You are on page 1of 3

1- What is the Max Dry density (gm/cm3) and optimized water content

for the following chart?


2- Calculate the fill/excavation (CY)
3- What is the advantage of using concordant cable in pre-stressed
concrete?
4- What are RC columns execution sequences?
5- Calculate the displacement for truss.
6- What is the slope at section ..(.. EI=constant
7- Normal dry-density of RC concrete mix.
8- What is ABET?
9- Why in two way slab, lifting of corner slab happens from ..?
10What should be issued first when project starts?
11Activity is followed by two activates what do you call this
activity?
1210#@10/m to change to 12# how much the new space?
13What is the last of stage of sewage treatment plant?
14The road cross section, using to calculate
15The expression is used in roads engineering followed capacity.
16When design RC section, whether the concrete at tension side
will be neglected or considered?
17Is any relation between rock density and its content (more or
less)?
18At project time frame what is type of cost estimation being
used?
19Air-Entrained Concrete is used to ( Freeze-Thaw Resistance)
20The station is 00,.000 with elevation of 178.00 what is the filling
required
21What is the nearest to 100 Yard (1:100, 1: 1000, 1:1500)
22How many compaction tests are required in 1000m2?

1.

What does QCS stand for?

2.

What is hydration in concrete?

3.

Calculate joint deflection when membrane temperature increases.

4.

What does RQD 100% mean?

5.

Calculate super elevation in roads.

6.

Calculate stopping distance when moving @ speed of 60mi./hr (distance in


feet)

7.

What is the function of admixtures in concrete?

8.

Project scope definition.

9.

What is the last stage in WTP process?

10. What do status reports represent?


11. What is the use of dummy activity in diagrams?
12. Calculate the horizontal displacement for a truss.
13. What is the effect of air within poured concrete?
14. Definition of grade (highways).
15. What is the weight of concrete?
16. What is the yield strength of steel?
17. What is the strength of concrete?
18. What is the maximum allowable stress redistribution in RCC beams (%)?
19. How many compaction tests are required in 1000m2?

20. Tensile strength in wood (direction wrt grains).


21. Ethical- should report any wrong doing.
22. Calculate deflection @ a joint.
23. What is the slope of the cost time curve?
24. Calculate future investment.
25. Where is maximum bending stress located/ how is it distributed when
placing a load on the beams C-S (linear/ Parabolic/uniform/ @ top &
bottom)