Professional Documents
Culture Documents
Please specify each activity as Quality Assurance Testing, Designing, Assembly, Automation,
Instrumentation ,Installation and Maintenance(electrical control systems, machinery and
equipment)or others.
DATE
ACTIVITIES
WEEK 1
MAY 05, 2016 MAY 18, 2016
Deployment
Company tour
General Orientation
Discussion of the following:
7S
Manufacturing House Rules
ESD
Health and Safety
ISO 9001:2008
Basic Assembly Process Flow
Basic Parts Familiarization
Direct Materials and Indirect Materials
ISO 14001
Company Profile
IPC-A-610E
(Acceptability of Electronic Assemblies)
Start of General Orientation Exam
Continuation of General and Technical Orientation
Exam
Waiting for Endorsement to assigned department
Noted:
Angelito A. Alburo
Supervisors Signature
Please specify each activity as Quality Assurance Testing, Designing, Assembly, Automation,
Instrumentation,Installation and Maintenance(electrical control systems, machinery and
equipment)or others.
DATE
ACTIVITIES
WEEK 2
MAY 19, 2016 MAY 28, 2016
.
Mam Mitzie was endorsed me and Marc RonnelPapag to
Sir Lito in Test Engineering Department in Box Build
Assembly (BBA). Sir Lito let me and Marc to choose what
section we want to belong if Test Analysis Group (TAG) or
Test Support Group (TSG) and I chose TSG.
Noted:
Angelito A. Alburo
Supervisors Signature
Please specify each activity as Quality Assurance Testing, Designing, Assembly, Automation,
Instrumentation,Installation and Maintenance(electrical control systems, machinery and
equipment)or others.
DATE
ACTIVITIES
WEEK 3
MAY 30 2016 JUNE 04,
2016
Noted:
Angelito A. Alburo
Supervisors Signature
Please specify each activity as Quality Assurance Testing, Designing, Assembly, Automation,
Instrumentation,Installation and Maintenance(electrical control systems, machinery and
equipment)or others.
DATE
ACTIVITIES
WEEK 4
JUNE 06, 2016 JUNE 11,
2016
Noted:
Angelito A. Alburo
Supervisors Signature
Please specify each activity as Quality Assurance Testing, Designing, Assembly, Automation,
Instrumentation,Installation and Maintenance(electrical control systems, machinery and
equipment) or others.
DATE
ACTIVITIES
WEEK 5
JUNE 13, 2016 JUNE 17,
2016
Noted:
Angelito A. Alburo
Supervisors Signature