You are on page 1of 26

Common rectification

Painting

1a

Labour

Hours

Rate

Skill labour (painter)

480.00

187.50

Un Skill labour

480.00

150.00

Brilion white emalson

60.00

505.00

Dove white

32.00

490.00

Total
1b

Material

Total
1c

Tools and scafolding

10% of ( 1a +1b)

Over head 35%

Total cost

Remove paint and cleaning

1a

Labour
Skill labour (painter)

Hours

Rate
10.00

187.50

1,490.00

150.00

HCL

40.00

800.00

Tile Cleaner

32.00

450.00

Glass cleaner

12.00

450.00

Un Skill labour
Total
1b

1c

Material

Total
Tools and scafolding

Arch International Pvt Ltd

10% of ( 1a +1b)

Over head 35%

Total cost

Arch International Pvt Ltd

Block 01 rectification
1

Bathroom fitting leak

1a

Labour

Hours

Rate

Skill labour

16.00

187.50

Un Skill labour

16.00

150.00

1.00

400.00

Total
1b

Material
Silicone
Solvent gum/thread seal
Total

1c

Tools and scafolding

10% of ( 1a +1b)

Over head 35%

Total cost

Blance pinth plastering

1a

Labour

Hours

Rate

Skill labour

32.00

187.50

Un Skill labour

40.00

150.00

Cement

2.00

900.00

Sand

0.10

3,000.00

Total
1b

Material

Total
1c

Tools and scafolding

10% of ( 1a +1b)

Over head 35%

Arch International Pvt Ltd

Total cost

Arch International Pvt Ltd

10

Block 02 &03 rectification


1

Bathroom fitting leak

1a

Labour

Hours

Rate

Skill labour

208.00

187.50

Un Skill labour

208.00

150.00

4.00

400.00

Total
1b

Material
Silicone
Solvent gum/thread seal
Total

1c

Tools and scafolding

10% of ( 1a +1b)

Over head 35%

Total cost

Swerage leak at room duct

1a

Labour

Hours

Rate

Skill labour (painter)

16.00

187.50

Un Skill labour

32.00

150.00

1.00

560.00

Total
1b

Material
160 dia door L bow
Solvent gum/thread seal
Total

1c

Tools and scafolding

10% of ( 1a +1b)

Over head 35%

Arch International Pvt Ltd

11

Total cost

Arch International Pvt Ltd

12

Cold water line leak in rooom 203 and 304

1a

Labour

Hours

Skill labour
Un Skill labour

Rate
80.00

187.50

128.00

150.00

8.00

50.00

Total
1b

Material
PVC item
Solvent gum/thread seal
Total

1c

Tools and scafolding

10% of ( 1a +1b)

Over head 35%

Total cost

Balance tiling and grouting

1a

Labour

Hours

Rate

Skill labour

128.00

187.50

Un Skill labour

192.00

150.00

3.00

900.00

Total
1b

Material
Cement
Sand and other small item
Total

1c

Tools and scafolding

10% of ( 1a +1b)

Over head 35%

Total cost

Arch International Pvt Ltd

13

Arch International Pvt Ltd

14

Roof top balcony water leak

1a

Labour

Hours

Rate

Skill labour

192.00

187.50

Un Skill labour

336.00

150.00

Cement

4.00

900.00

Zinc Al flashing

6.00

260.00

25.00

275.00

12.00

450.00

Total
1b

Material

Sypex
Sand and other small item
Tile
Total
1c

Tools and scafolding

10% of ( 1a +1b)

Over head 35%

Total cost

Hot water leak at roof top balcony

1a

Labour
Skill labour
Un Skill labour

Hours

Rate
96.00

187.50

128.00

150.00

4.00

650.00

Total
1b

Material
PVC item
Solvent gum/thread seal
Sand and other small item

Arch International Pvt Ltd

15

Total
1c

Tools and scafolding

10% of ( 1a +1b)

Over head 35%

Total cost

Arch International Pvt Ltd

16

Pump fixing balance work

1a

Labour

Hours

Rate

Skill labour

24.00

187.50

Un Skill labour

24.00

150.00

1.00

900.00

10.00

275.00

Total
1b

Material
Cement
PVC fitting and presure gauge
Sypex
Sand and other small item
Total

1c

Tools and scafolding

10% of ( 1a +1b)

Over head 35%

Total cost

Block 04 rectification
1

Re arrange the waste line from pot and dish wash

1a

Labour

Hours

Rate

Skill labour

144.00

187.50

Un Skill labour

144.00

150.00

Total
1b

Material
PVC item
Solvent gum/thread seal
Sand and other small item

Arch International Pvt Ltd

17

Floor tile

16.00

450.00

Total
1c

Tools and scafolding

10% of ( 1a +1b)

Over head 35%

Total cost

Arch International Pvt Ltd

18

Spout gully cover rectification

1a

Labour

Hours

Rate

Skill labour

64.00

187.50

Un Skill labour

96.00

150.00

Cement

4.00

900.00

10mm steel

4.00

450.00

8.00

450.00

Total
1b

Material

Sand /metal nand other small item


Floor tile
Total
1c

Tools and scafolding

10% of ( 1a +1b)

Over head 35%

Total cost

Arch International Pvt Ltd

19

Amount
90,000.00
72,000.00
162,000.00

30,300.00
15,680.00
45,980.00
20,798.00
80,072.30

308,850.30

Amount
1,875.00
223,500.00
225,375.00

32,000.00
14,400.00
5,400.00
51,800.00
27,717.50

Arch International Pvt Ltd

20

106,712.38

411,604.88

Arch International Pvt Ltd

21

Amount
3,000.00
2,400.00
5,400.00

400.00
100.00
500.00
590.00
2,271.50

8,761.50

Amount
6,000.00
6,000.00
12,000.00

1,800.00
100.00
1,900.00
1,390.00
5,351.50

Arch International Pvt Ltd

22

20,641.50

Arch International Pvt Ltd

23

Amount
39,000.00
31,200.00
70,200.00

1,600.00
1,500.00
3,100.00
7,330.00
28,220.50

108,850.50

Amount
3,000.00
4,800.00
7,800.00

560.00
200.00
760.00
856.00
3,295.60

Arch International Pvt Ltd

24

12,711.60

Arch International Pvt Ltd

25

nd 304
Amount
15,000.00
19,200.00
34,200.00

400.00
200.00
600.00
3,480.00
13,398.00

51,678.00

Amount
24,000.00
28,800.00
52,800.00

2,700.00
4,500.00
7,200.00
6,000.00
23,100.00

89,100.00

Arch International Pvt Ltd

26

Arch International Pvt Ltd

27

Amount
36,000.00
50,400.00
86,400.00

3,600.00
1,560.00
6,875.00
7,000.00
5,400.00
24,435.00
11,083.50
42,671.48

164,589.98

Amount
18,000.00
19,200.00
37,200.00

2,600.00
200.00
3,500.00

Arch International Pvt Ltd

28

6,300.00
4,350.00
16,747.50

64,597.50

Arch International Pvt Ltd

29

Amount
4,500.00
3,600.00
8,100.00

900.00
6,000.00
2,750.00
2,000.00
11,650.00
1,975.00
7,603.75

29,328.75

and dish wash


Amount
27,000.00
21,600.00
48,600.00

8,600.00
1,200.00
3,500.00

Arch International Pvt Ltd

30

7,200.00
20,500.00
6,910.00
26,603.50

102,613.50

Arch International Pvt Ltd

31

Amount
12,000.00
14,400.00
26,400.00

3,600.00
1,800.00
2,500.00
3,600.00
11,500.00
3,790.00
14,591.50

56,281.50

Arch International Pvt Ltd

32