Daily Site Report

Site
: HAYDARIA
Report No. : 23
Date
: Mon 08/02/2012

Man power

Sub Contractor

Admin.
2

Engineer
7

Surveyor
1

Admin.

Engineer

Surveyor

FBC
MO

Eng.
in

power

charge

Max:19 Min:7

Pr

en
t

Job Description & Comment

Man

Eq
ui
pm

Section

No.

Weather: cloudy - dusty

Civil works
Mobilization
1
2
3
4
8

supplying sub base for storage area ( today have supplied 95 cubic meters)
spreading and leveling sub base for storage area .
wetting & compacting for storage area .
continue civil work for building toilets and in camp area .
continue caravans installation , install structure basement on camp foundation

Eng.Wissam
Eng.Ali Omran
surveyor Karar

shovel
water tank
compactor
Excavator

50
50
47
8
4

soil investigation
still waiting for receiving the comments from Dr.Saffa
about soil investigation report .

1
2
3

electrical work (11 kV feeding line )


Eng.Shawkat
receiving materials for installing 11KV feeding line to site ( remaining only from underground cable )
continue civil works for installing 11KV line ( determine and excavation work for poles basement ) on the route from
tire planet to site area .
continue procedure poles and cable test by inspector engineer from Najaf electricity distribution

95
9
30

directorate to check Then samples from 11KV line materials will be taken next Sunday for test in Baghdad.

receiving materials
arrange container to be point guard in the site .

admin. Hamza

documents

Eng.Ali Hanoon

handling submittal #30 to MOE

Visits and Meetings

Next day works


1
2
3
4
5

civil works
continue supplying sub base for storage area.
spreading and leveling sub base for storage area .
wetting and compacting sub base for storage area .
continue building works for toilets foundation (wooden frame work ).
continue caravans installation works in site.

1
2

electrical works
waiting for receiving remaining materials of 11KV feeding line from contractor( underground cable)
continue civil works for installing 11KV line from tire plant to site area by contractor

Site Manager Comment

Foreman
0

technician
1

worker
1

Total
12

Foreman
1
1

technician
5
1

worker
4
4

Total
10
6
16

Max:19 Min:7

en
t

Progress

Plan

Actual

start

finish

start

1/23/2012
1/25/2012
12/28/2011
1/28/2012
2/7/2012

2/4/2012
2/6/2012
1/20/2012
2/12/2012
3/29/2012

1/23/2012
1/25/2012
12/28/2012
2/4/2012
2/7/2012

12/9/2011

2/15/2012

12/9/2011

1/3/2012
1/26/2012

1/25/2012
2/18/2012

1/4/2012
2/4/2012

1/23/2012

1/30/2012

2/7/2012

finish

Site Manager Comments