Professional Documents
Culture Documents
1 AT PIER BASE
Pier grade
E
m = 280/fck
Dia of Pier
Cover
Dia of Link
Layer 1
Layer 2
Layer 3
1
2.1
2.2
2.3
2.4
2.5
2.6
3
=
=
=
=
=
=
Bar dia =
Bar dia =
Bar dia =
SLS Cases
11801.6
6684.0
10327.9
9594.3
10327.9
13904.2
11282.7
4095.7
9373.1
3717.0
10327.9
10327.9
10327.9
3905.3
3905.3
5822.5
50.0
34000.0
5.6
2100.0
50.0
20.0
25.0 mm
25.0 mm
32.0 mm
100
100
100
100
100
100
100
100
steel
% steel
39270
1.134
0
0
No. =
No. =
No. =
1
2.1a
2.2a
2.3a
2.4a
2.5a
2.6a
2.1b
2.2b
2.3b
2.4b
2.5b
2.6b
0
40.0
40.0
0.0
ULS Cases
17089.5
14510.6
14510.6
15704.1
13317.1
10392.5
12385.4
17994.7
5743.0
5268.3
14510.6
14510.6
12791.3
12791.3
14318.9
11263.6
12791.3
12791.3
5504.5
5504.5
11729.7
19077.4
3283.3
2618.2
2950.3
2950.3
1
2.1
2.2
2.3
2.4
2.5
2.6
3
=
=
=
=
=
=
Bar dia =
Bar dia =
Bar dia =
SLS Cases
11576.4
5462.1
10389.2
6228.1
9816.3
10459.7
10389.2
3638.7
9816.3
3239.6
11057.5
3438.5
9148.0
3438.5
10102.8
4290.7
50.0
34000.0
5.6
2100.0
50.0
20.0
25.0 mm
25.0 mm
0.0 mm
100
100
100
100
100
100
100
100
steel
% steel
39270
1.134
0
0
No. =
No. =
No. =
1
2.1a
2.2a
2.3a
2.4a
2.5a
2.6a
2.1b
2.2b
0
40.0
40.0
0.0
ULS Cases
16808.1
14587.2
13871.1
14587.2
13871.1
15422.6
13035.7
12968.2
12051.6
8417.8
8159.6
13630.8
5105.6
4605.8
4855.0
4855.0
7109.5
14157.6
2.3b
2.4b
2.5b
2.6b
12968.2
12051.6
14037.5
10982.2
3283.3
2618.2
2950.3
2950.3
1
2.1
2.2
2.3
2.4
2.5
2.6
3
=
=
=
=
=
=
Bar dia =
Bar dia =
Bar dia =
SLS Cases
11489.9
5026.7
10302.6
9729.7
10302.6
9729.7
10971.0
9061.4
10016.2
5050.2
9157.4
3480.8
3074.6
3277.2
3277.2
3783.8
50.0
34000.0
5.6
2100.0
50.0
20.0
25.0 mm
25.0 mm
0.0 mm
100
100
100
100
100
100
100
100
steel
% steel
39270
1.134
0
0
No. =
No. =
No. =
0
40.0
40.0
0.0
ULS Cases
16699.9
7711.1
1
2.1a
2.2a
2.3a
2.4a
2.5a
2.6a
2.1b
2.2b
2.3b
2.4b
2.5b
2.6b
14479.0
13762.9
14479.0
13762.9
15314.4
12927.4
12859.9
11943.3
12859.9
11943.3
13929.3
10874.0
6699.5
11981.4
4885.7
4377.1
4630.9
4630.9
5477.7
12297.9
3283.3
2618.2
2950.3
2950.3
1
2.1
2.2
2.3
2.4
=
=
=
=
=
=
Bar dia =
Bar dia =
Bar dia =
SLS Cases
11455.2
4859.9
10268.0
4612.0
9695.1
8640.3
10268.0
3421.0
9695.1
3012.1
50.0
34000.0
5.6
2100.0
50.0
20.0
25.0 mm
0.0 mm
0.0 mm
100
100
100
100
100
steel
% steel
19635
0.567
0
0
No. =
No. =
No. =
1
2.1a
2.2a
2.3a
2.4a
0
40.0
0.0
0.0
ULS Cases
16656.6
14435.7
13719.6
14435.7
13719.6
7439.9
6161.2
11326.7
4802.4
4290.6
2.5
2.6
3
10936.3
9026.7
9981.5
3216.2
3216.2
3601.3
100
100
100
2.5a
2.6a
2.1b
2.2b
2.3b
2.4b
2.5b
2.6b
15271.1
12884.1
12816.6
11900.0
12816.6
11900.0
13886.0
10830.7
4546.1
4546.1
4869.9
11559.2
3283.3
2618.2
2950.3
2950.3
=
=
=
=
=
=
Bar dia =
Layer 2
Layer 3
1
2.1
2.2
2.3
2.4
2.5
2.6
3
Bar dia =
Bar dia =
SLS Cases
11411.9
4658.2
10224.7
4102.5
9651.8
7997.0
10224.7
3349.1
9651.8
2937.3
10893.0
3142.9
8983.5
3142.9
9938.2
3393.9
50.0
34000.0
5.6
2100.0
50.0
20.0
25.0 mm
steel
% steel
0
0
25.0 mm
0.0 mm
100
100
100
100
100
100
100
100
19635
0.567
No. =
40.0
No. =
No. =
0.0
0.0
ULS Cases
16602.5
14381.6
13665.5
14381.6
13665.5
15217.0
12830.0
12762.5
11845.9
12762.5
11845.9
13831.9
10776.6
1
2.1a
2.2a
2.3a
2.4a
2.5a
2.6a
2.1b
2.2b
2.3b
2.4b
2.5b
2.6b
7111.6
5540.2
10512.5
4702.3
4186.9
4444.3
4444.3
4167.8
10640.0
3283.3
2618.2
2950.3
2950.3
=
=
=
=
=
=
Bar dia =
Bar dia =
Bar dia =
SLS Cases
11397.8
4594.3
50.0
34000.0
5.6
2100.0
50.0
20.0
25.0 mm
25.0 mm
0.0 mm
100
steel
% steel
19635
0.567
Lap1
32
No. =
No. =
No. =
0
40.0
0.0
0.0
ULS Cases
16584.8
7007.5
2.1
2.2
2.3
2.4
2.5
2.6
3
10210.6
9637.7
10210.6
9637.7
10878.9
8969.3
9924.1
3947.9
7788.2
3326.4
2913.6
3119.8
3119.8
3332.0
100
100
100
100
100
100
100
2.1a
2.2a
2.3a
2.4a
2.5a
2.6a
2.1b
2.2b
2.3b
2.4b
2.5b
2.6b
14363.9
13647.8
14363.9
13647.8
15199.4
12812.4
12744.9
11828.3
12744.9
11828.3
13814.2
10758.9
5353.0
10248.1
4670.7
4154.2
4412.2
4412.2
3957.5
10341.4
3283.3
2618.2
2950.3
2950.3
=
=
=
Dia of Pier
Cover
Dia of Link
Layer 1
Layer 2
Layer 3
1
2.1
2.2
2.3
2.4
2.5
2.6
3
=
=
=
Bar dia =
Bar dia =
Bar dia =
SLS Cases
11397.8
4594.3
10210.6
3947.9
9637.7
7788.2
10210.6
3326.4
9637.7
2913.6
10878.9
3119.8
8969.3
3119.8
9924.1
3332.0
50.0
34000.0
5.6
steel
% steel
2100.0
50.0
20.0
32.0 mm
25.0 mm
0.0 mm
100
100
100
100
100
100
100
100
0
0.000
Lap2
0
No. =
No. =
No. =
0.0
0.0
0.0
ULS Cases
16584.8
14363.9
13647.8
14363.9
13647.8
15199.4
12812.4
12744.9
11828.3
12744.9
11828.3
13814.2
10758.9
1
2.1a
2.2a
2.3a
2.4a
2.5a
2.6a
2.1b
2.2b
2.3b
2.4b
2.5b
2.6b
7007.5
5353.0
10248.1
4670.7
4154.2
4412.2
4412.2
3957.5
10341.4
3283.3
2618.2
2950.3
2950.3
=
=
=
=
=
=
Bar dia =
50.0
34000.0
5.6
2100.0
50.0
20.0
32.0 mm
steel
% steel
0
0.000
Lap3
0
No. =
0
0.0
Layer 2
Layer 3
1
2.1
2.2
2.3
2.4
2.5
2.6
3
Bar dia =
Bar dia =
SLS Cases
11397.8
4594.3
10210.6
3947.9
9637.7
7788.2
10210.6
3326.4
9637.7
2913.6
10878.9
3119.8
8969.3
3119.8
9924.1
3332.0
25.0 mm
0.0 mm
100
100
100
100
100
100
100
100
No. =
No. =
0.0
0.0
ULS Cases
16584.8
14363.9
13647.8
14363.9
13647.8
15199.4
12812.4
12744.9
11828.3
12744.9
11828.3
13814.2
10758.9
1
2.1a
2.2a
2.3a
2.4a
2.5a
2.6a
2.1b
2.2b
2.3b
2.4b
2.5b
2.6b
7007.5
5353.0
10248.1
4670.7
4154.2
4412.2
4412.2
3957.5
10341.4
3283.3
2618.2
2950.3
2950.3
1
2.1
2.2
2.3
2.4
2.5
2.6
3
=
=
=
=
=
=
Bar dia =
Bar dia =
Bar dia =
SLS Cases
11397.8
4594.3
10210.6
3947.9
9637.7
7788.2
10210.6
3326.4
9637.7
2913.6
10878.9
3119.8
8969.3
3119.8
9924.1
3332.0
50.0
34000.0
5.6
2100.0
50.0
20.0
0.0 mm
25.0 mm
0.0 mm
100
100
100
100
100
100
100
100
steel
% steel
0
0.000
Lap4
0
No. =
No. =
No. =
1
2.1a
2.2a
2.3a
2.4a
2.5a
2.6a
2.1b
2.2b
2.3b
2.4b
2.5b
2.6b
0
0.0
0.0
0.0
ULS Cases
16584.8
14363.9
13647.8
14363.9
13647.8
15199.4
12812.4
12744.9
11828.3
12744.9
11828.3
13814.2
10758.9
7007.5
5353.0
10248.1
4670.7
4154.2
4412.2
4412.2
3957.5
10341.4
3283.3
2618.2
2950.3
2950.3
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663
2.1c
2.2c
2.3c
2.4c
2.5c
2.6c
2.1c
2.2c
7396.6
7396.6
8828.8
5964.4
7396.6
7396.6
7623.6
6764.3
11101.1
16817.4
1975.4
1351.6
1662.8
1662.8
6623.2
12201.6
SLS1
SLS2
SLS3
SLS4
SLS5
SLS6
190 SLS7
203 SLS8
216 ULS1
229 ULS2
242 ULS3
255 ULS4
ULS5
ULS6
ULS7
ULS8
ULS9
ULS10
ULS11
ULS12
ULS13
ULS14
ULS15
SLS1
SLS2
SLS3
SLS4
SLS5
SLS6
191 SLS7
204 SLS8
1 Section
2 Section
3 Section
4 Section
5 Section
6 Section
7 Section
8 Section
9 Section
10 Section
11 Section
12 Section
13 Section
14 Section
15 Section
16 Section
17 Section
18 Section
19 Section
20 Section
21 Section
22 Section
23 Section
For
For
For
For
For
For
For
For
For
For
For
For
For
For
For
For
For
For
For
For
For
For
For
11801.6
10327.9
10327.9
11282.7
9373.1
10327.9
10327.9
10327.9
17089.5
14510.6
14510.6
15704.1
13317.1
14510.6
14510.6
12791.3
12791.3
14318.9
11263.6
7396.6
7396.6
8828.8
5964.4
11576.4
10389.2
9816.3
10389.2
9816.3
11057.5
9148.0
10102.8
2.3c
2.4c
2.5c
2.6c
2.1c
2.2c
2.3c
2.4c
2.5c
2.6c
7623.6
6764.3
8626.2
5761.8
7545.7
6686.4
7545.7
6686.4
8548.2
5683.9
1975.4
1351.6
1662.8
1662.8
4973.4
10456.1
1975.4
1351.6
1662.8
1662.8
217 ULS1
230 ULS2
243 ULS3
256 ULS4
ULS5
ULS6
ULS7
ULS8
ULS9
ULS10
ULS11
ULS12
ULS13
ULS14
ULS15
16808.1
14587.2
13871.1
14587.2
13871.1
15422.6
13035.7
12968.2
12051.6
12968.2
12051.6
7623.6
6764.3
7623.6
6764.3
SLS1
SLS2
SLS3
SLS4
SLS5
SLS6
192 SLS7
205 SLS8
218 ULS1
231 ULS2
244 ULS3
257 ULS4
ULS5
ULS6
ULS7
ULS8
ULS9
ULS10
ULS11
ULS12
ULS13
ULS14
ULS15
11489.9
10302.6
9729.7
10302.6
9729.7
10971.0
9061.4
10016.2
16699.9
14479.0
13762.9
14479.0
13762.9
15314.4
12927.4
12859.9
11943.3
12859.9
11943.3
7545.7
6686.4
7545.7
6686.4
11455.2
10268.0
9695.1
10268.0
2.1c
2.2c
2.3c
2.4c
2.5c
2.6c
7514.5
6655.2
7514.5
6655.2
8517.1
5652.7
4333.4
9762.6
1975.4
1351.6
1662.8
1662.8
9695.1
10936.3
9026.7
9981.5
16656.6
14435.7
13719.6
14435.7
13719.6
15271.1
12884.1
12816.6
11900.0
12816.6
11900.0
7514.5
6655.2
7514.5
6655.2
6684.0
9594.3
13904.2
4095.7
3717.0
3905.3
3905.3
5822.5
10392.5
12385.4
17994.7
5743.0
5268.3
5504.5
5504.5
11729.7
19077.4
3283.3
2618.2
11101.1
16817.4
1975.4
1351.6
5462.1
6228.1
10459.7
3638.7
3239.6
3438.5
3438.5
4290.7
8417.8
8159.6
13630.8
5105.6
4605.8
4855.0
4855.0
7109.5
14157.6
3283.3
2618.2
6623.2
12201.6
1975.4
1351.6
5026.7
5050.2
9157.4
3480.8
3074.6
3277.2
3277.2
3783.8
7711.1
6699.5
11981.4
4885.7
4377.1
4630.9
4630.9
5477.7
12297.9
3283.3
2618.2
4973.4
10456.1
1975.4
1351.6
4859.9
4612.0
8640.3
3421.0
3012.1
3216.2
3216.2
3601.3
7439.9
6161.2
11326.7
4802.4
4290.6
4546.1
4546.1
4869.9
11559.2
3283.3
2618.2
4333.4
9762.6
1975.4
1351.6
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
Prepared
Harjot
AECOM/CC28/PF148
Checked
R P Sharma
10761.372
Verified
Sumant
INDEX
S.No
Ref Drawing No.
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
Appendix-1
Appendix-2
Appendix-3
Appendix-5
Appendix-5a
Appendix-6
Appendix-7
Item
AECOM-CC28-112-R41
AECOM-CC28-770-R0
AECOM-CC28-371-R0
AECOM-CC28-271-R0
Span Arrangement
Pier details
Pile Cap details
Pile Foundation details
Introduction
Input Data
Load Calculations
SLS Load Cases for Pier
ULS Load Cases for Pier
Design checks for Pier
Load Calculations for Pile Design
Vertical Pile Load Check
Design Checks for Pile
Pile Cap : ULS Design
Pile Cap : SLS Checks
Pile Cap : Truss Analogy
Appendices
Calculation of spring stiffness
Staad Input and Output for Time Period Calculation
RCCol/Oasys output for Pier
Staad Input for Pile Design
Staad Input for Pile Load
Pile Design Check RC Col/Oasys
Vertical Pile Capacity & Bore hole Log
CC-28
L&T
of Substructure P148
Project Code
Date
2/21/2013
Rev
Page No
1
8
17
26
43
46
51
51
59
75
75
89
90
103
111
126
139
149
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
Introduction
This Design note presents design of Pier, Pile Cap & Pile Foundation for P148 with following details:
Pier No.
P148
P40
P41
P42
Chainage
Left Span
Right Span
10761.372
7179.889
7210.889
7241.889
31
31
31
31
37
37
37
37
Fixity Side
at Pier
LEFT
LEFT
LEFT
LEFT
Curve Radius
Pier No.
Pier Dia
Bore Hole
No.
m
P148
2.100
NBH-26
Left Curve
Right
Curve
404.1
404.1
Rail level
Ground level
221.833
234.711
235.294
235.547
212.891
214.713
214.729
214.839
C-28
&T
bstructure P148
2/21/2013
0
Project Code
Date
Rev
Height of Pier
with pier cap
m
6.463
17.519
18.086
18.229
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Left span
Right span
Rail level
Ground level
Rail pad depth
Segment height
Bearing + pedestal height
Depth of pile cap top below ground
Pier cap top level to rail level = 0.479+2.25+0.25
Pier cap top level = 221.833 - 2.979
Pile cap top level = 212.891 - 0.5
Ht of pier from pier cap top to pile cap top
Plan Curve radius
Left side
Right Side
Transverse Eccentricity (Cantilever eccentricity)
Cover in Pier
Cover in Pile
2100
20
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
P 148
10761.372
31.000
37.000
221.833
212.891
0.479
2.250
0.250
0.500
2.979
218.854
212.391
6.463
404.1
404.1
0.000
0.050
0.075
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
Pier dimensions
Dia
Ht excluding cap = 6.463 - 1.8
Pier cap dimensions
along track
3.35 m at top &
across track
4.1 m at top &
Depth
C.G. of pier cap from top (Long.)
C.G. of pier cap from top (Trans.)
Transverse ecc of pier cap =
Shear key dimensions
along track
across track
Depth
Tie bar Center
No
Pedestal dimensions
Length
Width
Depth
No
c/c distance along track
c/c distance across track
Crash Barrier dimensions
Height
Top Thickness
Bottom Thickness
Gap
Pile cap arrangement
No. of piles
Dia of piles
Corner Piles Spacing
along track
across track
Pile cap Length
along track
across track
Middle Piles (along track)
Pile Spacing (from corner piles) =
No of Piles
Thickness of pile cap
Pier ecc from to pile cap center
21
=
=
2.100
4.663
=
=
2.000
2.000
1.800
0.750
0.750
0.000
=
=
=
=
=
1.150
1.100
0.850
0.550
1
=
=
=
=
=
=
0.900
0.900
0.175
4
1.700
2.600
=
=
=
=
1.500
0.225
0.225
0.025
=
=
6
1.000
=
=
6.000
3.000
=
=
7.500
4.500
3.000
2
=
=
1.500
0.000
0.000
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
25 kN/m3
Density of steel
78.5 kN/m3
Density of Soil
20 kN/m3
=
=
=
m = 280/fck
m = 280/fck
=
=
M 50
E=
34000
M 35
E=
29500
Fe 500
Fe 415 (for shear link)
5.6 for Pier
(as per Cl. 2.2.1 (b) of DBR)
8.0 for pile
(as per Cl. 2.2.1 (b) of DBR)
1.3 Loads
1.3a Superstructure Dead Load
Weight (T)
297.2
335.2
373.1
413.3
451.2
489.1
527.0
0.956 m
3m segment wt
0m segment wt
=
=
37.9 t
0.00 t
22
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
1
2
3
4
5
6
7
8
9
Checked
Verified
Harjot
R P Sharma
Sumant
Prepared
451.2 t
Rails+pads
Cables
Cable trough cell
Cable trays
Hand rail
Plinth
Light wt deck drainage concrete
Parapet
Miscellaneous (OCS, signaling)
Total
0.30
0.07
0.74
0.01
0.08
3.40
0.24
3.26
0.40
8.5
t/m
t/m
t/m
t/m
t/m
t/m
t/m
t/m
t/m
t/m
22.1
Alt 1
a=
b=
c=
=
m
Alt 2
2.250
2.500
12.600
=
=
2.605
2.290
12.310
1.83 m
1.2
Centrifugal force
Design Speed
80 kmph
60 kmph
above
below
300
300
15.696
23
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Checked
Verified
Harjot
R P Sharma
Sumant
Prepared
0%
Regular
G II a
G II b
G III
Stresses
Stresses
Stresses
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Prestressing
SIDL
Earthquake
Overall T
Diff. Temp
PR
SIDL
EQ
OT
DT
1.00
1.20
1.00
1.20
1.00
1.00
1.20
1.00
1.00
1.20
Diff. Settlement
DS
1.00
Live Load
LL
1.10
Derailment Load
DR
Dead Load
ULS Combinations
Load
Dead Load
Prestressing
Symbol
DL
Symbol
DL
PR
SIDL
Earthquake
Live Load
SIDL
EQ
LL
Derailment Load
DR
1.00
0.80
GI
1.25
1.15
0.87
2.00
1.00
1.00
G II a
1.25
1.15
0.87
2.00
1.60
G II b
1.25
1.15
0.87
2.00
1.25
1.40
G II c
0.90
1.15
0.87
0.80
1.50
50.00
1.75
Pier dim. h
=
2.10
Effective length Le
Cl. 3.1.2 of DBR
=
14.86
As per Cl. 15.6.1.1, IRS CBC, Slenderness ratio:
Le/ h
=
7.08
Calculation for additional moments in longitudinal direction: (as per Cl. 15.6.5 of IRS:CBC)
MR_Slender = MRi +
1.6 Anchorage Length
Steel Grade =
Concrete Grade
24
0.000
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
N/mm2
M40 and more
M30
M35
2.66
2.10
2.38
= 31m + 37m
=
6.463 m
=
2.100 m
=
M 50
=
5.60
1.150 m
1.500 m
6.163 m
6.163 m
6.163 m
6.163 m
6.163 m
6.163 m
6.163 m
6.163 m
1.31 m
1.31 m
0.0 m
0m
No
0
0
20
20
20
20
0
0
0
0
54
22
5
5
0
600 mm
Dia
0
0
25
25
25
25
32
32
0
0
20
20
20
25
0
25
Concrete Volume =
Reinforcement =
=
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
Spacing
65 mm up to
70 mm up to
70 mm up to top
26
Height
3.150 m from bottom (as special confinement reinf.)
4.663 m from bottom
28
T
tructure P148
Project Code
Date
Rev
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
2/21/2013
0
Fixed
Free
27
28
T
tructure P148
Project Code
Date
Rev
2/21/2013
0
m
m
m at bottom
m at bottom
m
m
m
m
m
m
m
m from pier cap top
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m across the track
m along the track
28
28
T
tructure P148
Project Code
Date
Rev
2/21/2013
0
MPa
MPa
29
28
T
tructure P148
Project Code
Date
Rev
2/21/2013
0
83.385 kN/m
166.77 kN
m radius
m radius
kN/m
30
28
T
tructure P148
Project Code
Date
Rev
2/21/2013
0
GV
Stresses
1.00
1.00
1.00
1.20
1.00
GV
1.25
1.15
0.87
2.00
1.75
m
m ( 2.3 *L)
<12, Short Column
xP
Anchorage Length
31
28
T
tructure P148
2/21/2013
0
Project Code
Date
Rev
x dia of bar
40.9
51.8
45.7
16 cu m
3.92 t
243 kg/ cum
32
28
T
tructure P148
Project Code
Date
Rev
2/21/2013
0
33
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
S1
S2
S3
S4 S5 S6 S7
S6
S5
S3 S2 S1
S4
Left Span
A
Idealization Of Segmental Loads
Vertical Reaction's Due to Segment Loads
Wt. of left span
Wt. of right span
Reaction on A
Reaction on B
Total Reaction
=
=
451.2 t
527 t
= 225.6 t =
= 263.5 t =
= 489.1 t =
2213.1 kN
2584.9 kN
4798.1 kN
29.3 m
30.950 m
TOTAL SIDL
REACTION ON PIER
34
157.1 t
1541.6 kN
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
35
Prepared
Checked
Verified
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
17t 17t
17t 17t
17t 17t
17t
29.3 m
17t
17t
30.95 m
Schematic Representation of Train Axle Position (Exact spacing are given in Tables below)
CG of LL from rail level
Impact Factor
=
=
Alternate 1
Maximum ReactionsLeft Span - Taking moment about C
Load
Distance
(t)
(m)
VA
29.3
17 X
30.1
17 X
27.6
17 X
23.1
17 X
20.6
17 X
8.0
17 X
5.5
17 X
1.0
0 X
0.0
0 X
0.0
0 X
0.0
0 X
0.0
0 X
0.0
0 X
0.0
119 t
VA=
= 1167kN
VC=
1.83 m
1.2
Moment
(t-m)
512.1
469.6
393.1
350.6
136.4
93.9
17.4
0.0
0.0
0.0
0.0
0.0
0.0
67 t
52 t
0.00
2.50
4.50
2.50
12.60
2.50
4.50
2.50
12.60
2.50
4.50
2.50
12.60
x2=
x2=
36
134.7 t
103.3 t
2.5
7
9.5
22.1
24.6
29.1
31.6
44.2
46.7
51.2
53.7
66.3
= 1321.4
= 1013.4
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
37
Prepared
Checked
Verified
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
0.00
11.73
2.50
4.50
2.50
12.60
2.50
4.50
2.50
12.60
2.50
4.50
2.50
12.60
x2=
x2=
73.9 t
96.1 t
12.6
15.1
19.6
22.1
34.7
37.2
41.7
44.2
56.8
59.3
63.8
66.3
78.9
= 725.4
= 942.3
Alternate 2
Maximum ReactionsLeft Span - Taking moment about C
Load
Distance
(t)
(m)
VA
29.3
17 X
30.1
17 X
27.8
17 X
22.6
17 X
20.3
17 X
8.0
17 X
5.7
0 X
0.0
0 X
0.0
0 X
0.0
0 X
0.0
0 X
0.0
0 X
0.0
0 X
0.0
102 t
VA=
= 1001kN
VC=
Moment
(t-m)
512.1
473.2
384.6
345.7
136.4
97.5
0.0
0.0
0.0
0.0
0.0
0.0
0.0
67 t
35 t
0.00
2.29
5.21
2.29
12.31
2.29
5.21
2.29
12.31
2.29
5.21
2.29
12.31
x2=
x2=
38
133.1 t
70.9 t
2.29
7.5
9.79
22.1
24.39
29.6
31.89
44.2
46.49
51.7
53.99
66.3
= 1305.5
= 695.8
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
39
Prepared
Checked
Verified
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
Prepared
Checked
Verified
40
72.6 t
131.4 t
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
41
Prepared
Checked
Verified
CC-28
L&T
esign of Substructure P148
Harjot
R P Sharma
Sumant
S1
S2
Project Code
Date
2/21/2013
Rev
S3 S4 S5
S6
Right Span
B
35.3 m
36.95 m
Total
= 288.8 t
= 2833.0 kN
42
CC-28
L&T
esign of Substructure P148
Harjot
R P Sharma
Sumant
Project Code
Date
2/21/2013
Rev
43
CC-28
L&T
esign of Substructure P148
Harjot
R P Sharma
Sumant
17t 17t
35.3 m
Project Code
Date
2/21/2013
Rev
17t
17t
17t
36.95 m
2.5
7
9.5
22.1
24.6
29.1
31.6
44.2
46.7
51.2
53.7
66.3
kN
kN
44
CC-28
L&T
esign of Substructure P148
Harjot
R P Sharma
Sumant
Project Code
Date
2/21/2013
Rev
45
CC-28
L&T
esign of Substructure P148
Harjot
R P Sharma
Sumant
Project Code
Date
2/21/2013
Rev
2.29
7.5
9.79
22.1
24.39
29.6
31.89
44.2
46.49
51.7
53.99
66.3
kN
kN
46
CC-28
L&T
esign of Substructure P148
Harjot
R P Sharma
Sumant
Project Code
Date
2/21/2013
Rev
47
CC-28
L&T
esign of Substructure P148
Harjot
R P Sharma
Sumant
Project Code
Date
2/21/2013
Rev
48
CC-28
L&T
esign of Substructure P148
Harjot
R P Sharma
Sumant
Project Code
Date
2/21/2013
Rev
49
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
1.15 m
A
Quantity
12.91
2.60 m
SHEAR
KEY
Train
C
0.750 m
=
18.05
25 kN/m3 =
25.00
0m
2.55
=
0.85 mm
1.08 m3
Wt of Shear Key =
1.08
25.00
D
0.203
5.06
Pier Diameter D
Pier Concrete
=
=
=
=
Volume of Pier
Weight of Pier
=
=
Height
Top Thickness
=
=
Crash Barrier
2.4c Weight of Crash Barrier
50
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
Bottom Thickness
Gap
=
=
=
=
=
=
=
4.5
7.5
Thickness of Pile Cap
=
=
Pier
Soil Layer
GL
Pile Cap
Pile
Soil Density
Pier Area
=
=
51
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
52
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
ucture P148
-
Project Code
Date
2/21/2013
Rev
B
SHEAR
KEY
1.1 m
18.05 m3
t/m3
451.3 kN
26.9 kN
2.1 m
M 50
3.46 m2
1.8 m
4.7 m
16.2 m3
403.8 kN
1.5 m
0.225 m
53
ucture P148
-
Project Code
Date
2/21/2013
Rev
0.225 m
0.025 m
0.338 m2
8.17 m
6.75 m
7.46 m
63.0 kN
1.5 m
33.75 m2
50.625 m3
1265.6 kN
0.5 m
20.00 kN/m3
3.63 m2
1.82 m3
16.9 m3
15.1 m3
301.2 kN
54
ucture P148
Project Code
Date
2/21/2013
Rev
55
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
=
=
18 %
20 %
since both the tracks are supported by a single box girder, hence tractive force of one track and braking
force of another track will be taken in the same direction to produce worst condition of loading.
Governing Condition
Axle Load
kN
1167
kN
210.1
kN
233.5
=
=
=
1.6
31.00
486.6
=
=
=
=
404.1 m
404.1 m
30.95 m
36.95 m
2.19
2.62
Left
0.20 m
0.28 m
Right
56
Left Span
W
Right Span
CF
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
(km/hr)
80
(m)
404.1
(m)
404.1
57
Prepared
Checked
Verified
(kN)
1321
(kN)
164.78
Harjot
R P Sharma
Sumant
(kN)
725
8
T
ucture P148
-
Project Code
Date
2/21/2013
Rev
Total
kN
443.6
t/m
m
kN
Right
Right Span
CF
58
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
(kN)
90.46
59
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
0.24
R
=
2.5
I
=
1.5
(Sa/g)h
=
1.36 /T
(As per Cl.2.5.1.2 of DBR, medium soil site, Type II soil)
Time period is calculated with "Rayleigh Frequency" from STAAD. Pier, pile cap and piles are modeled with soil stiffness as spri
are lumped in longitudinal (x) and transverse (z) directions. 75% of inertia (as cracked section) is taken for pier and pile. Dynami
are taken. Soil springs are calculated in Appendix-1. STAAD Input and Output files are attached in Appendix-2.
Summary of Longitudinal Seismic Coefficients
Loads at top of Loads at bot. of
Height (L)
Pier
Pier
Pier No.
m
kN
kN
148
6.463
7631.1
63.0
Loads at top of pier = Wt. of (DL of Superstr+SIDL)
Loads at bottom of pier = Wt of (Crash barrier)
Frequency
from Staad
1/sec
1.530
Time period
Sa/g
sec
0.65
2.08
Shear Key
Loads
26.9 kN
Level (m)
0.550
Pedestal
20.25 kN
0.125
0.00
Sa/g
1.74
(Wt of DL, SIDL, LL are applied at shear key, other weights are applied at their CG.)
60
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
As per 8.8 IITK-RDSO - The seismic zone factor for vertical ground motions, when required (see clause
6.8.1), may be taken as two-thirds of that for horizontal motions given table 3.
6.8.1 - Vertical Component of Seismic Action
In some cases, the effect of vertical component of ground motion has to be specifically considered. The
effect of vertical component is particularly imortant in following components/situations:
a. Prestressed concrete decks.
b. Bearings, hold down devices, and linkages.
c. Horizontal cantilever structural elements such as cantilevers of deck slabs and cantilever bridges.
d. Situations where stability (overturning / sliding ) become critical.
e. Bridge sites located near fault.
In pile foundation Stability is not critical (and other cases are not applicable) therefore
v
0.0999
DL
SIDL
LIVE
Reaction from
Left Span
kN
2213.1
1291.4
1321.4
Right Span
kN
2584.9
1541.6
725.4
Left Span
kN
663.3
387.1
0.0
Right Span
kN
0.0
0.0
0.0
Left Span
kN
277.5
161.9
82.8
Non Seismic
Weights
Longitudinal
Seismic (r1)
Transverse
Seismic (r2)
Vertical
Seismic (r3)
kN
26.9
20.25
451.3
403.8
63.0
301.2
1265.6
kN
4.03
3.03
67.63
60.51
9.43
45.14
189.67
kN
3.37
2.54
56.58
50.63
7.89
37.76
158.69
kN
2.69
2.02
45.08
40.34
6.29
30.09
126.45
Load Type
Shear Key
Pedestal
Pier Cap
Pier
Pier Crash Barrier
Soil above Pile cap
Pile cap
2.9 Wind Load
Intensity given in D.B.R
Exposed Area
1.609 kN/m3
3.5 m
1.6 m
Train height
Parapet height
61
Right Span
kN
324.1
193.3
45.5
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
Prepared
Checked
Verified
Segments
2.25 m
Span
=
34 m Both Side
Wind Load
=
402.1 kN
Seismic Transverse Reaction
=
4743.4 kN
Governing Case - Transverse Seismic, So wind is not considered in further calculations.
62
Harjot
R P Sharma
Sumant
cture P148
Project Code
Date
2/21/2013
Rev
hL
0.150
hT
0.125
63
cture P148
Project Code
Date
2/21/2013
Rev
Right Span
kN
258.3
154.0
36.2
64
cture P148
Project Code
Date
2/21/2013
Rev
65
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
G-I
DL
SIDL
LL
Temp.
Earthquake
(Cracking + Stresses)
1.0
1.2
1.1
0.0
0.0
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
(Normal Case)
1. DEAD LOADS
DL Left Span
DL Right Span
Shear Key
Pedestal
A
B
C
D
Pier Cap
Pier
2. SIDL
SIDL Left Span
SIDL Right Span
V
kN
2213.1
2584.9
26.9
eL
m
0.85
-0.85
0.00
eT
m
0.20
0.28
0.00
ML
kN.m
1881.2
-2197.2
0.0
MT
kN.m
437.1
727.6
0.0
5.1
5.1
5.1
5.1
451.3
403.8
0.85
-0.85
0.85
-0.85
0.00
0.00
1.30
1.30
-1.30
-1.30
0.00
0.00
4.3
-4.3
4.3
-4.3
0.0
0.0
21.8
-21.8
21.8
-21.8
0.0
0.0
1549.7
1849.9
9099.8
0.85
-0.85
0.20
0.28
1317.3
-1572.4
-571.2
306.1
520.7
1991.6
V
kN
1744.2
957.6
eL
m
0.85
-0.85
eT
m
0.20
0.28
HL
kN
488.0
0.0
HT
kN
181.3
99.5
ML
kN.m
1482.6
-813.9
eL1
m
6.7
6.7
eT1
m
11.3
11.3
MT
kN.m
344.5
269.5
ML1
kN.m
3275.7
0.0
MT1
kN.m
2043.1
1121.7
3. LIVE LOADS
Case IV - Both Spans Both tracks
66
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
MR = (ML^2+MT^2)^0.5
HR = (HL^2+HT^2)^0.5
Vertical Load,
P
kN
11801.6
11576.4
11489.9
11455.2
11411.9
11397.8
11397.8
11397.8
11397.8
HL
HT
ML
MT
kN
488.0
488.0
488.0
488.0
488.0
488.0
488.0
488.0
488.0
kN
280.8
280.8
280.8
280.8
280.8
280.8
280.8
280.8
280.8
kN.m
3373.2
2104.5
1616.5
1421.3
1177.3
1097.8
1097.8
1097.8
1097.8
kN.m
5770.5
5040.5
4759.7
4647.4
4507.0
4461.2
4461.2
4461.2
4461.2
67
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
68
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
cture P148
Project Code
Date
2/21/2013
Rev
69
cture P148
Project Code
Date
2/21/2013
Rev
MR
kN.m
6684.0
5462.1
5026.7
4859.9
4658.2
4594.3
4594.3
4594.3
4594.3
70
cture P148
Project Code
Date
2/21/2013
Rev
71
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
G-II b
DL
SIDL
LL
Temp.
Earthquake
( Stresses)
1.0
1.2
1.0
0.0
1.0
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
(Seismic Case)
1. DEAD LOADS
DL Left Span
DL Right Span
Shear Key
Pedestal
A
B
C
D
Pier Cap
Pier
2. SIDL
SIDL Left Span
SIDL Right Span
V
kN
2213.1
2584.9
26.9
eL
m
0.85
-0.85
0.00
eT
m
0.20
0.28
0.00
ML
kN.m
1881.2
-2197.2
0.0
MT
kN.m
437.1
727.6
0.0
5.1
5.1
5.1
5.1
451.3
403.8
0.85
-0.85
0.85
-0.85
0.00
0.00
1.30
1.30
-1.30
-1.30
0.00
0.00
4.3
-4.3
4.3
-4.3
0.0
0.0
21.8
-21.8
21.8
-21.8
0.0
0.0
1549.7
1849.9
9099.8
0.85
-0.85
0.20
0.28
1317.3
-1572.4
-571.2
306.1
520.7
1991.6
V
kN
1585.6
870.5
eL
m
0.85
-0.85
eT
m
0.20
0.28
HL
kN
443.6
0.0
HT
kN
164.8
90.5
ML
kN.m
1347.8
-739.9
eL1
m
6.7
6.7
eT1
m
11.3
11.3
MT
kN.m
313.2
245.0
ML1
kN.m
2977.9
0.0
MT1
kN.m
1857.4
1019.7
3. LIVE LOADS
Case IV - Both Spans Both tracks
72
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
DL Left Span
SIDL Left Span
DL Right Span
SIDL Right Span
Shear Key
Live Left Span
Live Right Span
Pedestal
A
B
C
D
Pier Cap
Pier
eL
m
0.85
0.85
-0.85
-0.85
0.00
0.85
-0.85
0.85
-0.85
0.85
-0.85
0.0
0.0
eT
m
0.20
0.20
0.28
0.28
0.00
0.20
0.28
1.30
1.30
-1.30
-1.30
0.0
0.0
954.8
Horizontal Seismic Forces
DL
SIDL
Live Load
Shear Key
Pedestal
Pier Cap
Pier
Total
7626.5
ML-r3
kN.m
187.9
109.7
-219.5
-130.9
0.0
56.1
-30.8
0.43
-0.43
0.43
-0.43
0.0
0.0
MT-r3
kN.m
43.67
25.48
72.70
43.35
0.00
13.0
10.2
0.66
0.66
-0.66
-0.66
0.0
0.0
-27.5
208.4
Reduction in
Pier Wt.
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
kN
0.0
225.1
311.7
346.4
389.7
403.8
403.8
403.8
73
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
4.663
403.8
2.1
6.6
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
909.4
0.0
1089.0
Bearings
m
6.6
4.0
3.0
2.6
2.1
1.9
1.9
1.9
1.9
Pier Cap
m
5.7
3.1
2.1
1.7
1.2
1.1
1.1
1.1
1.1
Pier Cap
kN.m
386.3
210.5
142.9
115.8
82.0
71.0
71.0
71.0
71.0
DL
m
6.7
4.1
3.1
2.7
2.2
2.1
2.1
2.1
2.1
SIDL
m
6.7
4.1
3.1
2.7
2.2
2.1
2.1
2.1
2.1
LL
m
11.3
8.7
7.7
7.3
6.8
6.6
6.6
6.6
6.6
Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663
DL
kN.m
4453.0
2728.3
2065.0
1799.6
1468.0
1359.8
1359.8
1359.8
1359.8
SIDL
kN.m
2598.4
1592.0
1205.0
1050.1
856.6
793.5
793.5
793.5
793.5
LL
kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
DL
m
8.0
5.4
4.4
4.0
3.5
3.3
3.3
3.3
3.3
SIDL
m
9.6
7.0
6.0
5.6
5.1
4.9
4.9
4.9
4.9
LL
m
11.3
8.7
7.7
7.3
6.8
6.6
6.6
6.6
6.6
74
Bearings
m
6.6
4.0
3.0
2.6
2.1
1.9
1.9
1.9
1.9
Pier Cap
m
5.7
3.1
2.1
1.7
1.2
1.1
1.1
1.1
1.1
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663
DL
kN.m
4817.0
3252.8
2651.2
2410.6
2109.8
2011.7
2011.7
2011.7
2011.7
SIDL
kN.m
3396.5
2473.0
2117.8
1975.7
1798.1
1740.2
1740.2
1740.2
1740.2
Seismic Combinations:
LL
kN.m
1446.4
1112.8
984.4
933.1
869.0
848.0
848.0
848.0
848.0
Comb.1
Comb.2
Comb.3
Comb.4
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
Pier Cap
kN.m
323.2
176.1
119.6
96.9
68.6
59.4
59.4
59.4
59.4
r1
r2
r3
- r3
MR = (ML^2+MT^2)^0.5
HR = (HL^2+HT^2)^0.5
SLS G IIb Comb.1
Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663
Vertical Load,
P
kN
10327.9
10389.2
10302.6
10268.0
10224.7
10210.6
10210.6
10210.6
10210.6
Vertical Load,
P
kN
10327.9
9816.3
HL
HT
ML
MT
kN
1407.4
1373.7
1360.7
1355.5
1349.0
1346.9
1346.9
1346.9
1346.9
kN
127.6
127.6
127.6
127.6
127.6
127.6
127.6
127.6
127.6
kN.m
8848.2
5232.8
3865.7
3322.4
2646.3
2426.6
2426.6
2426.6
2426.6
kN.m
3709.2
3377.4
3249.8
3198.8
3134.9
3114.1
3114.1
3114.1
3114.1
HL
HT
ML
MT
kN
221.8
221.8
kN
1325.9
1297.6
kN.m
1221.7
645.0
kN.m
13850.4
10439.8
75
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
3.6
4
4.5
4.663
4.663
4.663
4.663
9729.7
9695.1
9651.8
9637.7
9637.7
9637.7
9637.7
Vertical Load,
P
kN
11282.7
10389.2
10302.6
10268.0
10224.7
10210.6
10210.6
10210.6
10210.6
Vertical Load,
P
kN
9373.1
9816.3
9729.7
9695.1
9651.8
9637.7
9637.7
9637.7
9637.7
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
221.8
221.8
221.8
221.8
221.8
221.8
221.8
1286.8
1282.4
1277.0
1275.2
1275.2
1275.2
1275.2
423.2
334.5
223.6
187.4
187.4
187.4
187.4
9147.6
8633.8
7993.9
7785.9
7785.9
7785.9
7785.9
HL
HT
ML
MT
kN
221.8
221.8
221.8
221.8
221.8
221.8
221.8
221.8
221.8
kN
127.6
127.6
127.6
127.6
127.6
127.6
127.6
127.6
127.6
kN.m
1194.2
617.5
395.7
307.0
196.1
159.9
159.9
159.9
159.9
kN.m
3917.7
3585.9
3458.2
3407.2
3343.4
3322.6
3322.6
3322.6
3322.6
HL
HT
ML
MT
kN
221.8
221.8
221.8
221.8
221.8
221.8
221.8
221.8
221.8
kN
127.6
127.6
127.6
127.6
127.6
127.6
127.6
127.6
127.6
kN.m
1249.2
672.5
450.7
362.0
251.1
214.9
214.9
214.9
214.9
kN.m
3500.8
3169.0
3041.4
2990.3
2926.5
2905.7
2905.7
2905.7
2905.7
76
8
T
ructure P148
Project Code
Date
2/21/2013
Rev
77
8
T
ructure P148
Project Code
Date
2/21/2013
Rev
MT-r2
kN.m
4817.01
3396.54
1446.38
23.22
16.73
323.24
118.03
10141.1
78
8
T
ructure P148
Project Code
Date
2/21/2013
Rev
597.9
Pier
m
2.3
1.0
0.5
0.3
0.1
0.0
0.0
0.0
0.0
Pier
kN.m
141.1
27.6
7.3
2.9
0.2
0.0
0.0
0.0
0.0
Pier
m
2.3
1.0
0.5
0.3
0.1
0.0
0.0
0.0
0.0
79
8
T
ructure P148
Project Code
Date
2/21/2013
Rev
Pier
kN.m
118.0
23.1
6.1
2.4
0.1
0.0
0.0
0.0
0.0
Total Moment
kN.m
10141.1
7062.4
5897.8
5435.0
4859.0
4671.8
4671.8
4671.8
4671.8
MR
kN.m
9594.3
6228.1
5050.2
4612.0
4102.5
3947.9
3947.9
3947.9
3947.9
MR
kN.m
13904.2
10459.7
80
8
T
ructure P148
Project Code
Date
2/21/2013
Rev
9157.4
8640.3
7997.0
7788.2
7788.2
7788.2
7788.2
MR
kN.m
4095.7
3638.7
3480.8
3421.0
3349.1
3326.4
3326.4
3326.4
3326.4
MR
kN.m
3717.0
3239.6
3074.6
3012.1
2937.3
2913.6
2913.6
2913.6
2913.6
81
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
G-III
DL
SIDL
LL
Temp.
Earthquake
( Stresses)
1.0
1.2
1.0
1.0
0.0
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
(LWR Case)
1. DEAD LOADS
DL Left Span
DL Right Span
Shear Key
Pedestal
A
B
C
D
Pier Cap
Pier
2. SIDL
SIDL Left Span
SIDL Right Span
V
kN
2213.1
2584.9
26.9
eL
m
0.85
-0.85
0.00
eT
m
0.20
0.28
0.00
ML
kN.m
1881.2
-2197.2
0.0
MT
kN.m
437.1
727.6
0.0
5.1
5.1
5.1
5.1
451.3
403.8
0.85
-0.85
0.85
-0.85
0.00
0.00
1.30
1.30
-1.30
-1.30
0.00
0.00
4.3
-4.3
4.3
-4.3
0.0
0.0
21.8
-21.8
21.8
-21.8
0.0
0.0
1549.7
1849.9
9099.8
0.85
-0.85
0.20
0.28
1317.3
-1572.4
-571.2
306.1
520.7
1991.6
V
kN
792.8
435.3
eL
m
0.85
-0.85
eT
m
0.20
0.28
HL
kN
221.8
486.6
HT
kN
82.4
45.2
ML
kN.m
673.9
-370.0
eL1
m
6.7
6.7
eT1
m
11.3
11.3
MT
kN.m
156.6
122.5
ML1
kN.m
1489.0
3266.4
MT1
kN.m
928.7
509.9
3. LIVE LOADS
Case IV - Both Spans Both tracks
82
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
Vertical Load,
P
kN
10327.9
10102.8
10016.2
9981.5
9938.2
9924.1
9924.1
9924.1
9924.1
HL
HT
ML
MT
kN
708.4
708.4
708.4
708.4
708.4
708.4
708.4
708.4
708.4
kN
127.6
127.6
127.6
127.6
127.6
127.6
127.6
127.6
127.6
kN.m
4488.1
2646.3
1937.9
1654.6
1300.4
1184.9
1184.9
1184.9
1184.9
kN.m
3709.2
3377.4
3249.8
3198.8
3134.9
3114.1
3114.1
3114.1
3114.1
83
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
84
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
8
T
ucture P148
Project Code
Date
Rev
2/21/2013
0
85
8
T
ucture P148
Project Code
Date
Rev
2/21/2013
0
R = (ML^2+MT^2)^0.5
R = (HL^2+HT^2)^0.5
MR
kN.m
5822.5
4290.7
3783.8
3601.3
3393.9
3332.0
3332.0
3332.0
3332.0
86
8
T
ucture P148
Project Code
Date
Rev
2/21/2013
0
87
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
G-I
DL
SIDL
LL
Temp.
Earthquake
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
(Normal Case)
1.25
2.00
1.75
0.00
1. DEAD LOADS
DL Left Span
DL Right Span
Shear Key
Pedestal
A
B
C
D
Pier Cap
Pier
2. SIDL
SIDL Left Span
SIDL Right Span
V
kN
2766.4
3231.2
33.6
eL
m
0.85
-0.85
0.00
eT
m
0.20
0.28
0.00
ML
kN.m
2351.5
-2746.5
0.0
MT
kN.m
546.4
909.6
0.0
6.3
6.3
6.3
6.3
564.1
504.7
0.85
-0.85
0.85
-0.85
0.00
0.00
1.30
1.30
-1.30
-1.30
0.00
0.00
5.4
-5.4
5.4
-5.4
0.0
0.0
34.0
-34.0
34.0
-34.0
0.0
0.0
2582.9
3083.2
12791.3
0.85
-0.85
0.20
0.28
2195.4
-2620.7
-820.3
510.1
867.9
2834.0
V
kN
2774.8
1523.4
eL
m
0.85
-0.85
eT
m
0.20
0.28
HL
kN
776.3
0.0
HT
kN
288.4
158.3
ML
kN.m
2358.6
-1294.9
eL1
m
6.7
6.7
eT1
m
11.3
11.3
MT
kN.m
548.1
428.8
ML1
kN.m
5211.4
0.0
MT1
kN.m
3250.5
1784.5
3. LIVE LOADS
Case IV - Both Spans Both tracks
88
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
Vertical Load,
P
kN
17089.5
16808.1
16699.9
16656.6
16602.5
16584.8
16584.8
16584.8
16584.8
Harjot
R P Sharma
Sumant
HR = (HL^2+HT^2)^0.5
MR = (ML^2+MT^2)^0.5 + MR_slender
MR_slender
HL
HT
ML
MT
kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
kN
776.3
776.3
776.3
776.3
776.3
776.3
776.3
776.3
776.3
kN
446.7
446.7
446.7
446.7
446.7
446.7
446.7
446.7
446.7
kN.m
5454.8
3436.4
2660.1
2349.6
1961.4
1834.9
1834.9
1834.9
1834.9
kN.m
8845.8
7684.5
7237.8
7059.1
6835.8
6763.0
6763.0
6763.0
6763.0
89
ucture P148
Project Code
Date
2/21/2013
Rev
90
ucture P148
Project Code
Date
2/21/2013
Rev
T^2)^0.5 + MR_slender
MR
HR
kN.m
10392.5
8417.8
7711.1
7439.9
7111.6
7007.5
7007.5
7007.5
7007.5
kN
895.6
895.6
895.6
895.6
895.6
895.6
895.6
895.6
895.6
91
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
G-II a
DL
SIDL
LL
Temp.
Earthquake
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
(Seismic Case)
1.25
2.00
0.00
1.60
1. DEAD LOADS
DL Left Span
DL Right Span
Shear Key
Pedestal
A
B
C
D
Pier Cap
Pier
2. SIDL
SIDL Left Span
SIDL Right Span
V
kN
2766.4
3231.2
33.6
eL
m
0.85
-0.85
0.00
eT
m
0.20
0.28
0.00
ML
kN.m
2351.5
-2746.5
0.0
MT
kN.m
546.4
909.6
0.0
6.3
6.3
6.3
6.3
564.1
504.7
0.85
-0.85
0.85
-0.85
0.00
0.00
1.30
1.30
-1.30
-1.30
0.00
0.00
5.4
-5.4
5.4
-5.4
0.0
0.0
34.0
-34.0
34.0
-34.0
0.0
0.0
2582.9
3083.2
12791.3
0.85
-0.85
0.20
0.28
2195.4
-2620.7
-820.3
510.1
867.9
2834.0
V
kN
0.0
0.0
eL
m
0.85
-0.85
eT
m
0.20
0.28
HL
kN
0.0
0.0
HT
kN
0.0
0.0
ML
kN.m
0.0
0.0
eL1
m
6.7
6.7
eT1
m
11.3
11.3
MT
kN.m
0.0
0.0
ML1
kN.m
0.0
0.0
MT1
kN.m
0.0
0.0
3. LIVE LOADS
Case IV - Both Spans Both tracks
92
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
FY
kN
353.8
206.4
413.2
246.4
4.3
105.6
58.0
0.81
0.81
0.81
0.81
72.1
64.5
eL
m
0.85
0.85
-0.85
-0.85
0.00
0.85
-0.85
0.85
-0.85
0.85
-0.85
0.0
0.0
eT
m
0.20
0.20
0.28
0.28
0.00
0.20
0.28
1.30
1.30
-1.30
-1.30
0.0
0.0
1527.7
Horizontal Seismic Forces
DL
SIDL
Live Load
Shear Key
Pedestal
Pier Cap
Pier
Total
12202.5
ML-r3
kN.m
300.7
175.5
-351.2
-209.5
0.0
89.8
-49.3
0.69
-0.69
0.69
-0.69
0.0
0.0
MT-r3
kN.m
69.87
40.77
116.32
69.37
0.00
20.9
16.3
1.05
1.05
-1.05
-1.05
0.0
0.0
-44.0
333.5
Reduction in
Pier Wt.
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
kN
0.0
281.4
389.7
433.0
487.1
504.7
504.7
504.7
93
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
4.663
504.7
2.1
6.6
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
0.0
0.0
0.0
Bearings
m
6.6
4.0
3.0
2.6
2.1
1.9
1.9
1.9
1.9
Pier Cap
m
5.7
3.1
2.1
1.7
1.2
1.1
1.1
1.1
1.1
Pier Cap
kN.m
618.2
336.8
228.6
185.3
131.2
113.6
113.6
113.6
113.6
DL
m
6.7
4.1
3.1
2.7
2.2
2.1
2.1
2.1
2.1
SIDL
m
6.7
4.1
3.1
2.7
2.2
2.1
2.1
2.1
2.1
LL
m
11.3
8.7
7.7
7.3
6.8
6.6
6.6
6.6
6.6
Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663
DL
kN.m
7124.7
4365.3
3303.9
2879.4
2348.7
2175.7
2175.7
2175.7
2175.7
SIDL
kN.m
4157.5
2547.2
1927.9
1680.2
1370.5
1269.6
1269.6
1269.6
1269.6
LL
kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
DL
m
8.0
5.4
4.4
4.0
3.5
3.3
3.3
3.3
3.3
SIDL
m
9.6
7.0
6.0
5.6
5.1
4.9
4.9
4.9
4.9
LL
m
11.3
8.7
7.7
7.3
6.8
6.6
6.6
6.6
6.6
94
Bearings
m
6.6
4.0
3.0
2.6
2.1
1.9
1.9
1.9
1.9
Pier Cap
m
5.7
3.1
2.1
1.7
1.2
1.1
1.1
1.1
1.1
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663
DL
kN.m
7707.2
5204.6
4242.0
3857.0
3375.7
3218.8
3218.8
3218.8
3218.8
SIDL
kN.m
5434.5
3956.8
3388.4
3161.1
2876.9
2784.3
2784.3
2784.3
2784.3
Seismic Combinations:
LL
kN.m
2314.2
1780.4
1575.1
1493.0
1390.3
1356.9
1356.9
1356.9
1356.9
Comb.1
Comb.2
Comb.3
Comb.4
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
Pier Cap
kN.m
517.2
281.8
191.3
155.1
109.8
95.1
95.1
95.1
95.1
r1
r2
r3
- r3
MR = (ML^2+MT^2)^0.5 + MR_slender
HR = (HL^2+HT^2)^0.5
MR_slender
HL
HT
ML
MT
kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
kN
1897.0
1843.0
1822.2
1813.9
1803.5
1800.2
1800.2
1800.2
1800.2
kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
kN.m
11382.2
6520.2
4687.6
3960.4
3056.0
2762.3
2762.3
2762.3
2762.3
kN.m
2834.0
2834.0
2834.0
2834.0
2834.0
2834.0
2834.0
2834.0
2834.0
MR_slender
HL
HT
ML
MT
kN.m
0.0
0.0
kN
0.0
0.0
kN
1917.2
1872.0
kN.m
-820.3
-820.3
kN.m
19059.8
14133.8
95
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
3.6
4
4.5
4.663
4.663
4.663
4.663
11943.3
11900.0
11845.9
11828.3
11828.3
11828.3
11828.3
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1854.7
1847.7
1839.0
1836.2
1836.2
1836.2
1836.2
-820.3
-820.3
-820.3
-820.3
-820.3
-820.3
-820.3
12270.5
11530.0
10608.3
10308.8
10308.8
10308.8
10308.8
MR_slender
HL
HT
ML
MT
kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
kN.m
-864.3
-864.3
-864.3
-864.3
-864.3
-864.3
-864.3
-864.3
-864.3
kN.m
3167.5
3167.5
3167.5
3167.5
3167.5
3167.5
3167.5
3167.5
3167.5
MR_slender
HL
HT
ML
MT
kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
kN.m
-776.3
-776.3
-776.3
-776.3
-776.3
-776.3
-776.3
-776.3
-776.3
kN.m
2500.5
2500.5
2500.5
2500.5
2500.5
2500.5
2500.5
2500.5
2500.5
96
ucture P148
Project Code
Date
2/21/2013
Rev
97
ucture P148
Project Code
Date
2/21/2013
Rev
MT-r2
kN.m
7707.21
5434.47
2314.21
37.15
26.76
517.18
188.86
16225.8
98
ucture P148
Project Code
Date
2/21/2013
Rev
0.0
Pier
m
2.3
1.0
0.5
0.3
0.1
0.0
0.0
0.0
0.0
HL-r1 for
pier
kN
96.8
42.8
22.1
13.8
3.4
0.0
0.0
0.0
0.0
Pier
kN.m
225.7
44.2
11.7
4.6
0.3
0.0
0.0
0.0
0.0
Total
Moment
kN.m
12202.5
7340.5
5507.9
4780.7
3876.3
3582.6
3582.6
3582.6
3582.6
Pier
m
2.3
1.0
0.5
0.3
0.1
0.0
0.0
0.0
0.0
HL-r1 for
pier
kN
81.0
35.8
18.5
11.5
2.8
0.0
0.0
0.0
0.0
99
ucture P148
Project Code
Date
2/21/2013
Rev
Pier
kN.m
188.9
37.0
9.8
3.8
0.2
0.0
0.0
0.0
0.0
Total
Moment
kN.m
16225.8
11299.9
9436.5
8696.0
7774.4
7474.8
7474.8
7474.8
7474.8
T^2)^0.5 + MR_slender
MR
HR
kN.m
11729.7
7109.5
5477.7
4869.9
4167.8
3957.5
3957.5
3957.5
3957.5
kN
1897.0
1843.0
1822.2
1813.9
1803.5
1800.2
1800.2
1800.2
1800.2
MR
HR
kN.m
19077.4
14157.6
kN
1917.2
1872.0
100
ucture P148
Project Code
Date
2/21/2013
Rev
12297.9
11559.2
10640.0
10341.4
10341.4
10341.4
10341.4
1854.7
1847.7
1839.0
1836.2
1836.2
1836.2
1836.2
MR
HR
kN.m
3283.3
3283.3
3283.3
3283.3
3283.3
3283.3
3283.3
3283.3
3283.3
kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
MR
HR
kN.m
2618.2
2618.2
2618.2
2618.2
2618.2
2618.2
2618.2
2618.2
2618.2
kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
101
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
G-II b
DL
SIDL
LL
Temp.
Earthquake
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
(Seismic Case)
1.25
2.00
1.40
1.25
1. DEAD LOADS
DL Left Span
DL Right Span
Shear Key
Pedestal
A
B
C
D
Pier Cap
Pier
2. SIDL
SIDL Left Span
SIDL Right Span
V
kN
2766.4
3231.2
33.6
eL
m
0.85
-0.85
0.00
eT
m
0.20
0.28
0.00
ML
kN.m
2351.5
-2746.5
0.0
MT
kN.m
546.4
909.6
0.0
6.3
6.3
6.3
6.3
564.1
504.7
0.85
-0.85
0.85
-0.85
0.00
0.00
1.30
1.30
-1.30
-1.30
0.00
0.00
5.4
-5.4
5.4
-5.4
0.0
0.0
34.0
-34.0
34.0
-34.0
0.0
0.0
2582.9
3083.2
12791.3
0.85
-0.85
0.20
0.28
2195.4
-2620.7
-820.3
510.1
867.9
2834.0
V
kN
2219.9
1218.7
eL
m
0.85
-0.85
eT
m
0.20
0.28
HL
kN
621.1
0.0
HT
kN
230.7
126.7
ML
kN.m
1886.9
-1035.9
eL1
m
6.7
6.7
eT1
m
11.3
11.3
MT
kN.m
438.4
343.1
ML1
kN.m
4169.1
0.0
MT1
kN.m
2600.4
1427.6
3. LIVE LOADS
Case IV - Both Spans Both tracks
102
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
FY
kN
276.4
161.3
322.8
192.5
3.4
82.5
45.3
0.63
0.63
0.63
0.63
56.4
50.4
eL
m
0.85
0.85
-0.85
-0.85
0.00
0.85
-0.85
0.85
-0.85
0.85
-0.85
0.0
0.0
eT
m
0.20
0.20
0.28
0.28
0.00
0.20
0.28
1.30
1.30
-1.30
-1.30
0.0
0.0
1193.5
Horizontal Seismic Forces
DL
SIDL
Live Load
Shear Key
Pedestal
Pier Cap
Pier
Total
9533.2
ML-r3
kN.m
234.9
137.1
-274.4
-163.6
0.0
70.1
-38.5
0.54
-0.54
0.54
-0.54
0.0
0.0
MT-r3
kN.m
54.59
31.85
90.87
54.19
0.00
16.3
12.8
0.82
0.82
-0.82
-0.82
0.0
0.0
-34.4
260.6
Reduction in
Pier Wt.
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
kN
0.0
281.4
389.7
433.0
487.1
504.7
504.7
504.7
103
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
4.663
504.7
2.1
6.6
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
1273.2
0.0
1524.7
Bearings
m
6.6
4.0
3.0
2.6
2.1
1.9
1.9
1.9
1.9
Pier Cap
m
5.7
3.1
2.1
1.7
1.2
1.1
1.1
1.1
1.1
Pier Cap
kN.m
482.9
263.1
178.6
144.8
102.5
88.8
88.8
88.8
88.8
DL
m
6.7
4.1
3.1
2.7
2.2
2.1
2.1
2.1
2.1
SIDL
m
6.7
4.1
3.1
2.7
2.2
2.1
2.1
2.1
2.1
LL
m
11.3
8.7
7.7
7.3
6.8
6.6
6.6
6.6
6.6
Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663
DL
kN.m
5566.2
3410.4
2581.2
2249.5
1834.9
1699.8
1699.8
1699.8
1699.8
SIDL
kN.m
3248.0
1990.0
1506.2
1312.7
1070.7
991.9
991.9
991.9
991.9
LL
kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
DL
m
8.0
5.4
4.4
4.0
3.5
3.3
3.3
3.3
3.3
SIDL
m
9.6
7.0
6.0
5.6
5.1
4.9
4.9
4.9
4.9
LL
m
11.3
8.7
7.7
7.3
6.8
6.6
6.6
6.6
6.6
104
Bearings
m
6.6
4.0
3.0
2.6
2.1
1.9
1.9
1.9
1.9
Pier Cap
m
5.7
3.1
2.1
1.7
1.2
1.1
1.1
1.1
1.1
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663
DL
kN.m
6021.3
4066.1
3314.1
3013.3
2637.3
2514.7
2514.7
2514.7
2514.7
SIDL
kN.m
4245.7
3091.2
2647.2
2469.6
2247.6
2175.2
2175.2
2175.2
2175.2
Seismic Combinations:
LL
kN.m
1808.0
1390.9
1230.6
1166.4
1086.2
1060.1
1060.1
1060.1
1060.1
Comb.1
Comb.2
Comb.3
Comb.4
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
Pier Cap
kN.m
404.0
220.2
149.4
121.2
85.8
74.3
74.3
74.3
74.3
r1
r2
r3
- r3
MR = (ML^2+MT^2)^0.5 + MR_slender
HR = (HL^2+HT^2)^0.5
ULS G IIb Comb.1
Ht from Pier Vertical Load,
Base
P
m
kN
0
14510.6
2.6
14587.2
3.6
14479.0
4
14435.7
4.5
14381.6
4.663
14363.9
4.663
14363.9
4.663
14363.9
4.663
14363.9
ULS G IIb Comb.2
Ht from Pier Vertical Load,
Base
P
m
kN
0
14510.6
2.6
13871.1
MR_slender
HL
HT
ML
MT
kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
kN
1792.5
1750.4
1734.1
1727.6
1719.5
1716.9
1716.9
1716.9
1716.9
kN
178.7
178.7
178.7
178.7
178.7
178.7
178.7
178.7
178.7
kN.m
11222.9
6617.2
4874.9
4182.6
3320.8
3040.7
3040.7
3040.7
3040.7
kN.m
5238.7
4774.2
4595.5
4524.0
4434.7
4405.6
4405.6
4405.6
4405.6
MR_slender
HL
HT
ML
MT
kN.m
0.0
0.0
kN
310.5
310.5
kN
1676.5
1641.2
kN.m
1689.8
882.4
kN.m
17915.1
13602.2
105
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
3.6
4
4.5
4.663
4.663
4.663
4.663
13762.9
13719.6
13665.5
13647.8
13647.8
13647.8
13647.8
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
0.0
0.0
0.0
0.0
0.0
0.0
0.0
310.5
310.5
310.5
310.5
310.5
310.5
310.5
1627.6
1622.2
1615.4
1613.2
1613.2
1613.2
1613.2
571.9
447.6
292.4
241.8
241.8
241.8
241.8
11967.8
11317.8
10508.4
10245.3
10245.3
10245.3
10245.3
MR_slender
HL
HT
ML
MT
kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
kN
310.5
310.5
310.5
310.5
310.5
310.5
310.5
310.5
310.5
kN
178.7
178.7
178.7
178.7
178.7
178.7
178.7
178.7
178.7
kN.m
1655.4
848.0
537.5
413.3
258.0
207.4
207.4
207.4
207.4
kN.m
5499.3
5034.7
4856.1
4784.6
4695.2
4666.1
4666.1
4666.1
4666.1
MR_slender
HL
HT
ML
MT
kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
kN
310.5
310.5
310.5
310.5
310.5
310.5
310.5
310.5
310.5
kN
178.7
178.7
178.7
178.7
178.7
178.7
178.7
178.7
178.7
kN.m
1724.1
916.8
606.3
482.0
326.8
276.2
276.2
276.2
276.2
kN.m
4978.2
4513.6
4334.9
4263.5
4174.1
4145.0
4145.0
4145.0
4145.0
106
ucture P148
Project Code
Date
2/21/2013
Rev
107
ucture P148
Project Code
Date
2/21/2013
Rev
MT-r2
kN.m
6021.26
4245.68
1807.98
29.02
20.91
404.05
147.54
12676.4
108
ucture P148
Project Code
Date
2/21/2013
Rev
837.0
Pier
m
2.3
1.0
0.5
0.3
0.1
0.0
0.0
0.0
0.0
HL-r1 for
pier
kN
75.6
33.5
17.2
10.8
2.6
0.0
0.0
0.0
0.0
Pier
kN.m
176.3
34.5
9.2
3.6
0.2
0.0
0.0
0.0
0.0
Total
Moment
kN.m
9533.2
5734.8
4303.1
3734.9
3028.4
2798.9
2798.9
2798.9
2798.9
Pier
m
2.3
1.0
0.5
0.3
0.1
0.0
0.0
0.0
0.0
HL-r1 for
pier
kN
63.3
28.0
14.4
9.0
2.2
0.0
0.0
0.0
0.0
109
ucture P148
Project Code
Date
2/21/2013
Rev
Pier
kN.m
147.5
28.9
7.7
3.0
0.2
0.0
0.0
0.0
0.0
Total
Moment
kN.m
12676.4
8828.0
7372.3
6793.8
6073.7
5839.7
5839.7
5839.7
5839.7
T^2)^0.5 + MR_slender
MR
HR
kN.m
12385.4
8159.6
6699.5
6161.2
5540.2
5353.0
5353.0
5353.0
5353.0
kN
1801.4
1759.5
1743.3
1736.9
1728.8
1726.2
1726.2
1726.2
1726.2
MR
HR
kN.m
17994.7
13630.8
kN
1705.0
1670.3
110
ucture P148
Project Code
Date
2/21/2013
Rev
11981.4
11326.7
10512.5
10248.1
10248.1
10248.1
10248.1
1657.0
1651.6
1645.0
1642.8
1642.8
1642.8
1642.8
MR
HR
kN.m
5743.0
5105.6
4885.7
4802.4
4702.3
4670.7
4670.7
4670.7
4670.7
kN
358.3
358.3
358.3
358.3
358.3
358.3
358.3
358.3
358.3
MR
HR
kN.m
5268.3
4605.8
4377.1
4290.6
4186.9
4154.2
4154.2
4154.2
4154.2
kN
358.3
358.3
358.3
358.3
358.3
358.3
358.3
358.3
358.3
111
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
G-II b
DL
SIDL
LL
Temp.
Earthquake
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
(Seismic Case)
0.90
0.80
0.00
1.50
1. DEAD LOADS
DL Left Span
DL Right Span
Shear Key
Pedestal
A
B
C
D
Pier Cap
Pier
2. SIDL
SIDL Left Span
SIDL Right Span
V
kN
1991.8
2326.4
24.2
eL
m
0.85
-0.85
0.00
eT
m
0.20
0.28
0.00
ML
kN.m
1693.0
-1977.5
0.0
MT
kN.m
393.4
654.9
0.0
4.6
4.6
4.6
4.6
406.1
363.4
0.85
-0.85
0.85
-0.85
0.00
0.00
1.30
1.30
-1.30
-1.30
0.00
0.00
3.9
-3.9
3.9
-3.9
0.0
0.0
17.6
-17.6
17.6
-17.6
0.0
0.0
1033.1
1233.3
7396.6
0.85
-0.85
0.20
0.28
878.2
-1048.3
-454.5
204.1
347.2
1599.5
V
kN
0.0
0.0
eL
m
0.85
-0.85
eT
m
0.20
0.28
HL
kN
0.0
0.0
HT
kN
0.0
0.0
ML
kN.m
0.0
0.0
eL1
m
6.7
6.7
eT1
m
11.3
11.3
MT
kN.m
0.0
0.0
ML1
kN.m
0.0
0.0
MT1
kN.m
0.0
0.0
3. LIVE LOADS
Case IV - Both Spans Both tracks
112
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
FY
kN
331.7
193.5
387.4
231.0
4.0
99.0
54.4
0.76
0.76
0.76
0.76
67.6
60.5
eL
m
0.85
0.85
-0.85
-0.85
0.00
0.85
-0.85
0.85
-0.85
0.85
-0.85
0.0
0.0
eT
m
0.20
0.20
0.28
0.28
0.00
0.20
0.28
1.30
1.30
-1.30
-1.30
0.0
0.0
1432.2
Horizontal Seismic Forces
DL
SIDL
Live Load
Shear Key
Pedestal
Pier Cap
Pier
Total
11439.8
ML-r3
kN.m
281.9
164.5
-329.3
-196.4
0.0
84.2
-46.2
0.64
-0.64
0.64
-0.64
0.0
0.0
MT-r3
kN.m
65.51
38.23
109.05
65.03
0.00
19.6
15.3
0.99
0.99
-0.99
-0.99
0.0
0.0
-41.3
312.7
Reduction in
Pier Wt.
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
kN
0.0
202.6
280.6
311.7
350.7
363.4
363.4
363.4
113
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
4.663
363.4
2.1
6.6
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
0.0
0.0
0.0
Bearings
m
6.6
4.0
3.0
2.6
2.1
1.9
1.9
1.9
1.9
Pier Cap
m
5.7
3.1
2.1
1.7
1.2
1.1
1.1
1.1
1.1
Pier Cap
kN.m
579.5
315.8
214.3
173.8
123.0
106.5
106.5
106.5
106.5
DL
m
6.7
4.1
3.1
2.7
2.2
2.1
2.1
2.1
2.1
SIDL
m
6.7
4.1
3.1
2.7
2.2
2.1
2.1
2.1
2.1
LL
m
11.3
8.7
7.7
7.3
6.8
6.6
6.6
6.6
6.6
Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663
DL
kN.m
6679.4
4092.4
3097.4
2699.4
2201.9
2039.7
2039.7
2039.7
2039.7
SIDL
kN.m
3897.6
2388.0
1807.4
1575.2
1284.9
1190.2
1190.2
1190.2
1190.2
LL
kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
DL
m
8.0
5.4
4.4
4.0
3.5
3.3
3.3
3.3
3.3
SIDL
m
9.6
7.0
6.0
5.6
5.1
4.9
4.9
4.9
4.9
LL
m
11.3
8.7
7.7
7.3
6.8
6.6
6.6
6.6
6.6
114
Bearings
m
6.6
4.0
3.0
2.6
2.1
1.9
1.9
1.9
1.9
Pier Cap
m
5.7
3.1
2.1
1.7
1.2
1.1
1.1
1.1
1.1
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Ht from Pier
Base
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663
DL
kN.m
7225.5
4879.3
3976.9
3615.9
3164.7
3017.6
3017.6
3017.6
3017.6
SIDL
kN.m
5094.8
3709.5
3176.7
2963.5
2697.1
2610.3
2610.3
2610.3
2610.3
Seismic Combinations:
LL
kN.m
2169.6
1669.1
1476.7
1399.7
1303.4
1272.1
1272.1
1272.1
1272.1
Comb.1
Comb.2
Comb.3
Comb.4
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
Pier Cap
kN.m
484.9
264.2
179.3
145.4
102.9
89.1
89.1
89.1
89.1
r1
r2
r3
- r3
MR = (ML^2+MT^2)^0.5 + MR_slender
HR = (HL^2+HT^2)^0.5
ULS G IIc Comb.1
Ht from Pier Vertical Load,
Base
P
m
kN
0
7396.6
2.6
7623.6
3.6
7545.7
4
7514.5
4.5
7475.6
4.663
7462.9
4.663
7462.9
4.663
7462.9
4.663
7462.9
ULS G IIc Comb.2
Ht from Pier Vertical Load,
Base
P
m
kN
0
7396.6
2.6
6764.3
MR_slender
HL
HT
ML
MT
kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
kN
1778.4
1727.8
1708.3
1700.5
1690.8
1687.6
1687.6
1687.6
1687.6
kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
kN.m
10985.3
6427.2
4709.1
4027.4
3179.5
2904.2
2904.2
2904.2
2904.2
kN.m
1599.5
1599.5
1599.5
1599.5
1599.5
1599.5
1599.5
1599.5
1599.5
MR_slender
HL
HT
ML
MT
kN.m
0.0
0.0
kN
0.0
0.0
kN
1797.4
1755.0
kN.m
-454.5
-454.5
kN.m
16811.2
12193.1
115
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
3.6
4
4.5
4.663
4.663
4.663
4.663
6686.4
6655.2
6616.3
6603.6
6603.6
6603.6
6603.6
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1738.7
1732.2
1724.1
1721.4
1721.4
1721.4
1721.4
-454.5
-454.5
-454.5
-454.5
-454.5
-454.5
-454.5
10446.2
9752.0
8888.0
8607.1
8607.1
8607.1
8607.1
MR_slender
HL
HT
ML
MT
kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
kN.m
-495.8
-495.8
-495.8
-495.8
-495.8
-495.8
-495.8
-495.8
-495.8
kN.m
1912.2
1912.2
1912.2
1912.2
1912.2
1912.2
1912.2
1912.2
1912.2
MR_slender
HL
HT
ML
MT
kN.m
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
kN.m
-413.3
-413.3
-413.3
-413.3
-413.3
-413.3
-413.3
-413.3
-413.3
kN.m
1286.8
1286.8
1286.8
1286.8
1286.8
1286.8
1286.8
1286.8
1286.8
116
ucture P148
Project Code
Date
2/21/2013
Rev
117
ucture P148
Project Code
Date
2/21/2013
Rev
MT-r2
kN.m
7225.51
5094.81
2169.57
34.82
25.09
484.86
177.05
15211.7
118
ucture P148
Project Code
Date
2/21/2013
Rev
0.0
Pier
m
2.3
1.0
0.5
0.3
0.1
0.0
0.0
0.0
0.0
HL-r1 for
pier
kN
90.8
40.2
20.7
12.9
3.2
0.0
0.0
0.0
0.0
Pier
kN.m
211.6
41.4
11.0
4.3
0.3
0.0
0.0
0.0
0.0
Total
Moment
kN.m
11439.8
6881.7
5163.7
4481.9
3634.1
3358.7
3358.7
3358.7
3358.7
Pier
m
2.3
1.0
0.5
0.3
0.1
0.0
0.0
0.0
0.0
HL-r1 for
pier
kN
75.9
33.6
17.3
10.8
2.7
0.0
0.0
0.0
0.0
119
ucture P148
Project Code
Date
2/21/2013
Rev
Pier
kN.m
177.1
34.7
9.2
3.6
0.2
0.0
0.0
0.0
0.0
Total
Moment
kN.m
15211.7
10593.6
8846.7
8152.5
7288.5
7007.7
7007.7
7007.7
7007.7
T^2)^0.5 + MR_slender
MR
HR
kN.m
11101.1
6623.2
4973.4
4333.4
3559.2
3315.5
3315.5
3315.5
3315.5
kN
1778.4
1727.8
1708.3
1700.5
1690.8
1687.6
1687.6
1687.6
1687.6
MR
HR
kN.m
16817.4
12201.6
kN
1797.4
1755.0
120
ucture P148
Project Code
Date
2/21/2013
Rev
10456.1
9762.6
8899.6
8619.1
8619.1
8619.1
8619.1
1738.7
1732.2
1724.1
1721.4
1721.4
1721.4
1721.4
MR
HR
kN.m
1975.4
1975.4
1975.4
1975.4
1975.4
1975.4
1975.4
1975.4
1975.4
kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
MR
HR
kN.m
1351.6
1351.6
1351.6
1351.6
1351.6
1351.6
1351.6
1351.6
1351.6
kN
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
121
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
5.1 SLS and ULS design of pier is checked with software RC Col / Oasys- ADSEC. Output of Oasys is attached in Appendix-3. As pe
IITK-RDSO Guidelines, longitudinal reinforcement shall be more than 0.8% and less than 6%. Reinforcement provided at differe
as under.
SLS Cases
Load Case
1
2
3
4
5
6
7
8
Description
GI, (Crack and Stresses)
GII,Seismic
r1
GII,Seismic
r2
GII,Seismic
r3
GII,Seismic
- r3
Not Considered
Not Considered
GIII, LWR
Where:
r1
r2
r3
Longitudinal Seismic
Transverse Seismic
Vertical Seismic
Pier Area=
ULS Cases
Load Case
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Description
GI, Normal Case
GIIb,Seis.
r1
GIIb,Seis.
r2
GIIb,Seis.
r3
GIIb,Seis.
- r3
Not Considered
Not Considered
GIIa,Seis.
r1
GIIa,Seis.
r2
GIIa,Seis.
r3
GIIa,Seis.
- r3
GIIc,Seis.
r1
GIIc,Seis.
r2
GIIc,Seis.
r3
GIIc,Seis.
- r3
3463606 mm2
Ht from Pier
Base
% of Min.
Reinf.
Required
Min. Reinf.
Required.
Area of Reinf.
Provided
% of Reinf.
Provided
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663
%
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
mm2
27709
27709
27709
27709
27709
27709
27709
27709
27709
mm2
39270
39270
39270
39270
39270
39270
39270
39270
39270
%
1.13
1.13
1.13
1.13
1.13
1.13
1.13
1.13
1.13
Check
OK
OK
OK
OK
OK
OK
OK
OK
OK
Stresses are checked with R C Col /Oasys Adsec (Appendix-3) for different load cases at different sections. Stress limitations for
SLS check are taken as per Table-11 of IRS: Concrete Bridge Code as follow:
Permissible stress in concrete = 0.5 fck
Permissible stress in steel in tension = 0.75 fck
Design Crack Width for "Moderate" condition
=
=
=
122
25 MPa
375 MPa
0.2 mm as per Table 10 of IRS:CBC
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
2100
Ht from Pier
Base
Maximum HR
Dr
dv
m
0
2.6
3.6
4
4.5
4.7
4.7
4.7
4.7
kN
1917.19
1872.02
1854.65
1847.70
1839.02
1836.19
1836.19
1836.19
1836.19
mm
1885
1885
1910
1910
1960
1960
1928
1928
1960
mm
1485
1485
1492
1492
1506
1506
1497
1497
1506
N/mm2
0.61
0.60
0.59
0.59
0.58
0.58
0.58
0.58
0.58
0.76
0.76
0.76
0.76
0.76
0.76
0.76
0.76
0.76
%
0.57
0.57
0.57
0.57
0.57
0.57
0.57
0.57
0.57
P (ULS)
m
0
2.6
3.6
4
4.5
4.663
4.663
4.663
4.663
kN
11264
10982
10874
10831
10777
10759
10759
10759
10759
N/mm2
0.54
0.54
0.54
0.54
0.54
0.53
0.54
0.54
0.53
123
links req.
links req.
links req.
links req.
links req.
links req.
links req.
links req.
links req.
mm
20
20
20
20
20
20
20
20
20
Max. sv if
v<svc1
mm
270
270
270
270
270
270
270
270
270
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
D
mm
2100
D'
mm
1980
link dia
mm
20
124
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
min. of
1/5 of D =
6xdia of main reinf. =
&
S
Diameter of the core, Dk
fck
fy
Ag
Ak
Ash, required
=
=
=
=
=
=
=
=
=
=
(a)
(b)
420 mm
150 mm
65 mm
65 mm
2000 mm
50 MPa
500 MPa
3463606 mm2
3141593 mm2
120 mm2
312 mm2
20 mm
314 mm2
Oasys
4786.8
Ht from Pier
Base
Vu
Dr
dv
m
0.0
kN
4786.83
mm
1885
mm
1485
N/mm2
1.53
0.76
%
0.57
P (ULS)
m
0.0
N/mm2
7397.00
N/mm2
0.51
125
links req.
mm
20
Max. sv if
v<svc1
mm
270
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
mm
65.00
mm
70.00
126
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
127
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
mm
Shear
resistance, vc
s.vc
N/mm2
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
0.61
N/mm2
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
sv required if
v>svc1
sv provided
mm
227.00
233.00
237.00
238.00
242.00
242.00
241.00
241.00
242.00
mm
65.00
65.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
128
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
129
8
T
ucture P148
-
Project Code
Date
2/21/2013
Rev
(a)
(b)
22321 kNm
kN
Shear
resistance, vc
s.vc
N/mm2
0.61
N/mm2
0.46
sv required if
v>svc1
mm
76.00
130
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
131
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
2.0832
0.24
R
=
2.083
I
=
1.5
(Sa/g)h
=
1.36 /T
(As per Cl.2.5.1.2 of DBR, medium soil site, Type II soil)
132
Sa/g
2.08
Sa/g
1.74
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
As per 8.8 IITK-RDSO - The seismic zone factor for vertical ground motions, when required (see clause
6.8.1), may be taken as two-thirds of that for horizontal motions given table 3.
6.8.1 - Vertical Component of Seismic Action
In some cases, the effect of vertical component of ground motion has to be specifically considered. The
effect of vertical component is particularly imortant in following components/situations:
a. Prestressed concrete decks.
b. Bearings, hold down devices, and linkages.
c. Horizontal cantilever structural elements such as cantilevers of deck slabs and cantilever bridges.
d. Situations where stability (overturning / sliding ) become critical.
e. Bridge sites located near fault.
In pile foundation Stability is not critical (and other cases are not applicable) therefore
v
0.120
DL
SIDL
LIVE
Reaction from
Left Span
kN
2213.1
1291.4
1321.4
Right Span
kN
2584.9
1541.6
725.4
Left Span
kN
796.0
464.5
0.0
Right Span
kN
0.0
0.0
0.0
Left Span
kN
333.0
194.3
99.4
Non Seismic
Weights
Longitudinal
Seismic (r1)
Transverse
Seismic (r2)
Vertical
Seismic (r3)
kN
26.9
20.25
451.3
403.8
63.0
301.2
1265.6
kN
4.83
3.64
81.15
36.31
11.32
54.17
227.61
kN
4.04
3.05
67.90
30.38
9.47
45.32
190.44
kN
3.22
2.43
54.10
48.41
7.55
36.11
151.74
Load Type
Shear Key
Pedestal
Pier Cap
Pier
Pier Crash Barrier
Soil above Pile cap
Pile cap
133
Right Span
kN
388.9
232.0
54.6
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
134
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
cture P148
Project Code
Date
2/21/2013
Rev
ment capacity.
hL
0.180
hT
0.150
135
cture P148
Project Code
Date
2/21/2013
Rev
Right Span
kN
309.9
184.8
43.5
136
cture P148
Project Code
Date
2/21/2013
Rev
137
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
A space model is created in STAAD with pier, pier cap and soil stiffness as springs. Soil Spring calculations are given i
Unfactored loads are applied at pier cap top and pile cap top. Static stiffness springs are taken for static loads (viz. Dead load, S
load) and dynamic stiffness springs are taken for other loads (viz. Live load, seismic loads). Load combinations are created in
SLS and ULS factors. Staad file is attached in Appendix-4.
DL Left Span
SIDL Left Span
DL Right Span
SIDL Right Span
Shear Key
Pedestal
A
B
C
D
Pier Cap
Pier
Crash Barrier
Soil above Pile cap
Pile cap
V
kN
2213.1
1291.4
2584.9
1541.6
26.9
eL
m
0.85
0.85
-0.85
-0.85
0.00
eT
m
0.20
0.20
0.28
0.28
0.00
ML
kN.m
1881.2
1097.7
-2197.2
-1310.3
0.0
MT
kN.m
437.1
255.1
727.6
433.9
0.0
5.1
5.1
5.1
5.1
451.3
403.8
63.0
301.2
1265.6
10163.0
0.85
-0.85
0.85
-0.85
0.00
0.00
0.00
0.00
0.00
1.30
1.30
-1.30
-1.30
0.00
0.00
0.00
0.00
0.00
4.3
-4.3
4.3
-4.3
0.0
0.0
0.0
0.0
0.0
-528.7
21.8
-21.8
21.8
-21.8
0.0
0.0
0.0
0.0
0.0
1853.8
V
kN
1321.4
725.4
eL
m
0.85
-0.85
eT
m
0.20
0.28
HL
kN
443.6
486.6
HT
kN
164.8
90.5
ML
kN.m
1123.2
-616.6
eL1
m
0.55
0.55
eT1
m
4.8
4.8
MT
kN.m
261.0
204.2
ML1
kN.m
244.0
267.6
MT1
kN.m
792.4
435.0
2. LIVE LOADS
Case IV - Both Spans Both tracks
138
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
V
Non Seismic Loads at Pier
cap top
kN
Dead Load
5296.5
SIDL
2833.0
Live Load
2046.8
LWR
Non Seismic Loads at Pile cap top
Dead Load
2033.5
Prepared
Checked
Verified
HL
kN
HT
kN
443.6
486.6
255.2
Harjot
R P Sharma
Sumant
ML
kN.m
-316.0
-212.6
750.5
267.6
MT
kN.m
1164.8
689.0
1692.7
0.0
0.0
ML-r3
kN.m
225.5
131.6
-263.4
-157.1
0.0
67.3
-37.0
0.5
-0.5
0.5
-0.5
0.0
0.0
0.0
0.0
0.0
-33.0
MT-r3
kN.m
52.4
30.6
87.2
52.0
0.0
15.6
12.2
0.8
0.8
-0.8
-0.8
0.0
0.0
0.0
0.0
0.0
250.1
Seismic Forces
Vertical Seismic Forces (r3)
Forces-Seismic (Pier)
DL Left Span
SIDL Left Span
DL Right Span
SIDL Right Span
Shear Key
Live Left Span
Live Right Span
Pedestal
A
B
C
D
Pier Cap
Pier
Crash Barrier
Soil above Pile cap
Pile cap
DL
SIDL
Live Load
Shear Key
Pedestal
Pier Cap
Loads at Pier cap top
Pier
Crash Barrier
Soil above Pile cap
FY
kN
265.3
154.8
309.9
184.8
3.2
79.2
43.5
0.61
0.61
0.61
0.61
54.1
48.4
7.5
36.1
151.7
1341.2
eL
m
0.85
0.85
-0.85
-0.85
0.00
0.85
-0.85
0.85
-0.85
0.85
-0.85
0.0
0.0
0.0
0.0
0.0
139
eT
m
0.20
0.20
0.28
0.28
0.00
0.20
0.28
1.30
1.30
-1.30
-1.30
0.0
0.0
0.0
0.0
0.0
ML-r1
kN.m
437.82
255.48
0.00
2.05
0.46
-60.87
634.9
84.65
0.00
0.00
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
Pile cap
Loads at Pile cap top
0.00
36.3
-0.75
0.00
84.7
0.00
30.4
-0.75
V
kN
HL
kN
1350.2
HT
kN
ML
kN.m
634.9
MT
kN.m
1377.2
1145.8
-33.0
36.3
3127.4
250.1
84.7
30.4
195.4
0.0
70.8
0.0
201
202
203
204
205
206
207
208
209
210
211
212
213
ULS G-I
ULS G-IIa (r1)
ULS G-IIa (r2)
ULS G-IIa (r3)
ULS G-IIa (+ r3)
ULS G-IIb (- r3)
ULS G-IIb (r1)
ULS G-IIb (r2)
ULS G-IIb (- r3)
ULS G-IIc (r1)
ULS G-IIc (r2)
ULS G-IIc (+ r3)
ULS G-IIc (- r3)
Load Combinations
SLS:
101
102
103
104
105
106
107
108
109
110
SLS G-I
SLS G-IIa (r1 )
SLS G-IIa (r2)
SLS G-IIa (r3)
SLS G-IIa (- r3)
SLS G-IIb (r1)
SLS G-IIb (r2)
SLS G-IIb (r3)
SLS G-IIb (- r3)
SLS G-III
ULS:
140
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
141
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
8
T
ructure P148
Project Code
Date
Rev
2/21/2013
0
142
8
T
ructure P148
Project Code
Date
Rev
2/21/2013
0
MT-r2
kN.m
1114.70
1321.03
740.52
1.72
0.38
-50.92
3127.4
70.82
0.00
0.00
143
8
T
ructure P148
Project Code
Date
Rev
2/21/2013
0
0.00
70.8
LS G-IIa (+ r3)
LS G-IIb (- r3)
LS G-IIb (- r3)
LS G-IIc (+ r3)
LS G-IIc (- r3)
144
8
T
ructure P148
Project Code
Date
Rev
2/21/2013
0
145
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
Node
145
Env
+ve
145
-ve
146
+ve
146
-ve
147
+ve
147
-ve
148
+ve
148
-ve
149
+ve
149
-ve
150
+ve
150
-ve
Max Load
Min Load
Factor of Safety for
Normal Case
Vertical
Fy kN
2050.82
101 SLS G-I
0.00
2957.12
101 SLS G-I
0.00
1787.74
101 SLS G-I
0.00
881.44
101 SLS G-I
0.00
2866.96
101 SLS G-I
0.00
1665.70
101 SLS G-I
0.00
2957.1
0.0
Seismic Case
Vertical
Fy kN
3363.99
107 SLS G-IIB (R2)
0.00
3858.73
107 SLS G-IIB (R2)
0.00
2659.50
106 SLS G-IIB (R1)
-11.15
103 SLS G-IIA (R2)
1548.81
104 SLS G-IIA (R3)
-341.91
107 SLS G-IIB (R2)
3979.84
107 SLS G-IIB (R2)
0.00
1906.06
104 SLS G-IIA (R3)
0.00
3979.8
-341.9
1.15
1.5
LWR
Seismic
2957.1 kN =
-227.9 kN =
Node
29
22
20
19
23
24
19
20
24
146
=
=
(at 4m from pile cut off level)
Fx kN
Fy kN
4806.5
3.8
-490.6
-19.5
3594.3
100.4
3397.6
-50.6
2796.7
-0.9
172.4
3.8
3536.8
-48.9
4045.6
63.0
172.4
3.8
301.4
-23.2
3018 kN =
-1000
Fz kN
-14.6
-13.5
3.1
-0.8
7.3
-43.2
-3.3
-1.9
-43.2
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Min My
Max Mz
Min Mz
23
20
19
23
20
25
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz
Beam
41
40
38
37
41
42
37
38
38
42
37
38
L/C
107 SLS G-IIB
107 SLS G-IIB
103 SLS G-IIA
106 SLS G-IIB
105 SLS G-IIA (
107 SLS G-IIB
107 SLS G-IIB
107 SLS G-IIB
107 SLS G-IIB
104 SLS G-IIA (
103 SLS G-IIA
106 SLS G-IIB
Beam
53
52
49
50
54
50
49
50
50
54
49
50
L/C
107 SLS G-IIB
107 SLS G-IIB
103 SLS G-IIA
106 SLS G-IIB
104 SLS G-IIA (
107 SLS G-IIB
107 SLS G-IIB
107 SLS G-IIB
107 SLS G-IIB
101 SLS G-I
103 SLS G-IIA
110 SLS G-III
Node
47
40
38
37
41
42
37
38
38
48
43
38
Beam
23
22
20
19
23
24
19
20
L/C
203 ULS G-IIA
211 ULS G-IIC
206 ULS G-IIB
203 ULS G-IIA
202 ULS G-IIA
207 ULS G-IIB
203 ULS G-IIA
203 ULS G-IIA
Verified
-1.1
50.0
12.3
6.0
-0.6
-4.7
Fx kN
4859.5
-437.6
3541.8
781.9
2232.7
225.4
3589.8
4098.6
4098.6
2376.0
3468.2
3647.3
Fy kN
-10.1
-22.7
14.2
-80.3
-0.9
-10.1
-24.8
5.4
5.4
-0.8
-15.3
-51.1
Fz kN
-107.2
-111.5
-97.5
-14.0
-0.9
-116.9
-107.7
-107.6
-107.6
-12.1
-97.6
-13.6
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Checked
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz
2179.7
3488.8
746.5
Prepared
Fx kN
4894.9
-402.3
3485.9
3682.7
2393.7
4133.9
3625.2
4133.9
4133.9
2120.9
3485.9
2945.7
Fy kN
-6.1
-7.1
3.6
-48.6
-0.4
-11.7
-1.6
-11.7
-11.7
-13.1
3.6
-29.1
Fz kN
-52.8
-55.1
-50.9
-9.2
-2.6
-55.8
-55.5
-55.8
-55.8
-11.5
-50.9
-8.6
147
Fx kN
6442.6
-1282.6
4825.0
5048.9
3440.7
467.9
5048.9
5180.0
Fy kN
-1.4
-12.0
132.5
-72.5
55.2
5.2
-72.5
71.7
Fz kN
-20.1
-10.2
3.6
-1.7
8.9
-57.7
-1.7
-1.4
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Max My
Min My
Max Mz
Min Mz
24
23
20
19
24
23
20
25
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz
Beam
41
40
38
37
41
42
37
38
38
42
37
38
L/C
203 ULS G-IIA
211 ULS G-IIC
203 ULS G-IIA
202 ULS G-IIA
213 ULS G-IIC
203 ULS G-IIA
203 ULS G-IIA
203 ULS G-IIA
203 ULS G-IIA
212 ULS G-IIC
203 ULS G-IIA
202 ULS G-IIA
Beam
53
52
49
50
51
50
49
50
50
54
49
50
L/C
203 ULS G-IIA
211 ULS G-IIC
203 ULS G-IIA
202 ULS G-IIA
210 ULS G-IIC
203 ULS G-IIA
203 ULS G-IIA
203 ULS G-IIA
203 ULS G-IIA
201 ULS G-I
203 ULS G-IIA
202 ULS G-IIA
Checked
Verified
-1.4
-0.9
71.7
25.3
-55.5
4.7
-1.4
-4.0
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz
-160.8
1591.5
5180.0
578.3
Prepared
Fx kN
6508.9
-1234.9
5246.2
622.4
1639.3
-94.5
5115.2
5246.2
5246.2
2148.1
5137.2
4524.3
Fy kN
-1.2
-10.7
19.8
-110.1
-0.7
-1.2
-21.3
19.8
19.8
-0.6
-21.3
-70.6
Fz kN
-155.0
-146.9
-155.4
-5.6
-0.1
-168.2
-155.6
-155.4
-155.4
-10.4
-155.6
-5.0
Fx kN
6553.1
-1203.1
5159.3
4568.4
3081.5
5290.4
5159.3
5290.4
5290.4
2893.6
5159.3
4568.4
Fy kN
-0.5
-2.7
5.4
-65.6
-60.5
-6.5
5.4
-6.5
-6.5
-20.7
5.4
-65.6
Fz kN
-76.5
-73.4
-80.8
-6.3
-1.7
-80.8
-80.8
-80.8
-80.8
-17.9
-80.8
-6.3
SLS and ULS design of pile is checked with software Oasys. Output of Oasys is attached in Appendix 5.
Pile Dia
Reinf. Provided
=
8
8
No. of
No. of
% of reinforcement
Reinf. Provided
dia bar
dia bar
25
16
dia bar
dia bar
=
8
8
No. of
No. of
% of reinforcement
Reinf. Provided
1000 mm
25
25
No. of
16
148
=
16
dia bar
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
% of reinforcement
0.41 %
=
=
17.5 MPa
375 MPa
Load Case
23
22
24
Axial Force
kN
4806.5
-490.6
172.4
Load Case
41
40
38
Axial Force
kN
4859.5
-437.6
4098.6
Load Case
53
52
50
Axial Force
kN
4894.9
-402.3
2945.7
Load Case
23
22
24
41
40
38
kN.m
441.3
465.4
517.6
kN.m
-40.2
-99.4
-36.4
kN.m
-17.4
-29.3
-44.5
kN.m
-2.0
9.7
-104.6
Axial Force
Load Case
kN
6508.9
-1234.9
5246.2
149
kN.m
637.6
603.1
737.2
kN.m
-5.1
-44.9
-6.6
kN.m
-1.2
-7.5
-21.2
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Load Case
53
52
50
Axial Force
kN
6553.1
-1203.1
4568.4
50
52
50
Checked
Verified
kN.m
0.2
10.6
-130.3
Beam
FOS
Prepared
Axial Force
BM My
BM Mz
kN
5290.4
-1203.1
4568.4
kN.m
99.0
82.5
15.1
kN.m
-46.3
10.6
-130.3
Clause 6.3.2
After taking Shaft resistance at corresponding Levels axial loads and moments : Forces for ULS Design
Beam
Load Case
23
22
24
Axial Force
BM My
BM Mz
kN
6483.3
-1241.9
-120.1
kN.m
637.6
603.1
737.2
kN.m
-5.1
-44.9
-6.6
Beam
Load Case
41
40
38
Axial Force
BM My
BM Mz
kN
6637.6
-1106.2
5374.9
kN.m
219.6
351.6
385.7
kN.m
-1.2
-7.5
-21.2
150
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Beam
Load Case
50
52
50
Prepared
Checked
Verified
Axial Force
BM My
BM Mz
kN
5520.4
-973.1
4798.4
kN.m
99.0
82.5
15.1
kN.m
-46.3
10.6
-130.3
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz
Beam
23
4
2
19
5
24
1
2
12
5
2
7
L/C
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
Fx kN
3470.0
778.9
3031.0
2074.3
3399.3
2014.9
2021.3
3031.0
1997.2
3399.3
3031.0
2056.6
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz
Beam
143
28
26
25
72
30
25
26
30
60
49
25
L/C
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
101 SLS G-I
Fz kN
-0.3
43.5
62.0
-4.5
62.4
-32.5
57.2
62.0
9.2
62.4
62.0
48.9
Fx kN
3823.4
849.6
3101.7
2092.0
2156.3
2032.6
2092.0
3101.7
2032.6
2138.6
2180.3
2092.0
Fy kN
9.5
27.1
158.0
-35.0
74.1
9.5
11.9
158.0
66.1
74.1
158.0
4.9
Axial Force
Load Case
kN
151
Fy kN
0.0
-36.1
34.5
-42.3
0.6
-8.1
-42.3
34.5
-8.1
-6.1
-10.2
-42.3
Fz kN
0.0
-27.0
-17.1
-18.9
3.5
-39.9
-18.9
-17.1
-39.9
-2.1
-13.9
-18.9
kN.m
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
23
4
2
3470.0
778.9
3031.0
Load Case
143
28
28
Prepared
Checked
Verified
105.2
51.7
-28.1
-84.1
-112.0
454.8
kN.m
0.0
124.0
124.0
kN.m
0.0
-128.0
-128.0
Crack width of pile is checked with software Oasys. Output of Oasys is attached in Appendix 5.
Shear Check for Pile
ULS:
201
202
203
204
205
206
207
ULS G-I
ULS G-IIa (r1)
ULS G-IIa (r2)
ULS G-IIa (r3)
ULS G-IIa (- r3)
ULS G-IIb (r1)
ULS G-IIb (r2)
208
209
210
211
212
213
ULS Pile Force Envelope from STAAD (1m from pile cut off level)
Max Fy
Min Fy
Max Fz
Min Fz
Beam
2
1
2
6
L/C
202 ULS G-IIA
203 ULS G-IIA
203 ULS G-IIA
202 ULS G-IIA
Node
2
1
2
6
Fx kN
4391.7
4982.6
5113.7
2752.8
Fy kN
460.3
-104.2
105.1
349.8
Fz kN
20.1
407.2
407.6
-26.2
Fy kN
423.0
-102.6
103.2
314.3
Fz kN
18.8
353.5
354.0
-26.8
ULS Pile Force Envelope from STAAD (2m from pile cut off level)
Max Fy
Min Fy
Max Fz
Min Fz
Beam
8
7
8
12
L/C
202 ULS G-IIA
203 ULS G-IIA
203 ULS G-IIA
202 ULS G-IIA
Node
8
7
8
12
Fx kN
4413.8
5004.7
5135.8
2774.9
ULS Pile Force Envelope from STAAD (2m from pile cut off level to end of pile)
Max Fy
Min Fy
Max Fz
Min Fz
Beam
14
37
14
36
L/C
202 ULS G-IIA
202 ULS G-IIA
203 ULS G-IIA
203 ULS G-IIA
Node
14
37
14
36
Dia
mm
Spacing
mm
152
Fx kN
4435.9
622.4
5157.9
-116.6
Fy kN
277.1
-110.1
90.4
-1.4
Fz kN
13.0
-5.6
165.7
-172.6
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
10
8
130
190
153
Prepared
Checked
Verified
2000
2000 to end of pile
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
Beam
2
8
14
Depth below
cutoff level
0
2
3
Maximum
HR= (Fy2 +
Fz2)0.5
Dr
dv
kN
460.75
423.43
277.42
mm
730
730
734
mm
659
659
660
Depth
factor, s
0.93
0.93
0.93
1000
785398
Shear stress, v
N/mm2
0.70
0.64
0.42
Beam
P (ULS)
2
8
14
kN
4392
4414
4436
N/mm2
0.67
0.58
0.49
154
links req.
links req.
OK
mm
10
10
8
No. of legs
2
2
2
CC-28
L&T
Substructure P148
Harjot
R P Sharma
Sumant
Project Code
Date
2/21/2013
Rev
LWR Case
Vertical
Fy kN
1555.33
110 SLS G-III
0.00
2930.35
110 SLS G-III
0.00
2139.62
110 SLS G-III
0.00
764.60
110 SLS G-III
0.00
2587.69
110 SLS G-III
0.00
1775.40
110 SLS G-III
0.00
2930.3
-6.0
t
t
kN
307.7 t OK
OK
Mx kNm
0.0
0.7
-0.1
0.7
0.0
0.0
0.7
-0.7
0.0
My kNm
441.3
465.4
56.8
398.8
8.8
517.6
442.4
440.3
517.6
Mz kNm
-40.2
-99.4
-104.2
-105.1
-4.3
-36.4
-141.2
78.9
-36.4
155
CC-28
L&T
Substructure P148
Harjot
R P Sharma
Sumant
Project Code
0.0
-0.7
0.1
4.7
398.2
62.9
-4.8
99.1
-304.7
Mx kNm
0.0
0.7
-0.7
0.1
0.0
0.0
0.7
-0.7
-0.7
0.0
0.7
-0.1
My kNm
151.6
264.3
242.9
37.7
15.3
253.4
265.8
266.5
266.5
1.6
145.3
42.0
Mz kNm
-17.4
-29.3
-14.2
-189.7
-1.7
-27.5
-13.4
-44.5
-44.5
-0.8
26.0
-207.0
Mx kNm
0.0
0.7
0.7
-0.1
0.0
-0.7
0.7
-0.7
-0.7
0.0
0.7
-0.1
My kNm
10.6
60.5
62.8
15.7
-5.9
68.2
67.4
68.2
68.2
-9.8
62.8
14.8
Mz kNm
-2.0
9.7
31.1
-97.0
-0.2
-44.5
24.7
-44.5
-44.5
-4.6
31.1
-104.6
Mx kNm
0.0
1.0
-0.1
1.1
0.0
0.0
1.1
-1.1
My kNm
637.6
603.1
81.1
635.0
10.8
664.3
635.0
634.3
Mz kNm
-5.1
-44.9
-122.3
-149.1
-305.6
-51.1
-149.1
140.4
Date
2/21/2013
Rev
156
CC-28
L&T
Substructure P148
Harjot
R P Sharma
Sumant
Project Code
0.0
0.0
-1.1
0.0
737.2
1.6
634.3
31.3
-6.6
-4.1
140.4
-416.3
Mx kNm
0.0
1.0
-1.1
0.0
0.0
0.0
1.1
-1.1
-1.1
0.0
1.1
0.0
My kNm
219.6
351.6
385.7
20.7
10.8
369.5
385.7
385.7
385.7
0.5
230.1
26.5
Mz kNm
-1.2
-7.5
-21.2
-265.9
-1.4
-2.4
16.2
-21.2
-21.2
-0.7
37.5
-281.2
Mx kNm
0.0
1.0
1.1
0.0
0.0
-1.1
1.1
-1.1
-1.1
0.0
1.1
0.0
My kNm
15.3
82.5
98.8
15.1
-1.0
99.0
98.8
99.0
99.0
-14.0
98.8
15.1
Mz kNm
0.2
10.6
44.3
-130.3
-108.1
-46.3
44.3
-46.3
-46.3
-7.3
44.3
-130.3
Date
2/21/2013
Rev
in Appendix 5.
157
CC-28
L&T
Substructure P148
Harjot
R P Sharma
Sumant
Project Code
Date
2/21/2013
Rev
Bending
Moment
kN
443.1
475.9
518.9
Bending
Moment
kN
152.6
266.0
270.2
kN
10.8
61.3
105.6
Bending
Moment
kN
637.6
604.8
737.2
Bending
Moment
kN
219.6
351.7
386.3
158
CC-28
L&T
Substructure P148
Harjot
R P Sharma
Sumant
Project Code
Date
2/21/2013
Rev
fe Shaft Resistance
kN
0.0
40.7
128.7
230.0
Bending
Moment
kN
219.6
351.7
386.3
159
CC-28
L&T
Substructure P148
Harjot
R P Sharma
Sumant
Project Code
Date
2/21/2013
Rev
Bending
Moment
kN
109.3
83.1
131.1
My kNm
105.2
51.7
-28.1
115.7
-36.2
172.2
-10.8
-28.1
186.8
-36.2
-28.1
95.3
Mz kNm
-84.1
-112.0
454.8
-168.5
102.5
-74.6
-169.3
454.8
-37.7
102.5
454.8
-186.2
My kNm
0.0
124.0
110.0
111.2
-9.5
139.7
111.2
110.0
139.7
-11.9
5.2
111.2
Mz kNm
0.0
-128.0
-28.0
-133.6
3.1
-84.1
-133.6
-28.0
-84.1
1.5
21.3
-133.6
Bending
Moment
kN
160
CC-28
L&T
Substructure P148
Harjot
R P Sharma
Sumant
134.6
123.3
455.6
Project Code
Date
2/21/2013
Rev
Mx kNm
0.0
1.1
-1.1
0.0
My kNm
-31.3
-290.9
-293.0
171.0
Mz kNm
1007.8
-446.4
439.1
539.9
Mx kNm
0.0
1.1
-1.1
0.0
My kNm
-11.1
116.2
114.6
144.9
Mz kNm
547.5
-342.2
334.0
190.1
Mx kNm
0.0
0.0
-1.1
0.0
My kNm
7.6
20.7
468.6
542.0
Mz kNm
124.5
-265.9
230.8
-3.7
161
CC-28
L&T
Substructure P148
Harjot
R P Sharma
Sumant
Project Code
Date
2/21/2013
Rev
162
CC-28
L&T
Substructure P148
Harjot
R P Sharma
Sumant
Project Code
Date
2/21/2013
Rev
mm
mm2
Shear
% of Reinf, Pt resistance,
vc
%
0.50
0.35
0.20
Max. sv if
v<svc1
mm
141
-
N/mm2
0.56
0.49
0.41
s.vc
N/mm2
0.52
0.46
0.38
sv required
sv provided
if v>svc1
mm
131.00
123.00
-
mm
130.00
130.00
190.00
163
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
L/C
Node
201 ULS G1
7
202 ULS G1
7
203 ULS G1
7
204 ULS G1
7
205 ULS G1
7
206 ULS G1
7
207 ULS G1
7
208 ULS G1
7
209 ULS G1
7
210 ULS G1
7
211 ULS G1
7
212 ULS G1
7
213 ULS G1
7
201 ULS G2
8
202 ULS G2
8
203 ULS G2
8
204 ULS G2
8
205 ULS G2
8
206 ULS G2
8
207 ULS G2
Fx kN
2862.615
-2884.704
489.894
-511.984
4982.623
-5004.712
4982.623
-5004.712
2012.727
-2034.816
1097.258
-1119.347
4607.201
-4629.291
4607.201
-4629.291
2286.971
-2309.06
-353.767
337.863
3858.166
-3874.07
1753.662
-1769.567
1073.888
-1089.793
4454.882
-4476.972
4391.726
-4413.815
5113.697
-5135.786
5113.697
-5135.786
2152.312
-2174.401
4758.713
-4780.803
5322.753
Fy kN
29.554
-29.554
318.934
-318.934
-104.202
104.202
-104.202
104.202
-54.072
54.072
273.721
-273.721
-56.853
56.853
-56.853
56.853
-17.69
17.69
322.932
-322.932
-73.758
73.758
-57.092
57.092
-26.761
26.761
240.69
-240.69
460.314
-460.314
105.084
-105.084
105.084
-105.084
55.046
-55.046
443.004
-443.004
165.481
164
Fz kN
89.422
-89.422
1.611
-1.611
407.185
-407.185
407.185
-407.185
8.11
-8.11
35.098
-35.098
351.953
-351.953
351.953
-351.953
40.176
-40.176
-2.139
2.139
378.087
-378.087
8.702
-8.702
3.955
-3.955
96.977
-96.977
20.124
-20.124
407.634
-407.634
407.634
-407.634
8.606
-8.606
52.502
-52.502
355.245
Mx kNm
0.216
-0.216
0.012
-0.012
1.08
-1.08
1.08
-1.08
0.002
-0.002
0.095
-0.095
0.93
-0.93
0.93
-0.93
0.088
-0.088
0.01
-0.01
1.012
-1.012
0.003
-0.003
0.001
-0.001
-0.211
0.211
0.005
-0.005
-1.08
1.08
-1.08
1.08
-0.002
0.002
-0.079
0.079
-0.928
My kNm
-16.119
-73.304
34.847
-36.458
-290.949
-116.236
-290.949
-116.236
3.011
-11.122
20.266
-55.364
-234.262
-117.691
-234.262
-117.691
-4.606
-35.57
30.148
-28.009
-275.286
-102.801
-0.059
-8.644
0.301
-4.256
-43.408
-53.569
-31.262
11.138
-293.003
-114.632
-293.003
-114.632
0.792
-9.398
-41.926
-10.576
-246.41
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
208 ULS G209 ULS G210 ULS G211 ULS G212 ULS G213 ULS G3
201 ULS G202 ULS G203 ULS G204 ULS G205 ULS G206 ULS G207 ULS G208 ULS G209 ULS G210 ULS G211 ULS G212 ULS G213 ULS G-
201 ULS G202 ULS G203 ULS G204 ULS G205 ULS G206 ULS G-
8
2
8
2
8
2
8
2
8
2
8
2
8
3
9
3
9
3
9
3
9
3
9
3
9
3
9
3
9
3
9
3
9
3
9
3
9
3
9
4
10
4
10
4
10
4
10
4
10
4
-5344.843
5322.753
-5344.843
3009.171
-3031.26
3253.947
-3269.851
3930.794
-3946.699
1818.313
-1834.217
1154.496
-1170.4
2541.067
-2563.156
3860.736
-3882.825
-631.992
609.903
-631.992
609.903
1695.686
-1717.775
3674.593
-3696.682
164.649
-186.738
164.649
-186.738
1983.148
-2005.237
2954.256
-2970.16
-1257.676
1241.772
1448.906
-1464.81
924.522
-940.426
948.799
-970.889
-41.096
19.007
-763.067
740.977
-763.067
740.977
1556.101
-1578.19
13.137
-165.481
165.481
-165.481
126.388
-126.388
407.275
-407.275
74.247
-74.247
57.495
-57.495
27.336
-27.336
217.117
-217.117
455.405
-455.405
32.269
-32.269
32.269
-32.269
51.239
-51.239
430.629
-430.629
100.054
-100.054
100.054
-100.054
114.875
-114.875
404.504
-404.504
7.814
-7.814
53.692
-53.692
25.598
-25.598
53.127
-53.127
323.843
-323.843
-31.386
31.386
-31.386
31.386
-50.264
50.264
286.096
165
Prepared
Checked
Verified
-355.245
355.245
-355.245
43.504
-43.504
15.045
-15.045
378.336
-378.336
8.908
-8.908
4.247
-4.247
62.969
-62.969
-17.565
17.565
388.01
-388.01
388.01
-388.01
-6.627
6.627
13.012
-13.012
329.867
-329.867
329.867
-329.867
21.557
-21.557
-13.6
13.6
366.625
-366.625
-6.92
6.92
-3.346
3.346
70.524
-70.524
0.949
-0.949
388.459
-388.459
388.459
-388.459
-6.131
6.131
30.416
0.928
-0.928
0.928
-0.086
0.086
0.006
-0.006
-1.012
1.012
-0.003
0.003
-0.001
0.001
-0.203
0.203
-0.002
0.002
-1.071
1.071
-1.071
1.071
0.005
-0.005
-0.084
0.084
-0.919
0.919
-0.919
0.919
-0.079
0.079
-0.004
0.004
-1.006
1.006
0.005
-0.005
0.002
-0.002
0.197
-0.197
-0.015
0.015
1.071
-1.071
1.071
-1.071
-0.005
0.005
0.069
Harjot
R P Sharma
Sumant
-108.834
-246.41
-108.834
-16.884
-26.62
-31.043
15.998
-276.424
-101.912
-1.041
-7.867
-0.992
-3.255
97.573
-160.543
122.423
-104.858
-203.373
-184.636
-203.373
-184.636
74.66
-68.033
118.288
-131.3
-136.24
-193.627
-136.24
-193.627
80.973
-102.53
82.494
-68.893
-222.94
-143.685
67.219
-60.299
37.716
-34.37
70.284
-140.807
56.313
-57.262
-205.427
-183.032
-205.427
-183.032
72.44
-66.309
56.096
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
207 ULS G208 ULS G209 ULS G210 ULS G211 ULS G212 ULS G213 ULS G5
201 ULS G202 ULS G203 ULS G204 ULS G205 ULS G206 ULS G207 ULS G208 ULS G209 ULS G210 ULS G211 ULS G212 ULS G213 ULS G-
201 ULS G202 ULS G203 ULS G204 ULS G205 ULS G-
10
4
10
4
10
4
10
4
10
4
10
4
10
4
10
5
11
5
11
5
11
5
11
5
11
5
11
5
11
5
11
5
11
5
11
5
11
5
11
5
11
6
12
6
12
6
12
6
12
6
-35.227
-550.902
528.813
-550.902
528.813
1260.947
-1283.037
-653.458
637.554
-1330.305
1314.401
1384.255
-1400.16
843.914
-859.818
4908.215
-4930.305
3374.435
-3396.524
6354.285
-6376.375
6354.285
-6376.375
2880.777
-2902.866
3987.947
-4010.036
6315.955
-6338.044
6315.955
-6338.044
3602.277
-3624.366
2006.632
-2022.536
4800.242
-4816.147
2469.437
-2485.341
1543.828
-1559.732
2694.796
-2716.885
2752.814
-2774.903
-227.037
204.948
-227.037
204.948
2346.458
-286.096
8.573
-8.573
8.573
-8.573
-6.176
6.176
325.702
-325.702
-7.325
7.325
-53.289
53.289
-25.023
25.023
117.915
-117.915
349.848
-349.848
-0.883
0.883
-0.883
0.883
-0.974
0.974
320.645
-320.645
46.636
-46.636
46.636
-46.636
46.565
-46.565
328.321
-328.321
-0.489
0.489
-0.403
0.403
-0.575
0.575
117.915
-117.915
349.848
-349.848
-0.883
0.883
-0.883
0.883
-0.974
166
Prepared
Checked
Verified
-30.416
333.158
-333.158
333.158
-333.158
24.885
-24.885
3.583
-3.583
366.874
-366.874
-6.714
6.714
-3.054
3.054
96.046
-96.046
21.06
-21.06
374.256
-374.256
374.256
-374.256
16.134
-16.134
51.054
-51.054
326.988
-326.988
326.988
-326.988
47.206
-47.206
12.674
-12.674
343.794
-343.794
17.292
-17.292
8.055
-8.055
30.749
-30.749
-26.179
26.179
327.016
-327.016
327.016
-327.016
-20.093
-0.069
0.917
-0.917
0.917
-0.917
0.077
-0.077
-0.012
0.012
1.006
-1.006
-0.005
0.005
-0.002
0.002
0.004
-0.004
0.01
-0.01
0
0
0
0
0
0
0.009
-0.009
0.002
-0.002
0.002
-0.002
0.002
-0.002
0.009
-0.009
0
0
0
0
0
0
-0.004
0.004
-0.01
0.01
0
0
0
0
0
Harjot
R P Sharma
Sumant
-86.512
-148.388
-184.77
-148.388
-184.77
68.695
-93.58
21.303
-24.887
-224.078
-142.796
66.237
-59.523
36.422
-33.368
-48.729
-47.317
-44.783
23.723
-176.583
-197.673
-176.583
-197.673
-35.991
19.857
-46.361
-4.693
-149.33
-177.659
-149.33
-177.659
-39.493
-7.713
-28.872
16.198
-152.434
-191.36
-37.114
19.822
-20.629
12.574
231.923
-262.672
171.03
-144.851
39.231
-366.247
39.231
-366.247
140.28
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
206 ULS G207 ULS G208 ULS G209 ULS G210 ULS G211 ULS G212 ULS G213 ULS G-
12
6
12
6
12
6
12
6
12
6
12
6
12
6
12
6
12
-2368.548
2729.607
-2751.696
401.598
-423.688
401.598
-423.688
2412.142
-2434.231
1655.79
-1671.694
-1137.82
1121.916
2036.748
-2052.652
1274.832
-1290.736
Prepared
Checked
Verified
0.974
320.645
-320.645
46.636
-46.636
46.636
-46.636
46.565
-46.565
328.321
-328.321
-0.489
0.489
-0.403
0.403
-0.575
0.575
20.093
-3.408
3.408
272.526
-272.526
272.526
-272.526
1.347
-1.347
-15.563
15.563
315.558
-315.558
-21.268
21.268
-9.857
9.857
0
-0.009
0.009
-0.002
0.002
-0.002
0.002
-0.002
0.002
-0.009
0.009
0
0
0
0
0
0
Harjot
R P Sharma
Sumant
-120.186
195.387
-191.98
92.419
-364.945
92.419
-364.945
171.363
-172.71
100.126
-84.563
-23.437
-292.122
128.954
-107.686
71.297
-61.44
Grade of concrete
35 N/mm2
Grade of steel
Depth of Pile Cap
Diameter of Pile
Density of Soil
Thickness of soil layer
Dia of Pier
Area of pier
Equivalent square side of pier
Area of Pile cap
=
=
=
=
=
=
=
=
=
500 N/mm2
1.5 m
1m
20 kN/m3
0.5 m
2100 mm
3463605.9006 mm2
1484 mm
33.75 m2
P5
P6
167
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
Lever arm for moment along long. Direc. (from face of inscribed square to pile center) =
Length for calculating downward moment along long. Dir. (from face of inscribed square) =
Lever arm for moment along trans. direc. (from face of inscribed square to pile center) =
Length for calculating downward moment along trans. dir. (from face of inscribed square) =
Beam / Pile
No.
P1
P2
P3
P4
P5
P6
P1
P2
P3
P4
P5
P6
P1
P2
P3
P4
P5
P6
P1
P2
P3
P4
P5
P6
P1
P2
P3
P4
P5
P6
P1
P2
P3
P4
Pile load
kN
2862.6
4454.9
2541.1
948.8
4908.2
2694.8
489.9
4391.7
3860.7
-41.1
3374.4
2752.8
4982.6
5113.7
-632.0
-763.1
6354.3
-227.0
4982.6
5113.7
-632.0
-763.1
6354.3
-227.0
2012.7
2152.3
1695.7
1556.1
2880.8
2346.5
1097.3
4758.7
3674.6
13.1
168
kN
12225.7
448.8
8252.5
8256.1
4219.6
4481.7
16450.6
4219.6
4481.7
16450.6
3568.8
3848.0
7045.8
1110.4
8433.3
9843.9
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
P5
P6
P1
P2
P3
P4
P5
P6
P1
P2
P3
P4
P5
P6
P1
P2
P3
P4
P5
P6
P1
P2
P3
P4
P5
P6
P1
P2
P3
P4
P5
P6
P1
P2
P3
P4
P5
P6
P1
P2
P3
P4
P5
P6
3987.9
2729.6
4607.2
5322.8
164.6
-550.9
6316.0
401.6
4607.2
5322.8
164.6
-550.9
6316.0
401.6
2287.0
3009.2
1983.1
1260.9
3602.3
2412.1
-353.8
3253.9
2954.3
-653.5
2006.6
1655.8
3858.2
3930.8
-1257.7
-1330.3
4800.2
-1137.8
1818.3
-632.0
1448.9
1384.3
2469.4
2036.7
1154.5
-632.0
924.5
843.9
1543.8
1274.8
Prepared
Checked
Verified
4056.3
5487.4
16245.9
4056.3
5487.4
16245.9
3547.9
4992.3
8898.4
-1007.2
6208.2
4906.8
2527.9
2673.1
12589.2
3202.6
816.9
3655.8
1998.4
292.5
2066.3
=
=
169
Harjot
R P Sharma
Sumant
8433.3
16450.6
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
=
=
1007.2
3725.8
x 2.258 m =
19042.4
=
=
8433.3
=
=
3.008
13.54
25.0 x
763.4
20.0 x
0.0
763.4
=
=
18279.0
4.5
13.54 x
1.50 x
=
Mu =
Mu =
0.15fckbd2
13.54 x
0.00 x
0.87fyAsz
Depth Required
35
18279
x 4500
x 1.0E+06
x 0.15
880 mm
< 1500 hence Safe
Assumed As'
32429 mm2
As - As'
1-
d1
1409
1.1
1409
- 1409
1.1fy As d
fck bd
x 32429
x 35
d2
As =
Mu
0.87fy z
< 0.95 d
x 500
x 4500
1296 mm
0.95 d
=
Minimum z =
1339 mm
1296 mm
32429 mm2
32429 mm2
46
170
x 804
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
36995
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
mm2
>
32429
O.K.
16450.6
x 0.758 m =
12469.6
=
=
=
=
1.508
11.31
25.0 x
319.8
20.0 x
0.0
319.8
=
=
12149.8
7.5
11.31 x
1.50 x
=
Mu =
Mu =
0.15fckbd2
0.87fyAsz
11.31 x
0.00 x
Depth Required
35
12150
x 7500
x 1.0E+06
x 0.15
555 mm
< 1500 hence Safe
Assumed As'
21297 mm2
As - As'
1.1fy As d
fck bd
1-
d1
1381
1.1
1381
- 1381
x 21297
x 35
d2
As =
Mu
0.87fy z
< 0.95 d
x 500
x 7500
1336 mm
0.95 d
=
Minimum d =
1311 mm
1311 mm
21297 mm2
21297 mm2
25 mm
491 mm2
44
70
171
x 491
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
34361
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
mm2
>
21297
O.K.
1007.2
x 2.258 m =
2274.3
=
=
=
=
3.008
13.54
25.0 x
763.4
20.0 x
203.6
967.0
=
=
3241.3
4.5
13.54 x
1.50 x
=
Mu =
Mu =
0.15fckbd2
0.87fyAsz
13.54 x
0.50 x
Depth Required
35
3241
x 4500
x 1.0E+06
x 0.15
370 mm
< 1500 hence Safe
Assumed As'
5535 mm2
As - As'
1-
d1
1417
- 1417
1.1
1417
1.1fy As d
fck bd
x 5535
x 35
d2
As =
Mu
0.87fy z
0
< 0.95 d
x 500
x 4500
1398 mm
0.95 d
=
Minimum z =
1346 mm
1346 mm
5535 mm2
5535 mm2
10585 mm2
172
20 mm
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
=
=
23
11850
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
x 201
mm2
+
>
23
10585
O.K.
3725.8
x 0.758 m =
2824.2
=
=
=
=
1.508
11.31
25.0 x
319.8
20.0 x
85.3
405.1
=
=
3229.2
7.5
11.31 x
1.50 x
=
Mu =
Mu =
0.15fckbd2
0.87fyAsz
11.31 x
0.50 x
Depth Required
35
3229
x 7500
x 1.0E+06
x 0.15
286 mm
< 1500 hence Safe
Assumed As'
5578 mm2
As - As'
1-
d1
1401
1.1
1401
- 1401
1.1fy As d
fck bd
x 5578
x 35
d2
As =
Mu
0.87fy z
< 0.95 d
x 500
x 7500
1389 mm
0.95 d
=
Minimum d =
1331 mm
1331 mm
5578 mm2
5578 mm2
17442 mm2
+
20 mm
35
173
x 201
35
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Shear Check
18033
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
mm2
>
17442
O.K.
As per Cl. 15.8.3.2 (a), shear shall be checked at a distance effective depth from the face of pier.
Longitudinal Direction Bottom Reinforcement (Compression)
Shear Force
Width at Critical Section for Shear
Effective depth distance from the face of pier loaded area
=
=
=
Critical section at
effective d
8433 kN
742
1758
3008 1.599
7.20 x
7.20 x
-349
1409
1000
=
1409 =
=
1.50 x
0.00 x
=
=
25.0 =
20.0 =
=
=
=
% Ast
=
IRS->
( 0.000 x
0 kN +
174
Ast %
0.15
0.25
0.5
1
2
3
0.5
1
2000 +
0.450 x
1586 kN
2500 )x
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
1586 kN
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
<
Shear Stirrups:
Shear Force for shear stirrups Vs = V - Vc + 0.4 b.d
Vs
=
Required Asv s Vs / (0.87fyv . d)
Spacing of Stirrups, s
=
fyv
=
Required Asv
No. of legs
Dia of links
Area of links provided
=
=
=
=
12057 kN
100 mm
415 N/mm2
2370 mm2
23
12 mm
2601 mm2
>
Safe.
=
=
=
Critical section at
effective d
16451 kN
742
258
1508 0.128
0.96 x
0.96 x
175
=
1381 =
=
1.50 x
0.00 x
=
=
1123
1381
1000
25.0 =
20.0 =
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
=
=
=
% Ast
=
Ast %
0.15
0.25
0.5
1
2
3
0.25
0.5
( 0.744 x
2000 +
2053 kN +
4876 kN
>
=
=
0.372 x
5500 )x
2823 kN
0 kN Safe in Shear
Shear Stirrups:
Shear Force for shear stirrups Vs = V - Vc + 0.4 b.d
Vs
=
Required Asv s Vs / (0.87fyv . d)
Spacing of Stirrups, s
=
fyv
=
Required Asv
No. of legs
Dia of links
Area of links provided
=
=
=
=
-735 kN
120 mm
415 N/mm2
-177 mm2
22
8 mm
1106 mm2
>
Safe.
=
=
=
Critical section
1007 kN
742
1758
500
2258
1000
=
176
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
3008 3.008
13.54 x
13.54 x
0=
=
1.50 x
0.50 x
=
=
25.0 =
20.0 =
=
=
=
% Ast
=
IRS->
0.15
0.25
1.00
0.305 N/mm2
( 0.305 x
2000 +
863 kN +
1942 kN
>
=
=
Ast %
0.15
0.25
0.5
1
2
3
0.305 x
2500 )x
1079 kN
1650 kN Safe in Shear
Shear Stirrups:
Shear Force for shear stirrups Vs = V - Vc + 0.4 b.d
Vs
=
Required Asv s Vs / (0.87fyv . d)
Spacing of Stirrups, s
=
fyv
=
Required Asv
No. of legs
Dia of links
Area of links provided
=
=
=
=
177
2259 kN
110 mm
415 N/mm2
486 mm2
12
8 mm
578 mm2
>
Safe.
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
=
=
=
Critical section
3726 kN
742
258
1508 1.508
11.31 x
11.31 x
500
758
1000
=
0=
=
1.50 x
0.50 x
=
=
25.0 =
20.0 =
=
=
=
% Ast
1.00
0.298 N/mm2
( 0.298 x
2000 +
834 kN +
3128 kN
<
178
Ast %
0.15
0.25
0.5
1
2
3
0.15
0.25
0.298 x
5500 )x
2294 kN
4263 kN Provide Shear Stirrups.
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
Shear Stirrups:
Shear Force for shear stirrups Vs = V - Vc + 0.4 b.d
Vs
=
Required Asv s Vs / (0.87fyv . d)
Spacing of Stirrups, s
=
fyv
=
Required Asv
No. of legs
Dia of links
Area of links provided
=
=
=
=
5338 kN
120 mm
415 N/mm2
1266 mm2
18
10 mm
1374 mm2
>
Safe.
For Pier
For Pier, critical section is checked at 1.5d from the face of inscribed square.
deff in longitudinal direction dx
deff in transverse direction dy
1.5dmin
Distance from the face of inscribed square of pier to edge of pile cap
Since critical section is falling outside the pilecap edge, punching shear shall not govern.
For Pile (In compression)
Max. load in a pile
As per Fig.6 if IRS CBC, Case (c-ii)
=
=
=
=
=
=
=
b
bs
Reinf. in long. Dir. =
100As/(bs.d)
23 x
804 =
=
=
sx
for 2d/av , av = dia of pile/2
=
2dL/av
=
dL = Depth in Longitudinal Direction
Reinf. in tran. Dir. =
34 x
491 =
100As/(bs.d)
sy
=
for 2d/av , av = dia of pile/2
=
2dT/av
=
dT = Depth in Transverse Direction
Steel % for vc
=
179
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
Checked
Verified
vc
Harjot
R P Sharma
Sumant
Prepared
=
2d/av =
>
Hence OK
For Pile (In tension)
Min. load in a pile
As per Fig.6 if IRS CBC, Case (c-ii)
=
=
=
b
bs
Reinf. in long. Dir. =
100As/(bs.d)
11 x
17 x
201 =
=
vc
=
s
=
s vc
=
for 2d/av , av = dia of pile/2
=
2d/av
=
(2d/av) (s vc) =
201 =
=
vc
=
s
=
s vc
=
for 2d/av , av = dia of pile/2
=
2d/av
=
(2d/av) (s vc) =
>
Hence OK
180
re P148
Project Code
Date
Rev
2/21/2013
0
ap is designed based on
ken for getting maximum
Mz kNm
-220.517
250.071
361.674
-42.74
-446.38
342.179
-446.38
342.179
-269.028
214.956
253.568
20.153
-377.725
320.871
-377.725
320.871
-239.168
221.479
450.61
-127.678
-306.942
233.184
-248.831
191.739
-140.674
113.913
675.43
-434.739
1007.847
-547.533
439.129
-334.045
439.129
-334.045
261.202
-206.156
999.65
-556.646
555.339
181
re P148
Project Code
Date
Rev
2/21/2013
0
-389.859
555.339
-389.859
416.334
-289.945
836.097
-428.822
302.924
-228.677
245.353
-187.857
136.117
-108.781
586.85
-369.733
985.416
-530.012
177.362
-145.093
177.362
-145.093
242.728
-191.489
950.76
-520.131
319.467
-219.413
319.467
-219.413
370.535
-255.66
823.437
-418.933
65.886
-58.072
228.983
-175.291
127.167
-101.568
-131.938
185.064
384.105
-60.262
-184.613
153.227
-184.613
153.227
-250.554
200.29
302.458
182
re P148
Project Code
Date
Rev
2/21/2013
0
-16.362
-141.853
150.426
-141.853
150.426
-193.369
187.194
463.269
-137.567
-69.904
62.579
-232.462
179.173
-131.724
106.7
164.124
-46.21
539.914
-190.066
-9.675
8.792
-9.675
8.792
-10.456
9.482
489.211
-168.567
59.845
-13.209
59.845
-13.209
59.234
-12.67
509.879
-181.558
-5.361
4.872
-4.629
4.225
-6.093
5.518
164.124
-46.21
539.914
-190.066
-9.675
8.792
-9.675
8.792
-10.456
183
re P148
Project Code
Date
Rev
2/21/2013
0
9.482
489.211
-168.567
59.845
-13.209
59.845
-13.209
59.234
-12.67
509.879
-181.558
-5.361
4.872
-4.629
4.225
-6.093
5.518
BL=
BT=
7.500 m
4.500 m
d1 =
d2 =
d3 =
d4=
ET=
EL=
0.742 m
1.758 m
0.250 m
0.258 m
0.000 m
0.000 m
184
re P148
Project Code
Date
Rev
2/21/2013
0
2.258 m
3.008 m
0.758 m
1.508 m
kN
6184.7
6572.5
-1622.1
-1622.1
5598.2
6417.3
185
re P148
Project Code
Date
Rev
2/21/2013
0
15.3
15.3
5656.2
3956.6
-3725.8
4869.9
3043.3
kN
kN
186
re P148
Project Code
Date
Rev
2/21/2013
0
kN
kN
kN.m
x 4.50
m
1.504
kN.m
1.504
kN.m
kN.m
kN.m
m
187
re P148
Project Code
Date
Rev
2/21/2013
0
mm2
kN.m
x 7.50
m2
0.754
kN.m
0.754
kN.m
kN.m
kN.m
m
x 201.1
188
re P148
Project Code
Date
Rev
2/21/2013
0
mm2
kN.m
x 4.50
m2
1.504
kN.m
1.504
kN.m
kN.m
kN.m
m
189
re P148
Project Code
Date
Rev
2/21/2013
0
x 314.2
mm2
kN.m
x 7.50
m2
0.754
kN.m
0.754
kN.m
kN.m
kN.m
m
x 314.2
190
re P148
Project Code
Date
Rev
2/21/2013
0
mm2
8433 kN
4500 mm
1409 mm
11377 kN
0 kN
mm Pile dia
3008 mm
1599 mm
7.20 m2
270 kN
0 kN
11107 kN
1.752 N/mm2
1758 mm
200 mm
1409 mm
0.58 %
M0
0.37
0.44
0.56
0.7
0.89
1.01
0.56
0.70
1409 /
1.00E+03
191
re P148
Project Code
Date
Rev
2/21/2013
0
2370 mm2
16451 kN
7500 mm
1381 mm
0 kN
0 kN
mm Pile dia
1508 mm
128 mm
0.96 m2
36 kN
0 kN
0 kN
0.000 N/mm2
192
re P148
Project Code
Date
Rev
2/21/2013
0
258 mm
200 mm
1381 mm
0.33 %
M 35
0.37
0.44
0.56
0.7
0.89
1.01
0.44
0.56
1381 /
1.00E+03
-177 mm2
1007 kN
4500 mm
1417 mm
504 kN
0 kN
mm Pile dia
3008 mm
193
re P148
2/21/2013
0
Project Code
Date
Rev
3008 mm
13.54 m2
508 kN
135 kN
1650 kN
0.259 N/mm2
1758 mm
200 mm
1958 mm
0.19 %
M 35
0.37
0.44
0.56
0.7
0.89
1.01
0.37
0.44
1417 /
1.00E+03
486 mm2
194
re P148
2/21/2013
0
Project Code
Date
Rev
3726 kN
7500 mm
1401 mm
1863 kN
0 kN
mm Pile dia
1508 mm
1508 mm
11.31 m2
424 kN
113 kN
4263 kN
0.406 N/mm2
258 mm
200 mm
458 mm
0.17 %
M 35
0.37
0.44
0.56
0.7
0.89
1.01
0.37
0.44
1401 /
1.00E+03
195
re P148
Project Code
Date
Rev
2/21/2013
0
1266 mm2
1409 mm
1381 mm
2071 mm
1508 mm
6354.3 kN
3121 mm
2207 mm
18497.7 mm2
0.59 %
0.772
500
5.636
ongitudinal Direction
16689.7 mm2
0.55 %
0.776
500 mm
5.522
ransverse Direction
0.57
196
re P148
Project Code
Date
Rev
2/21/2013
0
0.580 N/mm2
5.58
10899 kN
6354 kN
-1330.3 kN
3121 mm
2207 mm
2211.7 mm2
0.07 %
0.370 N/mm2
0.771
0.285 N/mm2
500 mm
5.636
1.61 N/mm2
3418.1 mm2
0.11 %
0.370 N/mm2
0.773
0.286 N/mm2
500 mm
5.522
1.58 N/mm2
6935 kN
1330 kN
197
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
Pile cap is designed based on Beam Theory. Inscribed square is taken for pier . SLS pile loads from pile design model are
taken for getting maximum load for pile cap design.
L/C
1 DEAD L
Node
1
7
2 SIDL
1
7
3 LIVE LO
1
7
101 SLS G1
7
102 SLS G1
7
103 SLS G1
7
104 SLS G1
7
105 SLS G-I
1
7
106 SLS G1
7
107 SLS G1
7
108 SLS G1
7
109 SLS G-I
1
7
110 SLS G-I
1
7
1 DEAD L
2
8
2 SIDL
2
8
3 LIVE LO
2
8
101 SLS G2
8
102 SLS G2
8
103 SLS G2
8
104 SLS G2
Fx kN
1159.166
-1176.837
463.158
-463.158
278.481
-278.481
2021.284
-2038.956
536.594
-554.265
3344.549
-3362.22
1941.547
-1959.218
1488.364
-1506.035
675.834
-693.505
3483.789
-3501.46
2080.787
-2098.458
1627.604
-1645.276
1412.855
-1430.526
1209.663
-1227.335
497.134
-497.134
1113.449
-1113.449
3031.018
-3048.689
2984.586
-3002.258
3435.818
-3453.489
2027.497
Fy kN
-34.569
34.569
-13.519
13.519
57.03
-57.03
11.942
-11.942
192.448
-192.448
-72.012
72.012
-60.901
60.901
-40.681
40.681
220.963
-220.963
-43.497
43.497
-32.387
32.387
-12.166
12.166
60.503
-60.503
34.909
-34.909
13.748
-13.748
96.891
-96.891
157.986
-157.986
294.645
-294.645
72.627
-72.627
61.459
198
Fz kN
5.179
-5.179
2.085
-2.085
45.017
-45.017
57.199
-57.199
2.035
-2.035
255.519
-255.519
9.263
-9.263
6.098
-6.098
24.544
-24.544
278.028
-278.028
31.771
-31.771
28.606
-28.606
28.903
-28.903
5.352
-5.352
2.201
-2.201
49.077
-49.077
61.978
-61.978
13.638
-13.638
255.832
-255.832
9.547
Mx kNm
0.002
-0.002
0.001
-0.001
0.122
-0.122
0.136
-0.136
0.008
-0.008
0.675
-0.675
0.003
-0.003
0.002
-0.002
0.069
-0.069
0.736
-0.736
0.064
-0.064
0.063
-0.063
0.065
-0.065
-0.002
0.002
-0.001
0.001
-0.119
0.119
-0.133
0.133
0.003
-0.003
-0.676
0.676
-0.003
My kNm
-2.516
-2.663
2.982
-5.067
-10.822
-34.195
-10.841
-46.358
21.08
-23.115
-182.543
-72.977
0.943
-10.206
1.183
-7.28
15.669
-40.213
-187.953
-90.074
-4.468
-27.303
-4.228
-24.378
1.469
-30.372
-3.307
-2.045
2.45
-4.651
-25.242
-23.835
-28.134
-33.844
-20.385
6.747
-183.973
-71.859
-0.384
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
1 DEAD L
2 SIDL
3 LIVE LO
101 SLS G102 SLS G103 SLS G104 SLS G105 SLS G-I
106 SLS G107 SLS G108 SLS G109 SLS G-I
110 SLS G-I
1 DEAD L
2 SIDL
3 LIVE LO
101 SLS G102 SLS G103 SLS G-
8
2
8
2
8
2
8
2
8
2
8
2
8
3
9
3
9
3
9
3
9
3
9
3
9
3
9
3
9
3
9
3
9
3
9
3
9
3
9
4
10
4
10
4
10
4
10
4
10
4
-2045.168
1584.952
-1602.623
3541.31
-3558.982
3992.542
-4010.213
2584.221
-2601.892
2141.676
-2159.348
2804.289
-2821.961
991.427
-1009.098
368.037
-368.037
323.263
-323.263
1788.66
-1806.332
2611.433
-2629.104
-196.522
178.851
1607.866
-1625.537
1258.276
-1275.948
2773.064
-2790.736
-34.891
17.219
1769.497
-1787.168
1419.908
-1437.579
2036.043
-2053.715
940.929
-958.6
334.061
-334.061
-511.705
511.705
778.927
-796.598
163.44
-181.112
-287.791
-61.459
41.353
-41.353
343.09
-343.09
121.072
-121.072
109.904
-109.904
89.798
-89.798
182.63
-182.63
32.891
-32.891
12.554
-12.554
86.226
-86.226
142.805
-142.805
291.195
-291.195
26.735
-26.735
57.321
-57.321
38.591
-38.591
334.308
-334.308
69.848
-69.848
100.434
-100.434
81.704
-81.704
173.848
-173.848
-32.551
32.551
-12.325
12.325
67.695
-67.695
27.123
-27.123
195.898
-195.898
-26.121
199
Prepared
Checked
Verified
-9.547
6.44
-6.44
38.177
-38.177
280.371
-280.371
34.085
-34.085
30.978
-30.978
33.817
-33.817
-4.3
4.3
-1.579
1.579
40.858
-40.858
38.75
-38.75
-11.84
11.84
241.644
-241.644
-7.386
7.386
-5.003
5.003
8.59
-8.59
262.074
-262.074
13.043
-13.043
15.426
-15.426
12.949
-12.949
-4.127
4.127
-1.462
1.462
44.918
-44.918
43.529
-43.529
-0.237
0.237
241.957
0.003
-0.002
0.002
-0.056
0.056
-0.735
0.735
-0.062
0.062
-0.061
0.061
-0.06
0.06
0.003
-0.003
0.001
-0.001
-0.119
0.119
-0.127
0.127
-0.001
0.001
-0.669
0.669
0.005
-0.005
0.004
-0.004
-0.061
0.061
-0.728
0.728
-0.054
0.054
-0.056
0.056
-0.057
0.057
-0.003
0.003
-0.001
0.001
0.116
-0.116
0.124
-0.124
-0.01
0.01
0.669
Harjot
R P Sharma
Sumant
-9.163
-0.351
-6.088
-33.006
-5.171
-196.594
-83.777
-13.005
-21.081
-12.972
-18.006
-18.806
-15.012
40.774
-36.474
19.714
-18.135
4.102
-44.96
68.942
-107.692
84.448
-72.608
-119.175
-122.47
74.265
-66.879
54.596
-49.593
86.499
-95.088
-117.124
-144.95
76.316
-89.359
56.647
-72.073
72.298
-85.248
39.983
-35.856
19.181
-17.719
-10.319
-34.6
51.65
-95.179
42.983
-42.746
-120.605
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
1 DEAD L
2 SIDL
3 LIVE LO
101 SLS G102 SLS G103 SLS G104 SLS G105 SLS G-I
106 SLS G107 SLS G108 SLS G109 SLS G-I
110 SLS G-I
1 DEAD L
2 SIDL
3 LIVE LO
101 SLS G102 SLS G-
10
4
10
4
10
4
10
4
10
4
10
4
10
4
10
5
11
5
11
5
11
5
11
5
11
5
11
5
11
5
11
5
11
5
11
5
11
5
11
5
11
6
12
6
12
6
12
6
12
6
270.12
1521.916
-1539.587
1161.688
-1179.36
-92.412
74.741
-543.644
525.972
1266.063
-1283.735
905.836
-923.507
644.609
-662.28
1642.146
-1659.817
660.876
-660.876
876.446
-876.446
3399.288
-3416.959
2435.197
-2452.869
4297.604
-4315.275
2743.734
-2761.405
2126.661
-2144.333
2873.42
-2891.092
4735.827
-4753.499
3181.957
-3199.628
2564.884
-2582.556
2873.42
-2891.092
1386.66
-1404.332
509.744
-509.744
-33.153
33.153
1961.885
-1979.557
1998.353
26.121
-56.763
56.763
-37.919
37.919
229.745
-229.745
7.727
-7.727
-22.916
22.916
-4.072
4.072
69.285
-69.285
-0.34
0.34
-0.229
0.229
67.884
-67.884
74.058
-74.058
218.592
-218.592
-0.615
0.615
-0.557
0.557
-0.672
0.672
252.534
-252.534
33.327
-33.327
33.385
-33.385
33.27
-33.27
111.06
-111.06
-0.34
0.34
-0.229
0.229
67.884
-67.884
74.058
-74.058
218.592
200
Prepared
Checked
Verified
-241.957
-7.102
7.102
-4.661
4.661
22.223
-22.223
264.417
-264.417
15.357
-15.357
17.798
-17.798
17.863
-17.863
10.624
-10.624
3.89
-3.89
42.849
-42.849
62.426
-62.426
15.292
-15.292
236.039
-236.039
18.371
-18.371
12.213
-12.213
36.716
-36.716
257.464
-257.464
39.795
-39.795
33.638
-33.638
36.716
-36.716
-12.728
12.728
-5.135
5.135
32.531
-32.531
16.894
-16.894
-18.889
-0.669
-0.005
0.005
-0.003
0.003
0.048
-0.048
0.727
-0.727
0.053
-0.053
0.055
-0.055
0.052
-0.052
0
0
0
0
0.002
-0.002
0.003
-0.003
0.006
-0.006
0
0
0
0
0
0
0.007
-0.007
0.001
-0.001
0.001
-0.001
0.001
-0.001
0.003
-0.003
0
0
0
0
-0.002
0.002
-0.003
0.003
-0.006
Harjot
R P Sharma
Sumant
-121.353
72.939
-65.837
53.062
-48.401
37.824
-60.046
-125.764
-138.652
67.779
-83.137
47.903
-65.701
52.024
-69.887
-27.396
16.773
-5.269
1.378
-2.255
-40.594
-36.199
-26.227
-33.719
18.427
-116.094
-119.946
-39.214
20.843
-28.224
16.011
-34.846
-1.87
-117.221
-140.243
-40.341
0.546
-29.351
-4.286
-34.846
-1.87
79.284
-66.556
35.963
-30.828
34.796
-67.326
160.714
-177.609
122.439
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
12
6
12
6
12
6
12
6
12
6
12
6
12
6
12
6
12
-2016.025
135.947
-153.618
2252.325
-2269.997
1744.381
-1762.053
1981.777
-1999.448
119.37
-137.042
2235.749
-2253.42
1727.805
-1745.476
1981.777
-1999.448
Prepared
Checked
Verified
-218.592
-0.615
0.615
-0.557
0.557
-0.672
0.672
252.534
-252.534
33.327
-33.327
33.385
-33.385
33.27
-33.27
111.06
-111.06
18.889
201.858
-201.858
-22.693
22.693
-15.086
15.086
-2.624
2.624
218.123
-218.123
-6.428
6.428
1.18
-1.18
-2.624
2.624
0.006
0
0
0
0
0
0
-0.007
0.007
-0.001
0.001
-0.001
0.001
-0.001
0.001
-0.003
0.003
Harjot
R P Sharma
Sumant
-103.55
40.064
-241.922
141.658
-118.965
103.22
-88.134
139.837
-137.213
57.462
-275.585
159.056
-152.628
120.618
-121.797
139.837
-137.213
Grade of concrete
35 N/mm2
Grade of steel
Depth of Pile Cap
Diameter of Pile
Density of Soil
Thickness of soil layer
Dia of Pier
Area of pier
Equivalent square side of pier
Area of Pile cap
=
=
=
=
=
=
=
=
=
500 N/mm2
1.5 m
1m
20 kN/m3
0.5 m
2100 mm
3463605.9006 mm2
1484 mm
33.75 m2
P5
P6
201
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
Lever arm for moment along long. Direc. (from face of inscribed square to pile center) =
Length for calculating downward moment along long. Dir. (from face of inscribed square) =
Lever arm for moment along trans. direc. (from face of inscribed square to pile center) =
Length for calculating downward moment along trans. dir. (from face of inscribed square) =
2 SIDL
3 LIVE LOAD
Beam No.
Pile load
B1
B2
B3
B4
B5
B6
B1
B2
B3
B4
B5
B6
B1
B2
B3
B4
B5
B6
B1
B2
B3
B4
B5
B6
B1
B2
B3
B4
B5
B6
B1
B2
B3
B4
kN
1159.2
1209.7
991.4
940.9
1642.1
1386.7
463.2
497.1
368.0
334.1
660.9
509.7
278.5
1113.4
323.3
-511.7
876.4
-33.2
2021.3
3031.0
1788.7
778.9
3399.3
1961.9
536.6
2984.6
2611.4
163.4
2435.2
1998.4
3344.5
3435.8
-196.5
-287.8
202
kN
4011.0
797.2
865.2
1621.2
-233.2
1436.7
2268.4
2800.2
4819.7
8451.6
700.0
5596.0
5956.4
3056.8
3239.3
11078.0
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
B5
B6
B1
B2
B3
B4
B5
B6
B1
B2
B3
B4
B5
B6
B1
B2
B3
B4
B5
B6
B1
B2
B3
B4
B5
B6
B1
B2
B3
B4
B5
B6
B1
B2
B3
B4
B5
B6
B1
B2
B3
B4
B5
B6
4297.6
135.9
1941.5
2027.5
1607.9
1521.9
2743.7
2252.3
1488.4
1585.0
1258.3
1161.7
2126.7
1744.4
675.8
3541.3
2773.1
-92.4
2873.4
1981.8
3483.8
3992.5
-34.9
-543.6
4735.8
119.4
2080.8
2584.2
1769.5
1266.1
3182.0
2235.7
2141.7
323.3
1419.9
905.8
2564.9
1727.8
2804.3
1788.7
2036.0
644.6
2873.4
1981.8
203
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
3463.5
3635.4
6712.8
2650.1
2843.2
5200.0
583.4
6314.4
7090.6
2940.1
3957.7
12212.2
3346.9
4353.7
7847.0
3047.5
1743.2
5029.8
3448.9
3824.7
7466.4
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
=
=
=
=
=
6314.4
12212.2
4819.7
8451.6
3239.3
=
=
583.4
459.2
x 2.258 m =
14257.9
=
=
=
=
3.008
13.54
25.0 x
763.4
20.0 x
0.0
763.4
13494.4
6314.4
13.54 x
1.50 x
=
13.54 x
204
0.00 x
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
4.5
x 0.758 m =
9256.8
=
=
=
=
1.508
11.31
25.0 x
319.8
20.0 x
0.0
319.8
=
=
8937.0
7.5
x 2.258 m =
1317.4
=
=
=
=
3.008
13.54
25.0 x
763.4
20.0 x
203.6
967.0
=
=
2284.4
4.5
x 0.758 m =
348.0
=
=
=
=
1.508
11.31
25.0 x
319.8
20.0 x
85.3
405.1
=
=
753.1
7.5
1-
12212.2
11.31 x
1.50 x
=
11.31 x
0.00 x
1-
583.4
13.54 x
13.54 x
1.50 x
=
0.50 x
1-
459.2
11.31 x
1.50 x
=
11.31 x
205
0.50 x
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
4819.7
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
x 2.258 m =
10882.8
=
=
=
=
3.008
13.54
25.0 x
763.4
20.0 x
0.0
763.4
=
=
10119.4
4.5
x 0.758 m =
6406.3
=
=
=
=
1.508
11.31
25.0 x
319.8
20.0 x
0.0
319.8
=
=
6086.5
7.5
13.54 x
13.54 x
1.50 x
=
0.00 x
8451.6
11.31 x
1.50 x
=
11.31 x
0.00 x
3239.3
x 2.258 m =
7314.3
=
=
=
=
3.008
13.54
25.0 x
763.4
20.0 x
0.0
763.4
=
=
6550.9
4.5
13.54 x
13.54 x
1.50 x
=
0.00 x
3239.3
206
x 0.758 m =
2455.4
1.508
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
=
=
11.31
25.0 x
319.8
20.0 x
0.0
319.8
=
=
2135.6
7.5
11.31 x
1.50 x
=
11.31 x
207
0.00 x
re P148
Project Code
Date
Rev
2/21/2013
0
Mz kNm
-160.17
125.601
-63.25
49.731
60.683
-3.653
-169.318
181.26
194.172
-1.724
-310.862
238.85
-272.122
211.221
-200.017
159.336
224.513
-3.55
-280.521
237.024
-241.781
209.394
-169.676
157.51
-5.705
66.208
157.376
-122.467
61.37
-47.623
203.411
-106.52
454.772
-296.786
661.262
-366.617
305.813
-233.187
267.432
208
re P148
Project Code
Date
Rev
2/21/2013
0
-205.973
194.609
-153.256
762.967
-419.877
407.519
-286.447
369.138
-259.233
296.314
-206.516
532.749
-350.119
148.157
-115.266
55.917
-43.363
165.611
-79.386
397.43
-254.625
645.499
-354.304
140.465
-113.729
249.196
-191.876
181.318
-142.727
728.305
-393.996
223.27
-153.422
332.002
-231.568
264.124
-182.42
498.086
-324.238
-150.951
118.4
-57.797
45.471
98.482
-30.787
-111.976
139.099
209.935
-14.037
-145.514
209
re P148
Project Code
Date
Rev
2/21/2013
0
119.393
-253.886
197.123
-186.727
148.807
259.176
-29.431
-96.273
103.999
-204.645
181.729
-137.486
133.414
28.958
40.327
-3.727
3.387
-2.508
2.279
99.314
-31.43
102.509
-28.451
336.757
-118.164
-6.737
6.122
-6.249
5.691
-7.225
6.553
386.414
-133.879
42.92
-9.593
43.408
-10.024
42.432
-9.162
219.788
-108.728
-3.727
3.387
-2.508
2.279
99.314
-31.43
102.509
-28.451
336.757
210
re P148
Project Code
Date
Rev
2/21/2013
0
-118.164
-6.737
6.122
-6.249
5.691
-7.225
6.553
386.414
-133.879
42.92
-9.593
43.408
-10.024
42.432
-9.162
219.788
-108.728
BL=
BT=
7.500 m
4.500 m
d1 =
d2 =
d3 =
d4=
ET=
EL=
0.742 m
1.758 m
0.250 m
0.258 m
0.000 m
0.000 m
211
re P148
Project Code
Date
Rev
2/21/2013
0
2.258 m
3.008 m
0.758 m
1.508 m
kN
3319.0
1211.8
-221.6
4529.5
4773.2
-348.4
212
re P148
Project Code
Date
Rev
2/21/2013
0
5382.1
4164.3
4662.4
-459.2
5271.3
4053.5
4662.4
213
re P148
Project Code
Date
Rev
2/21/2013
0
kN
kN
kN
kN
kN
kN
kN
kN.m
x 4.50
m
1.504
kN.m
1.504
kN.m
kN.m
kN.m
214
re P148
Project Code
Date
Rev
2/21/2013
0
kN.m
x 7.50
m2
0.754
kN.m
0.754
kN.m
kN.m
kN.m
m
kN.m
x 4.50
m
1.504
kN.m
1.504
kN.m
kN.m
kN.m
m
kN.m
x 7.50
m2
0.754
kN.m
0.754
kN.m
kN.m
kN.m
m
215
re P148
Project Code
Date
Rev
2/21/2013
0
kN.m
x 4.50
m
1.504
kN.m
1.504
kN.m
kN.m
kN.m
m
kN.m
x 7.50
m2
0.754
kN.m
0.754
kN.m
kN.m
kN.m
m
kN.m
x 4.50
m
1.504
kN.m
1.504
kN.m
kN.m
kN.m
m
kN.m
x 7.50
216
re P148
Project Code
Date
Rev
2/21/2013
0
m2
0.754
kN.m
0.754
kN.m
kN.m
kN.m
m
217
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Drawing Ref
Chainage
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
Project Code
Date
Revision
Check for Crack Width for serviceability of Longitudinal Reinf. at Bottom of Pilecap
Crackwidth limited to main reinforcement is =
Design surface crack width
0.2 mm
Table 10 of (IRS:CBC) - Moderate
(as per IRS:CBC Cl.15.9.8.2.1)
Wcr =
Where,
but not greater than e1
where, 1 =
fck
fy
=
=
s =
(h-x) fst
(d-x) Es
( d -x ) 1
( h- x )
c = fc / Ec
35 MPa
500 MPa
x
Total depth, h
Width of section,b
Clear Cover
Dia of main rebar
Spacing of rebar
Number of rebars
Effective cover
Effective depth
SLS G-I moment
Permanent moment
Transient moment
Ratio Mq /Mg
=
=
=
=
=
=
=
=
=
=
=
=
1500 mm
4500 mm
75 mm
32 mm
97 mm
46
91.0 mm
1409 mm
10119 kN.m
6551 kN.m
3569 kN.m
0.545
d
h
fs / Es
36995 mm2
2E+05 MPa
29500 MPa
=
=
=
=
xm
k=
2 m + ( m )2 - x m
xu = k d
8.0
0.005834776
0.046678205
0.26240959
370 mm
4.0E+11 mm3
m M ( d-xu ) / Ic r
212.7 <
375 MPa
fc =
M (xu) / Icr
9.5 <
17.5 MPa
218
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Drawing Ref
Chainage
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
=
=
62 mm
0.00116
0.00106
0.0009
m =
min of
0.00116 &
0.0009
Project Code
Date
Revision
(With
Cnom
0.155 <
0.2 mm
Crack width is within allowable limits.
13494.4 kN.m
fst =
m M ( d-xu ) / Ic r
283.7 <
375 MPa
fc =
M (xu) / Icr
12.6 <
17.5 MPa
Check for Crack Width for serviceability of Transverse Reinf. at Bottom of Pilecap
Crackwidth limited to main reinforcement is =
Design surface crack width
0.2 mm
Table 10 of (IRS:CBC) - Severe
(as per IRS:CBC Cl.15.9.8.2.1)
Wcr =
Where,
but not greater than e1
where, 1 =
fck
fy
=
=
(h-x) fst
(d-x) Es
s =
( d -x ) 1
( h- x )
c = fc / Ec
35 MPa
500 MPa
x
Total depth, h
Width of section,b
Clear Cover
Dia of main rebar
Spacing of rebar
Number of rebars
Effective cover
Effective depth
Service BM, M
Permanent moment
Transient moment
Ratio Mq /Mg
=
=
=
=
=
=
=
=
=
=
=
=
1500 mm
7500 mm
75 mm
25 mm
107 mm
70
120 mm
1381 mm
6087 kN.m
2136 kN.m
3951 kN.m
1.9
d
h
fs / Es
34361 mm2
2E+05 MPa
29500 MPa
219
8.0
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Drawing Ref
Chainage
pt / 100 = Ast / bd
Prepared
Checked
Verified
220
0.003318717
Harjot
R P Sharma
Sumant
Project Code
Date
Revision
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Drawing Ref
Chainage
xm
k=
Checked
Verified
=
=
2 m + ( m )2 - x m
xu = k d
Harjot
R P Sharma
Sumant
Prepared
Project Code
Date
Revision
0.026549739
0.205407943
284 mm
3.9E+11 mm3
m M ( d-xu ) / Ic r
137.7 <
375 MPa
fc =
M (xu) / Icr
4.5 <
17.5 MPa
=
=
92 mm
0.00076
0.00069
0.0008
m =
min of
0.00076 &
0.0023
(With
Cnom
0.195 <
0.2 mm
Crack width is within allowable limits.
fst =
m M ( d-xu ) / Ic r
202.3 <
375 MPa
fc =
M (xu) / Icr
6.5 <
17.5 MPa
221
8937.0 kN.m
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Drawing Ref
Chainage
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
Project Code
Date
Revision
0.2 mm
Table 10 of (IRS:CBC) - Moderate
(as per IRS:CBC Cl.15.9.8.2.1)
Wcr =
Where,
but not greater than e1
where, 1 =
fck
fy
=
=
s =
(h-x) fst
(d-x) Es
( d -x ) 1
( h- x )
c = fc / Ec
35 MPa
500 MPa
x
Total depth, h
Width of section,b
Clear Cover
Dia of main rebar
Spacing of rebar
Number of rebars
Effective cover
Effective depth
SLS G-I moment
Permanent moment
Transient moment
Ratio Mq /Mg
=
=
=
=
=
=
=
=
=
=
=
=
1500 mm
4500 mm
75 mm
16 mm
198 mm
23
83.0 mm
1417 mm
10119 kN.m
6551 kN.m
3569 kN.m
0.5
d
h
fs / Es
4624 mm2
2E+05 MPa
29500 MPa
=
=
=
=
xm
k=
2 m + ( m )2 - x m
xu = k d
=
=
222
8.0
0.000725229
0.005801834
0.102074621
145 mm
6.4E+10 mm3
2284.4 kN.m
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Drawing Ref
Chainage
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
Project Code
Date
Revision
fst =
m M ( d-xu ) / Ic r
360.9 <
375 MPa
fc =
M (xu) / Icr
5.1 <
17.5 MPa
0.2 mm
Table 10 of (IRS:CBC) - Severe
(as per IRS:CBC Cl.15.9.8.2.1)
Wcr =
Where,
but not greater than e1
where, 1 =
fck
fy
=
=
(h-x) fst
(d-x) Es
s =
( d -x ) 1
( h- x )
c = fc / Ec
35 MPa
500 MPa
x
Total depth, h
Width of section,b
Clear Cover
Dia of main rebar
Spacing of rebar
Number of rebars
Effective cover
Effective depth
Service BM, M
Permanent moment
Transient moment
Ratio Mq /Mg
=
=
=
=
=
=
=
=
=
=
=
=
1500 mm
7500 mm
75 mm
16 mm
216 mm
35
99 mm
1401 mm
6087 kN.m
2136 kN.m
3951 kN.m
1.9
d
h
fs / Es
7037 mm2
2E+05 MPa
29500 MPa
8.0
pt / 100 = Ast / bd
=
=
=
0.000669728
0.005357824
0.098297157
xm
k=
2 m + ( m )2 - x m
xu = k d
223
138 mm
9.6E+10 mm3
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Drawing Ref
Chainage
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
Project Code
Date
Revision
fst =
m M ( d-xu ) / Ic r
79.0 <
375 MPa
fc =
M (xu) / Icr
1.1 <
17.5 MPa
224
753.1 kN.m
CC-28
L&T
n of Substructure P148
2/21/2013
0
Project Code
Date
Revision
BC) - Moderate
MPa
OK
MPa
OK
225
CC-28
L&T
n of Substructure P148
2/21/2013
0
Project Code
Date
Revision
Cnom
45 mm )
allowable limits.
MPa
OK
MPa
OK
226
CC-28
L&T
n of Substructure P148
Project Code
Date
Revision
2/21/2013
0
227
CC-28
L&T
n of Substructure P148
2/21/2013
0
Project Code
Date
Revision
MPa
OK
MPa
OK
Cnom
45 mm )
allowable limits.
MPa
OK
MPa
OK
228
CC-28
L&T
n of Substructure P148
Project Code
Date
Revision
2/21/2013
0
BC) - Moderate
229
CC-28
L&T
n of Substructure P148
2/21/2013
0
Project Code
Date
Revision
MPa
OK
MPa
OK
230
CC-28
L&T
n of Substructure P148
2/21/2013
0
Project Code
Date
Revision
MPa
OK
MPa
OK
231
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
=
=
=
2100 mm
3463605.901 mm2
1484 mm (side taken in the model for pier)
ULS Pile Forces from pile design model (Appendix-4) (also given in Section 9.0, Pile Cap: ULS Design)
Loads for Designing Pile Cap:
Beam / Pile
No.
P1
P2
P3
P4
P1
P2
P3
P4
P1
P2
P3
P4
P1
P2
P3
P4
P1
P2
P3
P4
P1
P2
P3
P4
P1
P2
P3
P4
Pile load
kN
2862.6
4454.9
2541.1
948.8
489.9
4391.7
3860.7
-41.1
4982.6
5113.7
-632.0
-763.1
4982.6
5113.7
-632.0
-763.1
2012.7
2152.3
1695.7
1556.1
1097.3
4758.7
3674.6
13.1
4607.2
5322.8
164.6
-550.9
232
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
ULS Tie Member Forces from pile cap design model (Appendix-7):
Beam
1
L/C
201 ULS G
202 ULS G203 ULS G204 ULS G205 ULS G206 ULS G207 ULS G208 ULS G209 ULS G210 ULS G211 ULS G212 ULS G213 ULS G-
201 ULS G
202 ULS G203 ULS G204 ULS G205 ULS G206 ULS G207 ULS G208 ULS G209 ULS G-
Node
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
3
2
3
2
3
2
3
2
3
2
3
2
3
2
3
2
3
Fx kN
-6593.217
6593.217
-4326.758
4326.758
-10192
10192
-10192
10192
-3550.048
3550.048
-5233.342
5233.342
-9815.556
9815.556
-9815.556
9815.556
-4626.542
4626.542
-2579.985
2579.985
-8078.638
8078.638
-483.494
483.494
281.261
-281.261
-3172.736
3172.736
-4216.196
4216.196
-1987.246
1987.246
-1987.246
1987.246
-1624.885
1624.885
-4202.811
4202.811
-2461.44
2461.44
-2461.44
2461.44
-2178.352
Fy kN
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
233
Fz kN
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Mx kNm
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
My kNm
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
201 ULS G
202 ULS G203 ULS G204 ULS G205 ULS G206 ULS G207 ULS G208 ULS G209 ULS G210 ULS G211 ULS G212 ULS G213 ULS G-
201 ULS G
202 ULS G203 ULS G204 ULS G205 ULS G206 ULS G207 ULS G208 ULS G-
2
3
2
3
2
3
2
3
2
4
3
4
3
4
3
4
3
4
3
4
3
4
3
4
3
4
3
4
3
4
3
4
3
4
3
4
1
4
1
4
1
4
1
4
1
4
1
4
1
4
2178.352
-3279.66
3279.66
-1190.014
1190.014
-164.13
164.13
166.242
-166.242
-3081.229
3081.229
-3436.581
3436.581
2428.651
-2428.651
2428.651
-2428.651
-2814.161
2814.161
-3294.441
3294.441
1287.775
-1287.775
1287.775
-1287.775
-2808.175
2808.175
-2077.566
2077.566
3421.095
-3421.095
-2618.77
2618.77
-1462.092
1462.092
-1659.759
1659.759
338.321
-338.321
-1890.634
1890.634
-1890.634
1890.634
-1554.109
1554.109
-56.913
56.913
-1798.282
1798.282
-1798.282
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
234
Prepared
Checked
Verified
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Harjot
R P Sharma
Sumant
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
209 ULS G210 ULS G211 ULS G212 ULS G213 ULS G-
1
4
1
4
1
4
1
4
1
4
1
1798.282
-1535.372
1535.372
953.161
-953.161
-1136.481
1136.481
-1385.486
1385.486
-756.08
756.08
Prepared
Checked
Verified
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Harjot
R P Sharma
Sumant
0
0
0
0
0
0
0
0
0
0
0
Transverse Direction
Longitudinal Direction
Long. Force
Load Cases
Tie 1
kN
201 ULS G-I MEMBER NUMB
-6593
202 ULS G-IIA (R1)
-4327
203 ULS G-IIA (R2) SIDE VIEW -10192
204 ULS G-IIA (R3)
-10192
205 ULS G-IIA (- R3)
-3550
206 ULS G-IIB (R1)
-5233
Tie 2
Tie 3
Tie 4
(Tie1 + Tie3)
kN
-3173
-4216
-1987
-1987
-1625
-4203
kN
-3081
-3437
2429
2429
-2814
-3294
kN
-1660
338
-1891
-1891
-1554
-57
kN
-9674
-7763
-7763
-7763
-6364
-8528
235
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
-9816
-9816
-4627
-2580
-8079
-483
281
-2461
-2461
-2178
-3280
-1190
-164
166
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
1288
1288
-2808
-2078
3421
-2619
-1462
-1798
-1798
-1535
953
-1136
-1385
-756
-8528
-8528
-7435
-4658
-4658
-3102
-1181
=
=
500 N/mm2
0.87 x fy
=
Ast Required
=
=
435 N/mm2
Tensile force / Tensile strength of Steel
0.87
Longitudinal Reinforcement
Max. Tensile force in long direction
9674 kN
9674446
/ 435
22240 mm
36995 mm2
>
Since reinforcement as per Beam theory is more than reinforcement as per Truss Anology, Beam theory is followed for
pile cap design.
Transverse Reinforcement
Max. Tensile force in long direction
4832 kN
4832495
/ 435
11109 mm
34361 mm2
>
Since reinforcement as per Beam theory is more than reinforcement as per Truss Anology, Beam theory is followed for
pile cap design.
Shear Check
No Shear Design Check is required for pile cap design by Truss Analogy.
236
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
237
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
ure P148
Project Code
Date
Rev
21-Feb-13
0
Beam / Pile
No.
P1
P2
P3
P4
P1
P2
P3
P4
P1
P2
P3
P4
P1
P2
P3
P4
P1
P2
P3
P4
P1
P2
P3
P4
Pile load
kN
4607.2
5322.8
164.6
-550.9
2287.0
3009.2
1983.1
1260.9
-353.8
3253.9
2954.3
-653.5
3858.2
3930.8
-1257.7
-1330.3
1818.3
-632.0
1448.9
1384.3
1154.5
-632.0
924.5
843.9
238
ure P148
Project Code
Date
Rev
21-Feb-13
0
Mz kNm
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
239
ure P148
Project Code
Date
Rev
21-Feb-13
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
240
ure P148
Project Code
Date
Rev
21-Feb-13
0
0
0
0
0
0
0
0
0
0
0
0
Longitudinal Direction
Trans. Force
(Tie2 + Tie4)
kN
-4832
-3878
-3878
-3878
-3179
-4260
241
ure P148
Project Code
Date
Rev
21-Feb-13
0
-4260
-4260
-3714
-2326
-2326
-1550
-590
x 500
22240 mm2
11109 mm2
242
ure P148
Project Code
Date
Rev
21-Feb-13
0
243
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
Layer
thk.
m
0
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
m
0.5
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
N value
12
23
27
26
27
36
51
85
101
100
100
84
53
51
50
51
53
69
98
101
82
41
43
44
43
43
48
57
54
55
59
Type of sand
Medium
Medium
Medium
Medium
Medium
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dense
Dry/
submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
Submerged
244
Harjot
R P Sharma
Sumant
Kstatic
Kdynamic
Kstatic
kN/m3
kN/m
1688
3272
3848
3704
3848
5108
6723
10385
12000
12000
12000
10277
6938
6723
6615
6723
6938
8662
11785
12000
10062
5646
5862
5969
5862
5862
6400
7369
7046
7154
7585
2532
13088
19240
22224
26936
40862
60508
103846
132000
144000
156000
143877
104077
107569
112462
121015
131831
173231
247477
264000
231415
135508
146538
155200
158262
164123
185600
221077
218431
228923
250292
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
245
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Substructure P148
-
Project Code
Date
2/21/2013
Rev
Appendix-1
=
=
=
NBH-26
h
h z.y
3.5 Kstatic
Kdynamic
kN/m
8862
45808
67340
77784
94276
143015
211777
363462
462000
504000
546000
503569
364269
376492
393615
423554
461408
606308
866169
924000
809954
474277
512885
543200
553915
574431
649600
773769
764508
801231
876023
246
CC-28
L&T
Substructure P148
Project Code
Date
2/21/2013
Rev
247
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Staad Input for Time Period Calculation
STAAD SPACE
INPUT WIDTH 79
UNIT METER KN
SET ECHO OFF
JOINT COORDINATES
1
-3
2
3
3
3
4
-3
5
0
6
0
7
-3
8
3
9
3
10
-3
11
0
12
0
13
-3
14
3
15
3
16
-3
17
0
18
0
19
-3
20
3
21
3
22
-3
23
0
24
0
25
-3
26
3
27
3
28
-3
29
0
30
0
31
-3
32
3
33
3
34
-3
35
0
36
0
37
-3
38
3
39
3
40
-3
41
0
42
0
43
-3
44
3
Pier P148
AECOM/CC28/PF148
10761.372
-2
-2
-2
-2
-2
-2
-3
-3
-3
-3
-3
-3
-4
-4
-4
-4
-4
-4
-5
-5
-5
-5
-5
-5
-6
-6
-6
-6
-6
-6
-7
-7
-7
-7
-7
-7
-8
-8
-8
-8
-8
-8
-9
-9
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
248
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
Pier P148
AECOM/CC28/PF148
10761.372
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
-9
-9
-9
-9
-10
-10
-10
-10
-10
-10
-11
-11
-11
-11
-11
-11
-12
-12
-12
-12
-12
-12
-13
-13
-13
-13
-13
-13
-14
-14
-14
-14
-14
-14
-15
-15
-15
-15
-15
-15
-16
-16
-16
-16
-16
-16
-17
-17
-17
-17
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
249
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
Pier P148
AECOM/CC28/PF148
10761.372
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-17
-17
-18
-18
-18
-18
-18
-18
-19
-19
-19
-19
-19
-19
-20
-20
-20
-20
-20
-20
-21
-21
-21
-21
-21
-21
-22
-22
-22
-22
-22
-22
-23
-23
-23
-23
-23
-23
-24
-24
-24
-24
-24
-24
-25
-25
-25
-25
-25
-25
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
250
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
201
202
Pier P148
AECOM/CC28/PF148
10761.372
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
0
0
-26
-26
-26
-26
-26
-26
-27
-27
-27
-27
-27
-27
-28
-28
-28
-28
-28
-28
-29
-29
-29
-29
-29
-29
-30
-30
-30
-30
-30
-30
-31
-31
-31
-31
-31
-31
-32
-32
-32
-32
-32
-32
-33
-33
-33
-33
-33
-33
-2
-0.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
0
0
251
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
203
204
205
206
207
208
209
210
211
212
213
215
216
217
218
219
220
221
222
223
224
225
226
227
228
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
Pier P148
AECOM/CC28/PF148
10761.372
0
0
0
0
0
0
0
0
-1.5
-3
-1.5
0
1.5
1.5
3
-1.5
-3
1.5
3
-1.5
-3
0
1.5
3
-1.5
1.5
-3
-1.5
0
1.5
3
-1.5
-3
0
1.5
3
-3.75
-3.75
-3.75
-3.75
-3.75
-3.75
-3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
0.75
2.08
4.16
5.21
5.96
6.09
6.51
7.79
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
0
0
0
0
0
0
0
0
-1.5
-0.75
-0.75
-0.75
-1.5
-0.75
-0.75
0
0
0
0
0.75
0.75
0.75
0.75
0.75
1.5
1.5
-2.25
-2.25
-2.25
-2.25
-2.25
2.25
2.25
2.25
2.25
2.25
-1.5
-0.75
0
0.75
1.5
-2.25
2.25
-1.5
-0.75
0
0.75
1.5
-2.25
2.25
252
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
MEMBER INCIDENCES
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
Pier P148
AECOM/CC28/PF148
10761.372
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
253
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
Pier P148
AECOM/CC28/PF148
10761.372
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
254
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
Pier P148
AECOM/CC28/PF148
10761.372
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
Member Numbers
255
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
150
150
151
151
152
152
153
153
154
154
155
155
156
156
157
157
158
158
159
159
160
160
161
161
162
162
163
163
164
164
165
165
166
166
167
167
168
168
169
169
170
170
171
171
172
172
173
173
174
174
175
175
176
176
177
177
178
178
179
179
180
180
181
181
182
182
183
183
184
184
185
185
186
186
205
201
206
202
207
203
208
204
209
205
210
206
211
207
212
208
213
209
ELEMENT INCIDENCES SHELL
214
4
215
211
216
6
Pier P148
AECOM/CC28/PF148
10761.372
Prepared
Checked
Verified
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
202
203
204
205
206
207
208
209
210
Harjot
R P Sharma
Sumant
211
6
216
213
215
217
256
212
213
215
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
216
212
213
215
217
220
219
201
221
224
223
225
226
231
232
233
234
1
228
5
230
241
242
243
244
246
245
3
218
222
227
235
2
ELEMENT
PROPERTY
214 TO
DEFINE MATERIAL START
ISOTROPIC CONCRETEM35
E 29500000
POISSON 0.17
DENSITY 25
ALPHA 1.17e-005
DAMP 0.05
ISOTROPIC CONCRETEM45
E 32500000
POISSON 0.17
DENSITY 25
ALPHA 1.17e-005
DAMP 0.05
ISOTROPIC CONCRETEM50
E 34000000
Pier P148
AECOM/CC28/PF148
10761.372
3
213
215
217
218
219
201
221
222
223
225
226
227
232
233
234
235
228
5
230
2
4
212
220
224
231
1
248
249
250
251
253
252
218
219
201
221
222
223
225
226
227
228
5
230
2
211
6
216
3
236
238
239
240
212
220
224
1
4
237
249
250
251
252
248
254
249 THICKNESS
257
Prepared
Checked
Verified
217
220
219
201
221
224
223
225
226
1
228
5
230
4
211
6
216
237
236
238
239
242
243
244
245
241
247
218
222
227
2
3
240
1.5
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
POISSON 0.17
DENSITY 25
ALPHA 1.17e-005
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
1 TO 144 PRIS AX 0.785 IX 0.074 IY 0.037 IZ 0.037
206 207 208 PRIS AX 3.464 IX 1.432 IY 0.716 IZ 0.716
205 PRIS YD 4.5 ZD 7.5
209 TO 210 PRIS YD 3.35 ZD 4.1
211 TO 213 PRIS YD 1.15 ZD 1.1
CONSTANTS
MATERIAL CONCRETEM35 MEMB 1 TO 144 205 214 TO 249
MATERIAL CONCRETEM50 MEMB 206 207 208
MATERIAL CONCRETEM45 MEMB 209 TO 213
SUPPORTS
7 TO 12 FIXED BUT FY MX MY MZ KFX 8862 KFZ 8862
13 TO 18 FIXED BUT FY MX MY MZ KFX 45808 KFZ 45808
19 TO 24 FIXED BUT FY MX MY MZ KFX 67340 KFZ 67340
25 TO 30 FIXED BUT FY MX MY MZ KFX 77784 KFZ 77784
31 TO 36 FIXED BUT FY MX MY MZ KFX 94276 KFZ 94276
37 TO 42 FIXED BUT FY MX MY MZ KFX 143015 KFZ 143015
43 TO 48 FIXED BUT FY MX MY MZ KFX 211777 KFZ 211777
49 TO 54 FIXED BUT FY MX MY MZ KFX 363462 KFZ 363462
55 TO 60 FIXED BUT FY MX MY MZ KFX 462000 KFZ 462000
61 TO 66 FIXED BUT FY MX MY MZ KFX 504000 KFZ 504000
67 TO 72 FIXED BUT FY MX MY MZ KFX 546000 KFZ 546000
73 TO 78 FIXED BUT FY MX MY MZ KFX 503569 KFZ 503569
79 TO 84 FIXED BUT FY MX MY MZ KFX 364269 KFZ 364269
85 TO 90 FIXED BUT FY MX MY MZ KFX 376492 KFZ 376492
91 TO 96 FIXED BUT FY MX MY MZ KFX 393615 KFZ 393615
97 TO 102 FIXED BUT FY MX MY MZ KFX 423554 KFZ 423554
103 TO 108 FIXED BUT FY MX MY MZ KFX 461408 KFZ 461408
109 TO 114 FIXED BUT FY MX MY MZ KFX 606308 KFZ 606308
115 TO 120 FIXED BUT FY MX MY MZ KFX 866169 KFZ 866169
121 TO 126 FIXED BUT FY MX MY MZ KFX 924000 KFZ 924000
127 TO 132 FIXED BUT FY MX MY MZ KFX 809954 KFZ 809954
133 TO 138 FIXED BUT FY MX MY MZ KFX 474277 KFZ 474277
139 TO 144 FIXED BUT FY MX MY MZ KFX 512885 KFZ 512885
145 TO 150 FIXED BUT MX MZ KFX 543200 KFZ 543200
151 TO 156 FIXED BUT FY MX MY MZ KFX 553915 KFZ 553915
157 TO 162 FIXED BUT MX MZ KFX 574431 KFZ 574431
163 TO 168 FIXED BUT FY MX MY MZ KFX 649600 KFZ 649600
169 TO 174 FIXED BUT FY MX MY MZ KFX 773769 KFZ 773769
175 TO 180 FIXED BUT FY MX MY MZ KFX 764508 KFZ 764508
181 TO 186 FIXED BUT FY MX MY MZ KFX 801231 KFZ 801231
187 TO 192 FIXED BUT MX MZ KFX 876023 KFZ 876023
LOAD 1 LONGITUDINAL
JOINT LOAD
203 FX 62.95
258
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
Prepared
Checked
Verified
204 FX 201.885
206 FX 451.25
208 FX 20.25
209 FX 26.88
209 FX 7631.08
CALCULATE RAYLEIGH FREQUENCY
LOAD 2 TRANSVERSE
JOINT LOAD
203 FZ 62.95
204 FZ 201.885
206 FZ 451.25
208 FZ 20.25
209 FZ 26.88
209 FZ 8142.77
CALCULATE RAYLEIGH FREQUENCY
PERFORM ANALYSIS
FINISH
STAAD Output
****************************************************
*
*
*
STAAD.Pro V8i SELECTseries3
*
*
Version 20.07.08.22
*
*
Proprietary Program of
*
*
Bentley Systems, Inc.
*
*
Date= FEB 19, 2013
*
*
Time= 10:57:22
*
*
*
*
USER ID: AECOM
*
****************************************************
1. STAAD SPACE
INPUT FILE: TP.P148.STD
2. START JOB INFORMATION
3. ENGINEER DATE 19-FEB-13
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. SET ECHO OFF
PR O B LE M S TAT I S T I C S
----------------------------------NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS = 202/ 189/ 144
259
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
Prepared
Checked
Verified
**********************************************************
*
*
* RAYLEIGH FREQUENCY FOR LOADING 1 = 1.53046 CPS *
* MAX DEFLECTION = 12.50208 CM GLO X, AT JOINT 210 *
*
*
**********************************************************
STAAD SPACE
-- PAGE NO.
**********************************************************
*
*
* RAYLEIGH FREQUENCY FOR LOADING 2 = 1.28047 CPS *
* MAX DEFLECTION = 17.66827 CM GLO Z, AT JOINT 210 *
*
*
**********************************************************
STAAD SPACE
-- PAGE NO.
260
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
-- PAGE NO.
261
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
cture P148
Project Code
Date
2/21/2013
Rev
Appendix-2
262
cture P148
Project Code
Date
2/21/2013
Rev
Appendix-2
263
cture P148
Project Code
Date
2/21/2013
Rev
Appendix-2
264
cture P148
Project Code
Date
2/21/2013
Rev
Appendix-2
265
cture P148
Project Code
Date
2/21/2013
Rev
Appendix-2
266
cture P148
Project Code
Date
2/21/2013
Rev
Appendix-2
267
cture P148
Project Code
Date
2/21/2013
Rev
Appendix-2
268
cture P148
Project Code
Date
2/21/2013
Rev
Appendix-2
ember Numbers
269
cture P148
Project Code
Date
2/21/2013
Rev
Appendix-2
270
cture P148
Project Code
Date
2/21/2013
Rev
Appendix-2
271
cture P148
Project Code
Date
2/21/2013
Rev
Appendix-2
272
cture P148
Project Code
Date
2/21/2013
Rev
Appendix-2
273
cture P148
Project Code
Date
2/21/2013
Rev
Appendix-2
274
cture P148
Project Code
Date
2/21/2013
Rev
Appendix-2
275
AECOM
Definition
Name
Section 1
Type
Concrete
Material
M50 - C
Origin
Centre
Dimensions
Diameter
2100.mm
Section Area
3.464E+6mm2
Reinforcement Area
39270.mm2
Reinforcement
1.134%
Section Nodes
Node Y
Z
[mm]
[mm]
1
0.0 1051.
2 126.7 1044.
3 251.6 1021.
4 372.8 983.0
5 488.6 930.9
6 597.2 865.2
7 697.1 786.9
8 786.9 697.1
9 865.2 597.2
10 930.9 488.6
11 983.0 372.8
12 1021. 251.6
13 1044. 126.7
14 1051. -61.62E-6
15 1044. -126.7
16 1021. -251.6
17 983.0 -372.8
18 930.9 -488.6
19 865.2 -597.2
20 786.9 -697.1
21 697.1 -786.9
22 597.2 -865.2
23 488.6 -930.9
24 372.8 -983.0
25 251.6 -1021.
26 126.7 -1044.
27 -123.2E-6 -1051.
28 -126.7 -1044.
29 -251.6 -1021.
30 -372.8 -983.0
31 -488.6 -930.9
32 -597.2 -865.2
33 -697.1 -786.9
34 -786.9 -697.1
35 -865.2 -597.2
276
Appendix-3
AECOM
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
-930.9 -488.6
-983.0 -372.8
-1021. -251.6
-1044. -126.7
-1051. 184.9E-6
-1044. 126.7
-1021. 251.6
-983.0 372.8
-930.9 488.6
-865.2 597.2
-786.9 697.1
-697.1 786.9
-597.2 865.2
-488.6 930.9
-372.8 983.0
-251.6 1021.
-126.7 1044.
Bars
Bar
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
[mm]
917.5
906.2
872.6
817.5
742.3
648.8
539.3
416.5
283.5
143.5
0.0
-143.5
-283.5
-416.5
-539.3
-648.8
-742.3
-817.5
-872.6
-906.2
-917.5
-906.2
-872.6
-817.5
-742.3
Diameter
[mm]
[mm]
0.0 25.00
143.5 25.00
283.5 25.00
416.5 25.00
539.3 25.00
648.8 25.00
742.3 25.00
817.5 25.00
872.6 25.00
906.2 25.00
917.5 25.00
906.2 25.00
872.6 25.00
817.5 25.00
742.3 25.00
648.8 25.00
539.3 25.00
416.5 25.00
283.5 25.00
143.5 25.00
0.0 25.00
-143.5 25.00
-283.5 25.00
-416.5 25.00
-539.3 25.00
277
Appendix-3
AECOM
26 -648.8 -648.8 25.00
27 -539.3 -742.3 25.00
28 -416.5 -817.5 25.00
29 -283.5 -872.6 25.00
30 -143.5 -906.2 25.00
31
0.0 -917.5 25.00
32 143.5 -906.2 25.00
33 283.5 -872.6 25.00
34 416.5 -817.5 25.00
35 539.3 -742.3 25.00
36 648.8 -648.8 25.00
37 742.3 -539.3 25.00
38 817.5 -416.5 25.00
39 872.6 -283.5 25.00
40 906.2 -143.5 25.00
41 967.5
0.0 25.00
42 955.6 151.4 25.00
43 920.1 299.0 25.00
44 862.0 439.2 25.00
45 782.7 568.7 25.00
46 684.1 684.1 25.00
47 568.7 782.7 25.00
48 439.2 862.0 25.00
49 299.0 920.1 25.00
50 151.4 955.6 25.00
51 -120.4E-6 967.5 25.00
52 -151.4 955.6 25.00
53 -299.0 920.1 25.00
54 -439.2 862.0 25.00
55 -568.7 782.7 25.00
56 -684.1 684.1 25.00
57 -782.7 568.7 25.00
58 -862.0 439.2 25.00
59 -920.1 299.0 25.00
60 -955.6 151.4 25.00
61 -967.5 -240.8E-6 25.00
62 -955.6 -151.4 25.00
63 -920.1 -299.0 25.00
64 -862.0 -439.2 25.00
65 -782.7 -568.7 25.00
66 -684.1 -684.1 25.00
67 -568.7 -782.7 25.00
68 -439.2 -862.0 25.00
69 -299.0 -920.1 25.00
70 -151.4 -955.6 25.00
71 126.3E-6 -967.5 25.00
72 151.4 -955.6 25.00
73 299.0 -920.1 25.00
74 439.2 -862.0 25.00
75 568.7 -782.7 25.00
76 684.1 -684.1 25.00
77 782.7 -568.7 25.00
78 862.0 -439.2 25.00
79 920.1 -299.0 25.00
80 955.6 -151.4 25.00
278
Appendix-3
AECOM
Elastic Properties
Geometric Centroid
y
0.0mm
0.0mm
Area
3.464E+6mm2
Second Moments of Area
Iyy
954.7E+9mm4
Izz
954.7E+9mm4
Iyz
0.0mm4
Principal Second Moments of Area Iuu
954.7E+9mm4
Izz
954.7E+9mm4
Angle
0.0
Shear Area Factor
ky
0.8571
kz
0.8571
Torsion Constant
1.909E+12mm4
Section Modulus
Zy
909.2E+6mm3
Zz
909.2E+6mm3
Plastic Modulus
Zpy
1.544E+9mm3
Zpz
1.544E+9mm3
Radius of Gyration
Ry
525.0mm
Rz
525.0mm
z
Geometric Centroid
y
333.0E-9mm
-2.912E-6mm
124.3E+6kN
EIyy
35.36E+6kNm2
EIzz
35.36E+6kNm2
EIyz
-0.01062kNm2
EIuu
35.36E+6kNm2
EIzz
35.36E+6kNm2
Angle
-45.00
z
EA
EI
Principal EI
Concrete
M50 - C
Normal Weight
r
2.300t/m3
fck 50.00N/mm2
fcr 0.0N/mm2
279
Appendix-3
AECOM
Reinforcement Properties
Name
500
fy
500.0N/mm2
Modulus
200000.N/mm2
Partial Safety Factor gms,ULS 1.150
gms,SLS 1.000
Maximum Strain
0.004174[-]
Stress/Strain Curve
Elastic-plastic
Loading
Reference Point
All loading acts through the Reference Point.
All strain planes are defined relative to the Reference Point.
Definition
Geometric
Centroid
Reference Point Coordinates y 0.0mm
z 0.0mm
Title
280
Appendix-3
AECOM
15 ULS7
16 ULS8
17 ULS9
18 ULS10
19 ULS11
20 ULS12
21 ULS13
22 ULS14
23 ULS15
Applied loads
Load Case
N Myy Mzz
[kN] [kNm] [kNm]
SLS1
11800. 6684. 0.0
SLS2
10330. 9594. 0.0
SLS3
10330. 13900. 0.0
SLS4
11280. 4096. 0.0
SLS5
9373. 3717. 0.0
SLS6
10330. 3905. 0.0
SLS7
10330. 3905. 0.0
SLS8
10330. 5823. 0.0
ULS1
17090. 10390. 0.0
ULS2
14510. 12390. 0.0
ULS3
14510. 17990. 0.0
ULS4
15700. 5743. 0.0
ULS5
13320. 5268. 0.0
ULS6
14510. 5505. 0.0
ULS7
14510. 5505. 0.0
ULS8
12790. 11730. 0.0
ULS9
12790. 19080. 0.0
ULS10
14320. 3283. 0.0
ULS11
11260. 2618. 0.0
ULS12
7397. 11100. 0.0
ULS13
7397. 16820. 0.0
ULS14
8829. 1975. 0.0
ULS15
5964. 1352. 0.0
Section 1 Details
1.13% reinforcement in section 1 (Section 1). Check this against code requirements.
Loading
Pre-stress Creep
Factor Coeff.
Long Term Short Term
281
Appendix-3
AECOM
282
Appendix-3
AECOM
Loading Pre-stress
Factor
283
Appendix-3
AECOM
Case Eff.
Eff.
N M
Mu M/Mu Governing Neutral Neutral
Centroid Centroid
Condition Axis Axis
(y)
(z)
Angle Depth
[kN] [kNm] [kNm]
[] [mm]
Maxima
13 -1.941E-6 -9.133E-6 7397. 16820. 17170. 0.9796 A: Bar 71
Minima
15 -1.942E-6 -9.111E-6 5964. 1352. 16340. 0.08272 A: Bar 71
284
Appendix-3
AECOM
285
Appendix-3
AECOM
286
Appendix-3
AECOM
287
Appendix-3
AECOM
288
Appendix-3
AECOM
289
Appendix-3
AECOM
290
Appendix-3
AECOM
291
Appendix-3
AECOM
292
Appendix-3
AECOM
293
Appendix-3
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Staad Input for Pile Design
STAAD SPACE
INPUT WIDTH 79
UNIT METER KN
SET NL 7
JOINT COORDINATES
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
Pier P148
AECOM/CC28/PF148
10761.372
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
-2
-2
-2
-2
-2
-2
-3
-3
-3
-3
-3
-3
-4
-4
-4
-4
-4
-4
-5
-5
-5
-5
-5
-5
-6
-6
-6
-6
-6
-6
-7
-7
-7
-7
-7
-7
-8
-8
-8
-8
-8
-8
-9
-9
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
294
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
Structure Idealization
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
Pier P148
AECOM/CC28/PF148
10761.372
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
-9
-9
-9
-9
-10
-10
-10
-10
-10
-10
-11
-11
-11
-11
-11
-11
-12
-12
-12
-12
-12
-12
-13
-13
-13
-13
-13
-13
-14
-14
-14
-14
-14
-14
-15
-15
-15
-15
-15
-15
-16
-16
-16
-16
-16
-16
-17
-17
-17
-17
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
295
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
Pier P148
AECOM/CC28/PF148
10761.372
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-17
-17
-18
-18
-18
-18
-18
-18
-19
-19
-19
-19
-19
-19
-20
-20
-20
-20
-20
-20
-21
-21
-21
-21
-21
-21
-22
-22
-22
-22
-22
-22
-23
-23
-23
-23
-23
-23
-24
-24
-24
-24
-24
-24
-25
-25
-25
-25
-25
-25
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
296
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
201
202
Pier P148
AECOM/CC28/PF148
10761.372
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
0
0
-26
-26
-26
-26
-26
-26
-27
-27
-27
-27
-27
-27
-28
-28
-28
-28
-28
-28
-29
-29
-29
-29
-29
-29
-30
-30
-30
-30
-30
-30
-31
-31
-31
-31
-31
-31
-32
-32
-32
-32
-32
-32
-33
-33
-33
-33
-33
-33
-2
-0.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
0
0
297
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
203
0
204
0
205
0
211
-1.5
212
-3
213
-1.5
215
0
216
1.5
217
1.5
218
3
219
-1.5
220
-3
221
1.5
222
3
223
-1.5
224
-3
225
0
226
1.5
227
3
228
-1.5
230
1.5
231
-3
232
-1.5
233
0
234
1.5
235
3
236
-1.5
237
-3
238
0
239
1.5
240
3
241
-3.75
242
-3.75
243
-3.75
244
-3.75
245
-3.75
246
-3.75
247
-3.75
248
3.75
249
3.75
250
3.75
251
3.75
252
3.75
253
3.75
254
3.75
MEMBER INCIDENCES
1
1
2
2
3
3
4
4
Pier P148
AECOM/CC28/PF148
10761.372
4.163
5.063
5.963
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
0
0
0
-1.5
-0.75
-0.75
-0.75
-1.5
-0.75
-0.75
0
0
0
0
0.75
0.75
0.75
0.75
0.75
1.5
1.5
-2.25
-2.25
-2.25
-2.25
-2.25
2.25
2.25
2.25
2.25
2.25
-1.5
-0.75
0
0.75
1.5
-2.25
2.25
-1.5
-0.75
0
0.75
1.5
-2.25
2.25
7
8
9
10
298
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
Pier P148
AECOM/CC28/PF148
10761.372
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
299
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
Pier P148
AECOM/CC28/PF148
10761.372
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
Member Numbers
300
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
Pier P148
AECOM/CC28/PF148
10761.372
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
301
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
155
155
156
156
157
157
158
158
159
159
160
160
161
161
162
162
163
163
164
164
165
165
166
166
167
167
168
168
169
169
170
170
171
171
172
172
173
173
174
174
175
175
176
176
177
177
178
178
179
179
180
180
181
181
182
182
183
183
184
184
185
185
186
186
205
201
206
202
207
203
208
204
ELEMENT INCIDENCES SHELL
214
4
215
211
216
6
217
216
218
212
219
213
220
215
221
217
222
220
223
219
224
201
225
221
226
224
Pier P148
AECOM/CC28/PF148
10761.372
Prepared
Checked
Verified
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
202
203
204
205
211
6
216
3
213
215
217
218
219
201
221
222
223
213
215
217
218
219
201
221
222
223
225
226
227
228
302
212
213
215
217
220
219
201
221
224
223
225
226
1
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
223
225
226
231
232
233
234
1
228
5
230
241
242
243
244
246
245
3
218
222
227
235
2
ELEMENT
PROPERTY
214 TO
DEFINE MATERIAL START
ISOTROPIC CONCRETEM35
E 29500000
POISSON 0.17
DENSITY 22.5
ALPHA 1.17e-005
DAMP 0.05
ISOTROPIC CONCRETEM45
E 32500000
POISSON 0.17
DENSITY 25
ALPHA 1.17e-005
DAMP 0.05
ISOTROPIC CONCRETEM50
E 34000000
POISSON 0.17
DENSITY 25
ALPHA 1.17e-005
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
1 TO 144 PRIS YD 1
206 PRIS YD 2.1
205 PRIS YD 4.5 ZD 7.5
207 TO 208 PRIS YD 3.35 ZD 4.1
Pier P148
AECOM/CC28/PF148
10761.372
225
226
227
232
233
234
235
228
5
230
2
4
212
220
224
231
1
248
249
250
251
253
252
5
230
2
211
6
216
3
236
238
239
240
212
220
224
1
4
237
249
250
251
252
248
254
249 THICKNESS
303
Prepared
Checked
Verified
228
5
230
4
211
6
216
237
236
238
239
242
243
244
245
241
247
218
222
227
2
3
240
1.5
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
CONSTANTS
MATERIAL CONCRETEM35 MEMB 1 TO 144 205 214 TO 249
MATERIAL CONCRETEM50 MEMB 206
MATERIAL CONCRETEM45 MEMB 207 208
*** STATIC SOIL STIFFNESS
SUPPORTS
7 TO 12 FIXED BUT FY MX MY MZ KFX 2532 KFZ 2532
13 TO 18 FIXED BUT FY MX MY MZ KFX 13088 KFZ 13088
19 TO 24 FIXED BUT FY MX MY MZ KFX 19240 KFZ 19240
25 TO 30 FIXED BUT FY MX MY MZ KFX 22224 KFZ 22224
31 TO 36 FIXED BUT FY MX MY MZ KFX 26936 KFZ 26936
37 TO 42 FIXED BUT FY MX MY MZ KFX 40862 KFZ 40862
43 TO 48 FIXED BUT FY MX MY MZ KFX 60508 KFZ 60508
49 TO 54 FIXED BUT FY MX MY MZ KFX 103846 KFZ 103846
55 TO 60 FIXED BUT FY MX MY MZ KFX 132000 KFZ 132000
61 TO 66 FIXED BUT FY MX MY MZ KFX 144000 KFZ 144000
67 TO 72 FIXED BUT FY MX MY MZ KFX 156000 KFZ 156000
73 TO 78 FIXED BUT FY MX MY MZ KFX 143877 KFZ 143877
79 TO 84 FIXED BUT FY MX MY MZ KFX 104077 KFZ 104077
85 TO 90 FIXED BUT FY MX MY MZ KFX 107569 KFZ 107569
91 TO 96 FIXED BUT FY MX MY MZ KFX 112462 KFZ 112462
97 TO 102 FIXED BUT FY MX MY MZ KFX 121015 KFZ 121015
103 TO 108 FIXED BUT FY MX MY MZ KFX 131831 KFZ 131831
109 TO 114 FIXED BUT FY MX MY MZ KFX 173231 KFZ 173231
115 TO 120 FIXED BUT FY MX MY MZ KFX 247477 KFZ 247477
121 TO 126 FIXED BUT FY MX MY MZ KFX 264000 KFZ 264000
127 TO 132 FIXED BUT FY MX MY MZ KFX 231415 KFZ 231415
133 TO 138 FIXED BUT FY MX MY MZ KFX 135508 KFZ 135508
139 TO 144 FIXED BUT FY MX MY MZ KFX 146538 KFZ 146538
145 TO 150 FIXED BUT MX MZ KFX 155200 KFZ 155200
151 TO 156 FIXED BUT FY MX MY MZ KFX 158262 KFZ 158262
157 TO 162 FIXED BUT MX MZ KFX 164123 KFZ 164123
163 TO 168 FIXED BUT FY MX MY MZ KFX 185600 KFZ 185600
169 TO 174 FIXED BUT FY MX MY MZ KFX 221077 KFZ 221077
175 TO 180 FIXED BUT FY MX MY MZ KFX 218431 KFZ 218431
181 TO 186 FIXED BUT FY MX MY MZ KFX 228923 KFZ 228923
187 TO 192 FIXED BUT MX MZ KFX 250292 KFZ 250292
LOAD 1 DEAD LOAD
SELFWEIGHT Y -1 LIST 1 TO 144
JOINT LOAD
205 FY -5296.45
205 MZ -316.03
205 MX 1164.76
202 FY -2033.54
202 MZ 0
202 MX 0
LOAD 2 SIDL
JOINT LOAD
205 FY -2833.01
205 MZ -212.63
304
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
Spring Supports
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
205 MX 689.01
LOAD 4 LWR
JOINT LOAD
205 FX 486.58
205 MZ -267.62
PERFORM ANALYSIS
CHANGE
*** DYNAMIC SOIL STIFFNESS
SUPPORTS
7 TO 12 FIXED BUT FY MX MY MZ KFX 8862 KFZ 8862
13 TO 18 FIXED BUT FY MX MY MZ KFX 45808 KFZ 45808
19 TO 24 FIXED BUT FY MX MY MZ KFX 67340 KFZ 67340
25 TO 30 FIXED BUT FY MX MY MZ KFX 77784 KFZ 77784
31 TO 36 FIXED BUT FY MX MY MZ KFX 94276 KFZ 94276
37 TO 42 FIXED BUT FY MX MY MZ KFX 143015 KFZ 143015
43 TO 48 FIXED BUT FY MX MY MZ KFX 211777 KFZ 211777
49 TO 54 FIXED BUT FY MX MY MZ KFX 363462 KFZ 363462
55 TO 60 FIXED BUT FY MX MY MZ KFX 462000 KFZ 462000
61 TO 66 FIXED BUT FY MX MY MZ KFX 504000 KFZ 504000
67 TO 72 FIXED BUT FY MX MY MZ KFX 546000 KFZ 546000
73 TO 78 FIXED BUT FY MX MY MZ KFX 503569 KFZ 503569
79 TO 84 FIXED BUT FY MX MY MZ KFX 364269 KFZ 364269
85 TO 90 FIXED BUT FY MX MY MZ KFX 376492 KFZ 376492
91 TO 96 FIXED BUT FY MX MY MZ KFX 393615 KFZ 393615
97 TO 102 FIXED BUT FY MX MY MZ KFX 423554 KFZ 423554
103 TO 108 FIXED BUT FY MX MY MZ KFX 461408 KFZ 461408
109 TO 114 FIXED BUT FY MX MY MZ KFX 606308 KFZ 606308
115 TO 120 FIXED BUT FY MX MY MZ KFX 866169 KFZ 866169
121 TO 126 FIXED BUT FY MX MY MZ KFX 924000 KFZ 924000
127 TO 132 FIXED BUT FY MX MY MZ KFX 809954 KFZ 809954
133 TO 138 FIXED BUT FY MX MY MZ KFX 474277 KFZ 474277
139 TO 144 FIXED BUT FY MX MY MZ KFX 512885 KFZ 512885
145 TO 150 FIXED BUT MX MZ KFX 543200 KFZ 543200
151 TO 156 FIXED BUT FY MX MY MZ KFX 553915 KFZ 553915
157 TO 162 FIXED BUT MX MZ KFX 574431 KFZ 574431
163 TO 168 FIXED BUT FY MX MY MZ KFX 649600 KFZ 649600
169 TO 174 FIXED BUT FY MX MY MZ KFX 773769 KFZ 773769
175 TO 180 FIXED BUT FY MX MY MZ KFX 764508 KFZ 764508
181 TO 186 FIXED BUT FY MX MY MZ KFX 801231 KFZ 801231
187 TO 192 FIXED BUT MX MZ KFX 876023 KFZ 876023
*** DYNAMIC LOADS
LOAD 3 LIVE LOAD
JOINT LOAD
205 FY -2046.78
205 FX 443.61
205 FZ 255.25
205 MZ -750.52
205 MX 1692.66
LOAD 11 LONGITUDINAL SEISMIC (r1)
JOINT LOAD
305
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
205 FX 1350.18
205 MZ -634.95
202 FX 36.31
202 MZ -84.65
LOAD 12 TRANSVERSE SEISMIC (r2)
JOINT LOAD
205 FZ 1377.21
205 MX 3127.43
202 FZ 30.38
202 MX 70.82
LOAD 13 VERTICAL SEISMIC (r3)
JOINT LOAD
205 FY -1145.8
205 MZ 33.02
205 MX 250.15
202 FY -195.4
202 MZ 0
202 MX 0
*****LOAD COMBINATIONS *****
*** SLS LOAD COMBINATIONS
LOAD COMB 101 SLS G-I
1 1 2 1.2 3 1.1
LOAD COMB 102 SLS G-IIa (r1)
1 1 2 1.2 11 1
LOAD COMB 103 SLS G-IIa (r2)
1 1 2 1.2 12 1
LOAD COMB 104 SLS G-IIa ( r3)
1 1 2 1.2 13 1
LOAD COMB 105 SLS G-IIa (- r3)
1 1 2 1.2 13 -1
LOAD COMB 106 SLS G-IIb (r1)
1 1 2 1.2 3 0.5 11 1
LOAD COMB 107 SLS G-IIb (r2)
1 1 2 1.2 3 0.5 12 1
LOAD COMB 108 SLS G-IIb (r3)
1 1 2 1.2 3 0.5 13 1
LOAD COMB 109 SLS G-IIb (- r3)
1 1 2 1.2 3 0.5 13 -1
LOAD COMB 110 SLS G-III
1 1 2 1.2 3 0.5 4 1
*** ULS LOAD COMBINATIONS
LOAD COMB 201 ULS G-I
1 1.25 2 2 3 1.75
LOAD COMB 202 ULS G-IIa (r1)
1 1.25 2 2 11 1.6
LOAD COMB 203 ULS G-IIa (r2)
1 1.25 2 2 12 1.6
LOAD COMB 204 ULS G-IIa (r3)
1 1.25 2 2 12 1.6
LOAD COMB 205 ULS G-IIa (- r3)
306
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
1 1.25 2 2 13 -1.6
LOAD COMB 206 ULS G-IIb (r1)
1 1.25 2 2 3 0.7 11 1.25
LOAD COMB 207 ULS G-IIb (r2)
1 1.25 2 2 3 0.7 12 1.25
LOAD COMB 208 ULS G-IIb (r3)
1 1.25 2 2 3 0.7 12 1.25
LOAD COMB 209 ULS G-IIb (- r3)
1 1.25 2 2 3 0.7 13 -1.25
LOAD COMc 210 ULS G-IIc (r1)
1 0.9 2 0.8 3 0 11 1.5
LOAD COMc 211 ULS G-IIc (r2)
1 0.9 2 0.8 3 0 12 1.5
LOAD COMc 212 ULS G-IIc ( r3)
1 0.9 2 0.8 3 0 13 1.5
LOAD COMc 213 ULS G-IIc (- r3)
1 0.9 2 0.8 3 0 13 -1.5
PERFORM ANALYSIS
FINISH
STAAD Output
307
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
308
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
309
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5
ructure Idealization
310
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5
311
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5
312
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5
313
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5
314
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5
315
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5
ember Numbers
316
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5
317
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5
318
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5
319
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5
pring Supports
320
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5
321
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5
322
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5
323
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5
324
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5
325
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Staad Input for Pile Load
STAAD SPACE
INPUT WIDTH 79
UNIT METER KN
SET NL 7
JOINT COORDINATES
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
Pier P148
AECOM/CC28/PF148
10761.372
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
-2
-2
-2
-2
-2
-2
-3
-3
-3
-3
-3
-3
-4
-4
-4
-4
-4
-4
-5
-5
-5
-5
-5
-5
-6
-6
-6
-6
-6
-6
-7
-7
-7
-7
-7
-7
-8
-8
-8
-8
-8
-8
-9
-9
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
326
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
Pier P148
AECOM/CC28/PF148
10761.372
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
-9
-9
-9
-9
-10
-10
-10
-10
-10
-10
-11
-11
-11
-11
-11
-11
-12
-12
-12
-12
-12
-12
-13
-13
-13
-13
-13
-13
-14
-14
-14
-14
-14
-14
-15
-15
-15
-15
-15
-15
-16
-16
-16
-16
-16
-16
-17
-17
-17
-17
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
327
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
Pier P148
AECOM/CC28/PF148
10761.372
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-17
-17
-18
-18
-18
-18
-18
-18
-19
-19
-19
-19
-19
-19
-20
-20
-20
-20
-20
-20
-21
-21
-21
-21
-21
-21
-22
-22
-22
-22
-22
-22
-23
-23
-23
-23
-23
-23
-24
-24
-24
-24
-24
-24
-25
-25
-25
-25
-25
-25
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
328
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
201
202
Pier P148
AECOM/CC28/PF148
10761.372
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
-3
3
3
-3
0
0
0
0
-26
-26
-26
-26
-26
-26
-27
-27
-27
-27
-27
-27
-28
-28
-28
-28
-28
-28
-29
-29
-29
-29
-29
-29
-30
-30
-30
-30
-30
-30
-31
-31
-31
-31
-31
-31
-32
-32
-32
-32
-32
-32
-33
-33
-33
-33
-33
-33
-2
-0.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
1.5
1.5
-1.5
-1.5
1.5
-1.5
0
0
329
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
203
0
204
0
205
0
211
-1.5
212
-3
213
-1.5
215
0
216
1.5
217
1.5
218
3
219
-1.5
220
-3
221
1.5
222
3
223
-1.5
224
-3
225
0
226
1.5
227
3
228
-1.5
230
1.5
231
-3
232
-1.5
233
0
234
1.5
235
3
236
-1.5
237
-3
238
0
239
1.5
240
3
241
-3.75
242
-3.75
243
-3.75
244
-3.75
245
-3.75
246
-3.75
247
-3.75
248
3.75
249
3.75
250
3.75
251
3.75
252
3.75
253
3.75
254
3.75
MEMBER INCIDENCES
1
1
2
2
3
3
4
4
Pier P148
AECOM/CC28/PF148
10761.372
4.163
5.063
5.963
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
-2
0
0
0
-1.5
-0.75
-0.75
-0.75
-1.5
-0.75
-0.75
0
0
0
0
0.75
0.75
0.75
0.75
0.75
1.5
1.5
-2.25
-2.25
-2.25
-2.25
-2.25
2.25
2.25
2.25
2.25
2.25
-1.5
-0.75
0
0.75
1.5
-2.25
2.25
-1.5
-0.75
0
0.75
1.5
-2.25
2.25
7
8
9
10
330
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
Pier P148
AECOM/CC28/PF148
10761.372
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
331
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
Pier P148
AECOM/CC28/PF148
10761.372
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
332
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
Pier P148
AECOM/CC28/PF148
10761.372
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
333
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
155
155
156
156
157
157
158
158
159
159
160
160
161
161
162
162
163
163
164
164
165
165
166
166
167
167
168
168
169
169
170
170
171
171
172
172
173
173
174
174
175
175
176
176
177
177
178
178
179
179
180
180
181
181
182
182
183
183
184
184
185
185
186
186
205
201
206
202
207
203
208
204
ELEMENT INCIDENCES SHELL
214
4
215
211
216
6
217
216
218
212
219
213
220
215
221
217
222
220
223
219
224
201
225
221
226
224
Pier P148
AECOM/CC28/PF148
10761.372
Prepared
Checked
Verified
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
202
203
204
205
211
6
216
3
213
215
217
218
219
201
221
222
223
213
215
217
218
219
201
221
222
223
225
226
227
228
334
212
213
215
217
220
219
201
221
224
223
225
226
1
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
223
225
226
231
232
233
234
1
228
5
230
241
242
243
244
246
245
3
218
222
227
235
2
ELEMENT
PROPERTY
214 TO
DEFINE MATERIAL START
ISOTROPIC CONCRETEM35
E 29500000
POISSON 0.17
DENSITY 25
ALPHA 1.17e-005
DAMP 0.05
ISOTROPIC CONCRETEM45
E 32500000
POISSON 0.17
DENSITY 25
ALPHA 1.17e-005
DAMP 0.05
ISOTROPIC CONCRETEM50
E 34000000
POISSON 0.17
DENSITY 25
ALPHA 1.17e-005
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
1 TO 144 PRIS YD 1
206 PRIS YD 2.1
Pier P148
AECOM/CC28/PF148
10761.372
225
226
227
232
233
234
235
228
5
230
2
4
212
220
224
231
1
248
249
250
251
253
252
5
230
2
211
6
216
3
236
238
239
240
212
220
224
1
4
237
249
250
251
252
248
254
249 THICKNESS
335
Prepared
Checked
Verified
228
5
230
4
211
6
216
237
236
238
239
242
243
244
245
241
247
218
222
227
2
3
240
1.5
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
336
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
205 FY -2833.01
205 MZ -212.63
205 MX 689.01
LOAD 4 LWR
JOINT LOAD
205 FX 486.58
205 MZ -267.62
PERFORM ANALYSIS
CHANGE
*** DYNAMIC SOIL STIFFNESS
SUPPORTS
7 TO 12 FIXED BUT FY MX MY MZ KFX 8862 KFZ 8862
13 TO 18 FIXED BUT FY MX MY MZ KFX 45808 KFZ 45808
19 TO 24 FIXED BUT FY MX MY MZ KFX 67340 KFZ 67340
25 TO 30 FIXED BUT FY MX MY MZ KFX 77784 KFZ 77784
31 TO 36 FIXED BUT FY MX MY MZ KFX 94276 KFZ 94276
37 TO 42 FIXED BUT FY MX MY MZ KFX 143015 KFZ 143015
43 TO 48 FIXED BUT FY MX MY MZ KFX 211777 KFZ 211777
49 TO 54 FIXED BUT FY MX MY MZ KFX 363462 KFZ 363462
55 TO 60 FIXED BUT FY MX MY MZ KFX 462000 KFZ 462000
61 TO 66 FIXED BUT FY MX MY MZ KFX 504000 KFZ 504000
67 TO 72 FIXED BUT FY MX MY MZ KFX 546000 KFZ 546000
73 TO 78 FIXED BUT FY MX MY MZ KFX 503569 KFZ 503569
79 TO 84 FIXED BUT FY MX MY MZ KFX 364269 KFZ 364269
85 TO 90 FIXED BUT FY MX MY MZ KFX 376492 KFZ 376492
91 TO 96 FIXED BUT FY MX MY MZ KFX 393615 KFZ 393615
97 TO 102 FIXED BUT FY MX MY MZ KFX 423554 KFZ 423554
103 TO 108 FIXED BUT FY MX MY MZ KFX 461408 KFZ 461408
109 TO 114 FIXED BUT FY MX MY MZ KFX 606308 KFZ 606308
115 TO 120 FIXED BUT FY MX MY MZ KFX 866169 KFZ 866169
121 TO 126 FIXED BUT FY MX MY MZ KFX 924000 KFZ 924000
127 TO 132 FIXED BUT FY MX MY MZ KFX 809954 KFZ 809954
133 TO 138 FIXED BUT FY MX MY MZ KFX 474277 KFZ 474277
139 TO 144 FIXED BUT FY MX MY MZ KFX 512885 KFZ 512885
145 TO 150 FIXED BUT MX MZ KFX 543200 KFZ 543200
151 TO 156 FIXED BUT FY MX MY MZ KFX 553915 KFZ 553915
157 TO 162 FIXED BUT MX MZ KFX 574431 KFZ 574431
163 TO 168 FIXED BUT FY MX MY MZ KFX 649600 KFZ 649600
169 TO 174 FIXED BUT FY MX MY MZ KFX 773769 KFZ 773769
175 TO 180 FIXED BUT FY MX MY MZ KFX 764508 KFZ 764508
181 TO 186 FIXED BUT FY MX MY MZ KFX 801231 KFZ 801231
187 TO 192 FIXED BUT MX MZ KFX 876023 KFZ 876023
SLAVE FX FZ MX MY MZ MASTER 201 JOINT 1 TO 6
*** DYNAMIC LOADS
LOAD 3 LIVE LOAD
JOINT LOAD
205 FY -2046.78
205 FX 443.61
205 FZ 255.25
205 MZ -750.52
337
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
205 MX 1692.66
LOAD 11 LONGITUDINAL SEISMIC (r1)
JOINT LOAD
205 FX 1350.18
205 MZ -634.95
202 FX 36.31
202 MZ -84.65
LOAD 12 TRANSVERSE SEISMIC (r2)
JOINT LOAD
205 FZ 1377.21
205 MX 3127.43
202 FZ 30.38
202 MX 70.82
LOAD 13 VERTICAL SEISMIC (r3)
JOINT LOAD
205 FY -1145.8
205 MZ 33.02
205 MX 250.15
202 FY -195.4
202 MZ 0
202 MX 0
*****LOAD COMBINATIONS *****
*** SLS LOAD COMBINATIONS
LOAD COMB 101 SLS G-I
112131
LOAD COMB 102 SLS G-IIa (r1)
1 1 2 1 11 1
LOAD COMB 103 SLS G-IIa (r2)
1 1 2 1 12 1
LOAD COMB 104 SLS G-IIa (r3)
1 1 2 1 13 1
LOAD COMB 105 SLS G-IIa (- r3)
1 1 2 1 13 -1
LOAD COMB 106 SLS G-IIb (r1)
1 1 2 1 3 0.5 11 1
LOAD COMB 107 SLS G-IIb (r2)
1 1 2 1 3 0.5 12 1
LOAD COMB 108 SLS G-IIb (r3)
1 1 2 1 3 0.5 13 1
LOAD COMB 109 SLS G-IIb (- r3)
1 1 2 1 3 0.5 13 -1
LOAD COMB 110 SLS G-III
1 1 2 1.2 3 0.5 4 1
PERFORM ANALYSIS
FINISH
338
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
339
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5a
340
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5a
341
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5a
342
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5a
343
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5a
344
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5a
345
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5a
346
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5a
347
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5a
348
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5a
349
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5a
350
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5a
351
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5a
352
8
T
ucture P148
Project Code
Date
2/21/2013
Rev
Appendix-5a
353
AECOM
Definition
Name
Section 1
Type
Concrete
Material
M35 - C
Origin
Centre
Dimensions
Diameter
1000.mm
Section Area
785400.mm2
Reinforcement Area
11780.mm2
Reinforcement
1.500%
Section Nodes
Node Y
Z
[mm]
[mm]
1
0.0 501.3
2 87.04 493.7
3 171.4 471.0
4 250.6 434.1
5 322.2 384.0
6 384.0 322.2
7 434.1 250.6
8 471.0 171.4
9 493.7 87.04
10 501.3 -44.32E-6
11 493.7 -87.05
12 471.0 -171.4
13 434.1 -250.6
14 384.0 -322.2
15 322.2 -384.0
16 250.6 -434.1
17 171.4 -471.0
18 87.04 -493.7
19 -88.64E-6 -501.3
20 -87.05 -493.7
21 -171.4 -471.0
22 -250.6 -434.1
23 -322.2 -384.0
24 -384.0 -322.2
25 -434.1 -250.6
26 -471.0 -171.4
27 -493.7 -87.04
28 -501.3 133.0E-6
29 -493.7 87.05
30 -471.0 171.4
31 -434.1 250.6
32 -384.0 322.2
33 -322.2 384.0
34 -250.6 434.1
354
Appendix-6
AECOM
35
36
-171.4
-87.04
Bars
Bar
Diameter
Loading
Reference Point
All loading acts through the Reference Point.
All strain planes are defined relative to the Reference Point.
Definition
Geometric
Centroid
Reference Point Coordinates y 0.0mm
z 0.0mm
355
Appendix-6
AECOM
Load
Case
1 SLS1
2 SLS2
3 SLS3
4 SLS4
5 SLS5
6 SLS6
7 ULS1
8 ULS2
9 ULS3
Title
Applied loads
Load Case
N Myy Mzz
[kN] [kNm] [kNm]
SLS1
3552. 160.5 0.0
SLS2
644.7 128.7 0.0
SLS3
3288. 477.4 0.0
SLS4
5460. 590.2 0.0
SLS5
-1071. 636.7 0.0
SLS6
-439.0 692.4 0.0
ULS1
7470. 861.5 0.0
ULS2
-2019. 834.1 0.0
ULS3
-1073. 999.6 0.0
Section Material Stresses/Strains at SLS Loads
Case Bar Coordinates
Notes
y
z
Strain Stress
[mm] [mm]
[-]
[N/mm]
Maxima
4 1
0.0 501.3
0.001003 9.864
4 1
0.0 501.3
0.001003 9.864
Minima
5 19 -88.64E-6 -501.3
-0.001966 0.0
2 14 384.0 -322.2
-4.808E-6 0.0
356
Appendix-6
AECOM
Loading Pre-stress
Factor
Case Eff.
Eff.
N M Mu M/Mu Governing Neutral Neutral
Centroid Centroid
Condition Axis Axis
(y)
(z)
Angle Depth
[kN] [kNm] [kNm]
[] [mm]
Maxima
2 27.98E-9 -1.817E-6 -2019. 834.1 979.8 0.8513 A: Bar 21
Minima
1 922.0E-9 110.7E-9 7470. 861.5 2116. 0.4071 B: Node 1
Definition
Name
Section 1
Type
Concrete
Material
M35 - C
Origin
Centre
Dimensions
Diameter
1000.mm
Section Area
785400.mm2
Reinforcement Area
5536.mm2
Reinforcement
0.7049%
357
Appendix-6
AECOM
Section Nodes
Node Y
Z
[mm]
[mm]
1
0.0 501.3
2 87.04 493.7
3 171.4 471.0
4 250.6 434.1
5 322.2 384.0
6 384.0 322.2
7 434.1 250.6
8 471.0 171.4
9 493.7 87.04
10 501.3 -44.32E-6
11 493.7 -87.05
12 471.0 -171.4
13 434.1 -250.6
14 384.0 -322.2
15 322.2 -384.0
16 250.6 -434.1
17 171.4 -471.0
18 87.04 -493.7
19 -88.64E-6 -501.3
20 -87.05 -493.7
21 -171.4 -471.0
22 -250.6 -434.1
23 -322.2 -384.0
24 -384.0 -322.2
25 -434.1 -250.6
26 -471.0 -171.4
27 -493.7 -87.04
28 -501.3 133.0E-6
29 -493.7 87.05
30 -471.0 171.4
31 -434.1 250.6
32 -384.0 322.2
33 -322.2 384.0
34 -250.6 434.1
35 -171.4 471.0
36 -87.04 493.7
Bars
Bar
[mm]
1 404.0
2 373.2
3 285.7
4 154.6
5
0.0
6 -154.6
7 -285.7
8 -373.2
Diameter
[mm]
0.0
154.6
285.7
373.2
404.0
373.2
285.7
154.6
[mm]
20.99
20.99
20.99
20.99
20.99
20.99
20.99
20.99
358
Appendix-6
AECOM
9
10
11
12
13
14
15
16
-404.0
0.0 20.99
-373.2 -154.6 20.99
-285.7 -285.7 20.99
-154.6 -373.2 20.99
0.0 -404.0 20.99
154.6 -373.2 20.99
285.7 -285.7 20.99
373.2 -154.6 20.99
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
500 Steel
Loading
Reference Point
All loading acts through the Reference Point.
All strain planes are defined relative to the Reference Point.
Definition
Geometric
Centroid
Reference Point Coordinates y 0.0mm
z 0.0mm
Title
Applied loads
Load Case
N Myy Mzz
[kN] [kNm] [kNm]
SLS1
3823. 0.0 0.0
SLS2
849.6 178.2 0.0
SLS3
849.6 178.2 0.0
SLS4
4860. 152.6 0.0
SLS5
-437.6 266.0 0.0
SLS6
4099. 270.2 0.0
ULS1
6638. 219.6 0.0
ULS2
-1106. 351.7 0.0
359
Appendix-6
AECOM
ULS3
Loading Pre-stress
Factor
360
Appendix-6
AECOM
Case Eff.
Eff.
N M Mu M/Mu Governing Neutral Neutral
Centroid Centroid
Condition Axis Axis
(y)
(z)
Angle Depth
[kN] [kNm] [kNm]
[] [mm]
Maxima
2
0.0
0.0 -1106. 351.7 443.5 0.7929 A: Bar 13
Minima
1 1.010E-6 469.6E-9 6638. 219.6 1695. 0.1295 B: Node 1
(9m from pile cut off level to end of pile)
Section 1 Details
Definition
Name
Section 1
Type
Concrete
Material
M35 - C
Origin
Centre
Dimensions
Diameter
1000.mm
Section Area
785400.mm2
Reinforcement Area
3217.mm2
Reinforcement
0.4096%
Section Nodes
Node Y
Z
[mm]
[mm]
1
0.0 501.3
2 87.04 493.7
3 171.4 471.0
4 250.6 434.1
5 322.2 384.0
6 384.0 322.2
7 434.1 250.6
8 471.0 171.4
9 493.7 87.04
10 501.3 -44.32E-6
11 493.7 -87.05
12 471.0 -171.4
13 434.1 -250.6
14 384.0 -322.2
15 322.2 -384.0
16 250.6 -434.1
17 171.4 -471.0
18 87.04 -493.7
19 -88.64E-6 -501.3
20 -87.05 -493.7
21 -171.4 -471.0
22 -250.6 -434.1
361
Appendix-6
AECOM
23
24
25
26
27
28
29
30
31
32
33
34
35
36
-322.2 -384.0
-384.0 -322.2
-434.1 -250.6
-471.0 -171.4
-493.7 -87.04
-501.3 133.0E-6
-493.7 87.05
-471.0 171.4
-434.1 250.6
-384.0 322.2
-322.2 384.0
-250.6 434.1
-171.4 471.0
-87.04 493.7
Bars
Bar
Diameter
Loading
Reference Point
All loading acts through the Reference Point.
All strain planes are defined relative to the Reference Point.
Definition
Geometric
Centroid
Reference Point Coordinates y 0.0mm
362
Appendix-6
AECOM
0.0mm
Title
Applied loads
Load Case
N Myy Mzz
[kN] [kNm] [kNm]
SLS1
3823. 0.0 0.0
SLS2
849.6 178.2 0.0
SLS3
849.6 178.2 0.0
SLS4
4895. 10.80 0.0
SLS5
-402.3 61.30 0.0
SLS6
2946. 105.6 0.0
ULS1
5520. 109.3 0.0
ULS2
-973.1 83.10 0.0
ULS3
4798. 131.1 0.0
363
Appendix-6
AECOM
Loading Pre-stress
Factor
Case Eff.
Eff.
N M Mu M/Mu Governing Neutral Neutral
Centroid Centroid
Condition Axis Axis
(y)
(z)
Angle Depth
[kN] [kNm] [kNm]
[] [mm]
Maxima
2 -203.5E-9 16.56E-6 -973.1 83.10 142.0 0.5853 A: Bar 13
Minima
1 1.041E-6 1.360E-6 5520. 109.3 1540. 0.07096 B: Node 1
364
Appendix-6
AECOM
365
Appendix-6
AECOM
366
Appendix-6
AECOM
367
Appendix-6
AECOM
368
Appendix-6
AECOM
369
Appendix-6
AECOM
370
Appendix-6
AECOM
371
Appendix-6
AECOM
372
Appendix-6
AECOM
373
Appendix-6
AECOM
374
Appendix-6
AECOM
375
Appendix-6
CC
L&
Design of Sub
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
Prepared
Checked
Verified
1
Overburden pressure at pile tip
15 D
Water content
limited to a depth of
m
15.0
Spacific gravity of soil
RL of ground level
m
0.0
Degree of saturation
RL of water table
m
0.0
Void ratio
RL of cutoff level pile
m
2.0
RL of pile tip
m
28.0
Therefore
Length of pile
26
0.0
26.0
m2
0.785
Ap
Density of water
Submerged density
Ap ( 0.5 D N + PD Nq + cp Nc)
376
Harjot
R P Sharma
Sumant
CC
L&
Design of Sub
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
377
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC
L&
Design of Sub
Project
Client
Job
38.1
58.2
120.5
150.6
150.6
150.6
0
0
0
0
0
0
14
18
24
28
24
24
(Part-1/Sec-2)-2010
15
20
28
33
28
28
477
902
2383
3442
2947
2949
191
361
953
1377
1179
1179
19
48
89
136
151
151
Hence Net
safe pile
capacity
13
6
19
9
28
6
27
29
31
32
31
31
Ultimate shaft
Resistance, PSU
m2
Reduction factor, i
4.0
27.0
0.0
27.0
9.52
2.0
29.0
0.0
29.0 10.06
6.0
31.0
0.0
31.0 10.38
3.0
32.0
0.0
32.0 10.06
9.0
31.0
0.0
31.0
9.93
2.0
31.0
0.0
31.0 10.11
26.00
Nq has been taken from Annex-B, fig. 1 of IS : 2911
kN
degree
s
2.0
6.0
8.0
14.0
17.0
26.0
28.0
kN
Effective
overburden at CG of
layer, Pdi
kN/m2
Verified
Effective
overburden at pile tip, PD
kN/m3
Checked
Effective
unit wt,
deg.
Ultimate Base
Resistance, PPU
Angle of wall
friction,
kN/m2
Cohesion
c
deg.
Nq
Angle of
repose,
Nc
Thickness of layer
Harjot
R P Sharma
Sumant
Prepared
Asi
1
2
3
4
5
5
Pier P148
AECOM/CC28/PF148
10761.372
RL of top
layer
Layer No.
Part of Structure
Doc No
Bridge No./Chainage
kN
0.3
0.3
0.3
0.3
0.3
0.3
122
290
1301
2100
4659
5227
= 3270.41 kN
As per DBR, Bulk density corresponding to 100% saturation shall be calculated and used for working out submerged density of soil.
* Additional load, W = Self weight of pile - Weight of soil removed
378
CC
L&
Design of Sub
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
379
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC
L&
Design of Sub
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
380
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC
L&
Design of Sub
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
381
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC
L&
Design of Sub
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
382
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Harjot
R P Sharma
Sumant
Project Code
Date
Rev
2/21/2013
0
Appendix-7
w
Gs
Sr =
1
e
w.Gs = Sr.e
e = w.Gs/Sr
w =
9.81 kN/m3
b - w
383
CC-28
L&T
Design of Substructure P148
Harjot
R P Sharma
Sumant
Project Code
Date
Rev
2/21/2013
0
384
CC-28
L&T
Design of Substructure P148
Harjot
R P Sharma
Sumant
2/21/2013
0
Project Code
Date
Rev
0
0
0
0
0
0
239
477
1474
2216
3042
3270
2.64
2.64
2.64
2.64
2.64
2.67
0.69
0.60
0.55
0.60
0.62
0.62
Submerged density
49
116
521
840
1863
2091
Moisture content, w
kN
Void ratio, e
kN
Specific gravity, Gs
kN
Additional load, W*
kN/m3
10.8
14.1
15.2
15.9
19.4
19.4
9.52
10.06
10.38
10.06
9.93
10.11
density of soil.
385
CC-28
L&T
Design of Substructure P148
Harjot
R P Sharma
Sumant
Project Code
Date
Rev
2/21/2013
0
386
CC-28
L&T
Design of Substructure P148
Harjot
R P Sharma
Sumant
Project Code
Date
Rev
2/21/2013
0
387
CC-28
L&T
Design of Substructure P148
Harjot
R P Sharma
Sumant
Project Code
Date
Rev
2/21/2013
0
388
CC-28
L&T
Design of Substructure P148
Harjot
R P Sharma
Sumant
Project Code
Date
Rev
2/21/2013
0
389
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Pier P148
AECOM/CC28/PF148
10761.372
Part of Structure
Doc No
Bridge No./Chainage
Prepared
Checked
Verified
Qallow
Re
Raf
Ksp
= An empirical coefficient
Diameter of pile
Dp
fck
=
=
=
=
Ksp
CR
RQD
=
=
Depth factor
df = 1 + 0.4 x Length of socket/Dia of socket 1.2
df
=
=
=
=
As
cus
Length of socket
Dia of socket
Hence
Qu = Re + Raf =
33002
The allowable end bearing component after dividing by factor of safety shall be restricted to 5 Mpa
Re/3 should not be greater than 5 x PI()/4 x Dp^2 = 3927 kN
Qallow = (Re/3 + Raf/6) =
3927
+
0
=
=
390
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
391
Prepared
Checked
Verified
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
392
Prepared
Checked
Verified
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
393
Prepared
Checked
Verified
CC-28
L&T
gn of Substructure P148
Harjot
R P Sharma
Sumant
Project Code
Date
Rev
2/21/2013
0
Appendix-6
1.0 m
M 35
63.3 %
36.7 %
50 %
0.56
75.42 Mpa
0.785 m2
0.00 m
1.0 m
1
0.00 m2
1.95 Mpa
33002 kN
394
CC-28
L&T
gn of Substructure P148
Harjot
R P Sharma
Sumant
Project Code
Date
Rev
2/21/2013
0
395
CC-28
L&T
gn of Substructure P148
Harjot
R P Sharma
Sumant
Project Code
Date
Rev
2/21/2013
0
396
CC-28
L&T
gn of Substructure P148
Harjot
R P Sharma
Sumant
Project Code
Date
Rev
2/21/2013
0
397
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Staad Input for Pile Cap Design
STAAD TRUSS
START JOB INFORMATION
ENGINEER DATE 21-May-12
ENGINEER NAME ashish
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
SET NL 7
JOINT COORDINATES
1
-3
2
3
3
3
4
-3
5
-0.742
6
0.742
7
0.742
8
-0.742
9
0
MEMBER INCIDENCES
1
1
2
3
3
4
4
4
5
5
6
9
7
8
8
9
9
1
10
2
11
3
12
4
13
5
14
7
15
8
16
8
17
1
18
1
19
1
20
2
21
2
22
2
23
3
24
3
25
3
26
4
27
4
28
4
DEFINE MATERIAL START
ISOTROPIC CONCRETEM35
Pier P148
AECOM/CC28/PF148
10761.372
0
0
0
0
1.35
1.35
1.35
1.35
1.35
Prepared
Checked
Verified
1.5
1.5
-1.5
-1.5
0.742
0.742
-0.742
-0.742
0
2
2
3
1
9
7
9
6
5
6
7
8
6
6
7
5
6
7
8
5
7
8
6
8
5
7
5
6
Node Numbers
398
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
E 29500000
POISSON 0.17
DENSITY 25
ALPHA 1.17e-005
DAMP 0.05
ISOTROPIC STEEL
E 2.0e+008
POISSON 0.3
DENSITY 78.5
ALPHA 1.17e-005
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY AMERICAN
9 TO 12 17 TO 28 PRIS AX 1
1 TO 4 PRIS AX 1
5 TO 8 13 TO 16 PRIS AX 100
CONSTANTS
MATERIAL CONCRETEM35 MEMB 1 TO 28
SUPPORTS
5 TO 8 PINNED
** PILE LOAD FROM PILE DESIGN MODEL
LOAD 201 ULS G-I
JOINT LOAD
1 FY 2862.615
2 FY 4454.882
3 FY 2541.067
4 FY 948.799
LOAD 202 ULS G-IIA (R1)
JOINT LOAD
1 FY 489.894
2 FY 4391.726
3 FY 3860.736
4 FY -41.096
LOAD 203 ULS G-IIA (R2)
JOINT LOAD
1 FY 4982.623
2 FY 5113.697
3 FY -631.992
4 FY -763.067
LOAD 204 ULS G-IIA (R3)
JOINT LOAD
1 FY 4982.623
2 FY 5113.697
3 FY -631.992
4 FY -763.067
LOAD 205 ULS G-IIA (- R3)
JOINT LOAD
1 FY 2012.727
2 FY 2152.312
3 FY 1695.686
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
Member Numbers
Side View
399
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
4 FY 1556.101
LOAD 206 ULS G-IIB (R1)
JOINT LOAD
1 FY 1097.258
2 FY 4758.713
3 FY 3674.593
4 FY 13.137
LOAD 207 ULS G-IIB (R2)
JOINT LOAD
1 FY 4607.201
2 FY 5322.753
3 FY 164.649
4 FY -550.902
LOAD 208 ULS G-IIB (R3)
JOINT LOAD
1 FY 4607.201
2 FY 5322.753
3 FY 164.649
4 FY -550.902
LOAD 209 ULS G-IIB (- R3)
JOINT LOAD
1 FY 2286.971
2 FY 3009.171
3 FY 1983.148
4 FY 1260.947
LOAD 210 ULS G-IIC (R1)
JOINT LOAD
1 FY -353.767
2 FY 3253.947
3 FY 2954.256
4 FY -653.458
LOAD 211 ULS G-IIC (R2)
JOINT LOAD
1 FY 3858.166
2 FY 3930.794
3 FY -1257.676
4 FY -1330.305
LOAD 212 ULS G-IIC ( R3)
JOINT LOAD
1 FY 1818.313
2 FY -631.992
3 FY 1448.906
4 FY 1384.255
LOAD 213 ULS G-IIC (- R3)
JOINT LOAD
1 FY 1154.496
2 FY -631.992
3 FY 924.522
4 FY 843.914
PERFORM ANALYSIS
400
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
CC-28
L&T
Design of Substructure P148
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
Pier P148
AECOM/CC28/PF148
10761.372
FINISH
401
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
8
T
ucture P148
Project Code
Date
Rev
21-Feb-13
0
Appendix-4
402
8
T
ucture P148
Project Code
Date
Rev
21-Feb-13
0
Appendix-4
403
8
T
ucture P148
Project Code
Date
Rev
21-Feb-13
0
Appendix-4
404
8
T
ucture P148
Project Code
Date
Rev
21-Feb-13
0
Appendix-4
405
Appendix-7
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
PIER P148
AECOM/PF148
10761.372
Value
1
1.0
2.5
2.5
1
15 D
15.0
0.0
0.0
2.0
26.0
24
m
m
0.0
24.0
m2
0.785
Ap
Ap ( 0.5 D N + PD Nq + cp Nc)
17 m
406
Checked
Verified
Prepared
Water content
Spacific gravity of soil
e
for 100 % saturation
e
Density of water
Submerged density
Appendix-7
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
PIER P148
AECOM/PF148
10761.372
407
Prepared
Checked
Verified
Appendix-7
Project
Client
Job
Effective
unit wt,
Effective
overburden at pile
tip, PD
deg.
kN/m3
kN/m2
2.0
2.5
6.0
7.5
8.0
11.0
14.0
15.0
16.5
17.0
20.0
26.0
26.0
26.0
0.5
27.0
0.0
3.5
27.0
0.0
1.5
27.0
0.0
0.5
29.0
0.0
3.0
31.0
0.0
3.0
31.0
0.0
1.0
31.0
0.0
1.5
31.0
0.0
0.5
32.0
0.0
3.0
32.0
0.0
6.0
31.0
0.0
0.0
31.0
0.0
0.0
31.0
0.0
24.00
Nq has been taken from Annex-B, fig.
17.0
17.0
17.0
18.5
19.2
19.2
19.2
19.2
18.6
19.7
19.2
19.2
19.2
15.3
15.3
15.3
16.2
16.7
16.7
16.7
16.7
16.1
16.9
16.1
16.1
16.1
27.0
27.0
27.0
29.0
31.0
31.0
31.0
31.0
32.0
32.0
31.0
31.0
31.0
9.50
9.50
9.50
10.06
10.35
10.35
10.35
10.35
8.83
9.91
9.42
9.42
9.42
4.7
38.0
52.2
57.3
88.3
119.4
129.7
145.2
149.6
149.6
149.6
149.6
149.6
1 of IS : 2911 (Part-1/Sec-2)-2010
408
0
0
0
0
0
0
0
0
0
0
0
0
0
14
14
14
18
24
24
24
24
28
28
24
24
24
15
15
15
20
28
28
28
28
33
33
28
28
28
kN
kN
110
476
632
889
1777
2362
2557
2849
3404
3418
2923
2923
2923
44
190
253
356
711
945
1023
1140
1362
1367
1169
1169
1169
Asi
Angle of wall
friction,
kN/m3
Verified
Effective
overburden at CG
of layer, Pdi
dry
unit wt, d
kN/m3
Checked
Safe Base
Resistance, PPU, s
Bulk
unit wt, b
kN/m2
Cohesion
c
deg.
Nq
Angle of
repose,
Nc
Thickness of layer
Prepared
Ultimate Base
Resistance, PPU
1
2
3
4
5
6
7
8
9
10
11
12
13
PIER P148
AECOM/PF148
10761.372
RL of top
layer
Layer No.
Part of Structure
Doc No
Bridge No./Chainage
m2
2
21
45
55
73
104
125
137
147
150
150
150
150
2
11
5
2
9
9
3
5
2
9
19
0
0
Appendix-7
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
PIER P148
AECOM/PF148
10761.372
Prepared
Checked
Verified
Pile Load =
PILE LENGTH
409
Appendix-7
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
PIER P148
AECOM/PF148
10761.372
410
Prepared
Checked
Verified
Appendix-7
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
PIER P148
AECOM/PF148
10761.372
411
Prepared
Checked
Verified
Appendix-7
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
PIER P148
AECOM/PF148
10761.372
412
Prepared
Checked
Verified
Appendix-7
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
PIER P148
AECOM/PF148
10761.372
413
Prepared
Checked
Verified
Appendix-7
Project
Client
Job
Part of Structure
Doc No
Bridge No./Chainage
PIER P148
AECOM/PF148
10761.372
414
Prepared
Checked
Verified
Appendix-7
CC28
L&T
PILE CAPACITY
Prepared
Checked
Verified
Water content
Spacific gravity of soil
for 100 % saturation
Harjot
R P Sharma
Sumant
w
Gs
w.Gs/Sr
Sr =
w.Gs
Density of water
w =
Submerged density
Project Code
Date
Rev
2/21/2013
0
9.81 kN/m3
b - w
415
Appendix-7
CC28
L&T
PILE CAPACITY
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
Project Code
Date
Rev
2/21/2013
0
416
capacity
Appendix-7
CC28
L&T
PILE CAPACITY
kN
kN
kN
2
122
230
278
690
1278
1513
1902
2047
2928
4623
4623
4623
1
49
92
111
276
511
605
761
819
1171
1849
1849
1849
0
0
0
0
0
0
0
0
0
0
0
0
0
44.8
238.9
344.9
466.7
986.6
1456
1628
1901
2180
2538
3018
3018
3018
= 3018.24 kN
2.64
2.64
2.64
2.64
2.64
2.64
2.64
2.64
2.62
2.63
2.66
2.66
2.66
0.69
0.69
0.69
0.60
0.55
0.55
0.55
0.55
0.60
0.53
0.62
0.62
0.62
Submerged density
kN
Void ratio, e
Additional load, W*
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
Rev
Safe shaft
Resistance, PSU, s
27
27
27
29
31
31
31
31
32
32
31
31
31
Date
Ultimate shaft
Resistance, PSU
Reduction factor, i
degree
s
Verified
2/21/2013
0
Project Code
Specific gravity, Gs
Checked
Moisture content, w
Harjot
R P Sharma
Sumant
Prepared
kN/m3
26.2
26.2
26.2
22.7
20.9
20.9
20.9
20.9
22.9
20.1
23.3
23.3
23.3
9.50
9.50
9.50
10.06
10.35
10.35
10.35
10.35
8.83
9.91
9.42
9.42
9.42
307.7 tonnes
417
oad =
Appendix-7
CC28
L&T
PILE CAPACITY
Harjot
R P Sharma
Sumant
Prepared
Checked
Verified
2957.1
24.00 m
kN
Project Code
Date
Rev
2/21/2013
0
301.4 tonnes
AECOM/CC28/PF148/R0
418
Appendix-7
CC28
L&T
PILE CAPACITY
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
Project Code
Date
Rev
2/21/2013
0
419
Appendix-7
CC28
L&T
PILE CAPACITY
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
Project Code
Date
Rev
2/21/2013
0
420
Appendix-7
CC28
L&T
PILE CAPACITY
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
Project Code
Date
Rev
2/21/2013
0
421
Appendix-7
CC28
L&T
PILE CAPACITY
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
Project Code
Date
Rev
2/21/2013
0
422
Appendix-7
CC28
L&T
PILE CAPACITY
Prepared
Checked
Verified
Harjot
R P Sharma
Sumant
Project Code
Date
Rev
2/21/2013
0
423