ITEM

1.00
1.01
1.02
2.00
2.01
2.02
2.03
2.04
2.05
3.00
3.01
3.02
3.03
3.04
3.05
4.00
4.01
5.00
5.01
6.00
6.01
7.00
7.01
8.00
8.01

ACTIVIDAD
PRELIMINARES
Localizacin y replanteo topogrfico
Sealizacin (suministro de barricadas, seales preventivas, vallas)
MANHOLES
Construccion de manholes de 6m a 10m de profundidad
Construccion de manholes de 4,5m a 6m de profundidad
Construccion de manholes de 3m a 4,5m de profundidad
Construccion de manholes de 2m a 3m de profundidad
Construccion de manholes de 0m a 2m de profundidad
EXCAVACIONES PARA REDES
Excavacion de material comn y/o arcillosode 6m a 10m de profundidad
Excavacion de material comn y/o arcilloso de 4,5m a 6m de profundidad
Excavacion de material comn y/o arcilloso de 3m a 4,5m de profundidad
Excavacion de material comn y/o arcilloso de 2m a 3m de profundidad
Excavacion de material comn y/o arcilloso de 0m a 2m de profundidad
ENTIBADOS
Entibados para excavaciones que superen 2m de profundidad
TUBERIAS
Suministro e instalacin de tuberia nueva en pvc D=8"
RELLENOS
Relleno con material proveniente de excavaciones
ACOMETIDAS
Instalacin tuberia domiciliaria en PVC incluye Exc.y relleno, silla "Y" y
dems accesorios en PVC, cajas de registro en concreto

UNIDAD
ML
GLB
UND
UND
UND
UND
UND
M3
M3
M3
M3
M3
M2
ML
M3
UND

LIMPIEZA
Limpieza general y retiro de sobrantes

GLB

CANTIDAD
3115.461
1

VR UNITARIO
$4,634.00
$1,783,963.00

VR TOTAL
$16,221,009.27
$14,437,046.27
$1,783,963.00

$31,618,145.00
5
6
7
7
9

$1,414,714.00
$1,174,047.00
$1,006,653.00
$801,996.00
$537,750.00

$7,073,570.00
$7,044,282.00
$7,046,571.00
$5,613,972.00
$4,839,750.00

$2,865,901,271.70
15490.5
13833.75
13005.75
10246.5
2404.2

$72,953.00
$57,452.00
$44,008.00
$30,388.00
$23,841.00

427.85

$182,456.00

$1,130,078,446.50
$794,776,605.00
$572,357,046.00
$311,370,642.00
$57,318,532.20

$78,063,799.60
$78,063,799.60

$807,826,925.00
10555

$76,535.00

$807,826,925.00

$32,451,021,349.56
54642.94

$593,874.00

$32,451,021,349.56

$0.00
$0.00

$0.00
$0.00

Tramo
Inic.
Fin.

Longitud
Cota terreno
Cota terreno
Pendiente de
(m)
Inicial
Final
diseo

COTAS
TRAMO
INICIAL

1
2
3
4
26
5
6
12
13
17
16

2
3
4
26
5
6
13
13
16
16
18

139.41
106.69
130.73
61.01
104.49
78.22
118.20
43.29
149.10
51.97
94.44

504.95
501.6
496.5
490.4
488.3
484.2
484.45
480.2
478.85
472.95
472.6

501.6
496.5
490.4
488.3
484.2
480.85
478.85
478.85
472.6
472.6
468.00

2.402984
4.780204
4.666106
3.442059
3.923820
4.282792
4.737733
3.118503
4.191818
0.673465
4.870817

0.8
1.4
2
2.6
3.2
3.8
4.4
0.8
1.4
0.8
1.4

6
27
13
14
7
24
8

27
7
14
7
24
8
10

97.28
148.85
111.89
74.90
69.04
26.76
101.81

480.85
477
478.85
476.25
473.65
470.05
468.2

477
470.65
476.25
473.65
470.05
468.2
464.6

3.957648
4.266040
2.323711
3.471295
5.214368
6.913303
3.535998

4.4
5
1.4
2
2.6
3
3.8

9
10

10
11

69.73
96.321

466.2
464.6

464.6
463.45

2.294565
1.193924

0.8
4.4

14
16
15
24
25
11
18
21
22
11
21
20
19
23

15
15
25
25
11
18
22
22
23
21
20
19
23
PTAR

108.09
132.28
37.01
115.23
36.60
128.79
46.06
125.37
100.61
66.39
42.40
36.79
138.94
126.77
3115.461

476.25
472.6
471.15
470.25
468.65
463.45
468
468.25
466.85
463.45
460.35
458.75
456.9
454.3

471.15
471.15
468.65
468.65
463.45
462.35
466.85
466.85
462
460.35
458.75
456.9
454.3
451.7

4.718290
1.096160
6.754931
1.388527
14.207650
0.854104
2.496743
1.116695
4.820594
4.669378
3.773585
5.028540
1.871311
2.050958

2
1.4
2.6
3
3.8
7.3
2
7.9
1.4
7.3
7.9
8.5
9.1
9.7

COTAS
TRAMO
FINAL

PROFUNDIDAD ANCHO

LONG.*PEND. VOLUMEN DE
EXCAVACION

CLASIFICACION

1.4
2
2.6
3.2
3.8
4.4
1.4
1.4
1.4
1.4
2

1.1
1.7
2.3
2.9
3.5
4.1
2.9
1.1
1.4
1.1
1.7

0.6
0.6
1.5
1.5
1.5
1.5
1.5
0.6
0.6
0.6
0.6

335.000000
510.000000
610.000000
210.000000
410.000000
335.000000
560.000000
135.000000
625.000000
35.000000
460.000000

221.1
520.2
2104.5
913.5
2152.5
2060.25
2436
89.1
525
23.1
469.2

EXCAVACION 0-2m
EXCAVACION 0-2m
EXCAVACION 2-3m
EXCAVACION 2-3m
EXCAVACION 3-4,5m
EXCAVACION 3-4,5m
EXCAVACION 2-3m
EXCAVACION 0-2m
EXCAVACION 0-2m
EXCAVACION 0-2m
EXCAVACION 0-2m

5
2.6
2
2.6
3
3.8
4.4

4.7
3.8
1.7
2.3
2.8
3.4
4.1

1.5
1.5
0.6
1.5
1.5
1.5
1.5

385.000000
635.000000
260.000000
260.000000
360.000000
185.000000
360.000000

2714.25
3619.5
265.2
897
1512
943.5
2214

EXCAVACION 4,5-6m
EXCAVACION 3-4,5m
EXCAVACION 0-2m
EXCAVACION 2-3m
EXCAVACION 2-3m
EXCAVACION 3-4,5m
EXCAVACION 3-4,5m

4.4
7.3

2.6
5.85

1.5
1.5

160.000000
115.000000

2.6
2.6
3.8
3.8
7.3
2
1.4
1.4
9.7
7.9
8.5
9.1
9.7
10.2

2.3
2
3.2
3.4
5.55
4.65
1.7
4.65
5.55
7.6
8.2
8.8
9.4
9.95

1.5
0.6
1.5
1.5
1.5
1.5
0.6
1.5
1.5
1.5
1.5
1.5
1.5
1.5

510.000000
145.000000
250.000000
160.000000
520.000000
110.000000
115.000000
140.000000
485.000000
310.000000
160.000000
185.000000
260.000000
260.000000
10555.000000

624 EXCAVACION 2-3m


1009.125 EXCAVACION 4,5-6m
1759.5
174
1200
816
4329
767.25
117.3
976.5
4037.625
3534
1968
2442
3666
3880.5

EXCAVACION 2-3m
EXCAVACION 0-2m
EXCAVACION 3-4,5m
EXCAVACION 3-4,5m
EXCAVACION 4,5-6m
EXCAVACION 4,5-6m
EXCAVACION 0-2m
EXCAVACION 4,5-6m
EXCAVACION 4,5-6m
EXCAVACION 2-3m
EXCAVACION 2-3m
EXCAVACION 2-3m
EXCAVACION 2-3m
EXCAVACION 2-3m

VOLUMEN VOLUMEN
EXC. 0-2m EXC. 2-3m
2404.2

VOLUMEN VOLUMEN
EXC. 3EXC. 4,5- VOLUMEN
4,5m
6m
EXC. 6-10m

10246.5

13005.75

Area long.
Area transv.
AREA
ENTIBADO

398
29.85
427.85

13833.75

15490.5

VOLUMEN TOTAL
EXCAVACION
54980.7

Area de un
tubo 8"
Sobrante
Relleno

0.032

m2

337.76 m3
54642.94 m4

ANLISIS DE PRECIOS UN

Universidad Pontificia Bolivariana


ALCANTARILLADO
21 de septiembre de 2015

FECHA

juan camilo montiel ayala

PROPONENTE

XXXXX
Localizacin y replanteo topogrfico

PROYECTO
DESCRIPCIN

I. EQUIPO
DESCRIPCIN
1 ESTACION TOPOGRAFICA
2 HERRAMIENTAS MENORES

TIPO

TARIFA / HORA

RENDIMIENTO

TOPCON

$14,000.00

100.00

HERRAORO

$4,143.00

0.05

UNIDAD

VR. UNITARIO

CANTIDAD

$300.00

0.50

OBSERVACIONES:

II. MATERIALES EN OBRA


DESCRIPCIN
1 NYLON
2 PUNTILLAS CABEZA 2"

lb

$2,000.00

0.05

und

$6,000.00

0.30

$1,810.00

0.05

VOL-PESO-CANT.

DISTANCIA

M3 M3/Km

TARIFA

JORNAL

PRESTACIONES

JORNAL TOTAL

RENDIMIENTO

$214,574.60

100

3 VARETA BLANCA 2x1x4,5


4 DESPERDICIO
OBSERVACIONES:

III. TRANSPORTE
DESCRIPCIN
1
OBSERVACIONES:

IV. MANO DE OBRA


DESCRIPCIN
1 CUAD. LOCALIZACION

$112,934

$101,640.60

TOTAL COSTO DIRECTO

Universidad Pontificia Bolivariana

ANLISIS DE PRECIOS UN

ALCANTARILLADO
21 de septiembre de 2015

FECHA

juan camilo montiel ayala

PROPONENTE

XXXXXXXXXXXXXXX
Sealizacin (suministro de barricadas, seales preventivas, vallas)

PROYECTO
DESCRIPCIN

I. EQUIPO
DESCRIPCIN
1 HERRAMIENTAS MENORES

TIPO

TARIFA / HORA

RENDIMIENTO

HERRAORO

$1,869,919.00

0.01

UNIDAD

VR. UNITARIO

CANTIDAD

2
OBSERVACIONES:

II. MATERIALES EN OBRA


DESCRIPCIN
1 CINTA PREVENTIVA

$50.00

3115.46

2 BARRICADAS

und

$80,000.00

15.00

3 VALLA

und

$400,000.00

1.00

$186,927.00

0.05

VOL-PESO-CANT.

DISTANCIA

M3 M3/Km

TARIFA

JORNAL

PRESTACIONES

JORNAL TOTAL

RENDIMIENTO

$87,149.20

600

4 DESPERDICIO
OBSERVACIONES:

III. TRANSPORTE
DESCRIPCIN
1
OBSERVACIONES:

IV. MANO DE OBRA


DESCRIPCIN
1 2 AYUDANTE

$45,868

$41,281.20

TOTAL COSTO DIRECTO

SIS DE PRECIOS UNITARIO


TEM

1.01

ntiel ayala

X
co

UNIDAD

ML
VR. PARCIAL
$140.00
$207.15
SUBTOTAL

347

2,141

VR. PARCIAL
$150.00
$100.00
$1,800.00
$90.50
SUBTOTAL

VR. PARCIAL

SUBTOTAL

VR. PARCIAL
$2,145.75
SUBTOTAL

TOTAL COSTO DIRECTO

SIS DE PRECIOS UNITARIO

2,146
$4,634.00

TEM

1.02

ntiel ayala

XXXXXX
reventivas, vallas)

UNIDAD

GLB
VR. PARCIAL
$18,699.19
SUBTOTAL

18,699

1,765,119

VR. PARCIAL
$155,773.05
$1,200,000.00
$400,000.00
$9,346.35
SUBTOTAL

VR. PARCIAL
SUBTOTAL

145

VR. PARCIAL
$145.25
SUBTOTAL

TOTAL COSTO DIRECTO

$1,783,963.00

ANLISIS DE PRECIOS UNITA

Universidad Pontificia Bolivariana


ALCANTARILLADO
21 de septiembre de 2015

FECHA

juan camilo montiel ayala

PROPONENTE

XXXXXXXXXXXXXXX
Construccion de manholes de 6m a 10m de profundidad

PROYECTO
DESCRIPCIN

I. EQUIPO
DESCRIPCIN
1

HERRAMIENTAS MENORES

MEZCLADORA

TIPO

TARIFA / HORA RENDIMIENTO

HERRAORO

$1,347,346.00

0.05

1 BULTO

$17,500.00

1.88

UNIDAD

VR. UNITARIO

CANTIDAD

m3

$281,792.00

3.90

OBSERVACIONES:

II. MATERIALES EN OBRA


DESCRIPCIN
1

CONCRETO 3000 PSI

ACERO

Kg

$3,850.00

14.23

FORMALETA

glb

$50,000.00

1.00

DESPERDICIO

$1,153,774.30

0.05

M3 M3/Km

TARIFA

OBSERVACIONES:

III. TRANSPORTE
DESCRIPCIN

VOL-PESO-CANT. DISTANCIA

1
OBSERVACIONES:

IV. MANO DE OBRA


DESCRIPCIN
1

CUAD. OFICIOS VARIOS

1 AYUDANTE

JORNAL

PRESTACIONESJORNAL TOTAL RENDIMIENTO

$88,140.60
$22,934 $20,640.60

$97,934.00

$186,074.60

$43,574.60

TOTAL COSTO DIRECTO

Universidad Pontificia Bolivariana


ALCANTARILLADO
FECHA

21 de septiembre de 2015

ANLISIS DE PRECIOS UNITA

juan camilo montiel ayala

PROPONENTE

XXXXXXXXXXXXXXXXX
Construccion de manholes de 4,5m a 6m de profundidad

PROYECTO
DESCRIPCIN

I. EQUIPO
DESCRIPCIN
1

HERRAMIENTAS MENORES

MEZCLADORA

TIPO

TARIFA / HORA RENDIMIENTO

HERRAORO

$1,118,140.00

0.05

1 BULTO

$17,500.00

1.88

OBSERVACIONES:

II. MATERIALES EN OBRA


UNIDAD

VR. UNITARIO

CANTIDAD

CONCRETO 3000 PSI

DESCRIPCIN

m3

$281,792.00

3.20

ACERO

Kg

$3,850.00

13.50

FORMALETA

glb

$50,000.00

1.00

DESPERDICIO

$953,709.40

0.05

M3 M3/Km

TARIFA

OBSERVACIONES:

III. TRANSPORTE
DESCRIPCIN

VOL-PESO-CANT. DISTANCIA

1
OBSERVACIONES:

IV. MANO DE OBRA


DESCRIPCIN
1

CUAD. OFICIOS VARIOS

1 AYUDANTE

JORNAL

PRESTACIONESJORNAL TOTAL RENDIMIENTO

$88,140.60
$22,934 $20,640.60

$97,934.00

$186,074.60

$43,574.60

TOTAL COSTO DIRECTO

ANLISIS DE PRECIOS UNITA

Universidad Pontificia Bolivariana


ALCANTARILLADO
21 de septiembre de 2015

FECHA

juan camilo montiel ayala

PROPONENTE

XXXXXXXXXXXXXXXXX
Construccion de manholes de 3m a 4,5m de profundidad

PROYECTO
DESCRIPCIN

I. EQUIPO
DESCRIPCIN

TIPO

TARIFA / HORA RENDIMIENTO

HERRAMIENTAS MENORES

MEZCLADORA

HERRAORO

$958,717.00

0.05

1 BULTO

$17,500.00

1.88

UNIDAD

VR. UNITARIO

CANTIDAD

OBSERVACIONES:

II. MATERIALES EN OBRA


DESCRIPCIN
1

CONCRETO 3000 PSI

m3

$281,792.00

2.70

ACERO

Kg

$3,850.00

13.50

FORMALETA

glb

$50,000.00

1.00

DESPERDICIO

$812,813.40

0.05

M3 M3/Km

TARIFA

OBSERVACIONES:

III. TRANSPORTE
DESCRIPCIN

VOL-PESO-CANT. DISTANCIA

1
OBSERVACIONES:

IV. MANO DE OBRA


DESCRIPCIN
1

CUAD. OFICIOS VARIOS

1 AYUDANTE

JORNAL

PRESTACIONESJORNAL TOTAL RENDIMIENTO

$88,140.60
$22,934 $20,640.60

$97,934.00

$186,074.60

$43,574.60

TOTAL COSTO DIRECTO

ANLISIS DE PRECIOS UNITA

Universidad Pontificia Bolivariana


ALCANTARILLADO
21 de septiembre de 2015

FECHA

juan camilo montiel ayala

PROPONENTE

XXXXXXXXXXXXXXXXXXX
Construccion de manholes de 2m a 3m de profundidad

PROYECTO
DESCRIPCIN

I. EQUIPO
DESCRIPCIN
1

HERRAMIENTAS MENORES

MEZCLADORA

TIPO

TARIFA / HORA RENDIMIENTO

HERRAORO

$763,805.00

0.05

1 BULTO

$17,500.00

1.88

OBSERVACIONES:

II. MATERIALES EN OBRA


UNIDAD

VR. UNITARIO

CANTIDAD

CONCRETO 3000 PSI

DESCRIPCIN

m3

$281,792.00

2.10

ACERO

Kg

$3,850.00

9.20

FORMALETA

glb

$50,000.00

1.00

DESPERDICIO

$627,183.20

0.05

OBSERVACIONES:

III. TRANSPORTE
DESCRIPCIN

VOL-PESO-CANT. DISTANCIA

M3 M3/Km

TARIFA

1
OBSERVACIONES:

IV. MANO DE OBRA


DESCRIPCIN
1

CUAD. OFICIOS VARIOS

1 AYUDANTE

JORNAL

PRESTACIONESJORNAL TOTAL RENDIMIENTO

$88,140.60
$22,934 $20,640.60

$97,934.00

$186,074.60

$43,574.60

TOTAL COSTO DIRECTO

ANLISIS DE PRECIOS UNITA

Universidad Pontificia Bolivariana


ALCANTARILLADO
21 de septiembre de 2015

FECHA

juan camilo montiel ayala

PROPONENTE
PROYECTO

Construccion de manholes de 0m a 2m de profundidad

DESCRIPCIN

I. EQUIPO
DESCRIPCIN
1

HERRAMIENTAS MENORES

MEZCLADORA

TIPO

TARIFA / HORA RENDIMIENTO

HERRAORO

$512,143.00

0.05

1 BULTO

$17,500.00

1.88

OBSERVACIONES:

II. MATERIALES EN OBRA


UNIDAD

VR. UNITARIO

CANTIDAD

CONCRETO 3000 PSI

DESCRIPCIN

m3

$281,792.00

1.30

ACERO

Kg

$3,850.00

5.50

FORMALETA

glb

$50,000.00

1.00

DESPERDICIO

$387,504.60

0.05

M3 M3/Km

TARIFA

OBSERVACIONES:

III. TRANSPORTE
DESCRIPCIN

VOL-PESO-CANT. DISTANCIA

1
OBSERVACIONES:

IV. MANO DE OBRA


DESCRIPCIN
1

CUAD. OFICIOS VARIOS

JORNAL
$97,934.00

PRESTACIONESJORNAL TOTAL RENDIMIENTO

$88,140.60

$186,074.60

1 AYUDANTE

$22,934 $20,640.60

$43,574.60

TOTAL COSTO DIRECTO

SIS DE PRECIOS UNITARIO


TEM

2.01

montiel ayala

XXXXXXXX
10m de profundidad

UNIDAD

UND
VR. PARCIAL
$67,367.30
$9,333.33
SUBTOTAL

76,701

1,261,463

VR. PARCIAL
$1,098,988.80
$54,785.50
$50,000.00
$57,688.72
SUBTOTAL

VR. PARCIAL
SUBTOTAL

VR. PARCIAL
$62,024.87
$14,524.87
SUBTOTAL

OTAL COSTO DIRECTO

76,550
$1,414,714.00

SIS DE PRECIOS UNITARIO


TEM

2.02

montiel ayala

XXXXXXXXX
a 6m de profundidad

UNIDAD

UND
VR. PARCIAL
$55,907.00
$9,333.33
SUBTOTAL

65,240

1,051,395

VR. PARCIAL
$901,734.40
$51,975.00
$50,000.00
$47,685.47
SUBTOTAL

VR. PARCIAL
SUBTOTAL

VR. PARCIAL
$46,518.65
$10,893.65
SUBTOTAL

OTAL COSTO DIRECTO

57,412
$1,174,047.00

SIS DE PRECIOS UNITARIO


TEM

2.03

montiel ayala

XXXXXXXXX
4,5m de profundidad

UNIDAD

UND
VR. PARCIAL

$47,935.85
$9,333.33
SUBTOTAL

57,269

903,454

VR. PARCIAL
$760,838.40
$51,975.00
$50,000.00
$40,640.67
SUBTOTAL

VR. PARCIAL
SUBTOTAL

VR. PARCIAL
$37,214.92
$8,714.92
SUBTOTAL

OTAL COSTO DIRECTO

45,930
$1,006,653.00

SIS DE PRECIOS UNITARIO


TEM

2.04

montiel ayala

XXXXXXXXXX
3m de profundidad

UNIDAD

UND
VR. PARCIAL
$38,190.25
$9,333.33
SUBTOTAL

47,524

708,542

VR. PARCIAL
$591,763.20
$35,420.00
$50,000.00
$31,359.16
SUBTOTAL

VR. PARCIAL
SUBTOTAL

VR. PARCIAL
$37,214.92
$8,714.92
SUBTOTAL

OTAL COSTO DIRECTO

45,930
$801,996.00

SIS DE PRECIOS UNITARIO


TEM

2.05

montiel ayala

2m de profundidad

UNIDAD

UND
VR. PARCIAL
$25,607.15
$9,333.33
SUBTOTAL

34,940

456,880

VR. PARCIAL
$366,329.60
$21,175.00
$50,000.00
$19,375.23
SUBTOTAL

VR. PARCIAL
SUBTOTAL

VR. PARCIAL
$37,214.92

$8,714.92
SUBTOTAL

OTAL COSTO DIRECTO

45,930
$537,750.00

ANLISIS DE PRECIOS U

Universidad Pontificia Bolivariana


ALCANTARILLADO
21 de septiembre de 2015

FECHA

juan camilo montiel ayala

PROPONENTE

XXXXXXXXXXXXXXX
Excavacion de material comn y/o arcillosode 6m a 10m de profundidad

PROYECTO
DESCRIPCIN

I. EQUIPO
DESCRIPCIN
1

HERRAMIENTAS MENORES

RETROEXCAVADORA

TIPO

TARIFA / HORA

HERRAORO

$69,241.00

320D Caterpillar 148 Hp


20,22 TON

$150,000.00

OBSERVACIONES:

II. MATERIALES EN OBRA


DESCRIPCIN

UNIDAD

VR. UNITARIO

VOL-PESO-CANT.

DISTANCIA

M3 M3/Km

JORNAL

PRESTACIONES

JORNAL TOTAL

1
OBSERVACIONES:

III. TRANSPORTE
DESCRIPCIN
1
OBSERVACIONES:

IV. MANO DE OBRA


DESCRIPCIN
1
2

1 OFICIAL
3 AYUDANTE

$35,000.00
$68,802

$31,500.00 $66,500.00
$61,921.80 $130,723.80

TOTAL COSTO DIRECT

Universidad Pontificia Bolivariana


FECHA
PROPONENTE
PROYECTO
DESCRIPCIN

ANLISIS DE PRECIOS U

ALCANTARILLADO
21 de septiembre de 2015

juan camilo montiel ayala


XXXXXXXXXXXXXX
Excavacion de material comn y/o arcilloso de 4,5m a 6m de profundidad

I. EQUIPO
DESCRIPCIN
1

HERRAMIENTAS MENORES

TIPO

TARIFA / HORA

HERRAORO

$54,716.00

320D Caterpillar 148 Hp


20,22 TON

RETROEXCAVADORA

$140,000.00

OBSERVACIONES:

II. MATERIALES EN OBRA


DESCRIPCIN

UNIDAD

VR. UNITARIO

VOL-PESO-CANT.

DISTANCIA

M3 M3/Km

JORNAL

PRESTACIONES

JORNAL TOTAL

1
OBSERVACIONES:

III. TRANSPORTE
DESCRIPCIN
1
OBSERVACIONES:

IV. MANO DE OBRA


DESCRIPCIN
1
2

1 OFICIAL
2 AYUDANTE

$35,000.00
$45,868

$31,500.00 $66,500.00
$41,281.20 $87,149.20

TOTAL COSTO DIRECT

ANLISIS DE PRECIOS U

Universidad Pontificia Bolivariana


ALCANTARILLADO
21 de septiembre de 2015

FECHA

juan camilo montiel ayala

PROPONENTE

XXXXXXXXXXXXXXXXXX
Excavacion de material comn y/o arcilloso de 3m a 4,5m de profundidad

PROYECTO
DESCRIPCIN

I. EQUIPO
DESCRIPCIN
1

HERRAMIENTAS MENORES

RETROEXCAVADORA

TIPO

TARIFA / HORA

HERRAORO

$41,912.00

320D Caterpillar 148 Hp


20,22 TON

$140,000.00

OBSERVACIONES:

II. MATERIALES EN OBRA


DESCRIPCIN
1
OBSERVACIONES:

UNIDAD

VR. UNITARIO

III. TRANSPORTE
DESCRIPCIN

VOL-PESO-CANT.

DISTANCIA

M3 M3/Km

JORNAL

PRESTACIONES

JORNAL TOTAL

1
OBSERVACIONES:

IV. MANO DE OBRA


DESCRIPCIN

1 OFICIAL
2 AYUDANTE

1
2

$35,000.00
$45,868

$31,500.00 $66,500.00
$41,281.20 $87,149.20

TOTAL COSTO DIRECT

ANLISIS DE PRECIOS U

Universidad Pontificia Bolivariana


ALCANTARILLADO
21 de septiembre de 2015

FECHA

juan camilo montiel ayala

PROPONENTE

XXXXXXXXXXXXXXXXX
Excavacion de material comn y/o arcilloso de 2m a 3m de profundidad

PROYECTO
DESCRIPCIN

I. EQUIPO
DESCRIPCIN
1
2

HERRAMIENTAS MENORES

TIPO

TARIFA / HORA

HERRAORO

$25,608.00

320D Caterpillar 148 Hp


20,22 TON

RETROEXCAVADORA

$140,000.00

OBSERVACIONES:

II. MATERIALES EN OBRA


DESCRIPCIN

UNIDAD

VR. UNITARIO

VOL-PESO-CANT.

DISTANCIA

M3 M3/Km

JORNAL

PRESTACIONES

JORNAL TOTAL

1
OBSERVACIONES:

III. TRANSPORTE
DESCRIPCIN
1
OBSERVACIONES:

IV. MANO DE OBRA


DESCRIPCIN
1
2

1 OFICIAL
2 AYUDANTE

$35,000.00
$45,868

$31,500.00 $66,500.00
$41,281.20 $87,149.20

TOTAL COSTO DIRECT

ANLISIS DE PRECIOS U

Universidad Pontificia Bolivariana


ALCANTARILLADO
21 de septiembre de 2015

FECHA

juan camilo montiel ayala

PROPONENTE

XXXXXXXXXXXXXX
Excavacion de material comn y/o arcilloso de 0m a 2m de profundidad

PROYECTO
DESCRIPCIN

I. EQUIPO
DESCRIPCIN
1

HERRAMIENTAS MENORES

RETROEXCAVADORA

TIPO

TARIFA / HORA

HERRAORO

$22,706.00

320D Caterpillar 148 Hp


20,22 TON

$140,000.00

OBSERVACIONES:

II. MATERIALES EN OBRA


DESCRIPCIN

UNIDAD

VR. UNITARIO

VOL-PESO-CANT.

DISTANCIA

M3 M3/Km

JORNAL

PRESTACIONES

JORNAL TOTAL

1
OBSERVACIONES:

III. TRANSPORTE
DESCRIPCIN
1
OBSERVACIONES:

IV. MANO DE OBRA


DESCRIPCIN
1
2

1 OFICIAL
2 AYUDANTE

$35,000.00
$45,868

$31,500.00 $66,500.00
$41,281.20 $87,149.20

TOTAL COSTO DIRECT

ANLISIS DE PRECIOS UNITARIO


TEM

3.01

lo montiel ayala

XXXXXXXXXX
losode 6m a 10m de profundidad

UNIDAD

M3
RENDIMIENTO VR. PARCIAL
0.05

$3,462.05

40.00

$3,750.00
SUBTOTAL

CANTIDAD

7,212

VR. PARCIAL
SUBTOTAL

TARIFA

VR. PARCIAL
SUBTOTAL

RENDIMIENTO VR. PARCIAL

3
3

$22,166.67
$43,574.60
SUBTOTAL

TOTAL COSTO DIRECTO

65,741

$72,953.00

ANLISIS DE PRECIOS UNITARIO


TEM

3.02

lo montiel ayala

XXXXXXXXXX
oso de 4,5m a 6m de profundidad

UNIDAD

M3

RENDIMIENTO VR. PARCIAL


0.05

$2,735.80

40.00

$3,500.00
SUBTOTAL

CANTIDAD

6,236

VR. PARCIAL
SUBTOTAL

TARIFA

VR. PARCIAL
SUBTOTAL

RENDIMIENTO VR. PARCIAL

3
3

$22,166.67
$29,049.73
SUBTOTAL

TOTAL COSTO DIRECTO

51,216

$57,452.00

ANLISIS DE PRECIOS UNITARIO


TEM

3.03

lo montiel ayala

XXXXXXXXXXXX
oso de 3m a 4,5m de profundidad

UNIDAD

M3
RENDIMIENTO VR. PARCIAL
0.05

$2,095.60

40.00

$3,500.00
SUBTOTAL

CANTIDAD

5,596

VR. PARCIAL
SUBTOTAL

TARIFA

VR. PARCIAL
SUBTOTAL

RENDIMIENTO VR. PARCIAL

4
4

$16,625.00
$21,787.30
SUBTOTAL

TOTAL COSTO DIRECTO

38,412

$44,008.00

ANLISIS DE PRECIOS UNITARIO


TEM

3.04

lo montiel ayala

XXXXXXXXXXX
lloso de 2m a 3m de profundidad

UNIDAD

M3
RENDIMIENTO VR. PARCIAL
0.05

$1,280.40

40.00

$3,500.00
SUBTOTAL

CANTIDAD

4,780

VR. PARCIAL
SUBTOTAL

TARIFA

VR. PARCIAL
SUBTOTAL

RENDIMIENTO VR. PARCIAL

6
6

$11,083.33
$14,524.87
SUBTOTAL

25,608

TOTAL COSTO DIRECTO

$30,388.00

ANLISIS DE PRECIOS UNITARIO


TEM

3.05

lo montiel ayala

XXXXXXXXXX
lloso de 0m a 2m de profundidad

UNIDAD

M3
RENDIMIENTO VR. PARCIAL
0.05

$1,135.30

40.00

$3,500.00
SUBTOTAL

CANTIDAD

4,635

VR. PARCIAL
SUBTOTAL

TARIFA

VR. PARCIAL
SUBTOTAL

RENDIMIENTO VR. PARCIAL

8
8

$8,312.50
$10,893.65
SUBTOTAL

TOTAL COSTO DIRECTO

19,206

$23,841.00

ANLISIS DE PRECIOS UNITA

Universidad Pontificia Bolivariana


ALCANTARILLADO
21 de septiembre de 2015

FECHA

juan camilo montiel ayala

PROPONENTE

XXXXXXXXXXXXXXX
Entibados para excavaciones que superen 2m de profundidad

PROYECTO
DESCRIPCIN

I. EQUIPO
DESCRIPCIN
1

HERRAMIENTAS MENORES

TIPO

TARIFA / HORA

RENDIMIENTO

HERRAORO

$156,625.00

0.05

UNIDAD

VR. UNITARIO

CANTIDAD

OBSERVACIONES:

II. MATERIALES EN OBRA


DESCRIPCIN
1

TABLONES DE MADERA 1"x8"

ML

PUNTALES DE MADERA DIAMETRO 4"

UND

Desperdicio

$30,000.00
$17,900.00
$119,900.00

4
1.00
0.05

OBSERVACIONES:

III. TRANSPORTE
DESCRIPCIN

VOL-PESO-CANT.

DISTANCIA

M3 M3/Km

TARIFA

JORNAL

PRESTACIONES

JORNAL TOTAL

RENDIMIENTO

$66,500.00

$87,149.20

1
OBSERVACIONES:

IV. MANO DE OBRA


DESCRIPCIN
1

1 OFICIAL

2 AYUDANTE

$35,000.00 $31,500.00
$45,868 $41,281.20

TOTAL COSTO DIRECTO

DE PRECIOS UNITARIO
TEM

4.01

el ayala

XXX
m de profundidad

UNIDAD

M2
VR. PARCIAL
$7,831.25
SUBTOTAL

7,831

VR. PARCIAL

$
$

120,000
17,900
$5,995.00

SUBTOTAL

$ 143,895

VR. PARCIAL
SUBTOTAL

VR. PARCIAL
$13,300.00
$17,429.84
SUBTOTAL

30,730

TOTAL COSTO DIRECTO $182,456.00

ANLISIS DE PRECIOS UNITARIO

Universidad Pontificia Bolivariana


ALCANTARILLADO
21 de septiembre de 2015

FECHA

juan camilo montiel ayala

PROPONENTE

XXXXXXXXXXXXX
Suministro e instalacin de tuberia nueva en pvc D=8"

PROYECTO
DESCRIPCIN

I. EQUIPO
DESCRIPCIN
1

TIPO

HERRAMIENTAS MENORES

HERRAORO

TARIFA / HORA RENDIMIENTO VR. PARCIAL


$67,235.00

0.01

OBSERVACIONES:

$672.35
SUBTOTAL

II. MATERIALES EN OBRA


DESCRIPCIN

UNIDAD

TUBERIA SANITARIA 6m

ML

DESPERDICIO

VR. UNITARIO

CANTIDAD

$70,000.00
$61,372.00

1
0.05

OBSERVACIONES:

VR. PARCIAL

$
$

70,000
3,069

SUBTOTAL

III. TRANSPORTE
DESCRIPCIN

VOL-PESO-CANT. DISTANCIA

M3 M3/Km

TARIFA

VR. PARCIAL

1
OBSERVACIONES:

SUBTOTAL

IV. MANO DE OBRA


DESCRIPCIN
1

1 OFICIAL

2 AYUDANTE

JORNAL

PRESTACIONESJORNAL TOTAL RENDIMIENTO VR. PARCIAL

$35,000.00 $31,500.00
$45,868 $41,281.20

$66,500.00

55

$87,149.20

55

$1,209.09
$1,584.53
SUBTOTAL

TOTAL COSTO DIRECTO

CIOS UNITARIO
TEM

5.01

UNIDAD

ML

672

73,069

2,794

$76,535.00

ANLISIS DE PRECIOS

Universidad Pontificia Bolivariana


ALCANTARILLADO
21 de septiembre de 2015

FECHA

juan camilo montiel ayala

PROPONENTE

XXXXXXXXXXXXXXXXXXXXX
Relleno con material proveniente de excavaciones

PROYECTO
DESCRIPCIN

I. EQUIPO
DESCRIPCIN
1

TIPO

HERRAMIENTAS MENORES

TARIFA / HORA

HERRAORO

OBSERVACIONES:

II. MATERIALES EN OBRA


DESCRIPCIN

UNIDAD

VR. UNITARIO

DISTANCIA

M3 M3/Km

5.00

1
2
OBSERVACIONES:

III. TRANSPORTE
DESCRIPCIN
1

RETIRO MATERIAL SOBRANTE

VOL-PESO-CANT.
337.76

OBSERVACIONES:

IV. MANO DE OBRA


DESCRIPCIN
1

1 OFICIAL

2 AYUDANTE

JORNAL

PRESTACIONESJORNAL TOTAL

$35,000.00 $31,500.00
$45,868 $41,281.20

$66,500.00
$87,149.20

TOTAL COSTO DIRECT

ANLISIS DE PRECIOS UNITARIO


TEM

6.01

n camilo montiel ayala

XXXXXXXXXXXXXXXXXX
proveniente de excavaciones

UNIDAD

M3
RENDIMIENTO VR. PARCIAL
0.01

$0.00
SUBTOTAL

CANTIDAD

$350.00

VR. PARCIAL

SUBTOTAL

TARIFA

VR. PARCIAL
$591,080.00
SUBTOTAL

591,080

2,794

RENDIMIENTO VR. PARCIAL


55
55

$1,209.09
$1,584.53
SUBTOTAL

TOTAL COSTO DIRECTO

$593,874.00

JORNALES
DESCRIPCN UN - JORNAL VR - DA JORNAL
AYUDANTE
OFICIAL
MAESTRO
TOPGRAFO
CADENERO

DA
DA
DA
DA
DA

PRSTACIONES SOCIALES

$22,934
$35,000
$40,000
$60,000
$30,000

VR - MES

VR PREST

$688,020 $619,218.00
$1,050,000 $945,000.00
$1,200,000 $1,080,000.00
$1,500,000 $1,350,000.00
$900,000 $810,000.00

0.9

VR TOTAL
$1,307,238.00
$1,995,000.00
$2,280,000.00
$2,850,000.00
$1,710,000.00

CUADRILLA A
DESCRIPCIN
TOPOGRAFO
CADENERO
AYUDANTE

LOCALIZACIN, TRAZADO Y REPLANTEO


CANT
VR - DA
VR - PARCIAL
1
$60,000
$60,000
1
$30,000
$30,000
1
$22,934
$22,934
TOTAL CUADRILLA DIA
$112,934

CUADRILLA B
DESCRIPCIN
AYUDANTE
OFICIAL
MAESTRO

EXC-RELL-OFICIOS VARIOS
CANT
VR - DA
VR - PARCIAL
1
$22,934.00
$22,934.00
1
$35,000.00
$35,000.00
1
$40,000.00
$40,000.00
TOTAL CUADRILLA DIA
$97,934

M
O

R
TE
R
O

C
O

N
C
R
ET
O

F'c
(Kg/Cm)
280
250
226
210
200
140
240
200
160

F'c
(PSI)

F'c
(MPa)

4000
3571
3229
3000
2857
2000

M
O

R
TE
R
O

C
O

N
C
R
ET
O

120
VALOR MATERIALES
280
250
226
210
200
140
240
200
160
120

28
25
23
21
20
14

DOSIFICACION CEMENTO GRAVA (m)


(KG)
EN VOLUMEN
1:2:2
1:2:2,5
1:2:3
1:2:3
1:2:4
1:3:5
1:4
1:5
1:6

420
380
350
350
300
230
364
302
260

0.67
0.76
0.86
0.86
0.95
0.92

1:7

228

1:2:2
1:2:2,5
1:2:3
1:2:3
1:2:4
1:3:5
1:4
1:5
1:6

Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520

Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520

1:7

Err:520

Err:520

ARENA (m) AGUA (Lt)

VR. TOTAL

0.67
0.6
0.55
0.55
0.48
0.55
1.16
1.18
1.2

200
190
180
180
170
160
185
170
150

1.25

140

Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520

$ 230
$ 46,000
$ 43,700
$ 41,400
$ 41,400
$ 39,100
$ 36,800
$ 42,550
$ 39,100
$ 34,500

m
$ 306,307
$ 291,128
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520

Err:520

$ 32,200

Err:520

T
O
T
A
L
E
S

14.2857143 FACTOR CONVERSION

You might also like