You are on page 1of 10

5/2

Assessment Activity Front Sheet


P2.1

P2.2

Criteria Achieved
P2.3
P2.4
P2.5

M3

D2

(This front sheet must be completed by the STUDENT where appropriate and included with the work submitted for assessment)

Students Name:

Assessors Name:

Issued date :
Qualification

Completion Date

BTEC Level 5 Higher National Diploma in


Mechanical Engineering

Dr. Mohammed Fekry


Eng. Islam Mohammed

Submitted on:
Group:

Unit No.:

Unit Title:

Engineering Design

Outcome No. :

Outcome Title:

Be able to analyse and evaluate possible design solutions


and prepare a final design report

Assignment No.:

Assessment Title:

prepare a final design report

In this assessment you will have opportunities to provide evidence against the following criteria. Indicate the page numbers
where the evidence can be found

Grading

To achieve the criteria the evidence must show that the student is able to:

P2.1
P2.2
P2.3
P2.4
P2.5

produce an analysis of possible design solutions


produce and evaluate conceptual designs
select the optimum design solution
carry out a compliance check
produce a final design report
present and communicate appropriate findings (communication has taken place
in familiar and unfamiliar contexts)
take responsibility for managing and organising activities ( activities have been
managed)

M3
D2

Tick
if met

Page
numbers

Declaration
I certify that this assignment is my own work, written in my own words. Any other persons work included in my
assignment is referenced / acknowledged.
Students Name:

Students Signature:

Internal Verifiers approval to use with students


IVs Name: Eng. Naglaa Fathy
IVs Signature

1 | 10

Date:

Date

5/2
Assessment Tasks
Assume that you have to manufacture one of following products (Table below) by using the
workshop machines. A range of manufacturing process such as, Casting, forging ,fabrications
and metal forming are assumed to be used to produce the following components:No
1
2
3
4
5
6

Product
tyre rim
Braking shoe
pulley
Connecting rod
Disk brake
Suspension arm

Select one of the above components and create the design process at minimum cost and make
the following tasks
Task (1)
Produce an analysis of possible design solutions

(P2.1)

Task (2)
(P2.2)
Produce conceptual designs for the chosen product (two or more) and put the
evaluation matrix using as your norm, and rank all the remaining design solutions.
Task (3)
Select the optimum design solution and why.

(P2.3)

Task (4)
(D2)
Manage and organize to produce the (TPP) Technological Procedure planning of
your optimum design and Take in consideration the following points: Steps of operation.
Shape of the work piece at each operation.
Name of the machine tool for each operation.
Determine the working conditioning for each operation.
Task (6)
(P2.4)
Carry a visit to the workshop in the training sector to be sure of compliance check for
the chosen design process of your optimum design
Task (7)
(P2.5)
Using standard format to prepare a final design report for your chosen product
2 | 10

5/2
Task (8)
(M3)
Present and communicate how to using standard format to prepare a final design
report for your chosen product.
Take in consideration the following points: Select the appropriate technical words.
You will present to the subject in front of familiar and unfamiliar.

3 | 10

5/2

4 | 10

5/2

5 | 10

5/2

6 | 10

5/2

7 | 10

5/2

8 | 10

5/2

9 | 10

5/1
Assessment feedback
(This feedback sheet must be completed by the ASSESSOR where appropriate)

Students Name:

Group:

Prepare a Design Specification

Assessment Title:

Unit No.:

Unit Title:

Engineering Design

Outcome No.:
Outcome Title:

Prepare a final design report


Grading Criteria Achieved:

Criteria Achieved

Be able to analyse and evaluate possible design


solutions and prepare a final design report

Assignment No.:
Grading

P2.1

P2.2

P2.3

Assessment Criteria

Achieved

Evidence

produce an analysis of possible design solutions

Yes/No

P2.2

produce and evaluate conceptual designs

Yes/No

P2.3

select the optimum design solution

Yes/No

P2.4

carry out a compliance check

Yes/No

Practical and
photo graphics

P2.5

produce a final design report

Yes/No

Writing task

Yes/No

Power point

Yes/No

TPP model

D2

P2.5

D2

present and communicate appropriate findings


(communication has taken place in familiar and
unfamiliar contexts)
take responsibility for managing and organising
activities ( activities have been managed)

Comments/feedback

Writing task

Assessors General Comments:

Assessors Name:

Signature:

Date:

Students Comments:
Students Name:

Signature:

Date

Student's Work has been Internally Verified

IVs Name: Eng. Naglaa Fathy

10 | 10

M3

P2.1

M3

P2.4

IVs Signature

Date

You might also like