You are on page 1of 34

Annex IX-00-01

Ecuador CCS Hydropower Station Project


Basic Design
Summary of Main Hydraulic Machinery and Electrical Equipment
(Version B)

Yellow River Engineering Consulting Co., Ltd.


Sept

2011

Summary of CCS Main Hydraulic Machinery and Electrical Equipment


Description of

No.
2
2.1
(1)
2.2

(1)

(2)

Specifications and Parameters

Equipment

Unit

Qty.

Set

Location of

Turbine Generator Units


Turbine
Hr=604.1m;
nr=300r/min;
3
Nr=187.65 MW
Qr=34.8m /s
D=3.3~3.42mTemporary

Turbine

Underground
powerhouse

Governor

Governor

Oil

Pressure

Busbar floor of

PID governing;

Set

operating oil pressure: 6.3 MPa


Unit

Governor

of

underground
powerhouse
Busbar floor of

HYZ-4.0-6.3;

V=4m

Set

underground
powerhouse
Spherical

(3)

Leakage Device

V=249 L;

equipped with oil pump

Set

valve

floor
underground
powerhouse

2.3

Inlet Spherical Valve


Spherical valve

(1)

Remarks

Installation

Inlet Spherical Valve

DN= 2.2 m

P=7.5MPa

Set

floor of
underground

of

No.

Description of
Equipment

Specifications and Parameters

Unit

Location of

Qty.

Remarks

Installation
powerhouse
Turbine floor of

(2)

Oil Pressure Unit of inlet


Spherical Valve

HYZ-8-6.3;

V=8m

Set

underground
powerhouse

(3)

2.4
1

Standby Inlet spherical


valve (including
connection pipe,
servomotor, by-pass valve
and associated pipe, not
including oil pressure unit
and expansion joint )
Generator

Inlet spherical valve


DN= 2.2 m

P=7.5MPa

floor

of

underground
powerhouse

Capacity: 205MVA;
U=13.8kV;

Generator

Set

nr=300r/min;
cos=0.9

Set

Underground
powerhouse
Busbar floor of

(2)

Neutral
equipment

complete

Set

underground
powerhouse

Excitation System
Generator

1)

Excitation
Device

Regulating

Set

of

underground
powerhouse
Busbar floor of

2)

Excitation Transformer

3-phase

Set

underground
powerhouse

No.

Description of

Specifications and Parameters

Equipment

Unit

Qty.

Location of

Remarks

Installation
Busbar floor of

3)

Braking Transformer

3-phase

Set

underground
powerhouse

Partial
4

discharge

of

generatorsupervision of
generator gap between

Set

Set

Generator pit

rotor and stator


5
3

Monitoring of vibration
and swing for unit

Turbine and
generator pit

Transformer
1 set for standby.

(1)

Single-phase
Transformer

Step-up

68.3MVA 50022.5%/ 3 //13.8kV


YN,d11 Uk=14%

Set

25

Main
cavern

transformers See 3.1.5 for spare


parts and special
tools.

(2)

HV
Station
Service
Isolating
Transformer
(on-load
voltage
regulation)

Dry type 6000kVA13.842.5%/13.8kV


DYn11 Uk=10%

Set

(3)

Auxiliary
Transformer
(With Protective Housing)

Dry type, 3150kVA ;


13.822.5%/0.48kV; DYn11 Uk=6%

Set

(4)

Auxiliary
Transformer
(With Protective Housing)

Dry type 400kVA; 0.4822.5%/0.22-0.127kV


DYn11 Uk=4%

Set

(5)

Auxiliary
Transformer
(With Protective Housing)

Dry type 400kVA ;


DYn11 Uk=4%

Set

13.822.5%/0.48kV

Busbar
floor
underground
powerhouse

of

Busbar
floor
of
underground
powerhouse
Busbar floor layout
of
underground
powerhouse
In
the
control
building

No.

Description of
Equipment

Specifications and Parameters

Unit

Qty.

Set

Set

Set

Auxiliary
Transformer
(With Protective Housing)
Auxiliary
Transformer
(With Protective Housing)

Dry type 100kVA; 0.4822.5%/0.22-0.127kV


DYn11 Uk=4%
Dry type 1250kVA; 13.822.5%/0.48kV
DYn11 Uk=6%

(8)

Auxiliary
Transformer
(With Protective Housing)

Dry type 250kVA;


DYn11 Uk=4%

(9)

Auxiliary
Transformer
(With Protective Housing)

Dry type 50kVA; 0.4822.5%/0.22-0.127kV


DYn11 Uk=4%

Set

(10)

Auxiliary
Transformer
(With Protective Housing)

Dry type 50kVA 13.822.5%/0.48kV


DYn11 Uk=4%

Set

(11)

Auxiliary
Transformer
(With Protective Housing)

Dry type 10kVA 0.4822.5%/0.22-0.127kV


DYn11 Uk=4%

Set

(12)

Auxiliary
Transformer
(With Protective Housing)

Dry type 400kVA 13.842.5%/0.48kV


DYn11 Uk=4%

Set

(13)

Auxiliary
Transformer
(With Protective Housing)

Dry type 50kVA 0.4842.5%/0.22-0.127kV


DYn11 Uk=4%

Set

(14)

Auxiliary
Transformer
(With Protective Housing)

Dry type 400kVA 13.842.5%/0.48kV


DYn11 Uk=4%

Set

(15)

Auxiliary
Transformer
(With Protective Housing)

Dry type 50kVA 0.4842.5%/0.22-0.127kV


DYn11 Uk=4%

Set

(16)

Auxiliary

Dry type 400kVA 13.842.5%/0.48kV

Set

(6)
(7)

Transformer

13.822.5%/0.48kV

Location of
Installation
In
the
control
building
Transformer room of
generator house
Substation
and
distribution center of
tailwater gate
Substation
and
distribution center of
tailwater gate
Substation
and
distribution center of
overhaul shop
Substation
and
distribution center of
overhaul shop
Substation
and
distribution center of
intake complex
Substation
and
distribution center of
intake complex
Substation
and
distribution center of
compensation
reservoir
Substation
and
distribution center of
compensation
reservoir
Substation
and

Remarks

No.

Description of
Equipment
(With Protective Housing)

Specifications and Parameters

Unit

Qty.

DYn11 Uk=4%

Location of
Installation
distribution center of

Coca Codo Sinclair


camp
Substation
and
distribution center of

(17)

Auxiliary
Transformer
(With Protective Housing)

Dry type 250kVA 0.4842.5%/0.22-0.127kV


DYn11 Uk=4%

Set

(18)

Auxiliary
Transformer
(With Protective Housing)

Dry type 400kVA 13.842.5%/0.48kV


DYn11 Uk=4%

Set

Auxiliary
Transformer
(With Protective Housing)

Dry type 250kVA 0.4842.5%/0.22-0.127kV


DYn11 Uk=4%

Set

13.8kV10000A

3 m About 480 Busbar tunnel

13.8kV, 10000A, 80kA

Set

Busbar tunnel

13.8kV,

Set

Busbar floor

Nr.

Busbar tunnel

Group

24

Set

(19)
4
(1)
(2)
(3)
(4)

Substation
and
distribution center of

San Rafael camp


1

Substation
and
distribution center of

San Rafael camp

Generator Voltage System


13.8kV

Isolated-phase

Busbar
Generator Circuit Breaker
Short-circuiting / Braking
circuit breaker
Fuse Cabinet of Station
Service Load Switch

(5)

Current Transformer

500kV Equipment

(1)

Coca Codo Sinclair


camp

Incoming Circuit Breaker


Bay (GIS)

13.8kV,

300A,

100kA

13.8kV10000/5A

550kV

4000A 63kA

Isolated-phase
Busbar
GIS room of main
transformer cavern

Remarks

Description of

No.
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
6
(1)
(2)
(3)
(4)

Equipment
Outgoing Circuit Breaker
Bay (GIS)
PT Bay (GIS)
Busbar

Circuit

Breaker

SF6-Gas Isolated Busbar


(GIB)
Capacitor Type Voltage
Transformer
Oxide

Lightning

Arrester
Aluminum

Qty.

Set

Set

Set

3 m

330

550kV, 500/ 3 //0.1/ 3 //0.1/ 3 //0.1kV

Set

Switchyard

550kV

Set

Switchyard

Set

Switchyard

400

Switchyard

km

10

500kV cable tunnel

Set

13

500kV switchyard

Set

13

Nr.

550kV

4000A 63kA

550kV

4000A 63kA

550kV

4000A

Y20W

GW-550 4000A

HV Disconnector

Location of

Unit

550kV

Bay (GIS)

Zinc

Specifications and Parameters

Conductor

Steel Reinforced

Remarks

Installation
GIS room of main
transformer cavern
GIS room of main
transformer cavern
GIS room of main
transformer cavern
GIS room of main
transformer cavern

500kV Cable and Cable Accessories


500kV Cable
500kV

Cable

500kV 1600mm
Terminal

(GIS Connected)
500kV

Cable

Terminal

(Outdoor)
Earth Box of 500kV Cable

XLPE

500kV 1600mm (dry type)


500kV 1600mm (porcelain insulating)
stainless steel shell with thickness not less
than 3mm

Inside

the

main

transformer cavern
500kV cable tunnel

No.
(5)
(6)

Description of
Equipment
500kV

Cable

Sheath

Protector
500kV Cable Insulation
Flange Protector

Location of

Specifications and Parameters

Unit

Qty.

Remarks

nonlinear metallic oxide resistor valve plate

Set

metallic oxide

Set

500kV cable tunnel

Installation
500kV cable tunnel

(7)

500kV Cable Return Line

Insulated copper core cable

Set

500kV cable tunnel

(8)

500kV Cable Clamp

nonmagnetic material

Set

500kV cable tunnel

hot galvanizing

Set

500kV cable tunnel

Microcomputer-based

Nr.

Near the generator

Microcomputer-based

Nr.

Near the generator

Microcomputer-based

Nr.

Near the generator

Microcomputer-based

Nr.

Near the generator

Microcomputer-based

Nr.

Near the generator

Microcomputer-based

Nr.

Near the generator

Microcomputer-based

Nr.

(9)
7
(1)
(2)
(3)
(4)
(5)
(6)
(7)

500kV

Cable

Support,

Hanger and Bracket


Relay Protection
Generator-Transformer
Unit Protection Cabinet A
Generator-Transformer
Unit Protection Cabinet B
Generator-Transformer
Unit Protection Cabinet C
Generator-Transformer
Unit Protection Cabinet D
Generator-Transformer
Unit Protection Cabinet E
Unit fault event recorder
cabinet
Protection Cabinet 1 of
500kV Line 1 from CCS

Relay
chamber

protection
of

Description of

No.

Equipment

Specifications and Parameters

Unit

Qty.

Hydropower Station to EL

Location of

Remarks

Installation
powerhouse

INGA Substation
Protection Cabinet 2 of
(8)

500kV Line 1 from CCS


Hydropower Station to EL

Relay
Microcomputer-based

Nr.

(9)

Operating

Cabinet

of 500kV Line 1

from

CCS

Station

to

Hydropower
EL

chamber

of

powerhouse

INGA Substation
Breaker

protection

Relay
Microcomputer-based

Nr.

INGA

protection

chamber

of

powerhouse

Substation
Protection Cabinet 1 of
(10)

500kV Line 2 from CCS


Hydropower Station EL

Relay
Microcomputer-based

Nr.

Protection Cabinet 2 of
(11)

Hydropower Station EL

Relay protection
Microcomputer-based

Nr.

(12)

Operating

Cabinet

of 500kV Line 2

from
Station

CCS
to

Hydropower
EL

chamber of
powerhouse

INGA Substation
Breaker

chamber
powerhouse

INGA Substation
500kV Line 2 from CCS

protection

Relay protection
Microcomputer-based

Nr.

INGA

chamber of
powerhouse

Substation

of

No.

Description of

Specifications and Parameters

Equipment

Unit

Qty.

Location of

Remarks

Installation

Communication Interface
Cabinet of Protection for
(13)

500kV Line from CCS

Communication
Microcomputer-based

Nr.

Hydropower Station EL

center

of

surface

control building

INGA Substation
Protection Cabinet 1 of
500kV Line from CCS
(14)

Hydropower

Station

to

CELEC-

Relay
Microcomputer-based

Nr.

protection

chamber

of

powerhouse

TRANSELECTRIC
Substation
Protection Cabinet 2 of
500kV Line from CCS
(15)

Hydropower

Station

to

CELEC-

Relay
Microcomputer-based

Nr.

protection

chamber

of

powerhouse

TRANSELECTRIC
Substation
(16)

(17)
(18)

Protection Cabinet 1 of
500kV Busbar

500kV Busbar
Cabinet

Microcomputer-based

Nr.

protection

chamber

of

powerhouse

Protection Cabinet 2 of

Protection

Relay

Relay
Microcomputer-based

Nr.

chamber

protection
of

powerhouse
of

Microcomputer-based

Nr.

Relay

protection

No.

Description of
Equipment

Specifications and Parameters

Unit

Qty.

500kV Busbar Breaker

Location of

Remarks

Installation
chamber

of

powerhouse
(19)

500kV system fault event


recorder cabinet

Relay
Microcomputer-based

Nr.

(22)

of

Voltage

Relay

combine

Nr.

Operation
(21)

chamber
powerhouse

Cabinet for 500kV Bus


(20)

protection

protection

chamber

of

powerhouse
Relay

Power Supply Cabinet for

Nr.

Relay Protection Test

Fault event
Workstation

protection

chamber

of

powerhouse
Relay

recorder

Set

protection

chamber

of

powerhouse

(23)

Control Cable

0.6/1kV

Item

Powerhouse

(24)

Computer Cable

0.5 kV

Item

surface

Item

building

Set

Set

Set

Set

(25)
8

LV Cable

0.6/1kV

Operator Workstation

(2)

Database Server

(4)

control

Hydropower Station Control System

(1)

(3)

and

Historical

Each provided with 2 22LCD displays

Database

Server
Engineer Workstation

Each provided with 2 22LCD displays

10

Control
surface
building

room

of

control

Description of

No.

Specifications and Parameters

Unit

Qty.

Each provided with 2 22LCD displays

Set

Equipment

(5)

Training Workstation

(6)

ON-CALL Workstation

Set

(7)

Communication Server

Set

(8)

Hard disk

USB interface

Set

(9)

Laser Printer

A3

Set

(10)

Industrial Ethernet Switch

Set

(11)

Industrial Ethernet Switch

Set

22

1Tbyte

Location of

Control

GPS Synchronizing Clock

Set

room

surface

of

control

building

powerhouse
Control

(12)

Remarks

Installation

room

surface

of

control

building
(13)
(14)
(15)
(16)

(17)

Unit Local Control Unit


Emergency

Unit

Local

Control Unit
Utility Local Control Unit
500kV GIS Local Control
Unit
Local

Control

Unit

Set

Set

Set

Set

Near the generator


unit of powerhouse
Near the emergency
unit of powerhouse
Relay

protection

chamber

of

powerhouse
Communication

of

Set

Switchyard

center

of

surface

control building

(18)

Portable Computer

Set

10

Control

(19)

Remote control Gateway

Set

surface

(20)

Mimic Board and Driver

Set

building

11

room

of

control

Description of

No.
(21)
(22)
(23)

(24)

Specifications and Parameters

Equipment
Remote I/O for Tailwater
Gate
Remote

I/O

for

Compensating Reservoir
Remote I/O for Owners
Camp
Uninterruptible

Unit

Qty.

Set

Set

Set

UPS Main Unit

b.

Distribution Panel

Remarks

Installation
Tailrace

gate

chamber
Compensating
Reservoir
Owners camp
Communication

Power

center

Supply

a.

Location of

of

surface

control building
10kVA DC/AC inverter

Set

Set

Communication
center

of

surface

control building
Powerhouse, surface
control

(25)

Photoelectric Converter

Pair

building,

compensating
Reservoir and intake
complex
Powerhouse

(26)

Network Optical Cable

Item

surface

and
control

building
Control
(27)

Console

Set

surface
building

12

room

of

control

Description of

No.

Specifications and Parameters

Equipment

Unit

Qty.

Location of
Control

(28)

Monitoring Software

Item

Remarks

Installation
room

surface

of

control

building
(29)

Control Cable

0.6/1kV

Item

Powerhouse

(30)

Computer Cable

0.5 kV

Item

surface

(31)

LV Cable

0.6/1kV

Item

building

SDH 662Mb/s

Set

Set

Set

9
(1)
(2)
(3)

and
control

Communication System
Optical

Communication

Equipment
PCM
Combined

Distribution

Frame

Including optical fiber, digital and voice


distribution unit

Communication
center

of

surface

control building
Communication

(4)

Optical

Communication

Equipment

center
SDH MSTP 155Mb/s

Set

of

surface

control building and


other

machine

rooms
(5)

PCM

(6)

PABX

(7)

SPC

(8)

Distribution

400-line,

including

attendant

console,

maintenance terminal and charging system


100-line,

including

dispatching

console,

maintenance terminal and charging system


Frame

of

13

Set

Set

Set

Set

Communication
center

of

surface

control building
Other machine room

Description of

No.

Equipment

Specifications and Parameters

Unit

Qty.

Nr.

Location of
Installation

Communication
(9)

Junction Box

500kV switchyard
500kV switchyard and

(10)

Optical Cable

GYFZTY-24D

km

2.5

surface

control

building
All-dielectric
(11)

Self-Supporting

Optical

ADSS-AT-22-24-G.652

km

30

13.kV line

Fiber Cable
Powerhouse, surface
control
(12)

Communication Cable

Item

building,

compensating
Reservoir and intake
complex etc.

(13)
(14)
(15)
(16)

Trunking Switch
Fiber

Optic

Master Block
Fiber

Optic

Repeater

Slave Block
Omnidirectional Outdoor
Antenna
Trunking

(17)

Repeater

set

set

set

set

Network

Communication
center

of

surface

control building
Powerhouse
Switchyard,

camp

and intake complex


Communication

Administration
Equipment

set

center

of

surface

control building

14

Remarks

No.

(18)

Description of
Equipment
Repeater

Specifications and Parameters

Unit

Location of

Qty.

Remarks

Installation
Communication

Network

set

Administration Equipment

center

of

surface

control building
Communication

(19)

DIspatching Console

set

center

of

surface

control building
Powerhouse, surface
control
(20)

Portable Unit

Nr.

100

building,

compensating
Reservoir and intake
complex etc.

(21)

Indoor Antenna

Nr.

15

(22)

Leaky Coaxial Cable

2000

Powerhouse
HV cable tunnel and
access tunnel
surface

control

building,
(23)

Feeder Cable

1500

compensating
Reservoir and intake
complex etc.

10
10.1

Auxiliary System of the Hydropower Station


Mechanical Workshop

Item

15

In

the

erection bay

auxiliary

See Table10-1 for


the

list

mechanical

of

No.

Description of

Specifications and Parameters

Equipment

Unit

Location of

Qty.

Remarks

Installation

equipment
10.2
10.3
(1)

Electrical Test Room

Overhead Crane for main


Powerhouse

200t/50t/10t

S =25 m

Set

single-girder

overhead crane for GIS

16tS=16.5 m

Set

Chamber
10.4
(1)
(2)
(3)
(4)
10.5

auxiliary

powerhouse

See 10-2 for the list


of

electrical

test

equipment.

In

the

main Include

powerhouse

balance

beam

GIS chamber in main


transformer cavern

Electrical
single-girder
overhead crane

Cooling Water Supply System


Cooling Water Pump
Well Submerged Pump
Tailrace Heat Exchanger
Cooling

Water

Q=814m /hH=67m

N=220kW

Q=60 m /h
3

Q=814m /h

Supply

Control System

Turbine

floor

Set

16

set

Out of powerhouse

Group

Tailrace tunnel

Set

of

powerhouse

Turbine

floor

The head is pending


of

powerhouse

Unwatering and Drainage System

(1)

Drainage Pump

(2)

Drainage Pump

(3)

the

Overhead Crane

Electrical
(2)

Item

Inside

Portable

Submersible

Q=100 m /hH=19m N=7.5kW

Set

Q=100 m /hH=25m, N=11kW

Set

Q=100 m /hH=22mN =15kW

16

4
4
8

Spherical valve floor


of powerhouse
Spherical valve floor
of powerhouse
Tail water tunnel

No.

(4)
10.6

Description of
Equipment

Specifications and Parameters

Unit

Pump

Set

Drainage Control System

Set

Qty.

Location of

Remarks

Installation
Turbine

floor

of

powerhouse

Compressed Air System


Turbine floor under

(1)

LP Air Compressor

Q=3.2 m /min; P=0.85MPa; N=22kW

Set

the erection bay of


main powerhouse
Turbine floor under

(2)

LP Air Storage Tank

V=6 m ; P=0.85MPa;

Set

the erection bay of


main powerhouse
Turbine floor under

(3)

Portable Air Compressor

Q=1.08 m /min; P=0.8MPa; N=7.5kW

Set

the erection bay of


powerhouse
Busbar

(4)

MP Air Compressor

Q=0.82 m /min; P=7.0MPa;N=11KW

Set

32

turbine

floor
floor

and
of

powerhouse
10.7

Oil System
Turbine floor under

(1)

Oil Pump

Q=4.5m /h;

P=0.33MPa;N=1.5kw

Set

the erection bay of


powerhouse
Turbine floor under

(2)

Turbine Oil Filter

Q=1m /h;

P0.5MPa;

N=9.3kw

Set

the erection bay of


powerhouse

17

No.

Description of
Equipment

Specifications and Parameters

Unit

Location of

Qty.

Remarks

Installation
Turbine floor under

(3)

Standard Jerrycan

V=160L

Nr.

the erection bay of


powerhouse

(4)

Vaccum Oil Purifier

Q=2m /min;

(5)

Vaccum Pumping Device

Q=30L/s; N=1.85 kW

(6)

Portable Oil Pump

Q=4.5m /h;

(7)

Oil Sewage Treatment


Equipment

Q=20m /h;

P0.5MPa;N=21.4kW

Set

Set

P=0.33Mpa, N=1.5 kW

Set

P0.33MPa, N=5.5 kW

Set

Main

transformer

cavern
Main

transformer

cavern
Main

transformer

cavern
Main

transformer

cavern
Nearby access tunnel

(8)

Turbine Oil Tank

V=12m

Nr.

to

the

main

powerhouse
Turbine floor under
(9)

Protable Oil Trolley

V=2m

Nr.

the erection bay of


powerhouse

10.8

Hydraulic Monitoring and Measuring System


Main powerhouse and

Whole-Plant Measuring

Set

compensating
reservoir

Turbine-Generator Unit

Set

Monitoring

18

Main powerhouse

Description of

No.
10.9

Specifications and Parameters

Equipment

Unit

Qty.

Location of

Remarks

Installation

DC Power Supply
125V DC System of

10.9.3

Underground

Powerhouse

Powerhouse
(1)

Valve-regulated

Sealed

Lead-acid Battery

2V,3000Ah/cell
480VCA/125VDC 600A high frequency switch

Nr.

116

Set

(2)

Battery Charger

(3)

DC Panel

Set

(4)

DC Feeder Panel

Set

12

Set

(5)

Inverter of Underground
Powerhouse
125V

10.9.4

power supply

and

System

48V

of

125VDC/127VAC60Hz40kVA

DC

(1)

Battery Charger

(3)

protection

chamber

of

powerhouse

Battery

Sealed

2V,1000Ah/cell

Nr.

116

room

surface

of

control

building
480VCA/125VDC 200A high frequency switch

Set

DC Panel

Nr.

(4)

DC Feeder Panel

Nr.

(5)

Inverter

Set

of

Relay

control building

Lead-acid Battery

(2)

powerhouse

DC room of surface

Surface

Control Building
Valve-regulated

Battery chamber of

power supply

Surface

125VDC/127VAC60Hz10kVA

19

DC room of surface
control building

No.

Description of
Equipment

Specifications and Parameters

Unit

Qty.

Location of

Remarks

Installation

Control Building
(6)
(7)

(8)

(9)

48V DC Power Supply of

DC room of surface

Surface Control Building

control building

Battery Charger
Valve-regulated

480VCA/48VDC 240A
Sealed

Lead-acid Battery

Set

DC room of surface
control building
Battery

2V,800Ah/cell

Nr.

96

room

surface

of

control

building

DC Panel

Nr.

DC room of surface
control building
Underground
powerhouse,

10.10

Grounding

Item

ground

control building, and


diesel generator room,
switchyard etc.
Underground
powerhouse,

10.11

Lightning Protection

Item

ground

control building, and


diesel generator room,
switchyard etc.

10.12
(1)

Station Service Supply System


Switch Cabinet

13.8kV

KYN-

Nr.

20

40

Underground
powerhouse, ground

Description of

No.

Equipment

Specifications and Parameters

Unit

Location of

Qty.

Installation
control building, and
diesel generator room
etc.
Underground
powerhouse, ground

(2)

LV Switch Cabinet

0.48kV

MNS-

Nr.

40

control building, and


diesel generator room
etc.
Underground
powerhouse, ground

(3)

LV Switch Cabinet

0.22kV

MNS-

Nr.

30

control building, and


diesel

generator

house etc.
(4)
(5)
(6)
(7)
(8)

Local

LV

Distribution

Cabinet
Power

Distribution

Cabinet
Inspection

Distribution

Cabinet
Inspection

Distribution

Box
Diesel Generator

Underground

0.48kV

Nr.

16

0.48kV

Nr.

16

Powerhouse

0.48kV

Nr.

20

Powerhouse

0.48kV

Nr.

40

Powerhouse

0.48kV1250kVA

Set

21

powerhouse

Diesel
house

generator

Remarks

No.

Description of
Equipment

Specifications and Parameters

Unit

Qty.

(9)

Diesel Generator

0.48kV150kVA

Set

(10)

Diesel Generator

0.48kV300kVA

Set

(11)

Diesel Generator

0.48kV300kVA

Set

Location of
Installation
Distribution center of
tail water gate
Intake Complex
Compensating
Reservoir
Underground
powerhouse,

(12)

MV Cable

8.7/15kV

Item

ground

control building, diesel


generator room,intake
complex,compensating
reservior etc.
Underground
powerhouse,

(13)

LV Cable

0.6/1kV

Item

ground

control building, diesel


generator room, intake
complex,compensating
reservior etc
Underground
powerhouse,

(14)

Cable

Bridge,

Support

Item

and Hanger

ground

control building, diesel


generator room,intake
complex,compensating
reservior etc

22

Remarks

No.

Description of

Specifications and Parameters

Equipment

Unit

Qty.

Location of
Installation
Underground
powerhouse,

(15)

Cable Fire Protection

Item

ground

control building, diesel


generator room,intake
complex,compensating
reservior etc
Underground
powerhouse,

(16)

Foundation Channel Steel

10#

Item

ground

control building, diesel


generator room,intake
complex,compensating
reservior etc
Underground
powerhouse,

(17)

Electrical

Embedded

Item

Conduits and Parts

ground

control building, diesel


generator room,intake
complex,compensating
reservior etc
Underground
powerhouse,

10.13

Lighting System and LV

Item

Power System

ground

control building, diesel


generator room,intake
complex,compensating
reservior etc

23

Remarks

No.

Description of

Specifications and Parameters

Equipment

Unit

Location of

Qty.

Remarks

Installation
Powerhouse, surface

10.14

Closed Circuit TV System

control

building,

(CCTV)

switchyard,

and

intake complex etc.


(1)
(2)

(3)

Integrated Camera

NSTC

Outdoor Constant-speed

IP66

23 times optical zoom

Set

System

Powerhouse,
control

Set

Spherical PTZ
Video Matrix Switching

33
33

surface
building,

switchyard, and intake


complex etc.

NSTC

120VAC

60Hz 48 Video inputs & 8

Video outputs

Set

(4)

Converter/Distributor

120VAC

60Hz

Set

(5)

System Keyboard

120VAC

60Hz

Set

(6)

Video Server

19LCD

Set

(7)

Color Monitor

22LCD

Set

Communication center
of

surface

control

building
Control

room

of

surface control building


Communication center

(8)

Digital Video Recorder

full D1, 16 channels

Set

of

surface

control

building
Surface
(9)

Optical Transmitter and


Receiver

1V+1D

Pair

building,
tunnel

control
HV

cable

and

tailrace

Powerhouse

and

outlet
(10)

Optical Transmitter and


Receiver

8V+2D

Pair

24

surface control building

No.

Description of
Equipment

Specifications and Parameters

Unit

Location of

Qty.

Remarks

Installation
etc.

(11)
(12)

Optical Transmitter and


Receiver

Compensating
4V+2D

Pair

reservoir

and

intake

complex etc.

Access Control System

Access tunnel etc.

a.

Access Controller

Set

Access tunnel etc

b.

Card Reader

Set

Access tunnel etc

c.

Inductor Card

Nr.

100

Access tunnel etc

d.

Access Control Software

Set

Access tunnel etc

Video Phone System

Set

Access tunnel etc

(13)

Communication center
(14)

Control Cabinet

2260800600mm

Set

of

surface

control

building
(15)

Power Distribution Box

(16)

Video Cable

(17)
(18)

Control Cable
Power Cable

Set

Powerhouse,

ZR-SYV-75

Item

control

2X1.5 mm

Item

switchyard, and intake

2X2.5 mm

Item

complex etc.
Powerhouse,
control

(19)

Optical Cable

4 cores, single-mode armoured cable

Item

surface
building,

surface
building,

switchyard, and intake


complex etc.

10.15
(1)

Station Service 13.8kV Line to Head Complex and Compensating Reservoir


Aluminum

Conductor

160 mm

km

25

65

The loop starts from

No.

Description of

Specifications and Parameters

Equipment

Unit

Qty.

Steel Reinforced (ACSR)

Location of
Installation

Remarks

the 13.8kV bus bar


in the control
building of the power
station the tail
water gate the
Coca Codo Sinclair
camp the
compensating
reservoir the head
complex the San
Rafael camp the
13.8kV bus bar in
the control building
of the power station
in the end.
Compensating

(2)

Crosslinked Polyethylene
Insulation(XLPE) Cable

non-magnetic

metal-sheathed

polyvinyl

chloride sheathed(PVC), 12/20kV, 70mm

km

About 1

reservoir, intake
complex, control
building, camp etc.

10.16
(1)
(2)

Ventilation and air-conditioning


Water-cooled

Screw

Refrigerating capacity:1,060kW

chiller

Input power:199kW

Chilled Water Circulating

Flowrate:56L/s,

Pump

Input power:30kW

Head:32m,

26

Set

Refrigerator chamber

Set

Refrigerator chamber

Two working
One standby
Two working
One standby

Description of

No.
(3)
(4)
(5)
(6)
(7)

Specifications and Parameters

Equipment
Intermediate

Water

Circulating Pump
Cooling

Water

Supply

Plate-type

Heat

Exchanger

Head:30m,

Integrated

Minimum water pressure:0.15MPa


Water

Processor

Soft-water Tank

Flowrate:0.5~1L/s,
Minimum working pressure:0.20MPa
Capacity:2500L,
Specifications:100010002500mm

Water

Replenishing Pump
Chilled

Flowrate:72~120L/s,
Input power:0.33kW

(9)

Intermediate

Heat transfer area:180m ,


Flowrate:89L/s,

Cyclone Desander

Flowrate:0.9L/s,

Head:12.5m,

Input power: 0.37kW


Water

Replenishing Pump

(12)

Manifold

(13)

Catchment

(14)

Thermo-regulation Fresh

Qty.

Set

Refrigerator chamber

Set

Refrigerator chamber

Set

Refrigerator chamber

Set

Refrigerator chamber

Set

Refrigerator chamber

Set

Refrigerator chamber

Set

Refrigerator chamber

Set

Refrigerator chamber

Set

Refrigerator chamber

Set

Refrigerator chamber

Set

Refrigerator chamber

Set

Intersection of access

Installation

Remarks
Two working
One standby
Two working
One standby

Heat load:1330kW

Automatic Water Softener

(11)

Flowrate:67L/s,
Input power:30kW

(8)

(10)

Head:26m,

Input power:30kW

Pump

Full

Flowrate:72L/s,

Location of

Unit

Flowrate:0.9L/s,

Head:32m,

Input power:1.1kW
Outer diameter: 700mm, Pipe thickness:8mm,
Length: 2910mm
Outer diameter: 700mm, Pipe thickness:8mm,
Length: 2910mm
3

Ventilation quantity15,000 m /h,

27

One working
One standby
One working
One standby

Description of

No.

Equipment
Air-type Dehumidifier

Specifications and Parameters


wind pressure450Pa

Unit

Qty.

power11 kW;

Location of
tunnel

dehumidification amount G=60Kg/h,

Remarks

Installation
and

transformer chamber

power 24kW
3

(15)

(16)
(17)
(18)
(19)

Low-noise Energy-saving
Mixed-flow Fan Box

11# air volume: 53530 m /h,


wind pressure : 1100Pa,
N=22kW,
3

4# L=2299m /h,

H=149Pa,

Mixed-flow Fan Box

N=0.55kW,

n=960r/min

Smoke

12# L=70231m /h,

H=1152Pa,

Mixed-flow Fan

N=30kW,

n=960r/min

Low-noise Energy-saving

7A# L=18612m /h,

H=1044Pa,

Mixed-flow Fan

N=11kW,

n=1,450r/min

Low-noise Energy-saving

13# L=59200m /h,

H=886Pa,

Mixed-flow Fan Box

N=22kW,

n=960r/min

Exhaust

(20)

Axial-flow Fan

(21)

Low-noise Axial-flow Fan

4.5# L=6658m /h,


N=0.37kW,

H=153Pa,
n=1,450r/min

(22)

4.5# L=5,700 m /h,

H=121Pa,

N=0.25kW,

n=1,450r/min
3

Explosion-proof Axial-flow

2.5# L=1,737 m /h,

H=208Pa,

Fan

N=0.18kW,

n=2,900r/min
3

(23)

Axial-flow Fan

(24)

Low-noise Axial-flow Fan

Set

Bus tunnel

Set

Exploratory heading

Set

Exploratory heading

Set

Cable outlet opening

Set

16

Transformer chamber

Set

20

Set

Oil, storage

Set

Transformer chamber

Set

Lighting

n=960r/min

Low-noise Energy-saving

5# L=8832 m /h,

H=152Pa,

N=0.55kW,

n=1,450r/min
3

3.6# L=2,486 m /h,

H=104Pa,

28

Exploration adit and

Set

HV cable tunnel

Downstream of water
turbine floor

distribution,

No.

Description of

Specifications and Parameters

Equipment

N=0.12kW,

Unit

Qty.

n=1,450r/min

Location of
Installation
cable

interlayer

chamber
Relay
3

(25)

Low-noise Axial-flow Fan

4# L=4,000 m /h,

H=123Pa,

N=0.25kW,

n=1,450r/min

Set

protection

chamber Drainage
pump station in air
compressor room

(26)

Low-noise Axial-flow Fan

(27)

Low-noise Axial-flow Fan

4# L=3114 m /h,

H=138Pa,

N=0.25kW,

n=1450r/min

Set

12

Set

Set

Set

Set

10

Turbine floor

Set

Busbar floor

Set

Turbine floor

Set

Busbar tunnel

Set

Air compressor room

2.5# L=1,737 m /h,

H=208Pa,

N=0.18kW,

n=2,900r/min
3

(28)

Low-noise Axial-flow Fan

(29)

Movable Dehumidifier

(30)
(31)
(32)
(33)
(34)

suspended

type

air-treatment unit
Suspended

type

air-treatment unit
Suspended

type

air-treatment unit
Suspended

type

air-treatment unit
Suspended

type

4.5# L=6658 m /h,

H=153Pa,

N=0.37kW,

n=1,450r/min

Dehumidification amount 10kg/h


3

air volume3,000 m /h

Power4.3kW

L=4,000 m /h, QL=25kWN=0,8 kW


3

L=12,000m /h, QL=69kW, N=2.2kW


3

L=7,000m /h, QL=40kW, N=1.6kW


L=10,000m /h, QL=58kW, N=1.6kW
L=14,000m /h, QL=82kW,N=3.3kW

29

Upstream wall
Steel

cylinder

chamber
Refrigerator room
Water

distribution

pipe floor

Remarks

Description of

No.

Specifications and Parameters

Equipment

Unit

Qty.

Set

Location of

Remarks

Installation

air-treatment unit
(35)
10.17.9

Upright

air-treatment

unit

L=20,000m /h, QL=116kW,N=5.5kW

Fire Protection Design for Electromechanical Equipment

set

Pressure
(1)

Busbar floor

reducing-stabilized

fire

SNJ65

DN65

38
Main powerhouse

P=1.6MPa

hydrants
(2)
(3)

GL-type water filter


Deluge alarm valve

IG541 fire extinguisher

Mobile Fire Extinguisher

DN200
ZSFM

DN100

Set

Main powerhouse

Set

27

Main

transformer

cavern

P=1.6MPa

Set

surface

control

building

Set

surface control building

10.17.13 Fire Alarm System


(1)

(2)

(3)
(4)

Fire

Alarm

Control

Console(FACP01)
Fire Alarm Control Unit
(FACU)
Fire Alarm Control Unit
(FACU)
Photoelectric

Smoke

Non standard

Set

8 Bus Loop

Set

2 Bus Loop

Set

Addressable

Nr.

100

30

Control

room

of

surface control building

Relay
protection
chamber
of
powerhouse
Control

room

of

surface control building

powerhouse

and

Description of

No.

Specifications and Parameters

Equipment

Unit

Qty.

(5)

Heat Detector

(6)

Rate of
Detecto

(8)
(9)
(10)

Fiber

Remarks

Installation
surface control building

Detector

(7)

Location of

Rise

Heat

Heat

Detector

(FHD)

Nr.

35

Addressable, Alarm 9/min

Nr.

4000

Double Way

Set

19 TFT LCD

Set

Addressable

Pair

Multi-mode

optical

cable

Detecting

temperature: -4085

Fiber Fire Alarm Control


Unit(Fiber- FACU)
FHDS

Addressable, Alarm temperature 57

Dedicated

Computer
Reflective Infrared Beam
Smoke Detector

(11)

Input Module

Addressable

Nr.

200

(12)

Output Module

Addressable

Nr.

150

(13)

Manual Fire Alarm Button

Addressable

Set

60

(14)

Sound and Light Alarm

Sound output: 80dB,Lighting output:70cd

Set

60

(15)

FAS Module Box

Plus Hygrostat,IP54

Set

31

31

powerhouse

and

surface control building

powerhouse

and

surface control building

powerhouse

and

surface control building


Control

room

of

surface control building


Control

room

of

surface control building

powerhouse
powerhouse

and

surface control building

powerhouse

and

surface control building

powerhouse

and

surface control building

powerhouse

and

surface control building

powerhouse

and

surface control building

Description of

No.

Specifications and Parameters

Equipment

Unit

(16)

Bus-FAS Computer

19 TFT LCD

Set

(17)

Printer

A3 size sheets

Set

(18)

Private Branch Exchange

(19)

Emergency

Fire

Service

Set

Qty.

1
1

(21)
(22)

Bus Loop Cable Of Fire


Alarm
Power Cable
Communication

ZR-RVSP-21.5mm

ZR-RVVP-22.5mm

Optical

Cable Of FAS

11

Emergency Power Unit and Auxiliary Equipment

(1)

Turbine

(2)

Generator

(3)
(4)

nr 1800r/min, Hr=600.25m;
3

N r=1300kW, Qr=0.248m /s
1422KVA,

nr1800r/min;
cos=0.85

room

of

Control

room

of

Control

room

of

surface control building

powerhouse

and

Set

30

Item

Item

Item

Set

Upstream side of the


generator floor

Set

Upstream side of the


generator floor

U=0.48kV,

f=60Hz

Inlet Spherical Valve

DN300

P=7.5MPa

Set

Spherical Valve

DN300

P=7.5MPa

Set

32

Control

surface control building

Station-Handset(FTSH)
(20)

Remarks

Installation
surface control building

or

Telephone

Location of

surface control building

powerhouse

and

surface control building

powerhouse

and

surface control building

powerhouse

and

surface control building

Upstream side of the


generator floor
Upstream side of the
Used for maintenance
water distribution

No.

Description of
Equipment

(5)

Governing System

(6)
(7)
(8)
(9)

Specifications and Parameters

Location of
Installation
floor
Upstream side of the
generator floor
Upstream side of the
generator floor
Upstream side of the
generator floor

Excitation System

Set

Single Beam Motor Crane Lifting capacity :10t

Set

0.48kV

Nr.

Upstream side of the


generator floor

0.6/1kV

Item

Upstream side of the


generator floor

Small-unit

LV cable

Power

regulation

Qty.

Set

Distribution Cabinet

PID

Unit

33

Remarks