You are on page 1of 27

SPECIFICATION REPORT TO ACCOMPANY FOR THE

WORK OF Providing Paver block pavement at Vellampatty west


habitation area. H/O: Vellampatty.
NAME OF UNION

Vedasandur

NAME OF PANCHAYAT

Vellampatty

SCHEME & YEAR

THAI 2015 - 16

ESTIMATE AMOUNT
ADMINISTRATIVE SANCTION NO.

: R149937 /Dindigul Collector Roc N190/2015/A11,25.08.15

The above work has been proposed under the scheme of THAI 2015 - 16
The above street is a earthen surface and it becomes slushy during
rainy seasons. So the people living on the sides of the street found very
difficult to ride & to cross the street. Hence it is necessary to provide Paver
block pavement to the street.

The following provisions are made in this estimate


1. Earthwork excavation in all clauses of soils and depositing on bank with initial lead
and lift
2. Cement concrete 1:5:10 mix using 40mm ISS HBG metal including cost and
conveyance
3. Construction of Granular Sub base by providing with graded materials of size
9.5mm to 4.75mm metal in 66% & 2.36mm in 34% including spreading in uniform
layers
4. Cement concrete 1:3 : 6 mix using 40mm ISS HBG metal including cost and
conveyance
5. Supply and errection of steel centering for sides and soffits of cc works including
cost and conveyance
6. Supplying & Laying interlocking Paver Blocks of 80cm thick of require shaoe in CC
1:1:2 using 10 - 12 mm HBG Metal including cost of shuttering laying vibrating (with
mechanical Vibrating) finishing curing and cost includers for hydraulic pressed
machine and the cost including transporting charges etc., complete

LUMPSUM PROVISIONS
Necessary provisions have also been made for Name Board & Photo and
Rain water harvesting structures.

This estimate is prepared based on the current schedule of rates


for the year 2015 - 16. The work on sanction will be carried out as per
standard specifications and time to time instructions given by Higher
authorities.

This estimate is prepared based on the current schedule of rates


for the year 2015 - 16. The work on sanction will be carried out as per
standard specifications and time to time instructions given by Higher
authorities.

25.08.15

ABSTRACT ESTIMATE
Name of Work: Providing Paver block pavement at Vellampatty west habitation area. H/O:
Vellampatty.
Estimate
Amount:

Name of union : Guziliamparai


Sl.
No.

QTY

4.00

Earthwork excavation in all clauses of soils and


depositing on bank with initial lead and lift for
foundation as per ss20B For road

2.00

Cement concrete 1:4:8 mix using 40mm ISS HBG


metal including cost and conveyance of all matials to 2693.76
site and all labour charges etc., complete.

DESCRIPTION OF WORK

Construction of Granular Sub base by providing with


graded materials of size 9.5mm to 4.75mm metal in
66% & 2.36mm in 34% including spreading in
uniform layers with motor grader on propared
11.31 surface, mixing by mix in place method with
rotavator at OMC and compacting with three wheeler
80 - 100 KN static roller coa pcity to acheive the
desired dinsity etc., complete as Technical
specification clause 402 Grading C.
4.29

RATE

UNIT

AMOUNT

50.60

CUM

202.00

CUM

5388.00

CUM

9059.00

CUM

12702.00

Sqm

8922.00

801.01

Cement concrete 1:3 : 6 mix using 40mm ISS HBG


metal including cost and conveyance of all matials to 2960.93
site and all labour charges etc., complete

Supply and errection of steel centering for sides and


soffits of cc works including cost and conveyance of
37.33
all matials to site and all labour charges etc.,
complete.

149937

239.00

Supplying & Laying interlocking Paver Blocks of


80cm thick of require shaoe in CC 1:1:2 using 10 - 12
mm HBG Metal including cost of shuttering laying
113.07 vibrating (with mechanical Vibrating) finishing curing 1002.60
and cost includers for hydraulic pressed machine
and the cost including transporting charges etc.,
complete complying standard specification

Sqm 113364.00

LS

Provision for Name Board

LS

300.00

LS

Contigencies & other unforeseen charges

LS

0.00

TOTAL

149937.00

DETAILED ESTIMATE
Name of Work: Providing Paver block pavement at Vellampatty west habitation area. H/O:
Vellampatty.

Sl.
No
1

Description of work

Nos.

Quantity

Earthwork excavation in all clauses of soils and depositing on bank with initial
lead and lift for foundation as per ss20B

core wall 1 x 2

33.33

0.30

0.20

4.00
4.00

Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and
conveyance of all matials to site and all labour charges etc., complete.

core wall 1 x 2

33.33

0.30

0.10

2.00
2.00

Construction of Granular Sub base by providing with graded materials of size


9.5mm to 4.75mm metal in 66% & 2.36mm in 34% including spreading in
uniform layers with motor grader on propared surface, mixing by mix in place
3
method with rotavator at OMC and compacting with three wheeler 80 - 100 KN
static roller coa pcity to acheive the desired dinsity etc., complete as Technical
specification clause 402 Grading C.

road 1 x 1

32.87

3.44

0.10

11.31
11.31

Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and
conveyance of all matials to site and all labour charges etc., complete.

core wall 1 x 2

33.33

0.23

0.28

4.29
4.29

Supply and errection of steel centering for sides and soffits of cc works including
cost and conveyance of all matials to site and all labour charges etc., complete.

core wall 2 x 2

33.33

0.28

37.33
37.33

Sl.
No

Description of work

Nos.

Quantity

Supplying & Laying interlocking Paver Blocks of 80cm thick of require shaoe in
CC 1:1:2 using 10 - 12 mm HBG Metal including cost of shuttering laying
6 vibrating (with mechanical Vibrating) finishing curing and cost includers for
hydraulic pressed machine and the cost including transporting charges etc.,
complete complying standard specification

road 1 x 1

32.87

3.44

113.07
113.07

7 Provision for Name Board

Ls

8 Contigencies & other unforeseen charges

LS

LEAD STATEMENT

SL.
NO.

MATERIAL

LEAD

LOADING & COST OF


MATERIAL CONVEYANC
UNLOADIN MATERIAL AT
COST
E
G
SITE

CEMENT

15

4870.00

77.55

4947.55

Steel

15

50925.00

77.55

51002.55

Sand

25

176.40

193.30

369.70

40mm ISS HBG METAL

848.00

34.76

882.76

20mm ISS HBG METAL

1180.00

34.76

1214.76

12mm ISS HBG METAL

1095.00

34.76

1129.76

10mm ISS HBG METAL

806.00

34.76

840.76

9.5 - 4.75mm ISS HBG


METAL

568.08

34.76

602.84

2.36mm ISS HBG METAL

502.00

34.76

536.76

10 COUNTRY BRICKS

4725.00

7.33

4732.33

11 US GRAVEL

157.00

8.69

165.69

DATA SHEET
SUB DATA
SL.
QUANTIT
NO
DESCRIPTION
Y
.
1 CEMENT MORTAR 1:2 MIX - 1
COST OF CEMENT
COST OF SAND
TOTAL FOR 1m3
2 CEMENT MORTAR 1:3 MIX - 1m3

RATE

UNIT

AMOUNT

720.00 Kg
1.00 m3

4947.55 Mt
369.70 m3

3562.24
369.70
3931.94

480.00 Kg
1.00 m3

4947.55 Mt
369.70 m3

2374.82
369.70
2744.52
52.40
2796.92

COST OF CEMENT
COST OF SAND
FOR CONCRETE WORKS - 1m3
1.00 m3
MIXING CHARGES
FOR MASONRY WORKS - 1m3
3 CEMENT MORTAR 1:4 MIX - 1m3
360.00 Kg
1.00 m3
1.00 m3

COST OF CEMENT
COST OF SAND
FOR CONCRETE WORKS - 1m3
MIXING CHARGES
FOR MASONRY WORKS - 1m3

52.40 m3

4947.55 Mt
369.70 m3
52.40 m3

1781.12
369.70
2150.82
52.40
2203.22

MAIN DATA
SL.
QUANTITY
NO.
1

RATE

PER

AMOUNT

Earthwork excavation in all clauses of soils and depositing on bank with initial lead and
lift for foundation as per ss20B
For Pavement
For Drain
For Foundation

DESCRIPTION

Rate for 1m3

50.60 m3

50.60

Rate for 1m3

50.60 m3

75.90

Rate for 1m3

50.60 m3

101.20

Filling the Carted revier sand including cost and conveyance of meterials and laying
charges.
1.00 m3

Cost of Filling sand

1.00 m3

Labour charges for filling

369.70 m3

369.70

15.60 m3

15.60

Rate for 1m3

385.30

3 Filling the US garavel including cost and conveyance of meterials and laying charges.
1.00 m3

Cost of US gravel

1.00 m3

Labour charges for filling


Rate for 1m3

165.69 m3

165.69

5.16 m3

5.16
170.85

Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of
all matials to site and all labour charges etc., complete for 10m3
9.00 m3

Cost of 40mm ISSHBG metal

4.50 m3

Cost of CM1:4 mix

1.8 Nos.

882.76 m3

7944.84

2150.82 m3

9678.69

Mason II class

404.00 E

727.20

17.70 Nos.

Mazdoor I class

282.00 E

4991.40

14.10 Nos.

Mazdoor II class

255.00 E

3595.50

Total for 10 m3

26937.63

Rate for 1m3


2693.76
Construction of Granular Sub base by providing with graded materials of size 9.5mm to
4.75mm metal in 66% & 2.36mm in 34% including spreading in uniform layers with
motor grader on propared surface, mixing by mix in place method with rotavator at OMC
5
and compacting with three wheeler 80 - 100 KN static roller coa pcity to acheive the
desired dinsity etc., complete as Technical specification clause 402 Grading C.(out Put
300cum)
Sub Data : 1

Labour charges
0.48 Nos.

Mate

300.00 day

144.00

2.00 Nos.

Mazdoor (Skilled)

291.00 day

582.00

Mazdoor (Un Skilled)

260.00 day

2600.00

10.00 Nos.

Total

3326.00

Sub Data : 2

Machinery
charges
12.00 Nos.

Tractor with Grader with 25 cm /hour

363.00 Hour

4356.00

30.00 Nos.

Three wheel 80-100 static roller at 10cm/hour

460.00 Hour

13800.00

Water tanker 6kl Capacity

386.00 Hour

1930.00

Tractor with Rotavator with 25cm/hour

363.00 Hour

4356.00

5.00 Nos.
12.00 Nos.

Total

24442.00

Main Data :

237.60 Nos.

Cost of 9.5mm to 4.50mm metal (66%)

602.84 Cum

143234.78

122.40 Nos.

Cost of 2.36mm metal (34%)

536.76 Cum

65699.42

Water

120.00 Ltr

3600.00

3326.00 day

3326.00

24442.00 day

24442.00

30.00 Ltr
1.00 day

Labour charges

1.00 day

Machinery charges

Total for 300 m3

240302.20

Rate for 1m3

801.01

Suopply & Laying interlocking Paver Blocks of 80cm thick of require shaoe in CC 1:1:2
using 10-12mm HBG metal including cost of shuttering laying vibrating (with mechanical
6
Vibrating) finishing curing and includers for hydraulic pressed machine and the Cost
including tansporting charges etc.. Complete complying standard specification
Sub Data : 1

CEMENT MORTAR 1:1 MIX - 1

1440.00 Kg
1.00 m3

COST OF CEMENT
COST OF SAND

4947.55 Mt
369.70 m3

TOTAL FOR 1m3

7124.47
369.70
7494.17

Sub Data : 2

CC1:1:2 using 10-12mm HBG metal including all labour charges etc..
Cost of 10mm HBG Metal

840.76 Cum

Cost of 12mm HBG Metal

1129.76 Cum

Total

1970.52

Cost of 10 -12 mm HBG Metal

985.26 Cum

9.00 Cum

10mm - 12mm HBG Metal avarage

985.26 Cum

8867.34

4.50 Cum

Cost of 1:1 Mix

7494.17 Cum

33723.77

1.80 Nos.

Masion II Class

404.00 E

727.20

17.70 Nos.

Mazdoor I Class

282.00 E

4991.40

14.10 Nos.

Mazdoor II Class

255.00 E

3595.50

CC1:1:2

Total for 10 m3

51905.21

Rate for 1m3

5190.52

Area of Paver Block 0.028 cum


Volume of Concrete 0.028x0.08 = 0.0022 cum
Sub Data : 3

0.0022 Cum

CC 1 : 1 : 2

5190.52 Cum

11.42

1.00 Ls

Qurry rubbish, Colour Pigments

4.40

4.40

1.00 Ls

Mould base Plate

4.60

4.60

1.00 Ls

Compactness with power Machine

4.60

4.60

Total for 1 m3
Amount of paver block Per Sqm

25.02
25.02

893.57

Main Data :

10.00 Sqm

CC 1 : 1 : 2

893.57 Sqm

1.00 Nos.

Mason II class

404.00 E

404.00

1.00 Nos.

Mazdoor I class

282.00 E

282.00

1.50 Nos.

Mazdoor II class

255.00 E

382.50

1.00

Compactness with power Machine

21.80

21.80

Total for 10 m2

10026.00

Rate for 1m2


7

1002.60

Cement concrete 1:3 : 6 mix using 40mm ISS HBG metal including cost and conveyance
of all matials to site and all labour charges etc., complete for 10m3
9.00 m3

Cost of 40mm ISSHBG metal

4.50 m3

Cost of CM1:3 mix

1.8 Nos.

882.76 m3

7944.84

2744.52 m3

12350.34

Mason II class

404.00 E

727.20

17.70 Nos.

Mazdoor I class

282.00 E

4991.40

14.10 Nos.

Mazdoor II class

255.00 E

3595.50

Total for 10 m3

29609.28

Rate for 1m3

8935.70

2960.93

Supply and errection of Centering and shuttering charges for all RCC (or)
PCC wall works charges
1 m2

239.00

RATE OF MATERIALS
SL.
NO.

MATERIALS

1 CEMENT

COST

4870.00

2 M.S. & R.T.S. STEEL ROD

50925.00

3 SAND FOR MORTAR

176.40

4 SAND FOR FILLING

176.40

5 ROUGH STONE

379.00

6 BOND STONE

520.00

7 CUT STONE

288.00

8 40mm ISS HBG METAL

848.00

9 20mm ISS HBG METAL

1180.00

10 10mm - 12mm ISS HBG METAL

950.50

11 COUNTRY BRICKS

4725.00

12 SHELL LIME

1260.00

13 SLACKED LIME

929.00

14 BRICK JELLY 20mm SIZE

652.00

15 PRESSED TILES
17 BINDING WIRE
18 US GRAVEL

10335.00

LABOUR RATE

WATER PROOFING COMPOUND

ENAMEL PAINT
FILLING CHARGES-OTHER THAN
SAND

CONVEYANCE in KM
0 - 10

20-Oct 20 - 40 40 - 80

5.43
5.43
8.69
8.69
8.69
8.69
5.60
8.69
8.69
8.69
7.33
0.00
0.00
5.97
9.77

4.65
4.65
7.44
7.44
7.44
7.44
4.65
7.44
7.44
7.44
6.28
0.00
0.00
5.12
8.37

4.00
4.00
6.40
6.40
6.40
6.40
4.00
6.40
6.40
6.40
5.40
0.00
0.00
4.40
7.20

3.45
3.45
6.00
6.00
6.00
6.00
3.20
6.00
6.00
6.00
4.65
0.00
0.00
3.80
6.20

8.69

7.44

6.40

6.00

45.60
157.00

SAND FILLING CHARGES


CARPENTER- I CLASS
FITTER -I CLASS
MASON - I CLASS
MASON -I I CLASS
MAZDOOR - I CLASS
MAZDOOR - II CLASS
PAINTER - I CLASS
PAINTER -I I CLASS
WODDER
MIXING CHARGES
EARTH WORK S.S. 20B

I.C

15.60
441.00
392.00
451.00
404.00
282.00
255.00
361.00
336.00
292.00
52.40
50.60
42.35
242.55
17.75

TENDER REGISTER
Name of Work: Providing Paver block pavement at Vellampatty west habitation area. H/O: Vellampatty.

Estimate Amount of the Contract :

149937

Whether tender notice has been approved by competent authority : Yes


Total No.of Tender Received ; 2 (Two Only)

Date of Tender :
Whether the
Certificate or
Verificationor
clearance of income
tax assesments has
been obtained from
the contractor for the
year concerned

Tender
percentage

S.N
o

Name of Tender

Whether regitered
contractor or not if
registered the serial
No.of in the Register
or contractor

K.Subiramani

Yes

Yes

-4.03 %

M.Ramachandiran

Yes

Yes

-3.94 %

12.12.2013

Order of the
Recommendations of
authority
Amount of
the Commissions and component to
Deposit
Engineer If there is one accept the
tender

Ch No

- Rs5400/
Date :12.12.2013

Ch No

- Rs5400/
Date :12.12.2013

The lowest tender received from the contractor Thiru K.Subiramani


was 0.06 % less then the estimate rate. So , may be recommanded and
approvel

BLOCK DEVELOPMENT OFFICER


PANCHAYAT UNION
VADAMADURAI

ASSISTANT ENGINEER
PANCHAYAT UNION
VADAMADURAI

TENDER SCHEDULE TO ACCOMPANY THE WORK OF


Name of Work: Providing Paver block pavement at Vellampatty west habitation area. H/O: Vellampatty.

Estimate Amount:

149937.00

EMD Rs : 1500.00

Tender Date:

Contract value:

Time of Completion:
Rate in

Sl.N Probable
o. Quantity

Description of work

Figure

words

Unit

4.00

Earthwork excavation in all clauses of soils and depositing on bank


with initial lead and lift for foundation as per ss20B For road

one cubic
metre

2.00

Cement concrete 1:4:8 mix using 40mm ISS HBG metal including
cost and conveyance of all matials to site and all labour charges etc.,
complete.

one cubic
metre

11.31

Construction of Granular Sub base by providing with graded materials


of size 9.5mm to 4.75mm metal in 66% & 2.36mm in 34% including
spreading in uniform layers with motor grader on propared surface,
mixing by mix in place method with rotavator at OMC and compacting
with three wheeler 80 - 100 KN static roller coa pcity to acheive the
desired dinsity etc., complete as Technical specification clause 402
Grading C.

one cubic
metre

4.29

Cement concrete 1:3 : 6 mix using 40mm ISS HBG metal including
cost and conveyance of all matials to site and all labour charges etc.,
complete

one cubic
metre

37.33

Supply and errection of steel centering for sides and soffits of cc


works including cost and conveyance of all matials to site and all
labour charges etc., complete.

one
square
metre

113.07

Supplying & Laying interlocking Paver Blocks of 80cm thick of require


shaoe in CC 1:1:2 using 10 - 12 mm HBG Metal including cost of
shuttering laying vibrating (with mechanical Vibrating) finishing curing
and cost includers for hydraulic pressed machine and the cost
including transporting charges etc., complete complying standard
specification

one
square
metre

Signature of Contractor:

No. of corrections:

No. of overwrittings:

STATEMENT OF PARTICULARS TO ACCOMPANY T.R.TENDERS


1
2

Name Of the Panchayat Union


Whether Panchayat Union

: Vadamadurai
: Vadamadurai

Name of the Work

Name of Work: Providing Paver block


: pavement at Vellampatty west habitation
area. H/O: Vellampatty.

Amount Sanctioned estimate with

: 149937

DR or SDR No & Date of Sanction

: AEE / RD / VDSR No :

Nature of Works whether road work or building


wor

: Paver Block

Rates adopted in the sanction i.e. scheduled of


rates or the Year of Sanction

: 2014- 15

Value of Contracted as per the Sanctioned


estimate

: 149637.58

Date with no. of Tender calls and the results


1. First call
2. Second call
3. Third call
Name of the Tenders

: 12.12.2013
:
:
:
1. Thiru : K.Subiramani
2. Thiru : M.Ramachandiran
:

10

Name of lowest tenders recommended with of


Tender

11

Whether the tender is a registered contractor note


: Yes
with his money limit

12

His subsisting Value of Contract including this


work new recommended

13

/ 2013 - 14 Dated :

: K.Subiramani

: Yes

Whether the required EMD has been remitted in


case of at 5% of S.B.
:

14

Whether the current LTYCA STVC have been


produced

15

Whether funds are avilable to execute the work

: THAI 2015 - 16

16

Whether extra cot if any involved way of premium


:
tender is Prposed to be met with

17

Reasons for delay in entrustment of work if any

18

Commissioner`s remarks

143606.64 143737.31 -

-4.03 %
-3.94 %

143606.64 -

-4.03 %

19

Asst. Engineer`s remarks

TENDER COMPARTIVE
Name of Work: Providing Paver block pavement at Vellampatty west habitation area. H/O: Vellampatty.
Estimate Amount : 149937

S.No

Qty

Description

ESTIMATE

K.Subiramani

M.Ramachandiran

Rate

Amount

Rate

Amount

Rate

Amount

4.00

Earthwork excavation in all clauses of soils and depositing on bank with


initial lead and lift for foundation as per ss20B For road

50.60

202.40

46.00

184.00

46.00

184.00

2.00

Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost
and conveyance of all matials to site and all labour charges etc., 2693.76
complete.

5387.52

2502.00

5004.00

2503.00

5006.00

11.31

Construction of Granular Sub base by providing with graded materials


of size 9.5mm to 4.75mm metal in 66% & 2.36mm in 34% including
spreading in uniform layers with motor grader on propared surface,
mixing by mix in place method with rotavator at OMC and compacting
with three wheeler 80 - 100 KN static roller coa pcity to acheive the
desired dinsity etc., complete as Technical specification clause 402
Grading C.

801.01

9059.42

839.00

9489.09

840.00

9500.40

4.29

Cement concrete 1:3 : 6 mix using 40mm ISS HBG metal including cost
and conveyance of all matials to site and all labour charges etc., 2960.93
complete

12702.39

2749.00

11793.21

2750.00

11797.50

37.33

Supply and errection of steel centering for sides and soffits of cc works
including cost and conveyance of all matials to site and all labour
charges etc., complete.

8921.87

221.00

8249.93

221.00

8249.93

239.00

S.No

Qty

Description

113.07

ESTIMATE

K.Subiramani

M.Ramachandiran

Rate

Amount

Rate

Amount

Rate

Amount

113363.98

963.00

108886.41

964.00

108999.48

Supplying & Laying interlocking Paver Blocks of 80cm thick of require


shaoe in CC 1:1:2 using 10 - 12 mm HBG Metal including cost of
shuttering laying vibrating (with mechanical Vibrating) finishing curing 1002.60
and cost includers for hydraulic pressed machine and the cost including
transporting charges etc., complete complying standard specification

149637.58

K.Subiramani

143606.64

143606.64

143737.31

149637.58 x 100

-4.03 %

149637.58 x 100

-3.94 %

149637.58
M.Ramachandiran

143737.31

149637.58

The lowest tender received from the contractor Thiru K.Subiramani was 0.06 % less then the
estimate rate. So , may be recommanded and approvel

VADAMADURAI BLOCK
COMPLETION REPORT SHOWING THE DIFFERENCE BETWEEN THE ORIGINAL ESTIMATE AND BILLS
Name of Work: Providing Paver block pavement at Vellampatty west habitation area. H/O: Vellampatty.
As per Original Estimate

Item
No.

Particulars

As per Bills

Differnce

Explanation of
Difference

Quantity

Rate

Amount

Quantity

Rate

Amount

Increse

Decrese

Earthwork excavation in all clauses of soils and


depositing on bank with initial lead and lift for
foundation as per ss20B For road

4.00

50.60

202.00

4.00

46.00

184.00

18.00

As per actuals

Cement concrete 1:4:8 mix using 40mm ISS HBG


metal including cost and conveyance of all
matials to site and all labour charges etc.,
complete.

2.00

2693.76

5388.00

2.00

2502.00

5004.00

384.00

As per actuals

Construction of Granular Sub base by providing with graded


materials of size 9.5mm to 4.75mm metal in 66% & 2.36mm in
34% including spreading in uniform layers with motor grader
on propared surface, mixing by mix in place method with
rotavator at OMC and compacting with three wheeler 80 - 100
KN static roller coa pcity to acheive the desired dinsity etc.,
complete as Technical specification clause 402 Grading C.

11.31

801.01

9059.00

11.31

839.00

9489.09

430.09

As per actuals

Cement concrete 1:3 : 6 mix using 40mm ISS


HBG metal including cost and conveyance of all
matials to site and all labour charges etc.,
complete

4.29

2960.93

12702.00

4.29

2749.00

11793.21

908.79

As per actuals

Supply and errection of steel centering for sides


and soffits of cc works including cost and
conveyance of all matials to site and all labour
charges etc., complete.

37.33

239.00

8922.00

37.33

221.00

8249.93

672.07

As per actuals

As per Original Estimate

Item
No.

Particulars

Supplying & Laying interlocking Paver Blocks of 80cm thick of


require shaoe in CC 1:1:2 using 10 - 12 mm HBG Metal
including cost of shuttering laying vibrating (with mechanical
Vibrating) finishing curing and cost includers for hydraulic
pressed machine and the cost including transporting charges
etc., complete complying standard specification

Provision for Name Board

Quantity

Err:50
Err:509
9
8

Contigencies & other unforeseen charges

113.07

LS

Rate

1002.60 113364.00

LS

Err:509
LS

Amount

300.00

As per Bills

Differnce

Quantity

Rate

Amount

Increse

Decrese

113.07

963.00

108886.41

4477.59

As per actuals

300.00

0.00

300.00

As per actuals

Err:509

Err:509

As per actuals

As per actuals

Err:509

Err:509

Err:509
LS

0.00

0.00

Err:509

Difference R

Explanation of
Difference

143606.64

Err:509

Diff

Rs

Err:509

Quantity Executed or
Supplied
Up to date

Since last
Certificate

Amount
ITEMS

Rate

Per

Rs

Up to date

Since last Certificate

Rs

Rs

Brought forward

143606.64

143606.64

143607

143607

Add in Col.7 Total up to date in last Certificate Voucher No


Total Value of work done up tp date agreeing with total of col.6..
Deduct:
Fitnes and other deductions up to date (to be specified in remarks coloumn)
Amount of previous payments as per last certificate.
Voucher No...................................
Payments now made Rs...................(in words).....................

Balance Due
Signature of the Contractor..Dated.200 Certified that
the proceeding claims is correct, that the necessary measurements have been made by me on 200
and that works has beeb satisfactory performed vide page ......................of measurements book
no ...........................................D............................200

Office in - charege of work

CHECK MEASUREMENTS CERTIFICATE


Work was
Material work

Certificate that the

duly check measured by me on (date).

Chairman
Commissioner

COMPLETION CERTIFICATE
Certificate that the work has been completed in accrdance with the plan and estimate in as substancial and satisfactory
manner
Rs.
Allotment for the year

.---------

Expenditure including this bill

.---------

Balance Available

.---------

Ps.

Chairman
Commissioner

Pay Rupees (.)


Station
Dated :20
Received Rs. (...
.)

Only as final payment is settlement of all demands..

...Payee
Witness :
Head of Account

Resolution NoDate.20
Rs.

Ps.

Chairman
Commissioner

Remarks

0 Certified that
200

- charege of work

Chairman
Commissioner

atisfactory

Chairman
Commissioner

Payee

Chairman
Commissioner

CC I st and Final

THAI 2015 - 16

M.F. Form No.83


P.U. Form No.55

CONTRACT CERTIFICATE

Name of Work: Providing Paver block pavement at Vellampatty west habitation


area. H/O: Vellampatty.
How executed
Last Certificate granted for this if any Voucher No
Quantity Executed or
Supplied

Voucher No.

Amount of Estimate: 149937


Authority
Name of Contractor K.Subiramani
Month

Rate
ITEMS

Amount
Per

Up to date

Since last
Certificate

Up to date

Since last
Certificate

6
Rs

7
Rs

4.00

4.00

Earthwork excavation in all clauses of soils and


depositing on bank with initial lead and lift for
foundation as per ss20B For road

46.00

CUM

184.00

184.00

2.00

2.00

Cement concrete 1:4:8 mix using 40mm ISS


HBG metal including cost and conveyance of all
matials to site and all labour charges etc.,
complete.

2502.00

CUM

5004.00

5004.00

11.31

Construction of Granular Sub base by providing with


graded materials of size 9.5mm to 4.75mm metal in
66% & 2.36mm in 34% including spreading in uniform
layers with motor grader on propared surface, mixing
by mix in place method with rotavator at OMC and
compacting with three wheeler 80 - 100 KN static
roller coa pcity to acheive the desired dinsity etc.,
complete
as Technical specification clause 402
Grading C.

839.00

CUM

9489.09

9489.09

4.29

Cement concrete 1:3 : 6 mix using 40mm ISS


HBG metal including cost and conveyance of all
matials to site and all labour charges etc.,
complete

2749.00

CUM

11793.21

11793.21

37.33

Supply and errection of steel centering for sides


and soffits of cc works including cost and
conveyance of all matials to site and all labour
charges etc., complete.

221.00

Sqm

8249.93

8249.93

113.07

113.07

Supplying & Laying interlocking Paver Blocks of 80cm


thick of require shaoe in CC 1:1:2 using 10 - 12 mm
HBG Metal including cost of shuttering laying vibrating
(with mechanical Vibrating) finishing curing and cost
includers for hydraulic pressed machine and the cost
including transporting charges etc., complete
complying standard specification

963.00

Sqm

108886.41

108886.41

0.00

0.00

Provision for Name Board

300.00

0.00

0.00

0.00

0.00

0.00

0.00

143606.64

143606.64

11.31

4.29

37.33

Rs P

Carried Over

Remarks
8