General information
According to the Regulation (EU) of the European Parliament and of the Council No. 305/2011
of 9 March 2011 (Construction Product Regulations CPR) and the Polish Act of 16 April 2004 on
construction products (Journal of Laws, 2004, No. 92, item 881, as further amended), a construction
product may be placed on the market and incorporated in construction works, if
It has the CE marking affixed,
It is included in the European Commission specification of products which do not
essentially affect health and safety, for which manufacturer issued declaration of
constancy of product performance, to recognized principles of building art.
Procedure of declaring product performance and marking it with the CE marking:
definition of harmonized technical specifications, i.e. depending on intended use of
product. It may be a harmonized Polish Standard which is not
a withdrawn standard or the European Assessment Document;
performance of product conformity assessment with harmonized technical
specification, with participation of a notified body (notified product certification
body or a notified laboratory), if the applied conformity assessment system so
require;
when performed assessment of constancy of product performance demonstrate that
the product fulfils the requirements given in harmonized technical specifications, the
manufacturer of a construction product, or its authorized representative, issues at its
own responsibility a declaration of performance for the product, acc. to Article 6 of
Construction Product Regulations (CPR) and subsequently affix the CE marking to the
product, acc. to CPR Article 8 and 9, enclosing required information thereto.
derogations from drawing up a declaration of performance have been defined in
Article 5 of the Regulation (EU) of the European Parliament and of the Council (UE)
No. 305/2011.
1.3.
The manufacturer shall appoint a person responsible for management and surveillance of
factory production control (e.g. FPC Proxy).
Product Certification Bureau, Polski Rejestr Statkw S.A., al. gen. Jzefa Hallera 126, 80-416 Gdask, Poland
Index: WCW/ZKP
Revision:
08.09.2014
Page: 3/9
The manufacturer shall determine a period of time and a place for keeping documents and records
as well as the method of handling them to demonstrate conformity and effectiveness of factory
production control. The manufacturer is obliged to keep any records pertaining to particular
products or product batches for a period of time defined in technical specifications or appropriate
legal regulations.
1.5.
The manufacturer shall establish and supervise method of evaluation of suppliers of production
means (materials, components, subassemblies) and subcontractors of services affecting factory
production control and shall define the requirements for such means and services.
When choosing the method of supervision, the control made by the manufacturer and
documented conformity evidences (conformity declarations, attestations, certificates, test
reports, safety data sheets, acceptance protocols and other) shall be considered.
The manufacturer shall ensure that supplied production means have been verified for their
Product Certification Bureau, Polski Rejestr Statkw S.A., al. gen. Jzefa Hallera 126, 80-416 Gdask, Poland
Index: WCW/ZKP
Revision:
08.09.2014
Page: 4/9
The manufacturer shall supervise the process of construction product manufacturing and carry
out inspections and testing to make product conforming with requirements. The manufacturer
shall, in particular:
define stages of the production process;
define type, scope, frequency and methods of tests carried out during production;
define the parameters to be controlled together with assumed tolerances;
define the persons responsible for carrying out inspections and examinations;
provide document specifying product performance and containing appropriate workplace
procedures/ instructions;
provide appropriate equipment for inspections and examinations.
The manufacturer shall keep records to document inspections and testing activities during
production. When any nonconformities have been identified during production process, the
manufacturer shall take appropriate corrective actions provided by factory production control
system. After removal of the nonconformities, inspection or testing shall be repeated to prove that
the fault has been eliminated.
1.7.
The manufacturer shall provide supervision of production machinery and equipment, including their
maintenance, inspections, overhauls and repairs, in accordance with prepared schedule. Execution
of these activities shall be controlled. The manufacturer shall also define the method of post-repair
and post-overhaul control activities. Performed activities shall be recorded.
1.8.
Index: WCW/ZKP
Revision:
08.09.2014
Page: 5/9
The manufacturer shall establish a method of identifying product at the stages of its
manufacturing (if it is possible) and of finished product. Particular products or product batches
shall be capable of being identified and their production history shall be traceable. The
manufacturer is obliged to keep records for particular products or product batches, together
with relevant detailed information pertaining to products manufacture and characteristics.
Retrieval of any essential information such as: manufacture date, applied raw materials,
materials, components and products, product batch, product type, designation or intended use,
method of marking product with safety mark, date of sale, product recipient, etc., shall be
possible on the basis of the records made.
1.10. Supervision of measuring, control and testing equipment
The manufacturer shall establish and document a method of supervision, calibration/ verification
and maintaining in appropriate condition of measuring, control and testing equipment. The
manufacturer shall supervise equipment and:
define instruments necessary for measuring, control and examination, taking into account
appropriate level of accuracy (on the basis of tests plan);
keep the list of all own equipment and keep it identified;
prepare the schedule of metrological verifications for the instruments and supervise
Product Certification Bureau, Polski Rejestr Statkw S.A., al. gen. Jzefa Hallera 126, 80-416 Gdask, Poland
Index: WCW/ZKP
Revision:
08.09.2014
Page: 6/9
Index: WCW/ZKP
Revision:
08.09.2014
Page: 7/9
Product Certification Bureau, Polski Rejestr Statkw S.A., al. gen. Jzefa Hallera 126, 80-416 Gdask, Poland
Index: WCW/ZKP
Revision:
08.09.2014
Page: 8/9
Document name
Designation
1.
2.
3.
4.
5.
6.
7.
Document name
Designation
1.
EN 1090-1:2009+A1:2011
2.
EN 1090-2:2008+A1:2011
3.
EN 1090-3:2012
Product Certification Bureau, Polski Rejestr Statkw S.A., al. gen. Jzefa Hallera 126, 80-416 Gdask, Poland
Index: WCW/ZKP
Revision:
08.09.2014
Page: 9/9
Item
Document name
Designation
4.
EN 12620:2002+A1:2008
EN 13043:2002
6.
EN 13055-1:2002
7.
EN 13055-2:2004
8.
EN 13139:2002
9.
Aggregates for unbound and hydraulically bound materials for use in civil
engineering work and road construction
EN 13242:2002+A1:2007
10.
EN 13450:2002
11.
EN 13383-1:2002
Requirements
Item
Name of document
Designation
1.
ISO/IEC 17065:2013
Other requirements
Item
Name of document
Designation
1.
2.
DACW-01
3.
DAN-01
4.
DA-06
Product Certification Bureau, Polski Rejestr Statkw S.A., al. gen. Jzefa Hallera 126, 80-416 Gdask, Poland