AERASI :

Loading rate = 47 m3/hour/m2


DO = 4.3 mg/L
Temperatur = 26 C
Pressure = 753 mmHg
DO =8,0 mg/L
Inflow = 385 m3/hour
DO = 80% (Treatment Requirements)
DESIGN OF CASCADE AERATORS
0.7x8.0 = 5.60 mg/L
r = 1+0,5(a x b x h)
r= (8.0-4.3)/(8.0-5.60)
=1.541
1.541=1+(1.25x1.30xh)
h=0.587
AREA OF COLLECTRON BASIN
=385/47
=8.19 m2
D2/4=8.19 m2
D= 5.22 m
GROUND REMOVAL

C
C

=e-kn

Ket =
C=8mg/l e-5(0.33)
8mg/l = 5000 persons

max demand 150 gal/persons day


k=0.33 (hydraulic wading 3 gpm/ft
(8mg/l)0.1920)= 1.54 mg/l
GROUND REMOVAL
Q= 5000 persons

150 gal
personsda y

Q=(750.000 gal/day)

A =(520.8 gpm

ft 2
3 gpm

1440
day

) = 750.000 gal/day

)= 520.8 gal/min total flowrate

)=173.6 ft2

Ket =
520.8 (flowrate)
3 gpm = loading rate
L=4W
A= W(4W) = 173.6 ft2
W= 6.59 ft or 6 ft. 7,05 in or 6 ft 8 in
L=4(6.59 ft) = 26.35 ft or 26 ft 5 in
CARBONDIOXIDE REMOVAL PROBLEM
C
CO

=e-kn

C=COe-kn
C= 20e-4(0.31)
Ket :
4 = aerasi trays
20= 20 mg/L

C= 20(0.2894 = 5.79 mg/L


Q= 50.000 person

150 gal
personday

Q =(7.5X105 gal/day)

Q= (5208.3 gal/min)

day
1440 min
1
8

= 7.5 x 105 gal/day

)= 5208.3 gal/min

)= 651 gal/min

CARBON DIOXIDE REMOVAL PROBLEM


A=651 gpm

ft 2
4 gpm

)= 162.8 ft2

Ket =
651 gpm = flowrate/aerator
4 gpm = loading rate
L=2W
A=W(2W)=162.8 ft2
W=9.02 ft or 9 ft 0.25 in or 9 ft 1 in
L=2(9 ft.1 in) or 18 ft 2 in.