M.V.ASSAD ULLAH
IMO NO: 8913356
:
:
:
:
BUILDER
YEAR BUILT
28/10/1991
HULL NUMBER
309
CLASSIFICATION
PRINCIPAL DIMENSION
LENGTH OA
LBP
:
BREADTH MOULDED
DEPTH MOULDED
DRAUGHT MAX (SUMMER)
TONNAGE
SUMMER
G.R.T.
N.R.T.
DEAD WEIGHT
MAIN ENGINE
:
:
:
:
158.87 M
145.00 M
22.80 M
13.40 M
09.956 M
:
:
:
12,453 MT
7,389 MT
16,979 MT
1. HULL PREPARATION AND PAINTING .HULL CLEANING / FRESH WATER WASH HULL. HAND
SCRAP BARNACLES, LOOSE PAINT AND RUSTY AREA
2. PAINT TOP SIDE INCLUDING GUARD RAIL. VERTICAL BOTTOM INCLUDING THE SEA
CHEST. FLAT BOTTOM AREA EXTENDING TO BILGE KEELS INCLUSIVE RUDDER
3. HULL MARKINGS
The following to be cleaned and repainted in White after completion of hull painting
A.
B.
C.
D.
E.
F.
Banani Complex 6th Floor, Tower-B 942/A SK-Mujib road, Agrabad, Chittagong 4100.Tel#880 31 812566-7
Email:operations@akshipman.com
Page 2 of 6
4. HULL PROTECTION
A)
Wooden plugs & half round pipes to fit ship side scupper and to remove after completion of hull painting.
Necessary staging and mobile cranes to be included.
B) Echo sounder, Doppler speed log transducer and newly installed anodes to be protected from grit blasting/spray
Painting applications, including all newly installed and re- used anodes.
6. ZINC ANODES
A) Zinc anodes may either be supplied by shipyard or the owners. Renewed quantity will be confirmed on
inspection. All anodes supplied are to be based on 3 years of hull protection and bolted / welded type.
B) Old anodes to be removed and new anodes to fit, inclusive of accessory works / staging. All new anodes
to be coated with soft soap/grease to protect against spray painting.
All 05 crane to be spot chipped & touch up two coat by primer and also full top coat to be applied.
All cranes (05 nos.) operator cabin doors, cabin glass fitting rubber packing & its retaining frames to be
renewed.
C)
All 05 cranes sheave to be opened, checked (along with others as normal practice in dry dock) and fitted back.
Bearings to be renewed.
D) The crane wires to be opened and refitted after the repair. The wire tension / functionality
to be tested and confirmed in order.
E) CRANE UPPER RAILING
All 05 cranes top maintenance side railing to be checked.
F) CRANE HYDRAULIC OIL COOLER CLEANING: - 5 NOS.
All crane hydraulic oil cooler complete with the fan and motor to be removed from place to yards workshop to
carry out the chemical cleaning. Cooler fan motors to open, clean and box back after the varnishing. The
cooler to pressure test. On completion the coolers to refit in place and tested in order.
G) CRANE RESTING CRUTCH
Crane fixing crutch no.1 dented, require to be cropped and renewed.
All crutch steps are badly damaged during Log loading/discharging & wooden pads are missing,
Require cropping and renewing as required.
Banani Complex 6th Floor, Tower-B 942/A SK-Mujib road, Agrabad, Chittagong 4100.Tel#880 31 812566-7
Email:operations@akshipman.com
Page 3 of 6
9. JAMBO DERRICK
Jambo derrick and associated hydraulic pump, motor & wire drums to be removed and amend stability booklet
after completion of inclining test under supervision of BV class.
Banani Complex 6th Floor, Tower-B 942/A SK-Mujib road, Agrabad, Chittagong 4100.Tel#880 31 812566-7
Email:operations@akshipman.com
Page 4 of 6
N) Hatch pontoon wheel arm bracket to be thinned and wasted (Hatch no- 01 port fwd, stbd fwd, no-02 stbd aft, no03 port fwd, stbd aft, no-04 stbd aft, center fwd & aft, no-05 port fwd, stbd fwd, center fwd & aft) to be renewed.
O) Track way in Hatch no-04 aft worn out, need to be repaired by installing new plate bar.
P) All frozen nuts and damaged for Hatch cover locking cleats to be free and repaired.
Banani Complex 6th Floor, Tower-B 942/A SK-Mujib road, Agrabad, Chittagong 4100.Tel#880 31 812566-7
Email:operations@akshipman.com
Page 5 of 6
C)
D)
E)
F)
Ship name plate in Navigation Bridge (port & stbd side) need to be renewed.
Heavy rusted on funnel deck to be de-rusted and painted.
Accomodation super structure to be chipped and paint to be applied.
Wasted of Ladder steps from stbd side Bridge deck to Funnel deck , port & stbd side Boat deck to poop deck
and port side poop deck to Main deck to be cropped and renewed.
E) Port hole compression bar corroded in various places. Same to be cropped and renewed. ( Room no313,217,317,306,415,417,427,414,425,301,325,333,314,418, SHM-2, SHM-3).
Banani Complex 6th Floor, Tower-B 942/A SK-Mujib road, Agrabad, Chittagong 4100.Tel#880 31 812566-7
Email:operations@akshipman.com
Page 6 of 6
_______________
CHIEF OFFICER
M.V.ASSAD ULLAH
_________________
MASTER
M.V.ASSAD ULLAH