULS G211 ULS G212 ULS G213 ULS G3

201 ULS G
202 ULS G203 ULS G204 ULS G205 ULS G206 ULS G207 ULS G208 ULS G209 ULS G210 ULS G211 ULS G212 ULS G213 ULS G-

201 ULS G
202 ULS G203 ULS G204 ULS G205 ULS G206 ULS G207 ULS G208 ULS G-

2
3
2
3
2
3
2
3
2
4
3
4
3
4
3
4
3
4
3
4
3
4
3
4
3
4
3
4
3
4
3
4
3
4
3
4
1
4
1
4
1
4
1
4
1
4
1
4
1
4

2178.352
-3279.66
3279.66
-1190.014
1190.014
-164.13
164.13
166.242
-166.242
-3081.229
3081.229
-3436.581
3436.581
2428.651
-2428.651
2428.651
-2428.651
-2814.161
2814.161
-3294.441
3294.441
1287.775
-1287.775
1287.775
-1287.775
-2808.175
2808.175
-2077.566
2077.566
3421.095
-3421.095
-2618.77
2618.77
-1462.092
1462.092
-1659.759
1659.759
338.321
-338.321
-1890.634
1890.634
-1890.634
1890.634
-1554.109
1554.109
-56.913
56.913
-1798.282
1798.282
-1798.282

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

234

Prepared
Checked
Verified

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Harjot
R P Sharma
Sumant

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

209 ULS G210 ULS G211 ULS G212 ULS G213 ULS G-

1
4
1
4
1
4
1
4
1
4
1

1798.282
-1535.372
1535.372
953.161
-953.161
-1136.481
1136.481
-1385.486
1385.486
-756.08
756.08

Prepared
Checked
Verified

0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0

Harjot
R P Sharma
Sumant

0
0
0
0
0
0
0
0
0
0
0

Transverse Direction

Longitudinal Direction

Plan of STAAD Model with Node and Member Numbers

Summary of Forces of Tie Members in Longitudinal & Transverse Directions


Forces in

Long. Force

Load Cases
Tie 1
kN
201 ULS G-I MEMBER NUMB
-6593
202 ULS G-IIA (R1)
-4327
203 ULS G-IIA (R2) SIDE VIEW -10192
204 ULS G-IIA (R3)
-10192
205 ULS G-IIA (- R3)
-3550
206 ULS G-IIB (R1)
-5233

Tie 2

Tie 3

Tie 4

(Tie1 + Tie3)

kN
-3173
-4216
-1987
-1987
-1625
-4203

kN
-3081
-3437
2429
2429
-2814
-3294

kN
-1660
338
-1891
-1891
-1554
-57

kN
-9674
-7763
-7763
-7763
-6364
-8528

235

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

207 ULS G-IIB (R2)


208 ULS G-IIB (R3)
209 ULS G-IIB (- R3)
210 ULS G-IIC (R1)
211 ULS G-IIC (R2)
212 ULS G-IIC ( R3)
213 ULS G-IIC (- R3)

Pier P148
AECOM/CC28/PF148
10761.372

-9816
-9816
-4627
-2580
-8079
-483
281

-2461
-2461
-2178
-3280
-1190
-164
166

Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

1288
1288
-2808
-2078
3421
-2619
-1462

-1798
-1798
-1535
953
-1136
-1385
-756

-8528
-8528
-7435
-4658
-4658
-3102
-1181

Tensile strength of Steel fy


Design Tensile strength of Steel

=
=

500 N/mm2
0.87 x fy
=

Ast Required

=
=

435 N/mm2
Tensile force / Tensile strength of Steel

0.87

Longitudinal Reinforcement
Max. Tensile force in long direction

Ast Required in long. dirc.

Ast as per Beam Theory

9674 kN
9674446

/ 435

22240 mm

36995 mm2

>

Since reinforcement as per Beam theory is more than reinforcement as per Truss Anology, Beam theory is followed for
pile cap design.
Transverse Reinforcement
Max. Tensile force in long direction

Ast Required in long. dirc.

Ast as per Beam Theory

4832 kN
4832495

/ 435

11109 mm

34361 mm2

>

Since reinforcement as per Beam theory is more than reinforcement as per Truss Anology, Beam theory is followed for
pile cap design.
Shear Check
No Shear Design Check is required for pile cap design by Truss Analogy.

236

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

237

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

ure P148
Project Code
Date
Rev

21-Feb-13
0

scribed square pier is taken


f pier are connected by each
odel are applied at pile

in the model for pier)

Beam / Pile
No.
P1
P2
P3
P4
P1
P2
P3
P4
P1
P2
P3
P4
P1
P2
P3
P4
P1
P2
P3
P4
P1
P2
P3
P4

Pile load
kN
4607.2
5322.8
164.6
-550.9
2287.0
3009.2
1983.1
1260.9
-353.8
3253.9
2954.3
-653.5
3858.2
3930.8
-1257.7
-1330.3
1818.3
-632.0
1448.9
1384.3
1154.5
-632.0
924.5
843.9

238

ure P148
Project Code
Date
Rev

21-Feb-13
0

Mz kNm
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

239

ure P148
Project Code
Date
Rev

21-Feb-13
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

240

ure P148
Project Code
Date
Rev

21-Feb-13
0

0
0
0
0
0
0
0
0
0
0
0

Longitudinal Direction

Trans. Force
(Tie2 + Tie4)
kN
-4832
-3878
-3878
-3878
-3179
-4260

241

ure P148
Project Code
Date
Rev

21-Feb-13
0

-4260
-4260
-3714
-2326
-2326
-1550
-590

x 500

22240 mm2

eam theory is followed for

11109 mm2

eam theory is followed for

242

ure P148
Project Code
Date
Rev

21-Feb-13
0

243

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Prepared
Checked
Verified

Calculation of spring stiffness


(As per Annexure C of IS: 2911 (Part 1/Sec 2) - 2010)
Modulus of subgrade reaction
Static spring constant (for a layer thk = dz) at a depth z below GL
Dynamic spring stiffness (as per DBR)
Depth (z)
Below GL

Layer
thk.

m
0
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

m
0.5
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

N value

12
23
27
26
27
36
51
85
101
100
100
84
53
51
50
51
53
69
98
101
82
41
43
44
43
43
48
57
54
55
59

Type of sand

Medium
Medium
Medium
Medium
Medium
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense

Dry/
submerged

Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged

244

Harjot
R P Sharma
Sumant

Kstatic
Kdynamic

Kstatic

kN/m3

kN/m

1688
3272
3848
3704
3848
5108
6723
10385
12000
12000
12000
10277
6938
6723
6615
6723
6938
8662
11785
12000
10062
5646
5862
5969
5862
5862
6400
7369
7046
7154
7585

2532
13088
19240
22224
26936
40862
60508
103846
132000
144000
156000
143877
104077
107569
112462
121015
131831
173231
247477
264000
231415
135508
146538
155200
158262
164123
185600
221077
218431
228923
250292

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

245

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Substructure P148
-

Project Code
Date

2/21/2013

Rev

Appendix-1

=
=
=

NBH-26
h
h z.y
3.5 Kstatic

Kdynamic
kN/m
8862
45808
67340
77784
94276
143015
211777
363462
462000
504000
546000
503569
364269
376492
393615
423554
461408
606308
866169
924000
809954
474277
512885
543200
553915
574431
649600
773769
764508
801231
876023

246

CC-28
L&T
Substructure P148
Project Code

Date

2/21/2013

Rev

247

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
Staad Input for Time Period Calculation
STAAD SPACE
INPUT WIDTH 79
UNIT METER KN
SET ECHO OFF
JOINT COORDINATES
1
-3
2
3
3
3
4
-3
5
0
6
0
7
-3
8
3
9
3
10
-3
11
0
12
0
13
-3
14
3
15
3
16
-3
17
0
18
0
19
-3
20
3
21
3
22
-3
23
0
24
0
25
-3
26
3
27
3
28
-3
29
0
30
0
31
-3
32
3
33
3
34
-3
35
0
36
0
37
-3
38
3
39
3
40
-3
41
0
42
0
43
-3
44
3

Pier P148
AECOM/CC28/PF148
10761.372

-2
-2
-2
-2
-2
-2
-3
-3
-3
-3
-3
-3
-4
-4
-4
-4
-4
-4
-5
-5
-5
-5
-5
-5
-6
-6
-6
-6
-6
-6
-7
-7
-7
-7
-7
-7
-8
-8
-8
-8
-8
-8
-9
-9

1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5

248

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

Node Numbers at Pile

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94

Pier P148
AECOM/CC28/PF148
10761.372

3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3

-9
-9
-9
-9
-10
-10
-10
-10
-10
-10
-11
-11
-11
-11
-11
-11
-12
-12
-12
-12
-12
-12
-13
-13
-13
-13
-13
-13
-14
-14
-14
-14
-14
-14
-15
-15
-15
-15
-15
-15
-16
-16
-16
-16
-16
-16
-17
-17
-17
-17

-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5

249

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144

Pier P148
AECOM/CC28/PF148
10761.372

0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0

-17
-17
-18
-18
-18
-18
-18
-18
-19
-19
-19
-19
-19
-19
-20
-20
-20
-20
-20
-20
-21
-21
-21
-21
-21
-21
-22
-22
-22
-22
-22
-22
-23
-23
-23
-23
-23
-23
-24
-24
-24
-24
-24
-24
-25
-25
-25
-25
-25
-25

1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5

250

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
201
202

Pier P148
AECOM/CC28/PF148
10761.372

-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
0
0

-26
-26
-26
-26
-26
-26
-27
-27
-27
-27
-27
-27
-28
-28
-28
-28
-28
-28
-29
-29
-29
-29
-29
-29
-30
-30
-30
-30
-30
-30
-31
-31
-31
-31
-31
-31
-32
-32
-32
-32
-32
-32
-33
-33
-33
-33
-33
-33
-2
-0.5

1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
0
0

251

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
203
204
205
206
207
208
209
210
211
212
213
215
216
217
218
219
220
221
222
223
224
225
226
227
228
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254

Pier P148
AECOM/CC28/PF148
10761.372

0
0
0
0
0
0
0
0
-1.5
-3
-1.5
0
1.5
1.5
3
-1.5
-3
1.5
3
-1.5
-3
0
1.5
3
-1.5
1.5
-3
-1.5
0
1.5
3
-1.5
-3
0
1.5
3
-3.75
-3.75
-3.75
-3.75
-3.75
-3.75
-3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75

0.75
2.08
4.16
5.21
5.96
6.09
6.51
7.79
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2

0
0
0
0
0
0
0
0
-1.5
-0.75
-0.75
-0.75
-1.5
-0.75
-0.75
0
0
0
0
0.75
0.75
0.75
0.75
0.75
1.5
1.5
-2.25
-2.25
-2.25
-2.25
-2.25
2.25
2.25
2.25
2.25
2.25
-1.5
-0.75
0
0.75
1.5
-2.25
2.25
-1.5
-0.75
0
0.75
1.5
-2.25
2.25

252

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

Node Numbers at Pile cap

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
MEMBER INCIDENCES
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

Pier P148
AECOM/CC28/PF148
10761.372

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55

253

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99

Pier P148
AECOM/CC28/PF148
10761.372

50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99

56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105

254

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149

Pier P148
AECOM/CC28/PF148
10761.372

100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149

106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

Member Numbers

255

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
150
150
151
151
152
152
153
153
154
154
155
155
156
156
157
157
158
158
159
159
160
160
161
161
162
162
163
163
164
164
165
165
166
166
167
167
168
168
169
169
170
170
171
171
172
172
173
173
174
174
175
175
176
176
177
177
178
178
179
179
180
180
181
181
182
182
183
183
184
184
185
185
186
186
205
201
206
202
207
203
208
204
209
205
210
206
211
207
212
208
213
209
ELEMENT INCIDENCES SHELL
214
4
215
211
216
6

Pier P148
AECOM/CC28/PF148
10761.372

Prepared
Checked
Verified

156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
202
203
204
205
206
207
208
209
210

Harjot
R P Sharma
Sumant

Plate no. for Pile Cap

211
6
216

213
215
217

256

212
213
215

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249

216
212
213
215
217
220
219
201
221
224
223
225
226
231
232
233
234
1
228
5
230
241
242
243
244
246
245
3
218
222
227
235
2
ELEMENT
PROPERTY
214 TO
DEFINE MATERIAL START
ISOTROPIC CONCRETEM35
E 29500000
POISSON 0.17
DENSITY 25
ALPHA 1.17e-005
DAMP 0.05
ISOTROPIC CONCRETEM45
E 32500000
POISSON 0.17
DENSITY 25
ALPHA 1.17e-005
DAMP 0.05
ISOTROPIC CONCRETEM50
E 34000000

Pier P148
AECOM/CC28/PF148
10761.372

3
213
215
217
218
219
201
221
222
223
225
226
227
232
233
234
235
228
5
230
2
4
212
220
224
231
1
248
249
250
251
253
252

218
219
201
221
222
223
225
226
227
228
5
230
2
211
6
216
3
236
238
239
240
212
220
224
1
4
237
249
250
251
252
248
254

249 THICKNESS

257

Prepared
Checked
Verified

217
220
219
201
221
224
223
225
226
1
228
5
230
4
211
6
216
237
236
238
239
242
243
244
245
241
247
218
222
227
2
3
240
1.5

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

POISSON 0.17
DENSITY 25
ALPHA 1.17e-005
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
1 TO 144 PRIS AX 0.785 IX 0.074 IY 0.037 IZ 0.037
206 207 208 PRIS AX 3.464 IX 1.432 IY 0.716 IZ 0.716
205 PRIS YD 4.5 ZD 7.5
209 TO 210 PRIS YD 3.35 ZD 4.1
211 TO 213 PRIS YD 1.15 ZD 1.1
CONSTANTS
MATERIAL CONCRETEM35 MEMB 1 TO 144 205 214 TO 249
MATERIAL CONCRETEM50 MEMB 206 207 208
MATERIAL CONCRETEM45 MEMB 209 TO 213
SUPPORTS
7 TO 12 FIXED BUT FY MX MY MZ KFX 8862 KFZ 8862
13 TO 18 FIXED BUT FY MX MY MZ KFX 45808 KFZ 45808
19 TO 24 FIXED BUT FY MX MY MZ KFX 67340 KFZ 67340
25 TO 30 FIXED BUT FY MX MY MZ KFX 77784 KFZ 77784
31 TO 36 FIXED BUT FY MX MY MZ KFX 94276 KFZ 94276
37 TO 42 FIXED BUT FY MX MY MZ KFX 143015 KFZ 143015
43 TO 48 FIXED BUT FY MX MY MZ KFX 211777 KFZ 211777
49 TO 54 FIXED BUT FY MX MY MZ KFX 363462 KFZ 363462
55 TO 60 FIXED BUT FY MX MY MZ KFX 462000 KFZ 462000
61 TO 66 FIXED BUT FY MX MY MZ KFX 504000 KFZ 504000
67 TO 72 FIXED BUT FY MX MY MZ KFX 546000 KFZ 546000
73 TO 78 FIXED BUT FY MX MY MZ KFX 503569 KFZ 503569
79 TO 84 FIXED BUT FY MX MY MZ KFX 364269 KFZ 364269
85 TO 90 FIXED BUT FY MX MY MZ KFX 376492 KFZ 376492
91 TO 96 FIXED BUT FY MX MY MZ KFX 393615 KFZ 393615
97 TO 102 FIXED BUT FY MX MY MZ KFX 423554 KFZ 423554
103 TO 108 FIXED BUT FY MX MY MZ KFX 461408 KFZ 461408
109 TO 114 FIXED BUT FY MX MY MZ KFX 606308 KFZ 606308
115 TO 120 FIXED BUT FY MX MY MZ KFX 866169 KFZ 866169
121 TO 126 FIXED BUT FY MX MY MZ KFX 924000 KFZ 924000
127 TO 132 FIXED BUT FY MX MY MZ KFX 809954 KFZ 809954
133 TO 138 FIXED BUT FY MX MY MZ KFX 474277 KFZ 474277
139 TO 144 FIXED BUT FY MX MY MZ KFX 512885 KFZ 512885
145 TO 150 FIXED BUT MX MZ KFX 543200 KFZ 543200
151 TO 156 FIXED BUT FY MX MY MZ KFX 553915 KFZ 553915
157 TO 162 FIXED BUT MX MZ KFX 574431 KFZ 574431
163 TO 168 FIXED BUT FY MX MY MZ KFX 649600 KFZ 649600
169 TO 174 FIXED BUT FY MX MY MZ KFX 773769 KFZ 773769
175 TO 180 FIXED BUT FY MX MY MZ KFX 764508 KFZ 764508
181 TO 186 FIXED BUT FY MX MY MZ KFX 801231 KFZ 801231
187 TO 192 FIXED BUT MX MZ KFX 876023 KFZ 876023
LOAD 1 LONGITUDINAL
JOINT LOAD
203 FX 62.95

258

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

Prepared
Checked
Verified

204 FX 201.885
206 FX 451.25
208 FX 20.25
209 FX 26.88
209 FX 7631.08
CALCULATE RAYLEIGH FREQUENCY
LOAD 2 TRANSVERSE
JOINT LOAD
203 FZ 62.95
204 FZ 201.885
206 FZ 451.25
208 FZ 20.25
209 FZ 26.88
209 FZ 8142.77
CALCULATE RAYLEIGH FREQUENCY
PERFORM ANALYSIS
FINISH
STAAD Output

****************************************************
*
*
*
STAAD.Pro V8i SELECTseries3
*
*
Version 20.07.08.22
*
*
Proprietary Program of
*
*
Bentley Systems, Inc.
*
*
Date= FEB 19, 2013
*
*
Time= 10:57:22
*
*
*
*
USER ID: AECOM
*
****************************************************

1. STAAD SPACE
INPUT FILE: TP.P148.STD
2. START JOB INFORMATION
3. ENGINEER DATE 19-FEB-13
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. SET ECHO OFF

PR O B LE M S TAT I S T I C S
----------------------------------NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS = 202/ 189/ 144

259

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

Prepared
Checked
Verified

SOLVER USED IS THE OUT-OF-CORE BASIC SOLVER


ORIGINAL/FINAL BAND-WIDTH= 200/ 16/ 102 DOF
TOTAL PRIMARY LOAD CASES = 2, TOTAL DEGREES OF FREEDOM = 1200
SIZE OF STIFFNESS MATRIX = 123 DOUBLE KILO-WORDS
REQRD/AVAIL. DISK SPACE = 13.7/ 65889.2 MB

**********************************************************
*
*
* RAYLEIGH FREQUENCY FOR LOADING 1 = 1.53046 CPS *
* MAX DEFLECTION = 12.50208 CM GLO X, AT JOINT 210 *
*
*
**********************************************************

STAAD SPACE

-- PAGE NO.

**********************************************************
*
*
* RAYLEIGH FREQUENCY FOR LOADING 2 = 1.28047 CPS *
* MAX DEFLECTION = 17.66827 CM GLO Z, AT JOINT 210 *
*
*
**********************************************************

STAAD SPACE

-- PAGE NO.

*********** END OF THE STAAD.Pro RUN ***********


**** DATE= FEB 19,2013 TIME= 10:57:23 ****
************************************************************
*
For questions on STAAD.Pro, please contact
*
*
Bentley Systems or Partner offices
*
*
*
*
Telephone
Web / Email
*
* USA
+1 (714) 974-2500
*
* UK
+44 (0) 808 101 9246
*

260

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

* SINGAPORE +65 6225-6158


*
* FRANCE +33 (0) 1 55238400
*
* GERMANY +49 0931 40468
*
* INDIA +91 (033) 4006-2021
*
* JAPAN +81 (03)5952-6500 http://www.ctc-g.co.jp *
* CHINA +86 21 6288 4040
*
* THAILAND +66 (0)2645-1018/19 partha.p@reisoftwareth.com*
*
*
* Worldwide http://selectservices.bentley.com/en-US/ *
*
*
************************************************************
STAAD SPACE

-- PAGE NO.

261

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

cture P148
Project Code

Date

2/21/2013

Rev

Appendix-2

ode Numbers at Pile

262

cture P148
Project Code

Date

2/21/2013

Rev

Appendix-2

263

cture P148
Project Code

Date

2/21/2013

Rev

Appendix-2

264

cture P148
Project Code

Date

2/21/2013

Rev

Appendix-2

265

cture P148
Project Code

Date

2/21/2013

Rev

Appendix-2

266

cture P148
Project Code

Date

2/21/2013

Rev

Appendix-2

267

cture P148
Project Code

Date

2/21/2013

Rev

Appendix-2

268

cture P148
Project Code

Date

2/21/2013

Rev

Appendix-2

ember Numbers

269

cture P148
Project Code

Date

2/21/2013

Rev

Appendix-2

270

cture P148
Project Code

Date

2/21/2013

Rev

Appendix-2

271

cture P148
Project Code

Date

2/21/2013

Rev

Appendix-2

272

cture P148
Project Code

Date

2/21/2013

Rev

Appendix-2

273

cture P148
Project Code

Date

2/21/2013

Rev

Appendix-2

274

cture P148
Project Code

Date

2/21/2013

Rev

Appendix-2

275

AECOM

Oasys Output for Pier Design Check

AT PIER BASE (2.1m Pier Diameter)


Section 1 Details

Definition
Name
Section 1
Type
Concrete
Material
M50 - C
Origin
Centre
Dimensions
Diameter
2100.mm
Section Area
3.464E+6mm2
Reinforcement Area
39270.mm2
Reinforcement
1.134%

Section Nodes
Node Y
Z
[mm]
[mm]
1
0.0 1051.
2 126.7 1044.
3 251.6 1021.
4 372.8 983.0
5 488.6 930.9
6 597.2 865.2
7 697.1 786.9
8 786.9 697.1
9 865.2 597.2
10 930.9 488.6
11 983.0 372.8
12 1021. 251.6
13 1044. 126.7
14 1051. -61.62E-6
15 1044. -126.7
16 1021. -251.6
17 983.0 -372.8
18 930.9 -488.6
19 865.2 -597.2
20 786.9 -697.1
21 697.1 -786.9
22 597.2 -865.2
23 488.6 -930.9
24 372.8 -983.0
25 251.6 -1021.
26 126.7 -1044.
27 -123.2E-6 -1051.
28 -126.7 -1044.
29 -251.6 -1021.
30 -372.8 -983.0
31 -488.6 -930.9
32 -597.2 -865.2
33 -697.1 -786.9
34 -786.9 -697.1
35 -865.2 -597.2

276

Appendix-3

AECOM
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52

Oasys Output for Pier Design Check

-930.9 -488.6
-983.0 -372.8
-1021. -251.6
-1044. -126.7
-1051. 184.9E-6
-1044. 126.7
-1021. 251.6
-983.0 372.8
-930.9 488.6
-865.2 597.2
-786.9 697.1
-697.1 786.9
-597.2 865.2
-488.6 930.9
-372.8 983.0
-251.6 1021.
-126.7 1044.

Cover and Links


Cover
50.00mm
Link Size
20.00mm
Link Material 415

Bars
Bar

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

[mm]
917.5
906.2
872.6
817.5
742.3
648.8
539.3
416.5
283.5
143.5
0.0
-143.5
-283.5
-416.5
-539.3
-648.8
-742.3
-817.5
-872.6
-906.2
-917.5
-906.2
-872.6
-817.5
-742.3

Diameter

[mm]
[mm]
0.0 25.00
143.5 25.00
283.5 25.00
416.5 25.00
539.3 25.00
648.8 25.00
742.3 25.00
817.5 25.00
872.6 25.00
906.2 25.00
917.5 25.00
906.2 25.00
872.6 25.00
817.5 25.00
742.3 25.00
648.8 25.00
539.3 25.00
416.5 25.00
283.5 25.00
143.5 25.00
0.0 25.00
-143.5 25.00
-283.5 25.00
-416.5 25.00
-539.3 25.00

Material Type Pre-stress Pre-stress Appl. loads


Force Strain include/exclude
pre-stress
[kN]
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel

277

Appendix-3

AECOM
26 -648.8 -648.8 25.00
27 -539.3 -742.3 25.00
28 -416.5 -817.5 25.00
29 -283.5 -872.6 25.00
30 -143.5 -906.2 25.00
31
0.0 -917.5 25.00
32 143.5 -906.2 25.00
33 283.5 -872.6 25.00
34 416.5 -817.5 25.00
35 539.3 -742.3 25.00
36 648.8 -648.8 25.00
37 742.3 -539.3 25.00
38 817.5 -416.5 25.00
39 872.6 -283.5 25.00
40 906.2 -143.5 25.00
41 967.5
0.0 25.00
42 955.6 151.4 25.00
43 920.1 299.0 25.00
44 862.0 439.2 25.00
45 782.7 568.7 25.00
46 684.1 684.1 25.00
47 568.7 782.7 25.00
48 439.2 862.0 25.00
49 299.0 920.1 25.00
50 151.4 955.6 25.00
51 -120.4E-6 967.5 25.00
52 -151.4 955.6 25.00
53 -299.0 920.1 25.00
54 -439.2 862.0 25.00
55 -568.7 782.7 25.00
56 -684.1 684.1 25.00
57 -782.7 568.7 25.00
58 -862.0 439.2 25.00
59 -920.1 299.0 25.00
60 -955.6 151.4 25.00
61 -967.5 -240.8E-6 25.00
62 -955.6 -151.4 25.00
63 -920.1 -299.0 25.00
64 -862.0 -439.2 25.00
65 -782.7 -568.7 25.00
66 -684.1 -684.1 25.00
67 -568.7 -782.7 25.00
68 -439.2 -862.0 25.00
69 -299.0 -920.1 25.00
70 -151.4 -955.6 25.00
71 126.3E-6 -967.5 25.00
72 151.4 -955.6 25.00
73 299.0 -920.1 25.00
74 439.2 -862.0 25.00
75 568.7 -782.7 25.00
76 684.1 -684.1 25.00
77 782.7 -568.7 25.00
78 862.0 -439.2 25.00
79 920.1 -299.0 25.00
80 955.6 -151.4 25.00

Oasys Output for Pier Design Check


500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel

278

Appendix-3

AECOM

Oasys Output for Pier Design Check

Elastic Properties

Effective properties of the section, ignoring reinforcement.

Geometric Centroid

y
0.0mm
0.0mm
Area
3.464E+6mm2
Second Moments of Area
Iyy
954.7E+9mm4
Izz
954.7E+9mm4
Iyz
0.0mm4
Principal Second Moments of Area Iuu
954.7E+9mm4
Izz
954.7E+9mm4
Angle
0.0
Shear Area Factor
ky
0.8571
kz
0.8571
Torsion Constant
1.909E+12mm4
Section Modulus
Zy
909.2E+6mm3
Zz
909.2E+6mm3
Plastic Modulus
Zpy
1.544E+9mm3
Zpz
1.544E+9mm3
Radius of Gyration
Ry
525.0mm
Rz
525.0mm
z

Properties of gross section, including reinforcement.

Geometric Centroid

y
333.0E-9mm
-2.912E-6mm
124.3E+6kN
EIyy
35.36E+6kNm2
EIzz
35.36E+6kNm2
EIyz
-0.01062kNm2
EIuu
35.36E+6kNm2
EIzz
35.36E+6kNm2
Angle
-45.00
z

EA
EI

Principal EI

Maximum compressive force


Nu
93550.kN
Strain at Nmax
0.003500[-]
Moment at ref. pt. for Nmax
Myy
-0.001041kNm
Mzz
151.3E-6kNm
Note: Nmax is the maximum compressive force which can be carried by the section.
This is calculated by applying a constant strain across the entire section, using
ultimate material properties.

Section Material Properties


Type
Name
Weight
Density
Cube Strength
Tensile Strength

Concrete
M50 - C
Normal Weight
r
2.300t/m3
fck 50.00N/mm2
fcr 0.0N/mm2

279

Appendix-3

AECOM

Oasys Output for Pier Design Check

Elastic Modulus (short E


34000.N/mm2
term)
Poisson's Ratio
n
0.2000
Coeff. Thermal Expansion a
10.00E-6/C
Partial Safety Factor gmc,ULS 1.500
gmc,SLS 1.000
Maximum Strain
0.003500[-]
ULS Compression Curve
Recto-parabolic
ULS Tension Curve
No-tension
SLS Compression Curve
Linear
SLS Tension Curve
No-tension
Aggregate Size
20.00mm

Reinforcement Properties
Name
500
fy
500.0N/mm2
Modulus
200000.N/mm2
Partial Safety Factor gms,ULS 1.150
gms,SLS 1.000
Maximum Strain
0.004174[-]
Stress/Strain Curve
Elastic-plastic

Loading

Reference Point
All loading acts through the Reference Point.
All strain planes are defined relative to the Reference Point.
Definition

Geometric
Centroid
Reference Point Coordinates y 0.0mm
z 0.0mm

Load Case Titles


Load
Case
1 SLS1
2 SLS2
3 SLS3
4 SLS4
5 SLS5
6 SLS6
7 SLS7
8 SLS8
9 ULS1
10 ULS2
11 ULS3
12 ULS4
13 ULS5
14 ULS6

Title

280

Appendix-3

AECOM

Oasys Output for Pier Design Check

15 ULS7
16 ULS8
17 ULS9
18 ULS10
19 ULS11
20 ULS12
21 ULS13
22 ULS14
23 ULS15

Applied loads
Load Case
N Myy Mzz
[kN] [kNm] [kNm]
SLS1
11800. 6684. 0.0
SLS2
10330. 9594. 0.0
SLS3
10330. 13900. 0.0
SLS4
11280. 4096. 0.0
SLS5
9373. 3717. 0.0
SLS6
10330. 3905. 0.0
SLS7
10330. 3905. 0.0
SLS8
10330. 5823. 0.0
ULS1
17090. 10390. 0.0
ULS2
14510. 12390. 0.0
ULS3
14510. 17990. 0.0
ULS4
15700. 5743. 0.0
ULS5
13320. 5268. 0.0
ULS6
14510. 5505. 0.0
ULS7
14510. 5505. 0.0
ULS8
12790. 11730. 0.0
ULS9
12790. 19080. 0.0
ULS10
14320. 3283. 0.0
ULS11
11260. 2618. 0.0
ULS12
7397. 11100. 0.0
ULS13
7397. 16820. 0.0
ULS14
8829. 1975. 0.0
ULS15
5964. 1352. 0.0

Section 1 Details
1.13% reinforcement in section 1 (Section 1). Check this against code requirements.

SLS Cases Analysed


Name

Loading
Pre-stress Creep
Factor Coeff.
Long Term Short Term

Serivceability Analysis - Loads


Case N Myy Mzz M q
[kN] [kNm] [kNm] [kNm] []
1 11800. 6684. 0.0 6684. 0.0

281

Appendix-3

AECOM

Oasys Output for Pier Design Check

2 10330. 9594. 0.0 9594. 0.0


3 10330. 13900. 0.0 13900. 0.0
4 11280. 4096. 0.0 4096. 0.0
5 9373. 3717. 0.0 3717. 0.0
6 10330. 3905. 0.0 3905. 0.0
7 10330. 3905. 0.0 3905. 0.0
8 10330. 5823. 0.0 5823. 0.0

SLS Loads Analysis Summary


Case Secant Neutral Neutral k at M0
EI Axis Axis
Angle Depth
[kNm] [] [mm] [/m]
1 15.64E+6 0.0 1393. 6.131E-12
2 11.12E+6 0.0 1025. 5.339E-12
3 9.148E+6 0.0 869.9 5.339E-12
4 19.00E+6 0.0 1837. 5.852E-12
5 18.60E+6 0.0 1747. 4.826E-12
6 18.83E+6 0.0 1796. 5.339E-12
7 18.83E+6 0.0 1796. 5.339E-12
8 15.69E+6 0.0 1398. 5.339E-12

Moment summary for SLS axial loads


Effective centroid is reported relative to the reference point.
Cracking moment is for short term loading
Case Eff. Centroid
N M
Mu M/Mu Mcr
Note
y
z
[mm]
[mm] [kN] [kNm] [kNm]
[kNm]
Maxima
1 -2.001E-6 -7.387E-6 11800. 6684. 19570. 0.3415 3193.
3 -2.001E-6 -7.387E-6 10330. 13900. 18800. 0.7397 2795.
1 -2.001E-6 -7.387E-6 11800. 6684. 19570. 0.3415 3193.
Minima
5 -2.001E-6 -7.387E-6 9373. 3717. 18280. 0.2034 2536.
5 -2.001E-6 -7.387E-6 9373. 3717. 18280. 0.2034 2536.
5 -2.001E-6 -7.387E-6 9373. 3717. 18280. 0.2034 2536.

Section Material Stresses/Strains at SLS Loads


Case Bar Coordinates
Notes
y
z
Strain Stress
[mm] [mm]
[-]
[N/mm]
Maxima
3 1
0.0 1051.
0.001322 22.48
3 1
0.0 1051.
0.001322 22.48
Minima
3 27 -123.2E-6 -1051.
-0.001874 0.0
1 17 983.0 -372.8
-13.09E-6 0.0

Reinforcement Stresses/Strains at SLS Loads

282

Appendix-3

AECOM

Oasys Output for Pier Design Check

Case Bar Coordinates


Notes
y
z
Strain Stress
[mm] [mm]
[-]
[N/mm]
Maxima
3 51 -120.4E-6 967.5
0.001195 239.0 500
3 51 -120.4E-6 967.5
0.001195 239.0 500
Minima
3 71 126.3E-6 -967.5
-0.001746 -349.2 500
3 71 126.3E-6 -967.5
-0.001746 -349.2 500
Crack Widths at SLS Loads
Crack widths calculated at 20mm intervals
Note: Cover to controlling bar measured to different side from crack location
Case 1
Crack Numbers
3 to 4 11 to 18 25 to 26 43 43 to 50 56 to 58 75 75 to 77 88 to 90 107 107 to 108 115 to 122
129 to 130
147
147 to 154
160 to 162

Case Face Point Coordinates Strain Control Bar acr


Cover
h x Crack
Width
y z
cmin From
[mm] [mm]
[mm] [mm]
[mm] [mm] [mm]
Maxima
1 27 88 -79.85 -1046. -300.9E-6
71 99.79 71.13 Face 27 2103. 1393. 0.08335

ULS Cases Analysed


Name

Loading Pre-stress
Factor

Strength Analysis - Loads


Case N Myy Mzz M q
[kN] [kNm] [kNm] [kNm] []
1 17090. 10390. 0.0 10390. 0.0
2 14510. 12390. 0.0 12390. 0.0
3 14510. 17990. 0.0 17990. 0.0
4 15700. 5743. 0.0 5743. 0.0
5 13320. 5268. 0.0 5268. 0.0
6 14510. 5505. 0.0 5505. 0.0
7 14510. 5505. 0.0 5505. 0.0
8 12790. 11730. 0.0 11730. 0.0
9 12790. 19080. 0.0 19080. 0.0
10 14320. 3283. 0.0 3283. 0.0
11 11260. 2618. 0.0 2618. 0.0
12 7397. 11100. 0.0 11100. 0.0
13 7397. 16820. 0.0 16820. 0.0
14 8829. 1975. 0.0 1975. 0.0
15 5964. 1352. 0.0 1352. 0.0

283

Appendix-3

AECOM

Oasys Output for Pier Design Check

Strength Analysis - Summary


Governing conditions are defined as:
A - reinforcing steel tension strain limit
B - concrete compression strain limit
C - concrete pure compression strain limit
IS 456 Section 39.1
Effective centroid is reported relative to the reference point.

Case Eff.
Eff.
N M
Mu M/Mu Governing Neutral Neutral
Centroid Centroid
Condition Axis Axis
(y)
(z)
Angle Depth
[kN] [kNm] [kNm]
[] [mm]
Maxima
13 -1.941E-6 -9.133E-6 7397. 16820. 17170. 0.9796 A: Bar 71
Minima
15 -1.942E-6 -9.111E-6 5964. 1352. 16340. 0.08272 A: Bar 71

284

Appendix-3

AECOM

Oasys Output for Pier Design Check

285

Appendix-3

AECOM

Oasys Output for Pier Design Check

286

Appendix-3

AECOM

Oasys Output for Pier Design Check

287

Appendix-3

AECOM

Oasys Output for Pier Design Check

288

Appendix-3

AECOM

Oasys Output for Pier Design Check

289

Appendix-3

AECOM

Oasys Output for Pier Design Check

290

Appendix-3

AECOM

Oasys Output for Pier Design Check

291

Appendix-3

AECOM

Oasys Output for Pier Design Check

292

Appendix-3

AECOM

Oasys Output for Pier Design Check

293

Appendix-3

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
Staad Input for Pile Design
STAAD SPACE
INPUT WIDTH 79
UNIT METER KN
SET NL 7
JOINT COORDINATES
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44

Pier P148
AECOM/CC28/PF148
10761.372

-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3

-2
-2
-2
-2
-2
-2
-3
-3
-3
-3
-3
-3
-4
-4
-4
-4
-4
-4
-5
-5
-5
-5
-5
-5
-6
-6
-6
-6
-6
-6
-7
-7
-7
-7
-7
-7
-8
-8
-8
-8
-8
-8
-9
-9

1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5

294

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

Structure Idealization

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94

Pier P148
AECOM/CC28/PF148
10761.372

3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3

-9
-9
-9
-9
-10
-10
-10
-10
-10
-10
-11
-11
-11
-11
-11
-11
-12
-12
-12
-12
-12
-12
-13
-13
-13
-13
-13
-13
-14
-14
-14
-14
-14
-14
-15
-15
-15
-15
-15
-15
-16
-16
-16
-16
-16
-16
-17
-17
-17
-17

-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5

295

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

Node Numbers PILES

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144

Pier P148
AECOM/CC28/PF148
10761.372

0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0

-17
-17
-18
-18
-18
-18
-18
-18
-19
-19
-19
-19
-19
-19
-20
-20
-20
-20
-20
-20
-21
-21
-21
-21
-21
-21
-22
-22
-22
-22
-22
-22
-23
-23
-23
-23
-23
-23
-24
-24
-24
-24
-24
-24
-25
-25
-25
-25
-25
-25

1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5

296

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
201
202

Pier P148
AECOM/CC28/PF148
10761.372

-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
0
0

-26
-26
-26
-26
-26
-26
-27
-27
-27
-27
-27
-27
-28
-28
-28
-28
-28
-28
-29
-29
-29
-29
-29
-29
-30
-30
-30
-30
-30
-30
-31
-31
-31
-31
-31
-31
-32
-32
-32
-32
-32
-32
-33
-33
-33
-33
-33
-33
-2
-0.5

1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
0
0

297

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

Node Numbers Pile Cap

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
203
0
204
0
205
0
211
-1.5
212
-3
213
-1.5
215
0
216
1.5
217
1.5
218
3
219
-1.5
220
-3
221
1.5
222
3
223
-1.5
224
-3
225
0
226
1.5
227
3
228
-1.5
230
1.5
231
-3
232
-1.5
233
0
234
1.5
235
3
236
-1.5
237
-3
238
0
239
1.5
240
3
241
-3.75
242
-3.75
243
-3.75
244
-3.75
245
-3.75
246
-3.75
247
-3.75
248
3.75
249
3.75
250
3.75
251
3.75
252
3.75
253
3.75
254
3.75
MEMBER INCIDENCES
1
1
2
2
3
3
4
4

Pier P148
AECOM/CC28/PF148
10761.372

4.163
5.063
5.963
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2

0
0
0
-1.5
-0.75
-0.75
-0.75
-1.5
-0.75
-0.75
0
0
0
0
0.75
0.75
0.75
0.75
0.75
1.5
1.5
-2.25
-2.25
-2.25
-2.25
-2.25
2.25
2.25
2.25
2.25
2.25
-1.5
-0.75
0
0.75
1.5
-2.25
2.25
-1.5
-0.75
0
0.75
1.5
-2.25
2.25

7
8
9
10

298

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54

Pier P148
AECOM/CC28/PF148
10761.372

5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54

11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60

299

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104

Pier P148
AECOM/CC28/PF148
10761.372

55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104

61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

Member Numbers

300

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154

Pier P148
AECOM/CC28/PF148
10761.372

105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154

111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160

301

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
155
155
156
156
157
157
158
158
159
159
160
160
161
161
162
162
163
163
164
164
165
165
166
166
167
167
168
168
169
169
170
170
171
171
172
172
173
173
174
174
175
175
176
176
177
177
178
178
179
179
180
180
181
181
182
182
183
183
184
184
185
185
186
186
205
201
206
202
207
203
208
204
ELEMENT INCIDENCES SHELL
214
4
215
211
216
6
217
216
218
212
219
213
220
215
221
217
222
220
223
219
224
201
225
221
226
224

Pier P148
AECOM/CC28/PF148
10761.372

Prepared
Checked
Verified

161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
202
203
204
205
211
6
216
3
213
215
217
218
219
201
221
222
223

213
215
217
218
219
201
221
222
223
225
226
227
228

302

212
213
215
217
220
219
201
221
224
223
225
226
1

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249

223
225
226
231
232
233
234
1
228
5
230
241
242
243
244
246
245
3
218
222
227
235
2
ELEMENT
PROPERTY
214 TO
DEFINE MATERIAL START
ISOTROPIC CONCRETEM35
E 29500000
POISSON 0.17
DENSITY 22.5
ALPHA 1.17e-005
DAMP 0.05
ISOTROPIC CONCRETEM45
E 32500000
POISSON 0.17
DENSITY 25
ALPHA 1.17e-005
DAMP 0.05
ISOTROPIC CONCRETEM50
E 34000000
POISSON 0.17
DENSITY 25
ALPHA 1.17e-005
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
1 TO 144 PRIS YD 1
206 PRIS YD 2.1
205 PRIS YD 4.5 ZD 7.5
207 TO 208 PRIS YD 3.35 ZD 4.1

Pier P148
AECOM/CC28/PF148
10761.372

225
226
227
232
233
234
235
228
5
230
2
4
212
220
224
231
1
248
249
250
251
253
252

5
230
2
211
6
216
3
236
238
239
240
212
220
224
1
4
237
249
250
251
252
248
254

249 THICKNESS

303

Prepared
Checked
Verified

228
5
230
4
211
6
216
237
236
238
239
242
243
244
245
241
247
218
222
227
2
3
240
1.5

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

CONSTANTS
MATERIAL CONCRETEM35 MEMB 1 TO 144 205 214 TO 249
MATERIAL CONCRETEM50 MEMB 206
MATERIAL CONCRETEM45 MEMB 207 208
*** STATIC SOIL STIFFNESS
SUPPORTS
7 TO 12 FIXED BUT FY MX MY MZ KFX 2532 KFZ 2532
13 TO 18 FIXED BUT FY MX MY MZ KFX 13088 KFZ 13088
19 TO 24 FIXED BUT FY MX MY MZ KFX 19240 KFZ 19240
25 TO 30 FIXED BUT FY MX MY MZ KFX 22224 KFZ 22224
31 TO 36 FIXED BUT FY MX MY MZ KFX 26936 KFZ 26936
37 TO 42 FIXED BUT FY MX MY MZ KFX 40862 KFZ 40862
43 TO 48 FIXED BUT FY MX MY MZ KFX 60508 KFZ 60508
49 TO 54 FIXED BUT FY MX MY MZ KFX 103846 KFZ 103846
55 TO 60 FIXED BUT FY MX MY MZ KFX 132000 KFZ 132000
61 TO 66 FIXED BUT FY MX MY MZ KFX 144000 KFZ 144000
67 TO 72 FIXED BUT FY MX MY MZ KFX 156000 KFZ 156000
73 TO 78 FIXED BUT FY MX MY MZ KFX 143877 KFZ 143877
79 TO 84 FIXED BUT FY MX MY MZ KFX 104077 KFZ 104077
85 TO 90 FIXED BUT FY MX MY MZ KFX 107569 KFZ 107569
91 TO 96 FIXED BUT FY MX MY MZ KFX 112462 KFZ 112462
97 TO 102 FIXED BUT FY MX MY MZ KFX 121015 KFZ 121015
103 TO 108 FIXED BUT FY MX MY MZ KFX 131831 KFZ 131831
109 TO 114 FIXED BUT FY MX MY MZ KFX 173231 KFZ 173231
115 TO 120 FIXED BUT FY MX MY MZ KFX 247477 KFZ 247477
121 TO 126 FIXED BUT FY MX MY MZ KFX 264000 KFZ 264000
127 TO 132 FIXED BUT FY MX MY MZ KFX 231415 KFZ 231415
133 TO 138 FIXED BUT FY MX MY MZ KFX 135508 KFZ 135508
139 TO 144 FIXED BUT FY MX MY MZ KFX 146538 KFZ 146538
145 TO 150 FIXED BUT MX MZ KFX 155200 KFZ 155200
151 TO 156 FIXED BUT FY MX MY MZ KFX 158262 KFZ 158262
157 TO 162 FIXED BUT MX MZ KFX 164123 KFZ 164123
163 TO 168 FIXED BUT FY MX MY MZ KFX 185600 KFZ 185600
169 TO 174 FIXED BUT FY MX MY MZ KFX 221077 KFZ 221077
175 TO 180 FIXED BUT FY MX MY MZ KFX 218431 KFZ 218431
181 TO 186 FIXED BUT FY MX MY MZ KFX 228923 KFZ 228923
187 TO 192 FIXED BUT MX MZ KFX 250292 KFZ 250292
LOAD 1 DEAD LOAD
SELFWEIGHT Y -1 LIST 1 TO 144
JOINT LOAD
205 FY -5296.45
205 MZ -316.03
205 MX 1164.76
202 FY -2033.54
202 MZ 0
202 MX 0
LOAD 2 SIDL
JOINT LOAD
205 FY -2833.01
205 MZ -212.63

304

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

Spring Supports

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

205 MX 689.01
LOAD 4 LWR
JOINT LOAD
205 FX 486.58
205 MZ -267.62
PERFORM ANALYSIS
CHANGE
*** DYNAMIC SOIL STIFFNESS
SUPPORTS
7 TO 12 FIXED BUT FY MX MY MZ KFX 8862 KFZ 8862
13 TO 18 FIXED BUT FY MX MY MZ KFX 45808 KFZ 45808
19 TO 24 FIXED BUT FY MX MY MZ KFX 67340 KFZ 67340
25 TO 30 FIXED BUT FY MX MY MZ KFX 77784 KFZ 77784
31 TO 36 FIXED BUT FY MX MY MZ KFX 94276 KFZ 94276
37 TO 42 FIXED BUT FY MX MY MZ KFX 143015 KFZ 143015
43 TO 48 FIXED BUT FY MX MY MZ KFX 211777 KFZ 211777
49 TO 54 FIXED BUT FY MX MY MZ KFX 363462 KFZ 363462
55 TO 60 FIXED BUT FY MX MY MZ KFX 462000 KFZ 462000
61 TO 66 FIXED BUT FY MX MY MZ KFX 504000 KFZ 504000
67 TO 72 FIXED BUT FY MX MY MZ KFX 546000 KFZ 546000
73 TO 78 FIXED BUT FY MX MY MZ KFX 503569 KFZ 503569
79 TO 84 FIXED BUT FY MX MY MZ KFX 364269 KFZ 364269
85 TO 90 FIXED BUT FY MX MY MZ KFX 376492 KFZ 376492
91 TO 96 FIXED BUT FY MX MY MZ KFX 393615 KFZ 393615
97 TO 102 FIXED BUT FY MX MY MZ KFX 423554 KFZ 423554
103 TO 108 FIXED BUT FY MX MY MZ KFX 461408 KFZ 461408
109 TO 114 FIXED BUT FY MX MY MZ KFX 606308 KFZ 606308
115 TO 120 FIXED BUT FY MX MY MZ KFX 866169 KFZ 866169
121 TO 126 FIXED BUT FY MX MY MZ KFX 924000 KFZ 924000
127 TO 132 FIXED BUT FY MX MY MZ KFX 809954 KFZ 809954
133 TO 138 FIXED BUT FY MX MY MZ KFX 474277 KFZ 474277
139 TO 144 FIXED BUT FY MX MY MZ KFX 512885 KFZ 512885
145 TO 150 FIXED BUT MX MZ KFX 543200 KFZ 543200
151 TO 156 FIXED BUT FY MX MY MZ KFX 553915 KFZ 553915
157 TO 162 FIXED BUT MX MZ KFX 574431 KFZ 574431
163 TO 168 FIXED BUT FY MX MY MZ KFX 649600 KFZ 649600
169 TO 174 FIXED BUT FY MX MY MZ KFX 773769 KFZ 773769
175 TO 180 FIXED BUT FY MX MY MZ KFX 764508 KFZ 764508
181 TO 186 FIXED BUT FY MX MY MZ KFX 801231 KFZ 801231
187 TO 192 FIXED BUT MX MZ KFX 876023 KFZ 876023
*** DYNAMIC LOADS
LOAD 3 LIVE LOAD
JOINT LOAD
205 FY -2046.78
205 FX 443.61
205 FZ 255.25
205 MZ -750.52
205 MX 1692.66
LOAD 11 LONGITUDINAL SEISMIC (r1)
JOINT LOAD

305

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

205 FX 1350.18
205 MZ -634.95
202 FX 36.31
202 MZ -84.65
LOAD 12 TRANSVERSE SEISMIC (r2)
JOINT LOAD
205 FZ 1377.21
205 MX 3127.43
202 FZ 30.38
202 MX 70.82
LOAD 13 VERTICAL SEISMIC (r3)
JOINT LOAD
205 FY -1145.8
205 MZ 33.02
205 MX 250.15
202 FY -195.4
202 MZ 0
202 MX 0
*****LOAD COMBINATIONS *****
*** SLS LOAD COMBINATIONS
LOAD COMB 101 SLS G-I
1 1 2 1.2 3 1.1
LOAD COMB 102 SLS G-IIa (r1)
1 1 2 1.2 11 1
LOAD COMB 103 SLS G-IIa (r2)
1 1 2 1.2 12 1
LOAD COMB 104 SLS G-IIa ( r3)
1 1 2 1.2 13 1
LOAD COMB 105 SLS G-IIa (- r3)
1 1 2 1.2 13 -1
LOAD COMB 106 SLS G-IIb (r1)
1 1 2 1.2 3 0.5 11 1
LOAD COMB 107 SLS G-IIb (r2)
1 1 2 1.2 3 0.5 12 1
LOAD COMB 108 SLS G-IIb (r3)
1 1 2 1.2 3 0.5 13 1
LOAD COMB 109 SLS G-IIb (- r3)
1 1 2 1.2 3 0.5 13 -1
LOAD COMB 110 SLS G-III
1 1 2 1.2 3 0.5 4 1
*** ULS LOAD COMBINATIONS
LOAD COMB 201 ULS G-I
1 1.25 2 2 3 1.75
LOAD COMB 202 ULS G-IIa (r1)
1 1.25 2 2 11 1.6
LOAD COMB 203 ULS G-IIa (r2)
1 1.25 2 2 12 1.6
LOAD COMB 204 ULS G-IIa (r3)
1 1.25 2 2 12 1.6
LOAD COMB 205 ULS G-IIa (- r3)

306

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

1 1.25 2 2 13 -1.6
LOAD COMB 206 ULS G-IIb (r1)
1 1.25 2 2 3 0.7 11 1.25
LOAD COMB 207 ULS G-IIb (r2)
1 1.25 2 2 3 0.7 12 1.25
LOAD COMB 208 ULS G-IIb (r3)
1 1.25 2 2 3 0.7 12 1.25
LOAD COMB 209 ULS G-IIb (- r3)
1 1.25 2 2 3 0.7 13 -1.25
LOAD COMc 210 ULS G-IIc (r1)
1 0.9 2 0.8 3 0 11 1.5
LOAD COMc 211 ULS G-IIc (r2)
1 0.9 2 0.8 3 0 12 1.5
LOAD COMc 212 ULS G-IIc ( r3)
1 0.9 2 0.8 3 0 13 1.5
LOAD COMc 213 ULS G-IIc (- r3)
1 0.9 2 0.8 3 0 13 -1.5
PERFORM ANALYSIS
FINISH

STAAD Output

307

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

308

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

309

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5

ructure Idealization

310

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5

ode Numbers PILES

311

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5

312

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5

313

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5

314

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5

315

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5

ember Numbers

316

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5

317

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5

318

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5

319

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5

pring Supports

320

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5

321

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5

322

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5

323

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5

324

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5

325

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
Staad Input for Pile Load
STAAD SPACE
INPUT WIDTH 79
UNIT METER KN
SET NL 7
JOINT COORDINATES
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44

Pier P148
AECOM/CC28/PF148
10761.372

-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3

-2
-2
-2
-2
-2
-2
-3
-3
-3
-3
-3
-3
-4
-4
-4
-4
-4
-4
-5
-5
-5
-5
-5
-5
-6
-6
-6
-6
-6
-6
-7
-7
-7
-7
-7
-7
-8
-8
-8
-8
-8
-8
-9
-9

1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5

326

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94

Pier P148
AECOM/CC28/PF148
10761.372

3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3

-9
-9
-9
-9
-10
-10
-10
-10
-10
-10
-11
-11
-11
-11
-11
-11
-12
-12
-12
-12
-12
-12
-13
-13
-13
-13
-13
-13
-14
-14
-14
-14
-14
-14
-15
-15
-15
-15
-15
-15
-16
-16
-16
-16
-16
-16
-17
-17
-17
-17

-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5

327

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144

Pier P148
AECOM/CC28/PF148
10761.372

0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0

-17
-17
-18
-18
-18
-18
-18
-18
-19
-19
-19
-19
-19
-19
-20
-20
-20
-20
-20
-20
-21
-21
-21
-21
-21
-21
-22
-22
-22
-22
-22
-22
-23
-23
-23
-23
-23
-23
-24
-24
-24
-24
-24
-24
-25
-25
-25
-25
-25
-25

1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5

328

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
201
202

Pier P148
AECOM/CC28/PF148
10761.372

-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
0
0

-26
-26
-26
-26
-26
-26
-27
-27
-27
-27
-27
-27
-28
-28
-28
-28
-28
-28
-29
-29
-29
-29
-29
-29
-30
-30
-30
-30
-30
-30
-31
-31
-31
-31
-31
-31
-32
-32
-32
-32
-32
-32
-33
-33
-33
-33
-33
-33
-2
-0.5

1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
0
0

329

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
203
0
204
0
205
0
211
-1.5
212
-3
213
-1.5
215
0
216
1.5
217
1.5
218
3
219
-1.5
220
-3
221
1.5
222
3
223
-1.5
224
-3
225
0
226
1.5
227
3
228
-1.5
230
1.5
231
-3
232
-1.5
233
0
234
1.5
235
3
236
-1.5
237
-3
238
0
239
1.5
240
3
241
-3.75
242
-3.75
243
-3.75
244
-3.75
245
-3.75
246
-3.75
247
-3.75
248
3.75
249
3.75
250
3.75
251
3.75
252
3.75
253
3.75
254
3.75
MEMBER INCIDENCES
1
1
2
2
3
3
4
4

Pier P148
AECOM/CC28/PF148
10761.372

4.163
5.063
5.963
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2

0
0
0
-1.5
-0.75
-0.75
-0.75
-1.5
-0.75
-0.75
0
0
0
0
0.75
0.75
0.75
0.75
0.75
1.5
1.5
-2.25
-2.25
-2.25
-2.25
-2.25
2.25
2.25
2.25
2.25
2.25
-1.5
-0.75
0
0.75
1.5
-2.25
2.25
-1.5
-0.75
0
0.75
1.5
-2.25
2.25

7
8
9
10

330

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54

Pier P148
AECOM/CC28/PF148
10761.372

5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54

11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60

331

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104

Pier P148
AECOM/CC28/PF148
10761.372

55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104

61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110

332

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154

Pier P148
AECOM/CC28/PF148
10761.372

105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154

111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160

333

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
155
155
156
156
157
157
158
158
159
159
160
160
161
161
162
162
163
163
164
164
165
165
166
166
167
167
168
168
169
169
170
170
171
171
172
172
173
173
174
174
175
175
176
176
177
177
178
178
179
179
180
180
181
181
182
182
183
183
184
184
185
185
186
186
205
201
206
202
207
203
208
204
ELEMENT INCIDENCES SHELL
214
4
215
211
216
6
217
216
218
212
219
213
220
215
221
217
222
220
223
219
224
201
225
221
226
224

Pier P148
AECOM/CC28/PF148
10761.372

Prepared
Checked
Verified

161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
202
203
204
205
211
6
216
3
213
215
217
218
219
201
221
222
223

213
215
217
218
219
201
221
222
223
225
226
227
228

334

212
213
215
217
220
219
201
221
224
223
225
226
1

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249

223
225
226
231
232
233
234
1
228
5
230
241
242
243
244
246
245
3
218
222
227
235
2
ELEMENT
PROPERTY
214 TO
DEFINE MATERIAL START
ISOTROPIC CONCRETEM35
E 29500000
POISSON 0.17
DENSITY 25
ALPHA 1.17e-005
DAMP 0.05
ISOTROPIC CONCRETEM45
E 32500000
POISSON 0.17
DENSITY 25
ALPHA 1.17e-005
DAMP 0.05
ISOTROPIC CONCRETEM50
E 34000000
POISSON 0.17
DENSITY 25
ALPHA 1.17e-005
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
1 TO 144 PRIS YD 1
206 PRIS YD 2.1

Pier P148
AECOM/CC28/PF148
10761.372

225
226
227
232
233
234
235
228
5
230
2
4
212
220
224
231
1
248
249
250
251
253
252

5
230
2
211
6
216
3
236
238
239
240
212
220
224
1
4
237
249
250
251
252
248
254

249 THICKNESS

205 PRIS YD 4.5 ZD 7.5

335

Prepared
Checked
Verified

228
5
230
4
211
6
216
237
236
238
239
242
243
244
245
241
247
218
222
227
2
3
240
1.5

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

207 TO 208 PRIS YD 3.35 ZD 4.1


CONSTANTS
MATERIAL CONCRETEM35 MEMB 1 TO 144 205 214 TO 249
MATERIAL CONCRETEM50 MEMB 206
MATERIAL CONCRETEM45 MEMB 207 208
*** STATIC SOIL STIFFNESS
SUPPORTS
7 TO 12 FIXED BUT FY MX MY MZ KFX 2532 KFZ 2532
13 TO 18 FIXED BUT FY MX MY MZ KFX 13088 KFZ 13088
19 TO 24 FIXED BUT FY MX MY MZ KFX 19240 KFZ 19240
25 TO 30 FIXED BUT FY MX MY MZ KFX 22224 KFZ 22224
31 TO 36 FIXED BUT FY MX MY MZ KFX 26936 KFZ 26936
37 TO 42 FIXED BUT FY MX MY MZ KFX 40862 KFZ 40862
43 TO 48 FIXED BUT FY MX MY MZ KFX 60508 KFZ 60508
49 TO 54 FIXED BUT FY MX MY MZ KFX 103846 KFZ 103846
55 TO 60 FIXED BUT FY MX MY MZ KFX 132000 KFZ 132000
61 TO 66 FIXED BUT FY MX MY MZ KFX 144000 KFZ 144000
67 TO 72 FIXED BUT FY MX MY MZ KFX 156000 KFZ 156000
73 TO 78 FIXED BUT FY MX MY MZ KFX 143877 KFZ 143877
79 TO 84 FIXED BUT FY MX MY MZ KFX 104077 KFZ 104077
85 TO 90 FIXED BUT FY MX MY MZ KFX 107569 KFZ 107569
91 TO 96 FIXED BUT FY MX MY MZ KFX 112462 KFZ 112462
97 TO 102 FIXED BUT FY MX MY MZ KFX 121015 KFZ 121015
103 TO 108 FIXED BUT FY MX MY MZ KFX 131831 KFZ 131831
109 TO 114 FIXED BUT FY MX MY MZ KFX 173231 KFZ 173231
115 TO 120 FIXED BUT FY MX MY MZ KFX 247477 KFZ 247477
121 TO 126 FIXED BUT FY MX MY MZ KFX 264000 KFZ 264000
127 TO 132 FIXED BUT FY MX MY MZ KFX 231415 KFZ 231415
133 TO 138 FIXED BUT FY MX MY MZ KFX 135508 KFZ 135508
139 TO 144 FIXED BUT FY MX MY MZ KFX 146538 KFZ 146538
145 TO 150 FIXED BUT MX MZ KFX 155200 KFZ 155200
151 TO 156 FIXED BUT FY MX MY MZ KFX 158262 KFZ 158262
157 TO 162 FIXED BUT MX MZ KFX 164123 KFZ 164123
163 TO 168 FIXED BUT FY MX MY MZ KFX 185600 KFZ 185600
169 TO 174 FIXED BUT FY MX MY MZ KFX 221077 KFZ 221077
175 TO 180 FIXED BUT FY MX MY MZ KFX 218431 KFZ 218431
181 TO 186 FIXED BUT FY MX MY MZ KFX 228923 KFZ 228923
187 TO 192 FIXED BUT MX MZ KFX 250292 KFZ 250292
SLAVE FX FZ MX MY MZ MASTER 201 JOINT 1 TO 6
*** STATIC LOADS
LOAD 1 DEAD LOAD
JOINT LOAD
205 FY -5296.45
205 MZ -316.03
205 MX 1164.76
202 FY -2033.54
202 MZ 0
202 MX 0
LOAD 2 SIDL
JOINT LOAD

336

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

205 FY -2833.01
205 MZ -212.63
205 MX 689.01
LOAD 4 LWR
JOINT LOAD
205 FX 486.58
205 MZ -267.62
PERFORM ANALYSIS
CHANGE
*** DYNAMIC SOIL STIFFNESS
SUPPORTS
7 TO 12 FIXED BUT FY MX MY MZ KFX 8862 KFZ 8862
13 TO 18 FIXED BUT FY MX MY MZ KFX 45808 KFZ 45808
19 TO 24 FIXED BUT FY MX MY MZ KFX 67340 KFZ 67340
25 TO 30 FIXED BUT FY MX MY MZ KFX 77784 KFZ 77784
31 TO 36 FIXED BUT FY MX MY MZ KFX 94276 KFZ 94276
37 TO 42 FIXED BUT FY MX MY MZ KFX 143015 KFZ 143015
43 TO 48 FIXED BUT FY MX MY MZ KFX 211777 KFZ 211777
49 TO 54 FIXED BUT FY MX MY MZ KFX 363462 KFZ 363462
55 TO 60 FIXED BUT FY MX MY MZ KFX 462000 KFZ 462000
61 TO 66 FIXED BUT FY MX MY MZ KFX 504000 KFZ 504000
67 TO 72 FIXED BUT FY MX MY MZ KFX 546000 KFZ 546000
73 TO 78 FIXED BUT FY MX MY MZ KFX 503569 KFZ 503569
79 TO 84 FIXED BUT FY MX MY MZ KFX 364269 KFZ 364269
85 TO 90 FIXED BUT FY MX MY MZ KFX 376492 KFZ 376492
91 TO 96 FIXED BUT FY MX MY MZ KFX 393615 KFZ 393615
97 TO 102 FIXED BUT FY MX MY MZ KFX 423554 KFZ 423554
103 TO 108 FIXED BUT FY MX MY MZ KFX 461408 KFZ 461408
109 TO 114 FIXED BUT FY MX MY MZ KFX 606308 KFZ 606308
115 TO 120 FIXED BUT FY MX MY MZ KFX 866169 KFZ 866169
121 TO 126 FIXED BUT FY MX MY MZ KFX 924000 KFZ 924000
127 TO 132 FIXED BUT FY MX MY MZ KFX 809954 KFZ 809954
133 TO 138 FIXED BUT FY MX MY MZ KFX 474277 KFZ 474277
139 TO 144 FIXED BUT FY MX MY MZ KFX 512885 KFZ 512885
145 TO 150 FIXED BUT MX MZ KFX 543200 KFZ 543200
151 TO 156 FIXED BUT FY MX MY MZ KFX 553915 KFZ 553915
157 TO 162 FIXED BUT MX MZ KFX 574431 KFZ 574431
163 TO 168 FIXED BUT FY MX MY MZ KFX 649600 KFZ 649600
169 TO 174 FIXED BUT FY MX MY MZ KFX 773769 KFZ 773769
175 TO 180 FIXED BUT FY MX MY MZ KFX 764508 KFZ 764508
181 TO 186 FIXED BUT FY MX MY MZ KFX 801231 KFZ 801231
187 TO 192 FIXED BUT MX MZ KFX 876023 KFZ 876023
SLAVE FX FZ MX MY MZ MASTER 201 JOINT 1 TO 6
*** DYNAMIC LOADS
LOAD 3 LIVE LOAD
JOINT LOAD
205 FY -2046.78
205 FX 443.61
205 FZ 255.25
205 MZ -750.52

337

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

205 MX 1692.66
LOAD 11 LONGITUDINAL SEISMIC (r1)
JOINT LOAD
205 FX 1350.18
205 MZ -634.95
202 FX 36.31
202 MZ -84.65
LOAD 12 TRANSVERSE SEISMIC (r2)
JOINT LOAD
205 FZ 1377.21
205 MX 3127.43
202 FZ 30.38
202 MX 70.82
LOAD 13 VERTICAL SEISMIC (r3)
JOINT LOAD
205 FY -1145.8
205 MZ 33.02
205 MX 250.15
202 FY -195.4
202 MZ 0
202 MX 0
*****LOAD COMBINATIONS *****
*** SLS LOAD COMBINATIONS
LOAD COMB 101 SLS G-I
112131
LOAD COMB 102 SLS G-IIa (r1)
1 1 2 1 11 1
LOAD COMB 103 SLS G-IIa (r2)
1 1 2 1 12 1
LOAD COMB 104 SLS G-IIa (r3)
1 1 2 1 13 1
LOAD COMB 105 SLS G-IIa (- r3)
1 1 2 1 13 -1
LOAD COMB 106 SLS G-IIb (r1)
1 1 2 1 3 0.5 11 1
LOAD COMB 107 SLS G-IIb (r2)
1 1 2 1 3 0.5 12 1
LOAD COMB 108 SLS G-IIb (r3)
1 1 2 1 3 0.5 13 1
LOAD COMB 109 SLS G-IIb (- r3)
1 1 2 1 3 0.5 13 -1
LOAD COMB 110 SLS G-III
1 1 2 1.2 3 0.5 4 1
PERFORM ANALYSIS
FINISH

338

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

339

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5a

340

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5a

341

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5a

342

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5a

343

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5a

344

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5a

345

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5a

346

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5a

347

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5a

348

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5a

349

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5a

350

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5a

351

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5a

352

8
T
ucture P148
Project Code

Date

2/21/2013

Rev

Appendix-5a

353

AECOM

Oasys Output for Pile Design Check

Oasys Output for Pile


(at 4m from pile cut off level)
Section 1 Details

Definition
Name
Section 1
Type
Concrete
Material
M35 - C
Origin
Centre
Dimensions
Diameter
1000.mm
Section Area
785400.mm2
Reinforcement Area
11780.mm2
Reinforcement
1.500%

Section Nodes
Node Y
Z
[mm]
[mm]
1
0.0 501.3
2 87.04 493.7
3 171.4 471.0
4 250.6 434.1
5 322.2 384.0
6 384.0 322.2
7 434.1 250.6
8 471.0 171.4
9 493.7 87.04
10 501.3 -44.32E-6
11 493.7 -87.05
12 471.0 -171.4
13 434.1 -250.6
14 384.0 -322.2
15 322.2 -384.0
16 250.6 -434.1
17 171.4 -471.0
18 87.04 -493.7
19 -88.64E-6 -501.3
20 -87.05 -493.7
21 -171.4 -471.0
22 -250.6 -434.1
23 -322.2 -384.0
24 -384.0 -322.2
25 -434.1 -250.6
26 -471.0 -171.4
27 -493.7 -87.04
28 -501.3 133.0E-6
29 -493.7 87.05
30 -471.0 171.4
31 -434.1 250.6
32 -384.0 322.2
33 -322.2 384.0
34 -250.6 434.1

354

Appendix-6

AECOM
35
36

-171.4
-87.04

Oasys Output for Pile Design Check


471.0
493.7

Cover and Links


Cover
75.00mm
Link Size
10.00mm
Link Material 415

Bars
Bar

Diameter

Material Type Pre-stress Pre-stress Appl. loads


Force Strain include/exclude
pre-stress
[mm]
[mm]
[mm]
[kN]
1 352.5
0.0 25.00
500 Steel
2 249.3 249.3 25.00
500 Steel
3
0.0 352.5 25.00
500 Steel
4 -249.3 249.3 25.00
500 Steel
5 -352.5
0.0 25.00
500 Steel
6 -249.3 -249.3 25.00
500 Steel
7
0.0 -352.5 25.00
500 Steel
8 249.3 -249.3 25.00
500 Steel
9 402.5
0.0 25.00
500 Steel
10 371.9 154.0 25.00
500 Steel
11 284.6 284.6 25.00
500 Steel
12 154.0 371.9 25.00
500 Steel
13 -6.906E-6 402.5 25.00
500 Steel
14 -154.0 371.9 25.00
500 Steel
15 -284.6 284.6 25.00
500 Steel
16 -371.9 154.0 25.00
500 Steel
17 -402.5 -13.81E-6 25.00
500 Steel
18 -371.9 -154.0 25.00
500 Steel
19 -284.6 -284.6 25.00
500 Steel
20 -154.0 -371.9 25.00
500 Steel
21 6.235E-6 -402.5 25.00
500 Steel
22 154.0 -371.9 25.00
500 Steel
23 284.6 -284.6 25.00
500 Steel
24 371.9 -154.0 25.00
500 Steel

Loading

Reference Point
All loading acts through the Reference Point.
All strain planes are defined relative to the Reference Point.
Definition

Geometric
Centroid
Reference Point Coordinates y 0.0mm
z 0.0mm

Load Case Titles

355

Appendix-6

AECOM

Load
Case
1 SLS1
2 SLS2
3 SLS3
4 SLS4
5 SLS5
6 SLS6
7 ULS1
8 ULS2
9 ULS3

Oasys Output for Pile Design Check

Title

Applied loads
Load Case
N Myy Mzz
[kN] [kNm] [kNm]
SLS1
3552. 160.5 0.0
SLS2
644.7 128.7 0.0
SLS3
3288. 477.4 0.0
SLS4
5460. 590.2 0.0
SLS5
-1071. 636.7 0.0
SLS6
-439.0 692.4 0.0
ULS1
7470. 861.5 0.0
ULS2
-2019. 834.1 0.0
ULS3
-1073. 999.6 0.0
Section Material Stresses/Strains at SLS Loads
Case Bar Coordinates
Notes
y
z
Strain Stress
[mm] [mm]
[-]
[N/mm]
Maxima
4 1
0.0 501.3
0.001003 9.864
4 1
0.0 501.3
0.001003 9.864
Minima
5 19 -88.64E-6 -501.3
-0.001966 0.0
2 14 384.0 -322.2
-4.808E-6 0.0

Reinforcement Stresses/Strains at SLS Loads


Case Bar Coordinates
Notes
y
z
Strain Stress
[mm] [mm]
[-]
[N/mm]
Maxima
4 13 -6.906E-6 402.5
913.5E-6 182.7 500
4 13 -6.906E-6 402.5
913.5E-6 182.7 500
Minima
5 21 6.235E-6 -402.5
-0.001705 -341.0 500
5 21 6.235E-6 -402.5
-0.001705 -341.0 500
Crack Widths at SLS Loads
Crack widths calculated at 20mm intervals

356

Appendix-6

AECOM

Oasys Output for Pile Design Check

Case Face Point Coordinates Strain Control Bar acr


Cover
h x Crack
Width
y z
cmin From
[mm] [mm]
[mm] [mm]
[mm] [mm] [mm]
ULS Cases Analysed
Name

Loading Pre-stress
Factor

Strength Analysis - Loads


Case N Myy Mzz M q
[kN] [kNm] [kNm] [kNm] []
1 7470. 861.5 0.0 861.5 0.0
2 -2019. 834.1 0.0 834.1 0.0
3 -1073. 999.6 0.0 999.6 0.0

Strength Analysis - Summary


Governing conditions are defined as:
A - reinforcing steel tension strain limit
B - concrete compression strain limit
C - concrete pure compression strain limit
IS 456 Section 39.1
Effective centroid is reported relative to the reference point.

Case Eff.
Eff.
N M Mu M/Mu Governing Neutral Neutral
Centroid Centroid
Condition Axis Axis
(y)
(z)
Angle Depth
[kN] [kNm] [kNm]
[] [mm]
Maxima
2 27.98E-9 -1.817E-6 -2019. 834.1 979.8 0.8513 A: Bar 21
Minima
1 922.0E-9 110.7E-9 7470. 861.5 2116. 0.4071 B: Node 1

(7m from pile cut off level)


Section 1 Details

Definition
Name
Section 1
Type
Concrete
Material
M35 - C
Origin
Centre
Dimensions
Diameter
1000.mm
Section Area
785400.mm2
Reinforcement Area
5536.mm2
Reinforcement
0.7049%

357

Appendix-6

AECOM

Oasys Output for Pile Design Check

Section Nodes
Node Y
Z
[mm]
[mm]
1
0.0 501.3
2 87.04 493.7
3 171.4 471.0
4 250.6 434.1
5 322.2 384.0
6 384.0 322.2
7 434.1 250.6
8 471.0 171.4
9 493.7 87.04
10 501.3 -44.32E-6
11 493.7 -87.05
12 471.0 -171.4
13 434.1 -250.6
14 384.0 -322.2
15 322.2 -384.0
16 250.6 -434.1
17 171.4 -471.0
18 87.04 -493.7
19 -88.64E-6 -501.3
20 -87.05 -493.7
21 -171.4 -471.0
22 -250.6 -434.1
23 -322.2 -384.0
24 -384.0 -322.2
25 -434.1 -250.6
26 -471.0 -171.4
27 -493.7 -87.04
28 -501.3 133.0E-6
29 -493.7 87.05
30 -471.0 171.4
31 -434.1 250.6
32 -384.0 322.2
33 -322.2 384.0
34 -250.6 434.1
35 -171.4 471.0
36 -87.04 493.7

Bars
Bar

[mm]
1 404.0
2 373.2
3 285.7
4 154.6
5
0.0
6 -154.6
7 -285.7
8 -373.2

Diameter

[mm]
0.0
154.6
285.7
373.2
404.0
373.2
285.7
154.6

[mm]
20.99
20.99
20.99
20.99
20.99
20.99
20.99
20.99

Material Type Pre-stress Pre-stress Appl. loads


Force Strain include/exclude
pre-stress
[kN]
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel

358

Appendix-6

AECOM
9
10
11
12
13
14
15
16

Oasys Output for Pile Design Check

-404.0
0.0 20.99
-373.2 -154.6 20.99
-285.7 -285.7 20.99
-154.6 -373.2 20.99
0.0 -404.0 20.99
154.6 -373.2 20.99
285.7 -285.7 20.99
373.2 -154.6 20.99

500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel

Loading

Reference Point
All loading acts through the Reference Point.
All strain planes are defined relative to the Reference Point.
Definition

Geometric
Centroid
Reference Point Coordinates y 0.0mm
z 0.0mm

Load Case Titles


Load
Case
1 SLS1
2 SLS2
3 SLS3
4 SLS4
5 SLS5
6 SLS6
7 ULS1
8 ULS2
9 ULS3

Title

Applied loads
Load Case
N Myy Mzz
[kN] [kNm] [kNm]
SLS1
3823. 0.0 0.0
SLS2
849.6 178.2 0.0
SLS3
849.6 178.2 0.0
SLS4
4860. 152.6 0.0
SLS5
-437.6 266.0 0.0
SLS6
4099. 270.2 0.0
ULS1
6638. 219.6 0.0
ULS2
-1106. 351.7 0.0

359

Appendix-6

AECOM
ULS3

Oasys Output for Pile Design Check


5375. 386.3 0.0

Section Material Stresses/Strains at SLS Loads


Case Bar Coordinates
Notes
y
z
Strain Stress
[mm] [mm]
[-]
[N/mm]
Maxima
6 1
0.0 501.3
705.2E-6 6.934
6 1
0.0 501.3
705.2E-6 6.934
Minima
5 19 -88.64E-6 -501.3
-0.001589 0.0
2 14 384.0 -322.2
-19.64E-6 0.0

Reinforcement Stresses/Strains at SLS Loads


Case Bar Coordinates
Notes
y z
Strain Stress
[mm] [mm]
[-]
[N/mm]
Maxima
4 5 0.0 404.0
662.2E-6 132.4 500
4 5 0.0 404.0
662.2E-6 132.4 500
Minima
5 13 0.0 -404.0
-0.001393 -278.6 500
5 13 0.0 -404.0
-0.001393 -278.6 500
Crack Widths at SLS Loads
Crack widths calculated at 20mm intervals
Case Face Point Coordinates Strain Control Bar acr
Cover
h x Crack
Width
y z
cmin From
[mm] [mm]
[mm] [mm]
[mm] [mm] [mm]
ULS Cases Analysed
Name

Loading Pre-stress
Factor

Strength Analysis - Loads


Case N Myy Mzz M q
[kN] [kNm] [kNm] [kNm] []
1 6638. 219.6 0.0 219.6 0.0
2 -1106. 351.7 0.0 351.7 0.0
3 5375. 386.3 0.0 386.3 0.0

Strength Analysis - Summary


Governing conditions are defined as:
A - reinforcing steel tension strain limit
B - concrete compression strain limit
C - concrete pure compression strain limit

360

Appendix-6

AECOM

Oasys Output for Pile Design Check

IS 456 Section 39.1


Effective centroid is reported relative to the reference point.

Case Eff.
Eff.
N M Mu M/Mu Governing Neutral Neutral
Centroid Centroid
Condition Axis Axis
(y)
(z)
Angle Depth
[kN] [kNm] [kNm]
[] [mm]
Maxima
2
0.0
0.0 -1106. 351.7 443.5 0.7929 A: Bar 13
Minima
1 1.010E-6 469.6E-9 6638. 219.6 1695. 0.1295 B: Node 1
(9m from pile cut off level to end of pile)
Section 1 Details

Definition
Name
Section 1
Type
Concrete
Material
M35 - C
Origin
Centre
Dimensions
Diameter
1000.mm
Section Area
785400.mm2
Reinforcement Area
3217.mm2
Reinforcement
0.4096%

Section Nodes
Node Y
Z
[mm]
[mm]
1
0.0 501.3
2 87.04 493.7
3 171.4 471.0
4 250.6 434.1
5 322.2 384.0
6 384.0 322.2
7 434.1 250.6
8 471.0 171.4
9 493.7 87.04
10 501.3 -44.32E-6
11 493.7 -87.05
12 471.0 -171.4
13 434.1 -250.6
14 384.0 -322.2
15 322.2 -384.0
16 250.6 -434.1
17 171.4 -471.0
18 87.04 -493.7
19 -88.64E-6 -501.3
20 -87.05 -493.7
21 -171.4 -471.0
22 -250.6 -434.1

361

Appendix-6

AECOM
23
24
25
26
27
28
29
30
31
32
33
34
35
36

Oasys Output for Pile Design Check

-322.2 -384.0
-384.0 -322.2
-434.1 -250.6
-471.0 -171.4
-493.7 -87.04
-501.3 133.0E-6
-493.7 87.05
-471.0 171.4
-434.1 250.6
-384.0 322.2
-322.2 384.0
-250.6 434.1
-171.4 471.0
-87.04 493.7

Cover and Links


Cover
75.00mm
Link Size
10.00mm
Link Material 415

Bars
Bar

Diameter

Material Type Pre-stress Pre-stress Appl. loads


Force Strain include/exclude
pre-stress
[mm]
[mm] [mm]
[kN]
1 407.0
0.0 16.00
500 Steel
2 376.0 155.8 16.00
500 Steel
3 287.8 287.8 16.00
500 Steel
4 155.8 376.0 16.00
500 Steel
5 13.29E-6 407.0 16.00
500 Steel
6 -155.8 376.0 16.00
500 Steel
7 -287.8 287.8 16.00
500 Steel
8 -376.0 155.8 16.00
500 Steel
9 -407.0 26.58E-6 16.00
500 Steel
10 -376.0 -155.8 16.00
500 Steel
11 -287.8 -287.8 16.00
500 Steel
12 -155.8 -376.0 16.00
500 Steel
13 -10.04E-6 -407.0 16.00
500 Steel
14 155.8 -376.0 16.00
500 Steel
15 287.8 -287.8 16.00
500 Steel
16 376.0 -155.8 16.00
500 Steel

Loading

Reference Point
All loading acts through the Reference Point.
All strain planes are defined relative to the Reference Point.
Definition

Geometric
Centroid
Reference Point Coordinates y 0.0mm

362

Appendix-6

AECOM

Oasys Output for Pile Design Check


z

0.0mm

Load Case Titles


Load
Case
1 SLS1
2 SLS2
3 SLS3
4 SLS4
5 SLS5
6 SLS6
7 ULS1
8 ULS2
9 ULS3

Title

Applied loads
Load Case
N Myy Mzz
[kN] [kNm] [kNm]
SLS1
3823. 0.0 0.0
SLS2
849.6 178.2 0.0
SLS3
849.6 178.2 0.0
SLS4
4895. 10.80 0.0
SLS5
-402.3 61.30 0.0
SLS6
2946. 105.6 0.0
ULS1
5520. 109.3 0.0
ULS2
-973.1 83.10 0.0
ULS3
4798. 131.1 0.0

Section Material Stresses/Strains at SLS Loads


Case Bar Coordinates
Notes
y
z
Strain Stress
[mm] [mm]
[-]
[N/mm]
Maxima
4 1
0.0 501.3
597.4E-6 5.875
4 1
0.0 501.3
597.4E-6 5.875
Minima
5 19 -88.64E-6 -501.3
-0.001202 0.0
2 14 384.0 -322.2
-25.73E-6 0.0

Reinforcement Stresses/Strains at SLS Loads


Case Bar Coordinates
Notes
y
z
Strain Stress
[mm] [mm]
[-]
[N/mm]
Maxima
4 5 13.29E-6 407.0
595.5E-6 119.1 500
4 5 13.29E-6 407.0
595.5E-6 119.1 500
Minima
5 13 -10.04E-6 -407.0
-0.001093 -218.7 500
5 13 -10.04E-6 -407.0
-0.001093 -218.7 500

363

Appendix-6

AECOM

Oasys Output for Pile Design Check

Crack Widths at SLS Loads


Crack widths calculated at 20mm intervals
Case Face Point Coordinates Strain Control Bar acr
Cover
h x Crack
Width
y z
cmin From
[mm] [mm]
[mm] [mm]
[mm] [mm] [mm]

ULS Cases Analysed


Name

Loading Pre-stress
Factor

Strength Analysis - Loads


Case N Myy Mzz M q
[kN] [kNm] [kNm] [kNm] []
1 5520. 109.3 0.0 109.3 0.0
2 -973.1 83.10 0.0 83.10 0.0
3 4798. 131.1 0.0 131.1 0.0

Strength Analysis - Summary


Governing conditions are defined as:
A - reinforcing steel tension strain limit
B - concrete compression strain limit
C - concrete pure compression strain limit
IS 456 Section 39.1
Effective centroid is reported relative to the reference point.

Case Eff.
Eff.
N M Mu M/Mu Governing Neutral Neutral
Centroid Centroid
Condition Axis Axis
(y)
(z)
Angle Depth
[kN] [kNm] [kNm]
[] [mm]
Maxima
2 -203.5E-9 16.56E-6 -973.1 83.10 142.0 0.5853 A: Bar 13
Minima
1 1.041E-6 1.360E-6 5520. 109.3 1540. 0.07096 B: Node 1

364

Appendix-6

AECOM

Oasys Output for Pile Design Check

365

Appendix-6

AECOM

Oasys Output for Pile Design Check

366

Appendix-6

AECOM

Oasys Output for Pile Design Check

367

Appendix-6

AECOM

Oasys Output for Pile Design Check

368

Appendix-6

AECOM

Oasys Output for Pile Design Check

369

Appendix-6

AECOM

Oasys Output for Pile Design Check

370

Appendix-6

AECOM

Oasys Output for Pile Design Check

371

Appendix-6

AECOM

Oasys Output for Pile Design Check

372

Appendix-6

AECOM

Oasys Output for Pile Design Check

373

Appendix-6

AECOM

Oasys Output for Pile Design Check

374

Appendix-6

AECOM

Oasys Output for Pile Design Check

375

Appendix-6

CC
L&
Design of Sub

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

Prepared
Checked
Verified

CALCULATION OF VERTICAL LOAD CARRYING CAPACITY OF PILE


(As per IRC:78-2000 Appendix-5)
Sym
Unit
Value
Diameter of pile
D
m
1
Coefficient of earth pressure
K
1.0
Factor of safety for base resistance
2.5
(as per cl. 709.3.2 of IRC:78-2000)
Factor of safety for shaft resistance
2.5
Angle of wall friction

1
Overburden pressure at pile tip
15 D
Water content
limited to a depth of
m
15.0
Spacific gravity of soil
RL of ground level
m
0.0
Degree of saturation
RL of water table
m
0.0
Void ratio
RL of cutoff level pile
m
2.0
RL of pile tip
m
28.0
Therefore
Length of pile

26

Depth of water table below GL

0.0

Length of pile shaft below GL

26.0

m2

0.785

Cross sectional area of pile tip

Ap

Density of water

Submerged density

Ultimate base resistance

Ap ( 0.5 D N + PD Nq + cp Nc)

Ultimate shaft resistance

Ki PDi tani Asi + i ci Asi

376

Harjot
R P Sharma
Sumant

CC
L&
Design of Sub

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

377

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC
L&
Design of Sub

Project
Client
Job

38.1
58.2
120.5
150.6
150.6
150.6

0
0
0
0
0
0

14
18
24
28
24
24

(Part-1/Sec-2)-2010

N has been taken from Table -1 of IS 6403

15
20
28
33
28
28

477
902
2383
3442
2947
2949

191
361
953
1377
1179
1179

19
48
89
136
151
151

Hence Net
safe pile
capacity

13
6
19
9
28
6

27
29
31
32
31
31

Ultimate shaft
Resistance, PSU

m2

Reduction factor, i

4.0
27.0
0.0
27.0
9.52
2.0
29.0
0.0
29.0 10.06
6.0
31.0
0.0
31.0 10.38
3.0
32.0
0.0
32.0 10.06
9.0
31.0
0.0
31.0
9.93
2.0
31.0
0.0
31.0 10.11
26.00
Nq has been taken from Annex-B, fig. 1 of IS : 2911

kN

degree
s

2.0
6.0
8.0
14.0
17.0
26.0
28.0

kN

Effective
overburden at CG of
layer, Pdi

kN/m2

Verified

Effective
overburden at pile tip, PD

kN/m3

Checked

Safe Base Resistance, PPU,

Effective
unit wt,

deg.

Ultimate Base
Resistance, PPU

Angle of wall
friction,

kN/m2

Cohesion
c

deg.

Nq

Angle of
repose,

Nc

Thickness of layer

Harjot
R P Sharma
Sumant

Prepared

Asi

1
2
3
4
5
5

Pier P148
AECOM/CC28/PF148
10761.372

RL of top
layer

Layer No.

Part of Structure
Doc No
Bridge No./Chainage

kN

0.3
0.3
0.3
0.3
0.3
0.3

122
290
1301
2100
4659
5227

= 3270.41 kN

As per DBR, Bulk density corresponding to 100% saturation shall be calculated and used for working out submerged density of soil.
* Additional load, W = Self weight of pile - Weight of soil removed
378

CC
L&
Design of Sub

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

379

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC
L&
Design of Sub

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

380

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC
L&
Design of Sub

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

381

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC
L&
Design of Sub

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

382

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148
Harjot
R P Sharma
Sumant

Project Code
Date
Rev

2/21/2013
0

Appendix-7

w
Gs
Sr =
1
e
w.Gs = Sr.e
e = w.Gs/Sr
w =
9.81 kN/m3

b - w

383

CC-28
L&T
Design of Substructure P148
Harjot
R P Sharma
Sumant

Project Code
Date
Rev

2/21/2013
0

384

CC-28
L&T
Design of Substructure P148
Harjot
R P Sharma
Sumant

2/21/2013
0

Project Code
Date
Rev

0
0
0
0
0
0

239
477
1474
2216
3042
3270

2.64
2.64
2.64
2.64
2.64
2.67

0.69
0.60
0.55
0.60
0.62
0.62

Submerged density

49
116
521
840
1863
2091

Moisture content, w

kN

Void ratio, e

kN

Specific gravity, Gs

Net Safe capacity =


(PPU,s+PSU,s) -W

kN

Additional load, W*

Safe shaft Resistance, PSU,

kN/m3

10.8
14.1
15.2
15.9
19.4
19.4

9.52
10.06
10.38
10.06
9.93
10.11

density of soil.

385

CC-28
L&T
Design of Substructure P148
Harjot
R P Sharma
Sumant

Project Code
Date
Rev

2/21/2013
0

386

CC-28
L&T
Design of Substructure P148
Harjot
R P Sharma
Sumant

Project Code
Date
Rev

2/21/2013
0

387

CC-28
L&T
Design of Substructure P148
Harjot
R P Sharma
Sumant

Project Code
Date
Rev

2/21/2013
0

388

CC-28
L&T
Design of Substructure P148
Harjot
R P Sharma
Sumant

Project Code
Date
Rev

2/21/2013
0

389

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372

Part of Structure
Doc No
Bridge No./Chainage

Prepared
Checked
Verified

VERTICAL CAPACITY OF PILES IN ROCK


(As per IRC : 78-2000 Appendix - 5 (Notification no. 68)
Where cores of rock can be taken and unconfined compresssive strength directly established using
method of testing, the approach defined in method 1 shall be used.
METHOD -1
The safe load capacity of piles is given by
Qu = Re + Raf = Ksp qc df Ab + As cus
Qallow = (Re/3 + Raf/6)
where
Qu

= Ultimate capacity of pile socketted into rock

Qallow

= Allowable capacity of pile

Re
Raf

= Ultimate end bearing


= Ultimate side shear

Ksp

= An empirical coefficient

Diameter of pile

Dp

Grade of concrete of pile


Core recovery in %
Rock quality designation in %
(CR + RQD)/2
(should be within 30 to100)

fck

=
=
=
=

Therefore value of coefficient

Ksp

CR
RQD

Average unconfined compressive strength of rock core below qc


base of pile for the depth twice the diameter or least lateral
dimension of pile
Ab
Cross-sectional area of base of pile

=
=

Depth factor
df = 1 + 0.4 x Length of socket/Dia of socket 1.2

df

=
=
=
=

Surface area of socket

As

Ultimate shear strength of rock along socket length


cus = 0.225 (qc)1/2 but 3 x (fck/35)1/2

cus

Length of socket
Dia of socket

Hence
Qu = Re + Raf =

33002

The allowable end bearing component after dividing by factor of safety shall be restricted to 5 Mpa
Re/3 should not be greater than 5 x PI()/4 x Dp^2 = 3927 kN
Qallow = (Re/3 + Raf/6) =
3927
+
0
=
=

390

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

391

Prepared
Checked
Verified

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

392

Prepared
Checked
Verified

CC-28
L&T
Design of Substructure P148

Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

393

Prepared
Checked
Verified

CC-28
L&T
gn of Substructure P148
Harjot
R P Sharma
Sumant

Project Code
Date
Rev

2/21/2013
0

Appendix-6

ngth directly established using standard

1.0 m
M 35
63.3 %
36.7 %
50 %
0.56
75.42 Mpa

0.785 m2
0.00 m
1.0 m
1
0.00 m2
1.95 Mpa
33002 kN

ety shall be restricted to 5 Mpa which means


3927 kN
400.3 t

394

CC-28
L&T
gn of Substructure P148
Harjot
R P Sharma
Sumant

Project Code
Date
Rev

2/21/2013
0

395

CC-28
L&T
gn of Substructure P148
Harjot
R P Sharma
Sumant

Project Code
Date
Rev

2/21/2013
0

396

CC-28
L&T
gn of Substructure P148
Harjot
R P Sharma
Sumant

Project Code
Date
Rev

2/21/2013
0

397

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage
Staad Input for Pile Cap Design
STAAD TRUSS
START JOB INFORMATION
ENGINEER DATE 21-May-12
ENGINEER NAME ashish
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
SET NL 7
JOINT COORDINATES
1
-3
2
3
3
3
4
-3
5
-0.742
6
0.742
7
0.742
8
-0.742
9
0
MEMBER INCIDENCES
1
1
2
3
3
4
4
4
5
5
6
9
7
8
8
9
9
1
10
2
11
3
12
4
13
5
14
7
15
8
16
8
17
1
18
1
19
1
20
2
21
2
22
2
23
3
24
3
25
3
26
4
27
4
28
4
DEFINE MATERIAL START
ISOTROPIC CONCRETEM35

Pier P148
AECOM/CC28/PF148
10761.372

0
0
0
0
1.35
1.35
1.35
1.35
1.35

Prepared
Checked
Verified

1.5
1.5
-1.5
-1.5
0.742
0.742
-0.742
-0.742
0

2
2
3
1
9
7
9
6
5
6
7
8
6
6
7
5
6
7
8
5
7
8
6
8
5
7
5
6

Node Numbers

398

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

E 29500000
POISSON 0.17
DENSITY 25
ALPHA 1.17e-005
DAMP 0.05
ISOTROPIC STEEL
E 2.0e+008
POISSON 0.3
DENSITY 78.5
ALPHA 1.17e-005
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY AMERICAN
9 TO 12 17 TO 28 PRIS AX 1
1 TO 4 PRIS AX 1
5 TO 8 13 TO 16 PRIS AX 100
CONSTANTS
MATERIAL CONCRETEM35 MEMB 1 TO 28
SUPPORTS
5 TO 8 PINNED
** PILE LOAD FROM PILE DESIGN MODEL
LOAD 201 ULS G-I
JOINT LOAD
1 FY 2862.615
2 FY 4454.882
3 FY 2541.067
4 FY 948.799
LOAD 202 ULS G-IIA (R1)
JOINT LOAD
1 FY 489.894
2 FY 4391.726
3 FY 3860.736
4 FY -41.096
LOAD 203 ULS G-IIA (R2)
JOINT LOAD
1 FY 4982.623
2 FY 5113.697
3 FY -631.992
4 FY -763.067
LOAD 204 ULS G-IIA (R3)
JOINT LOAD
1 FY 4982.623
2 FY 5113.697
3 FY -631.992
4 FY -763.067
LOAD 205 ULS G-IIA (- R3)
JOINT LOAD
1 FY 2012.727
2 FY 2152.312
3 FY 1695.686

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

Member Numbers

Side View

399

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

4 FY 1556.101
LOAD 206 ULS G-IIB (R1)
JOINT LOAD
1 FY 1097.258
2 FY 4758.713
3 FY 3674.593
4 FY 13.137
LOAD 207 ULS G-IIB (R2)
JOINT LOAD
1 FY 4607.201
2 FY 5322.753
3 FY 164.649
4 FY -550.902
LOAD 208 ULS G-IIB (R3)
JOINT LOAD
1 FY 4607.201
2 FY 5322.753
3 FY 164.649
4 FY -550.902
LOAD 209 ULS G-IIB (- R3)
JOINT LOAD
1 FY 2286.971
2 FY 3009.171
3 FY 1983.148
4 FY 1260.947
LOAD 210 ULS G-IIC (R1)
JOINT LOAD
1 FY -353.767
2 FY 3253.947
3 FY 2954.256
4 FY -653.458
LOAD 211 ULS G-IIC (R2)
JOINT LOAD
1 FY 3858.166
2 FY 3930.794
3 FY -1257.676
4 FY -1330.305
LOAD 212 ULS G-IIC ( R3)
JOINT LOAD
1 FY 1818.313
2 FY -631.992
3 FY 1448.906
4 FY 1384.255
LOAD 213 ULS G-IIC (- R3)
JOINT LOAD
1 FY 1154.496
2 FY -631.992
3 FY 924.522
4 FY 843.914
PERFORM ANALYSIS

400

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

CC-28
L&T
Design of Substructure P148

Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

Pier P148
AECOM/CC28/PF148
10761.372

FINISH

401

Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

8
T
ucture P148
Project Code
Date
Rev

21-Feb-13
0

Appendix-4

402

8
T
ucture P148
Project Code
Date
Rev

21-Feb-13
0

Appendix-4

403

8
T
ucture P148
Project Code
Date
Rev

21-Feb-13
0

Appendix-4

404

8
T
ucture P148
Project Code
Date
Rev

21-Feb-13
0

Appendix-4

405

Appendix-7
Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

PIER P148
AECOM/PF148
10761.372

CALCULATION OF VERTICAL LOAD CARRYING CAPACITY OF PILE


(As per IRC:78-2000 Appendix-5)
Sym
Unit
Diameter of pile
D
m
Coefficient of earth pressure
K
Factor of safety for base resistance
Factor of safety for shaft resistance
Angle of wall friction

Overburden pressure at pile tip


limited to a depth of
m
RL of ground level
m
RL of water table
m
RL of cutoff level pile
m
RL of pile tip
m
L
Length of pile
m

Value
1
1.0
2.5
2.5
1
15 D
15.0
0.0
0.0
2.0
26.0
24

Depth of water table below GL


Length of pile shaft below GL

m
m

0.0
24.0

m2

0.785

Ap

Cross sectional area of pile tip

Ap ( 0.5 D N + PD Nq + cp Nc)

Ultimate shaft resistance

Ki PDi tani Asi + i ci Asi

17 m

406

Checked
Verified

(as per cl. 709.3.2 of IRC:78-2000)

Ultimate base resistance

Depth of Water table from G.L

Prepared

Water content
Spacific gravity of soil
e
for 100 % saturation
e

Density of water

Submerged density

Appendix-7
Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

PIER P148
AECOM/PF148
10761.372

407

Prepared
Checked
Verified

Appendix-7
Project
Client
Job

Effective
unit wt,

Effective
overburden at pile
tip, PD

deg.

kN/m3

kN/m2

2.0
2.5
6.0
7.5
8.0
11.0
14.0
15.0
16.5
17.0
20.0
26.0
26.0
26.0

0.5
27.0
0.0
3.5
27.0
0.0
1.5
27.0
0.0
0.5
29.0
0.0
3.0
31.0
0.0
3.0
31.0
0.0
1.0
31.0
0.0
1.5
31.0
0.0
0.5
32.0
0.0
3.0
32.0
0.0
6.0
31.0
0.0
0.0
31.0
0.0
0.0
31.0
0.0
24.00
Nq has been taken from Annex-B, fig.

17.0
17.0
17.0
18.5
19.2
19.2
19.2
19.2
18.6
19.7
19.2
19.2
19.2

15.3
15.3
15.3
16.2
16.7
16.7
16.7
16.7
16.1
16.9
16.1
16.1
16.1

27.0
27.0
27.0
29.0
31.0
31.0
31.0
31.0
32.0
32.0
31.0
31.0
31.0

9.50
9.50
9.50
10.06
10.35
10.35
10.35
10.35
8.83
9.91
9.42
9.42
9.42

4.7
38.0
52.2
57.3
88.3
119.4
129.7
145.2
149.6
149.6
149.6
149.6
149.6

1 of IS : 2911 (Part-1/Sec-2)-2010

408

0
0
0
0
0
0
0
0
0
0
0
0
0

14
14
14
18
24
24
24
24
28
28
24
24
24

15
15
15
20
28
28
28
28
33
33
28
28
28

kN

kN

110
476
632
889
1777
2362
2557
2849
3404
3418
2923
2923
2923

44
190
253
356
711
945
1023
1140
1362
1367
1169
1169
1169

Asi

Angle of wall
friction,

kN/m3

Verified

Effective
overburden at CG
of layer, Pdi

dry
unit wt, d

kN/m3

Checked

Safe Base
Resistance, PPU, s

Bulk
unit wt, b

kN/m2

Cohesion
c

deg.

Nq

Angle of
repose,

Nc

Thickness of layer

Prepared

Ultimate Base
Resistance, PPU

1
2
3
4
5
6
7
8
9
10
11
12
13

PIER P148
AECOM/PF148
10761.372

RL of top
layer

Layer No.

Part of Structure
Doc No
Bridge No./Chainage

m2

2
21
45
55
73
104
125
137
147
150
150
150
150

2
11
5
2
9
9
3
5
2
9
19
0
0

Safe pile capacity

Appendix-7
Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

PIER P148
AECOM/PF148
10761.372

N has been taken from Table -1 of IS 6403

Prepared
Checked
Verified

Pile Load =
PILE LENGTH

409

Appendix-7
Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

PIER P148
AECOM/PF148
10761.372

410

Prepared
Checked
Verified

Appendix-7
Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

PIER P148
AECOM/PF148
10761.372

411

Prepared
Checked
Verified

Appendix-7
Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

PIER P148
AECOM/PF148
10761.372

412

Prepared
Checked
Verified

Appendix-7
Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

PIER P148
AECOM/PF148
10761.372

413

Prepared
Checked
Verified

Appendix-7
Project
Client
Job

Part of Structure
Doc No
Bridge No./Chainage

PIER P148
AECOM/PF148
10761.372

414

Prepared
Checked
Verified

Appendix-7
CC28
L&T
PILE CAPACITY
Prepared
Checked
Verified

Water content
Spacific gravity of soil
for 100 % saturation

Harjot
R P Sharma
Sumant

w
Gs
w.Gs/Sr
Sr =
w.Gs

Density of water

w =

Submerged density

Project Code
Date
Rev

2/21/2013
0

9.81 kN/m3

b - w

415

Appendix-7
CC28
L&T
PILE CAPACITY
Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

Project Code
Date
Rev

2/21/2013
0

416

capacity

Appendix-7
CC28
L&T
PILE CAPACITY

kN

kN

kN

2
122
230
278
690
1278
1513
1902
2047
2928
4623
4623
4623

1
49
92
111
276
511
605
761
819
1171
1849
1849
1849

0
0
0
0
0
0
0
0
0
0
0
0
0

44.8
238.9
344.9
466.7
986.6
1456
1628
1901
2180
2538
3018
3018
3018

= 3018.24 kN

2.64
2.64
2.64
2.64
2.64
2.64
2.64
2.64
2.62
2.63
2.66
2.66
2.66

0.69
0.69
0.69
0.60
0.55
0.55
0.55
0.55
0.60
0.53
0.62
0.62
0.62

Submerged density

Net Safe capacity =


(PPU,s+PSU,s) -W

kN

Void ratio, e

Additional load, W*

0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3

Rev

Safe shaft
Resistance, PSU, s

27
27
27
29
31
31
31
31
32
32
31
31
31

Date

Ultimate shaft
Resistance, PSU

Reduction factor, i

degree
s

Verified

2/21/2013
0

Project Code

Specific gravity, Gs

Checked

Moisture content, w

Harjot
R P Sharma
Sumant

Prepared

kN/m3

26.2
26.2
26.2
22.7
20.9
20.9
20.9
20.9
22.9
20.1
23.3
23.3
23.3

9.50
9.50
9.50
10.06
10.35
10.35
10.35
10.35
8.83
9.91
9.42
9.42
9.42

307.7 tonnes

417

oad =

Appendix-7
CC28
L&T
PILE CAPACITY
Harjot
R P Sharma
Sumant

Prepared
Checked
Verified

2957.1
24.00 m

kN

Project Code
Date
Rev

2/21/2013
0

301.4 tonnes
AECOM/CC28/PF148/R0

418

Appendix-7
CC28
L&T
PILE CAPACITY
Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

Project Code
Date
Rev

2/21/2013
0

419

Appendix-7
CC28
L&T
PILE CAPACITY
Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

Project Code
Date
Rev

2/21/2013
0

420

Appendix-7
CC28
L&T
PILE CAPACITY
Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

Project Code
Date
Rev

2/21/2013
0

421

Appendix-7
CC28
L&T
PILE CAPACITY
Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

Project Code
Date
Rev

2/21/2013
0

422

Appendix-7
CC28
L&T
PILE CAPACITY
Prepared
Checked
Verified

Harjot
R P Sharma
Sumant

Project Code
Date
Rev

2/21/2013
0

423