Annex A_Activity Plan and Schedule of Outputs

UGCP No.: __________


Faculty Research Promoter: Engr. Maurice Licdan
Project Title: DESIGN OF AN UNDERGROUND DRIP IRRIGATION SYSTEM FOR
CARROT FARMS IN BAGUIO CITY
A. ACTIVITY PLAN GANNT CHART
Activity
A. Finalization of research project title
B. Preparation of research proposal
1. Literature review
2. Writing introduction (with problem, objective/s, research
questions, significance, etc.)
3. Writing methods section (with identified research design,
methods and data-gathering techniques, target participants, etc.)
4. Preparing data gathering instruments (questionnaire, FGD
guide, KI interview guide, etc.)
5. Pre-testing of data gathering instruments
6. Writing communications to participants, offices, etc.
C. Gathering of data
1 Collection of data
2 Organizing data
D. Processing of data
1 Statistical analysis, qualitative analysis, etc.
2 Writing down results
E. Preparation of final report/output
1 Writing manuscript
2 Editing

Month
1 2 3
x

x
x

x
x

x
x
x
x
x
x

x
x

B. SCHEDULE OF OUTPUTS
Activity
A.
B.
C.
D.
E.
F.

Finalization of research project title


Preparation of research proposal
Literature review
Introduction
Methods
Data gathering instruments
Communications to participants, offices
Gathering of data
Processing of data
Preparation of final manuscript
Sending manuscript for publication in a refereed
journal (optional)

Note:

10

Output to be submitted

Deadline

Research project title

Aug 31

Literature review
Introduction
Methods
Data gathering instruments

Sept 30
Oct 31
Nov 30
Nov 30
Dec 31
Feb 28
Apr 30
May 15

Report on data collected


Report on processed data
Publishable manuscript

This is a general sample. Some modifications may be done according to the specifics of the
research project.