AL RAIDAH HOUSING COMPLEX PROJECT

JEDDAH, SAUDI ARABIA

ITEM
NO
1

4
5

6
7

QUESTION / INFORMATION REQUESTED

RESPONSE

In BOQ (ZONE R-AP-3, BLDG 01) Div03 Item no. 03 48


46.13 Concrete capping size not shown in drawing,
please clarify?
In BOQ (ZONE R-AP-3, BLDG 01) Div03 Item no. 03 48
46.16 Concrete capping to parapet walls not clear in
drawings, please clarify?
In (ZONE R-AP-4, BLDG 01- R-AP-4, BLDG 02- R-AP4, BLDG 31) in BOQ Div06 Item NO. 06 40 13.16.13
wooden shade structure is deleted but it shown in
drawings.
Please clarify which Type Lighting Fixtures Required
Conventional type or LED type Lighting Fixtures?
Please Clarify SEC connection Fees Will be under
(client side) or from Contractor Side?

Please refer to the detail 6 in the drawing


AR-D-1310

Please clarify which type telephone System required.


IP-Telephone system or Normal Telephone?
Please make sure that the given BOQ includes the
whole items which are newly added in Addendum-01
Drawings like Lighting Control panel (LCP) & Deviator
Switch which we didnt found in your provided BOQ.

Please clarify whether Electrical Energy Meters are in


our Scope or not? If in our scope then Please Clarify
Type of Electrical Energy meters as in Technical Spec
there are more than one type of Energy meter
Mentioned which have to be considered for the
Apartment package 4 & 6 project?

Please provide us the security passwords as some


Tender Drawing combined files & Tech Spec Combined
Files are secured one and need security password to
extract the Drawings for segregation purpose.
Please provide the corrected DB-Main Service panel
Schedules Of all Apartment Buildings in which DB-Main
Service Feeding to (LCP) Lighting Control Panel as per
LV Distribution SLD & also provide Load schedules of
LCP for all the Apartment Buildings as per Newly
Added item In Addendum-01 Drawings.

10

BP-04&06 Apartment Buildings

The concrete capping/copping size is


30cm wide and 20cm thick. Please refer
to the drawings AR-D-1110 to 1240
Please refer to the revised BOQs

LED type lighting fixtures


The electricity metering will be on the
name of RIC and the fee will be paid by
RIC. Contractor shall be responsible for
all the coordination with the local
authority and installation of electricity
metering including final connection all in
accordance with the drawings and
specification.
It is normal telephone system.
Please refer to the revised BOQs.
The quantities set out in the Bills of
Quantities are deemed to be verified by
the Contractor as being quantities of the
whole work to be required to be
executed in accordance with the
Contract Drawings and Contract
Documents.
The Tender Sum shall be based on
Contractors own measurements of
quantities.
The electricity metering will be on the
name of RIC and the fee will be paid by
RIC. Contractor shall be responsible for
all the coordination with the local
authority and installation of electricity
metering including final connection all in
accordance with the drawings.
Specifications to be as per Saudi Electric
Company (SEC) standards.
Cannot be provided due to security
reasons.

LCP is only control switches for DBService 1, located on the ground floor.
Please refer to the following attached
revised drawings:
RAP3-02-CD-SAK-EL-D-1301-A
RAP3-03-CD-SAK-EL-D-1301-A
RAP4-02-CD-SAK-EL-D-1301-A
RAP4-03-CD-SAK-EL-D-1301-A
RAP4-021-CD-SAK-EL-D-1301-A