25.6mSWL=184t
17.8mSWL=285t
17mSWL=300t
Fronthangoffframe
A&Rcable
Afthangoffframe
SPC
Portalframe
Upendframe
Afthangoffseat
JmodePLETinstallationprocedure
Solitaire J-mode operation has 5 different phases:
Phase 1
Phase 2
Phase 3
Phase 4
Phase 5
J-mode recovery;
Hang-off pipeline;
Up-end PLET;
PLET Installation to pipeline;
Lower PLET with pipe to protection structure.
Phase1 Jmoderecovery
Phase1 Jmoderecovery
Phase1 Jmoderecovery
Phase1 Jmoderecovery
Phase1 Jmoderecovery
Phase1 Jmoderecovery
Phase1 Jmoderecovery
Phase1 Jmoderecovery
Phase1 Jmoderecovery
Phase1 Jmoderecovery
Phase1 Jmoderecovery
Phase1 Jmoderecovery
Phase2 Hangoffpipeline
Phase2 Hangoffpipeline
Phase2 Hangoffpipeline
Phase2 Hangoffpipeline
Phase2 Hangoffpipeline
Phase2 Hangoffpipeline
Phase2 Hangoffpipeline
Phase2 Hangoffpipeline
Phase3 UpendPLET
Phase3 UpendPLET
Phase3 UpendPLET
Phase3 UpendPLET
Phase4PLETinstallationtopipeline
Phase4PLETinstallationtopipeline
Phase4PLETinstallationtopipeline
Phase4PLETinstallationtopipeline
Phase4PLETinstallationtopipeline
Phase5LowerPLETwithpipeto
protectionstructure
Phase4PLETinstallationtopipeline
Phase5LowerPLETwithpipeto
protectionstructure
Phase5LowerPLETwithpipeto
protectionstructure
Phase5LowerPLETwithpipeto
protectionstructure
SmodePLETinstallation
Value
14 m
17 m
TBD
Remark
Must be checked by draftsman as value is dependent on recovery
angle and detailed FLET layout.
Must be checked by draftsman
Clearance with A-frame must be checked by draftsman
Capacity
145 t
124 t
135 t
Remark
Specified value is for an onboard lift at a maximum radius of 21 m
(which is over the A-frame location prior to upending).
Specified value is for an offboard lift in nice weather at a maximum
radius of 16 m.
Certified for 120 t. Assistance with SPC possible to upend 145 t
FLET system. Values are valid for 4 cylinder system.
550 t
Value
11.0 m
2.4 m
Remark
Must be checked by draftsman
Must be checked by draftsman
Capacity
124 t
Rollerboxes
100 t
50 t
2 x 30 t
Remark
Specified value is for an offboard lift in nice weather at a
maximum radius of 16 m.
Trolley is used to transport structure from Special Purpose Crane
into the vessel to the beadstall area.
Beadstall cranes are used to lift the structure from the trolley
into the line-up station in the firing line. The two cranes are
spaced at a minimum distance of 6.5 m (to be confirmed when
as built) and are synchronised. The COG of the structure must be
as such that none of the two crane loads exceeds 30 t (including
dynamic effects).
Maximum individual rollerbox load is 100 t. The applied rollerbox
load during installation is primarily a function of structure weight,
structure shape (offset from pipe centreline), structure stiffness,
lay tension and stinger radius.
[mm]
Maximum 10000
Maximum 10000
TBD
Capacity
300 t
300 t
Remark
-
Value
17.0 m
1.15 m
1.10 m
Remark
Must be checked by draftsman
Tensioner squeeze cylinders to be removed for structures higher than 1.15 m
Governed by passage through the opened tensioners.
Capacity
300 t
15 t
Remark
-
2 x 10 t
70/45 t
Value
14 m
17 m
TBD
Remark
Must be checked by draftsman as value is dependent on recovery
angle and detailed FLET layout.
Must be checked by draftsman
Clearance with A-frame must be checked by draftsman
Capacity
145 t
124 t
135 t
Remark
Specified value is for an onboard lift at a maximum radius of 21 m
(which is over the A-frame location prior to upending).
Specified value is for an offboard lift in nice weather at a maximum
radius of 16 m.
Certified for 120 t. Assistance with SPC possible to upend 145 t
FLET system. Values are valid for 4 cylinder system.
550 t
Value
11.0 m
2.4 m
Remark
Must be checked by draftsman
Must be checked by draftsman
Capacity
124 t
Rollerboxes
100 t
50 t
2 x 30 t
Remark
Specified value is for an offboard lift in nice weather at a
maximum radius of 16 m.
Trolley is used to transport structure from Special Purpose Crane
into the vessel to the beadstall area.
Beadstall cranes are used to lift the structure from the trolley
into the line-up station in the firing line. The two cranes are
spaced at a minimum distance of 6.5 m (to be confirmed when
as built) and are synchronised. The COG of the structure must be
as such that none of the two crane loads exceeds 30 t (including
dynamic effects).
Maximum individual rollerbox load is 100 t. The applied rollerbox
load during installation is primarily a function of structure weight,
structure shape (offset from pipe centreline), structure stiffness,
lay tension and stinger radius.
[mm]
Maximum 10000
Maximum 10000
TBD
Capacity
300 t
300 t
Remark
-
Value
17.0 m
1.15 m
1.10 m
Remark
Must be checked by draftsman
Tensioner squeeze cylinders to be removed for structures higher than 1.15 m
Governed by passage through the opened tensioners.
Capacity
300 t
15 t
Remark
-
2 x 10 t
70/45 t