You are on page 1of 338

Sum - Column F

Column B
Civil works

Column C
Common areas
Contingencies
ETP Civil Works
Foundations
Line Area
People Infrastructure

Plant
Process Rooms
RMPM Building
Roads
Storm Water Drains
Tank

Contingencies
Due Deligence

Warehouse
WTP
Contingencies
Environmental DD

Legal DD
Electricals

Electricals

Classified - Confidential

ETP & Misc.

ETP & Misc.

Head
IT Infra
Line Equipment

Equipment/Area
IT Infra
CHA & Transport
Line

Others

PMC

Process Equipment

CHA & Transport


I&C

QA Lab Equipment

Sugar Dissolving System


Misc.
Testing

Racks & Material HandForklifts


Hand-Trolleys
House Keeping Machine
Misc.
Racks
Safety

Safety

Support Equipment

WTP

Classified - Confidential

Utilities Equipment

Boiler
CO2 Distribution System
Cooling Towers

HVAC
LP Compressor
Misc.
PET Crusher

Recovery Systems
Refrigeration System

(empty)
Total Result

(empty)

Classified - Confidential

Column D
Column E
Roads-RCC
1CW08
Contingencies
1CW21
Pathways and Landscaping
1CW19
Equipment Foundations & Platforms
1CW15
Pipe Racks
1CW14
Security Cabins, CMC, DMC
1CW13
Earth brought from outside
1CW01
Main production building
1CW02
Admin Block
1CW10
Admin Office, Lab, Etc. Interiors
1CW12
People Infrastructure (Toilets, Water Coolers, Hand-Wash S
1CW11
Grading
1CW01
Main production building- Mezzanines
1CW03
FG Canopy Area
1CW05
Storm Water Drains, Connectivity & RWH
1CW07
WWTP Building
1CW06
Back Wash Recovery Tank
1CW20
ETP Civil Works ( Main work part of ETP)
1CW16
Pathways and Landscaping
1CW19
Raw Water tank and Fire water tank.
1CW17
Tank Farms Areas
1CW18
Process areas only PIR panels , AR Tiles & Wall Tiles
1CW04
Process Drains
1CW09
Contingencies
13CO01
Feasibility study
14DD02
Pre-feasibility study
14DD01
Soil and water testing
14DD03
Legal Due deligence
14DD03
Miscelleneous out of pockect cost
14DD03
Active Filter
6EL16
Battery Charger & Bank
6EL13
BUS Duct
6EL04
Cable HT & LT
6EL05
Cable Tray including SS trays in process area and cable R6EL10
Capacitor Panel
6EL09
CCTV & Others
6EL12
DG Set
6EL02
Earthing & Lighting Protection
6EL14
Electricals
6EL18
HT Line
6EL01
HT System
6EL08
Lighting & Lighting Distribution
6EL15
LT Panel
6EL07
Misc
6EL17
PCC
6EL06
Classified - Confidential

Column A
Line

Transformer
6EL03
UPS
6EL11
New System
10ET01
Piping & Distribution Network
10ET03
Relocation of Pond, re-routing Treated Effluent Path, Pump10ET04
Sprinklers
10ET05
Water Recovery Schemes
10ET02
Description
Coding
IT Infra
7IT01
CHA Charges (incl Transportation)
2LE07
Learnings
2LE08
Local SLE Monitoring System
2LE05
PET Line, including duties, CSD Moulds & Change-Parts 2LE01
A & E Firm, Construction Mgmt
11OT01
Facility Infrastructure Planning
11OT09
IBPL Site Office
11OT02
Insurance
11OT05
Pre-Operatives
11OT11
Sending of Samples for Testing etc.
11OT08
Site Security Team
11OT10
Statutory Approvals
11OT07
Temp Power & DG Set for time-period of Construction
11OT03
Training - People Travel, Lodging & Boarding, FAT etc.
11OT06
Transportation
11OT04
CHA Charges (incl Transportation)
3PE02
Carbon Tanks, Platform and Accessories for Cont. Sugar d3PE09
CIP System
3PE04
Electricals & Instrumentation Etc
3PE06
Inter-Connecting System Piping
3PE07
Simple, Water & Ready Syrup Tanks
3PE05
Spare-Parts, Ops Support
3PE10
Sugar Dissolving System - Installation
3PE03
Testing & Commissioning & Miscellaneous
3PE11
Working Platform for CIP and Ready Syrup tanks
3PE08
Sugar Dissolving System, including duties
3PE01
Racks for Sample Storages
9QL03
Furniture
9QL02
Lab Equipment
9QL01
Forklifts - Double Mast
8RA02
Forklifts - Single Mast
8RA01
Hand-Trolleys
8RA03
House Keeping Machine
8RA04
Third Party Testing
8RA07
Design
8RA05
Supply and Installation & Commissioning
8RA06
Safety Consultant
12SA01
Safety Infrastructure
12SA02
Atlantium UV -80 M3
4SE11
Back-Wash Recovery System
4SE04

Classified - Confidential

CHA Charges
Electricals & Mechanical Interfacing
I & C of the System
Iron Removal filter
Miscellaneous
Miscellaneous Items - Flow Meters, Safety Showers
Piping & Distribution Network to Line/Process
Post-Treatment System
Pre-Treatment System for Process Water
RO System
Tanks ( Blending Tank - 15 KL, UF Treated Water Tank-80
Tax & Duties- Atlantium UV -80 M3
Treatment-UF System
Boiler & Accessories
Dominick Hunter Filter, Purifier & Connecting Piping
Cooling Towers
Fire Detection & Controls
Fire Hydrant System
Instrumentation on Distribution Network
Piping & Distribution Network to Line/Process
Safety Extenguishers & Showers
HVAC System
CO2 Vertical Tank
LP Compressor
Bulk Tank for Nitrogen - Lease
Misc.
Nitrogen Cylinders
Nitrogen Piping Vacuum Insulated # Approx. 60 M
PET Crusher
Tanks (FO & HSD)
Condensate Recovery System
Cold Room Refrigeration
Condensate Recovery System
Refrigeration System
(empty)

4SE13
4SE08
4SE07
4SE15
4SE14
4SE10
4SE09
4SE03
4SE01
4SE05
4SE06
4SE12
4SE02
5UE06
5UE03
5UE09
5UE13
5UE12
5UE11
5UE10
5UE14
5UE05
5UE08
5UE07
5UE20
5UE19
5UE17
5UE18
5UE15
5UE16
5UE04
5UE02
5UE04
5UE01
(empty)

Classified - Confidential

Sparkling Line
Water Line
(empty)
60,439,500.00
40,015,500.00
2,775,000.00
4,440,000.00
8,880,000.00
1,687,200.00
3,937,725.00
410,622,300.00
17,325,990.00
10,989,000.00
2,775,000.00
159,828,900.00
31,623,900.00
23,135,175.00
2,106,225.00
2,775,000.00
333,000.00
1,110,000.00
3,663,000.00
33,300,000.00
9,768,000.00
10,755,900.00
4,914,525.00
30,766,583.51
10,186,858.08
4,073,911.80
3,102,115.80
1,845,060.00
2,300,000.00
1,328,912.40
6,318,876.96
3,159,438.48
2,106,292.32
7,477,337.74
4,212,584.64
14,744,046.24
10,531,461.60
3,264,753.10
2,106,292.32
3,686,011.56
3,686,011.56
12,637,753.92
5,792,303.88
1,053,146.16
27,392,331.62
18,956,630.88
2,843,494.63
2,106,292.32
11,584,607.76
1,053,146.16
4,212,584.64
2,106,292.32
2,106,292.32
1,053,146.16
17,903,484.72
15,797,192.40

Total Result
60,439,500.00
40,015,500.00
2,775,000.00
4,440,000.00
10,567,200.00
3,937,725.00
410,622,300.00
17,325,990.00
10,989,000.00
2,775,000.00
159,828,900.00
31,623,900.00
23,135,175.00
2,106,225.00
3,108,000.00
1,110,000.00
3,663,000.00
33,300,000.00
9,768,000.00
10,755,900.00
4,914,525.00
40,953,441.60
4,073,911.80
3,102,115.80
1,845,060.00
2,300,000.00
1,328,912.40
9,478,315.44
2,106,292.32
11,689,922.38
25,275,507.84
5,371,045.42
7,372,023.12
12,637,753.92
6,845,450.04
27,392,331.62
18,956,630.88
4,949,786.95
12,637,753.92
6,318,876.96
3,159,438.48
33,700,677.12

Classified - Confidential

2,790,837.32
895,174.24
27,908,373.24
3,159,438.48
5,265,730.80
7,372,023.12
5,265,730.80
17,942,451.13
11,236,000.00
1,895,663.09
905,648,593.63
112,360,000.00
2,809,000.00
12,359,600.00
5,618,000.00
2,247,200.00
2,809,000.00
4,853,952.00
11,348,360.00
6,741,600.00
6,179,800.00
8,427,000.00
2,247,200.00
3,159,438.48
13,755,105.00
3,159,438.48
3,159,438.48
18,956,630.88
2,527,550.78
3,370,800.00
3,159,438.48
2,632,865.40
86,166,794.45
1,579,719.24
1,053,146.16
7,372,023.12
13,164,327.00
4,739,157.72
4,212,584.64
10,531,461.60
3,370,800.00
6,849,396.71
8,029,895.57
355,436.83

2,790,837.32
4,739,157.72
4,212,584.64

5,265,730.80
2,106,292.32
11,236,000.00
###
1,895,663.09
572,101,180.57
5,618,000.00

1,123,600.00

1,123,600.00
6,516,880.00

13,690,900.08

526,573.08
315,943.85
5,265,730.80

210,629.23

7,976,004.01
3,159,438.48

Classified - Confidential

5,581,674.65
895,174.24
32,647,530.96
7,372,023.12
5,265,730.80
7,372,023.12
10,531,461.60
20,048,743.45
22,472,000.00
3,791,326.18
1,477,749,774.20
117,978,000.00
2,809,000.00
12,359,600.00
5,618,000.00
2,247,200.00
3,932,600.00
4,853,952.00
11,348,360.00
6,741,600.00
7,303,400.00
14,943,880.00
2,247,200.00
3,159,438.48
27,446,005.08
3,159,438.48
3,159,438.48
18,956,630.88
2,527,550.78
3,370,800.00
3,159,438.48
2,632,865.40
86,166,794.45
2,106,292.32
1,369,090.01
12,637,753.92
13,164,327.00
4,949,786.95
4,212,584.64
10,531,461.60
3,370,800.00
6,849,396.71
16,005,899.58
3,514,875.31

595,508.00
3,230,350.00
2,106,750.00
5,265,730.80
2,106,292.32
803,023.95
5,199,909.17
20,036,105.69
5,970,022.29
14,217,473.16
1,169,402.27
10,057,545.83
36,491,514.44
1,263,775.39
37,615,010.77
2,948,809.25
7,898,596.20
24,222,361.68
526,573.08
31,278,440.95
12,111,180.84
17,608,603.80
2,106,292.32

561,800.00
2,022,480.00
2,208,539.52
1,053,146.16
1,548,124.86
4,562,229.17
14,912,549.63
7,077,142.20
17,060,967.79
4,574,866.92
1,161,553.98
10,236,580.68

2,106,292.32
1,053,146.16
10,004,888.52
4,739,157.72

7,435,211.89
8,530,483.90
9,952,231.21
1,158,460.78
5,265,730.80

1,053,146.16
1,579,719.24

44,232,138.72
###

###

###
###

Classified - Confidential

1,157,308.00
5,252,830.00
4,315,289.52
5,265,730.80
3,159,438.48
2,351,148.80
9,762,138.33
34,948,655.32
13,047,164.49
17,060,967.79
18,792,340.08
2,330,956.25
20,294,126.50
36,491,514.44
1,263,775.39
37,615,010.77
5,055,101.57
7,898,596.20
25,275,507.84
10,004,888.52
526,573.08
36,017,598.67
12,111,180.84
17,608,603.80
2,106,292.32
7,435,211.89
8,530,483.90
9,952,231.21
1,158,460.78
6,318,876.96
1,579,719.24
44,232,138.72
4,063,385,086.59
7,579,561,957.95

Date
10/9/2012
10/10/2012
10/4/2012
4/1/2014
Total

RFA ID
12BIGG1364-1233605
12BIGG1364-9851104
12BIGG1364-3894721
14BIGG1364-0023104

Break-up of RFA 4:
Buildings & Improvements
Machinery & Equipment (M&E)
Furniture & Fixtures
IT Hardware

BDT

In Mn

40,000,000.00
12,650,000.00
550,000,000.00
4,496,000,000.00
5,098,650,000.00
77.560370268

40.00
12.65
550.00
4,496.00
5,098.65

1,065,800,000
3,060,000,000
303,600,000
66,600,000
4,496,000,000

BDT mn
Land
Due Diligence for land
Preliminary Exp
Land development
Civil
720 BPM Sparkling Line
Total
600 BPM water
Total With 2 lines
Approved Amount
RFA Amt (14BIGG1364-0023104)

Classified - Confidential

1,066
3,060
304
67
4,496

USD mn
470
13
40
169
1,065
2,322
4,079
1,020
5,099
603
4,496.00

6
0.2
0.5
2.2
13.7
29.8
52.4
13.1
65.5
7
58.50

USD
490,196
155,692
6,740,195
58,351,741
65,737,824.39

Engg. RFA
RFA 1
RFA 2
RFA 3
RFA 4

In INR
13,832,581
39,714,485
3,940,300
864,374
58,351,740

3,503,526,871
1.283278298

Classified - Confidential

RFA Details
Bangladesh CBO-IBPL-Green Field Project-Preliminary Expenses
Environmental Due Deligence fees for IBPL green field project in Bangladesh
Bangladesh CBO - Purchase of Land for Greenfield Plant at Dhaka
2014 Sub-BOD Item-Bangladesh CBO-Dhaka Green Field Project

5,099

Classified - Confidential

Head
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Equipment / Area
Preliminary expenses
Purchase of land
Environmental Due Deligence
Civil Works
Line Equipment
Process Equipments
Support Equipment
Utilities Equipment
Electricals
IT Infra
Material Handling Equipment
QA Lab Equipment
ETP & Misc
Others
Safety
Contingencies
Total
in USD (BDT/USD=77.56)

BDT/INR rate

Original RFA
(BDT)
40,000,000
550,000,000
12,650,000
1,087,194,452
1,930,067,372
200,172,936
201,806,894
348,001,675
249,429,077
25,728,117
42,166,164
20,677,638
81,088,777
243,996,879
13,115,357
52,554,663
5,098,650,000
65,738,138

1.28

Classified - Confidential

Reallocation of Budgets through App


6/Feb/15
471,988,680
(646,789,074)
213,834,388
(39,033,995)
(0)

location of Budgets through Approvals


30/Apr/15
34,000,000
(37,500,000)
(35,000,000)
21,500,000
15,000,000
15,000,000
6,000,000
10,700,000
17,125,000
(46,825,000)
(0)

Final Revised
Open LoI
PO issued
Budget
40,000,000
19,723,447
550,000,000
85,953,615
12,650,000
5,912,446
1,559,183,132
(1)
1,534,503,629
1,317,278,298
26,434,200
1,191,151,791
10,268,000
172,940,936
172,940,900
166,806,894
3,357,036
140,920,327
45,000,000
414,501,675
149,692,595
262,624,507
(55,268,000)
422,995,466
17,912,194
360,776,910
25,728,117
3,089,167
57,166,164
19,857,500
26,677,638
52,754,782
49,696,450
261,121,879
26,870,117
13,115,357
5,729,663
5,098,650,000 217,253,524
3,854,163,305
65,738,138
17/Jul/15

Classified - Confidential

Non PO transactions Total Commitment


20,274,181
459,735,985
173,423,699
653,433,865

39,997,627
545,689,600
5,912,446
1,534,503,628
1,217,585,991
172,940,900
144,277,363
412,317,102
378,689,104
3,089,167
19,857,500
49,696,450
200,293,816
4,724,850,694

RFA Balance
2,373
4,310,400
6,737,554
24,679,504
99,692,307
36
22,529,531
2,184,573
44,306,362
22,638,950
37,308,664
26,677,638
3,058,332
60,828,063
13,115,357
5,729,663
373,799,306

Classified - Confidential

GRN made till date


33,649,670
540,611,318
4,508,188
179,102,795
4,561,775
700,570
417,683
777,500
202,959
2,898,597
165,694
21,531,654
789,128,403

Balance in PO for GRN


6,347,958
5,078,282
1,404,258
1,355,400,834
1,186,590,015
172,240,330
140,502,644
261,847,007
360,573,951
190,570
49,530,756
178,762,162
3,718,468,766

Advance Given
2,676,405
156,075,427
47,859,300
40,263,916
10,309,200
68,856,603
13,444,134
487,455
339,972,441

Open Advance
2,676,405
156,075,427
47,859,300
40,263,916
10,309,200
68,856,603
13,444,134
487,455
339,972,441

Classified - Confidential

Capex Basis - PET Sparkling 720 bpm Line & Water 600 bpm Line @ Bangladesh - GF
1
2
3
4

Broad Project Scope:


Basic: Line Equipment, Process & Support Equipment, Utilities and Electricals, Required ETP & Others
Required Spaces for Line and Warehouse, Required Construction Areas for WTP & Utility Buildings Etc.
RMPM Space for this line
Safety & Quality Infrastructure

Capital Estimation (Summary)


Head

Equipment / Area

1
2

Civil Works
Line Equipment

3
4

PET Sparkling Line (INR)


Total Cost
Net of Modvat

Water Line (INR)


Total Cost
Net of Modvat

Total (PET Sparkling + Water) (INR)


Total Cost
Net of Modvat

840,299,415
1,027,297,406

840,299,415
918,780,257

29%
36%

6,901,425
653,867,879

6,901,425
585,232,844

1%
71%

847,200,840
1,681,165,284

847,200,840
1,504,013,100

22%
44%

Process Equipment
Support Equipment

158,708,422
87,981,341

142,294,700
79,143,446

6%
3%

15,345,904
93,233,886

13,690,900
78,115,423

2%
10%

174,054,326
181,215,228

155,985,601
157,258,869

5%
5%

Utilities Equipment

263,048,628

234,679,720

9%

40,914,541

36,502,046

4%

303,963,169

271,181,766

8%

6
7

Electricals
IT Infra
Racks & Material
Handling Equipment
QA Lab Equipment

162,206,206
20,111,398

144,712,814
17,942,451

6%
1%

55,658,414
2,360,908

49,655,841
2,106,292

6%
0%

217,864,620
22,472,306

194,368,655
20,048,743

6%
1%

36,594,079
11,214,315

32,647,531
10,004,889

1%
0%

236,091
6,846,634

210,629
6,108,248

0%
1%

36,830,170
18,060,949

32,858,160
16,113,136

1%
0%

8
9
10

ETP & Misc.

11
12

Others
Safety

13

Contingencies
Total
Inflation
Total
Nett of Modvat
Total
Total

62

54,891,118

48,971,296

2%

15,936,131

14,217,473

2%

70,827,250

63,188,770

2%

175,753,512
11,048,176

175,753,512
10,220,197

6%
0%

14,382,080
0

14,382,080
0

2%
0%

190,135,592
11,048,176

190,135,592
10,220,197

5%
0%

30,766,584

30,766,584

1%

10,186,858

10,186,858

1%

40,953,442

40,953,442

1%

2,879,920,598

2,686,216,811

915,870,751

817,310,060

3,795,791,350

3,503,526,871

2,879,920,598

2,686,216,811

915,870,751

817,310,060

3,795,791,350

3,503,526,871

2,686,216,811
~ 269 Crore

817,310,060
~ 82 Crore

3,503,526,871
~ 351 Crore

~ $ 44 MM

~ $ 14 MM

~ $ 57 MM

Page 17 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Sum(Sprk+Wtr)_x000D_Classified - Confidential

Capex Basis - PET Sparkling 720 bpm Line & Water 600 bpm Line @ Dhaka- GF
1
2
3
4

Broad Project Scope:


Basic: Line Equipment, Process & Support Equipment, Utilities and Electricals, Required ETP & Others
Required Spaces for Line and Warehouse, Required Construction Areas for WTP & Utility Buildings Etc.
RMPM Space for this line
Safety & Quality Infrastructure

Capital Estimation (Summary)

Civil Works

Head

Equipment / Area

Plant
Line Area
Line Area
Process Rooms
Warehouse
RMPM Building
Storm Water Drains
Roads
Common areas
WTP
People Infrastructure

1
1
2
3
4
5
6
7
8
9
10
11

Foundations

12
13

Grading
Earth brought from outside
Main production building
Main production building- Mezzanines
Process areas only PIR panels , AR Tiles & Wall Tiles
FG Canopy Area
WWTP Building
Storm Water Drains, Connectivity & RWH
Roads-RCC
Process Drains
Admin Block
People Infrastructure (Toilets, Water Coolers, Hand-Wash
Stations etc.)
Admin Office, Lab, Etc. Interiors
Security Cabins, CMC, DMC

Page 18 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Civil Works

Capital Estimation (Summary)


1

Head

Equipment / Area

ETP Civil Works


Tank

Contingencies

14
15
16
17
18
19
20
21

Pipe Racks
Equipment Foundations & Platforms
ETP Civil Works ( Main work part of ETP)
Raw Water tank and Fire water tank.
Tank Farms Areas
Pathways and Landscaping
Back Wash Recovery Tank
Contingencies

Sub-Total
Line

PET Line

Duties

CHA & Transport

2
3
4
5
6
7
8

Impact of Duties & Taxes


CSD Moulds & Change-Parts - 400 ml
CSD Moulds & Change-Parts - 2000 ml
Local SLE Monitoring System
Additional Change Orders Provision
CHA Charges (incl Transportation)
Learnings

Sugar Dissolving System

Sub-Total
Sugar Dissolving System

Assumed Purchase Price (in Euro)

ipment

Line Equipment

Assumed Purchase Price (in Euro)


Converted Purchase Price (in INR)

Page 19 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Capital Estimation (Summary)


Head

Equipment / Area

Process Equipment

Converted Purchase Price (in INR)


Duties
CHA & Transport
I&C

2
3
4
5
6
7
8
9

Impact of Duties & Taxes


CHA Charges (incl Transportation)
Sugar Dissolving System - Installation
CIP System
Simple, Water & Ready Syrup Tanks
Electricals & Instrumentation Etc
Inter-Connecting System Piping
Working Platform for CIP and Ready Syrup tanks

10

Carbon Tanks, Platform and Accessories for ConSugar dissolving

11

Spare-Parts, Ops Support

12

Testing & Commissioning & Miscellaneous

Sub-Total

Support Equipment

WTP
1
2
3
4
5

Pre-Treatment System for Process Water


Treatment-UF System
Post-Treatment System
Back-Wash Recovery System
RO System

Tanks ( Blending Tank - 15 KL, UF Treated Water Tank-80 KL)

7
8
9

I & C of the System


Electricals & Mechanical Interfacing
Piping & Distribution Network to Line/Process

Page 20 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Support Equipment

Capital Estimation (Summary)


Head
4

Equipment / Area

10
Miscellaneous Items - Flow Meters, Safety Showers
11 Atlantium UV -80 M3- Price in USD
Assumed Purchase Price (in USD)
Converted Purchase Price (in INR)
12 Tax & Duties
13
CHA Charges
14
Miscellaneous

Iron Removal filter


Sub-Total

Refrigeration System

Utilities Equipment

CO2 Distribution System


Recovery Systems
HVAC
Boiler
LP Compressor

Cooling Towers

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Refrigeration System
Cold Room Refrigeration
Dominick Hunter Filter, Purifier & Connecting Piping
Condensate Recovery System
HVAC System
Boiler & Accessories
LP Compressor
CO2 Vertical Tank
Cooling Towers
Piping & Distribution Network to Line/Process
Instrumentation on Distribution Network
Fire Hydrant System
Fire Detection & Controls
Safety Extenguishers & Showers

Page 21 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Utilities Equipment

Capital Estimation (Summary)


5

Head

Equipment / Area

PET Crusher

Misc.

15
16
17
18
19

PET Crusher
Tanks (FO & HSD)
Nitrogen Cylinders
Nitrogen Piping Vacuum Insulated # Approx. 60 M
Misc.
Bulk Tank for Nitrogen - Lease
Misc.

Electricals

Sub-Total

1
2
3
4
5
6
7
8
9

HT Line
DG Set
Transformer
BUS Duct
Cable HT & LT
PCC
LT Panel
HT System
Capacitor Panel

10

Cable Tray including SS trays in process area and cable Rack

11
12
13

UPS
CCTV & Others
Battery Charger & Bank

Page 22 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Electricals

Capital Estimation (Summary)


6

Head

Equipment / Area

14
15
16
17
18

Earthing & Lighting Protection


Lighting & Lighting Distribution
Active Filter
Misc
Electricals

IT Infra

Sub-Total

IT Infra

Sub-Total

Page 23 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Capital Estimation (Summary)

Racks & Material


Handling Equipment

Head

Equipment / Area

Forklifts
Hand-Trolleys
House Keeping Machine
Racks
Misc.

1
2
3
4
5
6
7

Forklifts - Single Mast


Forklifts - Double Mast
Hand-Trolleys
House Keeping Machine
Design
Supply and Installation & Commissioning
Goods Lifts

1
2
3

Lab Equipment
Furniture Lab
Racks for Sample Storages

1
2
3

New System
Water Recovery Schemes
Piping & Distribution Network
Relocation of Pond, re-routing Treated Effluent Path, Pumps ,
Misc. etc.

QA Lab
Equipment

Sub-Total

Testing
Misc.

10

ETP & Misc.

Sub-Total

Page 24 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

ETP & Misc.

Capital Estimation (Summary)


Head
10

Equipment / Area

5
6

Sprinklers
ETP Lab Equipments

A & E Firm, Construction Mgmt

IBPL Site Office

Temp Power & DG Set for time-period of Construction

4
5

Transportation
Insurance

Training - People Travel, Lodging & Boarding, FAT etc.

Sub-Total

11

Others

PMC

7
8
9
10

Statutory Approvals
Sending of Samples for Testing etc.
Facility Infrastructure Planning
Site Security Team

Page 25 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Others

11

Capital Estimation (Summary)


Head

Equipment / Area

11

Hand wash station, water Cooler, water filters, organic food


composer, canteen equipment and furniture

12

Pre-Operatives

13

LEED Consultant

Sub-Total

Page 26 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Capital Estimation (Summary)

12

Safety

Head

Equipment / Area

Safety

1
2

Safety Consultant
Safety Infrastructure

13

Total

Sub-Total

Sub-Total
Contingencies

Sub-Total
Contingencies

Total
Inflation
Total
Nett of Modvat
Total
Total

62

Page 27 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

- GF

thers
s Etc.

PET Sparkling Line (INR)


Category
Land
Land
Land
Land
Land
Land
Land
Land
Land
Land
Land

Development,
Development,
Development,
Development,
Development,
Development,
Development,
Development,
Development,
Development,
Development,

Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil

&
&
&
&
&
&
&
&
&
&
&

Coding

Basic Cost

Total Cost
(with All Taxes)

Net of Modvat

PEB
PEB
PEB
PEB
PEB
PEB
PEB
PEB
PEB
PEB
PEB

1CW01
1CW01
1CW02
1CW03
1CW04
1CW05
1CW06
1CW07
1CW08
1CW09
1CW10

369,930,000
143,990,000
9,690,000
28,490,000
20,842,500
54,450,000
4,427,500
15,609,000

410,622,300
159,828,900
10,755,900
31,623,900
23,135,175
60,439,500
4,914,525
17,325,990

410,622,300
159,828,900
10,755,900
31,623,900
23,135,175
60,439,500
4,914,525
17,325,990

Land Development, Civil & PEB

1CW11

2,500,000

2,775,000

2,775,000

Land Development, Civil & PEB


Land Development, Civil & PEB

1CW12
1CW13

9,900,000
3,547,500

10,989,000
3,937,725

10,989,000
3,937,725

Page 28 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

PET Sparkling Line (INR)


Category
Land
Land
Land
Land
Land
Land
Land
Land
Civil
720
720
720
720
720
720
720
720
720
720

Development,
Development,
Development,
Development,
Development,
Development,
Development,
Development,
Works

BPM
BPM
BPM
BPM
BPM
BPM
BPM
BPM
BPM
BPM

CSD
CSD
CSD
CSD
CSD
CSD
CSD
CSD
CSD
CSD

Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil

&
&
&
&
&
&
&
&

PEB
PEB
PEB
PEB
PEB
PEB
PEB
PEB

LINE
LINE
LINE
LINE
LINE
LINE
LINE
LINE
LINE
LINE

Coding

Basic Cost

1CW14
1CW15
1CW16
1CW17
1CW18
1CW19
1CW20
1CW21

8,880,000
4,440,000
1,110,000
33,300,000
9,768,000
3,663,000
2,775,000
40,015,500

8,880,000
4,440,000
1,110,000
33,300,000
9,768,000
3,663,000
2,775,000
40,015,500

757,026,500

840,299,415

840,299,415

Included
Included
2LE05
2LE07
2LE08

Line Equipment

1,800,000
10,000,000
887,916,460

SUGAR DISSOLVING SYSTEM


SUGAR DISSOLVING SYSTEM

Net of Modvat

8,000,000
4,000,000
1,000,000
30,000,000
8,800,000
3,300,000
2,500,000
36,050,000

9,178,800
761,840,400
114,276,060

2LE01

Total Cost
(with All Taxes)

870,000

881,683,990
132,252,598 incl above
2,124,817
11,236,000
1,027,297,406

Page 29 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

905,648,594
1,895,663
11,236,000
918,780,257

PET Sparkling Line (INR)


Category
SUGAR DISSOLVING SYSTEM
SUGAR DISSOLVING SYSTEM
SUGAR DISSOLVING SYSTEM

Coding

Basic Cost

Total Cost
(with All Taxes)

Net of Modvat

SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM
SYSTEM

3PE01
3PE02
3PE03
3PE04
3PE05
3PE06
3PE07
3PE08

74,425,890
8,931,107
2,000,000
3,000,000
13,100,100
18,000,000
3,000,000
3,000,000
2,500,000

SUGAR DISSOLVING SYSTEM

3PE09

3,000,000

3,541,362

3,159,438

SUGAR DISSOLVING SYSTEM

3PE10

2,400,000

2,833,090

2,527,551

SUGAR DISSOLVING SYSTEM

3PE11

3,000,000

3,541,362

3,159,438

136,357,097

158,708,422

142,294,700

SUGAR
SUGAR
SUGAR
SUGAR
SUGAR
SUGAR

DISSOLVING
DISSOLVING
DISSOLVING
DISSOLVING
DISSOLVING
DISSOLVING

SUGAR DISSOLVING SYSTEM


Process Equipments

WTP
WTP
WTP
WTP
WTP

86,133,678
10,336,041 incl above
2,247,200
3,370,800
15,422,853
21,248,175
3,541,362
3,541,362
2,951,135

86,166,794
2,247,200
3,370,800
13,755,105
18,956,631
3,159,438
3,159,438
2,632,865

PLANT
PLANT
PLANT
PLANT
PLANT

4SE01
4SE02
4SE03
4SE04
4SE05

5,668,750
9,550,000
19,025,000
337,500
-

6,691,700
11,273,337
22,458,140
398,403
-

5,970,022
10,057,546
20,036,106
355,437
-

WTP PLANT

4SE06

13,500,000

15,936,131

14,217,473

WTP PLANT
WTP PLANT
WTP PLANT

4SE07
4SE08
4SE09

1,875,000
2,875,000
4,937,500

2,106,750
3,230,350
5,828,492

2,106,750
3,230,350
5,199,909

Page 30 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

PET Sparkling Line (INR)


Category
WTP
WTP
WTP
WTP
WTP
WTP
WTP

PLANT
PLANT
PLANT
PLANT
PLANT
PLANT
PLANT

Coding
4SE10
4SE11

4SE12
4SE13
4SE14
4SE15

WTP PLANT
Support Equipment

VAM CHILLER
HVAC SYSTEM
CO2 and LN2 SYSTEM
UTILITY PIPING & VALVES
HVAC SYSTEM
BOILER
COMPRESSOR & ACCESSORIES
CO2 and LN2 SYSTEM

5UE01
5UE02
5UE03
5UE04
5UE05
5UE06
5UE07
5UE08

VAM CHILLER
UTILITY PIPING & VALVES
UTILITY PIPING & VALVES
FIRE PROTECTION & DETECTION SYSTEM
FIRE PROTECTION & DETECTION SYSTEM
FIRE PROTECTION & DETECTION SYSTEM

5UE09
5UE10
5UE11
5UE12
5UE13
5UE14

Basic Cost

Total Cost
(with All Taxes)

Net of Modvat

762,500

900,096

803,024

120,438
7,541,796
1,131,269
530,000
2,000,000
5,000,000

8,990,027
1,309,227
595,508
2,360,908
5,902,271

8,029,896
1,169,402
595,508
2,106,292
5,265,731

74,734,316

87,981,341

79,143,446

42,000,000
5,000,000
1,200,000
1,100,000
29,700,000
34,650,000
16,720,000
11,500,000
35,716,800
23,000,000
7,500,000
2,800,000

49,579,075
5,902,271
1,416,545
1,298,500
35,059,489
40,902,737
19,737,194
13,575,223
42,162,045
27,150,446
8,853,406
3,305,272

44,232,139
5,265,731
1,263,775
1,158,461
31,278,441
36,491,514
17,608,604
12,111,181
37,615,011
24,222,362
7,898,596
2,948,809

Page 31 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

PET Sparkling Line (INR)


Category
PET Crusher unit
HSD, ACID & LYE TANK
CO2 and LN2 SYSTEM
CO2 and LN2 SYSTEM
CO2 and LN2 SYSTEM
CO2 and LN2 SYSTEM
CO2 and LN2 SYSTEM

Coding
5UE15
5UE16
5UE17
5UE18
5UE19
5UE20

Utilities Equipment

Basic Cost

Total Cost
(with All Taxes)

Net of Modvat

500,000
9,450,000
2,000,000

590,227
11,155,292
2,360,908

526,573
9,952,231
2,106,292

222,836,800

263,048,628

234,679,720

ELECTRICAL HT, LT AND ACCESSORIES


GENERATOR AND ACCESSORIES
ELECTRICAL HT, LT AND ACCESSORIES
ELECTRICAL HT, LT AND ACCESSORIES
ELECTRICAL HT, LT AND ACCESSORIES
ELECTRICAL HT, LT AND ACCESSORIES
ELECTRICAL HT, LT AND ACCESSORIES
ELECTRICAL HT, LT AND ACCESSORIES
ELECTRICAL HT, LT AND ACCESSORIES

6EL01
6EL02
6EL03
6EL04
6EL05
6EL06
6EL07
6EL08
6EL09

18,000,000
12,000,000
2,650,000
7,100,000
14,000,000
17,000,000
4,000,000
2,700,000
3,500,000

21,248,175
14,165,450
3,128,204
8,381,225
16,526,358
20,067,721
4,721,817
3,187,226
4,131,590

18,956,631
12,637,754
2,790,837
7,477,338
14,744,046
17,903,485
4,212,585
2,843,495
3,686,012

ELECTRICAL HT, LT AND ACCESSORIES

6EL10

3,100,000

3,659,408

3,264,753

ELECTRICAL HT, LT AND ACCESSORIES


DOOR ACCESS CONTROLLER and CCTV
ELECTRICAL HT, LT AND ACCESSORIES

6EL11
6EL12
6EL13

850,000
2,000,000

1,003,386
2,360,908

895,174
2,106,292

Page 32 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

PET Sparkling Line (INR)


Category
ELECTRICAL
ELECTRICAL
ELECTRICAL
ELECTRICAL
ELECTRICAL

HT,
HT,
HT,
HT,
HT,

LT
LT
LT
LT
LT

AND
AND
AND
AND
AND

ACCESSORIES
ACCESSORIES
ACCESSORIES
ACCESSORIES
ACCESSORIES

Coding
6EL14
6EL15
6EL16
6EL17
6EL18

Electricals

IT Equipment

IT Infra

7IT01

Basic Cost

Total Cost
(with All Taxes)

Net of Modvat

5,500,000
11,000,000
6,000,000
2,000,000
26,010,000

6,492,498
12,984,996
7,082,725
2,360,908
30,703,613

5,792,304
11,584,608
6,318,877
2,106,292
27,392,332

137,410,000

162,206,206

144,712,814

17,037,000

20,111,398

17,942,451

17,037,000

20,111,398

17,942,451

Page 33 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

PET Sparkling Line (INR)


Category

MATERIAL HANDLING
MATERIAL HANDLING
MATERIAL HANDLING
MATERIAL HANDLING
Racking system
MATERIAL HANDLING
MATERIAL HANDLING

EQUIPMENTS
EQUIPMENTS
EQUIPMENTS
EQUIPMENTS
EQUIPMENTS
EQUIPMENTS

Coding

8RA01
8RA02
8RA03
8RA04
8RA05
8RA06
8RA07

Material Handling Equipment

LAB EQUIPMENT
LAB EQUIPMENT
LAB EQUIPMENT

9QL01
9QL02
9QL03

QA Lab Equipment

Basic Cost

Total Cost
(with All Taxes)

Net of Modvat

12,500,000
4,500,000
4,000,000
10,000,000
-

14,755,677
5,312,044
4,721,817
11,804,542
-

13,164,327
4,739,158
4,212,585
10,531,462
-

31,000,000

36,594,079

32,647,531

7,000,000
1,000,000
1,500,000

8,263,179
1,180,454
1,770,681

7,372,023
1,053,146
1,579,719

9,500,000

11,214,315

10,004,889

ETP TANKS & PUMPS CAPACITIES


ETP TANKS & PUMPS CAPACITIES
ETP TANKS & PUMPS CAPACITIES

10ET01
10ET02
10ET03

26,500,000
5,000,000
3,000,000

31,282,035
5,902,271
3,541,362

27,908,373
5,265,731
3,159,438

ETP TANKS & PUMPS CAPACITIES

10ET04

5,000,000

5,902,271

5,265,731

Page 34 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

PET Sparkling Line (INR)


Category
ETP TANKS & PUMPS CAPACITIES

Coding
10ET05

ETP & Misc

Basic Cost

Total Cost
(with All Taxes)

Net of Modvat

7,000,000

8,263,179

7,372,023

46,500,000

54,891,118

48,971,296

A&E Firm for designing

11OT01

100,000,000

112,360,000

112,360,000

Site Office & Preoperative Exp

11OT02

11,000,000

12,359,600

12,359,600

Site Office & Preoperative Exp

11OT03

6,000,000

6,741,600

6,741,600

Site Office & Preoperative Exp


Site Office & Preoperative Exp

11OT04
11OT05

7,500,000
5,000,000

8,427,000
5,618,000

8,427,000
5,618,000

Site Office & Preoperative Exp

11OT06

5,500,000

6,179,800

6,179,800

Site
Site
Site
Site

11OT07
11OT08
11OT09
11OT10

10,100,000
2,500,000
2,500,000
4,320,000

11,348,360
2,809,000
2,809,000
4,853,952

11,348,360
2,809,000
2,809,000
4,853,952

Office
Office
Office
Office

&
&
&
&

Preoperative
Preoperative
Preoperative
Preoperative

Exp
Exp
Exp
Exp

Page 35 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

PET Sparkling Line (INR)


Category

Site Office & Preoperative Exp

Others

Coding

11OT11

Basic Cost

Total Cost
(with All Taxes)

Net of Modvat

2,000,000

2,247,200

2,247,200

156,420,000

175,753,512

175,753,512

Page 36 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

PET Sparkling Line (INR)


Category

Safety Equipment
Safety Equipment

Coding

12SA01
12SA02

Safety

Miscelleneous items

13CO01

Basic Cost

Total Cost
(with All Taxes)

Net of Modvat

3,000,000
6,503,748

3,370,800
7,677,376

3,370,800
6,849,397

9,503,748

11,048,176

10,220,197

2,486,241,920
30,766,584

2,849,154,015
30,766,584

2,655,450,228
30,766,584

2,517,008,504

2,879,920,598

2,686,216,811

2,517,008,504

2,879,920,598

2,686,216,811
2,686,216,811
~ 269 Crore
~ $ 44 MM

Page 37 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Water Line (INR)

Total (PET Sparkling + Water) (INR)

Total Cost
(with All Taxes)

Basic Cost
1,897,500
-

Net of Modvat

2,106,225
-

Basic Cost

2,106,225
-

Total Cost
(with All Taxes)

369,930,000
143,990,000
9,690,000
28,490,000
1,897,500
20,842,500
54,450,000
4,427,500
15,609,000

410,622,300
159,828,900
10,755,900
31,623,900
2,106,225
23,135,175
60,439,500
4,914,525
17,325,990

2,500,000

2,775,000

9,900,000
3,547,500

10,989,000
3,937,725

Page 38 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Water Line (INR)


Total Cost
(with All Taxes)

Basic Cost

Total (PET Sparkling + Water) (INR)


Net of Modvat

Basic Cost

Total Cost
(with All Taxes)

1,520,000
2,500,000
300,000

1,687,200
2,775,000
333,000

1,687,200
2,775,000
333,000

9,520,000
4,000,000
1,000,000
30,000,000
8,800,000
5,800,000
2,800,000
36,050,000

10,567,200
4,440,000
1,110,000
33,300,000
9,768,000
6,438,000
3,108,000
40,015,500

6,217,500

6,901,425

6,901,425

763,244,000

847,200,840

556,962,662
572,101,181
83,544,399 incl above

1,438,646,651
215,796,998
4,249,635
22,472,000
1,681,165,284

5,798,278
481,257,074
72,188,561

1,800,000
10,000,000
-

2,124,817
11,236,000
-

1,895,663
11,236,000
-

14,977,078
1,243,097,474
186,464,621
3,600,000
20,000,000
-

565,245,635

653,867,879

585,232,844

1,453,162,095

Page 39 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Water Line (INR)


Total Cost
(with All Taxes)

Basic Cost

13,000,000

15,345,904

Total (PET Sparkling + Water) (INR)


Net of Modvat

13,690,900

Basic Cost

Total Cost
(with All Taxes)

74,425,890
8,931,107
2,000,000
3,000,000
26,100,100
18,000,000
3,000,000
3,000,000
2,500,000

86,133,678
10,336,041
2,247,200
3,370,800
30,768,757
21,248,175
3,541,362
3,541,362
2,951,135

3,000,000

3,541,362

2,400,000

2,833,090

3,000,000

3,541,362

13,000,000

15,345,904

13,690,900

149,357,097

174,054,326

6,720,000
9,720,000
14,160,000
3,000,000
16,200,000

7,932,652
11,474,014
16,715,231
3,541,362
19,123,357

7,077,142
10,236,581
14,912,550
3,159,438
17,060,968

12,388,750
19,270,000
33,185,000
3,337,500
16,200,000

14,624,351
22,747,352
39,173,371
3,939,766
19,123,357

4,344,000

5,127,893

4,574,867

17,844,000

21,064,024

2,160,000
1,800,000
4,332,000

2,475,516
2,022,480
5,113,727

2,208,540
2,022,480
4,562,229

4,035,000
4,675,000
9,269,500

4,582,266
5,252,830
10,942,220

Page 40 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Water Line (INR)


Total Cost
(with All Taxes)

Basic Cost
1,470,000

1,735,268

Total (PET Sparkling + Water) (INR)


Net of Modvat

Basic Cost

Total Cost
(with All Taxes)

1,548,125

2,232,500

2,635,364

17,919,718
2,609,668
1,157,308
3,541,362
5,902,271

119,629
7,491,181
1,123,677
500,000
1,000,000

8,929,691
1,300,440
561,800
1,180,454

7,976,004
1,161,554
561,800
1,053,146

240,067
15,032,977
2,254,947
1,030,000
3,000,000
5,000,000

74,020,858

87,233,886

78,115,423

143,755,173

169,312,957

1,000,000
1,500,000
4,500,000
-

1,180,454
1,770,681
5,312,044
-

1,053,146
1,579,719
4,739,158
-

9,500,000
1,000,000
2,000,000
-

11,214,315
1,180,454
2,360,908
-

10,004,889
1,053,146
2,106,292
-

42,000,000
6,000,000
1,200,000
2,600,000
34,200,000
34,650,000
16,720,000
11,500,000
45,216,800
1,000,000
23,000,000
9,500,000
2,800,000

49,579,075
7,082,725
1,416,545
3,069,181
40,371,532
40,902,737
19,737,194
13,575,223
53,376,360
1,180,454
27,150,446
11,214,315
3,305,272

Page 41 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Water Line (INR)

Total (PET Sparkling + Water) (INR)

Total Cost
(with All Taxes)

Basic Cost

Net of Modvat

Basic Cost

8,100,000
5,060,000

9,561,679
5,973,098

8,530,484
5,328,920

2,000,000

2,360,908

34,660,000

Total Cost
(with All Taxes)

2,106,292

500,000
9,450,000
8,100,000
5,060,000
4,000,000

590,227
11,155,292
9,561,679
5,973,098
4,721,817

40,914,541

36,502,046

257,496,800

303,963,169

2,650,000
4,000,000
10,000,000
15,000,000
2,000,000
2,000,000
3,500,000

3,128,204
4,721,817
11,804,542
17,706,812
2,360,908
2,360,908
4,131,590

2,790,837
4,212,585
10,531,462
15,797,192
2,106,292
2,106,292
3,686,012

18,000,000
12,000,000
5,300,000
11,100,000
24,000,000
32,000,000
6,000,000
4,700,000
7,000,000

21,248,175
14,165,450
6,256,407
13,103,041
28,330,900
37,774,533
7,082,725
5,548,135
8,263,179

2,000,000

2,360,908

2,106,292

5,100,000

6,020,316

850,000
2,000,000

1,003,386
2,360,908

Page 42 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Water Line (INR)


Total Cost
(with All Taxes)

Basic Cost
1,000,000
1,000,000
3,000,000
1,000,000

1,180,454
1,180,454
3,541,362
1,180,454

47,150,000

55,658,414

2,000,000

2,360,908

2,000,000

2,360,908

Total (PET Sparkling + Water) (INR)


Net of Modvat
1,053,146
1,053,146
3,159,438
1,053,146

Basic Cost

Total Cost
(with All Taxes)

6,500,000
12,000,000
9,000,000
3,000,000
26,010,000

7,672,952
14,165,450
10,624,087
3,541,362
30,703,613

184,560,000

217,864,620

2,106,292

19,037,000

22,472,306

2,106,292

19,037,000

22,472,306

49,655,841 ###

Page 43 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Water Line (INR)

Total (PET Sparkling + Water) (INR)

Total Cost
(with All Taxes)

Basic Cost

Net of Modvat

Basic Cost

Total Cost
(with All Taxes)

200,000
-

236,091
-

210,629
-

12,500,000
4,700,000
4,000,000
10,000,000
-

14,755,677
5,548,135
4,721,817
11,804,542
-

200,000

236,091

210,629

31,200,000

36,830,170

5,000,000
300,000
500,000

5,902,271
354,136
590,227

5,265,731
315,944
526,573

12,000,000
1,300,000
2,000,000

14,165,450
1,534,590
2,360,908

5,800,000

6,846,634

6,108,248

15,300,000

18,060,949

4,500,000
5,000,000
4,000,000

5,312,044
5,902,271
4,721,817

4,739,158
5,265,731
4,212,585

31,000,000
10,000,000
7,000,000

36,594,079
11,804,542
8,263,179

5,000,000

5,902,271

Page 44 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Water Line (INR)

Total (PET Sparkling + Water) (INR)

Total Cost
(with All Taxes)

Basic Cost

Net of Modvat

Basic Cost

Total Cost
(with All Taxes)

7,000,000

8,263,179

13,500,000

15,936,131

14,217,473

60,000,000

70,827,250

5,000,000

5,618,000

5,618,000

105,000,000

117,978,000

11,000,000

12,359,600

6,000,000

6,741,600

5,800,000
-

6,516,880
-

6,516,880
-

13,300,000
5,000,000

14,943,880
5,618,000

1,000,000

1,123,600

1,123,600

6,500,000

7,303,400

1,000,000
-

1,123,600
-

1,123,600
-

10,100,000
3,500,000
2,500,000
4,320,000

11,348,360
3,932,600
2,809,000
4,853,952

Page 45 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Water Line (INR)

Total (PET Sparkling + Water) (INR)

Total Cost
(with All Taxes)

Basic Cost

12,800,000

Net of Modvat

14,382,080

Basic Cost

14,382,080

Total Cost
(with All Taxes)

2,000,000

2,247,200

169,220,000

190,135,592

Page 46 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Water Line (INR)

Total (PET Sparkling + Water) (INR)

Total Cost
(with All Taxes)

Basic Cost

Net of Modvat

Basic Cost

Total Cost
(with All Taxes)

3,000,000
6,503,748

3,370,800
7,677,376

9,503,748

11,048,176

774,593,993
10,186,858

899,683,893
10,186,858

807,123,202
10,186,858

3,260,835,913
40,953,442

3,748,837,908
40,953,442

784,780,851

909,870,751

817,310,060

3,301,789,354

3,789,791,350

784,780,851

909,870,751

817,310,060

3,301,789,354

3,789,791,350

817,310,060
~ 82 Crore
~ $ 14 MM

Page 47 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Total (PET Sparkling + Water) (INR)


Net of Modvat
410,622,300
159,828,900
10,755,900
31,623,900
2,106,225
23,135,175
60,439,500
4,914,525
17,325,990
2,775,000
10,989,000
3,937,725

Page 48 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Total (PET Sparkling + Water) (INR)


Net of Modvat
10,567,200
4,440,000
1,110,000
33,300,000
9,768,000
6,438,000
3,108,000
40,015,500
847,200,840

1,477,749,774
3,791,326
22,472,000
1,504,013,100

Page 49 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Total (PET Sparkling + Water) (INR)


Net of Modvat
86,166,794
2,247,200
3,370,800
27,446,005
18,956,631
3,159,438
3,159,438
2,632,865
3,159,438
2,527,551
3,159,438

155,985,601

13,047,164
20,294,127
34,948,655
3,514,875
17,060,968
18,792,340
4,315,290
5,252,830
9,762,138

Page 50 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Total (PET Sparkling + Water) (INR)


Net of Modvat
2,351,149

16,005,900
2,330,956
1,157,308
3,159,438
5,265,731
157,258,869

44,232,139
6,318,877
1,263,775
2,738,180
36,017,599
36,491,514
17,608,604
12,111,181
47,619,899
1,053,146
24,222,362
10,004,889
2,948,809

Page 51 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Total (PET Sparkling + Water) (INR)


Net of Modvat
526,573
9,952,231
8,530,484
5,328,920
4,212,585
271,181,766

18,956,631
12,637,754
5,581,675
11,689,922
25,275,508
33,700,677
6,318,877
4,949,787
7,372,023
5,371,045
895,174
2,106,292

Page 52 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Total (PET Sparkling + Water) (INR)


Net of Modvat
6,845,450
12,637,754
9,478,315
3,159,438
27,392,332
194,368,655

20,048,743

20,048,743

Page 53 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Total (PET Sparkling + Water) (INR)


Net of Modvat

13,164,327
4,949,787
4,212,585
10,531,462
32,858,160

12,637,754
1,369,090
2,106,292
16,113,136

32,647,531
10,531,462
7,372,023
5,265,731

Page 54 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Total (PET Sparkling + Water) (INR)


Net of Modvat
7,372,023

63,188,770

117,978,000

12,359,600

6,741,600
14,943,880
5,618,000
7,303,400
11,348,360
3,932,600
2,809,000
4,853,952

Page 55 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Total (PET Sparkling + Water) (INR)


Net of Modvat

2,247,200

190,135,592

Page 56 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Total (PET Sparkling + Water) (INR)


Net of Modvat

3,370,800
6,849,397
10,220,197

3,462,573,430
40,953,442

3,503,526,871
3,503,526,871
3,503,526,871
~ 351 Crore
~ $ 57 MM

Page 57 of 338_x000D_File: 333823635.xlsx / Sheet: Capex B'lades GF-Detail-Sprk+Wt_x000D_Classified - Confidential

Capex Basis - PET Sparkling 720 bpm Line & Water 600 bpm Line @ B
1
2
3
4

Broad Project Scope:


Basic: Line Equipment, Process & Support Equipment, Utilities and Electricals, Require
Required Spaces for Line and Warehouse, Required Construction Areas for WTP & Utilit
RMPM Space for this line
Safety & Quality Infrastructure

Capital Estimation (Detailed)

Civil Works-SPARKLING LINE

Head

Equipment / Area

Sr. No.

Details

Plant
Line Area
Line Area

1
2
3

Process Rooms

Warehouse

RMPM Building
Storm Water Drains

6
7

Grading
Earth brought from outside
Main production building
Main production building- Mezzanines
Process areas only PIR panels , AR Tiles &
Wall Tiles
FG Canopy Area
WWTP Building

Roads

Storm Water Drains, Connectivity & RWH

ETP Civil Works

13
14
15
16

Roads-RCC
Process Drains
Admin Block
People Infrastructure (Toilets, Water Coolers,
Hand-Wash Stations etc.)
Admin Office, Lab, Etc. Interiors
Security Cabins, CMC, DMC
Pipe Racks
Equipment Foundations & Platforms

Tank

17

ETP Civil Works ( Main work part of ETP)

Contingencies

18
19
20
21

Raw Water tank and Fire water tank.


Tank Farms Areas
Pathways and Landscaping
Back Wash Recovery Tank
Contingencies

Common areas
WTP
People Infrastructure

9
10
11
12

Foundations

Sub-Total

ing Line Equipment

Line

PET Sparkling Line


Assumed Purchase Price (in Euro)
Converted Purchase Price (in INR)

Page 58 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Sprk_x000D_Classified - Confidential

Capital Estimation (Detailed)

Sparkling Line Equipment

Head

Equipment / Area

Sr. No.

Details

2
3
4
5
6
5
6
7
8

Impact of Duties & Taxes


Moulds & Change-Parts - 400 ml
Moulds & Change-Parts - 750 ml
Moulds & Change-Parts - 1750ml
Moulds & Change-Parts - 2250 ml
Local SLE Monitoring System
Additional Change Orders Provision
CHA Charges (incl Transportation)
Learnings

Sugar Dissolving System

Duties
CHA & Transport
I&C

2
3
4
5
6
7
8

Sugar Dissolving System


Assumed Purchase Price (in Euro)
Converted Purchase Price (in INR)
Impact of Duties & Taxes
CHA Charges (incl Transportation)

Duties

CHA & Transport

Process Equipment-SPARKLING Line

Sub-Total

Sugar Dissolving System - Installation


CIP System
Simple, Water & Ready Syrup Tanks
Electricals & Instrumentation Etc
Inter-Connecting System Piping

Working Platform for CIP and Ready Syrup tanks

10

Carbon Tanks, Platform and Accessories for Cont.


Sugar dissolving

11

Spare-Parts, Ops Support

12

Testing & Commissioning & Miscellaneous

Sub-Total

pport Equipment-SPARKLING Line

WTP

1
2
3
4
5

7
8

Pre-Treatment System for Process Water


Treatment-UF System
Post-Treatment System
Back-Wash Recovery System
RO System
Tanks ( Blending Tank - 15 KL, UF Treated Water
Tank-80 KL)
I & C of the System
Electricals & Mechanical Interfacing

Piping & Distribution Network to Line/Process

10

Miscellaneous Items - Flow Meters, Safety


Showers

Page 59 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Sprk_x000D_Classified - Confidential

Support Equipment-SPARKLING Line

Capital Estimation (Detailed)


Head
4

Equipment / Area

Details

Sr. No.

### Atlantium UV -80 M3- Price in USD


Assumed Purchase Price (in USD)
Converted Purchase Price (in INR)
### Tax & Duties
13 CHA Charges
14 Miscellaneous
15 Chemical Handling - Auto
16

Acid & Caustic - Piping from Bulk Tanks to service

17

Iron Removal filter

Sub-Total

Recovery Systems

Refrigeration System
Cold Room Refrigeration
CO2 Vertical Tank (Including accessories &
fittings)
CO2 Tank Installation
Dominick Hunter Filter, Purifier &
Connecting Piping
Condensate Recovery System

HVAC

HVAC System- Sparkling Line & Process

Refrigeration System

1
2
3

CO2 Distribution System

Utilities Equipment-Sparkling Line

Boiler
LP Compressor

8
9
10

Cooling Towers

11

PET Crusher

12

Instrumentation on Distribution Network

13
14
15
16
17

Fire Hydrant System


Fire Detection & Controls- Sparkling
Safety Extenguishers & Showers
PET Crusher
Tanks ( HSD , FO )
Nitrogen Cylinders- Portable Cylinders not
considered)

18

Misc.

Boiler & Accessories


LP Compressor (No Standby)
Cooling Towers
Piping & Distribution Network to
Line/Process- Sparkling

19

Nitrogen Piping Vacuum Insulated # Approx.


180 M+ Phase Separator+ Accessories

20
21

Bulk Tank for Nitrogen - Lease


Misc.

Sub-Total

Page 60 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Sprk_x000D_Classified - Confidential

Capital Estimation (Detailed)

Equipment / Area

Electricals-SPARKLING Line

Head

Details

Sr. No.

HT Line

DG Set

3
4
5
6
7
8
9

Transformer
BUS Duct
Cable HT & LT
PCC
LT Panel
HT System
Capacitor Panel
Cable Tray including SS trays in process area
and cable Rack
UPS
CCTV & Others
Battery Charger & Bank
Earthing & Lighting Protection
Lighting & Lighting Distribution
Active Filter
Misc
Electricals
Sub Total
Cost Escalation @ 10%

10
11
12
13
14
15
16
17
18
19
20

Racks & Material Handling


Equipment-SPARKLING Line

IT Infra

Sub-Total

IT Infra

Hand-Trolleys

1
2
3

Forklifts - Single Mast


Forklifts - Double Mast
Hand-Trolleys

House Keeping Machine

House Keeping Machine

Racks

Design

Supply and Installation & Commissioning

Third Party Testing

Sub-Total

Forklifts

Misc.
Sub-Total

Page 61 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Sprk_x000D_Classified - Confidential

Capital Estimation (Detailed)


Equipment / Area

QA Lab
EquipmentSPARKLING
Line

Head

Testing

Misc.

Details

Sr. No.

1
2
3

Lab Equipment
Furniture
Racks for Sample Storages

1
2

New System
Water Recovery Schemes

Sprinklers & Piping & Distribution Network

Relocation of Pond, re-routing Treated


Effluent Path, Pumps , Misc. etc.

10

ETP & Misc.-SPARKLING Line

Sub-Total

Sprinklers
Sub-Total

PMC

Others-SPARKLING Line

11

1
2

4
5
6
7
8
9
10
11

A & E Firm, Construction Mgmt


HCCB Site Office
Temp Power & DG Set for time-period of
Construction
Transportation
Insurance
Training - People Travel, Lodging & Boarding,
FAT etc.
Statutory Approvals
Sending of Samples for Testing etc.
Facility Infrastructure Planning
Site Security Team
Pre-Operatives

12

Safety

Sub-Total
Safety

1
2

Safety Consultant
Safety Infrastructure

Sub-Total

Page 62 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Sprk_x000D_Classified - Confidential

Capital Estimation (Detailed)

Total

Head

13

Equipment / Area

Sub-Total
Contingencies

Total
Inflation
Total
Nett of Modvat
Total
Total

Details

Sr. No.

Sub-Total
Contingencies
INR Total
0%
INR
INR Total
USD Total

Capital Estimation (Summary)


Head

Equipment / Area

Details

Sr. No.

1
2
3
4
5
6
7

Civil Works
Sparkling Line Equipment
Process Equipment
Support Equipment
Utilities Equipment
Electricals
IT Infra

Civil Works
Sparkling Line Equipment
Process Equipment
Support Equipment
Utilities Equipment
Electricals
IT Infra

House Keeping equipment,


Hand-Trolleys

House Keeping equipment, Hand-Trolleys

9
10
11
12
13

QA Lab Equipment
ETP & Misc.
Others
Safety
Contingencies

Total
Inflation
Total
Nett of Modvat
Total
Total

INR
0

QA Lab Equipment
ETP & Misc.
Others
Safety
Contingencies
Total

INR
INR Total
USD Total

Page 63 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Sprk_x000D_Classified - Confidential

0 bpm Line @ Bangladesh GF

d Electricals, Required ETP & Others


Areas for WTP & Utility Buildings Etc.

Size/Spec

44,506
40,000
12,980

Approx Basic Price

Coca-Cola User:
143,990,000
Only over Line
area @ 90 m
length

1,020

9,690,000

1,295

28,490,000
-

1,450

20,842,500

9,900
350
660

54,450,000
4,427,500
15,609,000

2,500,000

500
150
800

9,900,000
3,547,500
8,000,000
4,000,000

1,000,000

1,200
2,200
1,500

30,000,000
8,800,000
3,300,000
2,500,000
36,050,000

5%

757,026,500

83

CENVAT

369,930,000

7,480

100 kL

Packaging &
Forwarding (P&F)

9,178,800
761,840,400

94,163,473

Page 64 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Sprk_x000D_Classified - Confidential

Size/Spec
15%

0%
0%

Approx Basic Price


114,276,060
Included
Included
Included
Included
1,800,000
10,000,000
887,916,460

85
12%

80 m3/hr

Packaging &
Forwarding (P&F)

54,000

CENVAT
14,124,521
229,154
-

54,000

108,517,149

870,000
74,425,890
8,931,107
2,000,000
3,000,000
13,100,100
18,000,000
3,000,000
3,000,000

393,003
540,000
90,000
90,000

1,667,748
2,291,544
381,924
381,924

2,500,000

75,000

318,270

3,000,000

90,000

381,924

2,400,000

72,000

305,539

3,000,000

90,000

381,924

136,357,097

1,440,003

16,413,722

5,668,750
9,550,000
19,025,000
337,500
-

170,063
286,500
570,750
10,125
-

721,677
1,215,791
2,422,035
42,966
-

13,500,000

405,000

1,718,658

148,125

628,583

22,875

97,072

9,199,040
1,103,885

1,875,000
2,875,000
4,937,500
TempAdmin:
762,500
Change in dollare
price from
56 to 62 as per 8th Jan
currency rates

Page 65 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Sprk_x000D_Classified - Confidential

Size/Spec

62
15%

Approx Basic Price

TempAdmin:
Change in dollare price from
56 to 62 as per 8th Jan
currency rates

120,438
7,541,796
1,131,269
530,000
2,000,000

960,131
139,825

60,000

254,616

5,000,000

150,000

636,540

74,734,316

2,049,691

8,837,895

42,000,000
5,000,000

100 Ton

11,500,000

Included

Abhishek Tiwari:
1,260,000
Tank considered
on Lease

150,000

5,346,936
636,540

345,000

1,464,042

1,200,000
1,100,000

Included

CENVAT

226,254

600 TR
150 sqm

2 @ 2. 5 TPH
1 @600 cfm

Packaging &
Forwarding (P&F)

kaushlendra
Sharma:
36,000
RFI Prices are very high ~
7.5 - *8.0 Cr.

152,770

33,000

140,039

29,700,000

891,000

3,781,048

34,650,000
16,720,000
-

1,039,500
501,600
-

4,411,222
2,128,590
-

35,716,800

1,071,504

4,547,034

23,000,000
7,500,000
2,800,000
500,000
9,450,000

690,000
225,000
kaushlendra
Sharma:
84,000
Required for Start Up
15,000
283,500

2,928,084
954,810
356,462
63,654
1,203,061

2,000,000

60,000

254,616

222,836,800

6,685,104

28,368,907

Page 66 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Sprk_x000D_Classified - Confidential

Kaushlend

Considerde
Boilers. . C
fired Boiler
will be hi
Boiler appr

Size/Spec

33 KV
500 plus 4 *
1250KVA
3.15 MVA

Approx Basic Price

Packaging &
Forwarding (P&F)

CENVAT

18,000,000

540,000

2,291,544

12,000,000

360,000

1,527,696

2,650,000
7,100,000
14,000,000
17,000,000
4,000,000
2,700,000
3,500,000

79,500
213,000
420,000
510,000
120,000
81,000
105,000

337,366
903,887
1,782,312
2,164,236
509,232
343,732
445,578

3,100,000

93,000

394,655

850,000
2,000,000
5,500,000
11,000,000
6,000,000
2,000,000
26,010,000

25,500
60,000
165,000
330,000
180,000
60,000
780,300

108,212
254,616
700,194
1,400,388
763,848
254,616
3,311,281

137,410,000

4,122,300

17,493,392

17,037,000

511,110

2,168,946

17,037,000

511,110

2,168,946

12,500,000
4,500,000

375,000
135,000

1,591,350
572,886

4,000,000

120,000

509,232

10,000,000

300,000
-

31,000,000

930,000

1,273,080
3,946,548

Page 67 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Sprk_x000D_Classified - Confidential

Size/Spec

Approx Basic Price

Packaging &
Forwarding (P&F)

CENVAT

7,000,000
1,000,000
1,500,000

210,000
30,000
45,000

891,156
127,308
190,962
-

9,500,000

285,000

1,209,426

26,500,000
5,000,000

795,000
150,000

3,373,662
636,540

3,000,000

90,000

381,924

5,000,000

150,000

636,540

7,000,000

210,000

891,156
-

46,500,000

1,395,000

5,919,822

100,000,000
11,000,000
6,000,000
7,500,000
5,000,000
5,500,000
10,100,000
2,500,000
2,500,000
4,320,000
2,000,000
156,420,000

3,000,000
6,503,748

195,112

827,979

9,503,748

195,112

827,979

Page 68 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Sprk_x000D_Classified - Confidential

Size/Spec

Approx Basic Price

Packaging &
Forwarding (P&F)

CENVAT

2,486,241,920
30,766,584

17,667,321

193,703,787

2,517,008,504
2,517,008,504

17,667,321
17,667,321

193,703,787
193,703,787

62

Size/Spec

Approx Basic Price

Packaging &
Freight (P&F)

CENVAT

757,026,500
887,916,460
136,357,097
74,734,316
222,836,800
137,410,000
17,037,000

54,000
1,440,003
2,049,691
6,685,104
4,122,300
511,110

108,517,149
16,413,722
8,837,895
28,368,907
17,493,392
2,168,946

31,000,000

930,000

3,946,548

9,500,000
46,500,000
156,420,000
9,503,748
30,766,584

285,000
1,395,000
195,112
-

1,209,426
5,919,822
827,979
-

2,517,008,504
2,517,008,504

17,667,321
17,667,321

193,703,787
193,703,787

62

Page 69 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Sprk_x000D_Classified - Confidential

Sales Tax

Total

Total (Net of Modvat) % of Total

2,686,216,811

2,686,216,811

40,692,300

410,622,300

410,622,300

15,838,900

159,828,900

159,828,900

1,065,900

10,755,900

10,755,900

3,133,900
-

31,623,900
-

31,623,900
-

2,292,675

23,135,175

23,135,175

5,989,500
487,025
1,716,990

60,439,500
4,914,525
17,325,990

60,439,500
4,914,525
17,325,990

275,000

2,775,000

2,775,000

1,089,000
390,225
880,000
440,000

10,989,000
3,937,725
8,880,000
4,440,000

10,989,000
3,937,725
8,880,000
4,440,000

110,000

1,110,000

1,110,000

3,300,000
968,000
363,000
275,000
3,965,500

33,300,000
9,768,000
3,663,000
2,775,000
40,015,500

33,300,000
9,768,000
3,663,000
2,775,000
40,015,500

83,272,915

840,299,415

840,299,415

25,680,116

881,683,990

905,648,594

29%

Page 70 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Sprk_x000D_Classified - Confidential

Sales Tax

Total

Total (Net of Modvat) % of Total

2,686,216,811

2,686,216,811

3,852,017
41,663
1,236,000
-

132,252,598
2,124,817
11,236,000
-

incl above
1,895,663
11,236,000
-

30,809,797

1,027,297,406

918,780,257

2,508,748
301,050
247,200
370,800
262,002
416,631
69,438
69,438

86,133,678
10,336,041
2,247,200
3,370,800
15,422,853
21,248,175
3,541,362
3,541,362

86,166,794
incl above
2,247,200
3,370,800
13,755,105
18,956,631
3,159,438
3,159,438

57,865

2,951,135

2,632,865

69,438

3,541,362

3,159,438

55,551

2,833,090

2,527,551

69,438

3,541,362

3,159,438

4,497,601

158,708,422

142,294,700

131,210
221,046
440,356
7,812
-

6,691,700
11,273,337
22,458,140
398,403
-

5,970,022
10,057,546
20,036,106
355,437
-

312,473

15,936,131

14,217,473

231,750
355,350.00

2,106,750
3,230,350

2,106,750
3,230,350

114,284

5,828,492

5,199,909

17,649

900,096

803,024

36%

6%

Page 71 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Sprk_x000D_Classified - Confidential

Sales Tax

Total

Total (Net of Modvat) % of Total

2,686,216,811
-

2,686,216,811

261,845
38,133
65,508
46,292

8,990,027
1,309,227
595,508
2,360,908

8,029,896
1,169,402
595,508
2,106,292

115,731

5,902,271

5,265,731

2,359,439

87,981,341

79,143,446

972,139
115,731

49,579,075
5,902,271

44,232,139
5,265,731

266,181

13,575,223

12,111,181

27,775

1,416,545

1,263,775

25,461

1,298,500

1,158,461

687,441

35,059,489

31,278,441

802,014
40,902,737
Kaushlendra
Sharma:
387,004
19,737,194
Considerded Dual fuel ( Gas & Oil )
Boilers. . Cost of Solid/Briquetted
fired Boiler 826,707
is not considered . It
42,162,045
will be higher for Solid Fired
Boiler approx. INR (48500000 x 2)
-

36,491,514
17,608,604
-

532,362
173,596
64,809
11,573
218,731

27,150,446
8,853,406
3,305,272
590,227
11,155,292

3%

37,615,011
24,222,362
7,898,596
2,948,809
526,573
9,952,231

46,292

2,360,908

2,106,292

5,157,816

263,048,628

234,679,720

9%

Page 72 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Sprk_x000D_Classified - Confidential

Sales Tax

Total

Total (Net of Modvat) % of Total

2,686,216,811

2,686,216,811

416,631

21,248,175

18,956,631

277,754

14,165,450

12,637,754

61,337
164,338
324,046
393,485
92,585
62,495
81,012

3,128,204
8,381,225
16,526,358
20,067,721
4,721,817
3,187,226
4,131,590

2,790,837
7,477,338
14,744,046
17,903,485
4,212,585
2,843,495
3,686,012

71,753

3,659,408

3,264,753

19,674
46,292
127,304
254,608
138,877
46,292
602,032

1,003,386
2,360,908
6,492,498
12,984,996
7,082,725
2,360,908
30,703,613

895,174
2,106,292
5,792,304
11,584,608
6,318,877
2,106,292
27,392,332

3,180,514

162,206,206

144,712,814

394,341

20,111,398

17,942,451

394,341

20,111,398

17,942,451

289,327
104,158

14,755,677
5,312,044

13,164,327
4,739,158

92,585

4,721,817

4,212,585

231,462
717,531

11,804,542
36,594,079

6%

1%

10,531,462
32,647,531

1%

Page 73 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Sprk_x000D_Classified - Confidential

Sales Tax

Total

Total (Net of Modvat) % of Total

2,686,216,811

2,686,216,811

162,023
23,146
34,719

8,263,179
1,180,454
1,770,681

7,372,023
1,053,146
1,579,719

219,889

11,214,315

10,004,889

613,373
115,731

31,282,035
5,902,271

27,908,373
5,265,731

69,438

3,541,362

3,159,438

115,731

5,902,271

5,265,731

162,023

8,263,179

7,372,023

1,076,296

54,891,118

48,971,296

12,360,000
1,359,600

112,360,000
12,359,600

112,360,000
12,359,600

741,600

6,741,600

6,741,600

927,000
618,000

8,427,000
5,618,000

8,427,000
5,618,000

679,800

6,179,800

6,179,800

1,248,360
309,000
309,000
533,952
247,200
-

11,348,360
2,809,000
2,809,000
4,853,952
2,247,200

11,348,360
2,809,000
2,809,000
4,853,952
2,247,200
-

19,333,512

175,753,512

175,753,512

370,800
150,537

3,370,800
7,677,376

3,370,800
6,849,397

521,337

11,048,176

10,220,197

0%

2%

6%

0%

Page 74 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Sprk_x000D_Classified - Confidential

Sales Tax

151,540,987

151,540,987
151,540,987

Sales Tax

Total

Total (Net of Modvat) % of Total

2,686,216,811

2,686,216,811

2,849,154,015
30,766,584

2,655,450,228
30,766,584

2,879,920,598
2,879,920,598
2,686,216,811
~ 269 Crore
~ $ 44 MM

Total

1%

2,686,216,811
2,686,216,811

Total (Net of Modvat) % of Total

83,272,915
30,809,797
4,497,601
2,359,439
5,157,816
3,180,514
394,341

840,299,415
1,027,297,406
158,708,422
87,981,341
263,048,628
162,206,206
20,111,398

840,299,415
918,780,257
142,294,700
79,143,446
234,679,720
144,712,814
17,942,451

29%
36%
6%
3%
9%
6%
1%

717,531

36,594,079

32,647,531

1%

219,889
1,076,296
19,333,512
521,337
-

11,214,315
54,891,118
175,753,512
11,048,176
30,766,584

10,004,889
48,971,296
175,753,512
10,220,197
30,766,584

0%
2%
6%
0%
1%

151,540,987
151,540,987

2,879,920,598
2,879,920,598
2,686,216,811
~ 269 Crore
~ $ 44 MM

2,686,216,811
2,686,216,811

Page 75 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Sprk_x000D_Classified - Confidential

Capex Basis - PET Sparkling 720 bpm Line & Water 600 b
1
2
3
4

Broad Project Scope:


Basic: Line Equipment, Process & Support Equipment, Utilities and El
Required Spaces for Line and Warehouse, Required Construction Area
RMPM Space for this line
Safety & Quality Infrastructure

Capital Estimation (Detailed)

Civil Works-WATER LINE

Head

Equipment / Area

Sr. No.

Plant
Line Area
Line Area
Process Rooms
Warehouse
RMPM Building
Storm Water Drains
Roads
Common areas
WTP

1
2
3
4
5
6
7
8
9
10

People Infrastructure

11

Foundations
ETP Civil Works
Tank

Contingencies

12
13
14
15
16
17
18
19
20
21

Sub-Total

Water Line Equipment

Line

Page 76 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Process Equipment- WATER Line


Water Line Equipment

Capital Estimation (Detailed)


Head

Duties

CHA & Transport

Sr. No.

2
3
4
5
6

Sub-Total

1
Sub-Total
WTP
1
2
3
4
5

Support Equipment-Water Line

Equipment / Area

6
7
8
9
10
EUR 11

EUR 12
13
14
15
16
17
Sub-Total

Refrigeration System

1
2

Line

Page 77 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Capital Estimation (Detailed)

Utilities Equipment-Water Line

Head

Equipment / Area

Sr. No.

CO2 Distribution System

Recovery Systems
HVAC
Boiler
LP Compressor

4
5
6
7
8
9

Cooling Towers

10
11
12

PET Crusher

13
14
15
16
17
18

Misc.

19

Electricals-WATER Line

Sub-Total

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Page 78 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Electricals-WATER Lin

6
Capital
Estimation (Detailed)

Head

Equipment / Area

Sr. No.

15
16
17
18
19
Sub-Total

Page 79 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Capital Estimation (Detailed)

10

Racks & Material Handling


Equipment-WATER Line
QA Lab
EquipmentWater Line

Equipment / Area

Sr. No.

1
Sub-Total

Forklifts
Hand-Trolleys
House Keeping Machine
Racks

1
2
3
4
5
6

Misc.

Sub-Total
Testing

Misc.

1
2
3

Sub-Total
1
2
3

ETP & Misc.WATER Line

IT Infra

Head

Sub-Total

PMC

1
2

11

Others-WATER Line

3
4
5
6

Page 80 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Others-WATER Line

Capital Estimation (Detailed)


Head
11

Equipment / Area

Sr. No.

7
8
9
10
11

13

Total

12

Safety

Sub-Total
Safety

1
2

Sub-Total

Sub-Total
Contingencies

Total
Inflation
Total
Nett of Modvat
Total
Total

INR
0%
INR
INR
USD

Capital Estimation (Summary)


Head

Equipment / Area

1
2
3
4
5
6
7

Civil Works
Water Line Equipment
Process Equipments
Support Equipment
Utilities Equipment
Electricals
IT Infra

House Keeping equipment,


Hand-Trolleys

9
10
11

Sr. No.

QA Lab Equipment
ETP & Misc
Others

Page 81 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Capital Estimation (Detailed)


Head
12
13

Equipment / Area

Sr. No.

Safety
Contingencies

Total
Inflation
Total
Nett of Modvat
Total
Total

INR
0
INR
INR
USD

Page 82 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

0 bpm Line & Water 600 bpm Line @ Bangalore GF

& Support Equipment, Utilities and Electricals, Required ETP & Others
arehouse, Required Construction Areas for WTP & Utility Buildings Etc.

Details

Grading
Earth brought from outside
Main production building
Process areas
Finished Goods, Loading Bays
Utility Building
Process Water Drains & Connectivity
Roads
Compound wall
Canteen block
People Infrastructure (Toilets, Water Coolers,
Hand-Wash Stations etc.)
Admin Office, Lab, Etc.
Security Watch Towers
DG Set & Cooling Towers etc.
Equipment Foundations & Platforms
ETP Civil Works
Raw Water tank and Fire water tank.
Relocation of Trees
Sugar Storage
Back Wash Recovery Tank
Contingencies

Size/Spec

Approx Basic Price

0
4,500
0
0
400
150
0
0
0

1,897,500
-

0
150
375
500

1,520,000
-

0
100 kL
5%

2,500,000
300,000
6,217,500

Water Line
Assumed Purchase Price (in Euro)
Converted Purchase Price (in INR)
Molds and Chane Parts-500 ml
Molds and Chane Parts-750 ml

83

5,798,278
481,257,074
Included
Included

Page 83 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Details

Size/Spec

Molds and Chane Parts-1000 ml


Molds and Chane Parts-2000 ml
Impact of Duties & Taxes
Local SLE Monitoring System
Additional Change Orders Provision
CHA Charges (incl Transportation)
Learnings

15%
0%
0%

Approx Basic Price


Included
Included
72,188,561
1,800,000
10,000,000
565,245,635

CIP System & Water Recovery

13,000,000
13,000,000

Pre-Treatment System for Process Water


80 m3/hr
Treatment-UF System
Post-Treatment System
Back-Wash Recovery System
RO System- Double Pass
Post Treatment Transferr System including Tanks
( Blending Tank - 15 KL, UF Treated Water Tank-50
KL)
I & C of the System
Electricals & Mechanical Interfacing

6,720,000
9,720,000
14,160,000
3,000,000
16,200,000
4,344,000
2,160,000
1,800,000

Piping & Distribution Network to Line/Process

4,332,000

Miscellaneous Items - Flow Meter, Safety , Safety


Shower
Atlantium UV -80 M3- Price in USD
Assumed Purchase Price (in USD)
Converted Purchase Price (in INR)
Tax & Duties
CHA Charges
Chemical Handling - Auto

1,470,000

62
15%

119,629
7,491,181
1,123,677
500,000
1,000,000

Acid & Caustic - Piping from Bulk Tanks to service


Miscellaneous

1,000,000
5,000,000

Iron Removal filter

80,020,858

Refrigeration System
Cold Room Refrigeration & Racks

TR
sqm

1,000,000

Page 84 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Details

Size/Spec

Approx Basic Price

Dominick Hunter Filter, Purifier & Connecting


Piping
Condensate Recovery System
HVAC System
2 X 3-4TPH
Boiler & Accessories
400-500 cfm
LP Compressor
On Lease
CO2 Vertical Tank
Cooling Towers

1,500,000
4,500,000
-

Piping & Distribution Network to Line/Process

9,500,000

Instrumentation on Distribution Network

1,000,000

Fire Hydrant System


Fire Detection & Controls
Safety Extenguishers & Showers
PET Crusher
Tanks (FO & HSD)
Nitrogen Cylinders - Not Considered
Nitrogen Piping Vacuum Insulated # Approx.
180 M+Phase Separator + Accessories

2,000,000
180

Bulk Tank For Liquid Nitrogen


Misc.

8,100,000
5,060,000
2,000,000
34,660,000

11 KV
HT Line
500-750 KVA
DG Set
3.15 MVA
Transformer
BUS Duct
Cable HT & LT
PCC
LT Panel
HT System
Capacitor Panel
Cable Tray including SS trays in process area
and cable Rack
UPS
CCTV & Others
Battery Charger & Bank
Earthing & Lighting Protection

2,650,000
4,000,000
10,000,000
15,000,000
2,000,000
2,000,000
3,500,000
2,000,000
1,000,000

Page 85 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Details
Lighting & Lighting Distribution
Active Filter
Misc
Sub Total
Escalation @ 10%

Size/Spec

Approx Basic Price


1,000,000
3,000,000
1,000,000
47,150,000
47,150,000

Page 86 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Details

Size/Spec

IT Infra

Approx Basic Price

2,000,000
2,000,000

Forklifts - Single Mast


Forklifts - Double Mast
Hand-Trolleys
House Keeping Machine
Design
Supply and Installation & Commissioning

Rental
0%

0%

200,000
-

0%

Third Party Testing


200,000

Lab Equipment+BIS
Furniture
Racks for Sample Storages

5,000,000
300,000
500,000
5,800,000

New System
Water Recovery Schemes
Piping & Distribution Network
Relocation of Pond, re-routing Treated Effluent
Path, Pumps , Misc. etc.

4,500,000
5,000,000
4,000,000

13,500,000

A & E Firm, Construction Mgmt


HCCB Site Office
Temp Power & DG Set for time-period of
Construction
Transportation
Insurance
Training - People Travel, Lodging & Boarding,
FAT etc.

5,000,000
-

5,800,000
1,000,000

Page 87 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Details

Size/Spec

Statutory Approvals
Sending of Samples for Testing etc.
Facility Infrastructure Planning
Site Security Team
Pre-Operatives

Approx Basic Price

1,000,000
12,800,000

Safety Consultant
Safety Infrastructure

Sub-Total
Contingencies
Total

5%

780,593,993
10,186,858

790,780,851
790,780,851

Total
Total

62

Details
Civil Works
Water Line Equipment
Process Equipments
Support Equipment
Utilities Equipment
Electricals
IT Infra-WATER Line
House Keeping equipment, Hand-TrolleysWATER Line
QA Lab Equipment
ETP & Misc
Others

Size/Spec

Approx Basic Price


6,217,500
565,245,635
13,000,000
80,020,858
34,660,000
47,150,000
2,000,000
200,000
5,800,000
13,500,000
12,800,000

Page 88 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Details

Size/Spec

Approx Basic Price

Safety
Contingencies
Total

Total
Total

10,186,858

790,780,851
790,780,851

62

Page 89 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Packaging & Forwarding (P&F)

CENVAT

Sales Tax

Total
915,870,751

208,725
-

2,106,225
-

59,483,374

167,200
275,000
33,000

1,687,200
2,775,000
333,000

683,925

6,901,425

16,222,213

556,962,662

Page 90 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Packaging & Forwarding (P&F)

CENVAT

Sales Tax

Total
915,870,751

54,000

8,922,506
229,154
-

2,433,332
41,663
1,236,000
-

83,544,399
2,124,817
11,236,000
-

54,000

68,635,035

19,933,209

653,867,879

390,000

1,655,004

300,900

15,345,904

390,000

1,655,004

300,900

15,345,904

201,600
291,600
424,800
90,000
486,000

855,510
1,237,434
1,802,681
381,924
2,062,390

155,542
224,981
327,750
69,438
374,968

7,932,652
11,474,014
16,715,231
3,541,362
19,123,357

130,320

553,026

100,547

5,127,893

266,976

48,540
222,480

2,475,516
2,022,480

129,960

551,498

100,269

5,113,727

44,100

187,143

34,025

1,735,268

224,735

953,687
138,886

260,088
37,877
61,800

8,929,691
1,300,440
561,800
1,000,000

30,000

127,308

23,146

1,180,454
5,000,000

2,053,115

9,118,463

2,041,450

93,233,886

30,000

127,308

23,146

1,180,454

Page 91 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Packaging & Forwarding (P&F)

CENVAT

Sales Tax

Total
915,870,751

45,000
135,000
-

190,962
572,886
-

34,719
104,158
-

1,770,681
5,312,044
-

285,000

1,209,426

219,889

11,214,315

30,000

127,308

23,146

1,180,454

60,000
-

254,616
-

46,292
-

2,360,908
-

243,000

1,031,195

187,484

9,561,679

151,800
60,000

644,178
254,616

117,120
46,292

5,973,098
2,360,908

1,039,800

4,412,495

802,246

40,914,541

79,500
120,000
300,000
450,000
60,000
60,000
105,000

337,366
509,232
1,273,080
1,909,620
254,616
254,616
445,578

61,337
92,585
231,462
347,192
46,292
46,292
81,012

3,128,204
4,721,817
11,804,542
17,706,812
2,360,908
2,360,908
4,131,590

60,000

254,616

46,292

2,360,908

30,000

127,308

23,146

1,180,454

Page 92 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Packaging & Forwarding (P&F)

CENVAT

Sales Tax

Total
915,870,751

30,000
90,000
30,000

127,308
381,924
127,308

23,146
69,438
23,146

1,180,454
3,541,362
1,180,454

1,091,341

55,658,414

1,414,500

6,002,572

Page 93 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Packaging & Forwarding (P&F)

CENVAT

Sales Tax

Total
915,870,751

60,000

254,616

46,292

2,360,908

60,000

254,616

46,292

2,360,908

6,000
-

25,462
-

4,629
-

236,091
-

6,000

25,462

4,629

236,091

150,000
9,000
15,000

636,540
38,192
63,654
-

115,731
6,944
11,573

5,902,271
354,136
590,227

174,000

738,386

134,248

6,846,634

135,000
150,000
120,000

572,886
636,540
509,232

104,158
115,731
92,585

5,312,044
5,902,271
4,721,817

405,000

1,718,658

312,473

15,936,131

618,000
-

5,618,000
-

716,880
-

6,516,880
-

123,600

1,123,600

Page 94 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Packaging & Forwarding (P&F)

CENVAT

Sales Tax

Total
915,870,751

123,600
-

1,123,600
-

1,582,080

14,382,080

5,596,415

92,560,691

26,932,794

5,596,415

92,560,691

26,932,794

5,596,415

92,560,691

26,932,794

Packaging & Freight


(P&F)

CENVAT

Sales Tax

905,683,893
10,186,858

915,870,751
915,870,751
823,310,060
~ 83 Crore
~ $ 14 MM

Total

54,000
390,000
2,053,115
1,039,800
1,414,500
60,000

68,635,035
1,655,004
9,118,463
4,412,495
6,002,572
254,616

683,925
19,933,209
300,900
2,041,450
802,246
1,091,341
46,292

6,901,425
653,867,879
15,345,904
93,233,886
40,914,541
55,658,414
2,360,908

6,000

25,462

4,629

236,091

174,000
405,000
-

738,386
1,718,658
-

134,248
312,473
1,582,080

6,846,634
15,936,131
14,382,080

Page 95 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Packaging & Forwarding (P&F)

CENVAT

Sales Tax

Total
915,870,751

5,596,415
5,596,415

92,560,691
92,560,691

26,932,794
26,932,794

10,186,858

915,870,751
915,870,751
823,310,060
~ 83 Crore
~ $ 14 MM

Page 96 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Total (Net of
Modvat)

% of
Total

817,310,060

2,106,225
1,687,200
2,775,000
333,000
6,901,425

1%

572,101,181

Page 97 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Total (Net of
Modvat)

% of
Total

817,310,060

incl above
1,895,663
11,236,000
585,232,844

71%

13,690,900
13,690,900

2%

7,077,142
10,236,581
14,912,550
3,159,438
17,060,968
4,574,867
2,208,540
2,022,480
4,562,229
1,548,125

7,976,004
1,161,554
561,800

1,053,146
78,115,423

10%

1,053,146

Page 98 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Total (Net of
Modvat)

% of
Total

817,310,060
1,579,719
4,739,158
10,004,889
1,053,146
2,106,292
8,530,484
5,328,920
2,106,292
36,502,046

4%

2,790,837
4,212,585
10,531,462
15,797,192
2,106,292
2,106,292
3,686,012
2,106,292
1,053,146

Page 99 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Total (Net of
Modvat)

% of
Total

817,310,060
1,053,146
3,159,438
1,053,146

49,655,841

6%

Page 100 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Total (Net of
Modvat)

% of
Total

817,310,060

2,106,292
2,106,292

0%

210,629
210,629

0%

5,265,731
315,944
526,573
6,108,248

1%

4,739,158
5,265,731
4,212,585
-

14,217,473

2%

5,618,000
6,516,880
1,123,600

Page 101 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Total (Net of
Modvat)

% of
Total

817,310,060
1,123,600
14,382,080

2%

807,123,202
10,186,858

0%

1%

817,310,060
817,310,060

Total (Net of
Modvat)

% of
Total

6,901,425
585,232,844
13,690,900
78,115,423
36,502,046
49,655,841
2,106,292

1%
71%
2%
10%
4%
6%
0%

210,629

0%

6,108,248
14,217,473
14,382,080

1%
2%
2%

Page 102 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

Total (Net of
Modvat)

% of
Total

817,310,060
10,186,858

0%
1%

817,310,060
817,310,060

Page 103 of 338_x000D_File: 333823635.xlsx / Sheet: Capex-B'lades GF-Wtr_x000D_Classified - Confidential

List of Machineries
Sl.No:
A. 600 BPM WATER LINE EQUIPMENT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
B. 720 BPM CSD LINE
1
2
3
4
5
6
7
8
9
10
Classified - Confidential

104 of 338

List of Machineries
Sl.No:
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
C. CIP SYSTEM (MODULE - 1)
1
Classified - Confidential

105 of 338

List of Machineries
Sl.No:
2
3
4
5
6
7
D. CIP SYSTEM (MODULE - 2)
8
9
10
11
12
13
14
15
16
E. SUGAR DISSOLVING SYSTEM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
F. READY SYRUP SYSTEM
1
2
3
4
5
6
Classified - Confidential

106 of 338

List of Machineries
Sl.No:
7
8
9
G. WATER SOURCING
1
2
3
4
5
6
7
8
H. WTP SETUP FOR WATER LINE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
I. WTP PLANT
1
2
3
4
5
6
7
8
9
10
11
12
13
Classified - Confidential

107 of 338

List of Machineries
Sl.No:
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
J. MAIN LAB
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Classified - Confidential

108 of 338

List of Machineries
Sl.No:
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
Classified - Confidential

109 of 338

List of Machineries
Sl.No:
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
K. ETP LAB EQUIPMENT
1
2
3
4
5
6
7
8
9
10
11
L. ETP TANKS & PUMPS CAPACITIES
1
2
3
4
5
6
7
8
9
10
11
Classified - Confidential

110 of 338

List of Machineries
Sl.No:
12
13
14
15
16
17
18
19
20
21
22
23
24
25

Classified - Confidential

111 of 338

List of Machineries
Sl.No:
26
27
28
29
30
31
32
33
34
M. FIRE PROTECTION & DETECTION SYSTEM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
N. HSD, ACID & LYE TANK
1
2
3
4
5
6
7
8
9
10
11
O. CO2 and LN2 SYSTEM
1
2
3
4
5
Classified - Confidential

112 of 338

List of Machineries
Sl.No:
6
7
8
9
10
11
12
13
14
15
16
17
P. DOOR ACCESS CONTROLLER and CCTV
1
2
3
4
5
6
7
8

Classified - Confidential

113 of 338

List of Machineries
Sl.No:
Q. FORKLIFT
1
2
3
4
5
6
7
8
9
10
11
R. AIR WASHER UNITS AND ACS
1
2
3
4
5
6
7
8
9
10
S. HVAC System
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Classified - Confidential

114 of 338

List of Machineries
Sl.No:
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

43
44
45
46
47
48
49
Classified - Confidential

115 of 338

List of Machineries
Sl.No:
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82

Classified - Confidential

116 of 338

List of Machineries
Sl.No:
83
93
94
95
96

97

98
99
100
T. LIFT
1
U. KITCHEN and CANTEEN
1
V. VAM CHILLER
1
2
3
4
5
6
7
8
9
10
11
12
13
W. BOILER
1
2
3
4
5
6
Classified - Confidential

117 of 338

List of Machineries
Sl.No:
7
8
9
10
11
12
13
14
15
16
X. GENERATOR AND ACCESSORIES
1
2
3
4
5
6
7
8
9
10
11
12

Classified - Confidential

118 of 338

List of Machineries
Sl.No:
Y. ELECTRICAL HT, LT AND ACCESSORIES
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Z. COMPRESSOR & ACCESSORIES
1
2
3
4
5
6
7
8
9
10
AA. UTILITY PIPING
1
2
3
4
5
6
AB. PET Crusher unit
1
Classified - Confidential

119 of 338

List of Machineries
Sl.No:
AC. Racking system
1
AD. Miscelleneous items
Total

Classified - Confidential

120 of 338

List of Machineries
EQUIPMENT NAME
A. 600 BPM WATER LINE EQUIPMENT
Block Machine
Preform Inspection System
Blow Moulder-De-humidifier
Caps-U.V Disinfection System
Cap Feeder-Water Fall Sorter
Capper-Camera based Closure Inspection System
Capper-Bulk Closure Handling Mechanism
Filler-Fully Automatic COP System
Filler-Individual Servo Driven Chuck
HP Compressors (including Cooling Tower)
Chiller - Water Cooled Type (including Cooling Tower)
Fill Level/Closure Inspector (with FMS)
Date Coder - Laser
Date Coder - Inkjet
Bottle Dryer (Fixed before Labeler)
Bottle Conveoyor-Automatic Side Rail Adjsutment wherever required
Sampling Conveyor
Crate/Case Conveyors
Pallet Conveyors
Conveyor Cross-Overs
Labeler and Label Inspector
Sleevers
Basic Machine-Shrink Packer
Coding Machine for Shrink Wraps (Inkjet-Make)
Basic Machine
Basic Machine - Ring Type
Dry Lubrication System
UPS with all Batteries (As per Electrical Specifications)
Voltage stablizer
One Set of Moulds (N+1) - 1000 ml -Kinley
One Set of Moulds (N+1) -500ml Mold
B. 720 BPM CSD LINE
Block Machine
Preform Inspection System
Blown Bottle Inspection System
Blow Moulder-De-humidifier
Caps-U.V Disinfection System
Cap Feeder-Water Fall Sorter
Capper-Camera based Closure Inspection System
Capper-Bulk Closure Handling Mechanism
Filler-Fully Automatic COP System
Filler-Individual Servo Driven Chuck
Classified - Confidential

121 of 338

List of Machineries
EQUIPMENT NAME
HP Compressors (including Cooling Tower)
Chiller - Water Cooled Type (including Cooling Tower)
Fill Level/Closure Inspector (with FMS)
Mixer-Basic Machine
Mixer-Auto Brix and G.V Correction (Make:Anton-Paar,Model: DSRn 427(s) )
Date Coder - Laser
Date Coder - Inkjet
Warmer-Basic Machine with Auto Dew point based control.
Bottle Dryer (Fixed at Warmer/Cooling Tunnel Exit)
Bottle Dryer (Fixed before Labeler)
Bottle Conveoyor-Automatic Side Rail Adjsutment wherever required
Sampling Conveyor
Crate/Case Conveyors
Pallet Conveyors
Conveyor Cross-Overs
Labeler
Label Inspector
Basic Machine-Shrink Packer
Coding Machine for Shrink Wraps (Inkjet-Make)
Basic Machine
Basic Machine- Ring Type
Dry Lubrication System
UPS with all Batteries (As per Electrical Specifications)
Voltage stablizer
Platforms for Electrical Panels
Total Spares & Consummables for 6000 Hrs of operation
One Set of Moulds (N+1) - 400 ml - Contour) Common Base Mold
One Set of Moulds (N+1) - 400 ml - Dimple) Common Base Mold
One Set of Moulds (N+1) - 400 ml - Splash) Common Base Mold
One Set of Moulds (N+1) - 750 ml - Contour) Common Base Mold
One Set of Moulds (N+1) - 750 ml - Dimple) Common Base Mold
One Set of Moulds (N+1) - 750 ml - Splash) Common Base Mold
One Set of Moulds (N+1) - 1750 ml - Contour) Common Base Mold
One Set of Moulds (N+1) - 1750 ml - Dimple) Common Base Mold
One Set of Moulds (N+1) - 1750 ml - Splash) Common Base Mold
One Set of Moulds (N+1) - 2250 ml - Contour) Common Base Mold
One Set of Moulds (N+1) - 2250 ml - Dimple) Common Base Mold
One Set of Moulds (N+1) - 2250 ml - Splash) Common Base Mold
Second Packer & Associated Conveyors
Shifting of Preform & Closure Dumpers to Mezzanine
Capper-Additional Second set of Chucks
C. CIP SYSTEM (MODULE - 1)
RECOVERY TANK (3 KL)
Classified - Confidential

122 of 338

List of Machineries
EQUIPMENT NAME
BUFFER WATER TANK (1 KL)
RECUPERATION TANK (9 KL)
HOT WATER TANK (5 KL)
CIRCULATION PUMP (45 M3/Hr.)
CIP Skid
MCC and Control Panel
D. CIP SYSTEM (MODULE - 2)
RECUPERATION TANK (14 KL)
HOT WATER TANK (12 KL)
LYE TANK (12 KL)
CHEMICAL TANK (12 KL)
BTD TANK (3 KL)
CIP Skid
CIRCULATION PUMP (45 M3/Hr.)
Diversion Panel
MCC Panel (630 A )
E. SUGAR DISSOLVING SYSTEM
GRANULATED SUGAR SILO (5 KL)
Sugar Dumping unit along with Gantry and Duct extractor
Carbon Dumping Unit with screw conveyor
SUGAR DISSOLVING TANK (3 KL)
BTD TANK(SIMPLE SYRUP) (500 L)
BTD TANK(WATER) (200 L)
HOLDING TANK (12 KL)
DUPLEX BAG FILTER
DELLA TOFOLLA FILTER (3 KL)
HYFLO DOSING TANK (1 KL )
TUBULAR HEAT EXCHANGER
PLATE HEAT EXCHANGER (19500KG/HR)
RECOVERY TANK (10 KL)
BUFFER TANK(FILTERED SYRUP) (500 L)
Diversion Panel
SLUDGE HOLDING TANK (20 KL)
Vacuum Drum with Recovery Tank
PPPU unit for condensate recovery system
Cooling Tower for Sugar dissolving system
F. READY SYRUP SYSTEM
READY SYRUP STORAGE TANK (30 KL)
RAW SYRUP STORAGE TANK (30 KL)
CONCENTRATE MIXING TANK (500 L)
Valve Cluster System
Control Panel
MCC Panel
Classified - Confidential

123 of 338

List of Machineries
EQUIPMENT NAME
Diversion Panel
Micron Filter (1 Micron)
Concentrate Trolly
G. WATER SOURCING
Submercible Pump (100 CuM/Hr)
Raw Water transfer pump
Domestic Raw water transfer pump
Chlorine dosing tank with pump and agitator
PSF for backwash water
Soft water transfer pump
Back wash water transfer pump
MCC panel for transfer pumps
H. WTP SETUP FOR WATER LINE
ROPT - 2 TANK (20 KL)
ROPT - 2 TRANSFER PUMP (60 M3/HR)
UV (80 M3/Hr.)
PRODUCT TANK (4 KL)
PRODUCT TANK OUTLET PUMP (42 KL)
CLOSED LOOP WATER CHILLER
OZONE GENERATOR (500GRM/HR)
RECOVERY TANK (2 KL)
RECIRCULATION PUMP (15 M3/HR)
RECOVERY TANK OUTLET PUMP (42 M3/HR)
MIS
1 MICRON FILTER
0.2 MICRON FILTER
FILLER SKID PUMP
VULCATHERM UNIT
I. WTP PLANT
Filter Water Tank
Backwash Feed Pump
ACF Feed Pump
PSF
ACF
Air Compressor
Sanitization System(Hot water System)
RO1 Pass Tank
RO1 Pass tank Transfer Pump
UF Product water tank
UF product water transfer Pump
UV system with flow meter
Softener System
Classified - Confidential

124 of 338

List of Machineries
EQUIPMENT NAME
Sampling Point Recovery Tank
Sampling table with rack and work station
Chlorinated Softwater tank
Chlorinated softwater transfer pump
UF CIP tank
UF CEB acid tank with agitator
Clarifier MCC panel
WTP MCC Panel
Brine Solution tank
RO and UF Lye preparation and dosing tank
RO system with Micron Filter
RO 1 feed pump
CO2 Dosing control Panel
RO2 system with Micron Filters
RO 2 feed Pump
RO 2 Transfer Pump
Raw water Tank to Clarifier Pipe Line
RO2 Pass to ROPT 2 tank Pipe Line
Softener system to Soft water tank Pipe Line
WTP to Back Wash Tank Pipe Line
UF product tank to Treated Water Header
Domestic Raw water Main Header
Soft water Main Header
UF filtration system with micron filters
UF system Control Panel
J. MAIN LAB
Densitymeter 4500
Weighing balance (0-300 KG)
Weighing Balance (0-210gm)
Weighing Balance (0-7.1kg)
TDS/Conductivity Meter
NOISE METER
IR THERMO METER
O2 PURITY ANALYSER
PORTABLE ORP METER
LUX METER
DUCTS
bulb thermo meter
SPRING CALIBRATION KIT FOR TORQUE TESTER
Degassing asssembly
GV tester small ( <1l )
Spectro Photometer ( 190nm - 1100nm)
Analytical Weighing Balance (0 - 220gms)
Classified - Confidential

125 of 338

List of Machineries
EQUIPMENT NAME
ph meter (0 - 35000uS/L)
Turbiditymeter (0 - 4000 NTU)
Water Bath ( ambient-100c( 8 holes digital) )
Desicator ( Plastic made )
Hot Plate ( ambient-200c )
Fumming Hood ( ss 316 made )
Distllation Assmbly ( 4 lts /hr )
ozone test kit ( 0.05-2.3mg/l )
OzonePOCKET COLIRIMETER ( 0.01-0.75MG/L )
Ozone destruction unit
Heating mantle
Gas Stripping Apparaturs
conductivity meter
Laminar air flow ( 54*24*84 )
Hot plate
Millpore filtration unit - 3 set
Vaccum pump ( 1/8hp )
Microscope
Air sampler (M-air-T) (1 )
Bunsen Burner ( 1 )
Colony Counter
Innoculating Loop
Autoclave-1 ( dia 16*24 inches )
Incubator-2 ( Ambient - 50C )
Incubator-3 ( Ambient - 50C )
BOD Incubator (5 - 50C)
Oven-1 (Ambient - 250C )
Analytical Weighing Balance (0 - 220gms)
Refrigerator
Polariscope
Digital Vernier Mitutoyo (small) ( 0-150MM )
Digital Vernier Mitutoyo (large) ( 0-300MM )
Vaccum pump
Magnetic Stirrer ( with heater )
Digital Thermometer ( ..-10-200c)
Thermometers (5)nos ( 0 - 110C )
Desicator
filtration single unit
Water Bath ( ambient-100c( 8 holes digital) )
Weighing Balance ( 0.1-7100gms)
Mitutoyo Dial Thickness guage
High intensity light source
Micrometers with least Count of 0.01 mm Classified - Confidential

126 of 338

List of Machineries
EQUIPMENT NAME
Dry and wet bulb thermometer and humidity chart.
Density meter 4500 ( 0.001)
Torque tester-1
Weighing Balance ( 0.1-7100gms )
HOTWIRE BOTTLE CUTTER ( RANGE220V)
BASECLEARANCEMEMBRANE
DEADWEIGHT TESTER
FILLHEIGHT GUAGE
PREFORM NECKCUTTER
PET &PREFORM THICKNESSGUAGE
DIGITAL HEIGHT GUAGE
Top load tester
Bottle perpendicularity tester
CHLORINE TEST KIT
IRON TEST KIT
Sulphates test kit
Jar test apparatus
LOVIBAND KIT FOR CHLORINE ( 0.2 4mg/l )
SDI test kit of Approved make & model
K. ETP LAB EQUIPMENT
Conductivity ( 0 - 35000uS/L )
ph meter
Top loading Weighing Balance ( 0-620gm)
BOD Incubator (5 - 50C)
Hot Air Oven (Ambient- 250 C)
Filtration System
Muffle Furnace (Max 1000 C)
Desicater
DO meter
COD Digester AND ANALYSER
BOD track 2apparatas
L. ETP TANKS & PUMPS CAPACITIES
( 30 KL ) PUMP
COLLECTION TANK TRANSFER
( 20 M3/HR)
ACID DOSING TANK ( 1 KL )
ALKALI TANK ( 1 KL )
TANK ( 70 KL
)
EQUALISATION TRANSFER
PUMP
(10 M3/HR)
AIR BLOWER ( 200 M3/HR)
AERATION TANK ( 300 KL)
NUTRIENT DOSING PUMP ( 150 L/HR)
MBR TANK (12 KL)
PERMEATE PUMP ( 10 M3/HR)
Classified - Confidential

127 of 338

List of Machineries
EQUIPMENT NAME
AIR BLOWER ( 275 M3/HR)
BACKPULSE TANK ( 2 KL)
PERMEATE PUMP (5 M3/HR )
CITRIC ACID TANK ( 200 L)
HYPO TANK ( 200 L)
RAS PUMP ( 20 M3/HR)
PERMEATE TANK ( 55 KL)
RO FEED PUMP ( 10 M3/HR)
ACTIVATE CARBON FILTER ( 10 M3/HR)
AO DOSING TANK ( 100 L)
ACID DOSING TANK ( 100 L)
POLYELECTROLYTE DOSING TANK ( 500 L)
POLYMER DOSING PUMP ( 160 L/HR)
CENTRIFUGE FEED PUMP ( 8 M3/HR)

Classified - Confidential

128 of 338

List of Machineries
EQUIPMENT NAME
SLUDGE HOLDING TANK ( 20 KL)
CIP TANK ( 1 KL)
OZONATOR ( 15 GRM/HR)
OZONE RECYCLIC PUMP ( 5 M3/HR)
RO PERMEATE TANK (55 KL )
SOFTNER FEED PUMP ( 10 M3/HR)
SOFTENER
( 500 LPH) for MBR servicing
Monorail Arrangement
(2 TON)
ETP
Soft water Pipe Line Header
(50 NB)
M. FIRE PROTECTION & DETECTION SYSTEM
FIRE WATER PUMP (Engine Driven) ( 137Cum/hr. at 75MWC)
FIRE WATER PUMP (Motor Driven) (137Cum/hr at 75MWC)
JOCKEY PUMP (Pressure Maintenance Pump) (10.8Cum/hr. at 75MWC)
PUMP CONTROL PANELS FOR MOTOR DRIVEN FIRE & JOCKEY PUMPS
Addressable type Fire Alarm Control Panel
Repeater Panel / Remote Annunciator
Addressable-Conventional Interface Module
Control Module
Monitor Module
Addressable Relay Module
CO2 GAS SUPPRESSION SYSTEM(BOILER ROOM)
NOVEC 1230 SUPPRESSION SYSTEM(SERVER ROOM)
FIRE HOSE REEL DRUM
FIRE EXTINGUISHER
FIRE HYDRANT POINT
N. HSD, ACID & LYE TANK
HSD Tank ( 40 KL )
FO Tank ( 40 KL )
HSD Unloading Pump ( 14 M3/Hr. )
HSD Transfer Pump ( 22.6 M3/Hr )
Unloading Flexible Hose ( 2 Meters)
Acid Tank ( 16 KL )
Caustic Tank ( 16 KL )
Acid Transfer Pump
Caustic Transfer Pump
Recirculation Tank ( 2 KL)
HSD Main Header ( 50 NB )
O. CO2 and LN2 SYSTEM
Vertical CO2 Bullet ( 109 KL)
Unloading Pump
Vapourizer ( 600 LPM )
Carbon filter
Carbon Polisher
Classified - Confidential

129 of 338

List of Machineries
EQUIPMENT NAME
Sterile Filter ( 0.1 Micron )
Refrigerator ( 2 TON)
Unloading Pump control Panel
Refrigerator Control Panel
PRV Station ( 20 - 15 Bar )
Unloading Flexible Hose
DP transmitter Unit
Jacketed N2 Bulk Tank ( 6 KL)
Micron Filter ( 0.1 Micron)
Safety Valve Assembly
CO2 Main Header ( 100 NB)
N2 Main Header ( 80 NB )
P. DOOR ACCESS CONTROLLER and CCTV
CONTROLLER
READER
EGRESS SWITCH
LOCK
BIOMETRIC READER
L BRACKET
POWER SUPPLY
CCTV CAMERA

Classified - Confidential

130 of 338

List of Machineries
EQUIPMENT NAME
Q. FORKLIFT
Forklift Double Mast ( 3.5 TON )
Forklift Single Mast ( 1.5 TON)
Additional Battery
Gantry Arrangement for Battery Loading and Unloading
( 2 TON )
Stacker ( 1.2 TON)
Stacket Additional Battery
Stacket Charging station
Forklift Battery Charging station
Forklift Battery Charger
Stacker Battery Charger
RMPM Unloading Gantry System ( 2 TON )
R. AIR WASHER UNITS AND ACS
Air Washer Unit ( 12000 CFM)
Air washer Unit ( 22000 CFM)
Exhaust Unit ( 45000 CFM)
Air Washer Unit ( 50000 CFM)
Air Washer Unit ( 48000 CFM )
Air washer Unit ( 30000 CFM )
Air washer Unit ( 24000 CFM )
Split Acs ( 2 TON )
Cold Room AC units ( 10 TON)
Plenum for Water Line Blower ( 5 TON )
S. HVAC System
WEATHER
WEATHER
WEATHER
WEATHER

PROOF
PROOF
PROOF
PROOF

OUTDOOR
OUTDOOR
OUTDOOR
OUTDOOR

AHU
AHU
AHU
AHU

50000
26000
52000
31500

cfm
cfm
cfm
cfm

(READY SYRUP ROOM)


(CIP ROOM)
(SUGAR DISSOLVING ROOM)
(LINE AREA VENTILATION)

Exhaust AHU 22000 cfm (READY SYRUP ROOM)


Exhaust AHU 23000 cfm (CIP ROOM)
Exhaust AHU 46000 cfm (SUGAR DISOLVING ROOM)
Exhaust AHU 29500 cfm (SUGAR DUMPING AND STORE)
ROOF EXHAUST AIR FANS 2250 cfm
ROOF EXHAUST AIR FANS 6700 cfm
CABINET TYPE SUPPLY AIR UNIT 31000 cfm (SUGAR DUMPING AND STORE)
CABINET TYPE SUPPLY AIR UNIT 33000 cfm ( SUGAR DUMPING AND STORE)
CEILING CONCEALED DUCTABLE SPLIT UNIT( 8.5 TR )
CEILING CONCEALED DUCTABLE SPLIT UNIT( 3.0 TR )
HI WALL SPLIT AIR CONDITIONERS - PREFORM AND CAPPER STORE ( 2 TR )
EXHAUST AIR FAN -(1250 CFM with 5mm WC TSP)- FORK LIFT CHARGER
EXHAUST AIR FAN (3000 CFM
with 5mm WC TSP)
Digital
Thermostat(Operating voltage: 230V + 10%; AC 50/60 Hz)
Classified - Confidential

131 of 338

List of Machineries
EQUIPMENT NAME
Humidistat (Voltage: 18-30 VAC, 60Hz,Control Range: 10% - 90% RH,Accuracy: + / - 3% RH )
AHU MV Panels:weather proof MCC Panel and Distribution Boards ( 3 phase 415V )
1000 Amps Microprocessor based adjustable ACB (EDO type) as Incoming feeder
Outdoor Condensing Units (ODU) of minimum COP 3.0 to 4.0
26 HP (GF-VRF -ODU -1) - (COMPRISING 18 HP X 1No. + 8HP X 1No.)
22 HP (GF-VRF -ODU -2) - (COMPRISING 10 HP X 1No. X 12HP X 1No.)
32 HP (MF-VRF -ODU -1) - (COMPRISING 16 HP X 2 No )
24 HP (MF-VRF -ODU -2) - (COMPRISING 16 HP X 1 No + 8HP X 1No.)
10 HP (MF-VRF -ODU -3) - (COMPRISING 10 HP X 1No.)
42 HP (MF-VRF -ODU -4) - (COMPRISING 18 HP X 1No. + 16 HP X 1NO + 8HP X 1No.)
32
HP (MF-VRF
-ODU -5) - (COMPRISING
16 HP X 2 No )
Cassette
Type Airconditioning
Units
MF-CAS-01, 02, 04 & 05: 2.64 TR
MF-CAS-03: 2.0 TR
MF-CAS-06:
4.0Wall
TR Type Indoor Units:
Decorative HiGF-HW-01:
1.65TR
Ductable Type
Indoor Units:
GF-CSU-01,02, 04 & 05: 8.2 TR
GF-CSU-03: 4.0 TR
MF-CSU-01, 02 & 03: 8.2 TR
MF-CSU- 04 & 05: 6.54 TR
MF-CSU- 06 to 12: 8.2 TR

AIR COOLED LIQUID CHILLERS :


(EER, COP >2.8 rated,R 134a / R407C HFC refrigerant to deliver 75.0 TR @ 110 F ambient, 180 U
GPM.power supply of 415 v / 3 ph / 50 Hz.)

Chilled Water Pumps: PCHWP - 01 to 03(180 US GPM & 27 M Head,IE 3 suitable for 415 10% vo
50 cycles, 3 phase AC)

Secondary Chilled Water Pumps: SCHWP - 01 to 03 (180 US GPM & 16 M Head,IE 3 suitable for 41
10% volts, 50 cycles, 3 phase AC)
Expansion Tank - 500 lts ( working pressures of 125 psig and 240F. )

Air seperator ( centrifugal type, design pressuresfor 125 psig @ 350 F, suitable for 360 gpm.)
CHILLED WATER AIR HANDLING UNITS:
GF-AHU01: 6000 cfu ( 14.0 TR Total Capacity and 11.5 TR Sensible Capacity,6000 cfm, Mo
4.0* KW, 1440 rpm TEFC, IE - 3 Energy efficient, Sq. Cage motor, IP 55, 50 C, Class F insulation.)
FF-AHU01: (18000 cfu,32.0 TR Total Capacity and 28.0 TR Sensible Capacity )
SF-AHU01: (7500 cfu 14.0 TR Total Capacity and 12.0 TR Sensible Capacity)
CHILLED WATER CEILING SUSPENDED UNITS:
SF CSU 1: (8.0 TR Total Capacity and 6.6TR Sensible Capacity, 3300 CFM,)
SF CSU 2: 6.0 TR Total Capacity and 5.0TR Sensible Capacity, 3000 CFM

CHILLED WATER CEILING SUSPENDED CASETTE UNITS :


GF CU 1 - 3.0 TR / 1600 CFM Complete with room thermostat, valve package, control package, fix
devices etc., Units to be selected at EAT 73.2 / 62.2 dwg F DB /WB.
GF CU 2 to 4 -( 3.0 TR / 1600 CFM )
Classified - Confidential
132 of 338

List of Machineries
EQUIPMENT NAME
GF CU 5 - (1.5 TR / 750 CFM )
GF CU 6 - (2.0 TR / 950 CFM )
FF CU 1 to 6 - (2.0 TR / 1200 CFM )
FF CU 7 - (1.5 TR / 600 CFM )
FF CU 8 - (2.5 TR / 1000 CFM)
FF CU 9 - (2.0 TR / 900 CFM)
FF CU 10 & 11 - (2.5 TR / 1500 CFM)
SF CU 1 - (2.5 TR / 1100 CFM )
SF CU 2 & 3 - (2.0 TR / 900 CFM)
SF CU 4 - (3.0 TR / 1800 CFM )
SF CU 5 - (2.0 TR / 1200 CFM)
SF CU 6 - (2.5 TR / 1300 CFM )
SF CU 7 - (2.0 TR / 1150 CFM )
SF CU 8 to 11 - ( 2.0 TR / 1150 CFM )

CHILLED WATER HI WALL UNITS:


FF HW 1 & 2 - (1.5 TR / 850 CFM Complete with room thermostat, valve package, control package
fixing devices etc., Units to be selected at EAT 73.3 / 62.1 dwg F DB /WB.)
FF HW 3 & 4 - ( 1.5TR / 850 CFM )

AXIAL FLOW FAN:


EF-01 Fan Capacity / rating shall be: 26000 CFM @ 76.2 mmwg Motor : 18.5 kw @ 2/4 Poles
CABINET TYPE FAN UNIT for Supply & Exhaust:
Exhaust unit - Fan Capacity / rating shall be: 1500 CFM @ 40 mmwg Motor : 1.15KW @ 4 Poles,Sp
1450 rpm, power supply - 415V/3ph/60Hz.
Exhaust unit - Fan Capacity (1400 CFM @ 40 mmwg )
Exhaust unit - Fan Capacity (650 CFM @ 40 mmwg )
Supply unit - Fan Capacity( 1500 CFM @ 40 mmwg )
Supply unit - Fan Capacity ( 550 CFM @ 40 mmwg )
Supply unit - Fan Capacity( 550 CFM @ 40 mmwg )
Kitchen fresh air unit - Fan Capacity:(2200 CFM @ 40 mmwg )
EXHAUST AIR UNITS :
Kitchen exhaust unit - Fan (Capacity 2500 CFM @ 40 mmwg)
IN LINE CIRCULAR FANS - CENTRIFUGAL FAN :
TF EAU 1 - 400 cfm @ 10 mm WC S.P. (WITHOUT FILTER)
TF FAU 1 - 340 cfm @ 10 mm WC S.P.
GF FAU 1 - 500 cfm @ 10 mm WC S.P.
FF FAU 1 - 600 cfm @ 10 mm WC S.P.
SF FAU 1 - 800 cfm @ 10 mm WC S.P.
HI WALL SPLIT AIR CONDITIONERS - UPS & SERVER ROOM ( 2.0 TR )
Digital Thermostat(Operating voltage: 230V + 10%; AC 50/60 Hz)
Humidistat (Voltage: 18-30 VAC, 60Hz,Control Range: 10% - 90% RH,Accuracy: + / - 3% RH )

Classified - Confidential

133 of 338

List of Machineries
EQUIPMENT NAME
MV Panels and accessories
FREE STANDING VERTICAL FLOOR STANDING UNIT - PRAYER ROOM:
FSU - 4.5 TR
FSU - 3.5 TR
BIG BLADE FANS: WARE HOUSE
TUBE AXIAL EXHAUST AIR FANS FOR VAM PLANT ROOM :
EAF - 01 to 04: Each Fan Capacity / rating shall be: 10000cfm @ 12.5 mmwg Motor of 2.2 KW
rating, Speed 1450 rpm, power supply - 415V / 3ph / 50Hz

ROOF EXHAUST AIR FANS:


RF-01 to 32 : Fan Capacity / rating shall be: 8250 CFM @ 10 mmwg Motor: 1.1 KW, 1450 rpm TEF
Sq. Cage motor. Motors shall be IE - 3 Energy efficient motor. (FOR LINE AREA / WARE HOUSE)

RF-01 & 02 : Fan Capacity / rating shall be: 2000 CFM @ 10 mmwg Motor: 0.37 KW, 1450 rpm TE
Sq. Cage motor.Motors shall be IE - 3 Energy efficient motor. (FOR WELDING ROOM)
WALL MOUNTED FANS:
4000 CFM with 5mm WC TSP (EXHAUST AIR FAN) 1450 rpm TEFC Sq. Cage motor. Motors shall be
3 Energy efficient motor. (Staging area)
3500 CFM with 5mm WC TSP (SUPPLY AIR FAN) 1450 rpm TEFC Sq. Cage motor. Motors shall be IE
Energy efficient motor. (Staging area)
T. LIFT
Elevator
U. KITCHEN and CANTEEN
SS Furnitures & accessories
V. VAM CHILLER
VAM Chiller ( Capacity - 300 TR) & accessories
Chiller water pumps & accessories
VFD panel & accessories
Hot/Cold well Tank ( capacity - 65 KL)
Condenser cooling tower with pumps and accessories
Self Contaminated modular stainless steel CIP items for the PHEs
Chilled water MS piping accessories with butterfly valves
Water fitting accessories - flange, valves, strainer, differential pressure transmitter
Medium voltage switchboard with accessories
Power cable and accessories
GI cable tray and accessories
Chiller SCADA control Panel with system
VAM chiller spare parts
W. BOILER
Boiler (4 TON)
Feed water Tank ( 10 KL)
Chemical dosing system
Oil Ring main station
Sampling Station
Boiler MCC Panel
Classified - Confidential
134 of 338

List of Machineries
EQUIPMENT NAME
PLC control Panel
Safety Control Panel
HSD Day Tank (1 KL)
Feed water day tank (10 KL)
Feed water pumps & accessories
Oxygen Level detector Panel
Steam Header
Steam PRV station
Blowdown Vessel
MS Chimney and related accessories
X. GENERATOR AND ACCESSORIES
Gas Generator Set (Capacity - 1850 KVA) and accessories
Diesel Generator Set (2000 KVA) and accessories
Diesel Generator Set (500 KVA) and accessorie
MCC Panel & Auxiliaries
LT AMF/Sunchronizing Panel
Remote radiator with pumps and accessories
Fuel Day tank ( 1 KL) and accessories
Vantilation Fans
MCC panel for Gas Generators & Diesel Generators
Power cable ( 1100 - 650 voltage) & accessories
GI cable tray and accessories
LT AMF/Sunchronizing Panel

Classified - Confidential

135 of 338

List of Machineries
EQUIPMENT NAME
Y. ELECTRICAL HT, LT AND ACCESSORIES
33 KV HT panel and accessories
11 KV HT panel and accessories
Power transformer ( 33 KV/ 11 KV); Capacity - 4000 KVA
Power transfomer ( 11 KV/.44 KV); Capacity - 2500 KVA
Power cables (33000 voltage) & accessories
Power cables (11000 voltage) & accessories
Power cables (1100 V - 750 Voltage) & accessories
Meduim voltage (440 Voltge) switchboard panels and accessories
UPS with battery sets ( Capacity - 60 KVA & 30 KVA)
Voltage stabilizer - 315 KVA
Distribution boards ( 440 voltage) and accessories
Adaptor boxes for distribution board and accessories
EMT conduits and accessories
Switches, sockets and accessoreis
GI cable trays and accessories
GI Pipes & accessories
Earthing tapes/wires, chemicals and accessories
Indoor light fixtures, lamps and accessories
Celling fans, exhaust fans and accessories
Outdoor light fixture and accessories
Solar street light and accessories
Lightning protection equipments
Z. COMPRESSOR & ACCESSORIES
Non-lubricated oil free type, air cooled air compressor set ( Capacity - 600 CFM)
Refrigerated Air Dryer System ( Capacity - 800 CFM)
Air Receiver ( Capacity - 4 CUM & 2 CUM)
Air filters & accessories
GI Pipes & accessories
PLC based Control panel
Spare Parts for air compressors unit
Medium Voltage Swich board
Power cable ( 1100 - 650 voltage) & accessories
GI cable tray and accessories
AA. UTILITY PIPING
SS tube & accessories ( multiple sizes)
GI Pipes & accessories ( multiple sizes)
GI Flanges & accessories ( multiple sizes)
Centrifugal transfer pump & accessories ( multiple sizes)
Seamless carbon steel pipes & accessories ( multiple sizes)
MS Pipes & accessories ( multiple sizes)
AB. PET Crusher unit
PET Crushing machine
Classified - Confidential
136 of 338

List of Machineries
EQUIPMENT NAME
AC. Racking system
Racking system
AD. Miscelleneous items
Total

Classified - Confidential

137 of 338

List of Machineries
QTY
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
3
1
2
1
1
1
1
1
1
1
1
1

Value in USD

Value in BDT

5,975,955

464,032,906

8,152,718

633,058,547

1
1
1
1
1
1
1
1
1
1
Classified - Confidential

138 of 338

List of Machineries
QTY
2
1
1
1
1
1
1
1
1
1
1
1
1
1
3
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2

Value in USD

Value in BDT

1
Classified - Confidential

139 of 338

List of Machineries
QTY
1
1
1
1
1
1

Value in USD

Value in BDT

1
1
1
1
1
1
2
2
1
1
1
1
1
2
1
1
2
2
2
1
1
1
1
5
1
1
2
1

2,064,340

160,296,000

4
1
1
1
1
1
Classified - Confidential

140 of 338

List of Machineries
QTY
2
1
1

Value in USD

Value in BDT

3
2
2
1
1
2
2
1

1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
4
3
1
1
1
2
1
2
1
1

1,586,419

123,185,412

Classified - Confidential

141 of 338

1,586,419

123,185,412

List of Machineries
QTY
1
1
1
2
1
1
1
1
1
2
1
2
1
1
2
2
1 SET
1 SET
1 SET
1 SET
1 SET
1 SET
1 SET
1
1

Value in USD

Value in BDT

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Classified - Confidential

142 of 338

List of Machineries
QTY
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Value in USD

259,441

Value in BDT

20,145,611

Classified - Confidential

143 of 338

List of Machineries
QTY
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Value in USD

Value in BDT

1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
2
2
2
2
1
2
1
Classified - Confidential

144 of 338

List of Machineries
QTY
2
1
1
1
1
2
1
2
1
2
1
1
2
2

Value in USD

735,762

Value in BDT

57,131,936

Classified - Confidential

145 of 338

List of Machineries
QTY
1
1
1
1
1
2
1
2
1
1 Set
1 set
2 set
1 st
10 set
1 set
28 set
10 set
10 set
3 set
1 set
1 set
1 LOT
1 LOT
1 LOT
1
1
2
2
1
1
1
2
2
2
1

Value in USD

Value in BDT

620,333

48,168,880

161,491

12,539,811

1
1
2
2
4
Classified - Confidential

146 of 338

List of Machineries
QTY
1
1
1
1
2
1
1
1
1
1 Set
1
1
24
22
19
25
6
25
30
1 LOT

Value in USD

Value in BDT

441,923

34,315,294

220,155

17,095,055

Classified - Confidential

147 of 338

List of Machineries
QTY

Value in USD

Value in BDT

4
1
5
1
3
3
1
1
5
3
1

254,702

19,777,584

2
1
2
1
1
1
1
1 LOT
4
5
1 nos
1 nos
1 nos
2 nos
2 nos
1 nos
1 nos
1 nos
1 set
1 set
1 Set
1 Set
1 nos
1 nos
1 set
2 nos
1 Set
5 nos
Classified - Confidential

148 of 338

List of Machineries
QTY
5 nos
1 Set
1 Set

Value in USD

Value in BDT

1 Set
1 Set
1 set
1 Set
1 set
1 Set
1 Set
4 set
1 set
1 set
1 set
1 Lot
1 nos
3 nos
2 nos
7 nos
3 nos
3 nos
3 nos
1 nos
1 nos

1 nos
1 nos
1 nos

584,445

45,382,175

1 nos
1 nos
1 nos
3 nos
Classified - Confidential

149 of 338

584,445

45,382,175

List of Machineries
QTY
1 nos
1 nos
6 nos
1 nos
1 nos
1 nos
2 nos
1 nos
2 nos
1 nos
1 nos
1 nos
1 nos
4 nos

Value in USD

Value in BDT

2 nos
2 nos
1 lot
1 lot
1
1
1
1
1
1

nos
nos
nos
nos
nos
nos

1 nos
1 nos
1
1
1
2
4

nos
nos
nos
nos
nos

3 nos
3 nos

Classified - Confidential

150 of 338

List of Machineries
QTY
1 lot
5 nos
1 nos
3 nos

Value in USD

Value in BDT

4 nos

1 set

2 nos
2 nos
2 nos
5
1 Lot
2 set
1 set
1 set
1 set
1 Lot
1 set
1 lot
1 lot
1 lot
1 lot
1 Lot
1 set
1 lot
2
1
1
2
2
2

450,741

35,000,000

76,619

5,949,489

717,740

55,732,495

set
set
set
set
set
set
636,567

Classified - Confidential
49,429,414

151 of 338

List of Machineries
QTY
1 set
1 set
1 set
1 set
4 set
2 set
2 set
2 set
1 set
1 set
2 Set
1 Set
1 Set
1 Set
1 Set
3 set
1 Set

Value in USD

Value in BDT

636,567

49,429,414

1,931,464

149,978,170

1 Set
1 Lot
1 Lot
1 Lot

Classified - Confidential

152 of 338

List of Machineries
QTY
1 Set
2 Set
1 nos
2 nos
1 Lot
1 Lot
1 Lot
25 set
02 set
01 set
150 set
150 set
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
3 set
2 Set
2 Set
2 Set
1 Set
1 Lot
2 Set
2 Set
1 Set
1 Lot
1 Lot
1
1
1
1
1
1

Lot
Lot
Lot
Lot
Lot
Lot
1

Value in USD

Value in BDT

4,121,056

320,000,000

285,729

22,186,841

789,801

61,328,038

9,577

743,686
Classified - Confidential

153 of 338

List of Machineries
QTY
1

Value in USD
191,548
6,874,295
37,142,821

Value in BDT
14,873,723
533,789,013
2,884,140,081

Classified - Confidential

154 of 338

List of Machineries
Sl.No:
*
1
2
3
4
5
6
7
8
9
10
11

Q.
Q.
Q.
Q.

Old Main category


FORKLIFT
FORKLIFT
FORKLIFT
FORKLIFT

Q. FORKLIFT
Q.
Q.
Q.
Q.
Q.
Q.
Q.

FORKLIFT
FORKLIFT
FORKLIFT
FORKLIFT
FORKLIFT
FORKLIFT
FORKLIFT

Classified - Confidential

155 of 338

List of Machineries
K.
K.
K.
K.

Revised Main Category


MATERIAL HANDLING EQUIPMENTS
MATERIAL HANDLING EQUIPMENTS
MATERIAL HANDLING EQUIPMENTS
MATERIAL HANDLING EQUIPMENTS

K. MATERIAL HANDLING EQUIPMENTS


K.
K.
K.
K.
K.
K.
K.

MATERIAL
MATERIAL
MATERIAL
MATERIAL
MATERIAL
MATERIAL
MATERIAL

HANDLING
HANDLING
HANDLING
HANDLING
HANDLING
HANDLING
HANDLING

EQUIPMENTS
EQUIPMENTS
EQUIPMENTS
EQUIPMENTS
EQUIPMENTS
EQUIPMENTS
EQUIPMENTS

Classified - Confidential

156 of 338

List of Machineries
Category
Material Handling Equipment

Classified - Confidential

157 of 338

List of Machineries
EQUIPMENT NAME
Forklift Double Mast ( 3.5 TON )
Forklift Single Mast ( 1.5 TON)
Additional Battery
Gantry Arrangement for Battery Loading and Unloading
( 2 TON )
Stacker ( 1.2 TON)
Stacket Additional Battery
Stacket Charging station
Forklift Battery Charging station
Forklift Battery Charger
Stacker Battery Charger
RMPM Unloading Gantry System ( 2 TON )

Classified - Confidential

158 of 338

List of Machineries
QTY
4
1
5
1
3
3
1
1
5
3
1

Classified - Confidential

159 of 338

List of Machineries
Sl.No:
A. 600 BPM WATER LINE EQUIPMENT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
B. 720 BPM CSD LINE
1
2
3
4
5
6
7
8
9
10
Classified - Confidential

160 of 338

List of Machineries
Sl.No:
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
C. CIP SYSTEM (MODULE - 1)
1
Classified - Confidential

161 of 338

List of Machineries
Sl.No:
2
3
4
5
6
7
D. CIP SYSTEM (MODULE - 2)
8
9
10
11
12
13
14
15
16
E. SUGAR DISSOLVING SYSTEM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
F. READY SYRUP SYSTEM
1
2
3
4
5
6
Classified - Confidential

162 of 338

List of Machineries
Sl.No:
7
8
9
G. WATER SOURCING
1
2
3
4
5
6
7
8
H. WTP SETUP FOR WATER LINE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
I. WTP PLANT
1
2
3
4
5
6
7
8
9
10
11
12
13
Classified - Confidential

163 of 338

List of Machineries
Sl.No:
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
J. MAIN LAB
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Classified - Confidential

164 of 338

List of Machineries
Sl.No:
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
Classified - Confidential

165 of 338

List of Machineries
Sl.No:
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
K. ETP LAB EQUIPMENT
1
2
3
4
5
6
7
8
9
10
11
L. ETP TANKS & PUMPS CAPACITIES
1
2
3
4
5
6
7
8
9
10
11
Classified - Confidential

166 of 338

List of Machineries
Sl.No:
12
13
14
15
16
17
18
19
20
21
22
23
24
25

Classified - Confidential

167 of 338

List of Machineries
Sl.No:
26
27
28
29
30
31
32
33
34
M. FIRE PROTECTION & DETECTION SYSTEM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
N. HSD, ACID & LYE TANK
1
2
3
4
5
6
7
8
9
10
11
O. CO2 and LN2 SYSTEM
1
2
3
4
5
Classified - Confidential

168 of 338

List of Machineries
Sl.No:
6
7
8
9
10
11
12
13
14
15
16
17
P. DOOR ACCESS CONTROLLER and CCTV
1
2
3
4
5
6
7
8

Classified - Confidential

169 of 338

List of Machineries
Sl.No:
Q. FORKLIFT
1
2
3
4
5
6
7
8
9
10
11
R. AIR WASHER UNITS AND ACS
1
2
3
4
5
6
7
8
9
10
S. HVAC System
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Classified - Confidential

170 of 338

List of Machineries
Sl.No:
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

43
44
45
46
47
48
49
Classified - Confidential

171 of 338

List of Machineries
Sl.No:
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82

Classified - Confidential

172 of 338

List of Machineries
Sl.No:
83
93
94
95
96

97

98
99
100
T. LIFT
1
U. KITCHEN and CANTEEN
1
V. VAM CHILLER
1
2
3
4
5
6
7
8
9
10
11
12
13
W. BOILER
1
2
3
4
5
6
Classified - Confidential

173 of 338

List of Machineries
Sl.No:
7
8
9
10
11
12
13
14
15
16
X. GENERATOR AND ACCESSORIES
1
2
3
4
5
6
7
8
9
10
11
12

Classified - Confidential

174 of 338

List of Machineries
Sl.No:
Y. ELECTRICAL HT, LT AND ACCESSORIES
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Z. COMPRESSOR & ACCESSORIES
1
2
3
4
5
6
7
8
9
10
AA. UTILITY PIPING
1
2
3
4
5
6
AB. PET Crusher unit
1
Classified - Confidential

175 of 338

List of Machineries
Sl.No:
AC. Racking system
1
AD. Miscelleneous items
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
Total

Classified - Confidential

176 of 338

List of Machineries
EQUIPMENT NAME
A. 600 BPM WATER LINE EQUIPMENT
Block Machine
Preform Inspection System
Blow Moulder-De-humidifier
Caps-U.V Disinfection System
Cap Feeder-Water Fall Sorter
Capper-Camera based Closure Inspection System
Capper-Bulk Closure Handling Mechanism
Filler-Fully Automatic COP System
Filler-Individual Servo Driven Chuck
HP Compressors (including Cooling Tower)
Chiller - Water Cooled Type (including Cooling Tower)
Fill Level/Closure Inspector (with FMS)
Date Coder - Laser
Date Coder - Inkjet
Bottle Dryer (Fixed before Labeler)
Bottle Conveoyor-Automatic Side Rail Adjsutment wherever required
Sampling Conveyor
Crate/Case Conveyors
Pallet Conveyors
Conveyor Cross-Overs
Labeler and Label Inspector
Sleevers
Basic Machine-Shrink Packer
Coding Machine for Shrink Wraps (Inkjet-Make)
Basic Machine
Basic Machine - Ring Type
Dry Lubrication System
UPS with all Batteries (As per Electrical Specifications)
Voltage stablizer
One Set of Moulds (N+1) - 1000 ml -Kinley
One Set of Moulds (N+1) -500ml Mold
B. 720 BPM CSD LINE
Block Machine
Preform Inspection System
Blown Bottle Inspection System
Blow Moulder-De-humidifier
Caps-U.V Disinfection System
Cap Feeder-Water Fall Sorter
Capper-Camera based Closure Inspection System
Capper-Bulk Closure Handling Mechanism
Filler-Fully Automatic COP System
Filler-Individual Servo Driven Chuck
Classified - Confidential

177 of 338

List of Machineries
EQUIPMENT NAME
HP Compressors (including Cooling Tower)
Chiller - Water Cooled Type (including Cooling Tower)
Fill Level/Closure Inspector (with FMS)
Mixer-Basic Machine
Mixer-Auto Brix and G.V Correction (Make:Anton-Paar,Model: DSRn 427(s) )
Date Coder - Laser
Date Coder - Inkjet
Warmer-Basic Machine with Auto Dew point based control.
Bottle Dryer (Fixed at Warmer/Cooling Tunnel Exit)
Bottle Dryer (Fixed before Labeler)
Bottle Conveoyor-Automatic Side Rail Adjsutment wherever required
Sampling Conveyor
Crate/Case Conveyors
Pallet Conveyors
Conveyor Cross-Overs
Labeler
Label Inspector
Basic Machine-Shrink Packer
Coding Machine for Shrink Wraps (Inkjet-Make)
Basic Machine
Basic Machine- Ring Type
Dry Lubrication System
UPS with all Batteries (As per Electrical Specifications)
Voltage stablizer
Platforms for Electrical Panels
Total Spares & Consummables for 6000 Hrs of operation
One Set of Moulds (N+1) - 400 ml - Contour) Common Base Mold
One Set of Moulds (N+1) - 400 ml - Dimple) Common Base Mold
One Set of Moulds (N+1) - 400 ml - Splash) Common Base Mold
One Set of Moulds (N+1) - 750 ml - Contour) Common Base Mold
One Set of Moulds (N+1) - 750 ml - Dimple) Common Base Mold
One Set of Moulds (N+1) - 750 ml - Splash) Common Base Mold
One Set of Moulds (N+1) - 1750 ml - Contour) Common Base Mold
One Set of Moulds (N+1) - 1750 ml - Dimple) Common Base Mold
One Set of Moulds (N+1) - 1750 ml - Splash) Common Base Mold
One Set of Moulds (N+1) - 2250 ml - Contour) Common Base Mold
One Set of Moulds (N+1) - 2250 ml - Dimple) Common Base Mold
One Set of Moulds (N+1) - 2250 ml - Splash) Common Base Mold
Second Packer & Associated Conveyors
Shifting of Preform & Closure Dumpers to Mezzanine
Capper-Additional Second set of Chucks
C. CIP SYSTEM (MODULE - 1)
RECOVERY TANK (3 KL)
Classified - Confidential

178 of 338

List of Machineries
EQUIPMENT NAME
BUFFER WATER TANK (1 KL)
RECUPERATION TANK (9 KL)
HOT WATER TANK (5 KL)
CIRCULATION PUMP (45 M3/Hr.)
CIP Skid
MCC and Control Panel
D. CIP SYSTEM (MODULE - 2)
RECUPERATION TANK (14 KL)
HOT WATER TANK (12 KL)
LYE TANK (12 KL)
CHEMICAL TANK (12 KL)
BTD TANK (3 KL)
CIP Skid
CIRCULATION PUMP (45 M3/Hr.)
Diversion Panel
MCC Panel (630 A )
E. SUGAR DISSOLVING SYSTEM
GRANULATED SUGAR SILO (5 KL)
Sugar Dumping unit along with Gantry and Duct extractor
Carbon Dumping Unit with screw conveyor
SUGAR DISSOLVING TANK (3 KL)
BTD TANK(SIMPLE SYRUP) (500 L)
BTD TANK(WATER) (200 L)
HOLDING TANK (12 KL)
DUPLEX BAG FILTER
DELLA TOFOLLA FILTER (3 KL)
HYFLO DOSING TANK (1 KL )
TUBULAR HEAT EXCHANGER
PLATE HEAT EXCHANGER (19500KG/HR)
RECOVERY TANK (10 KL)
BUFFER TANK(FILTERED SYRUP) (500 L)
Diversion Panel
SLUDGE HOLDING TANK (20 KL)
Vacuum Drum with Recovery Tank
PPPU unit for condensate recovery system
Cooling Tower for Sugar dissolving system
F. READY SYRUP SYSTEM
READY SYRUP STORAGE TANK (30 KL)
RAW SYRUP STORAGE TANK (30 KL)
CONCENTRATE MIXING TANK (500 L)
Valve Cluster System
Control Panel
MCC Panel
Classified - Confidential

179 of 338

List of Machineries
EQUIPMENT NAME
Diversion Panel
Micron Filter (1 Micron)
Concentrate Trolly
G. WATER SOURCING
Submercible Pump (100 CuM/Hr)
Raw Water transfer pump
Domestic Raw water transfer pump
Chlorine dosing tank with pump and agitator
PSF for backwash water
Soft water transfer pump
Back wash water transfer pump
MCC panel for transfer pumps
H. WTP SETUP FOR WATER LINE
ROPT - 2 TANK (20 KL)
ROPT - 2 TRANSFER PUMP (60 M3/HR)
UV (80 M3/Hr.)
PRODUCT TANK (4 KL)
PRODUCT TANK OUTLET PUMP (42 KL)
CLOSED LOOP WATER CHILLER
OZONE GENERATOR (500GRM/HR)
RECOVERY TANK (2 KL)
RECIRCULATION PUMP (15 M3/HR)
RECOVERY TANK OUTLET PUMP (42 M3/HR)
MIS
1 MICRON FILTER
0.2 MICRON FILTER
FILLER SKID PUMP
VULCATHERM UNIT
I. WTP PLANT
Filter Water Tank
Backwash Feed Pump
ACF Feed Pump
PSF
ACF
Air Compressor
Sanitization System(Hot water System)
RO1 Pass Tank
RO1 Pass tank Transfer Pump
UF Product water tank
UF product water transfer Pump
UV system with flow meter
Softener System
Classified - Confidential

180 of 338

List of Machineries
EQUIPMENT NAME
Sampling Point Recovery Tank
Sampling table with rack and work station
Chlorinated Softwater tank
Chlorinated softwater transfer pump
UF CIP tank
UF CEB acid tank with agitator
Clarifier MCC panel
WTP MCC Panel
Brine Solution tank
RO and UF Lye preparation and dosing tank
RO system with Micron Filter
RO 1 feed pump
CO2 Dosing control Panel
RO2 system with Micron Filters
RO 2 feed Pump
RO 2 Transfer Pump
Raw water Tank to Clarifier Pipe Line
RO2 Pass to ROPT 2 tank Pipe Line
Softener system to Soft water tank Pipe Line
WTP to Back Wash Tank Pipe Line
UF product tank to Treated Water Header
Domestic Raw water Main Header
Soft water Main Header
UF filtration system with micron filters
UF system Control Panel
J. MAIN LAB
Densitymeter 4500
Weighing balance (0-300 KG)
Weighing Balance (0-210gm)
Weighing Balance (0-7.1kg)
TDS/Conductivity Meter
NOISE METER
IR THERMO METER
O2 PURITY ANALYSER
PORTABLE ORP METER
LUX METER
DUCTS
bulb thermo meter
SPRING CALIBRATION KIT FOR TORQUE TESTER
Degassing asssembly
GV tester small ( <1l )
Spectro Photometer ( 190nm - 1100nm)
Analytical Weighing Balance (0 - 220gms)
Classified - Confidential

181 of 338

List of Machineries
EQUIPMENT NAME
ph meter (0 - 35000uS/L)
Turbiditymeter (0 - 4000 NTU)
Water Bath ( ambient-100c( 8 holes digital) )
Desicator ( Plastic made )
Hot Plate ( ambient-200c )
Fumming Hood ( ss 316 made )
Distllation Assmbly ( 4 lts /hr )
ozone test kit ( 0.05-2.3mg/l )
OzonePOCKET COLIRIMETER ( 0.01-0.75MG/L )
Ozone destruction unit
Heating mantle
Gas Stripping Apparaturs
conductivity meter
Laminar air flow ( 54*24*84 )
Hot plate
Millpore filtration unit - 3 set
Vaccum pump ( 1/8hp )
Microscope
Air sampler (M-air-T) (1 )
Bunsen Burner ( 1 )
Colony Counter
Innoculating Loop
Autoclave-1 ( dia 16*24 inches )
Incubator-2 ( Ambient - 50C )
Incubator-3 ( Ambient - 50C )
BOD Incubator (5 - 50C)
Oven-1 (Ambient - 250C )
Analytical Weighing Balance (0 - 220gms)
Refrigerator
Polariscope
Digital Vernier Mitutoyo (small) ( 0-150MM )
Digital Vernier Mitutoyo (large) ( 0-300MM )
Vaccum pump
Magnetic Stirrer ( with heater )
Digital Thermometer ( ..-10-200c)
Thermometers (5)nos ( 0 - 110C )
Desicator
filtration single unit
Water Bath ( ambient-100c( 8 holes digital) )
Weighing Balance ( 0.1-7100gms)
Mitutoyo Dial Thickness guage
High intensity light source
Micrometers with least Count of 0.01 mm Classified - Confidential

182 of 338

List of Machineries
EQUIPMENT NAME
Dry and wet bulb thermometer and humidity chart.
Density meter 4500 ( 0.001)
Torque tester-1
Weighing Balance ( 0.1-7100gms )
HOTWIRE BOTTLE CUTTER ( RANGE220V)
BASECLEARANCEMEMBRANE
DEADWEIGHT TESTER
FILLHEIGHT GUAGE
PREFORM NECKCUTTER
PET &PREFORM THICKNESSGUAGE
DIGITAL HEIGHT GUAGE
Top load tester
Bottle perpendicularity tester
CHLORINE TEST KIT
IRON TEST KIT
Sulphates test kit
Jar test apparatus
LOVIBAND KIT FOR CHLORINE ( 0.2 4mg/l )
SDI test kit of Approved make & model
K. ETP LAB EQUIPMENT
Conductivity ( 0 - 35000uS/L )
ph meter
Top loading Weighing Balance ( 0-620gm)
BOD Incubator (5 - 50C)
Hot Air Oven (Ambient- 250 C)
Filtration System
Muffle Furnace (Max 1000 C)
Desicater
DO meter
COD Digester AND ANALYSER
BOD track 2apparatas
L. ETP TANKS & PUMPS CAPACITIES
( 30 KL ) PUMP
COLLECTION TANK TRANSFER
( 20 M3/HR)
ACID DOSING TANK ( 1 KL )
ALKALI TANK ( 1 KL )
TANK ( 70 KL
)
EQUALISATION TRANSFER
PUMP
(10 M3/HR)
AIR BLOWER ( 200 M3/HR)
AERATION TANK ( 300 KL)
NUTRIENT DOSING PUMP ( 150 L/HR)
MBR TANK (12 KL)
PERMEATE PUMP ( 10 M3/HR)
Classified - Confidential

183 of 338

List of Machineries
EQUIPMENT NAME
AIR BLOWER ( 275 M3/HR)
BACKPULSE TANK ( 2 KL)
PERMEATE PUMP (5 M3/HR )
CITRIC ACID TANK ( 200 L)
HYPO TANK ( 200 L)
RAS PUMP ( 20 M3/HR)
PERMEATE TANK ( 55 KL)
RO FEED PUMP ( 10 M3/HR)
ACTIVATE CARBON FILTER ( 10 M3/HR)
AO DOSING TANK ( 100 L)
ACID DOSING TANK ( 100 L)
POLYELECTROLYTE DOSING TANK ( 500 L)
POLYMER DOSING PUMP ( 160 L/HR)
CENTRIFUGE FEED PUMP ( 8 M3/HR)

Classified - Confidential

184 of 338

List of Machineries
EQUIPMENT NAME
SLUDGE HOLDING TANK ( 20 KL)
CIP TANK ( 1 KL)
OZONATOR ( 15 GRM/HR)
OZONE RECYCLIC PUMP ( 5 M3/HR)
RO PERMEATE TANK (55 KL )
SOFTNER FEED PUMP ( 10 M3/HR)
SOFTENER
( 500 LPH) for MBR servicing
Monorail Arrangement
(2 TON)
ETP
Soft water Pipe Line Header
(50 NB)
M. FIRE PROTECTION & DETECTION SYSTEM
FIRE WATER PUMP (Engine Driven) ( 137Cum/hr. at 75MWC)
FIRE WATER PUMP (Motor Driven) (137Cum/hr at 75MWC)
JOCKEY PUMP (Pressure Maintenance Pump) (10.8Cum/hr. at 75MWC)
PUMP CONTROL PANELS FOR MOTOR DRIVEN FIRE & JOCKEY PUMPS
Addressable type Fire Alarm Control Panel
Repeater Panel / Remote Annunciator
Addressable-Conventional Interface Module
Control Module
Monitor Module
Addressable Relay Module
CO2 GAS SUPPRESSION SYSTEM(BOILER ROOM)
NOVEC 1230 SUPPRESSION SYSTEM(SERVER ROOM)
FIRE HOSE REEL DRUM
FIRE EXTINGUISHER
FIRE HYDRANT POINT
N. HSD, ACID & LYE TANK
HSD Tank ( 40 KL )
FO Tank ( 40 KL )
HSD Unloading Pump ( 14 M3/Hr. )
HSD Transfer Pump ( 22.6 M3/Hr )
Unloading Flexible Hose ( 2 Meters)
Acid Tank ( 16 KL )
Caustic Tank ( 16 KL )
Acid Transfer Pump
Caustic Transfer Pump
Recirculation Tank ( 2 KL)
HSD Main Header ( 50 NB )
O. CO2 and LN2 SYSTEM
Vertical CO2 Bullet ( 109 KL)
Unloading Pump
Vapourizer ( 600 LPM )
Carbon filter
Carbon Polisher
Classified - Confidential

185 of 338

List of Machineries
EQUIPMENT NAME
Sterile Filter ( 0.1 Micron )
Refrigerator ( 2 TON)
Unloading Pump control Panel
Refrigerator Control Panel
PRV Station ( 20 - 15 Bar )
Unloading Flexible Hose
DP transmitter Unit
Jacketed N2 Bulk Tank ( 6 KL)
Micron Filter ( 0.1 Micron)
Safety Valve Assembly
CO2 Main Header ( 100 NB)
N2 Main Header ( 80 NB )
P. DOOR ACCESS CONTROLLER and CCTV
CONTROLLER
READER
EGRESS SWITCH
LOCK
BIOMETRIC READER
L BRACKET
POWER SUPPLY
CCTV CAMERA

Classified - Confidential

186 of 338

List of Machineries
EQUIPMENT NAME
Q. FORKLIFT
Forklift Double Mast ( 3.5 TON )
Forklift Single Mast ( 1.5 TON)
Additional Battery
Gantry Arrangement for Battery Loading and Unloading
( 2 TON )
Stacker ( 1.2 TON)
Stacket Additional Battery
Stacket Charging station
Forklift Battery Charging station
Forklift Battery Charger
Stacker Battery Charger
RMPM Unloading Gantry System ( 2 TON )
R. AIR WASHER UNITS AND ACS
Air Washer Unit ( 12000 CFM)
Air washer Unit ( 22000 CFM)
Exhaust Unit ( 45000 CFM)
Air Washer Unit ( 50000 CFM)
Air Washer Unit ( 48000 CFM )
Air washer Unit ( 30000 CFM )
Air washer Unit ( 24000 CFM )
Split Acs ( 2 TON )
Cold Room AC units ( 10 TON)
Plenum for Water Line Blower ( 5 TON )
S. HVAC System
WEATHER
WEATHER
WEATHER
WEATHER

PROOF
PROOF
PROOF
PROOF

OUTDOOR
OUTDOOR
OUTDOOR
OUTDOOR

AHU
AHU
AHU
AHU

50000
26000
52000
31500

cfm
cfm
cfm
cfm

(READY SYRUP ROOM)


(CIP ROOM)
(SUGAR DISSOLVING ROOM)
(LINE AREA VENTILATION)

Exhaust AHU 22000 cfm (READY SYRUP ROOM)


Exhaust AHU 23000 cfm (CIP ROOM)
Exhaust AHU 46000 cfm (SUGAR DISOLVING ROOM)
Exhaust AHU 29500 cfm (SUGAR DUMPING AND STORE)
ROOF EXHAUST AIR FANS 2250 cfm
ROOF EXHAUST AIR FANS 6700 cfm
CABINET TYPE SUPPLY AIR UNIT 31000 cfm (SUGAR DUMPING AND STORE)
CABINET TYPE SUPPLY AIR UNIT 33000 cfm ( SUGAR DUMPING AND STORE)
CEILING CONCEALED DUCTABLE SPLIT UNIT( 8.5 TR )
CEILING CONCEALED DUCTABLE SPLIT UNIT( 3.0 TR )
HI WALL SPLIT AIR CONDITIONERS - PREFORM AND CAPPER STORE ( 2 TR )
EXHAUST AIR FAN -(1250 CFM with 5mm WC TSP)- FORK LIFT CHARGER
EXHAUST AIR FAN (3000 CFM
with 5mm WC TSP)
Digital
Thermostat(Operating voltage: 230V + 10%; AC 50/60 Hz)
Classified - Confidential

187 of 338

List of Machineries
EQUIPMENT NAME
Humidistat (Voltage: 18-30 VAC, 60Hz,Control Range: 10% - 90% RH,Accuracy: + / - 3% RH )
AHU MV Panels:weather proof MCC Panel and Distribution Boards ( 3 phase 415V )
1000 Amps Microprocessor based adjustable ACB (EDO type) as Incoming feeder
Outdoor Condensing Units (ODU) of minimum COP 3.0 to 4.0
26 HP (GF-VRF -ODU -1) - (COMPRISING 18 HP X 1No. + 8HP X 1No.)
22 HP (GF-VRF -ODU -2) - (COMPRISING 10 HP X 1No. X 12HP X 1No.)
32 HP (MF-VRF -ODU -1) - (COMPRISING 16 HP X 2 No )
24 HP (MF-VRF -ODU -2) - (COMPRISING 16 HP X 1 No + 8HP X 1No.)
10 HP (MF-VRF -ODU -3) - (COMPRISING 10 HP X 1No.)
42 HP (MF-VRF -ODU -4) - (COMPRISING 18 HP X 1No. + 16 HP X 1NO + 8HP X 1No.)
32
HP (MF-VRF
-ODU -5) - (COMPRISING
16 HP X 2 No )
Cassette
Type Airconditioning
Units
MF-CAS-01, 02, 04 & 05: 2.64 TR
MF-CAS-03: 2.0 TR
MF-CAS-06:
4.0Wall
TR Type Indoor Units:
Decorative HiGF-HW-01:
1.65TR
Ductable Type
Indoor Units:
GF-CSU-01,02, 04 & 05: 8.2 TR
GF-CSU-03: 4.0 TR
MF-CSU-01, 02 & 03: 8.2 TR
MF-CSU- 04 & 05: 6.54 TR
MF-CSU- 06 to 12: 8.2 TR

AIR COOLED LIQUID CHILLERS :


(EER, COP >2.8 rated,R 134a / R407C HFC refrigerant to deliver 75.0 TR @ 110 F ambient, 180 U
GPM.power supply of 415 v / 3 ph / 50 Hz.)

Chilled Water Pumps: PCHWP - 01 to 03(180 US GPM & 27 M Head,IE 3 suitable for 415 10% vo
50 cycles, 3 phase AC)

Secondary Chilled Water Pumps: SCHWP - 01 to 03 (180 US GPM & 16 M Head,IE 3 suitable for 41
10% volts, 50 cycles, 3 phase AC)
Expansion Tank - 500 lts ( working pressures of 125 psig and 240F. )

Air seperator ( centrifugal type, design pressuresfor 125 psig @ 350 F, suitable for 360 gpm.)
CHILLED WATER AIR HANDLING UNITS:
GF-AHU01: 6000 cfu ( 14.0 TR Total Capacity and 11.5 TR Sensible Capacity,6000 cfm, Mo
4.0* KW, 1440 rpm TEFC, IE - 3 Energy efficient, Sq. Cage motor, IP 55, 50 C, Class F insulation.)
FF-AHU01: (18000 cfu,32.0 TR Total Capacity and 28.0 TR Sensible Capacity )
SF-AHU01: (7500 cfu 14.0 TR Total Capacity and 12.0 TR Sensible Capacity)
CHILLED WATER CEILING SUSPENDED UNITS:
SF CSU 1: (8.0 TR Total Capacity and 6.6TR Sensible Capacity, 3300 CFM,)
SF CSU 2: 6.0 TR Total Capacity and 5.0TR Sensible Capacity, 3000 CFM

CHILLED WATER CEILING SUSPENDED CASETTE UNITS :


GF CU 1 - 3.0 TR / 1600 CFM Complete with room thermostat, valve package, control package, fix
devices etc., Units to be selected at EAT 73.2 / 62.2 dwg F DB /WB.
GF CU 2 to 4 -( 3.0 TR / 1600 CFM )
Classified - Confidential
188 of 338

List of Machineries
EQUIPMENT NAME
GF CU 5 - (1.5 TR / 750 CFM )
GF CU 6 - (2.0 TR / 950 CFM )
FF CU 1 to 6 - (2.0 TR / 1200 CFM )
FF CU 7 - (1.5 TR / 600 CFM )
FF CU 8 - (2.5 TR / 1000 CFM)
FF CU 9 - (2.0 TR / 900 CFM)
FF CU 10 & 11 - (2.5 TR / 1500 CFM)
SF CU 1 - (2.5 TR / 1100 CFM )
SF CU 2 & 3 - (2.0 TR / 900 CFM)
SF CU 4 - (3.0 TR / 1800 CFM )
SF CU 5 - (2.0 TR / 1200 CFM)
SF CU 6 - (2.5 TR / 1300 CFM )
SF CU 7 - (2.0 TR / 1150 CFM )
SF CU 8 to 11 - ( 2.0 TR / 1150 CFM )

CHILLED WATER HI WALL UNITS:


FF HW 1 & 2 - (1.5 TR / 850 CFM Complete with room thermostat, valve package, control package
fixing devices etc., Units to be selected at EAT 73.3 / 62.1 dwg F DB /WB.)
FF HW 3 & 4 - ( 1.5TR / 850 CFM )

AXIAL FLOW FAN:


EF-01 Fan Capacity / rating shall be: 26000 CFM @ 76.2 mmwg Motor : 18.5 kw @ 2/4 Poles
CABINET TYPE FAN UNIT for Supply & Exhaust:
Exhaust unit - Fan Capacity / rating shall be: 1500 CFM @ 40 mmwg Motor : 1.15KW @ 4 Poles,Sp
1450 rpm, power supply - 415V/3ph/60Hz.
Exhaust unit - Fan Capacity (1400 CFM @ 40 mmwg )
Exhaust unit - Fan Capacity (650 CFM @ 40 mmwg )
Supply unit - Fan Capacity( 1500 CFM @ 40 mmwg )
Supply unit - Fan Capacity ( 550 CFM @ 40 mmwg )
Supply unit - Fan Capacity( 550 CFM @ 40 mmwg )
Kitchen fresh air unit - Fan Capacity:(2200 CFM @ 40 mmwg )
EXHAUST AIR UNITS :
Kitchen exhaust unit - Fan (Capacity 2500 CFM @ 40 mmwg)
IN LINE CIRCULAR FANS - CENTRIFUGAL FAN :
TF EAU 1 - 400 cfm @ 10 mm WC S.P. (WITHOUT FILTER)
TF FAU 1 - 340 cfm @ 10 mm WC S.P.
GF FAU 1 - 500 cfm @ 10 mm WC S.P.
FF FAU 1 - 600 cfm @ 10 mm WC S.P.
SF FAU 1 - 800 cfm @ 10 mm WC S.P.
HI WALL SPLIT AIR CONDITIONERS - UPS & SERVER ROOM ( 2.0 TR )
Digital Thermostat(Operating voltage: 230V + 10%; AC 50/60 Hz)
Humidistat (Voltage: 18-30 VAC, 60Hz,Control Range: 10% - 90% RH,Accuracy: + / - 3% RH )

Classified - Confidential

189 of 338

List of Machineries
EQUIPMENT NAME
MV Panels and accessories
FREE STANDING VERTICAL FLOOR STANDING UNIT - PRAYER ROOM:
FSU - 4.5 TR
FSU - 3.5 TR
BIG BLADE FANS: WARE HOUSE
TUBE AXIAL EXHAUST AIR FANS FOR VAM PLANT ROOM :
EAF - 01 to 04: Each Fan Capacity / rating shall be: 10000cfm @ 12.5 mmwg Motor of 2.2 KW
rating, Speed 1450 rpm, power supply - 415V / 3ph / 50Hz

ROOF EXHAUST AIR FANS:


RF-01 to 32 : Fan Capacity / rating shall be: 8250 CFM @ 10 mmwg Motor: 1.1 KW, 1450 rpm TEF
Sq. Cage motor. Motors shall be IE - 3 Energy efficient motor. (FOR LINE AREA / WARE HOUSE)

RF-01 & 02 : Fan Capacity / rating shall be: 2000 CFM @ 10 mmwg Motor: 0.37 KW, 1450 rpm TE
Sq. Cage motor.Motors shall be IE - 3 Energy efficient motor. (FOR WELDING ROOM)
WALL MOUNTED FANS:
4000 CFM with 5mm WC TSP (EXHAUST AIR FAN) 1450 rpm TEFC Sq. Cage motor. Motors shall be
3 Energy efficient motor. (Staging area)
3500 CFM with 5mm WC TSP (SUPPLY AIR FAN) 1450 rpm TEFC Sq. Cage motor. Motors shall be IE
Energy efficient motor. (Staging area)
T. LIFT
Elevator
U. KITCHEN and CANTEEN
SS Furnitures & accessories
V. VAM CHILLER
VAM Chiller ( Capacity - 300 TR) & accessories
Chiller water pumps & accessories
VFD panel & accessories
Hot/Cold well Tank ( capacity - 65 KL)
Condenser cooling tower with pumps and accessories
Self Contaminated modular stainless steel CIP items for the PHEs
Chilled water MS piping accessories with butterfly valves
Water fitting accessories - flange, valves, strainer, differential pressure transmitter
Medium voltage switchboard with accessories
Power cable and accessories
GI cable tray and accessories
Chiller SCADA control Panel with system
VAM chiller spare parts
W. BOILER
Boiler (4 TON)
Feed water Tank ( 10 KL)
Chemical dosing system
Oil Ring main station
Sampling Station
Boiler MCC Panel
Classified - Confidential
190 of 338

List of Machineries
EQUIPMENT NAME
PLC control Panel
Safety Control Panel
HSD Day Tank (1 KL)
Feed water day tank (10 KL)
Feed water pumps & accessories
Oxygen Level detector Panel
Steam Header
Steam PRV station
Blowdown Vessel
MS Chimney and related accessories
X. GENERATOR AND ACCESSORIES
Gas Generator Set (Capacity - 1850 KVA) and accessories
Diesel Generator Set (2000 KVA) and accessories
Diesel Generator Set (500 KVA) and accessorie
MCC Panel & Auxiliaries
LT AMF/Sunchronizing Panel
Remote radiator with pumps and accessories
Fuel Day tank ( 1 KL) and accessories
Vantilation Fans
MCC panel for Gas Generators & Diesel Generators
Power cable ( 1100 - 650 voltage) & accessories
GI cable tray and accessories
LT AMF/Sunchronizing Panel

Classified - Confidential

191 of 338

List of Machineries
EQUIPMENT NAME
Y. ELECTRICAL HT, LT AND ACCESSORIES
33 KV HT panel and accessories
11 KV HT panel and accessories
Power transformer ( 33 KV/ 11 KV); Capacity - 4000 KVA
Power transfomer ( 11 KV/.44 KV); Capacity - 2500 KVA
Power cables (33000 voltage) & accessories
Power cables (11000 voltage) & accessories
Power cables (1100 V - 750 Voltage) & accessories
Meduim voltage (440 Voltge) switchboard panels and accessories
UPS with battery sets ( Capacity - 60 KVA & 30 KVA)
Voltage stabilizer - 315 KVA
Distribution boards ( 440 voltage) and accessories
Adaptor boxes for distribution board and accessories
EMT conduits and accessories
Switches, sockets and accessoreis
GI cable trays and accessories
GI Pipes & accessories
Earthing tapes/wires, chemicals and accessories
Indoor light fixtures, lamps and accessories
Celling fans, exhaust fans and accessories
Outdoor light fixture and accessories
Solar street light and accessories
Lightning protection equipments
Z. COMPRESSOR & ACCESSORIES
Non-lubricated oil free type, air cooled air compressor set ( Capacity - 600 CFM)
Refrigerated Air Dryer System ( Capacity - 800 CFM)
Air Receiver ( Capacity - 4 CUM & 2 CUM)
Air filters & accessories
GI Pipes & accessories
PLC based Control panel
Spare Parts for air compressors unit
Medium Voltage Swich board
Power cable ( 1100 - 650 voltage) & accessories
GI cable tray and accessories
AA. UTILITY PIPING
SS tube & accessories ( multiple sizes)
GI Pipes & accessories ( multiple sizes)
GI Flanges & accessories ( multiple sizes)
Centrifugal transfer pump & accessories ( multiple sizes)
Seamless carbon steel pipes & accessories ( multiple sizes)
MS Pipes & accessories ( multiple sizes)
AB. PET Crusher unit
PET Crushing machine
Classified - Confidential
192 of 338

List of Machineries
EQUIPMENT NAME
AC. Racking system
Racking system
AD. Miscelleneous items
Weigh Bridge
Ozonator
Solar Panel
PA system
Visitor management system
Hygiene and general facilities
Solar water heater
Office furniture
Water distribution sprinkles
IT Equipment
SLE monitoring system
House keeping equipments
Clean Outside Process system
Ultra Violet system
N2 vacuum insulated piping
Harmonic filter
Ambulance
A&E Firm for designing
Safety Equipment
Moulds & Change Parts
720 BPM CSD LINE
600 BPM WATER LINE EQUIPMENT
SUGAR DISSOLVING SYSTEM
WTP PLANT
HVAC System
UTILITY PIPING & VALVES
CO2 and LN2 SYSTEM
COMPRESSOR & ACCESSORIES
FIRE PROTECTION & DETECTION SYSTEM
PET Crusher unit
DOOR ACCESS CONTROLLER and CCTV
KITCHEN and CANTEEN
MATERIAL HANDLING EQUIPMENTS
LAB EQUIPMENT
Total

Classified - Confidential

193 of 338

List of Machineries
QTY
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
3
1
2
1
1
1
1
1
1
1
1
1

Value in USD

Value in BDT

5,975,955

464,032,906

8,152,718

633,058,547

1
1
1
1
1
1
1
1
1
1
Classified - Confidential

194 of 338

List of Machineries
QTY
2
1
1
1
1
1
1
1
1
1
1
1
1
1
3
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2

Value in USD

Value in BDT

1
Classified - Confidential

195 of 338

List of Machineries
QTY
1
1
1
1
1
1

Value in USD

Value in BDT

1
1
1
1
1
1
2
2
1
1
1
1
1
2
1
1
2
2
2
1
1
1
1
5
1
1
2
1

2,064,340

160,296,000

4
1
1
1
1
1
Classified - Confidential

196 of 338

List of Machineries
QTY
2
1
1

Value in USD

Value in BDT

3
2
2
1
1
2
2
1

1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
4
3
1
1
1
2
1
2
1
1

1,586,419

123,185,412

Classified - Confidential

197 of 338

1,586,419

123,185,412

List of Machineries
QTY
1
1
1
2
1
1
1
1
1
2
1
2
1
1
2
2
1 SET
1 SET
1 SET
1 SET
1 SET
1 SET
1 SET
1
1

Value in USD

Value in BDT

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Classified - Confidential

198 of 338

List of Machineries
QTY
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Value in USD

259,441

Value in BDT

20,145,611

Classified - Confidential

199 of 338

List of Machineries
QTY
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Value in USD

Value in BDT

1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
2
2
2
2
1
2
1
Classified - Confidential

200 of 338

List of Machineries
QTY
2
1
1
1
1
2
1
2
1
2
1
1
2
2

Value in USD

735,762

Value in BDT

57,131,936

Classified - Confidential

201 of 338

List of Machineries
QTY
1
1
1
1
1
2
1
2
1
1 Set
1 set
2 set
1 st
10 set
1 set
28 set
10 set
10 set
3 set
1 set
1 set
1 LOT
1 LOT
1 LOT
1
1
2
2
1
1
1
2
2
2
1

Value in USD

Value in BDT

620,333

48,168,880

161,491

12,539,811

1
1
2
2
4
Classified - Confidential

202 of 338

List of Machineries
QTY
1
1
1
1
2
1
1
1
1
1 Set
1
1
24
22
19
25
6
25
30
1 LOT

Value in USD

Value in BDT

441,923

34,315,294

220,155

17,095,055

Classified - Confidential

203 of 338

List of Machineries
QTY

Value in USD

Value in BDT

4
1
5
1
3
3
1
1
5
3
1

254,702

19,777,584

2
1
2
1
1
1
1
1 LOT
4
5
1 nos
1 nos
1 nos
2 nos
2 nos
1 nos
1 nos
1 nos
1 set
1 set
1 Set
1 Set
1 nos
1 nos
1 set
2 nos
1 Set
5 nos
Classified - Confidential

204 of 338

List of Machineries
QTY
5 nos
1 Set
1 Set

Value in USD

Value in BDT

1 Set
1 Set
1 set
1 Set
1 set
1 Set
1 Set
4 set
1 set
1 set
1 set
1 Lot
1 nos
3 nos
2 nos
7 nos
3 nos
3 nos
3 nos
1 nos
1 nos

1 nos
1 nos
1 nos

584,445

45,382,175

1 nos
1 nos
1 nos
3 nos
Classified - Confidential

205 of 338

584,445

45,382,175

List of Machineries
QTY
1 nos
1 nos
6 nos
1 nos
1 nos
1 nos
2 nos
1 nos
2 nos
1 nos
1 nos
1 nos
1 nos
4 nos

Value in USD

Value in BDT

2 nos
2 nos
1 lot
1 lot
1
1
1
1
1
1

nos
nos
nos
nos
nos
nos

1 nos
1 nos
1
1
1
2
4

nos
nos
nos
nos
nos

3 nos
3 nos

Classified - Confidential

206 of 338

List of Machineries
QTY
1 lot
5 nos
1 nos
3 nos

Value in USD

Value in BDT

4 nos

1 set

2 nos
2 nos
2 nos
5
1 Lot
2 set
1 set
1 set
1 set
1 Lot
1 set
1 lot
1 lot
1 lot
1 lot
1 Lot
1 set
1 lot
2
1
1
2
2
2

450,741

35,000,000

76,619

5,949,489

717,740

55,732,495

set
set
set
set
set
set
636,567

Classified - Confidential
49,429,414

207 of 338

List of Machineries
QTY
1 set
1 set
1 set
1 set
4 set
2 set
2 set
2 set
1 set
1 set
2 Set
1 Set
1 Set
1 Set
1 Set
3 set
1 Set

Value in USD

Value in BDT

636,567

49,429,414

1,931,464

149,978,170

1 Set
1 Lot
1 Lot
1 Lot

Classified - Confidential

208 of 338

List of Machineries
QTY
1 Set
2 Set
1 nos
2 nos
1 Lot
1 Lot
1 Lot
25 set
02 set
01 set
150 set
150 set
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
3 set
2 Set
2 Set
2 Set
1 Set
1 Lot
2 Set
2 Set
1 Set
1 Lot
1 Lot
1
1
1
1
1
1

Lot
Lot
Lot
Lot
Lot
Lot
1

Value in USD

Value in BDT

4,121,056

320,000,000

285,729

22,186,841

789,801

61,328,038

9,577

743,686
Classified - Confidential

209 of 338

List of Machineries
QTY
1

Value in USD
191,548

Value in BDT
14,873,723
Contingencies

6,874,295

533,789,013

37,142,821

2,884,140,081

Classified - Confidential

210 of 338

List of Machineries
Sl.No:
A. 600 BPM WATER LINE EQUIPMENT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
B. 720 BPM CSD LINE
1
2
3
4
5
6
7
8
9
10
Classified - Confidential

211 of 338

List of Machineries
Sl.No:
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
C. CIP SYSTEM (MODULE - 1)
1
Classified - Confidential

212 of 338

List of Machineries
Sl.No:
2
3
4
5
6
7
D. CIP SYSTEM (MODULE - 2)
8
9
10
11
12
13
14
15
16
E. SUGAR DISSOLVING SYSTEM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
F. READY SYRUP SYSTEM
1
2
3
4
5
6
Classified - Confidential

213 of 338

List of Machineries
Sl.No:
7
8
9
G. WATER SOURCING
1
2
3
4
5
6
7
8
H. WTP SETUP FOR WATER LINE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
I. WTP PLANT
1
2
3
4
5
6
7
8
9
10
11
12
13
Classified - Confidential

214 of 338

List of Machineries
Sl.No:
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
J. MAIN LAB
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Classified - Confidential

215 of 338

List of Machineries
Sl.No:
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
Classified - Confidential

216 of 338

List of Machineries
Sl.No:
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
K. ETP LAB EQUIPMENT
1
2
3
4
5
6
7
8
9
10
11
L. ETP TANKS & PUMPS CAPACITIES
1
2
3
4
5
6
7
8
9
10
11
Classified - Confidential

217 of 338

List of Machineries
Sl.No:
12
13
14
15
16
17
18
19
20
21
22
23
24
25

Classified - Confidential

218 of 338

List of Machineries
Sl.No:
26
27
28
29
30
31
32
33
34
M. FIRE PROTECTION & DETECTION SYSTEM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
N. HSD, ACID & LYE TANK
1
2
3
4
5
6
7
8
9
10
11
O. CO2 and LN2 SYSTEM
1
2
3
4
5
Classified - Confidential

219 of 338

List of Machineries
Sl.No:
6
7
8
9
10
11
12
13
14
15
16
17
P. DOOR ACCESS CONTROLLER and CCTV
1
2
3
4
5
6
7
8

Classified - Confidential

220 of 338

List of Machineries
Sl.No:
Q. FORKLIFT
1
2
3
4
5
6
7
8
9
10
11
R. AIR WASHER UNITS AND ACS
1
2
3
4
5
6
7
8
9
10
S. HVAC System
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Classified - Confidential

221 of 338

List of Machineries
Sl.No:
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

43
44
45
46
47
48
49
Classified - Confidential

222 of 338

List of Machineries
Sl.No:
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82

Classified - Confidential

223 of 338

List of Machineries
Sl.No:
83
93
94
95
96

97

98
99
100
T. LIFT
1
U. KITCHEN and CANTEEN
1
V. VAM CHILLER
1
2
3
4
5
6
7
8
9
10
11
12
13
W. BOILER
1
2
3
4
5
6
Classified - Confidential

224 of 338

List of Machineries
Sl.No:
7
8
9
10
11
12
13
14
15
16
X. GENERATOR AND ACCESSORIES
1
2
3
4
5
6
7
8
9
10
11
12

Classified - Confidential

225 of 338

List of Machineries
Sl.No:
Y. ELECTRICAL HT, LT AND ACCESSORIES
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Z. COMPRESSOR & ACCESSORIES
1
2
3
4
5
6
7
8
9
10
AA. UTILITY PIPING
1
2
3
4
5
6
AB. PET Crusher unit
1
Classified - Confidential

226 of 338

List of Machineries
Sl.No:
AC. Racking system
1
AD. Miscelleneous items
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Total

Classified - Confidential

227 of 338

List of Machineries
EQUIPMENT NAME
A. 600 BPM WATER LINE EQUIPMENT
Block Machine
Preform Inspection System
Blow Moulder-De-humidifier
Caps-U.V Disinfection System
Cap Feeder-Water Fall Sorter
Capper-Camera based Closure Inspection System
Capper-Bulk Closure Handling Mechanism
Filler-Fully Automatic COP System
Filler-Individual Servo Driven Chuck
HP Compressors (including Cooling Tower)
Chiller - Water Cooled Type (including Cooling Tower)
Fill Level/Closure Inspector (with FMS)
Date Coder - Laser
Date Coder - Inkjet
Bottle Dryer (Fixed before Labeler)
Bottle Conveoyor-Automatic Side Rail Adjsutment wherever required
Sampling Conveyor
Crate/Case Conveyors
Pallet Conveyors
Conveyor Cross-Overs
Labeler and Label Inspector
Sleevers
Basic Machine-Shrink Packer
Coding Machine for Shrink Wraps (Inkjet-Make)
Basic Machine
Basic Machine - Ring Type
Dry Lubrication System
UPS with all Batteries (As per Electrical Specifications)
Voltage stablizer
One Set of Moulds (N+1) - 1000 ml -Kinley
One Set of Moulds (N+1) -500ml Mold
B. 720 BPM CSD LINE
Block Machine
Preform Inspection System
Blown Bottle Inspection System
Blow Moulder-De-humidifier
Caps-U.V Disinfection System
Cap Feeder-Water Fall Sorter
Capper-Camera based Closure Inspection System
Capper-Bulk Closure Handling Mechanism
Filler-Fully Automatic COP System
Filler-Individual Servo Driven Chuck
Classified - Confidential

228 of 338

List of Machineries
EQUIPMENT NAME
HP Compressors (including Cooling Tower)
Chiller - Water Cooled Type (including Cooling Tower)
Fill Level/Closure Inspector (with FMS)
Mixer-Basic Machine
Mixer-Auto Brix and G.V Correction (Make:Anton-Paar,Model: DSRn 427(s) )
Date Coder - Laser
Date Coder - Inkjet
Warmer-Basic Machine with Auto Dew point based control.
Bottle Dryer (Fixed at Warmer/Cooling Tunnel Exit)
Bottle Dryer (Fixed before Labeler)
Bottle Conveoyor-Automatic Side Rail Adjsutment wherever required
Sampling Conveyor
Crate/Case Conveyors
Pallet Conveyors
Conveyor Cross-Overs
Labeler
Label Inspector
Basic Machine-Shrink Packer
Coding Machine for Shrink Wraps (Inkjet-Make)
Basic Machine
Basic Machine- Ring Type
Dry Lubrication System
UPS with all Batteries (As per Electrical Specifications)
Voltage stablizer
Platforms for Electrical Panels
Total Spares & Consummables for 6000 Hrs of operation
One Set of Moulds (N+1) - 400 ml - Contour) Common Base Mold
One Set of Moulds (N+1) - 400 ml - Dimple) Common Base Mold
One Set of Moulds (N+1) - 400 ml - Splash) Common Base Mold
One Set of Moulds (N+1) - 750 ml - Contour) Common Base Mold
One Set of Moulds (N+1) - 750 ml - Dimple) Common Base Mold
One Set of Moulds (N+1) - 750 ml - Splash) Common Base Mold
One Set of Moulds (N+1) - 1750 ml - Contour) Common Base Mold
One Set of Moulds (N+1) - 1750 ml - Dimple) Common Base Mold
One Set of Moulds (N+1) - 1750 ml - Splash) Common Base Mold
One Set of Moulds (N+1) - 2250 ml - Contour) Common Base Mold
One Set of Moulds (N+1) - 2250 ml - Dimple) Common Base Mold
One Set of Moulds (N+1) - 2250 ml - Splash) Common Base Mold
Second Packer & Associated Conveyors
Shifting of Preform & Closure Dumpers to Mezzanine
Capper-Additional Second set of Chucks
C. CIP SYSTEM (MODULE - 1)
RECOVERY TANK (3 KL)
Classified - Confidential

229 of 338

List of Machineries
EQUIPMENT NAME
BUFFER WATER TANK (1 KL)
RECUPERATION TANK (9 KL)
HOT WATER TANK (5 KL)
CIRCULATION PUMP (45 M3/Hr.)
CIP Skid
MCC and Control Panel
D. CIP SYSTEM (MODULE - 2)
RECUPERATION TANK (14 KL)
HOT WATER TANK (12 KL)
LYE TANK (12 KL)
CHEMICAL TANK (12 KL)
BTD TANK (3 KL)
CIP Skid
CIRCULATION PUMP (45 M3/Hr.)
Diversion Panel
MCC Panel (630 A )
E. SUGAR DISSOLVING SYSTEM
GRANULATED SUGAR SILO (5 KL)
Sugar Dumping unit along with Gantry and Duct extractor
Carbon Dumping Unit with screw conveyor
SUGAR DISSOLVING TANK (3 KL)
BTD TANK(SIMPLE SYRUP) (500 L)
BTD TANK(WATER) (200 L)
HOLDING TANK (12 KL)
DUPLEX BAG FILTER
DELLA TOFOLLA FILTER (3 KL)
HYFLO DOSING TANK (1 KL )
TUBULAR HEAT EXCHANGER
PLATE HEAT EXCHANGER (19500KG/HR)
RECOVERY TANK (10 KL)
BUFFER TANK(FILTERED SYRUP) (500 L)
Diversion Panel
SLUDGE HOLDING TANK (20 KL)
Vacuum Drum with Recovery Tank
PPPU unit for condensate recovery system
Cooling Tower for Sugar dissolving system
F. READY SYRUP SYSTEM
READY SYRUP STORAGE TANK (30 KL)
RAW SYRUP STORAGE TANK (30 KL)
CONCENTRATE MIXING TANK (500 L)
Valve Cluster System
Control Panel
MCC Panel
Classified - Confidential

230 of 338

List of Machineries
EQUIPMENT NAME
Diversion Panel
Micron Filter (1 Micron)
Concentrate Trolly
G. WATER SOURCING
Submercible Pump (100 CuM/Hr)
Raw Water transfer pump
Domestic Raw water transfer pump
Chlorine dosing tank with pump and agitator
PSF for backwash water
Soft water transfer pump
Back wash water transfer pump
MCC panel for transfer pumps
H. WTP SETUP FOR WATER LINE
ROPT - 2 TANK (20 KL)
ROPT - 2 TRANSFER PUMP (60 M3/HR)
UV (80 M3/Hr.)
PRODUCT TANK (4 KL)
PRODUCT TANK OUTLET PUMP (42 KL)
CLOSED LOOP WATER CHILLER
OZONE GENERATOR (500GRM/HR)
RECOVERY TANK (2 KL)
RECIRCULATION PUMP (15 M3/HR)
RECOVERY TANK OUTLET PUMP (42 M3/HR)
MIS
1 MICRON FILTER
0.2 MICRON FILTER
FILLER SKID PUMP
VULCATHERM UNIT
I. WTP PLANT
Filter Water Tank
Backwash Feed Pump
ACF Feed Pump
PSF
ACF
Air Compressor
Sanitization System(Hot water System)
RO1 Pass Tank
RO1 Pass tank Transfer Pump
UF Product water tank
UF product water transfer Pump
UV system with flow meter
Softener System
Classified - Confidential

231 of 338

List of Machineries
EQUIPMENT NAME
Sampling Point Recovery Tank
Sampling table with rack and work station
Chlorinated Softwater tank
Chlorinated softwater transfer pump
UF CIP tank
UF CEB acid tank with agitator
Clarifier MCC panel
WTP MCC Panel
Brine Solution tank
RO and UF Lye preparation and dosing tank
RO system with Micron Filter
RO 1 feed pump
CO2 Dosing control Panel
RO2 system with Micron Filters
RO 2 feed Pump
RO 2 Transfer Pump
Raw water Tank to Clarifier Pipe Line
RO2 Pass to ROPT 2 tank Pipe Line
Softener system to Soft water tank Pipe Line
WTP to Back Wash Tank Pipe Line
UF product tank to Treated Water Header
Domestic Raw water Main Header
Soft water Main Header
UF filtration system with micron filters
UF system Control Panel
J. MAIN LAB
Densitymeter 4500
Weighing balance (0-300 KG)
Weighing Balance (0-210gm)
Weighing Balance (0-7.1kg)
TDS/Conductivity Meter
NOISE METER
IR THERMO METER
O2 PURITY ANALYSER
PORTABLE ORP METER
LUX METER
DUCTS
bulb thermo meter
SPRING CALIBRATION KIT FOR TORQUE TESTER
Degassing asssembly
GV tester small ( <1l )
Spectro Photometer ( 190nm - 1100nm)
Analytical Weighing Balance (0 - 220gms)
Classified - Confidential

232 of 338

List of Machineries
EQUIPMENT NAME
ph meter (0 - 35000uS/L)
Turbiditymeter (0 - 4000 NTU)
Water Bath ( ambient-100c( 8 holes digital) )
Desicator ( Plastic made )
Hot Plate ( ambient-200c )
Fumming Hood ( ss 316 made )
Distllation Assmbly ( 4 lts /hr )
ozone test kit ( 0.05-2.3mg/l )
OzonePOCKET COLIRIMETER ( 0.01-0.75MG/L )
Ozone destruction unit
Heating mantle
Gas Stripping Apparaturs
conductivity meter
Laminar air flow ( 54*24*84 )
Hot plate
Millpore filtration unit - 3 set
Vaccum pump ( 1/8hp )
Microscope
Air sampler (M-air-T) (1 )
Bunsen Burner ( 1 )
Colony Counter
Innoculating Loop
Autoclave-1 ( dia 16*24 inches )
Incubator-2 ( Ambient - 50C )
Incubator-3 ( Ambient - 50C )
BOD Incubator (5 - 50C)
Oven-1 (Ambient - 250C )
Analytical Weighing Balance (0 - 220gms)
Refrigerator
Polariscope
Digital Vernier Mitutoyo (small) ( 0-150MM )
Digital Vernier Mitutoyo (large) ( 0-300MM )
Vaccum pump
Magnetic Stirrer ( with heater )
Digital Thermometer ( ..-10-200c)
Thermometers (5)nos ( 0 - 110C )
Desicator
filtration single unit
Water Bath ( ambient-100c( 8 holes digital) )
Weighing Balance ( 0.1-7100gms)
Mitutoyo Dial Thickness guage
High intensity light source
Micrometers with least Count of 0.01 mm Classified - Confidential

233 of 338

List of Machineries
EQUIPMENT NAME
Dry and wet bulb thermometer and humidity chart.
Density meter 4500 ( 0.001)
Torque tester-1
Weighing Balance ( 0.1-7100gms )
HOTWIRE BOTTLE CUTTER ( RANGE220V)
BASECLEARANCEMEMBRANE
DEADWEIGHT TESTER
FILLHEIGHT GUAGE
PREFORM NECKCUTTER
PET &PREFORM THICKNESSGUAGE
DIGITAL HEIGHT GUAGE
Top load tester
Bottle perpendicularity tester
CHLORINE TEST KIT
IRON TEST KIT
Sulphates test kit
Jar test apparatus
LOVIBAND KIT FOR CHLORINE ( 0.2 4mg/l )
SDI test kit of Approved make & model
K. ETP LAB EQUIPMENT
Conductivity ( 0 - 35000uS/L )
ph meter
Top loading Weighing Balance ( 0-620gm)
BOD Incubator (5 - 50C)
Hot Air Oven (Ambient- 250 C)
Filtration System
Muffle Furnace (Max 1000 C)
Desicater
DO meter
COD Digester AND ANALYSER
BOD track 2apparatas
L. ETP TANKS & PUMPS CAPACITIES
( 30 KL ) PUMP
COLLECTION TANK TRANSFER
( 20 M3/HR)
ACID DOSING TANK ( 1 KL )
ALKALI TANK ( 1 KL )
TANK ( 70 KL
)
EQUALISATION TRANSFER
PUMP
(10 M3/HR)
AIR BLOWER ( 200 M3/HR)
AERATION TANK ( 300 KL)
NUTRIENT DOSING PUMP ( 150 L/HR)
MBR TANK (12 KL)
PERMEATE PUMP ( 10 M3/HR)
Classified - Confidential

234 of 338

List of Machineries
EQUIPMENT NAME
AIR BLOWER ( 275 M3/HR)
BACKPULSE TANK ( 2 KL)
PERMEATE PUMP (5 M3/HR )
CITRIC ACID TANK ( 200 L)
HYPO TANK ( 200 L)
RAS PUMP ( 20 M3/HR)
PERMEATE TANK ( 55 KL)
RO FEED PUMP ( 10 M3/HR)
ACTIVATE CARBON FILTER ( 10 M3/HR)
AO DOSING TANK ( 100 L)
ACID DOSING TANK ( 100 L)
POLYELECTROLYTE DOSING TANK ( 500 L)
POLYMER DOSING PUMP ( 160 L/HR)
CENTRIFUGE FEED PUMP ( 8 M3/HR)

Classified - Confidential

235 of 338

List of Machineries
EQUIPMENT NAME
SLUDGE HOLDING TANK ( 20 KL)
CIP TANK ( 1 KL)
OZONATOR ( 15 GRM/HR)
OZONE RECYCLIC PUMP ( 5 M3/HR)
RO PERMEATE TANK (55 KL )
SOFTNER FEED PUMP ( 10 M3/HR)
SOFTENER
( 500 LPH) for MBR servicing
Monorail Arrangement
(2 TON)
ETP
Soft water Pipe Line Header
(50 NB)
M. FIRE PROTECTION & DETECTION SYSTEM
FIRE WATER PUMP (Engine Driven) ( 137Cum/hr. at 75MWC)
FIRE WATER PUMP (Motor Driven) (137Cum/hr at 75MWC)
JOCKEY PUMP (Pressure Maintenance Pump) (10.8Cum/hr. at 75MWC)
PUMP CONTROL PANELS FOR MOTOR DRIVEN FIRE & JOCKEY PUMPS
Addressable type Fire Alarm Control Panel
Repeater Panel / Remote Annunciator
Addressable-Conventional Interface Module
Control Module
Monitor Module
Addressable Relay Module
CO2 GAS SUPPRESSION SYSTEM(BOILER ROOM)
NOVEC 1230 SUPPRESSION SYSTEM(SERVER ROOM)
FIRE HOSE REEL DRUM
FIRE EXTINGUISHER
FIRE HYDRANT POINT
N. HSD, ACID & LYE TANK
HSD Tank ( 40 KL )
FO Tank ( 40 KL )
HSD Unloading Pump ( 14 M3/Hr. )
HSD Transfer Pump ( 22.6 M3/Hr )
Unloading Flexible Hose ( 2 Meters)
Acid Tank ( 16 KL )
Caustic Tank ( 16 KL )
Acid Transfer Pump
Caustic Transfer Pump
Recirculation Tank ( 2 KL)
HSD Main Header ( 50 NB )
O. CO2 and LN2 SYSTEM
Vertical CO2 Bullet ( 109 KL)
Unloading Pump
Vapourizer ( 600 LPM )
Carbon filter
Carbon Polisher
Classified - Confidential

236 of 338

List of Machineries
EQUIPMENT NAME
Sterile Filter ( 0.1 Micron )
Refrigerator ( 2 TON)
Unloading Pump control Panel
Refrigerator Control Panel
PRV Station ( 20 - 15 Bar )
Unloading Flexible Hose
DP transmitter Unit
Jacketed N2 Bulk Tank ( 6 KL)
Micron Filter ( 0.1 Micron)
Safety Valve Assembly
CO2 Main Header ( 100 NB)
N2 Main Header ( 80 NB )
P. DOOR ACCESS CONTROLLER and CCTV
CONTROLLER
READER
EGRESS SWITCH
LOCK
BIOMETRIC READER
L BRACKET
POWER SUPPLY
CCTV CAMERA

Classified - Confidential

237 of 338

List of Machineries
EQUIPMENT NAME
Q. FORKLIFT
Forklift Double Mast ( 3.5 TON )
Forklift Single Mast ( 1.5 TON)
Additional Battery
Gantry Arrangement for Battery Loading and Unloading
( 2 TON )
Stacker ( 1.2 TON)
Stacket Additional Battery
Stacket Charging station
Forklift Battery Charging station
Forklift Battery Charger
Stacker Battery Charger
RMPM Unloading Gantry System ( 2 TON )
R. AIR WASHER UNITS AND ACS
Air Washer Unit ( 12000 CFM)
Air washer Unit ( 22000 CFM)
Exhaust Unit ( 45000 CFM)
Air Washer Unit ( 50000 CFM)
Air Washer Unit ( 48000 CFM )
Air washer Unit ( 30000 CFM )
Air washer Unit ( 24000 CFM )
Split Acs ( 2 TON )
Cold Room AC units ( 10 TON)
Plenum for Water Line Blower ( 5 TON )
S. HVAC System
WEATHER
WEATHER
WEATHER
WEATHER

PROOF
PROOF
PROOF
PROOF

OUTDOOR
OUTDOOR
OUTDOOR
OUTDOOR

AHU
AHU
AHU
AHU

50000
26000
52000
31500

cfm
cfm
cfm
cfm

(READY SYRUP ROOM)


(CIP ROOM)
(SUGAR DISSOLVING ROOM)
(LINE AREA VENTILATION)

Exhaust AHU 22000 cfm (READY SYRUP ROOM)


Exhaust AHU 23000 cfm (CIP ROOM)
Exhaust AHU 46000 cfm (SUGAR DISOLVING ROOM)
Exhaust AHU 29500 cfm (SUGAR DUMPING AND STORE)
ROOF EXHAUST AIR FANS 2250 cfm
ROOF EXHAUST AIR FANS 6700 cfm
CABINET TYPE SUPPLY AIR UNIT 31000 cfm (SUGAR DUMPING AND STORE)
CABINET TYPE SUPPLY AIR UNIT 33000 cfm ( SUGAR DUMPING AND STORE)
CEILING CONCEALED DUCTABLE SPLIT UNIT( 8.5 TR )
CEILING CONCEALED DUCTABLE SPLIT UNIT( 3.0 TR )
HI WALL SPLIT AIR CONDITIONERS - PREFORM AND CAPPER STORE ( 2 TR )
EXHAUST AIR FAN -(1250 CFM with 5mm WC TSP)- FORK LIFT CHARGER
EXHAUST AIR FAN (3000 CFM
with 5mm WC TSP)
Digital
Thermostat(Operating voltage: 230V + 10%; AC 50/60 Hz)
Classified - Confidential

238 of 338

List of Machineries
EQUIPMENT NAME
Humidistat (Voltage: 18-30 VAC, 60Hz,Control Range: 10% - 90% RH,Accuracy: + / - 3% RH )
AHU MV Panels:weather proof MCC Panel and Distribution Boards ( 3 phase 415V )
1000 Amps Microprocessor based adjustable ACB (EDO type) as Incoming feeder
Outdoor Condensing Units (ODU) of minimum COP 3.0 to 4.0
26 HP (GF-VRF -ODU -1) - (COMPRISING 18 HP X 1No. + 8HP X 1No.)
22 HP (GF-VRF -ODU -2) - (COMPRISING 10 HP X 1No. X 12HP X 1No.)
32 HP (MF-VRF -ODU -1) - (COMPRISING 16 HP X 2 No )
24 HP (MF-VRF -ODU -2) - (COMPRISING 16 HP X 1 No + 8HP X 1No.)
10 HP (MF-VRF -ODU -3) - (COMPRISING 10 HP X 1No.)
42 HP (MF-VRF -ODU -4) - (COMPRISING 18 HP X 1No. + 16 HP X 1NO + 8HP X 1No.)
32
HP (MF-VRF
-ODU -5) - (COMPRISING
16 HP X 2 No )
Cassette
Type Airconditioning
Units
MF-CAS-01, 02, 04 & 05: 2.64 TR
MF-CAS-03: 2.0 TR
MF-CAS-06:
4.0Wall
TR Type Indoor Units:
Decorative HiGF-HW-01:
1.65TR
Ductable Type
Indoor Units:
GF-CSU-01,02, 04 & 05: 8.2 TR
GF-CSU-03: 4.0 TR
MF-CSU-01, 02 & 03: 8.2 TR
MF-CSU- 04 & 05: 6.54 TR
MF-CSU- 06 to 12: 8.2 TR

AIR COOLED LIQUID CHILLERS :


(EER, COP >2.8 rated,R 134a / R407C HFC refrigerant to deliver 75.0 TR @ 110 F ambient, 180 U
GPM.power supply of 415 v / 3 ph / 50 Hz.)

Chilled Water Pumps: PCHWP - 01 to 03(180 US GPM & 27 M Head,IE 3 suitable for 415 10% vo
50 cycles, 3 phase AC)

Secondary Chilled Water Pumps: SCHWP - 01 to 03 (180 US GPM & 16 M Head,IE 3 suitable for 41
10% volts, 50 cycles, 3 phase AC)
Expansion Tank - 500 lts ( working pressures of 125 psig and 240F. )

Air seperator ( centrifugal type, design pressuresfor 125 psig @ 350 F, suitable for 360 gpm.)
CHILLED WATER AIR HANDLING UNITS:
GF-AHU01: 6000 cfu ( 14.0 TR Total Capacity and 11.5 TR Sensible Capacity,6000 cfm, Mo
4.0* KW, 1440 rpm TEFC, IE - 3 Energy efficient, Sq. Cage motor, IP 55, 50 C, Class F insulation.)
FF-AHU01: (18000 cfu,32.0 TR Total Capacity and 28.0 TR Sensible Capacity )
SF-AHU01: (7500 cfu 14.0 TR Total Capacity and 12.0 TR Sensible Capacity)
CHILLED WATER CEILING SUSPENDED UNITS:
SF CSU 1: (8.0 TR Total Capacity and 6.6TR Sensible Capacity, 3300 CFM,)
SF CSU 2: 6.0 TR Total Capacity and 5.0TR Sensible Capacity, 3000 CFM

CHILLED WATER CEILING SUSPENDED CASETTE UNITS :


GF CU 1 - 3.0 TR / 1600 CFM Complete with room thermostat, valve package, control package, fix
devices etc., Units to be selected at EAT 73.2 / 62.2 dwg F DB /WB.
GF CU 2 to 4 -( 3.0 TR / 1600 CFM )
Classified - Confidential
239 of 338

List of Machineries
EQUIPMENT NAME
GF CU 5 - (1.5 TR / 750 CFM )
GF CU 6 - (2.0 TR / 950 CFM )
FF CU 1 to 6 - (2.0 TR / 1200 CFM )
FF CU 7 - (1.5 TR / 600 CFM )
FF CU 8 - (2.5 TR / 1000 CFM)
FF CU 9 - (2.0 TR / 900 CFM)
FF CU 10 & 11 - (2.5 TR / 1500 CFM)
SF CU 1 - (2.5 TR / 1100 CFM )
SF CU 2 & 3 - (2.0 TR / 900 CFM)
SF CU 4 - (3.0 TR / 1800 CFM )
SF CU 5 - (2.0 TR / 1200 CFM)
SF CU 6 - (2.5 TR / 1300 CFM )
SF CU 7 - (2.0 TR / 1150 CFM )
SF CU 8 to 11 - ( 2.0 TR / 1150 CFM )

CHILLED WATER HI WALL UNITS:


FF HW 1 & 2 - (1.5 TR / 850 CFM Complete with room thermostat, valve package, control package
fixing devices etc., Units to be selected at EAT 73.3 / 62.1 dwg F DB /WB.)
FF HW 3 & 4 - ( 1.5TR / 850 CFM )

AXIAL FLOW FAN:


EF-01 Fan Capacity / rating shall be: 26000 CFM @ 76.2 mmwg Motor : 18.5 kw @ 2/4 Poles
CABINET TYPE FAN UNIT for Supply & Exhaust:
Exhaust unit - Fan Capacity / rating shall be: 1500 CFM @ 40 mmwg Motor : 1.15KW @ 4 Poles,Sp
1450 rpm, power supply - 415V/3ph/60Hz.
Exhaust unit - Fan Capacity (1400 CFM @ 40 mmwg )
Exhaust unit - Fan Capacity (650 CFM @ 40 mmwg )
Supply unit - Fan Capacity( 1500 CFM @ 40 mmwg )
Supply unit - Fan Capacity ( 550 CFM @ 40 mmwg )
Supply unit - Fan Capacity( 550 CFM @ 40 mmwg )
Kitchen fresh air unit - Fan Capacity:(2200 CFM @ 40 mmwg )
EXHAUST AIR UNITS :
Kitchen exhaust unit - Fan (Capacity 2500 CFM @ 40 mmwg)
IN LINE CIRCULAR FANS - CENTRIFUGAL FAN :
TF EAU 1 - 400 cfm @ 10 mm WC S.P. (WITHOUT FILTER)
TF FAU 1 - 340 cfm @ 10 mm WC S.P.
GF FAU 1 - 500 cfm @ 10 mm WC S.P.
FF FAU 1 - 600 cfm @ 10 mm WC S.P.
SF FAU 1 - 800 cfm @ 10 mm WC S.P.
HI WALL SPLIT AIR CONDITIONERS - UPS & SERVER ROOM ( 2.0 TR )
Digital Thermostat(Operating voltage: 230V + 10%; AC 50/60 Hz)
Humidistat (Voltage: 18-30 VAC, 60Hz,Control Range: 10% - 90% RH,Accuracy: + / - 3% RH )

Classified - Confidential

240 of 338

List of Machineries
EQUIPMENT NAME
MV Panels and accessories
FREE STANDING VERTICAL FLOOR STANDING UNIT - PRAYER ROOM:
FSU - 4.5 TR
FSU - 3.5 TR
BIG BLADE FANS: WARE HOUSE
TUBE AXIAL EXHAUST AIR FANS FOR VAM PLANT ROOM :
EAF - 01 to 04: Each Fan Capacity / rating shall be: 10000cfm @ 12.5 mmwg Motor of 2.2 KW
rating, Speed 1450 rpm, power supply - 415V / 3ph / 50Hz

ROOF EXHAUST AIR FANS:


RF-01 to 32 : Fan Capacity / rating shall be: 8250 CFM @ 10 mmwg Motor: 1.1 KW, 1450 rpm TEF
Sq. Cage motor. Motors shall be IE - 3 Energy efficient motor. (FOR LINE AREA / WARE HOUSE)

RF-01 & 02 : Fan Capacity / rating shall be: 2000 CFM @ 10 mmwg Motor: 0.37 KW, 1450 rpm TE
Sq. Cage motor.Motors shall be IE - 3 Energy efficient motor. (FOR WELDING ROOM)
WALL MOUNTED FANS:
4000 CFM with 5mm WC TSP (EXHAUST AIR FAN) 1450 rpm TEFC Sq. Cage motor. Motors shall be
3 Energy efficient motor. (Staging area)
3500 CFM with 5mm WC TSP (SUPPLY AIR FAN) 1450 rpm TEFC Sq. Cage motor. Motors shall be IE
Energy efficient motor. (Staging area)
T. LIFT
Elevator
U. KITCHEN and CANTEEN
SS Furnitures & accessories
V. VAM CHILLER
VAM Chiller ( Capacity - 300 TR) & accessories
Chiller water pumps & accessories
VFD panel & accessories
Hot/Cold well Tank ( capacity - 65 KL)
Condenser cooling tower with pumps and accessories
Self Contaminated modular stainless steel CIP items for the PHEs
Chilled water MS piping accessories with butterfly valves
Water fitting accessories - flange, valves, strainer, differential pressure transmitter
Medium voltage switchboard with accessories
Power cable and accessories
GI cable tray and accessories
Chiller SCADA control Panel with system
VAM chiller spare parts
W. BOILER
Boiler (4 TON)
Feed water Tank ( 10 KL)
Chemical dosing system
Oil Ring main station
Sampling Station
Boiler MCC Panel
Classified - Confidential
241 of 338

List of Machineries
EQUIPMENT NAME
PLC control Panel
Safety Control Panel
HSD Day Tank (1 KL)
Feed water day tank (10 KL)
Feed water pumps & accessories
Oxygen Level detector Panel
Steam Header
Steam PRV station
Blowdown Vessel
MS Chimney and related accessories
X. GENERATOR AND ACCESSORIES
Gas Generator Set (Capacity - 1850 KVA) and accessories
Diesel Generator Set (2000 KVA) and accessories
Diesel Generator Set (500 KVA) and accessorie
MCC Panel & Auxiliaries
LT AMF/Sunchronizing Panel
Remote radiator with pumps and accessories
Fuel Day tank ( 1 KL) and accessories
Vantilation Fans
MCC panel for Gas Generators & Diesel Generators
Power cable ( 1100 - 650 voltage) & accessories
GI cable tray and accessories
LT AMF/Sunchronizing Panel

Classified - Confidential

242 of 338

List of Machineries
EQUIPMENT NAME
Y. ELECTRICAL HT, LT AND ACCESSORIES
33 KV HT panel and accessories
11 KV HT panel and accessories
Power transformer ( 33 KV/ 11 KV); Capacity - 4000 KVA
Power transfomer ( 11 KV/.44 KV); Capacity - 2500 KVA
Power cables (33000 voltage) & accessories
Power cables (11000 voltage) & accessories
Power cables (1100 V - 750 Voltage) & accessories
Meduim voltage (440 Voltge) switchboard panels and accessories
UPS with battery sets ( Capacity - 60 KVA & 30 KVA)
Voltage stabilizer - 315 KVA
Distribution boards ( 440 voltage) and accessories
Adaptor boxes for distribution board and accessories
EMT conduits and accessories
Switches, sockets and accessoreis
GI cable trays and accessories
GI Pipes & accessories
Earthing tapes/wires, chemicals and accessories
Indoor light fixtures, lamps and accessories
Celling fans, exhaust fans and accessories
Outdoor light fixture and accessories
Solar street light and accessories
Lightning protection equipments
Z. COMPRESSOR & ACCESSORIES
Non-lubricated oil free type, air cooled air compressor set ( Capacity - 600 CFM)
Refrigerated Air Dryer System ( Capacity - 800 CFM)
Air Receiver ( Capacity - 4 CUM & 2 CUM)
Air filters & accessories
GI Pipes & accessories
PLC based Control panel
Spare Parts for air compressors unit
Medium Voltage Swich board
Power cable ( 1100 - 650 voltage) & accessories
GI cable tray and accessories
AA. UTILITY PIPING
SS tube & accessories ( multiple sizes)
GI Pipes & accessories ( multiple sizes)
GI Flanges & accessories ( multiple sizes)
Centrifugal transfer pump & accessories ( multiple sizes)
Seamless carbon steel pipes & accessories ( multiple sizes)
MS Pipes & accessories ( multiple sizes)
AB. PET Crusher unit
PET Crushing machine
Classified - Confidential
243 of 338

List of Machineries
EQUIPMENT NAME
AC. Racking system
Racking system
AD. Miscelleneous items
Weigh Bridge
Ozonator
Solar Panel
PA system
Visitor management system
Hygiene and general facilities
Solar water heater
Office furniture
Water distribution sprinkles
IT Equipment
SLE monitoring system
House keeping equipments
Clean Outside Process system
Ultra Violet system
N2 vacuum insulated piping
Harmonic filter
Ambulance
A&E Firm for designing
Safety Equipment
Moulds & Change Parts
Total

Classified - Confidential

244 of 338

List of Machineries
QTY
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
3
1
2
1
1
1
1
1
1
1
1
1

Value in USD

Value in BDT

6,251,547

485,432,640

8,738,553

678,548,640

1
1
1
1
1
1
1
1
1
1
Classified - Confidential

245 of 338

List of Machineries
QTY
2
1
1
1
1
1
1
1
1
1
1
1
1
1
3
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2

Value in USD

Value in BDT

1
Classified - Confidential

246 of 338

List of Machineries
QTY
1
1
1
1
1
1

Value in USD

Value in BDT

1
1
1
1
1
1
2
2
1
1
1
1
1
2
1
1
2
2
2
1
1
1
1
5
1
1
2
1

2,167,557

168,310,800

4
1
1
1
1
1
Classified - Confidential

247 of 338

List of Machineries
QTY
2
1
1

Value in USD

Value in BDT

3
2
2
1
1
2
2
1

1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
4
3
1
1
1
2
1
2
1
1

1,858,750

144,331,967

Classified - Confidential

248 of 338

1,858,750

144,331,967

List of Machineries
QTY
1
1
1
2
1
1
1
1
1
2
1
2
1
1
2
2
1 SET
1 SET
1 SET
1 SET
1 SET
1 SET
1 SET
1
1

Value in USD

Value in BDT

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Classified - Confidential

249 of 338

List of Machineries
QTY
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Value in USD

471,159

Value in BDT

36,585,535

Classified - Confidential

250 of 338

List of Machineries
QTY
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Value in USD

Value in BDT

1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
2
2
2
2
1
2
1
Classified - Confidential

251 of 338

List of Machineries
QTY
2
1
1
1
1
2
1
2
1
2
1
1
2
2

Value in USD

735,762

Value in BDT

57,131,936

Classified - Confidential

252 of 338

List of Machineries
QTY
1
1
1
1
1
2
1
2
1
1 Set
1 set
2 set
1 st
10 set
1 set
28 set
10 set
10 set
3 set
1 set
1 set
1 LOT
1 LOT
1 LOT
1
1
2
2
1
1
1
2
2
2
1

Value in USD

Value in BDT

741,163

57,551,274

161,491

12,539,811

1
1
2
2
4
Classified - Confidential

253 of 338

List of Machineries
QTY
1
1
1
1
2
1
1
1
1
1 Set
1
1
24
22
19
25
6
25
30
1 LOT

Value in USD

Value in BDT

464,082

36,036,000

231,163

17,949,808

Classified - Confidential

254 of 338

List of Machineries
QTY

Value in USD

Value in BDT

4
1
5
1
3
3
1
1
5
3
1

286,227

22,225,508

2
1
2
1
1
1
1
1 LOT
4
5
1 nos
1 nos
1 nos
2 nos
2 nos
1 nos
1 nos
1 nos
1 set
1 set
1 Set
1 Set
1 nos
1 nos
1 set
2 nos
1 Set
5 nos
Classified - Confidential

255 of 338

List of Machineries
QTY
5 nos
1 Set
1 Set

Value in USD

Value in BDT

1 Set
1 Set
1 set
1 Set
1 set
1 Set
1 Set
4 set
1 set
1 set
1 set
1 Lot
1 nos
3 nos
2 nos
7 nos
3 nos
3 nos
3 nos
1 nos
1 nos

1 nos
1 nos
1 nos

743,903

57,764,103

1 nos
1 nos
1 nos
3 nos
Classified - Confidential

256 of 338

743,903

57,764,103

List of Machineries
QTY
1 nos
1 nos
6 nos
1 nos
1 nos
1 nos
2 nos
1 nos
2 nos
1 nos
1 nos
1 nos
1 nos
4 nos

Value in USD

Value in BDT

2 nos
2 nos
1 lot
1 lot
1
1
1
1
1
1

nos
nos
nos
nos
nos
nos

1 nos
1 nos
1
1
1
2
4

nos
nos
nos
nos
nos

3 nos
3 nos

Classified - Confidential

257 of 338

List of Machineries
QTY
1 lot
5 nos
1 nos
3 nos

Value in USD

Value in BDT

4 nos

1 set

2 nos
2 nos
2 nos
5

450,741

35,000,000

1 Lot

214,534

16,658,570

717,740

55,732,495

2 set
1 set
1 set
1 set
1 Lot
1 set
1 lot
1 lot
1 lot
1 lot
1 Lot
1 set
1 lot
2
1
1
2
2
2

set
set
set
set
set
set
636,567

Classified - Confidential
49,429,414

258 of 338

List of Machineries
QTY
1 set
1 set
1 set
1 set
4 set
2 set
2 set
2 set
1 set
1 set
2 Set
1 Set
1 Set
1 Set
1 Set
3 set
1 Set

Value in USD

Value in BDT

636,567

49,429,414

1,931,464

149,978,170

1 Set
1 Lot
1 Lot
1 Lot

Classified - Confidential

259 of 338

List of Machineries
QTY
1 Set
2 Set
1 nos
2 nos
1 Lot
1 Lot
1 Lot
25 set
02 set
01 set
150 set
150 set
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
3 set
2 Set
2 Set
2 Set
1 Set
1 Lot
2 Set
2 Set
1 Set
1 Lot
1 Lot
1
1
1
1
1
1

Lot
Lot
Lot
Lot
Lot
Lot
1

Value in USD

Value in BDT

4,121,056

320,000,000

313,810

24,367,379

1,600,213

124,256,512

25,757

2,000,000
Classified - Confidential

260 of 338

List of Machineries
QTY

Value in USD

Value in BDT

191,548

14,873,723
Contingencies

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

4,088,032

317,435,716

37,142,820

2,884,140,000

Classified - Confidential

261 of 338

List of Machineries

Sl.No:
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
S.
T.
U.
V.
W.

Revised Main Category

Category EQUIPMENT NAME Budget

720 BPM CSD LINE


600 BPM WATER LINE EQUIPMENT
SUGAR DISSOLVING SYSTEM
WTP PLANT
VAM CHILLER
HVAC System
UTILITY PIPING & VALVES
BOILER
CO2 and LN2 SYSTEM
COMPRESSOR & ACCESSORIES
FIRE PROTECTION & DETECTION SYSTEM
PET Crusher unit
HSD, ACID & LYE TANK
DOOR ACCESS CONTROLLER and CCTV
KITCHEN and CANTEEN
ELECTRICAL HT, LT AND ACCESSORIES
GENERATOR AND ACCESSORIES
IT Equipment
MATERIAL HANDLING EQUIPMENTS
Racking system
LAB EQUIPMENT
ETP TANKS & PUMPS CAPACITIES
Miscelleneous items
Weigh Bridge
Ozonator
Solar Panel
PA system
Visitor management system
Hygiene and general facilities
Solar water heater
Office furniture
Water distribution sprinkles
SLE monitoring system
House keeping equipments
Clean Outside Process system
Ultra Violet system
N2 vacuum insulated piping
Harmonic filter
Ambulance
A&E Firm for designing
Safety Equipment
Moulds & Change Parts
Husky Machine for Preform mfg
Machinery total

Line equipment
Annexure
Line Equipment
Annexure
Process Equipment Annexure
Support Equipment Annexure
Utilities Equipment Annexure
Utilities Equipment Annexure
Utilities Equipment Annexure
Utilities Equipment Annexure
Utilities Equipment Annexure
Utilities Equipment Annexure
Utilities Equipment Annexure
Utilities Equipment Annexure
Utilities Equipment Annexure
Utilities Equipment Annexure
Utilities Equipment Annexure
Electricals
Annexure
Electricals
Annexure
IT Infra
Annexure
Material Handling Eq Annexure
Material Handling Eq Annexure
QA Lab Equipment
Annexure
ETP & Misc
Annexure
Contingencies
Support Equipment
Line equipment
Electricals

Land Development, Civil & PEB


Site Office & Preoperative Exp
Community service center
CSR
Landscaping and green belt
Happiness factory
LEED certification
Contingency
Preliminary expenses
Environmental Due Deligence
Land
Land, DD, Civil, preoperatives total
Grand Total

Civil

Support Equipment
Line equipment
Support Equipment

Others
Safety
Line equipment
Line equipment

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

LOI/CC Done

LOI to be
issued

Balance Budget

Value submitt Additional val Revised LoM v R3

1,317,278,298
172,940,936
166,806,894
56,762,144
103,329,480
65,974,910
40,328,769
55,355,181
22,596,739
56,707,230
675,740
12,771,482
15,000,000
377,874,304
30,121,162
25,728,117
57,166,164
26,677,638
46,554,782
5,729,663
151,398,607
13,115,357
50,050,412
2,870,944,008

660,068,640
531,409,830
169,207,500
144,268,154
50,773,800
289,369,906
151,305,665
40,715,144
36,960,000
24,992,184
57,551,274
275,426,413
72,696,206
48,199,200
147,635,738
2,700,579,654

18,480,000
103,329,480
2,000,000
17,949,808
16,658,570
19,695,330
64,043,820
25,728,117
57,166,164
2,000,000
36,677,638
4,700,000
27,871,641
2,000,000
1,000,000
2,500,000
7,500,000
2,000,000
10,000,000
3,000,000
4,032,000
3,000,000
3,000,000
16,329,222
6,720,000
15,209,977
3,000,000
18,115,357
100,133,266
593,840,390

638,729,658
(531,409,830)
3,733,436
22,538,740
5,988,344
(289,369,906)
(85,330,755)
(386,375)
18,395,181
(2,395,445)
(844,044)
(1,324,260)
12,771,482
(2,949,808)
(16,658,570)
82,752,561 REB 33 K
(106,618,864)
(2,000,000)
(10,000,000)
(1,644,418)
5,729,663
(4,700,000)
(27,871,641)
(2,000,000)
(1,000,000)
(2,500,000)
(7,500,000)
(2,000,000)
(10,000,000)
(3,000,000)
(4,032,000)
(3,000,000)
(3,000,000)
(16,329,222)
(6,720,000)
(15,209,977)
(3,000,000)
3,762,869
(5,000,000) Man mac
(50,082,854)
(423,476,036)

1,559,183,132
92,598,272
40,000,000
12,650,000
550,000,000
2,254,431,404
5,125,375,412
65,709,941

1,606,533,783
628,232,319
39,997,627
5,912,446
460,906,311
2,741,582,487
5,442,162,141

30,000,000
5,000,000
4,000,000
4,000,000
10,000,000
5,850,000
22,519,573
81,369,573
675,209,963

(47,350,651)
(565,634,047)
(5,000,000)
(4,000,000)
(4,000,000)
(10,000,000)
(5,850,000)
(22,519,573)
2,373
6,737,554
89,093,689
(568,520,656)
(991,996,692)

Classified - Confidential

633,058,547
464,032,906
160,296,000
123,185,412
55,732,495
45,382,175
61,328,038
49,429,414
34,315,294
22,186,841
48,168,800
743,686
12,539,811
17,095,055
5,949,489
320,000,000
149,978,170
54,777,584
14,873,723
20,145,611
57,131,936
2,350,350,987

45,490,093
67,376,924
8,911,500
21,082,742
(4,958,695)
347,317,212
89,977,627
(8,714,270)
2,644,706
2,805,343
9,382,474
1,256,314
(12,539,811)
854,753
10,709,081
(24,878,257)
(13,238,144)
25,728,117
2,388,580
(12,873,723)
16,532,027
(8,932,736)
4,700,000
27,871,641
2,000,000
1,000,000
2,500,000
7,500,000
2,000,000
10,000,000
3,000,000
4,032,000
3,000,000
3,000,000
16,329,222
6,720,000
15,209,977
3,000,000
147,635,738
18,115,357
100,133,266
944,069,057

678,548,640
531,409,830
169,207,500
144,268,154
50,773,800
392,699,386
151,305,665
40,715,144
36,960,000
24,992,184
57,551,274
2,000,000
17,949,808
16,658,570
295,121,743
136,740,026
25,728,117
57,166,164
2,000,000
36,677,638
48,199,200
4,700,000
27,871,641
2,000,000
1,000,000
2,500,000
7,500,000
2,000,000
10,000,000
3,000,000
4,032,000
3,000,000
3,000,000
16,329,222
6,720,000
15,209,977
3,000,000
147,635,738
18,115,357
100,133,266
3,294,420,044

678,548,640
531,409,830
169,207,500
144,268,154
50,773,800
392,699,386
151,305,665
40,715,144
36,960,000
24,992,184
57,551,274
2,000,000
17,949,808
16,658,570
295,121,743
136,740,026
25,728,117
57,166,164
2,000,000
36,677,638
48,199,200
4,700,000
27,871,641
2,000,000
1,000,000
2,500,000
7,500,000
2,000,000
10,000,000
3,000,000
4,032,000
3,000,000
3,000,000
16,329,222
6,720,000
15,209,977
3,000,000
147,635,738
18,115,357
100,133,266
3,294,420,044

13,997,630

83,739,150

377,747,200

262 of 338

Sl. No. Budget Head


1 Land Development
2 Civil Works
3 Civil Works
3 Civil Works
3 Line Equipment
3 Line Equipment
3 Line Equipment
3 Line Equipment
3 Line Equipment
4 Process Equipments
4 Process Equipments
5 Support Equipment
5 Support Equipment
6 Utilities Equipment
6 Utilities Equipment
6 Utilities Equipment
6 Utilities Equipment
6 Utilities Equipment
6 Utilities Equipment
6 Utilities Equipment
6 Utilities Equipment
7 Electricals
7 Electricals
7 Electricals
11 ETP & Misc
3 Line Equipment
6 Utilities Equipment
7 Electricals
7 Electricals
7 Material Handling Equipment
11 Utilities Equipment

14 Others
15 Support Equipment

RFA Number
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104

14BIGG1364-0023104
14BIGG1364-0023104

Classified - Confidential

Budget amount
169,000,000
1,530,900,000

1,260,000,000
1,260,000,000
1,260,000,000

196,541,857
198,146,175

341,689,025

454,860,000
41,291,920

15 Others
17 Preliminary expenses
18 Purchase of land
19 Environmental Due Deligence
20 Site Office & Preoperative Exp
Total

14BIGG1364-0023104
12BIGG1364-1233605
12BIGG1364-3894721
12BIGG1364-9851104
14BIGG1364-0023104

Classified - Confidential

6,712,428,977

Category
Activity awarded
Land Development, Civil & PEB
Land development
Land Development, Civil & PEB
Civil works
Land Development, Civil & PEB
PEB works supply part
Land Development, Civil & PEB
PEB works erection part
600 BPM WATER LINE EQUIPMENT
Line equipment (Water)
600 BPM WATER LINE EQUIPMENT
Line equipment (Water)
600 BPM WATER LINE EQUIPMENT
Line equipment (Water)
720 BPM CSD LINE
Line equipment (CSD)
720 BPM CSD LINE
Line equipment (CSD)
SUGAR DISSOLVING SYSTEM
Syrup
SUGAR DISSOLVING SYSTEM
Syrup
WTP PLANT
WTP
WTP PLANT
WTP
VAM CHILLER
VAM foreign part
VAM CHILLER
VAM local part
BOILER
Boiler
BOILER
Boiler
COMPRESSOR & ACCESSORIES
Compressor
CO2 and LN2 SYSTEM
CO2 & LN2
UTILITY PIPING & VALVES
Piping works
FIRE PROTECTION & DETECTION SYSTEFire Fighting Works
Electrical Works
ELECTRICAL HT, LT AND ACCESSORIES
(Supply & Installation)
GENERATOR AND ACCESSORIES
Generator supply
GENERATOR AND ACCESSORIES
Generator Erection
ETP STP package
ETP TANKS & PUMPS CAPACITIES
600 BPM WATER LINE EQUIPMENT
Ozonator
UTILITY PIPING & VALVES
LN2 Piping
Stabilizer
Servo Stabilizer
CCTV
CCTV package
Forklift
Forklift
HVAC system
HVAC

A&E Firm for designing


WTP Consultant

Classified - Confidential

LEED Consultant
Preliminary expenses
Land
Environmental Due Deligence
Site Office & Preoperative Exp
Total

Classified - Confidential

Vendor
Commerci
Currency Agreed Value
Pubali Construction company Limited
Yes
BDT
167,098,830
Pubali Construction company Limited
Yes
BDT
1,040,096,393
PEB Steel Alliance Limited
Yes
BDT
381,038,575
PEB Steel Alliance Limited
Yes
BDT
18,299,985
Krones AG - Germany
Yes
EUR
5,175,000
Krones AG - Germany
Yes
EUR
172,200
Krones India Private Limited
Yes
EUR
103,600
Krones AG - Germany
Yes
EUR
6,980,000
Krones India Private Limited
Yes
EUR
163,600
Unicorn Industries
Yes
EUR
765,000
Unicorn Industries
Yes
USD
1,192,000
Thermax India Limited
Yes
USD
1,718,477
M/s Sueb and Sons
Yes
BDT
3,357,036
Kaltimex Energy (Singapore) Pte. Ltd.
Yes
USD
335,700
Kaltimex Energy Bangladesh (Pvt.) Ltd
Yes
BDT
21,500,000
THERMAX LIMITED
Yes
USD
460,841
M/s Sueb and Sons
Yes
BDT
1,900,000
INGERSOLL-RAND (INDIA) LIMITED
Yes
USD
297,526
Inox India Limited
Yes
USD
440,000
UTILITY ENGINEERING
Yes
USD
838,438
Sann Systems
Yes
USD
702,702
Energypac
Yes
BDT
275,426,413
Clarke Energy UK Limited
Yes
EUR
537,047
Clarke Energy Bangladesh Limited
Yes
BDT
23,073,063
Praj industries Limited
Yes
USD
573,800
Ozonetek Limited
Yes
USD
338,900
Shell-N-Tube Pvt. Ltd
Yes
USD
176,015
Consul Neowaat power Solutions Pvt. Ltd. Yes
USD
51,266
Sann Systems
Yes
USD
178,378
Toyota
Yes
JPY
30,550,000
UNIQUE ENGINEERS PRIVATE LIMITED
Yes
USD
1,162,852

Yes
Yes

USD
USD

Classified - Confidential

1,376,557
30,500

Yes

USD
BDT
BDT
BDT
BDT

Classified - Confidential

45,000
19,723,447
1,170,326
5,912,446
24,367,742

Agreed value (BDT) Non PO transaction


167,098,830
1,040,096,393
381,038,575
18,299,985
455,400,000
15,153,600
9,116,800
614,240,000
14,396,800
65,790,000
95,360,000
134,041,206
3,357,036
26,856,000
21,500,000
36,867,280
1,900,000
23,802,080
35,200,000
65,817,383
54,810,737
275,426,413
47,260,136
23,073,063
45,904,000
26,434,200
13,817,178
3,998,748
13,913,445
19,857,500
91,283,882

Amount BDT
167,098,830
1,040,096,393
381,038,575
18,299,985
478,170,000
15,911,280
9,572,640
644,952,000
15,116,640
69,079,500
100,128,000
140,743,266
3,524,888
28,198,800
22,575,000
38,710,644
2,004,500
24,992,184
36,960,000
125,053,028
57,551,274
275,426,413
49,623,143
23,073,063
48,199,200
27,755,910
26,252,637
4,198,685
18,365,747
21,247,525
289,369,906

107,371,446
2,379,000

147,635,738
2,973,750

Classified - Confidential

PO number
PF034059
PF035025
PF035030
PF035031
PF035095
PF035080
PF035094
PF035092
PF035093
PF035067
PF035058
PF035146
PF035047
PF035068
PF035048
PF035049
PF035091
PF035165
PF035150
PF035139
PF035183
PF035090
PF035164

3,510,000
19,723,447
1,170,326
5,912,446
24,367,742
4,005,545,677
3,671,806,317

20,274,181
459,735,985
603,864,577

4,387,500
39,997,627
460,906,311
5,912,446
628,232,319
5,493,335,348

Classified - Confidential

PO Value
Balance LOI
Agreement/LoI
179,851,963
(12,753,133) Agreement
1,040,096,393
0 Agreement
381,038,576
(0) Agreement
18,299,986
(1) Agreement
455,400,000
- LoI
15,153,600
- LoI
9,116,800
- LoI
614,240,000
- LoI
14,396,800
- LoI
65,790,000
- LoI
95,360,000
- LoI
134,041,206
- LoI
3,357,036 LoI
26,856,000
- LoI
21,500,000
(0) LoI
36,867,280
- LoI
1,900,000 LoI
23,802,080
- LoI
35,200,000
- LoI
64,119,407
1,697,976 LoI
54,810,737
275,426,413
(0) LoI
47,260,136
- LoI
23,073,062
1 LoI
45,904,000
- LoI
26,434,200 LoI
13,817,178
- LoI
3,998,748 LoI
13,913,445 LoI
19,857,500 LoI
91,283,882 LoI

147,635,738
2,973,750

LoI number
IBPL/GF/2014/LOI

IBPL/GF/2015/LOI-002
IBPL/GF/2015/LOI-002
IBPL/GF/2015/LOI-002
IBPL/GF/2015/LOI-001
IBPL/GF/2015/LOI-001
IBPL/GF/2015/LOI-004
IBPL/GF/2015/LOI-004
IBPL/GF/2015/LOI-009
IBPL/GF/2015/LOI-009
IBPL/GF/2015/LOI-003
IBPL/GF/2015/LOI-003
IBPL/GF/2015/LOI-006
IBPL/GF/2015/LOI-006
IBPL/GF/2015/LOI-005
IBPL/GF/2015/LOI-008
IBPL/GF/2015/LOI-011
IBPL/GF/2015/LOI-015
IBPL/GF/2015/LOI-007
IBPL/GF/2015/LOI-014
IBPL/GF/2015/LOI-014
IBPL/GF/2015/LOI-010
IBPL/GF/2015/LOI-018
IBPL/GF/2015/LOI-016
IBPL/GF/2015/LOI-019
IBPL/GF/2015/LOI-020
IBPL/GF/2015/LOI-021

Agreement
Agreement

Classified - Confidential

4,387,500
19,723,447
1,170,326
5,912,446
3,818,414,086

204,500,391

Classified - Confidential

L/C issued
N/A
N/A
N/A
N/A
No
No
Yes
No
Yes
Yes
Yes
Yes
No
Yes
N/A
Yes
N/A
Yes
Yes
No
No
N/A
Yes
N/A
Yes
No
No
No
No
No
No

L/C number

5634600838
5637600838
LCA # 278715150256
LCA # 278715150257

5631600824
5637600812
5636600813

5630600855
LCA # 278715150243

Classified - Confidential

Classified - Confidential

Pur Order
PF035156
PF035156
PF035164
PF035168
PF035169
PF035169
PF035169

Date
Due
Supplier
7/14/2015 5/31/2016 V0300203
7/14/2015 5/31/2016 V0300203
7/26/2015 5/31/2016 V0300473
7/27/2015 5/31/2016 V0300228
7/27/2015 5/31/2016 v0300312
7/27/2015 5/31/2016 v0300312
7/27/2015 5/31/2016 v0300312

Classified - Confidential

Vendor name
Progoti Insurance Limited
Progoti Insurance Limited
Shell-N-Tube Pvt. Ltd.
DEP COMM OFCUS.CUT,House CTG
HOMEBOUND PACKERS & SHIPPERS
HOMEBOUND PACKERS & SHIPPERS
HOMEBOUND PACKERS & SHIPPERS

Site
Q5
Q5
Q5
Q5
Q5
Q5
Q5

Classified - Confidential

Pur Acct
Sub-Acct
17350100 CWIP07
17350100 CWIP07
17350100 CWIP07
17350100 CWIP07
17350100 CWIP07
17350100 CWIP07
17350100 CWIP07

CC
D055
D055
D055
D055
D055
D055
D055

Project
N2 piping
N2 piping
N2 piping
N2 piping
N2 piping
N2 piping
N2 piping

Ln

Item Code
1 Insurance premium
2 Ins Stamp duty
1 LN2 piping works
1 Custom duties
1 Custom clearance
2 Loading transport
3 Local transport

Classified - Confidential

Vlookup
PF035156Insurance premium
PF035156Ins Stamp duty
PF035164LN2 piping works
PF035168Custom duties
PF035169Custom clearance
PF035169Loading transport
PF035169Local transport

Req Nbr
RF035158
RF035159
RF035157
RF035161
RF035160
RF035160
RF035160

Classified - Confidential

Line

Qty OrderedUM
1
1 EA
1
1 EA
1
1 EA
1
1 EA
1
1 EA
2
1 EA
3
1 EA

Qty ReceiveQty ReturneQty Open St


1.00
0.00
1
1.00
0.00
1
0.00
0.00
1
0.00
0.00
1
0.00
0.00
1
0.00
0.00
1
0.00
0.00
1

Classified - Confidential

Currency
BDT
BDT
USD
BDT
BDT
BDT
BDT

Unit Cost
Pur Cost
Pur Cost
60,000.00
45306
12,000.00
10069
13,817,177.00
176015
8,500,000.00
8500000
75,000.00
75000
250,000.00
250000
500,000.00
500000

Classified - Confidential

Base Taxable
0
45306
0
10069
0
176015
0
8500000
0
75000
0
250000
0
500000

Base Tax

Base Recove
RFA No
6795.9
5436.72 14BIGG1364-0023104
0
0 14BIGG1364-0023104
0
0 14BIGG1364-0023104
0
0 14BIGG1364-0023104
0
0 14BIGG1364-0023104
0
0 14BIGG1364-0023104
37500
30000 14BIGG1364-0023104

Budget Line
Utilities Equipment
Utilities Equipment
Utilities Equipment
Utilities Equipment
Utilities Equipment
Utilities Equipment
Utilities Equipment

Classified - Confidential

PO cost
46,665.18
10,069.00
13,817,177.50
8,500,000.00
75,000.00
250,000.00
507,500.00

GRN value
Payment made
46,665.18
10,069.00
-

Classified - Confidential

Advance paid

Code
5UE18
5UE18
5UE10
5UE10
5UE10
5UE10
5UE10

Sub head

Classified - Confidential

Remarks

Classified - Confidential

Balance Sheet Reconciliation


Ross Description :

Land

Ross code :

170100

UNIDAG Code :

WW85

Cola Code

17010100

Vendor Name

Description

Capitalisation
Date

Qty

Source

COLA
Life of Assets
Assets
Tag

Physical
Assets Tag

Closing Balance

Remarks

Cost of Land:
Dilip Kumar Modi,V0300254

Pur of Land for Grenfiel

11/23/2012

Non PO

Not tagable

Bijoy kumar Modi,V0300255

Pur of Land for Grenfiel

11/23/2012

Non PO

Not tagable

85,314,023 12BIGG1364-3894721

Ganesh Lal Modi,V0300256

Pur of Land for Grenfiel

11/23/2012

Non PO

Not tagable

131,252,344 12BIGG1364-3894721

Non PO

72,188,789 12BIGG1364-3894721

Giridhari Lal ModiV0300257

Pur of Land for Grenfiel

11/23/2012

Not tagable

131,252,344 12BIGG1364-3894721

Giridhari Lal ModiV0300257

Withholding tax

11/13/2012

Non PO

Not tagable

1,325,781 12BIGG1364-3894721

Ganesh Lal Modi,V0300256

Withholding tax

11/13/2012

Non PO

Not tagable

1,325,781 12BIGG1364-3894721

Bijoy kumar Modi,V0300255

Withholding tax

11/13/2012

Non PO

Not tagable

Dilip Kumar Modi,V0300254

Withholding tax

11/13/2012

Non PO

Not tagable

729,180 12BIGG1364-3894721

Stamp@ 3%-424250000

Stamp Duty

11/13/2012

Non PO

Not tagable

12,727,400 12BIGG1364-3894721

Reg Fees @2%-42425000

Registration fees

11/13/2012

Non PO

Not tagable

8,485,225 12BIGG1364-3894721

Lo.Tax @ 2%424250000

Local Government tax

11/13/2012

Non PO

Not tagable

8,485,000 12BIGG1364-3894721

Master & Master Association,V0300252

Brokerage Comm-Lan

2/22/2013

PO

Not tagable

1,000,000 12BIGG1364-3894721

Non PO

Not tagable
Not tagable

1,228,200 12BIGG1364-3894721

Non PO
Non PO
Non PO

Not tagable
Not tagable

31,572 12BIGG1364-1233605

Tanjibul Alam And Associates,V0300099

Due deli Comm-Land

2/22/2013

EuroConsult Mott Macdonald,V0300278

Environl due dili

6/30/2013

On call trip charg-G4+JL130331000007

On call trip charg-G4+JL130331000007

3/31/2013

Chrgs NOC-land-Jan13+JL130126000007

Chrgs NOC-land-Jan13+JL130126000007

1
1
1

11/7/2013

Balance as Per FAR

861,758 12BIGG1364-3894721

4,508,188 12BIGG1364-9851104
20,400 12BIGG1364-1233605
460,735,985

Other items under this RFA: (12BIGG1364-3894721)


Item Code
Guarding bill
Guarding billDec12
Supervisor billN12
Supervisor billD12
On call trip charg
On call trip
Shrubs clearing
Sand filling
Miscellaneous wrk

Supplier Name
G4S Security Services Bangld
G4S Security Services Bangld
G4S Security Services Bangld
G4S Security Services Bangld
G4S Security Services Bangld
G4S Security Services Bangld
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd

Pur Order
PF032078
PF032078
PF032078
PF032078
PF032079
PF032079
PF034059
PF034059
PF034059

Total for this RFA


Total RFA Value
Balance available

Source
PO
PO
PO
PO
PO
PO
PO
PO
PO

Total PO cost
8,162.00
81,620.00
4,452.00
44,520.00
26,500.00
5,072.10
4,961,446.09
67,958,647.37
6,157,746.90
79,248,166
535,423,991
550,000,000
14,576,009

Classified - Confidential

Vendor Code

Vendor Name

RFA Number

V0300222

Paradise Cables LTD & Anisha Engineerin12BIGG1364-1233605

V0300199

Anisha Engineering and Const

12BIGG1364-1233605

V0300199

Anisha Engineering and Const

12BIGG1364-1233605

V0300005

Bangladesh Bank

12BIGG1364-1233605

V0300225

Sagor Rent- a-Car

12BIGG1364-1233605

V0300225

Sagor Rent- a-Car

12BIGG1364-1233605

Non PO

Project Salary :

12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605

Non PO

Project Empl Rim :

12BIGG1364-1233605

JL130903000001

Electricity line project

12BIGG1364-1233605

M.K. Electronics

12BIGG1364-1233605

V0300298

The Union Construction Limit

12BIGG1364-1233605

v0300317

Upazilla Nirbahi Officer Bhaluka

12BIGG1364-1233605

V0300192

Euroconsult Mott MacDonald

12BIGG1364-1233605

V0300192

Euroconsult Mott MacDonald

12BIGG1364-1233605

v0300326

ARKO ENGINEERS LIMITED

12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605

V0300337

Madina Polymer Industries Lt

12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605

V0300258

H.S.Enterprise LTD

12BIGG1364-1233605

V0300225

Sagor Rent- a-Car

12BIGG1364-1233605
12BIGG1364-1233605

JL140401000002

12BIGG1364-1233605

JL140401000008

12BIGG1364-1233605
VE034B86 proj.cost

12BIGG1364-1233605

VE034B86 proj.cost

12BIGG1364-1233605

V0300361

MRT Engineering

12BIGG1364-1233605

V0300361

MRT Engineering

12BIGG1364-1233605

v0300325

The Megatech Engineers

12BIGG1364-1233605

v0300325

The Megatech Engineers

12BIGG1364-1233605

V0300225

Sagor Rent- a-Car

12BIGG1364-1233605

V0300368

Electro Solar Power Limited

12BIGG1364-1233605

V0300368

Electro Solar Power Limited

12BIGG1364-1233605

V0300351

ADEX CORPORATION LIMITED

12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605

V0300225

Sagor Rent- a-Car

12BIGG1364-1233605

Classified - Confidential

V0300225

Sagor Rent- a-Car

12BIGG1364-1233605
12BIGG1364-1233605

V0300225

Sagor Rent- a-Car

12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605

V0300361

MRT Engineering

12BIGG1364-1233605

V0300361

MRT Engineering

12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605

V0300405

MULTIPOINT TECHNOLOGY LTD.

14BIGG1364-0023104

V0300405

MULTIPOINT TECHNOLOGY LTD.

14BIGG1364-0023104

V0300405

MULTIPOINT TECHNOLOGY LTD.

14BIGG1364-0023104

V0300405

MULTIPOINT TECHNOLOGY LTD.

14BIGG1364-0023104

V0300405

MULTIPOINT TECHNOLOGY LTD.

14BIGG1364-0023104

V0300396

Pubali Construction Co.Ltd

12BIGG1364-3894721

V0300396

Pubali Construction Co.Ltd

12BIGG1364-3894721

V0300318

Mymensingh Palli Biddut Sami

14BIGG1364-0023104

V0300361

MRT Engineering

14BIGG1364-0023104

V0300361

MRT Engineering

14BIGG1364-0023104

V0300046

Reliance Insurance Ltd

14BIGG1364-0023104
12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605

V0300362

Dhaka Innovative Engineering

14BIGG1364-0023104

V0300318

Mymensingh Palli Biddut Sami

14BIGG1364-0023104

V0300152

DHL Worldwide Express (Bangl

14BIGG1364-0023104

V0300396

Pubali Construction Co.Ltd

14BIGG1364-0023104

V0300396

Pubali Construction Co.Ltd

14BIGG1364-0023104

V0300396

Pubali Construction Co.Ltd

14BIGG1364-0023104

V0300396

Pubali Construction Co.Ltd

14BIGG1364-0023104

V0300396

Pubali Construction Co.Ltd

14BIGG1364-0023104

V0300396

Pubali Construction Co.Ltd

12BIGG1364-3894721

V0300396

Pubali Construction Co.Ltd

12BIGG1364-3894721

v0300333

HARMONICS POWER LTD

14BIGG1364-0023104

v0300333

HARMONICS POWER LTD

14BIGG1364-0023104

V0300093

G4S Security Services Bangld

14BIGG1364-0023104

V0300093

G4S Security Services Bangld

14BIGG1364-0023104

V0300225

Sagor Rent- a-Car

14BIGG1364-0023104

v0300310

M. K Printers

14BIGG1364-0023104

V0300093

G4S Security Services Bangld

12BIGG1364-1233605

V0300093

G4S Security Services Bangld

12BIGG1364-1233605

V0300298

The Union Construction Limit

12BIGG1364-1233605

V0300298

The Union Construction Limit

12BIGG1364-1233605

V0300318

Mymensingh Palli Biddut Sami

14BIGG1364-0023104

V0300396

Pubali Construction Co.Ltd

14BIGG1364-0023104

V0300396

Pubali Construction Co.Ltd

14BIGG1364-0023104

V0300396

Pubali Construction Co.Ltd

14BIGG1364-0023104

Classified - Confidential

V0300396

Pubali Construction Co.Ltd

14BIGG1364-0023104

V0300396

Pubali Construction Co.Ltd

12BIGG1364-3894721

JV entry

12BIGG1364-1233605

JV entry

12BIGG1364-1233605

JV entry

12BIGG1364-1233605

JV entry

12BIGG1364-1233605

JV entry

14BIGG1364-0023104

JV entry

14BIGG1364-0023104

V0300225

Sagor Rent- a-Car

14BIGG1364-0023104

v0300318

Mymensingh Palli Biddut Sami

14BIGG1364-0023104

V0300093

G4S Security Services Bangld

12BIGG1364-1233605

V0300093

G4S Security Services Bangld

12BIGG1364-1233605

V0300225

Sagor Rent- a-Car

14BIGG1364-0023104

V0300021

Thakral Information System P

14BIGG1364-0023104

V0300223

A-1 Pest Specialist Pte Ltd

14BIGG1364-0023104

V0300106

Air Condition World

14BIGG1364-0023104

V0300384

Unique Business Systems Ltd.

14BIGG1364-0023104

V0300384

Unique Business Systems Ltd.

14BIGG1364-0023104

V0300384
V0300247
V0300396
V0300396
V0300396
V0300396
V0300396
V0300396
V0300396
V0300396
V0300396
V0300396
V0300396
V0300396
V0300396
V0300420
V0300420
v0300318
V0300093
V0300093
V0300225
V0300225

Unique Business Systems Ltd.


Tech Valley Solutions Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Telnet Communication Limited
Telnet Communication Limited
Mymensingh Palli Biddut Sami
G4S Security Services Bangld
G4S Security Services Bangld
Sagor Rent- a-Car
Sagor Rent- a-Car
JV entry
JV entry
JV entry
Thakral Information System P
Thakral Information System P
Endeavour Technologies Ltd
Endeavour Technologies Ltd
Endeavour Technologies Ltd
Endeavour Technologies Ltd
Endeavour Technologies Ltd

14BIGG1364-0023104
14BIGG1364-0023104
12BIGG1364-3894721
12BIGG1364-3894721
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
12BIGG1364-1233605
12BIGG1364-1233605
14BIGG1364-0023104
14BIGG1364-0023104
12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104

V0300021
V0300021
V0300121
V0300121
V0300121
V0300121
V0300121

Classified - Confidential

V0300121
V0300121
V0300121
V0300121
V0300121
V0300121
V0300121
V0300121
V0300121
V0300121
V0300121
V0300121
V0300121
V0300121
V0300121
V0300121
V0300121
V0300396
V0300396
V0300396
V0300396
V0300396
V0300396
V0300396
V0300396
V0300396
V0300396
V0300396
V0300326
V0300298

Endeavour Technologies Ltd


Endeavour Technologies Ltd
Endeavour Technologies Ltd
Endeavour Technologies Ltd
Endeavour Technologies Ltd
Endeavour Technologies Ltd
Endeavour Technologies Ltd
Endeavour Technologies Ltd
Endeavour Technologies Ltd
Endeavour Technologies Ltd
Endeavour Technologies Ltd
Endeavour Technologies Ltd
Endeavour Technologies Ltd
Endeavour Technologies Ltd
Endeavour Technologies Ltd
Endeavour Technologies Ltd
Endeavour Technologies Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
ARKO ENGINEERS LIMITED
The Union Construction Limit
JV entry
JV entry
JV entry
Sagor Rent- a-Car
Sagor Rent- a-Car
Navana Firniture
JV entry
JV entry
JV entry

14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
12BIGG1364-3894721
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
12BIGG1364-1233605
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104

V0300005

Bangladesh Bank

14BIGG1364-0023104

V0300225

Sagor Rent- a-Car

14BIGG1364-0023104

JV entry

14BIGG1364-0023104

JV entry

14BIGG1364-0023104

RV entry

14BIGG1364-0023104

JV entry
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Sagor Rent- a-Car
Sagor Rent- a-Car
JV entry
JV entry

14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104

V0300225
V0300225
v0300328

V0300396
V0300396
V0300396
V0300225
V0300225

Classified - Confidential

V0300093
V0300093

JV entry
G4S Security Services Bangld
G4S Security Services Bangld

14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104

JL150704000006

JV entry

14BIGG1364-0023104

JL150706000003

JV entry

14BIGG1364-0023104

JL150706000007

JV entry

14BIGG1364-0023104

JL150706000009

JV entry

14BIGG1364-0023104

JL150706000011

JV entry

14BIGG1364-0023104

V0300093

G4S Security Services Bangld

14BIGG1364-0023104

V0300225

Sagor Rent- a-Car

14BIGG1364-0023104

V0300225

Sagor Rent- a-Car

14BIGG1364-0023104

V0300262

insight interior & exterior

14BIGG1364-0023104

V0300396

Pubali Construction Co.Ltd

14BIGG1364-0023104

V0300396

Pubali Construction Co.Ltd

14BIGG1364-0023104

V0300407

Sheetal Engineering Company

14BIGG1364-0023104

V0300416

Energypac Electronics Ltd.

14BIGG1364-0023104

V0300427

E M Power Limited

14BIGG1364-0023104

V0300298

The Union Construction Limit

12BIGG1364-1233605

V0300396

Pubali Construction Co.Ltd

12BIGG1364-3894721

V0300420
V0300396
V0300396
V0300396
V0300396
V0300396
V0300046
V0300046
V0300046
V0300046
V0300046
V0300046
V0300046
V0300203
V0300203
V0300203
V0300203
V0300203
V0300203
V0300203
V0300203
V0300203
V0300203
V0300203
V0300203

Telnet Communication Limited


Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Pubali Construction Co.Ltd
Reliance Insurance Ltd
Reliance Insurance Ltd
Reliance Insurance Ltd
Reliance Insurance Ltd
Reliance Insurance Ltd
Reliance Insurance Ltd
Reliance Insurance Ltd
Progoti Insurance Limited
Progoti Insurance Limited
Progoti Insurance Limited
Progoti Insurance Limited
Progoti Insurance Limited
Progoti Insurance Limited
Progoti Insurance Limited
Progoti Insurance Limited
Progoti Insurance Limited
Progoti Insurance Limited
Progoti Insurance Limited
Progoti Insurance Limited

V0300046
V0300203

Reliance Insurance Ltd


Progoti Insurance Limited

14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104

RV entry

Classified - Confidential

V0300093
V0300093
V0300093
V0300093
V0300093
V0300093

G4S Security Services Bangld


G4S Security Services Bangld
G4S Security Services Bangld
G4S Security Services Bangld
G4S Security Services Bangld
G4S Security Services Bangld

14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104

Total

Classified - Confidential

PO Number

Source

Nature

JL130103000002

Non PO

Maintenance

PF032061

PO

Maintenance

PF032073

PO

Maintenance

PF033047

PO

Env. Clearence fee

PF033050

PO

Vehicle expenses

PF033050

PO

Vehicle expenses

Non PO

Non PO

Salary

Non PO

Non PO

Salary

Non PO

Non PO

Salary

Non PO

Non PO

ER

Non PO

Non PO

Power Connection

PF032109

PO

Furniture

PF033035

PO

Soil Test

PF033059

PO

Construction Design approval

PF033040

PO

Soil Test

PF033039

PO

Soil Test

PF033068

PO

Gas connection

JL140103000012

Non PO

Salary

JL140103000012

Non PO

Salary

JL140103000012

Non PO

Salary

JL140103000013

Non PO

ER

JL140106000003

Non PO

Vehicle expenses

PF033072

PO

Water tank

JL140127000007

Non PO

ER

JL140223000007

Non PO

Salary

JL140223000008

Non PO

ER

PO034059

PO

Battery

PF034013

PO

Vehicle expenses

Non PO

Non PO

Salary

JL140401000002

Non PO

Salary

JL140401000008

Non PO

Travel

Non PO

Non PO

Training

Non PO

Non PO

Conveyance

PO034079

PO

Assets

PO034079

PO

Assets

PF033069

PO

Assets

PF033069

PO

Assets

PF034013

PO

Transport

PF034001

PO

Assets

PF034001

PO

Assets

PF033094

PO

Assets

JL140525000004

Non PO

Salary

JL140525000007

Non PO

ER

JL140629000009

Non PO

Salary

JL140629000009

Non PO

Salary

JL140629000011

Non PO

ER

PF034039

PO

Transport

Classified - Confidential

PF034039

PO

Transport

JL140727000010

Non PO

ER

PF034039

PO

Transport

JL140823000014

Non PO

Salary

JL140823000015

Non PO

ER

RV140823000010

Non PO

ER

PO034079

PO

Assets

PO034079

PO

Assets

RV140823000010

Non PO

ER

JL140929000004 & JL140929000012

Non PO

Salary

JL140929000006

Non PO

ER

PF034050

PO

PPE

PF034050

PO

PPE

PF034050

PO

PPE

PF034050

PO

PPE

PF034050

PO

PPE

PF034059

PO

Assets

PF034059

PO

Assets

PF034060

PO

Electicity

PF034065

PO

Cables

PF034065

PO

Cables

PF034056

PO

Insurance

JL141026000003

Non PO

Salary

JL141026000005

Non PO

ER

JL141023000003

Non PO

ER

PF034054

PO

Assets

PF034060

PO

Electicity

PF034086

PO

Courier

PF034094

PO

Assets

PF034094

PO

Assets

PF034094

PO

Assets

PF034094

PO

Assets

PF034094

PO

Assets

PF034059

PO

Assets

PF034059

PO

Assets

PF034064

PO

Assets

PF034064

PO

Assets

PF034088

PO

Security

PF034088

PO

Security

PF034093

PO

Transport

PF034087

PO

Stationery

PF034088

PO

Security

PF034088

PO

Security

PF034037

PO

Testing

PF034037

PO

Testing

PF034060

PO

Electicity

PF034094

PO

Assets

PF034094

PO

Assets

PF034094

PO

Assets

Classified - Confidential

PF034094

PO

Assets

PF034059

PO

Assets

Salary trf to proj

Non PO

Salary

Plant G&A TRF

Non PO

ER

JL141130000003

Non PO

Salary

JL150102000010

Non PO

Salary

JL150102000017

Non PO

ER

JL150104000013

Non PO

Salary

PF034093

PO

Transport

PF034112

PO

Electicity

PF034088

PO

Security

PF034088

PO

Security

PF034093

PO

Transport

PF034073

PO

Assets

PF034085

PO

Opex

PF034084

PO

Assets

PF034103

PO

Assets

PF034103

PO

Assets

PF034103
PF034082
PF034059
PF034059
PF034094
PF034094
PF034094
PF034094
PF034094
PF034094
PF034094
PF034094
PF034094
PF034094
PF034094
PF034101
PF034101
PF034112
PF034088
PF034088
PF034093
PF034093
JL150129000004
JL150202000002
JL150202000017
PF034057
PF034057
PF034102
PF034102
PF034076
PF034076
PF034076

PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
Non PO
Non PO
Non PO
PO
PO
PO
PO
PO
PO
PO

Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Opex
Electicity
Security
Security
Transport
Transport
Salary
ER
ER
Assets
Assets
Assets
Assets
Assets
Assets
Assets

Classified - Confidential

PF034076
PF034076
PF034076
PF034076
PF034076
PF034076
PF034075
PF034075
PF034075
PF034075
PF034075
PF034075
PF034075
PF034075
PF034075
PF034075
PF034075
PF034059
PF034094
PF034094
PF034094
PF034094
PF034094
PF034094
PF034094
PF034094
PF034094
PF034094
PF034061
PF034100
JL150228000022
JL150302000011
JL150302000011
VR035C47
PF034077
PF035023
JL150404000008
JL150406000005
JL150407000003

PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
Non PO
Non PO
Non PO
PO
PO
PO
Non PO
Non PO
Non PO

Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets
Assets

PF035018

PO

Govt. fees

PF035023

PO

Transport

JL150503000005

Non PO

Salary

JL150503000012

Non PO

ER

RV150503000005

Non PO

CWIP

JL150504000008
PF035025
PF035025
PF035025
PF035024
PF035054
JL150601000001 & JL150601000019
JL150504000008

Non PO
PO
PO
PO
PO
PO
Non PO
Non PO

Interest
Assets
Assets
Assets
Transport
Transport
Transport
Interest

Classified - Confidential

Testing
Salary
ER
ER
Transport
Transport
Assets
Salary
ER
Interest

JL150530000018
PF035040
PF035042

Non PO
PO
PO

Salary
Security
Security

JL150704000006

Non PO

Salary

Interest

Non PO

Interest

JL150706000007

Non PO

Salary

G&A

Non PO

ER

Security

Non PO

Security

PF035040

PO

Security

PF035024

PO

Transport

PF035054

PO

Transport

PF035033

PO

Assets

G&A

Non PO

PF034094

PO

Assets

PF035021

PO

Assets

PF034078

PO

Assets

PF034116

PO

Assets

PF034035

PO

Testing

PF034059

PO

Assets

PF035079
PF035025
PF035025
PF035025
PF035025
PF035025
PF035096
PF035096
PF035097
PF035098
PF035099
PF035100
PF035136
PF035117
PF035117
PF035120
PF035123
PF035123
PF035127
PF035127
PF035130
PF035134
PF035140
PF035140
PF035147
Salary trf to proj
Project LC Charges
Re Ins_wrong input va
Pra Insu_wrong input
Project Interest Capi
CWIP Provision FTM

PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
Non PO
Non PO
Non PO
Non PO
Non PO
Non PO

Opex

Classified - Confidential

PF035102
PF035102
PF035102
PF035102
NonPO-July15G4S Secu
NonPO-July15G4S Secu

PO
PO
PO
PO
Non PO
Non PO

Classified - Confidential

Particulars

Ap No

Maintance work at Valuka


Maintance work at Valuka
Maintance work at Valuka
Env. Clearence fee
Monthly Car Expense
Monthly Car Expense
Project Salary
Project Salary
Project Salary
Plant G&A -ER
Electricity line project (REB)
Work station for warehouse
Geo Soil Test
Construction Design approval Fee
Geo Soil Test
Miscellaneous test
Contractor fees of GAS connection enlisment application
Project Salary
Project Salary
Project Salary
Plant G&A -ER
Monthly Car Expense
Water Tank
Regr mfg exp2cwip Jan
Project Salary
Project ER
Battery 12v 35Amp

462221

Monthly CAR Expense

465193

Project Salary
Project Salary
Travel cost
Training and Development
Local conveyance
Installation Charg
Supply of Electric
Submersible pump
Pump Accessories, transpottation, installation & commission
Monthly rental for Project Manager Car
Battery backup
Installation charg Battery backup
REB DG Change over
Project Salary Recla
Proj cost trf to cwi
Salary TRF To project
Salary TRF To project
Plant G&A trf to cwi
Monthly rental for Project Manager Car

Classified - Confidential

Monthly rental for Project Manager Car


Plan GNA trf to CWIP
Monthly rental for Project Manager Car
Salary TRF To project
Plan GNA trf to CWIP
Plan GNA trf to CWIP
Installation Charg
Supply of Electric
Plan GNA trf to CWIP
Salary TRF To project
Plan GNA trf to CWIP
Safety Shoe
Safety Helmet
Safety Harness
Safety Vest
Safety Goggles
Shrubs clearing
Sand filling
Govt.Electric bill
Electric cable
Installation charg
Insurance Premium for project
Salary trf to proj
Plant G&A TRF
1342Print project w
MS almirah
Govt.Electric bill
Courier fee
Brick and block wk
Excavation wrk
Flooring works
PCC Works
Sewage Disposal
Sand filling
Shrubs clearing
Helogen light set
Helogen light set
Security Guard
Security Guard
Monthly cost
Gate pass book
Security Guard
Security Guard
Water testing by B
Water testing by B
Govt.Electric bill
Excavation wrk
Excavation wrk
Excavation wrk

Classified - Confidential

Excavation wrk
Shrubs clearing
Salary trf to proj
Plant G&A TRF
Salary trf to Proj
Salary trf to proj
Plant G&A TRF
Salary trf to Proj
Monthly Vehical cost
Govt.Electric bill
Security Guard
Security Guard
Monthly Vehical cost
Printer purchase
Pest Control
LED TV
Auto Scren Projector
Projector
Clamp/Projector
10 KVA UPS
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
Installation Cost
2xE1 Bandwith cost
PO
PO
PO
PO
PO
Salary trf to Proj

Swtch
Router
Networking Work
Networking Work
Electric Supplies purchased for Project
Electric Supplies purchased for Project
Electric Supplies purchased for Project

Classified - Confidential

Electric Supplies purchased for Project


Electric Supplies purchased for Project
Electric Supplies purchased for Project
Electric Supplies purchased for Project
Electric Supplies purchased for Project
Electric Supplies purchased for Project
Electric Supplies purchased for Project
Electric Supplies purchased for Project
Electric Supplies purchased for Project
Electric Supplies purchased for Project
Electric Supplies purchased for Project
Electric Supplies purchased for Project
Electric Supplies purchased for Project
Electric Supplies purchased for Project
Electric Supplies purchased for Project
Electric Supplies purchased for Project
Electric Supplies purchased for Project
Land development
Land development
Land development
Land development
Land development
Land development
Land development
Land development
Land development
Land development
Land development
New Gas connection Enlistment
Sample Water Test
Salary trf to proj
TRF TO CWIP
Plant G&A TRF
Monthly vehicle running cost
Monthly Cost
Office furniture
Salary trf to proj
Plant G&A TRF
Project Interest Capi
DOE certificate renewal
Sagor Rent- a-Car monthly cost
Salary trf to proj
Plant G&A TRF
CWIP Provision FTM
Project Interest
Earth wrk excvatin
Plain reforce CC
Flooring
Monthly Cost Sagor Rent A Car
Monthly Cost Sagor Rent A Car
Plant G&A TRF
Project Interest

Classified - Confidential

Salary trf to proj


Security Guard & Supervisor
Security Guard & Supervisor
Salary
Interest
Salary
G&A
Security
Security Guard
Monthly Cost
Monthly Cost
Window curtain
Excavation wrk
AC for site office
Electrical works
65 KVA Diesel Gen
Water testing fee
Shrubs clearing
2x2E Data Link
Earth wrk excvatin
Earth wrk excvatin
Earth wrk excvatin
Earth wrk excvatin
Earth wrk excvatin
Insurance premium for project equipment purchase
Insurance premium for project equipment purchase
Insurance premium for project equipment purchase
Insurance premium for project equipment purchase
Insurance premium for project equipment purchase
Insurance premium for project equipment purchase
Insurance premium for project equipment purchase
Insurance premium for project equipment purchase
Insurance premium for project equipment purchase
Insurance premium for project equipment purchase
Insurance premium for project equipment purchase
Insurance premium for project equipment purchase
Insurance premium for project equipment purchase
Insurance premium for project equipment purchase
Insurance premium for project equipment purchase
Insurance premium for project equipment purchase
Insurance premium for project equipment purchase
Insurance premium for project equipment purchase
Insurance premium for project equipment purchase
Salary trf to proj
Project LC Charges
Insurance premium for project equipment purchase
Insurance premium for project equipment purchase
Project Interest Capi
CWIP Provision FTM

Classified - Confidential

Security
Security
Security
Security
Security
Security

Classified - Confidential

Opening
Jv No

Month

JL131217000001

Jul-13

JL131217000001

Jul-13

JL131217000001

Jul-13

JL131217000001

Jul-13

JL131217000001

Jul-13

JL131217000001

Jul-13

JL131217000001&JL140116000001

Jul-13

JL131217000001&JL140116000001

Aug-13

JL131217000001&JL140116000001

Sep-13

JL131217000001

Sep-13

JL131217000001

Sep-13

JL131217000001

Sep-13
Sep-13
Sep-13
Oct-13
Oct-13
Dec-13
Oct-13
Nov-13
Dec-13
Dec-13
Dec-13
Jan-14

JL140127000007

Jan-14
Jan-14
Feb-14
Mar-14
Mar-14

JL140401000002

Feb-14

JL140401000002

Mar-14

JL140401000008

Mar-14

JL140427000019
JL140427000019

Apr-14
Apr-14
Apr-14
Apr-14
Apr-14
Apr-14
May-14
May-14
May-14
May-14
Apr-14
May-14
May-14
Jun-14
Jun-14
Jun-14

closing
Addition

Total

94,734
198,076
82,604
300,000
128,239
93,943
468,435
567,302
999,432
2,385
403,289
14,040
2,164,500
376,200
1,852,712
3,098,400
172,500
761,950
780,937
878,723
5,225
63,286
21,060
11,743
906,730
15,145
5,200
68,172
900,598
993,527
114,319
12,000
9,820
211
7,920
196,560
673,327
76,948
218,200
17,935
187,020
1,082,995
4,620
1,068,334
967,420
21,310
79,373

Classified - Confidential

Total

94,734
198,076
82,604
300,000
128,239
93,943
468,435
567,302
999,432
2,385
403,289
14,040
2,164,500
376,200
1,852,712
3,098,400
172,500
761,950
780,937
878,723
5,225
63,286
21,060
11,743
906,730
15,145
5,200
68,172
900,598
993,527
114,319
12,000
9,820
211
7,920
196,560
673,327
76,948
218,200
17,935
187,020
1,082,995
4,620
1,068,334
967,420
21,310
79,373

Jun-14
Jul-14
Jul-14
Jul-14
Aug-14
Aug-14
Apr-14
Apr-14
Aug-14
Aug-14
Aug-14
Sep-14
Sep-14
Sep-14
Sep-14
Sep-14
Sep-14
Sep-14
Sep-14
Sep-14
Sep-14
Oct-14
Oct-14
Oct-14
Oct-14
Oct-14
Oct-14
Oct-14
Oct-14
Oct-14
Oct-14
Oct-14
Oct-14
Oct-14
Oct-14
Nov-14
Nov-14
Nov-14
Nov-14
Nov-14
Nov-14
Nov-14
Nov-14
Nov-14
Nov-14
Nov-14
Nov-14
Nov-14
Nov-14

77,355
104,008
78,033
990,346
19,143
159,757
(211)
(7,902)
(159,757)
974,559
180,535
46,852
7,020
3,640
5,928
5,460
4,217,229
5,776,489
11,135
211
12,911,524
1,116,164
26,486
1,840
27,040
4,268
5,170
319,086
2,480,696
113,479
264,841
116,050
15,095,693
418,677
36,878
5,756
130,862
49,965
126,556
6,900
130,862
49,965
12,248
123,280
6,877
4,761,411
3,629,077
570,275

Classified - Confidential

77,355
104,008
78,033
990,346
19,143
159,757
(211)
(7,902)
(159,757)
974,559
180,535
46,852
7,020
3,640
5,928
5,460
4,217,229
5,776,489
11,135
211
12,911,524
1,116,164
26,486
1,840
27,040
4,268
5,170
319,086
2,480,696
113,479
264,841
116,050
15,095,693
418,677
36,878
5,756
130,862
49,965
126,556
6,900
130,862
49,965
12,248
123,280
6,877
4,761,411
3,629,077
570,275

Nov-14
Nov-14
Nov-14
Nov-14
Dec-14
Dec-14
Dec-14
Dec-14
Dec-14
Dec-14
Dec-14
Dec-14
Dec-14
Dec-14
Dec-14
Dec-14
Dec-14
Dec-14
Dec-14
Dec-14
Jan-15
Jan-15
Jan-15
Jan-15
Jan-15
Jan-15
Jan-15
Jan-15
Jan-15
Jan-15
Jan-15
Jan-15
Jan-15
Jan-15
Jan-15
Jan-15
Jan-15
Jan-15
Jan-15
Jan-15
Jan-15
Jan-15
Jan-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15

5,612,335
25,621,165
1,419,817
22,806
1,528,424
1,296,460
180,672
49,493
109,458
7,617
130,862
49,965
125,157
220,001
15,784
65,520
12,480
67,600
8,320
695,001
21,465,308
112,191
593,231
800,198
4,331,179
411,747
510,015
1,022,016
6,354,248
1,063,274
12,776,423
368,032
646,897
50,001
24,269
15,954
130,862
49,965
81,589
40,250
1,416,877
27,178
15,280
206,730
208,838
9,672
16,016
19,344
15,912
12,480

Classified - Confidential

5,612,335
25,621,165
1,419,817
22,806
1,528,424
1,296,460
180,672
49,493
109,458
7,617
130,862
49,965
125,157
220,001
15,784
65,520
12,480
67,600
8,320
695,001
21,465,308
112,191
593,231
800,198
4,331,179
411,747
510,015
1,022,016
6,354,248
1,063,274
12,776,423
368,032
646,897
50,001
24,269
15,954
130,862
49,965
81,589
40,250
1,416,877
27,178
15,280
206,730
208,838
9,672
16,016
19,344
15,912
12,480

Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Feb-15
Mar-15
Mar-15
Mar-15
Mar-15
Mar-15
Apr-15
Apr-15
Apr-15
Apr-15
Apr-15
Apr-15
May-15
May-15
May-15
May-15
May-15
May-15
May-15

26,000
13,156
4,233
4,056
25,740
9,368
23,400
57,200
48,048
23,962
21,840
8,736
30,160
624
5,262
6,240
28,358
490,501
4,135,818
1,174,732
881,432
5,126,447
628,700
5,358,121
107,717
9,244
3,194,980
94,915
115,000
116,150
1,277,681
(105,551)
15,635
109,512
789,139
136,976
1,367,675
138,880
166,648
75,000
134,152
1,990,893
10,464
62,185
9,557,347
45,598,095
192,005
107,089
126,805
112,193
100,035

Classified - Confidential

26,000
13,156
4,233
4,056
25,740
9,368
23,400
57,200
48,048
23,962
21,840
8,736
30,160
624
5,262
6,240
28,358
490,501
4,135,818
1,174,732
881,432
5,126,447
628,700
5,358,121
107,717
9,244
3,194,980
94,915
115,000
116,150
1,277,681
(105,551)
15,635
109,512
789,139
136,976
1,367,675
138,880
166,648
75,000
134,152
1,990,893
10,464
62,185
9,557,347
45,598,095
192,005
107,089
126,805
112,193
100,035

May-15
May-15
May-15
Jun-15
Jun-15
Jun-15
Jun-15
Jun-15
Jun-15
Jun-15
Jun-15
Jun-15
Jun-15
Jun-15
Jun-15
Jun-15
Jun-15
Jun-15
Jun-15
Jun-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15

2,153,674
180,827
180,827
2,843,368
147,465
(666,448)
(23,011)
42,134
361,654
88,725
146,753
34,200
(93)
18,919,111
707,200
1,844,846
1,182,500
353,185
6,507,754
92,700
5,430,532
98,064
29,067,872
1,573,040
1,210,113
19,301
96,913
133,085
101,214
295,072
405,499
165,694
1,512,727
326,370
27,805
50,337
10,861
2,040,352
440,206
43,882
106,978
156,986
33,870
417,683
2,316,351
5,782,664
14,149
20
179,859
585,437,866

Classified - Confidential

2,153,674
180,827
180,827
2,843,368
147,465
(666,448)
(23,011)
42,134
361,654
88,725
146,753
34,200
(93)
18,919,111
707,200
1,844,846
1,182,500
353,185
6,507,754
92,700
5,430,532
98,064
29,067,872
1,573,040
1,210,113
19,301
96,913
133,085
101,214
295,072
405,499
165,694
1,512,727
326,370
27,805
50,337
10,861
2,040,352
440,206
43,882
106,978
156,986
33,870
417,683
2,316,351
5,782,664
14,149
20
179,859
585,437,866

Jul-15
Jul-15
Jul-15
Jul-15
Jul-15
Jul-15

144,200
54,075
144,200
54,075
60,375
209,300

923,226,023

Classified - Confidential

144,200
54,075
144,200
54,075
60,375
209,300

923,226,023

Captalized

CWIP balance

Capitalization month

94,734
198,076
82,604
300,000
128,239
93,943
468,435
567,302
999,432
2,385
403,289
14,040
2,164,500
376,200
1,852,712
3,098,400
172,500
761,950
780,937
878,723
5,225
63,286
21,060
11,743
906,730
15,145
5,200
68,172
900,598
993,527
114,319
12,000
9,820
211
7,920
196,560
673,327
76,948
218,200
17,935
187,020
1,082,995
4,620
1,068,334
967,420
21,310
79,373

Classified - Confidential

Comments

77,355
104,008
78,033
990,346
19,143
159,757
(211)
(7,902)
(159,757)
974,559
180,535
46,852
7,020
3,640
5,928
5,460
4,217,229
5,776,489
11,135
211
12,911,524
1,116,164
26,486
1,840
27,040
4,268
5,170
319,086
2,480,696
113,479
264,841
116,050
15,095,693
418,677
36,878
5,756
130,862
49,965
126,556
6,900
130,862
49,965
12,248
123,280
6,877
4,761,411
3,629,077
570,275

Classified - Confidential

220,001

12,480
67,600
8,320
695,001

206,730
208,838

5,612,335
25,621,165
1,419,817
22,806
1,528,424
1,296,460
180,672
49,493
109,458
7,617
130,862
49,965
125,157
15,784
65,520
21,465,308
112,191
593,231
800,198
4,331,179
411,747
510,015
1,022,016
6,354,248
1,063,274
12,776,423
368,032
646,897
50,001
24,269
15,954
130,862
49,965
81,589
40,250
1,416,877
27,178
15,280
9,672
16,016
19,344
15,912
12,480

Jun/15 CWIP - Computer Equipments(Project)

Jun/15
Jun/15
Jun/15
Jun/15

Jun/15 CWIP - Computer Equipments(Project)


Jun/15 CWIP - Computer Equipments(Project)

CWIP - Computer Equipments(Project)


CWIP - Computer Equipments(Project)
CWIP - Computer Equipments(Project)

Classified - Confidential

26,000
13,156
4,233
4,056
25,740
9,368
23,400
57,200
48,048
23,962
21,840
8,736
30,160
624
5,262
6,240
28,358
490,501
4,135,818
1,174,732
881,432
5,126,447
628,700
5,358,121
107,717
9,244
3,194,980
94,915
115,000
116,150
1,277,681
(105,551)
15,635
109,512
789,139
136,976
1,367,675
138,880
166,648
75,000
134,152
1,990,893
10,464
62,185
9,557,347
45,598,095
192,005
107,089
126,805
112,193
100,035

CWIP - Computer Equipments(Project)


CWIP - Computer Equipments(Project)
CWIP - Computer Equipments(Project)
CWIP - Computer Equipments(Project)
CWIP - Computer Equipments(Project)
CWIP - Computer Equipments(Project)
CWIP - Computer Equipments(Project)
CWIP - Computer Equipments(Project)
CWIP - Computer Equipments(Project)
CWIP - Computer Equipments(Project)
CWIP - Computer Equipments(Project)
CWIP - Computer Equipments(Project)
CWIP - Computer Equipments(Project)
CWIP - Computer Equipments(Project)
CWIP - Computer Equipments(Project)
CWIP - Computer Equipments(Project)
CWIP - Computer Equipments(Project)

Classified - Confidential

2,153,674
180,827
180,827
2,843,368
147,465
(666,448)
(23,011)
42,134
361,654
88,725
146,753
34,200
(93)
18,919,111
707,200
1,844,846
1,182,500
353,185
6,507,754
92,700
5,430,532
98,064
29,067,872
1,573,040
1,210,113
19,301
96,913
133,085
101,214
295,072
405,499
165,694
1,512,727
326,370
27,805
50,337
10,861
2,040,352
440,206
43,882
106,978
156,986
33,870
417,683
2,316,351
5,782,664
14,149
20
179,859
585,437,866

CWIP - Computer Equipments(Project)

Classified - Confidential

144,200
54,075
144,200
54,075
60,375
209,300

1,418,970

921,807,053

Classified - Confidential

Classified - Confidential

Classified - Confidential

ipments(Project)

ipments(Project)
ipments(Project)

ipments(Project)
ipments(Project)
ipments(Project)

Classified - Confidential

ipments(Project)
ipments(Project)
ipments(Project)
ipments(Project)
ipments(Project)
ipments(Project)
ipments(Project)
ipments(Project)
ipments(Project)
ipments(Project)
ipments(Project)
ipments(Project)
ipments(Project)
ipments(Project)
ipments(Project)
ipments(Project)
ipments(Project)

328,868

Classified - Confidential

Equipments(Project)

Classified - Confidential

Classified - Confidential

Source

- all -

PO Number
RFA Number
JL130103000002
12BIGG1364-1233605
JL140103000012
12BIGG1364-1233605
JL140103000013
12BIGG1364-1233605
JL140106000003
12BIGG1364-1233605
JL140127000007
12BIGG1364-1233605
JL140223000007
12BIGG1364-1233605
JL140223000008
12BIGG1364-1233605
JL140401000002
12BIGG1364-1233605
JL140401000008
12BIGG1364-1233605
JL140525000004
12BIGG1364-1233605
JL140525000007
12BIGG1364-1233605
JL140629000009
12BIGG1364-1233605
JL140629000011
12BIGG1364-1233605
JL140727000010
12BIGG1364-1233605
JL140823000014
12BIGG1364-1233605
JL140823000015
12BIGG1364-1233605
JL140929000004 & JL1409290 12BIGG1364-1233605
JL140929000006
12BIGG1364-1233605
JL141023000003
12BIGG1364-1233605
JL141026000003
12BIGG1364-1233605
JL141026000005
12BIGG1364-1233605
JL141130000003
12BIGG1364-1233605
JL150102000010
12BIGG1364-1233605
JL150102000017
14BIGG1364-0023104
JL150104000013
14BIGG1364-0023104
JL150129000004
12BIGG1364-1233605
JL150202000002
12BIGG1364-1233605
JL150202000017
12BIGG1364-1233605
JL150228000022
14BIGG1364-0023104
JL150302000011
14BIGG1364-0023104
JL150404000008
14BIGG1364-0023104
JL150406000005
14BIGG1364-0023104
JL150407000003
14BIGG1364-0023104
JL150503000005
14BIGG1364-0023104
JL150503000012
14BIGG1364-0023104
JL150504000008
14BIGG1364-0023104
JL150530000018
14BIGG1364-0023104
JL150601000001 & JL1506010 14BIGG1364-0023104
Non PO
12BIGG1364-1233605
PF032061
12BIGG1364-1233605
PF032073
12BIGG1364-1233605
PF032109
12BIGG1364-1233605
PF033035
12BIGG1364-1233605
PF033039
12BIGG1364-1233605
PF033040
12BIGG1364-1233605
PF033047
12BIGG1364-1233605

Sum - Addition
-

Classified - Confidential

PF033050
PF033059
PF033069
PF033072
PF033094
PF034001
PF034013
PF034037
PF034050
PF034056
PF034057
PF034059
PF034060
PF034061
PF034064
PF034065
PF034073
PF034075
PF034076
PF034077
PF034082
PF034084
PF034085
PF034087
PF034088
PF034093
PF034094
PF034100
PF034101
PF034102
PF034103
PF034112
PF035018
PF035023
PF035024
PF035025
PF035040
PF035042
PF035054
Plant G&A TRF
PO034059
PO034079
RV140823000010
RV150503000005
Salary trf to proj
VR035C47
PF033068
PF034039

12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
12BIGG1364-3894721
14BIGG1364-0023104
12BIGG1364-1233605
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
12BIGG1364-1233605
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
14BIGG1364-0023104
12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605
12BIGG1364-1233605
14BIGG1364-0023104
12BIGG1364-1233605
14BIGG1364-0023104
12BIGG1364-1233605
12BIGG1364-1233605

Classified - Confidential

PF034054
PF034086
Total Result

14BIGG1364-0023104
14BIGG1364-0023104

Classified - Confidential

Classified - Confidential

Classified - Confidential

Classified - Confidential

198,075.90
82,604.63
2,164,500.00

27,040
(198,076)
(82,605)
(2,164,500)

Classified - Confidential

3,098,400.00
1,852,712.16
300,000.00
202,738.05
376,200.00
869,887.38
21,060.00
187,020.00

(3,098,400)
(1,852,712)
(300,000)
(202,738)
(376,200)
(869,887)
(21,060)
(187,020)
26,422,096

Classified - Confidential

Classified - Confidential

Classified - Confidential

Classified - Confidential

Classified - Confidential

SL. No Vednor Name


3 Energypac Engineering Ltd
8 THERMAX LIMITED

Activity Awarded
Electrical works
WTP

Classified - Confidential

LC Number
BG Number
NA
GTEDAK159182
5634600862 2551C-107454

Citi Ref Number


NA
6634601177

Classified - Confidential

BG Issuing bank
HSBC
Canara Bank, India

Issue Place
Dhaka
Pune, India

Issung Date Expiry date


25-Jun-15
23-Sep-15
7-Aug-15
31-Dec-15

Classified - Confidential

BG Amount
Tax deducted Advance paid PO Number
68,856,603
3,442,830
65,413,773.09 PF035150
$
515,543.00
- $
515,543.00 PF035146

Classified - Confidential

PO value
275,426,413
134,041,206

Moblization adavance Days in Hand


68,856,603
-391
40,212,362
-292

Classified - Confidential

###

You might also like