MMUP Sample

Questions
1.
If you were
awarded a

project, you will


start work:a.
One week before
the approval of
the authoritiesb.

After the
approval of the
authoritiesc.
One day before
the approval of
the authorities2.

Project Scope
Management:a.
Define scope and
control scopeb.
Executing scope
and verify scopec.

Closing process
and Create work
breakdown
structured.
All of the abovee.

Only A & B3.


Scope
Management
starts with is:a.

To identify the
client
requirementsb.
Meet the teamc.
Review strategic
plan4.

Final as built
drawings for what
purposea.
To keep record
for later
maintenanceb.

To give more work


to architectc.
To be used for
further
renovation5.

Control
department work
startsa.
From the
beginning of the
projectb.

During
constructionc.
After
construction6.
Project
management is

ideally suited
excepta.
Accountabilityb.
Flexibilityc.
Innovationd.

Speede.
Repeatability7.
A critical path is
the
--------------------

--in the project


management:a.
longestb.
shortestc.
none8.

The forward pass


review of the
project manageme
nt will indicate
the following:a.

The earliest start


of the taskb.
The earliest
finish of the
taskc.

Critical path
(longest path)d.
Only A & Be.
All of the above

9.

The back pass


review of
the project will
indicate the
following:a.

The latest start


of the task.b.
The earliest
finish of the
task.c.

The critical
path.d.
Only A & Ce.
All of the
above.10.

Intersecting
point for WBS
and OBSa.
Cost accountb.
Intersect
matrixc.

Project matrixd.
None of above11.
For operation and
designed auto
mobile factorya.

Mechanical
Engineerb.
Civil Engineerc.
Chemical
Engineerd.

Petroleum
Engineer12.
Which of the
following
discipline is most
suitable for doing

a natural gas
pipeline work?a.
Mechanical Enggb.
Petroleum Enggc.
Chemical Enggd.

Civil Engg13.
Gypsum board at
residence and
industrial building
used excepta.

Low costb.
Ease of
installationc.
Recyclability14.
Stress defineda.

Strain time
forceb.
Mass divide
volumec.

Pressure time
lengthd.
None of above15.
What is the last
of estimation for
projecta.

Estimationb.
Assembly
schedule16.
Which one of
the following is

suitable in
engineering
manner? Decision
shall be based on
reason than sit
uation .
a.

Quantity
Thinking.b.
Logical Thinking.c.
Interpersonal
Skills.d.

Honesty.17.
What is QSAS?a.
Qatar
Sustainability
Assessment
System18.

An activity in a
project
network can be
represented by
which of the
following?

a.
Arrowb.
Linec.

Noded.
All of the
above19.
Before starting
work at site, the

major factor has


to be checked is?
a.
Access to site
(EFE)b.

Storage of
Water, tools &
equipmentsc.
Safetyd.

Approval from
MMUP / Civil /
Defence etc.e.
All of the
above20.

Software
programming
flowa.
Plan, Do, Check,
Actb.

Plan, Do, Act,


Checkc.
Plan, Act, Do,
Check21.

First step of
Scope planning
starts witha.
Budgetingb.
Current earning
estimationc.

Objectives and
requirements to
satisfy
customer22.
In network which
point getting

more inward
flowa.
Floatb.
Critical pathc.
Slackd.

Merging point23.
What is the least
level of WBSa.
Deliverableb.

Costc.
Work packaged.
Lowest sub
deliverable24.

The best place to


build an
exhibition and
convention center
(near the
Airport? Or in
satelliteplace far

from Urban?
Etc)25.
One situation for
cancel project.26.

What is the most


sensitive period in
the project?