You are on page 1of 8

Sl.

No.
Date
Gross
Amt
2
3
4
Four Laning of
REWA-MP/UP
BORDER Section of
NH-7 in the state of
Madhya Pradesh on
DBFOT basis Length
89.300 Km

1
Four Laning of
Gwalior -Shivpuri
Section of NH-3
from km 15.600 of
NH- 75 ( End of
Gwalior bypass) ti
Development
Work
jn
236.00 of NH-3
in
(Civil)
ofof
Scheme
the
State
Madhya
No.
166 (Part
-B) ,
Pradesh
under
NHDP Indore
phase IV on
BOT (Toll) on DBFOT
Length 125.300
Development
Kms Work
(Civil) of Scheme
No. 166 (Part -A) ,
Indore

Rehabilitation /
Strengthening of
Satna-Chitrakout for
total length 74.132
Kms. Exixting single
lane to double lane
road in the state of
M.P.

Dilip Buildcon Ltd.


Details of Labour Sheets for the Month of April 2016

Strengthening,
Widening of Four
Laning of MangwanMP / UP Border (NH27) Road Length 52
Km
Construction of 896
EWS and 1080 LIG
under afordable
housing scheme at
Gram Barrai PhaseI, (Building Work)
Rehabilitation and
upgradation of
Jarwal to Bahraich
section Km. 43 000
to Km. 93 000 of NH
28C in Uttar
Strengthening,
Pradesh
to two lane
Widening
of Four
with paved
Laning
ofon
Satnashoulder
EPC
Bela (NH-75)
Road
mode
under NHDP
Length
48 Km
Phase
IV.(Length50Km)
Redevelopment &
Redensifcation o
Government
Housing under Ram
Nagar Pari BazaarBara Mahal
Construction
of
Scheme,
Bhopal
BAHUTI M.P.
HIGH LEVEL
CANAL from KM 18
to KM 74 With full
canal network to
irrigate irrigable
Madhya
Pradesh
Jal
command
area of
Nigam
65000Maryadit
hectares"
Mardanpur
Group
with all in-line
Water Supply
structures
on the
Scheme
Disstt.
canal
system
can
Sehore M.P.
for
TURNKEY
BASIS
Construction
ultimate
with capacity
defect of of
Central25.65
Spilway,
bringing
MLD
liabilities
period
of
Earthen
Dam
&(22
its
treated
water
THREE
YEAR
Allied
works
and
hour
fow
from
the
reckoned
from
Supply
and
source
Narmada
issuance
of
errection
of redial
River,
located
near
completion
Rehabilitation
gates for and
Village-Mardanpur,
certifcate.
Upgradation
of
Mohanpura
major
Tehsil-Rehti
Distt.
(TURNKEY
BASIS)
NH765
from Km 23
Multipurpose
Sehore
000
to Km(WRD)
108 800
project
Hyderabad to Dindi
section in the State
of Andhra Pradesh
through an EPC
Basis (Length- 85.8
Km.) PKG-1

6
7
8
9
10
11
12
13
14

Rehabilition and
upgradation of
existing NH222(New NH-61)
from Km 615/000 to
Km 668/600 (Kalyan
Rehabilitaion
and
to
Nirmal section)
Upgradation
of
to
two lane with
existing
NH 365in
paved
shoulder
from
Km 72.6000
to
the state
of Andhra
121.000
Pradesh
under
(Thanamcherla
to
NHDP-IV through
Rehabilitaion
and
Jamandlapally
Engineering,
Upgradation
section)
to two of
lane
Procurement
existing
NH (EPC)
365
with paved
Construction
from
Km 154.000
shoulder
in the to
Basis
PKG-02
187.000
state
of Andra
(Mangalvarpet
Pradesh underto
Rehabilation
and
Mallampally
NHDP-IV
through
Upgrading
to
2
section)
to
two
Engineeringlane
lanes/2
lane with
with paved
Procurement
&
Paved
Shoulders
shoulder
in the
Construction(EPC)
Confguration
and
state
Andra
Basis.ofPKG-04
Strengthening
Pradesh underof
Rehabilitation
and
Pratapgarh-Padi
NHDP-IV
through
Upgradation
of to
Section
(km 80.0
Engineering
Kerala
Border
to
km
180.0)
of
NhProcurement &
Kollegala
of
113
in thesection
State of
Construction(EPC)
NH-212
Km.
Rajasthan
under
Basis. from
PKG-03
136.600
to National
268.475
Phase-1 of
Rehabilitation
and
excludingInterthe
Highways
Upgradation
NHstretch
fromofkm
Connectivity
565
Km 198.694
239.600
to km to
Improvement
294.000
241.520
(1.92
Km)
Projects
(NHIP)
to
toMarkapuram
Two Laning with
Veggam
Palle in
paved
shoulders
Rehabilitation
Section)
to two
lane
the State
ofand
Upgradation
from
paved
shoulders
in
Karnataka(LengthKmstate
294.000
to
the
of Andra
129.955)
361.327
i.e under
Veggam
pradesh
Palle
to Dornala
NHDPIV
(the T
Junction
Section
of
"Project")
through
Improvement/Augm
NH.565
in the state
an Engineering,
entation
ofand
of
Andhra
Pradesh
Procurement
Tirumayam
to
under
NHDP-IV(the
(the
Construction
Manamadurai
"Project")
through
"EPC") basis
section
to 2-lane
an
Engineering,
Contract(Lenwith paved
Procurement
and
95.306)
PKG-06
Two Laning
with
shoulders
from
km
Construction
(the
Paved
Shoulder
77.200
to km of
"EPC")
Karauli-Dholpur
154.929
(existing
Contract
PKG-05
section
of NHkm
11B
chainage
from
km 83.960
149.800)
(Totalto
Km
184.460
(length
Design
Length
=
100.900
Km)ofinNHthe
77.729 km)
Stateinof
Rajasthan
226
the
State of
under
NHDP under
Phase
Tamil Nadu
IV on Phase
EPC mode
NHDP
IV on
Project.
EPC
mode.

15
16
17
18
19
20
21
22
23

25
26
27
28

Rehabilation and
Upgrading from
existing Km 2/800
to Km 33/200 and
Km 55/400 to Km
83/400 of NH-75E
Rehabilitation
(Rewa Sidhiand
up-gradation
NHSection) in of
the
12A from
designto
Madhya
Pradesh
Ch.
245.375
to Ch.
two
lanes with
316.468
(Kawardha
paved shoulder
on
to Simga
EPC
modeSection)
inb the
AmritsarTaranto
twoof
lanes
with
state
Madhya
taran-Harike
section
paved
shoulders
in
Pradesh
(Lengthof the
NH-15.
inof
the
State
57.80)
State of on
Chhattisgarh
Punjab.Length
EPC
mode under
45.92
KmPhase-IV
Four Lane
NHDP
Construction of
(Length-71.093)
Hariphatak Bridge
Road-Mahakal
TempleInterpretation
Center Road Begam
Bag Road. Under
Simhansth-2016

2 Lane with paved


shoulder of Chas
Ramgarh section of
NH-23 from KM
0.000 to KM 78.192
in the state of
Construction
of
JHARKHAND
under
ShaniPhase
Mandir
NHDP
IVto
on
Chintaman
railway
EPC
mode (Lengthstation Km)
via
78.192
Dowdkhedi and
Lalpul Railway
CONSTRUCTION
OF
crossing
to tenching
VERIOUS
OF
ground
viaROAD
jawasiya
UJJAIN
CITY ROADS
chouraha
UNDER
SimhansthHasampura
Road
Under 2016
Simhansth2016
UPGRADATION OF
OUTER RING ROAD
FROM MAXI ROAD
TO NAIKHEDI VIA
DEWAS ROAD,
INDORE ROAD,
Koyala Fatak To
DHARAMBADLA
Makodiya
Road,
AND
PANCHKROSHI
Indore
Road,Under
ROAD.Under
Simhansth-2016
Simhansth-2016
(Pwd)

24
29
30
31
32

37
Development to
Four Lanes with
paved side
shoulders of End of
Sangrur Bypass to
Tapa Section of NH64Widening
[New NH and
No. 7]
Reconstruction
of
from existing Km
Madhya
116.950Pradesh
to Km
District
Connectivity
138.030
& existing
Sector
Project
Km.
142.950
to Km.
Package
Sidhi168.00 inK:Punjab
Rehabilitation
and
Tikhri
(MDR-45-02),
Up_gradation
Kyothi Katraof
Jabalpur_Patan_Sha
Lalgaon ( MDR-43hpura
section of
02),
Mauganj-Katra
SH_15
and SH_22
( MDR-43-04)
from
existing Ch.
Roads.(LengthConstruction
of
Km.
8_4 to
km.
95.77
Km)
Four and
Lane19_2
Road
31_8
to
From
VickyDesign
Factory
km. 3_10
Tiraha
NHAI-75
length to
38.842
km
Near
Malwa
to two
lane Engg.
with
Collage
paved Length
hard
7.260
kmin the
shoulder
road
state of Madhya
Pradesh on
Engineering
Procurement and

36
Shahdol to to
MP/CG Border Road
Project.Length
91.800 Km.

Name of Project
34
35

Jabalpur- Mandla Chilpi in the State


of MP (Length21.85Km)

Rehabilation and
Up-gradation of NH221(New NH-30)
from Km 32/735 to
Km 71/200
(Chandragundam to
Construction
AP/Telanganaof
KUNDALIA
Border
Section) In
the COMPOSITE
State of Andhra
GRAVITY
on
Pradesh DAM
to two
turnkey
Lane
withbasis
Paved
shoulder under
Adoni
to on
NHDP-IV
Phase
Madhavaram
via
EPC
Basis.(LengthMantralayam
in the
38.89 Km)
State of AP.Length
55.06 Km

33
38
39
40
41

Rehabilitation and
upgradation of
Mandla to Chilpi
section of NH-12A
from existing km
89/5 to km 192/4
Rehabilitation
including and
upgradation of
construction
of
Mandla Madhopur
to Pindari
Mandla,
and Anjania
Salimnabad
to
and
bypass
Vilayatkalan
Major
in the State
of
DistrictPradesh
Road onto
Madhya
Rehabilitation
and
EPC
mode (Lengthtwo-lanes
with
upgradation
106.33
km)of
paved
shoulders
Badnagar
under
NHDP-IV
Sundrabad
through
Khasrodkala
Unhel
Engineering,
and
Sunderabad
Procurement
&
Rehabilitation
and
Runija Khacrod
Construction
(EPC)
upgradation
abndContract
Runijaof
Basis
Allahabad
UP/MP
SatrundatoMajor
(Length-92.500
Km)
Border
of
Districtsection
Road on
NH-27
from
km
EPC
mode
Length4.28595.10Km
to km 45.627
Rehabilitation
to
four lanes and
with
Upgradation
of NHpaved shoulders
in
221(New
NH-30)
the
State of
Uttar
from
Km. 0.00
Pradesh
underto
32.735(Ibrahimpatn
NHDP-IV through
am Circle to
Engineering,
Rehabilitation
ChandragudemSect
Procurement,and
&
up-gradation
ofof
ion)
in the state
Construction
(EPC)
Kathipudi

Start
of
Andhra
Pradesh to
Basis Contract.
Kakinada
Bypass
two
lane
with
paved
Lenght -41.72Km
section
from
Km
shoulder
under
0/000
to Km
26/150
NHDP-IV
(LengthofRehabilitation
NH-214
(Newand
NH32.30)
up-gradation
NH216) to Fourof
lane
111
Km
withfrom
paved
82.500 to
shoulder
inKm
the
163.400
state of(Kathghora
Andhra
to Shivnagar
Pradesh
under
Construction
oflane
4
Section)
to two
NHDP IV
on EPC
Laning
ofpaved
Sargaonwith
basis
.Length-27.5
Bilaspur
of in
NHthe
200
shoulder
Km
(New
NH of
130)
State
(Package III) under
from
Chhattisgarh
Km
91+026
to Km
NHDP
IV through
Shahkot
-Moga
126+525(Total
Engineering,
Section
of NH-71
Length
35.499
Km)
Procurement
&
[New
NHofNo.
52]"
section
RaipurConstruction
(EPC)
Road
Bilaspur
Roadin
inthe
the
BasisProject
Contract."
State
of
Punjab.
State
of Km
Length-80.90
Project
length:
Chhattisgarh
under
Two Lane
32.45 Four
NHDP-IV
onlane
EPC
Mode

42
43
44
45
46
47
48
49
50

52
53

Earth, Unloading/
4 Laning of NH-9
Dumping,
from Vijayawada
Spreading, Dozing,
Machilipatnam
Water Sprinkling
Section from km
and Grading etc. by
0.000 to km 63.800
Mechanical Means
(Approx. Length
as "Four
per Instruction
of of
64.611 Laning
km) in the
Engineer-in-charge
Mahuliastate of Andhra
at Specifed Places
BaharagoraJH/WB
Pradesh under
of
NIGAHI
OCP of
Border
Section
NHDP
Phase
III of
to
NCL.
(Singrauli,
M.P.
(fromonKm.
beNH-33
executed
EPC
)
277+500
to Km.
mode.
Intermediate
333+500) & laning
NH-6
of Hata-Fatehpur(from
Km. 199+200
Rajpura-Solapurito Km. 183+587)
Bajna-Darawan
(Total
Length 71.61
(SH-48)
Road
in the
Km.) in the
State
of
State of M.P.
on
Jharkhand
Under
Rehabilitation
and
Design,
Build,on
NHDP
Phase-III
Up-gradation
to
Finance,
Operate
EPC Mode.
four
with
andlaning
Transfer
Paved
shoulder
(DBFOT)
on of
Guna - Biora
(Toll+Annuity)
basis
section of NH-3
Development
ofto
from
Km 332.100
MPRDC(LengthPatan
Tendhukheda
Km 426.100
in the
64.42
Km)
Rahli
on BOT
stateroad
of Madhya
Toll
plus Annuity
Pradesh
under
basis"
in the State
NHDP Phase
IV on
of MPbasisase
Project IV
DBFOT
Design,
Build,Km
Length
: 86.60
(Project
Length
:
Finance,
93.50Operate,
Km)
Maintain and
Transfer (DBFOMT)
of Existing State
Highway Hassan Ramanathapura Periyapatna in the
State of Karnataka
on DBFOMT Annuity
Basis

The Work of
Excavation of
Overburden of First
Dig (Solid) by Hiring
of Equipment such
as Excavators,
4-LANING OF
Dumpers/Tippers,
SHIVPURI
GUNA
Drills, Dozers,
SECTIONand
OF Water
NH-3
Graders
FROM
KM 236.000
Sprinklers
for
TO
KM 332.100
IN
Composite
Work
THE STATE
Consisting
of OF
Blast
Construction
of New
MADHYA
PRADESH
Hole Drilling,
District
Court At
(STAGE-I)
Excavation,
Indore
Including
Loading,
Electrifcation
Transportation of
BrokenWorks
Rocks/ Soil/

51
54
55
56
57
58
59

Design, Build,
Finance, Operate,
Maintain and
Transfer (DBFOMT)
of Existing State
Highway Hirekerur
Design, Build,
Ranibennur
in the
Finance,
Operate,
State
of Karnataka
Maintain Annuity
and
on DBFOMT
Transfer
(DBFOMT)
Basis (Project
of Existing
State
Length
: 55.69
Km)
Highway Mundargi Four-laning
Hadagali of
Ambala - Kaithal
Harapanahalli
in the
Section
from Km
State
of Karnataka
to Annuity
Km
on 0.000
DBFOMT
50.860
(length
Basis(Project
50.860
in Km)
the
Length :km)
51.21
Bid
For of
4Haryana
laning
state
of of
Ghaghra
Bridge
NH-65 with
topaved
Varanasi
section
shoulder
of NHNHDP
233 Phasefrom
under
Km
to Km
III 121.800
on EPC mode.
180.420
[Package
(Length-50.86)
Development
I from Ghagraof
Accessabutment
controlled
Bridge
on
Kundli-Manesar
Basti side to
-Palwal
Expressway
Bhudanpur
Urban
Sectionin
(Manesar
section]
the state
RDUttar
83.20
Km to
of
Pradesh
Two Laning
with
Palwal
RD 135.650
under
NHDP
Phase
paved
of
Km
Work)
IV(Balance
onshoulders
EPC Mode
Gulabpura
Uniara
on
itemto
Rate
Project(LenSection
of NH-148D
made(Length58.62Km)
from km
69.267 (at
52.33)
Junction of NH-79)
"CONSTRUCTION
to
km 282.936 (at
OF BRIDGE
Junction
of NH-116)
inINCLUDING
the State of
APPROACHES
Rajasthan
under
ACROSS
RIVER
NHDP PhaseON NHIV(ZUARI
Length-203.97
Construction
17/NH-66
Km) ONof
Approaches
PANJIM-in Ch.
522/615
to Ch.
MANGALORE
530/850
forINBridge
SECTION
THE
across
Zuari
STATERiver
OF GOAon (PACKAGE
NH-17/NH-66
II)" on
Construction of
Panjim-Mangalore
approaches
CH
section
in theinState
to CH
of 531/934
Goa (Package-I)
536/250
Bridge
( Job No:for
NH-17across River Zuari
Goa-2015-16-170)
on NH-17/NH-66
through an on
Panjim-Mangalore
Engineering,
Section
in the State
Procurement
and
of Goa-Package
III
Construction
(EPC)
( Job No: NH-17Contract.
Project
Goa-2015-16-171)
length: 8.235 Km

60
61
62
63
64
65
66
67
68

You might also like