Estimate Abstract

Name of Work: Provision of AC units to the DLSA Chairmans Chamber and


Secretary Chamber in the ADRC Building in the District Court Campus at
Thoothukudi.
Est. Rs.85,000/Sl.
pe
Qty
Description of Work
Rate
Amount
No
r
1.
2 Supply erection, testing and commissioning of 47955.00 ea
95910.00
nos 2.0 ton (6000Kcal/Hr) (Blue Star/Voltas) / Eq
ABS split type Air conditioner conforming to IS
1391(part-2) 1992 with Amdt No 1 fitted with
hermetically sealed Air compressor operating on
Refrigerant R-22 suitable for wall mounting for
operation on 230V , 50Hz single phase AC
supply with star rating of 3 as per BIS
specification and capable of performing
1) Cooling 2) Dehumidifying 3) Air circulation 4)
Filtering.
The installation works for the above split type
A.C units includes the following.
1. Mounting / Fitting indoor and outdoor units at
their respective locations.
2. Laying refrigerant pipe line of required length
within 6meters distance and connecting both
units after drilling hole/holes in the wall if
required. Thickness of the copper tubing shall not
be less than 0.8mm.
3. Insulation the suction pipe with expanded
polythene foam tubing.
4. Laying drain pipe to throw out the condensate
water being formed in the indoor unit.
5. Leak testing the entire system unit.
6. Charging refrigerant gas in the unit.
7. Suitable electric wiring and switch to be
provided with in 3meters of the unit.(Data-A)
2.
2 Supply and installation of 5 KVA electronic 4000.00 ea
8000.00
nos automatic voltage stabilizer V-guard make model
VGS 400 /Sakthi/equi with input range of 170V270V and output voltage range 200V to 240V
with high and low voltage cut off and 3 minutes

time delay with demonstration.(MR)


Total
Add for rounding off
(Rupees One Lakh and four thousand only)

Assistant Engineer,
PWD, Electrical Section
Thoothukudi.

Assistant Executive Engineer,


PWD, Electrical Sub Division,
Tirunelveli.

103910.00
90.00
104000.00

REPORT ACCOMPANYING THE ESTIMATE


Name of Work: Provision of AC units to the DLSA Chairmans Chamber and
Secretary Chamber in the ADRC Building in the District Court Campus at
Thoothukudi.
Est. Rs. 1,04,000/This estimate has been prepared for the provision of AC units to the
DLSA Chairmans Chamber and Secretary Chamber in the ADRC Building in the
District Court Campus at Thoothukudi, The main scheme estimate of
Construction of Alternate Disputes Resolution Centre in District Court Campus at
Thoothukudi, in Thoothukudi District has been technically sanctioned by the
Superintending Engineer, PWD,Buildings C&M Circle, Tirunelveli for Rs. 100
Lakhs (Rupees One Hundred Lakhs only) and Registered in CR.No. 14 /2011-12 in
which Rs. 60,000/- is provided for the provision of AC units to the DLSA
Chairmans Chamber and Secretary Chamber. But this amount is inadequate for
providing AC units to DLSA chairman chamber and Secretary chamber.
In this estimate 2 nos of 2.0 TRSplit AC units and 2 nos 5KVA Electronic
stabilizers are proposed. The rates adopted in this estimate are based on standard
schedule of rates for the year 2013-14.This estimate needs necessary additional
fund requirement of Rs.44,000/- for executing the work.
The expenditure due to this estimate is debitable to the head of account
4059-01-051-KX-1606.

Assistant Engineer,
PWD, Electrical Section
Thoothukudi.

Assistant Executive Engineer,


PWD, Electrical Sub Division,
Tirunelveli.

Heat Load Calculation


Secretarys Chamber and DLSA Chairmans Chamber:
1. Size of Room
: 5.2 Mt x 5.4 Mt [ 17.16 ft x 17.82 ft ]
2. Height of room
:8.5 ft
4. Area of room
:306 sqft
5. Out side Temperature
: 102o FDB = 142grains / Lb of Dry Air
o
6. In side Temperature : 75 FDB = 64 grains / Lb of Dry Air
7. Temperature Difference
: 27o FDB
8. Grain Difference
: 142 - 64 = 78 grains / Lb
9. No. of fresh Air change
: 2 Air change / Hr
10. Electrical Load
: 600 W
11. Occupancy
: 3
12. Cubic foot / minute
: 17.16 ft x 17.82 ft x 8.5 ft x 2 = 86.64 CFM
60
SENSIBLE HEAT DUE TO:
Walls
Floor & Ceiling
Electrical Load
Occupancy
Bye pass fresh air
Fresh air coil load

: (17.16 + 17.82 ) x 2x8.5x27x0.38


: (17.16 x 17.82) x 2 x 27 x0.4
: 400 x 3.40
: 3 x 255
: 86.64 x 27 x 0.2 x1.08
: 86.64 x 27 x 0.8 x 1.08

=
=
=
=
=
=

6101.21 BTU / Hr
6605.09 BTU / Hr
1360.00 BTU / Hr
765.00 BTU /Hr
505.28 BTU / Hr
2021.14 BTU /Hr

LATENT HEAT DUE TO:


Occupancy
Bye pass fresh air
Fresh air coil load

: 3 x 255
: 86.64 x 78 x 0.2 x 0.68
: 86.64 x 78 x 0.8 x 1.08

= 765.00 BTU / Hr
= 919.07 BTU / Hr
= 5838.84 BTU /Hr
24880.64 BTU /Hr
Add 10% Losses due to Infiltration
= 2488.06 BTU /Hr
Total
= 27368.70 BTU/ Hr
Refrigeration Required = 27368.7 = 2.2 Ton
12000

According to Heat load calculation 1 no. 2 Ton Split AC unit should be


needed. But due to lack of LS provision 1 no 1.5 TR Split AC is proposed to DLSA Chairman
Chamber and 1 no for Secretary Chamber.
Assistant Engineer,
PWD, Electrical Section
Tirunelveli.

Assistant Executive Engineer,


PWD, Electrical Sub Division,
Tirunelveli.

DATA SHEET
Qty
1 No

Description
2.0 Ton Split AC unit(Blue Star/Voltas make)
Installation charges

Rate
46300.00
Total

Assistant Engineer,
PWD, Electrical Section
Thoothukudi.

Amount
46300.00
1655
47955.00

Assistant Executive Engineer,


PWD, Electrical Sub Division,
Tirunelveli.