Professional Documents
Culture Documents
UNRESTRICTED
Feb, 2006
TheBuddySystem
Procedure
Rev3
Keywords:
This document is the property of Petroleum Development Oman, LLC. Neither the whole nor any part of
this document may be disclosed to others or reproduced, stored in a retrieval system, or transmitted in any
form by any means (electronic, mechanical, reprographic recording or otherwise) without prior written
consent of the owner.
PRINTED ON 11-Aug-16
PRINTED ON 11-Aug-16
PR-1081 Rev 3
The following is a brief summary of the 3 most recent revisions to this document. Details of all revisions
prior to these are held on file by the issuing department.
Revision No.
Rev 1
Rev 2
Date
Oct 98
Feb 01
Author
UOP/1
UOP/1
CDFP
UOP/1
UOP/1
Rev 3
Feb 06
UOP/1
UOP/1
PRINTED ON 11-Aug-16
Scope/Remarks
SI-12 rewritten to new format.
Revision to 2.2.2.3 & 2.8 to incorporate user
comments
Updated section 2.2 to add condition for
production operators working alone
PR-1081 Rev 3
PRINTED ON 11-Aug-16
PR-1081 Rev 3
Contents
1.
INTRODUCTION..................................................................................................................................7
1.1
1.2
1.3
1.4
2.
BACKGROUND......................................................................................................................................7
PURPOSE..............................................................................................................................................7
DISTRIBUTION/TARGET AUDIENCE......................................................................................................7
STRUCTURE OF THIS DOCUMENT.........................................................................................................7
BUSINESS CONTROLS PROCEDURE.............................................................................................8
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
SCOPE..................................................................................................................................................8
PROCEDURE DESCRIPTION...................................................................................................................8
ROLES AND RESPONSIBILITIES.............................................................................................................8
EXECUTION OF THE PROCEDURE.........................................................................................................9
RELATED FORMS..................................................................................................................................9
RELATED BUSINESS CONTROL DOCUMENTS.......................................................................................9
REVIEW AND IMPROVEMENT...............................................................................................................9
STEP-OUT APPROVAL...........................................................................................................................9
APPENDIX A.................................................................................................................................................11
ATTACHMENT 1............................................................................................................................................13
PRINTED ON 11-Aug-16
PR-1081 Rev 3
PRINTED ON 11-Aug-16
PR-1081 Rev 3
1.
Introduction
1.1
Background
Safe working practices are fundamental to Company operations. As part of Company
Safety Policy, the Buddy System provides a structured approach to ensuring that
workers performing potentially hazardous tasks, or working in high-risk locations,
work together to ensure each others safety.
1.2
Purpose
The purpose of this procedure is to outline the requirements for the Buddy System
and the principles that individuals must adhere to in ensuring their personal safety and
also monitoring that of their colleague(s) who may be working in a hazardous area, or
undertaking a hazardous task.
1.3
Distribution/Target Audience
Operations and Maintenance personnel.
1.4
Procedure description.
Forms to be used.
PRINTED ON 11-Aug-16
PR-1081 Rev 3
2.
2.1
Scope
This procedure is applicable to ALL situations where work may be carried out in
potentially hazardous circumstances.
2.2
Procedure Description
2.2.2.1
The Buddy System is based on the principle that workers not only look after their own
safety, but they also observe the safety of their co-workers so as to provide an early
warning of hazards or an unsafe situation.
2.2.2.2
Where the work is of a hazardous nature or in a potentially hazardous or toxic area, there
shall be two persons with valid entry/work permits attending a specified operation. One
person must remain in a safe location (the buddy), whilst observing the other who is
carrying out the work.
Where more than one worker is needed there should be a minimum of one to five
observer/worker ratio e.g one buddy for 1 to 5 workers and 2 buddies for 6-10 workers
etc.
2.2.2.3
Production operators operating high risk sour facilities shall always have buddy in place
whereas those operating sweet or low risk sour facilities can work alone providing
following conditions are met:
Activities to be performed are of a non hazardous nature i.e those listed at PR1100 Operator Routine Functions
Follow existing HSE, production and maintenance procedures and standards
Regular communication with area central control room
2.2.2.4
PR-1078, Hydrogen Sulphide Management Procedure, specifies the situations where the
buddy system shall be applied in H 2S designated facilities. It is to be noted that whilst
the requirements specified in PR-1078 are on basis of toxic atmospheres, the buddy
system shall be applied to ALL situations where work may be carried out in potentially
hazardous circumstances; e.g., vessel entry or hot tapping.
When working in H2S designated locations, the 'Worker' and the 'Buddy' shall carry or
wear appropriate personal protection as detailed in the Hydrogen Sulphide Management
Procedure PR-1078.
2.3
RESPONSIBILITY
Buddy or Buddies
Co-worker(s)
PRINTED ON 11-Aug-16
PR-1081 Rev 3
2.4
2.5
Related Forms
Not applicable.
2.6
2.7
TITLE
NUMBER
Procedure
PR-1078
Procedure
PR-1100
2.8
Step-out Approval
This procedure is mandatory. In circumstances where compliance with the procedure is
considered inappropriate or when the intended activity cannot be effectively completed
or safely performed, then step out approval must be obtained from the Asset Manager using the Operations Procedure Variance Form (PR-1001e) -prior to the commencement
of the activity.
PRINTED ON 11-Aug-16
PR-1081 Rev 3
PRINTED ON 11-Aug-16
10
PR-1081 Rev 3
Appendix A
Glossary of Terms, Definitions & Abbreviations
CDFP
CFDH
PRINTED ON 11-Aug-16
11
PR-1081 Rev 3
PRINTED ON 11-Aug-16
12
PR-1081 Rev 3
Attachment 1
Users Name:
New Operations Procedure required?
Ref. Ind: .
Yes / No
(delete as applicable).
PRINTED ON 11-Aug-16
Date:
13
PR-1081 Rev 3