LUSAIL
L
DEVELO
OPMENTT PROJECT CO
ONSTRUCTION HSE GENER
RAL
REQUIRE
R
EMENTSS
DocumentN
No
LUSHSEWG
G3432001.15
Uncontrolled
dCopy
Con
ntrolledCopy
Rev
15
Date
19Jul2016
COMPANYPR
ROPRIETARYIN
NFORMATION
Priortouse,eensurethisdocumentisthem
mostrecentrevisionbycheckin
ngtheMasterD
DocumentList.TTorequestach
hange,submitaa
DocumentCh
hangeRequestttotheDocumen
ntControlReprresentative.Maastercopyofth
hisdocumentw
willbemaintaineedbytheLRED
DC
QA/QCManagger.Notcontro
olledifprinted.
LusailRealEstateDevelopmentCompany
AmendmentRecord
LREDCConstructionHSEGeneralRequirements
Thisdocumentisreviewedtoensureitscontinuingrelevancetothesystemsandprocessthatitdescribes.Arecordof
contextualadditionsoromissionsisgivenbelow:
Rev .No
Description / Comments
Prepared By
Checked
By
Approved
By
Issue Date
All
HSE Working
Group
Bernard Lim
Uwe Krueger
May 2013
HSE Working
Group
Bernard Lim
Uwe Krueger
16 February
2014
HSE Working
Group
Bernard Lim
Uwe Krueger
16th February
2014
HSE Working
Group
Bernard Lim
Uwe Krueger
16th February
2014
HSE Working
Group
Bernard Lim
Uwe Krueger
16th February
2014
HSE Working
Group
Bernard Lim
Uwe Krueger
16 February
2014
HSE Working
Group
Bernard Lim
Uwe Krueger
16 February
2014
10
HSE Working
Group
Bernard Lim
Uwe Krueger
11
11
11
th
th
th
nd
March
2014
Uwe Krueger
11th February
2015
HSE Working
Group
Michael
Ford
HSE Working
Group
Michael
Ford
Uwe Krueger
11 February
2015
HSE Working
Group
Michael
Ford
Uwe Krueger
11 February
2015
HSE Working
Group
Michael
Ford
Uwe Krueger
11 February
2015
HSE Working
Group
Michael
Ford
Uwe Krueger
11
11 February
2015
HSE Working
Group
Michael
Ford
Uwe Krueger
12
12
HSE Working
Group
Michael
Ford
Uwe Krueger
13
HSE Working
Group
Michael
Ford
Uwe Krueger
14
HSE Working
Group
Michael
Ford
Uwe Krueger
HSE Working
Group
Michael
Ford
11
th
th
th
th
4 May 2015
Dec 6 2015
th
Uwe Krueger
19 July
2016
DocumentNo:LUSHSEWG3432001.14
Page2of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
Contents
LUSAILREALESTATEDEVELOPMENTCOMPANY............................................................................................................1
HEALTH,SAFETY,SECURITY,ENVIRONMENT,LOGISTICS&QUALITYDEPARTMENT.............................................................1
LUSAILDEVELOPMENTPROJECTCONSTRUCTIONHSEGENERALREQUIREMENTS....................................................1
1.0
POLICYSCOPE&LIMITATIONS........................................................................................................................5
1.1.
1.2.
1.3.
1.4.
DEFINITION&ACRONYMS.......................................................................................................................5
ZEROINCIDENTMANAGEMENTPOLICY..................................................................................................6
COMPLIANCEWITHTHESEREQUIREMENTS...........................................................................................6
LIMITSOFTHESEREQUIREMENTS...........................................................................................................7
2.0
HEALTH&SAFETYGENERAL.........................................................................................................................7
2.1.
2.2.
2.3.
2.4.
2.5.
2.6.
2.7.
2.8.
2.9.
2.10.
2.11
2.12
GENERAL...................................................................................................................................................7
PERSONALPROTECTIVEEQUIPMENT(PPE).............................................................................................8
WELFARE..................................................................................................................................................8
ADMINISTRATION....................................................................................................................................9
EMERGENCYMEASURES..........................................................................................................................9
TEMPORARYFACILITIES.......................................................................................................................9
SITESECURITY..........................................................................................................................................9
VEHICLES&TRAFFICMANAGEMENT.....................................................................................................10
WORKINGINPUBLICAREAS..................................................................................................................11
WORKINGATNIGHT...........................................................................................................................11
SUMMERWORKINGCONDITIONS.....................................................................................................11
FIREPREVENTION...............................................................................................................................11
3.0
CONSTRUCTIONHEALTH&SAFETYPLAN(HASP)..........................................................................................13
3.1
CONTRACTOROCCUPATIONALHASP....................................................................................................13
4.0
HEALTH,SAFETY&ENVIRONMENT(HSE)MANAGEMENT.............................................................................14
4.1
4.2
4.3
4.4
STAFFQUALIFICATIONS&STAFFING.....................................................................................................14
REVIEW&APPROVALOFSTAFFQUALIFICATIONS................................................................................16
HEALTH&SAFETYSTAFFRESPONSIBILITIES..........................................................................................16
HEALTH&SAFETYSUPPLIES&EQUIPMENT(NOTAPPLICABLETODEVELOPERS)...............................17
5.0
OCCUPATIONALHEALTHMANAGEMENT......................................................................................................17
6.0
ENVIRONMENTAL&SUSTAINABILITYMANAGEMENT...................................................................................18
7.0
ASSESSMENT,MONITORING&CORRECTIVEACTIONS...................................................................................19
7.1
7.2
7.3
7.4
7.5
HEALTH&SAFETYASSESSMENT............................................................................................................19
CORRECTIVEACTION..............................................................................................................................19
EQUIPMENTINSPECTION.......................................................................................................................19
MONITORINGOFWORKEREXPOSURE..................................................................................................20
REGULATORYAGENCYINSPECTION......................................................................................................20
8.0
INCIDENTREPORTING&INVESTIGATION......................................................................................................20
9.0
HAZARDAWARENESS...................................................................................................................................25
9.1
9.2
9.3
9.4
RISKASSESSMENTS................................................................................................................................25
METHODSTATEMENTS..........................................................................................................................25
JOBHAZARDANALYSIS..........................................................................................................................26
HAZARDOUSMATERIALS&SUBSTANCES.............................................................................................26
10.0
TRAINING&INDUCTION...........................................................................................................................27
10.1
10.2
LREDCPROJECTSITEINDUCTION.......................................................................................................27
SPECIALIZEDHEALTH&SAFETYTRAINING........................................................................................28
DocumentNo:LUSHSEWG3432001.14
Page3of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
11.0
PERMITTOWORKACTIVITIES...................................................................................................................28
11.1
11.2.
11.3
11.4.
11.5.
11.6.
EXCAVATION&TRENCHING...............................................................................................................29
CONFINEDSPACEENTRY(CSE)...........................................................................................................29
HOTWORK..........................................................................................................................................30
CONTROLOFHAZARDOUSENERGY(LO/TO).....................................................................................31
PRESSURIZEDLINETESTING...............................................................................................................31
CRANESUSPENDEDMANBASKETS....................................................................................................31
12.0
HIGHRISKACTIVITIES...............................................................................................................................32
12.1
12.2
WORKINGNEARWATER....................................................................................................................32
WORKINGATHEIGHTS.......................................................................................................................32
13.0
EQUIPMENTMACHINERY&TOOLS...........................................................................................................33
13.1
13.2
PLANT&MOBILEHEAVYEQUIPMENT...............................................................................................33
CRANES,RIGGING&HOISTINGEQUIPMENT.....................................................................................34
14.0
FAILURETOCOMPLYWITHLREDCCONSTRUCTIONHSEGENERALREQUIREMENTS...................................36
14.1
14.2
GENERAL.............................................................................................................................................36
PERFORMANCEDEDUCTIONS............................................................................................................37
DocumentNo:LUSHSEWG3432001.14
Page4of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
1.0 POLICYSCOPE&LIMITATIONS
1.1.
DEFINITION&ACRONYMS
ANSI
AmericanNationalStandardsInstitute
Approval
meanspriorwrittenassentoftheMasterDeveloperand/orLREDC.The
term Approval shall in no way be construed as relieving the
CONTRACTOR of any of its obligations, responsibilities or liabilities.
ApproveorApprovedshallbeconstruedaccordingly
CAP
meansCorrectiveActionPlan
Competent
CONTRACTOR
dBA
meansDecibelsAscale
EMT
meansEmergencyMedicalTechnician
HASP
meansHealth&SafetyPlan
HSE
meansHealthSafety,Environmental&Fire
JHA
meansJobHazardAnalysis
LREDC
LREDCREPRESENTATIVE
meansthepersonwhoshallbeappointedbyLREDCastheirnominated
representative whom LREDC may change from time to time and who
shall be as notified by LREDC to the CONTRCTOR, and may include
LREDCsHSEDepartment,SupervisingConsultantand/orEngineer.
LREDCProject
meanstheprojectknownasLusailCityandanyotherprojectthatLREDC
isinvolvedinfromtimetotime
MSDS
meansMaterialSafetyDataSheet
OHSAS18001
PPE
meansPersonalProtectiveEquipment
QCS
meansQatarConstructionSpecifications(mostcurrentrevision)
Requirements
meanstherequirementscontainedwithinthisdocumentbeingthe
GeneralRequirementsforLREDCConstructionHealth&Safetyasmay
beupdatedandnotifiedtotheCONTRACTORfromtimetotime
ReasonablyPracticable
meanswherealegalrequirementisqualifiedbythetermreasonably
practicable,thecost(intermsofmoney,timeandinconvenience)of
takingprecautionsmaybebalancedagainsttheriskbeingconsidered
DocumentNo:LUSHSEWG3432001.14
Page5of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
RIDDOR
meanstheReportingofInjuries,DiseasesandDangerousOccurrences
Regulations1995
Risk&Assessment
meanstheprocessofhazard,aspect,impact,identification,assessment
oftheriskandidentificationofthecontrolsrequiredtomanagetherisk
toanacceptableleveltoensurethehealthandsafetyofthoseaffected
bytheactivityandtheprotectionoftheenvironmentfromharm
WEL
meansWorkplaceExposureLimit
Workatheight
PEEPO
meansPeople,Environment,Equipment,ProceduresandOrganisation.
Itistheprocessofdata(analysisoffindings)gatheringintheeventofan
unwantedoccurrence.
1.2.
ZEROINCIDENTMANAGEMENTPOLICY
LREDCadherestoand implements aZeroIncident Policy with thegoalof being recognized asa leading
standard in the Region for excellence in construction health and safety. It is LREDCs requirement that all
CONTRACTORSadoptthispolicyandstriveforzeroincidentperformancethroughproperpreworkactivity
planning, management participation and support, employee training, and continual assessment for
improvementoftheirprograms.
1.3.
COMPLIANCEWITHTHESEREQUIREMENTS
The purpose of the Requirements is to provide the CONTRACTOR with LREDC Construction HSE General
RequirementstheminimumrequirementstowhichCONTRACTORmustcomplywhenconductingworkonor
inconnectionwiththeLREDCProject.
CONTRACTORSworkingontheLusailProjectsiteshallcomplywiththeseRequirements,LREDCConstruction
Safety Management Procedures, latest government approved QCS , and all other applicable Qatari laws
includingbutnotlimitedtolabour,environmental,healthandsafetystandards(QatarLaws).Ifaconflict
arisesbetweentheRequirementsandapplicableregulatoryrequirements,themoststringentshallapply.
AllCONTRACTORSshallcomplywithallwrittenorverbalinstructionregardingsafetyandhealththathave
beenissuedpursuanttotheseRequirementsbytheLREDCREPRESENTATIVE.
IninstanceswheretheCONTRACTORmustobtainApprovalsfromLREDCREPRESENTATIVE,suchapprovals
shallnotrelievetheCONTRACTORofitsobligationsandliabilitiesundertheCONTRACT.
All CONTRACTORS working on the LREDC Project can obtain a copy of LREDC Construction Safety
Management Procedures and related forms from LREDC website, HSEQ, Contracts Department upon
request.
Certain Performance Deductions are set out at Section 14.2. This list of Performance Deductions is non
exhaustive.Furthercompensationmayberequiredtobepaid,wherecosttoLREDCand otheraffected
party(ies) exceed the amounts referred to in Section 14.2. The amounts set out in Section 13.2 are in
additiontoanyamountthatmaybeprescribedundercontract,Qatarilaworotherregulationswhichmay
becollectedbyLREDCoranycompetentauthority.
ThetablesetoutinSection14.2hasspecificallyremainedsilentonotherhealthandsafetyviolationsthat
mayoccur.Thosewillbedealtwithusingtheremediesavailableunderthespecificconstructioncontractor
saleandpurchaseagreementasrelevant.
LREDCmayattheirdiscretionrestrictaccesstoasiteiftherehavebeenongoingHSEviolationsthathave
not been corrected by the CONTRACTOR in a timely manner. This will be at the discretion of the HSEQ
DirectorinconsultationwiththeLusailCEO.
DocumentNo:LUSHSEWG3432001.14
Page6of38
LusailRealEstateDevelopmentCompany
1.4.
LREDCConstructionHSEGeneralRequirements
LIMITSOFTHESEREQUIREMENTS
Where these Requirements do not adequately address CONTRACTOR activities, the CONTRACTOR is
required to comply with all aspects of latest government approved QCS and any other Qatar Laws, their
internal company health and safety policies and procedures, the projectspecific Health and Safety Plan
(HASP) and all applicable health and safety laws standards and guidelines from internationally recognized
healthandsafetyagencies,organizationsandassociations.
AstheseRequirementscannotaddresseverypossiblecondition,workactivityorsituationwhichmayarise
onsite,theCONTRACTORisrequiredandexpectedtoexhibitCompetence,exercisebestmanagementand
safeworkpracticeswithregardtothehealthandsafetyoftheirworkersandworkactivities.Omission or
failuretomentionaspecificissueintheseRequirementsinrelationtoanyactivitybeingconductedonthe
LREDCProjectdoesnotrelievetheCONTRACTORfromitsobligationsunderitscontract.
2.0 HEALTH&SAFETYGENERAL
The following are the minimum requirements that the CONTRACTOR shall comply with for all health and
safetyissuesrelatingtoworkactivitiesassociatedwiththeirCONTRACT.
Forenvironmentalandsustainabilityrequirements,theCONTRACTORshallrefertothelatestversionofthe
LREDCOCEMP(LUSHSEWG3446055.)
2.1.
GENERAL
TheCONTRACTORshall:
-
TakefullresponsibilityfortheHealthandSafetyofallpeopleontheirsite.
TakefullresponsibilityforanyEnvironmentalimpactsresultingfromtheirwork.
as a minimum, implement an occupational health and safety management system meeting the
requirementsofBSOHSAS18001;
provide and maintain plant, equipment including spares and systems of work that are safe and
withoutrisktohealth;
ensuresafetyandredcuetherisksintheuse,handling,storageandtransportationofmaterialsand
hazardoussubstancesaslowasreasonablypracticable
provideadequatesupervisionandtraining,asisnecessaryandimplementnecessaryproceduresto
ensurethehealthandsafetyoftheiremployeesandsafeoperationofplantandequipment;
provideandmaintainadequatewelfarefacilitiesandarrangementsforwelfareatwork;
identifyandunderstandallQatarLawsgoverninghisactivities,alongwithallsiterulesandhazards
createdbyadjacentCONTRACTORS,towhichhispersonnelmaybeexposed;
fosterandsupportahealthandsafetyprogramwhereallpersonnelareresponsibleforsafety;
ensure that these Requirements are enforced and followed by all personnel under their care and
responsibility.TheCONTRACTORshallprovideallnecessaryresourcesforfullcompliancewiththese
Requirements. Any failure by CONTRACTOR personnel to adhere to these Requirements will be
viewedasafailurebyCONTRACTOR;
ensurethatsafeaccessandegress isprovidedtotheLREDCREPRESENTATIVEforthepurposesof
regularvisitsincludingbutnotlimitedtositeinspection,assessmentoraudit;
DocumentNo:LUSHSEWG3432001.14
Page7of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
reportallincidents,regardlessofseveritytotheLREDCREPRESENTATIVEviathemonthlyreport
Allseriouseventsandincidentmustbereportedviaaphonecalltotheclientinatimelymanner
not Hoard Off or interfere with any site area(s) belonging to or intended for other site
CONTRACTORS;
provideadequatelightingandclearaccesstoandonallpathsoftravel;and
workshiftsshallnotexceed10hourspershift.Workersshallnotworkformorethanfive(5)hours
withoutabreak,whichshallbenotlessthanone(1)hourinduration.
2.2.
PERSONALPROTECTIVEEQUIPMENT(PPE)
TheCONTRACTORshall:
-
provide, at no cost to employees, all Personal Protective Equipment (PPE) necessary for the safe
conductofthework,asdeterminedbyQatarLaw,theLREDCREPRESENTATIVE,theCONTRACTOR
HASP,andLREDCConstructionSafetymanagementProcedures.PPEshallberatedperarecognized
testinglaboratory(ANSI,EU)andApprovedforusebytheLREDCREPRESENTATIVE(s);
ensurethatallPPEischeckedatregularintervalstoensurethatitremainsfitforpurpose;
notpermitthemodificationofanyPPEitemforanypurpose;
enforce all PPE requirements per the CONTRACTOR HASP and LREDC Construction Safety
ManagementProcedures;
makeavailableandprovide,uponrequestbyLREDC,PPEitemsandsafetyequipmentasidentifiedin
thecontractdocumentsalongwithanyrecordsrelatingtothem;
provideCONTRACTORHSEpersonnelwithredoverallsandhardhatswiththecompanynameclearly
markedontheoveralls;and
displaysignagedetailingrequirementsformandatoryPPEthroughouttheworksite.Signageshallbe
inaformatthatiseasilyrecognizabletoallpersonsonsiteregardlessoftheirpreferredlanguage.
2.3.
WELFARE
TheCONTRACTORshall:
-
supply adequate quantities of potable drinking water in the immediate work area for all workers.
Minimumquantityrequirementperworkeris6litres/10hoursshift;
provide workers with singleuse individual containers, or other approved method, for worker
consumptionofdrinkingwater;
supply adequate toilet and washing facilities with hot and cold running water. Separate facilities
shall beprovided for maleand femaleworkers,andshall be located within close proximity tothe
workarea.Aminimumofone(1)toiletshallbeprovidedpertwenty(20)workersassumingweekly
servicingoftheunits;
provide adequate residential accommodation in accordance with the LREDC policy on minimum
laborcampstandardswhichshallbeprovidedwithsmokedetectorsandfirealarmsperQatarCivil
DefenceFireSafetyHandbook;
ensure that transportation shall be provided between accommodation and work areas for all
personnel;and
ensurethatmultipleloadingandunloadingareasshallbedesignatedtominimizefoottravelalong
siteroads.
DocumentNo:LUSHSEWG3432001.14
Page8of38
LusailRealEstateDevelopmentCompany
2.4.
-
2.5.
LREDCConstructionHSEGeneralRequirements
ADMINISTRATION
Notices,signs,records,monitoringdata,emergencycontactinformation,etc.shallbeprominently
displayedintheEnglishandArabiclanguage,andallotherlanguagescommontotheworkforce.
The CONTRACTOR shall provide a minimum of one Site Health & Safety Signboard upon which is
postedallhealthandsafetydataandinformationpertinenttotheprojectsite,incidentrates,man
hours,etc.
Informationpostedonboard(s)shallbeupdatedbytheCONTRACTORasinformationchanges.
TheCONTRACTORshallmaintainaminimumofone(1)copyoftheCONTRACTORHASPonsiteatall
times.
EMERGENCYMEASURES
The CONTRACTOR shall develop and implement comprehensive emergency response procedures
specific to site work areas and activities occurring. All related equipment and supplies for
implementationofthewrittenplanshallbeprovidedbytheCONTRACTOR.
TheCONTRACTORHASPshallcontainthesitespecificEmergencyResponsePlan.
Allpersonnelshallberegularly(notlessthanannually)trainedonemergencyresponseprocedures,
and their role in response activities. All personnel shall be informed of and be expected to know
whotheiremergencyrespondersareandhavethecontactinformationforallpertinentresponders.
The CONTRACTOR shall conduct a minimum of one (1) emergency drill every three (3) months
(quarterly). Drills shall be coordinated with LREDC REPRESENTATIVE, and shall incorporate LREDC
Projectsiteemergencyservices.
The CONTRACTOR shall prominently display all emergency contact information in all active work
areas,ontheSiteHealth&SafetySignboard,andinareascommontotheirpersonnel.
TheCONTRACTORshallparticipateintheLREDCEmergencyResponseCommitteeforplanningand
coordinationoftheLREDCCrisisManagementPlan.
Whereoutsideassistanceisrequiredafteranevent(AmbulanceorCivilDefense)allCONTRACTORS
arerequiredtocontacttheLusailSecurityControlRoomon+97444977666toarrangeassistance.
Toensurefullcoordinationwiththeseservicesnocontractorshouldcontacttheseservicesdirectly.
The Emergency Number for Lusail Security Control room must be displayed prominently in each
workplaceinanappropriatelanguage.Eachcontractorshallsupplylocation CoordinatestoLusail
HSEsotheycanregularlyupdatethesitewideEmergencyResponsemap.
2.6. TEMPORARYFACILITIES
TheCONTRACTORshall:
submit plans of temporary construction buildings, facility fencing, access routes, and anchoring
systemsfortemporarystructurestotheLREDCRepresentativeforreviewandapproval.Theuseof
concretemasonryblocktobuildanytemporaryfacilitiesisstrictlyprohibited;and
anchor trailers and other temporary structures used as field offices, as personal housing, or for
storagewithrodsandcablesorbysteelstrapstogroundanchors.Theanchorsystemisdesignedto
withstand winds and must meet applicable state or local standards for anchoring mobile trailer
homes.
2.7.
SITESECURITY
TheCONTRACTORshall:
-
comply with all LREDC security and logistics plans when accessing and working on site.
Requirementsincludepersonnelbadging,vehiclepasses,andhealthandsafetyinductionforvisitors
andnewemployees;
DocumentNo:LUSHSEWG3432001.14
Page9of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
be responsible for those personnel entering the LREDC Project site on the CONTRACTORS behalf.
TheCONTRACTORshallensurethatonlyauthorizedpersonsandvehiclesenterthesite;
ensurethatvisitorsandvendorsshallbeprovidedwithtemporaryvehiclepassesbySecurityStaff,
which are valid for one (1) work day. The CONTRACTOR shall ensure that personnel are provided
withaphotoIDbadge;
beresponsibleforproperlysecuringallCompanyownedtools,equipmentandmaterialswhennot
inusetopreventtheft.Tothiseffect,CONTRACTORshallclearlydemarcateandidentifytheiroffice,
work,andstoragelocationswithCompanyname;
label or placard all tools, equipment and materials in order to verify ownership should disputes
arise;
prohibitallpersonnelfrombringingfirearms,weapons,alcohol,orcontrolledsubstancesontothe
projectsite;and
prohibit personnel observed to be under the influence of alcohol or drugs from entering and/ or
workingonsite.SuchcasesshallbeimmediatelyreportedtotheLREDCREPRESENTATIVE.
2.8.
VEHICLES&TRAFFICMANAGEMENT
TheCONTRACTORshall:
-
ensure that all company personnel who are operating motor vehicles on the LREDC Project site
roads comply with all requirements as stated in the LREDC Construction Traffic Management Site
Transport&ControlPlan.TheLREDCPlanimplementsandcomplieswithallQataritrafficlaws,and
theCONTRACTORshalloperatewiththeunderstandingthatsuchlawsapplytoallLREDCProjectsite
roads;
Eachcontractorwillsubmit(priortomobilisation)aTrafficManagementPlantoLusailLogisticsfor
approval.Theplanwilldetailallareasofresponsibilityandplanningfortrafficmanagement,access,
egress,signageandroadprotectionandmaintenancerequiredfortheirprojectarea.Changesmust
beupdatedregularlytoreflectchangesinrisk
ensure that all personnel are licensed/ trained/ competent to operate the vehicle(s) assigned to
themaspartoftheirscopeofwork.TheCONTRACTORshallnotpermitrecklessdrivingorhorseplay
invehicles;
ensure that vehicle operators are conducting regular vehicle safety inspections and notifying
managementofidentifieddeficiencies;
ensurethatallCONTRACTORdriversshallobeyallpostedspeedlimits,roadsigns,trafficrules,and
flagmeninstructionwhendrivingonallsiteroads.Vehicleoperatorsandallpassengersshallwear
seatbeltsatalltimes;
ensurethatdriversallowpedestrianstherightofwayatalltimes;
ensurethatallvehicleoperatorsshallreportaccidentsimmediatelyinaccordancewithSection7.0
oftheseRequirements;
ensure that flagmen are provided for activities which impact site road conveyance and/ or traffic
flow;and
ensure Vehicle operators shall notify the LREDC REPRESENTATIVE immediately to report
observationsofdamagedormissingtrafficcontrols,signs,etc.orrecklessdriving.
LREDCwillstationSpeedMonitorsrandomlythroughoutthesiteroadsystemtomonitorvehiclespeeds,
aswellascompliancewithalltrafficrules.Motoristsfoundtobeinviolationofpostedspeedlimitswillbe
subjecttodisciplinaryactionsasoutlinedbelow:
DocumentNo:LUSHSEWG3432001.14
Page10of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
At the discretion of the LREDC HSEQ Department, disciplinary action can be taken by LREDC including
termination of the service of offending person(s) found speeding and/or reporting to the relevant police
departmentorauthority.
2.9.
WORKINGINPUBLICAREAS
TheCONTRACTORshall:
-
carryoutallworkactivitiesconductedinareasaccessibletothepublicinamannerthatminimizes,
tothemaximumextentpossible,theimpactandlevelofrisktothepublic;
post notices of planned/ scheduled work activities a minimum of fifteen (15) days prior to the
proposedstartofworkattheworkareaandtheCONTRACTORsiteoffice;
ensures work activities shall be appropriately barricaded to provide physical separation between
constructionactivitiesandthepublic;
safeguardthepublicfromhazardspronetoaffectpersonsatdistances;suchas:arcflash,airborne
contaminants,excessivenoise,andconstructionvehicletraffic;
ensureallnecessarysecuritymeasuresshallbeprovidedbytheCONTRACTORtosecureworkareas
duringtimeswhenCONTRACTORpersonnelarenotpresent;and
ensurethatadditionalsafetyandsecuritymeasuresshallbeimplementedbytheCONTRACTORas
requiredbytheQatariCivilDefenceand/orQatariPolice.
2.10. WORKINGATNIGHT
TheCONTRACTORshall:
conductariskassessmentanddevelopamethodstatementuniquetonightworkactivities;(Tobe
approvedbyPMCM,orLusailHSEQDepartment.)
provide specific night shift induction and safety awareness talks to workers and ensure that all
workerscomplywiththesame;
ensureallaccesswaysarelighted,areofgoodstandardandfreeofmaterials;and
providecontinuous(24/7)healthandsafetycoveragebyaqualifiedHSErepresentative.
2.11 SUMMERWORKINGCONDITIONS
During the period from June 15th until August 31st, work under direct sunlight is prohibited from
11:30amto3:00pm.
The CONTRACTOR shall provide suitable shaded rest areas, rest periods, and cool drinking water
suppliesforallpersonsontheworksite.
The CONTRACTOR shall provide work wear that covers the skin for employees working in direct
sunlight.
2.12 FIREPREVENTION
-
CONTRACTOR shall comply with these Requirements, the Qatar Dept. of Civil Defense Fire Safety
Handbook,andalladditionalrequirementsspecifiedintheLREDCConstructionSafetyManagement
Procedures.
CopiesoftheFireSafetyHandbookshallbeprovidedatCONTRACTORSmainoffice,fieldworkshops,
chemicalstorageareas,oneachmarinevessel,andinareaswhereasubstantialvolumeofhotwork
isoccurring.
CONTRACTORshalldesignateaCompetentpersonwhoshallberesponsibleforthefireprevention
programandensurethatitiscarriedoutthroughcompletionoftheproject.
DocumentNo:LUSHSEWG3432001.14
Page11of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
CONTRACTOR shall provide for mechanical ventilation in work areas where potential exists for
accumulationofcombustibleorflammablevapours.
AFirePreventionPlanshallbepreparedandimplementedthroughoutthecourseofCONTRACTORS
scopeofwork.Personnelshallbetrainedonaregularbasis,butnotlessthanannually.
CONTRACTORshallprovideallnecessaryfirepreventionandprotectionequipmentbasedontheir
scopeofwork.
Fireextinguishers,typeABCdrychemical,shallbeprovidedinallactiveworkareas.Unitsshallbe
sized and spaced according to work activity occurring, quantities of combustible and flammable
materialsintheworkarea,andlevelofpotentialforfires.
Temporary enclosures shall be equipped with a minimum of one fire extinguisher suitable for all
classesoffiresthatareexpectedinsidetheenclosure.
Extinguishersshallbeinspectednotlessthanmonthlyforfunctionalitybyaqualifiedperson(s)and
professionallyservicedatleastannuallybyalicensedagency/entity.
Smoking shall be restricted to authorized locations only. Smoking shall not be permitted inside
structures, office buildings or tunnels, or within twenty (20) meters of combustible or flammable
materialsstorageareas.
CONTRACTORshallprohibitopenfiresonsite.
CONTRACTORshalltreatfiresofallsizesseriouslyandshalladheretoincidentreportingpoliciesand
procedures.RefertoSection7.0.
Fuel storage shall be in accordance with these Requirements, the Fire Safety Handbook, and
relevant consensus standards with regard to combustible and flammable liquids storage; i.e.,
NationalFireProtectionAssociation.
CONTRACTORshallnotconstructorplaceanaccommodationwithinaten(10)meterradiusofany
building or structure forming part of the permanent works. Where this cannot be avoided, prior
ApprovalshallbegainedfromLREDCREPRESENTATIVE.
Allpermitrequirementsforhotworkactivitiesshallbefollowed.RefertoSection10.3.
CONTRACTORshallprovideinformationandwarningsignsatthefollowinglocationsorareas:
Flammablematerialsstores
Combustiblematerialsstores
Temporaryfiresystems
Portablefireextinguishers
Fireescaperoutes,exits,andassemblyareas.
Internal combustion engines and associated equipment, such as air compressors, hoists, derricks, pumps
andsimilardevices,shallbelocatedsothattheexhaustsdischargeasafedistanceawayfromcombustible
materials.
CONTRATORshallprovideULlistedsafetycontainersforGasolineandotherflammableliquidstobestored
inanddispensedfrominconformance.
CONTRACTOR shall maintain that combustible debris, rubbish and waste material are removed from
buildingsattheendofeachshiftofwork.
CONTRACTORshallensurethatcombustibledebris,rubbishandwastematerialaredisposedofproperly.
CONTRACTOR shall ensure that adequate and unimpeded means of egress from all parts of the works, is
availableatalltimesincasefire.
DocumentNo:LUSHSEWG3432001.14
Page12of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
Ifexitsbecomeobstructedduringconstruction,theCONTRACTORshallprovidealternateexitroutesduring
eachphaseofconstructionandidentifythealternateroutesontheconstructiondrawings.
CONTRATORshallensuretemporarywiringforelectricalpowerandlightinginstallationsusedinconnection
withtheconstructioncomplywithNFPA70
CONTRACTORshallprovidereadilyaccessibleemergencytelephonefacilitiesatanApprovedlocationatthe
constructionsite.Thestreetaddressoftheconstructionsiteandtheemergencytelephonenumberofthe
firedepartmentshallbepostedadjacenttothetelephone
CONTRATORshallmaintainadequatevehicleaccessforfirefightingtoconstructionsite.Vehicleaccessshall
beprovidedtowithin30moftemporaryorpermanentfiredepartmentconnections(FDCandFireHydrant).
Vehicle access shall be provided by either temporary or permanent roads, capable of supporting vehicle
loading under all weather conditions. Vehicle access shall be maintained until permanent fire apparatus
accessroadsareavailable.
CONTRATOR shall maintain that the FDC and Fire Hydrant serving the construction site are freeand clear
fromobstructionanddamageandreadilyavailabletothefiredepartment.
Operationof temporary sprinkler and hydrantcontrol valves shall be allowed onlyby properly authorized
personnel. When the sprinkler protection is being regularly turned off and on to facilitate of newly
completed construction, the sprinkler control valves shall be checked at the end of each work period to
ascertainthatprotectionisinservice.
CONTRATORshallprovidetarpaulinsusedduringconstructionwhicharemadeofmaterial,whichisresistant
tofire,waterandweather.TarpaulinsshallhaveULapproval.
For dedicated onsite storage and staging areas, the CONTRACTOR shall provide detailed information in
regardstothecommodity,packingmethodandvolumesexpectedduringnormaloperations;andsubmita
planlayoutwhichindicatesthelocationandtypeofportableextinguishingequipmentandthelocationof
thenearestFireHydrant.
3.0 CONSTRUCTIONHEALTH&SAFETYPLAN(HASP)
3.1
CONTRACTOROCCUPATIONALHASP
All CONTRACTORS (at all levels) shall produce and implement a sitespecific HASP which adequately
summarizes their scope of works under their contract,or agreement with LREDC, , all safety and health
hazardstowhichhispersonnelwillormaybeexposed,andmethodswhichwillbeemployedtocontroland/
ormitigatethosehazardstoanacceptablelevelofrisk.TheHASPshallbesitespecifictotheLREDCProject.
TheHASPshallbesubmittedtotheLREDCREPRESENTATIVEwithinthirty(30)daysoftheircontractaward.
TheCONTRACTORSHASP,onceApprovedbytheLREDCREPRESENTATIVEshallbedeemedapartofthese
Requirements.
CONTRACTORshallundertakeafullformalreviewoftheHASPannuallyonthedateofcontractawardand
submitittotheLREDCRepresentativewithinfourteen(14)daysofthereviewwithanamendedplanshould
any amendment be required. The HASP shall also be revised when conditions or operations require. All
revisionsandamendmentsshallbesubmittedtotheLREDCREPRESENTATIVEforreview.
CONTRACTOR shall have sole responsibility for enforcement of requirements under this HASP. The HASP
shall illustrate adherence to these Requirements, adherence to Qatari Laws and regulations, and LATEST
GOVERNMENTAPPROVEDQCSandshallprovide theirpersonnelandLREDCwith anunderstandingofthe
means and methodsthattheCONTRACTORwill employin achievingcompliancewiththeseRequirements
andtheprogramsreferencedherein.
TheminimuminformationrequiredtobecontainedintheCONTRACTORHASPincludes:
-
FrontCover
TableofContents
DocumentNo:LUSHSEWG3432001.14
Page13of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
OHSAS18001Certificate(ifapplicable)
CONTRACTORhealthandsafetypolicystatement
ProjectScope,RequirementsandOccupationalHealthandSafetyObjectives
SubcontractorOccupationalHealthandSafety
Managementstructure,organizationchart,andkeypersonnelresponsibilities
PPErequirements
Trainingrequirements
HazardCommunicationProgram
OccupationalHealthProgram
EmergencyResponseProgram
IncidentNotificationandInvestigation
SafetyMeetingDetails
SiteSecurityProcedure
Air/noise/dustmonitoringprocedures
PermittoWorkProgram
Procedureforinspections,correctiveandpreventativeactions
MethodStatements
RiskAssessmentandJob/ActivityHazardAnalyses
KeyPerformanceIndicatorsandContinualImprovement
ReferencetoandlistingofpertinentCompanyHSEPolicies&Procedures
Appendices
ReferenceDocumentation
Additional Occupational HASP requirements can be found in QCS 2010 Section 1 Part 10.2 CONTRACTOR
OCCUPATIONALHEALTHANDSAFETYPLAN.
4.0 HEALTH,SAFETY&ENVIRONMENT(HSE)MANAGEMENT
4.1
STAFFQUALIFICATIONS&STAFFING
CONTRACTORshallensurethatallpersonnelservinginthehealth,safety,andenvironmentalmanagement
roleontheLREDCProjectarequalifiedwithregardtoeducation,certification,andconstructionsafetyand
healthexperienceonprojectsofsimilarsizeandscope.TheCONTRACTORshallappointthefollowingHSE
Staffwhoshallmeetthefollowingminimumeducation,certificationandexperiencecriteriatoserveinthe
environment,healthandsafetycapacityontheLREDCProject.
Note: HSE Staff, in excess of specifications outlined below, may be required at LREDCs discretion should
highriskactivitieswarrant,intheopinionofLREDC,suchadditionalmanpower.
HEALTH&SAFETYMANAGER:
-
TheHealthandSafetyManagershallholdadegreetoincludeaprofessionalHSEDiplomaoritsequivalent
in a health and safety discipline to an International Recognized Standard, with a minimum of ten (10)
yearsofconstructionhealthandsafetymanagementexperienceonprojectsofsimilarsizeandscope.
Becertifiedbyabodyofinternationallyrecognisedsafetyprofessionalsasaminimum.
DocumentNo:LUSHSEWG3432001.14
Page14of38
LusailRealEstateDevelopmentCompany
-
LREDCConstructionHSEGeneralRequirements
The CONTRACTOR shall provide a minimum of one (1) qualified HSE Manager under each of their
contracts.
DEPUTYHEALTH&SAFETYMANAGER
-
TheminimumeducationshallbeinaccordancewiththelatestgovernmentapprovedQCS.
HEALTH&SAFETYREPRESENTATIVESOFFICERS/INSPECTORSetc.:
-
TheHealthandSafetyRepresentativeshallhaveaminimumoffive(5)yearsofconstruction
safety and health management experience on projects of similar size and scope AND the
Health and Safety Representative shall be educated/ certified through internationally
recognized schools/ agencies as having received comprehensive training in construction
safetyandhealth.
HealthandSafetyRepresentativesshallbecurrentinFirstAidcertification.
CONTRACTOR shall provide a minimum of one (1) qualified HSE Representative for every
fifty(50)workersassignedundereachoftheircontracts.
OCCUPATIONALHEALTHSTAFF:
-
CONTRACTOR shall provide qualified health (medical) staff with at least three (3) years
relevant professional experience and qualifications in the organization/provision of
clinical (including emergency medicine), occupational, and public health at construction
projects of similar size and scope. In addition, candidates shall have knowledge of local
healthfacilities.
All Medical staff will have completed Intermediate Life Support training and will be
requiredtocompleterefreshertraining,asnecessary.
AllMedicalstaffshallhaveacurrentlicenseintheircountryoforigin,andhavereceiptto
proof application to obtain license from the Qatar Supreme Council of Health. This
applicationshallbeinitiatedwithinone(1)monthofarrivalinQatar.
No. of
employees
Less than 5
>5
100 500
500 +
per 25
1 First Aider
1 Nurse
1 Nurse
1 Nurse
EMT:EmergencyMedicalTechnician
CONTRACTOR shall make its own independent assessment of the staffing level and
arrangementforstaffingamedicalfacilityorfirstaidstationbasedonariskassessment.The
staffingplanshallbedocumentedandsubmittedtotheLREDCREPRESENTATIVEforreview
beforeimplementation.
CONTRACTORSseniormedicalrepresentativesonsiteorHealthAdvisorswillalsoactas
theHealthFocalPointfortheCONTRACTORandshallreportdirectlytotheCONTRACTOR
DocumentNo:LUSHSEWG3432001.14
Page15of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
Health and Safety Manager. The medical staff shall not be engaged until such time as the
LREDCREPRESENTATIVEhasreviewedandacceptedtheplanandcandidatessuitabilityfor
thepost.
TheContractorshallappointafulltimeEnvironmentalManager,whoshallbeassignedfulltimeonsiteat
the Lusail project. At LREDCs discretion, additional Environmental Officers may be required and shall be
providedbytheContractor.ThecriteriaforContractorsEnvironmentalStaffareoutlinedbelow:
ENVIRONMENTALMANAGER
TheEnvironmental ManagershallholdaUniversityDegreeand/orEnvironmentalDiploma
in environmental engineering or a similar discipline, with a minimum of eight (8) years of
construction environment management experience on projects of similar size and scope,
OR;
ENVIRONMENTALREPRESENTATIVE/OFFICER:
4.2
REVIEW&APPROVALOFSTAFFQUALIFICATIONS
CONTRACTOR shall submit an Occupational Health and Safety Organization Plan to the LREDC
REPRESENTATIVEthirty(30)daysaftertheawardoffthecontractandforreviewandApprovalasrequired
byLREDC.
This requirement includes subcontractor personnel proposed to serve as Subcontractor Health and Safety
Staff. The LREDC REPRESENTATIVE will reply back to the CONTRACTORS within 5 working with a
determinationonpersonnelsuitabilityfortheHSEposition.
4.3
HEALTH&SAFETYSTAFFRESPONSIBILITIES
HSEStaffshallbecompetenttofullyimplementallfacetsoftheCONTRACTORhealthandsafetyprogram.
HSEStaffshallhaveagenuineregardforthehealthandwelfareoftheLREDCProjectsiteworkerandshall
exercise that regard in his or her daily activities. HSE Staff shall never compromise worker safety in the
interestsofscheduleandbudget,orforfearofmanagementreprisal.HSEStaffshallworkhandinhandwith
theLREDCREPESENTATIVEwiththecommongoalofprovidingthehighestlevelofsafetytotheworker.
HealthandSafetyStaffshallhavetheauthoritytostopworkactivitieswhenitisdeemedthatanimminent
dangersituationorconditionexistsandpersonnelareexposedtothesituationorcondition.CONTRACTOR
shall ensure that all personnel making up CONTRACTOR Management team understand the authorities
provided to the Health and Safety Staff and that said personnel shall adhere to instructions given by the
HealthandSafetyStaff.
Health and Safety Staff shall be provided with the resources necessary for successful implementation of
workareahazardcontrolsandcorrective/preventivemeasures.HealthandSafetyStaffshallbetrainedand
qualified to use monitoring instrumentation and shall understand the limitations of that equipment. Staff
shallbeprovidedwithtransportationandacellularphoneforimplementationoftheirduties.
DocumentNo:LUSHSEWG3432001.14
Page16of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
Health and Safety Staff shall respond to the CONTRACTOR and the LREDC REPRESENTATIVE requests and
directives.StaffshallparticipateinprojectwideHSEprogramsasdirectedbyLREDC.HealthandSafetyStaff
membersshallattendallHealthandSafetyStaffmeetingsasscheduledbytheLREDCREPRESENTATIVE.
HSEStaffpersonnelshallbedistinguishablefromsiteworkersbyuseoftheredcoloredhardhat.OnlyHSE
Staff shall wear red hard hats on the LREDC Project. Hard hats shall be marked with the words Safety
printedinwhiteletters.HSEStafftrafficvestsshallbemarkedwiththewordSafetyinblackletters.HSE
Staffshallalsolabeltheirhardhatswiththeirname.
RefertoattachedLREDCOccupationalHealthManagementProgramforspecificCONTRACTOROccupational
HealthStaffresponsibilities.
4.4
HEALTH&SAFETYSUPPLIES&EQUIPMENT(NOTAPPLICABLETODEVELOPERS)
In support of LREDC Health and Safety Department, the CONTRACTOR shall at the request of the LREDC
REPRESENTATIVEprovidetothefollowingsuppliesandequipmentbutnotlimitedto:
HandheldGlobalPositioningdevices(GPS)2each
DigitalCameraswithGPS6each
Type2ReflectiveVestwithLusailSafetyandLogo60each
ANSIorCEapprovedHardHatswithLusailLogo60each
SafetyGlassesdark100each
SafetyGlassesclear20each
SafetyBootswithSteeltoe60pair
HSEInductionStickers(5000pcs)
RechargeableFlashlightswithbatteries30each
Defibrillators(AED)1unit(withsparebatteries&pads)
5.0 OCCUPATIONALHEALTHMANAGEMENT
CONTRACTORshallprovidethefollowingtoallCONTRACTORpersonnelofalltiers,Vendorrepresentatives
andothervisitorstositeasthecasemaybe:
-
A tiered Medical Emergency Response Plan that integrates with local services, covering medical
treatment for emergency first aid assessments, treatment, stabilization, and ongoing
transfer/referral
Primaryhealthcare(includingvaccinationprogram)andongoingspecialistreferral
Public health care and welfare covering all accommodation, living environment, catering facilities,
etc.
Occupationalhealthcare
BaselinemedicalscreeningforanyemployeeworkingontheLusailProject
Aminimumone(1)centralizedmedicalfacilityinproportiontothenumberofpersonnelandlevelof
riskassociatedwiththescopeofwork
Alloftheaboveshallbecoordinatedwith,andbeinconformancetominimumLREDCOccupationalHealth
Programspecifications,HamadMedicalCorporationrequirements,and locallegislationwithregardtothe
provisionofmedicalservices.
TheCONTRACTORshallberesponsiblefor:
DocumentNo:LUSHSEWG3432001.14
Page17of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
Hospitalizationandspecialisttreatment
Overseasmedivacandrepatriation
Theprovisionofmedicaltreatmentforemployeesduringleavedays.
CONTRACTORshallprovideacentralmedicalfacility(neartheworksite),andtheestablishmentofsatellite
First Aid Stations at the site equipped in accordance with minimum specifications in accordance with
LREDC policies. Workers requiring hospital care or treatment of chronic illnesses will be referred to local
medicalfacilities.QualityassuranceoftheretainerclinicsistheresponsibilityoftheCONTRACTOR.
AllpersonnelmobilizedtotheLREDCProjectforconstructionworkactivitiesshallbemedicallycapableto
perform all required tasks as part of their scope of work. Personnel shall be medically evaluated prior to
startingworkonsite.TheCONTRACTORshalldevelopfacilitiesandarrangementstoadministerafitnessto
workprocessforbothmanualandofficeprojectemployees.Thisincludesinitialandongoingscreening.
Personnelshallbeprovidedwithreadyaccesstomedicalservicesandshouldbeevaluatedforfitnessata
minimumeverytwo(2)years.
Refer to the LREDC Occupational Health Management Program for additional CONTRACTOR occupation
healthandwellnessrequirementsontheLusailProject.
6.0 ENVIRONMENTAL&SUSTAINABILITYMANAGEMENT
LREDChas developedanOverallConstructionEnvironmentalManagementPlan(OCEMP)fortheLusailProject.The
OCEMP describes the ways in which the projectlevel environmental management program is implemented and
enforced. The OCEMP describes in detail, the environmental requirements associated with project execution which
apply to all project stakeholders. This includes details of LREDCs expectation from stakeholders in relation to the
implementation of management systems; communication, documentation and reporting requirements; training
requirementsandenvironmentalriskmitigationmeasuresrequiredforexecutionofarangeofconstructionactivities.
TherequirementsspecifiedintheOCEMParemandatory.
TheOCEMPspecifiesanumberofimportantenvironmentalmanagementdeliverablesfromprojectstakeholders.Each
Contractor / Developer involved in the execution of construction related works shall be required to provide a
ConstructionEnvironmentalManagementPlan(CEMP),specifictotheiractivities.ThepurposeoftheCEMPisforthe
Contractor/Developertoidentifythelikelyenvironmentalimpactsfromtheircontractactivities,andtodescribethe
appropriate management measures to reduce the impacts to an acceptable level in accordance with OCEMP
requirements. The Contractor / Developer shall ensure that their CEMPs are endorsed by a third party independent
environmentalconsultant.
EachContractor/DevelopershallappointafulltimededicatedEnvironmentalManagerwhoshallbebasedfulltime
on the Lusail Project. The criteria for this position (education and experience) is described in section 4.1 of this
document.
EachContractorisrequiredtosubmittoLREDCaMonthlyEnvironmentalReport,whichhasbeenendorsedbyathird
party independent environmental consultant. The Monthly Environmental Report details environmental metrics and
keyperformanceindicatorsatacontractorlevel.3rdpartyendorsedMonthlyEnvironmentalReportsarearequirement
oftheMoE.ThereportsaresubmittedtoLREDC,whoastheprojectproponentshallthensubmitthereportstothe
MoEontheContractorsbehalf.
The OCEMP provides definitive guidance to project stakeholders, describing mandatory environmental obligations
whilepresentontheLusailProject.
DocumentNo:LUSHSEWG3432001.14
Page18of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
7.0 ASSESSMENT,MONITORING&CORRECTIVEACTIONS
7.1
HEALTH&SAFETYASSESSMENT
CONTRACTORshallconductvisualassessmentforsafeworkconditions,actions,andbehavioursonadaily
basis. All CONTRACTOR personnel are responsible for safety. All Managers shall manage safety issues
throughouttheiractivitiesonsiteandshalltakethenecessaryactionwhensubstandardworkconditionsor
actionsareidentified.Inmostcases,dailysafetyandhealthmonitoringshallbedocumentedandretainedin
theCONTRACTORSfiles.
CONTRACTOR shall schedule and perform regular documented assessments of all work areas, worker
actions, equipment, and methods for compliance with the CONTRACTOR and LREDC Construction Safety
Management Procedures requirements and general safe work practices. Documented assessments of all
saidareasshallbeconductednotlessthanweekly.
Forms/ records used by the CONTRACTORS to record assessments shall be Approved by the LREDC
REPRESENTATIVE. Forms/ records used must comprehensively identify and explain all substandard or
deficient work conditions, activities and/ or hazards encountered during the assessment. The
CONTRACTORSassessmentreportsshallindicateascheduleforcompletionofcorrectiveactionsplannedin
response to assessment items encountered. Completed HSE assessments shall be provided to the LREDC
REPRESENTATIVEwithintwentyfour(24)hoursfollowingtheassessment.
7.2
CORRECTIVEACTION
CONTRACTOR shall immediately rectify any situation or condition that poses an imminently dangerous
safety and/ or health risk to personnel. Should the condition not be correctable immediately, the
CONTRACTOR shall provide temporary measures as necessary for the protection of personnel and shall
immediatelysuspendallworkwhichexposespersonneltoimminentdangersituationsorconditions.Work
shallnotresumeuntilthesituationorconditionisadequatelycorrected.
Noncompliantissues,situationsorconditions(nonimminentdanger),forwhichanimmediatecorrectionis
notavailable,shallbedocumentedontheCONTRACTORSassessment/inspectionrecord.TheCONTRACTOR
shall begin immediate corrective action planning and implementation with the goal of rectifying the
condition or issue as soon as possible. A CAP which summarizes the corrective actions taken by the
CONTRACTOR shall be submitted to the LREDC REPRESENTATIVE within seventy two (72) hours of the
assessment.CAPsshallidentifyverballyandvisuallythecorrectionstaken/implemented,andsubsequently
closed.
CONTRACTOR shall review on a monthly basis all outstanding deficiencies for which adequate corrective
action has not been completed/ implemented. Outstanding issues shall be summarized in a report which
shallbesubmittedtotheLREDCREPRESENTATIVEforreview.
CONTRACTORSshallrefocustheireffortsandexercisetheutmosturgencywiththegoalofclosingoutany
longtermoutstandingdeficiencies.
7.3
EQUIPMENTINSPECTION
CONTRACTORshallensurethattools,equipmentandmachinerymobilizedtoandusedontheLREDCProject
areinproperworkingcondition,permanufacturersguidelines.Equipmentshallbeproperlyhandled,used
andstored.TheCONTRACTORSmustprovideforthesecurityoftheirequipmentatalltimes.LREDCwillnot
beliableforCONTRACTORneglectresultingindamagelossortheftofCONTRACTORtools,equipmentand/
ormachinery.
All equipment shall be inspected daily prior to use by the user, operator, or other qualified inspector.
Inspectionsshallbedocumented.Toolsorequipmentfoundtobedeficientorunsafeshallbetakenoutof
service,taggedassuch,andsenttothepertinentrepairfacility.Onlyqualifiedpersonsshallmakerepairsto
DocumentNo:LUSHSEWG3432001.14
Page19of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
tools,powertools,andequipment.Heavyequipmentshallbeserviced/repairedonlybytheownerofthe
equipment.
CONTRACTOR shall regularly evaluate inspection records to identify deficiencies which are not being
addressedinatimelymanner,aswellastrendsinequipmentdamageordeficiencyindicatingtheneedfor
worker training, modification of methods, etc. Equipment inspection records shall be retained on file and
madeavailableforinspectionatanytimebytheLREDCREPRESENTATIVE.
7.4
MONITORINGOFWORKEREXPOSURE
CONTRACTORshallprovideequipmentforsamplingandmonitoringnoiselevelsandairbornecontaminants.
TheCONTRACTORshallensurethatallmonitoringequipmentiscalibratedpermanufacturersinstructions
andoperatedbyqualifiedpersonnelonly.
Noisesurveys shallbecarried outaspartof the dailysite assessment and shall cover all areas ofthesite
where noise hazards exist. The CONTRACTOR shall implement components of a Hearing Conservation
Program(HCP)whennoiselevelsreach80dBA.
Should noise levels reach an 8 hour timeweighted average of 85 dBA then the CONTRACTOR shall
implementacompleteHCP.NoisemonitoringresultsshallbedocumentedandmadeavailabletotheLREDC
REPRESENTATIVE,andallCONTRACTORpersonnelwhoare/maybeexposedtoexcessivenoiselevels.
CONTRACTOR Health and Safety shall conduct a thorough daily monitoring program for airborne
contaminants or air deficiency as required per work activities, presence of confined spaces, or use of
hazardous materials. Monitoring results indicating oxygen deficiency (<19.5%), flammable gas
concentrationsinairgreaterthan10%lowerexplosivelimit,orinexcessofapplicablesafeexposurelevels
(PEL,REL,orTLV)shallwarrantanimmediatestopwork.
CONTRACTOR shall evaluate feasible engineering controls and/ or respiratory protection when sustained
measurementsofhalfthesafeexposurelevel(actionlevel)arereached.Aircontaminantmonitoringresults
shallbedocumentedandmadeavailabletotheLREDCREPESENTATIVE,andallCONTRACTORpersonnelwho
are/maybeexposedtoairbornecontaminants.
CONTRACTOR Health and Safety shall ensurethat safeexposure levels andhealth effects of all hazardous
materialsinusearecommunicatedtoandunderstoodbyallpersonnel.MaterialSafetyDataSheets(MSDS)
forallhazardousmaterialsshallbeprovidedintheworkarea.Personnelshallbeadvisedofthelocationof
allMSDS.
7.5
REGULATORYAGENCYINSPECTION
CONTRACTORshallensurethatitspersonnelareawareofandcomplywiththeprocedurestobetakenin
theeventofagovernmentorregulatoryagencyinspectionofanytype.TheCONTRACTORshallnotifythe
LREDCREPRESENTATIVEshouldarequestforinspectionbereceivedbyanyregulatoryagency.
Following any regulatory agency inspection the CONTRACTOR shall submit a written report to the LREDC
REPRESENTATIVE detailing all aspects of the inspection. This report shall be submitted within twenty four
(24)hoursfollowingtheinspection.
8.0 INCIDENTREPORTING&INVESTIGATION
CONTRACTOR shall IMMEDIATELY provide verbal notification to the LREDC REPRESENTATIVE for all
incidents,accidents,injuries,illnesses,andnearmissincidents.Failuretodosomayresultintheremovalof
staffresponsiblefortheareainquestionatthediscretionofLREDC.
In the event of an injury requiring medical attention beyond first aid, the scene of the event must be
preservedtoallowathoroughinvestigationofthescenebyLREDCandanyotherrelevantauthority.Failure
to preserve the scene may lead to the removal of responsible staff from the project at the discretion of
LREDC.
DocumentNo:LUSHSEWG3432001.14
Page20of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
TheCONTRACTORshallfollowupwithdocumentednotificationtoallaforementionedentitieswithintwelve
(12)hours.Wherewarrantedduetotheseverityornatureoftheincident,theCONTRACTORshallcomplete
all required notifications and reports to statutory entities. Work shall be halted at incident scenes, where
necessary,inordertobegintheincidentinvestigationinanuntamperedenvironment.
AllincidentsshallbethoroughlyinvestigatedbytheCONTRACTORandrelevantpartiestodetermineallroot
and supporting cause(s). All witnesses to the incident shall provide statements and all data, monitoring
records,medicalreports,etc.pertinenttotheincidentorthesuspectedcause(s)shallbetakenintoaccount
andincludedintheinvestigationreport.CONTRACTORSshallbecautioustoadheretoprivacyrequirements
whenattachingmedicalrecordstoinvestigationreports.
Within twenty four (24) hours of the incident, or as early as reasonably practicable (at the discretion of
LREDC) following the incident occurrence, the CONTRACTOR shall schedule and conduct an Post Incident
Briefing (PIB). This is intended to assist the Contractor in post incident / accident task assignment,
informationcollatingandtheanalysationthereofinordertoidentifyingcontributingcauses,rootcauseand
to formulate robust corrective measures necessary for prevent reoccurrence. . The CONTRACTOR shall
extendinvitationtothePIBto:
ContractorProjectManager
ContractorsHSEManager
AreaSupervisor/Foreman
PersonnelInvolvedinIncident
Witnesses(all)
LREDCRepresentatives
CompleteincidentinvestigationreportsshallbesubmittedtotheLREDCREPRESENTATIVEinlinewiththe
belowtableoncetheriskratinghasbeenagreedtobyLREDCREPRESENTATIVES.
Risk
Rating
Action/InvestigationRequirements
Actionsand
timeframefor
completion
Extreme
(2025)
ClientandClient
Representative
NotificationRequired
Signoffapproval
required
Stopworkmayberequired.
Immediateactionrequiredtoeliminate/reducerisk.
Verbal incident notification to supervisor and LREDC
Representativesimmediately.
Incident notification to government agencies i.e. police
immediately(ifapplicable).
IncidentNotificationReportwithin12hours.
Post Incident Briefing PEEPO type briefing to commence
within24hours
Investigation and Root Cause analysis to be commenced
within3daysledbytrainedfacilitator.
InvestigationandRootCauseanalysisfinalizedwithin1month
ofoccurrence.(timeextensionatthediscretionofLREDC)
Incidentistobecommunicatedwithimmediateworkersand
acrosstheProject.
InvestigationmayorwillinvolvetheRegulator.
LREDCSafetyManager(willescalateinternallyasrequiredas
required)
PMCMProjectManagerandHSEManager
CSSafetyManager
LREDC HSSEL&Q Director, Sr. HSE & F Manager and Safety
Manager
PMCMProjectManagerandHSEManager
CSSafetyManager
DocumentNo:LUSHSEWG3432001.14
Page21of38
LusailRealEstateDevelopmentCompany
Actionsand
timeframefor
completion
LREDCConstructionHSEGeneralRequirements
High
(1219)
ClientandClient
Representative
NotificationRequired
Signoffapproval
required
Actionsand
timeframefor
completion
Moderate
(711)
ClientandClient
Representative
NotificationRequired
Signoffapproval
required
Actionsand
timeframefor
completion
Low
(16)
ClientandClient
Representative
NotificationRequired
Signoffapproval
Stopworkmayberequired.
Immediateactionrequiredtoeliminate/reducerisk.
Verbal incident notification to supervisor and LREDC
Representativesimmediately.
Incident reported to government agencies i.e. police
immediately(ifapplicable).
IncidentNotificationReportwithin12hours.
Post Incident Briefing PEEPO type briefing to commence
within24hours
InvestigationandRootCauseanalysisfinalizedwithin2weeks
ofoccurrence.(TimeextensionatthediscretionofLREDC)
Incidentistobecommunicatedwithimmediateworkersand
acrosstheProject.
InvestigationmayorwillinvolvetheRegulator.
LREDCSafetyManager(willescalateinternallyasrequiredas
required)
PMCMProjectManagerandHSEManager
CSSafetyManager
LREDCSr.HSE&FManagerandSafetyManager
PMCMprojectManagerandHSEManager
CSSafetyManager
Immediateactionrequiredtoeliminate/reducerisk.
Verbal incident notification to supervisor and LREDC
Representativesimmediately.
IncidentNotificationReportwithin12hours.
Inspection by PMCM, Supervisory Consultant and Principle
Contractor to ensure that actions are adequate and
implemented.
Post Incident Briefing PEEPO type briefing to commence
within24hours
Investigation and analysis finalized within 7 days of
occurrence.(TimeextensionatthediscretionofLREDC)
Root Cause analysis may be required at the discretion of
LREDC
Incidentistobecommunicatedwithimmediateworkersand
acrosstheProject.
LREDC Safety Manager (will escalate internally as/if required
asrequired)
PMCMProjectManagerandSafetyManager
CSSafetyManager
SafetyManager
PMCMprojectManagerandSafetyManager
CSSafetyManager
Immediateactionrequiredtoeliminate/reducerisk.
Verbal incident notification to supervisor and LREDC
Representativesimmediately.
IncidentNotificationReportwithin12hours.
Inspection by PMCM, Supervisory Consultant and Principle
Contractor to ensure that actions are adequate and
implemented.
Analysisfinalizedwithin3daysofoccurrence.
Incidentistobecommunicatedwithimmediateworkersand
acrosstheProject.
LREDC Safety Manager (will escalate internally as/if required
asrequired)
PMCMProjectManagerandHSEManager
CSSafetyManager
ContractororSubcontractorManagement.
DocumentNo:LUSHSEWG3432001.14
Page22of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
required
CONTRACTORshalltrackincidentrates(metrics)usinganAccidentRegisterBook.
All notified accidents shall be entered in the CONTRACTORs accident book including all employees,
contractors,visitorstositeandaccidentstomembersofthepublic.
Specifically,CONTRACTORSshalltrack:
-
Totalincidents
Incidentsbytype
Incidentsinvolvingmedicaltreatment
Incidentsinvolvingaworkrestriction
Incidentsinvolvinglosttime
TheCONTRACTORshallusethefollowingformulastomeasureandtrendinjuryworkcaserates:
AccidentFrequencyRate=numberoflosttimeaccidents(>3days)X100,000
Numberofmanhoursworked
AccidentIncidentRate=numberofRIDDORinjuriesworkrelatedinjuriesX100,000
AverageNoofpersonsemployed
CONTRACTORshallmaintainuptodaterecordsofallincidentsandmakeallrecordsavailableforreviewby
theLREDCREPRESENTATIVE.Recordsmustberetainedforatleastfive(5)yearsfromthedateofthelast
entry in the book. The records must be sent to archive at the end of the contract with the rest of the
contractdocuments.Lessonslearnedandcorrectiveactionsplannedfollowingincidentinvestigationsmust
besharedwithallsitepersonnelandimplementedinallworkareaswheresimilaractivitiesareoccurring.
In accordance with QCS 2010 Section 11 Part 2, the following must be reported immediately to the
appropriate QatarAdministrative Authority bythe quickestpractical method (usually by telephone) anda
reportsubmittedontheapprovedform(e.g.F100,F100A)within10days:
-
Fatalitiesandmajorinjuries
Injuriesresultinginincapacityformorethanthreedayswhenlinkedtocertainworkactivities
Specifieddiseases
Dangerousoccurrences.
Pleasenote:FinalclassificationofinjurieswillbedeterminedbyLREDCbasedontheprovisionofmedical
certificates.Medicalcertificatesissuedbycontractorsmedicalstaffwillnotbeacceptediftheycontradict
anymedicalcertificateissuedbyaqualifiedmedicalpractitioner.
AdescriptionoftheabovelistedincidenttypeswhicharereportabletotheQatarAdministrativeAuthority
hasbeenprovidedbelow:
FATALITY
Thedeathofanyperson,whetherornottheyareatwork,ifitresultsfromanaccidentarisingoutoforin
connectionwithwork,willbeinvestigatedbythecontractor.
Regardlessonthenatureofanyfatality,beitworkrelatedornotworkrelated,eachContractorisrequired
tonotifyLREDCimmediatelyviaphone,aftercontactingtheSecurityControlRoom.Bothworkrelatedand
non work related fatalities inside the Lusail Project Boundary will require the provision of information to
Lusail as outlined in LREDC document LUSHSEFM4446138. Fatality Checklist. A hard copy of all information
DocumentNo:LUSHSEWG3432001.14
Page23of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
required is to be supplied to LREDC within 7 days. All fatalities inside the Lusail Project Boundary must be fully
investigatedregardlessoftheirnature.
MAJORINJURY
Definedinjury,whichrequiresimmediatenotificationtoEnforcingAuthorityunderRIDDOR.
Specifically;
a) Anyfracture,otherthantothefinger,thumbortoe
b) Anyamputation
c) Dislocationoftheshoulder,hip,knee,orspine
d) Lossofsight(whethertemporaryorpermanent)
e) Achemicalorhotmetalburntotheeyeorpenetratinginjurytotheeye
f)
Anyinjuryresultingfromanelectricshockorelectricburn,leadingtounconsciousnessorrequiring
resuscitation,oradmittancetohospitalformorethan24hours
g) Anyotherinjury
i.
Leadingtohypothermia,heatinducedillnessortounconsciousness
ii.
Requiringresuscitation
iii.
Requiringadmittancetohospitalformorethan24hours
iv.
v.
Acute illness or loss of consciousness resulting from the absorption of any substance
byinhalation,ingestionorthroughtheskin
Acuteillnesswhichrequiresmedicaltreatmentwherethereisreasontobelievethat
thisresultedfromexposuretoabiologicalagentoritstoxinsorinfectedmaterial.
OVER3DAYLTORRESTRICTED/MODIFIEDCASE
AnInjurynotbeingamajorinjurythatresultsinapersoneithermissing3ormoreconsecutivedaysfrom
work (not counting the day of the accident) or being unable to fulfil his/her normal duties for 3 or more
consecutive days, including nonworking days i.e. weekends. Only normal rostered days of work will be
takenintoconsideration.Holidaysarrangedoncetheinjuryhasoccurredwillbeincludedasdaysoffwork.
Days lost whilst diagnostic work is completed will not be counted as lost days unless the diagnosis is
confirmed.
SPECIFIEDDISEASE
WhereanypersonsuffersfromanyoftheoccupationaldiseasesspecifiedinRIDDORandtheirworkinvolves
one of the activities noted. All instances where it is suspected that it may be necessary to report an
OccupationalDiseaseshouldbereferredtotheLREDCHSEQDept.
DANGEROUSOCCURRENCE
An occurrence, which arises out of or in connection with work and contained in RIDDOR, specifically for
constructionworks,thiswouldinclude:
a) Thecollapseofoverturningof,orthefailureofanyloadbearingpartofanylift,hoist,crane,derrick,
MEWP,accesscradle,excavator,piledrivingframeorrig(over7minheight)orforklifttruck.
b) Anyunintentionalincidentinwhichplantorequipmentcomesintocontactwithorcausesan
electricaldischargebycomingintonearproximityofanoverheadelectricallineexceeding200volts
DocumentNo:LUSHSEWG3432001.14
Page24of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
c) Electricalshortcircuitoroverloadattendedbyfireorexplosionandstopstheplantformorethan24
hoursorhasthepotentialfordeath.
d) Collapseof:
i.
Scaffoldingover5minheight
ii.
Scaffoldingerectedneartowater,whichcouldhaveresultedinadrowningincident
iii.
Thesuspensionarrangementsofanyslungscaffold
iv.
Incidentsinvolvingpipelinesorpipelineworksincludingunintentionalescapes,damage,etc.
e) Collapseof:
f)
i.
ii.
Anyfloororwallofabuildingusedasaworkplace
iii.
Anyfalsework
Theescapeofflammablesubstances,includingspecificquantitiesofliquidsorgas
g) Theescapeofanysubstancesinsufficientquantitiestodeathormajorinjuryordamagetohealth.
9.0 HAZARDAWARENESS
9.1
RISKASSESSMENTS
Contractors shall use the process of risk management to identify hazards, evaluate risk and determine
appropriate control measures to reduce the risk to an acceptable level and monitor the adequacy and
effectivenessofsuchriskcontrolsystems.
RiskassessmentsshallbecarriedoutbyCompetentperson(s)andshallconsiderthepotentialriskstothe
health and/or safety of anyone who may be adversely affected, which may include employees, the
employeesofothercontractors,sitevisitors,membersofthepublic,etc.
Riskassessmentsandcontrolmeasuresshallbereviewedatregularintervalsandimmediatelyif:
(a)Thereisreasontobelievethatitisnolongervalid
(b)Therehasbeenasignificantchangeintheworktowhichtheassessmentapplies
Contractorsshallprovideinformation,instructionandtrainingtoemployeesasissuitableandsufficientto
ensuretheyknowtheriskstohealthandsafety,andtheprecautionswhichshouldbetaken.
9.2
METHODSTATEMENTS
CONTRACTORshallcompleteMethodStatementsforeachsubstantialworkprocessineachworkarea.All
personnel involved in execution of the work process shall be educated on the Method Statement and its
requirements.MethodStatementsshallinclude,ataminimum:
-
GeneralscopedescriptionoftheWorksandmethodologyofhowitwillbeperformedsafely
Locationandidentificationoftheworkcoveredbythemethodstatement
PermitsandLicensesRequired
SpecificOccupationalHealthandSafetyIssuesincludingRiskAssessmentsandJob
HazardAnalysis
Assessmentofpotentialriskstotheenvironmentandassociatedmitigationmeasures
Responsibilities
Detailsoftheavailabilityofnecessaryresourcestocompletethework
DocumentNo:LUSHSEWG3432001.14
Page25of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
Programschedulebrokendowntoindividualtasks
Detailsofmeasuresinplacetominimizedisturbancetothepublic(ifapplicable)
DrawingsandSketches
ReferenceDocumentation
CONTRACTORshallsubmitMethodStatementsminimumof(5)businessdayspriortoplanstartofwork.
CONTRACTORshallnotcommencework,includingtemporaryworks,untilMethodStatement(s)havebeen
approvedbyLUSAILREPRESENTATIVE.
Method statements shall be reviewed and approved by the Contractors Health Safety Manager prior to
submissiontotheLUSAILREPRESENTATIVE.MethodstatementsshallbeapprovedbytheEngineerbefore
commencingWork.
MethodStatementsshallbeupdated/revisedasscopeofwork or project schedule changes.
9.3
JOBHAZARDANALYSIS
CONTRACTOR shall prepare and submit to LUSAIL REPRESENTATIVE a JHA which adequately addresses all
tasksthatwillbeperformedwithinthescopeofworkunderthisCONTRACT.TheJHAshallbeincludedasan
integralpartofeverymethodstatementthatissubmitted.
CONTRACTORshallprepareandsubmittotheLREDCREPRESENTATIVEaJHAwhichadequatelyaddressesall
tasksthatwillbeperformedwithinthescopeofworkundertheircontract.TheJHAshallbepreparedfor
eachindividualjobthatrequiresamethodstatement.
The JHA shall identify all steps required to complete the job, including all tools, equipment and materials
required.TheJHAshallthenidentifyallhazardsassociatedwitheachidentifiedjobstep.TheJHAcontinues
toexplainwhatcontrolsormeasureswillbeimplemented,orareinplace,tominimizetheriskassociated
with each identified hazard. Lastly, the JHA shall identify the personnel or department responsible for
completing/implementingtheidentifiedcontrol.
JHAsshallbesubmittedtothetheLREDCREPRESENTATIVEaminimumoffive(5)dayspriortoplannedstart
ofwork.TheCONTRACTORmaybeginworkuponverificationthatallrequiredJHAshavebeensubmitted.
9.4
HAZARDOUSMATERIALS&SUBSTANCES
Prior to any material or substance defined as Hazardous being brought onto the LREDC Project, the
CONTRACTORshalladheretothefollowingrequirements:
TheMaterialSafetyDataSheet(MSDS)forALLhazardousmaterialsshallbeprovidedtotheLREDC
REPRESENTATIVEforreviewandApproval.
TheMSDSshallprecedethearrivalofthematerialshipmentbyaminimumoffive(5)days.
OnlyuponApprovalbytheLREDCREPRESENTATIVEshallthehazardousmaterialbebroughtonto
theLusailProject.
CONTRACTORshallmanageallhazardousmaterialsandsubstancesinaccordancewiththemanufacturers
use,storageandhandlingguidelines.TheCONTRACTORHSEDepartmentshallbeconsultedtoensurethat
factors such as compatibility, spill containment, grounding/ bonding, and hazard communication are
properlyaddressedinmaterialstorageareas.
CONTRACTORshallimplementacomprehensiveHazardCommunicationProgramwhichcomplieswiththe
LREDC HSE Hazard Communication Program and all relevant Qatari labor laws. The program shall include
suchcomponentsas:
-
Chemicalinventoryofallhazardousmaterialsandsubstancesinspecificworkarea(s)
MSDSavailabilityinallworkareaswherematerialsandsubstancesarestored/used
DocumentNo:LUSHSEWG3432001.14
Page26of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
Marking/labellingofcontainersusedtostore/holdmaterialsandsubstances(includestemporary
containers)
Signspostedtoindicatehazardousmaterialsandsubstancesuse/storageareas
Employee training on hazards associated with hazardous materials and substances in their work
area(s) and controls in place and required for use and handling of hazardous materials and
substances.
CONTRACTOR shall ensure that all workers who could potentially be exposed to hazardous materials and
substancesstoredorinuseinanyworkareaareadvisedofthematerialsandsubstancesandthehazards
associated with each. Personnel shall be advised of the health effects which are expected from over
exposuretothehazardousmaterials andsubstanceson site.Alltrainingshallbedocumentedwithcopies
providedtotheLREDCREPRESENTATIVE.
CONTRACTOR shall confer with the LREDC REPRESENTATIVE when uncertain of a materials or substance
hazard classification. The CONTRACTOR shall never assume that an unknown material is nonhazardous
andshallnotmobilizethematerialtothesiteuntildeterminationisgained.
The Lusail Construction Safety Management Procedures include additional requirements pertaining to
storage,handlinganduseofhazardousmaterialsandsubstancesontheLusailProject.
10.0 TRAINING&INDUCTION
CONTRACTOR shall establish and implement a health and safety training program and shall provide the
resources necessary to ensure adequate and effective training is provided to personnel as required. Site
personnelshallbeprovidedtrainingonthehazards associated withthetaskstheywillbeconductingand
thecontrolsavailableand/orrequiredbytheCONTRACTORtoperformtheworksafely.TheCONTRACTOR
shallprepareatrainingsafetybudgettoensurepersonnelhaveadequateknowledgeofhazardrecognition
and how besttoprotectthem self. A portion ofthisbudget shall beutilized as determinedby the LREDC
REPRESENTATIVES.
Should the LREDC REPRESENTATIVE provide training for CONTRACTOR personnel, the CONTRACTOR shall
allocate the budget necessary to conduct the training, including time and materials, to the LREDC
REPSENTATIVE.
Training must be implemented by instructors who are properly qualified and experienced to instruct and
teachthetopicsbeingpresented.Allhealthandsafetytrainingshallbeconductedinlanguagesunderstood
byallpersonnelparticipatinginthetraining.
Allhealthandsafetytrainingshallbedocumented.Personnelrecordsshallindicatewhatspecifichealthand
safetytrainingeachworkerhasreceived,whenthetrainingoccurred,expirationdate(ifapplicable)andthe
identity of the trainer(s). Personnel training shall be updated/ refreshed as required. Personnel shall be
providedhealthandsafetytrainingwhentheirjobscopechanges,orwhennewprocessesorsubstancesare
introducedintotheworkarea.TrainingrecordsshallbemadeavailabletotheLREDCREPRESENTATIVEupon
request.
Allpersons,includingvisitorsandvendors,whohavenotreceivedrequiredhealthandsafetytrainingshall
be escorted by personnel authorized by the CONTRACTOR at all times while on the LREDC Project. The
CONTRACTORshallplanforandallocatethenecessarytimeintheirprojectschedulesforpersonneltraining.
10.1 LREDCPROJECTSITEINDUCTION
CONTRACTORkeypersonnel,supervisors,managers,HealthandSafetypersonnel,ProjectManager,etcshall
attendtheLREDCConstructionHealthSafety&EnvironmentalOrientation/Induction.
CONTRACTORshallensurethatallpersonnel,visitors,vendors,etc.areprovidedwithprojectsitehealthand
safetyInductionontheirfirstdayofemployment/visittotheLREDCProject.Inductiontrainingshallbe
DocumentNo:LUSHSEWG3432001.14
Page27of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
designedanddeliveredtoadequatelyaddressallpotentialworkscenariosandhazardsthataworker/visitor
maybeexposedtoduringtheiremployment/visitattheLREDCProject.AsaminimumtheInductionshall
beatleasttwohoursindurationandcomprehensivelyaddressallcomponentsofTHECONTRACTORandthe
LREDCConstructionSafetyManagementProcedures,andincludeinstructiononLREDCsitewideprograms
whichmayaffecttheemployeeorvisitor.Suchinductiontrainingwillbereviewed,revised,andrepeated
forallpersonsthatentertheLREDCProjectatperiodsnotexceeding6monthsthroughoutthedurationof
theproject.
All personnel who have completed Induction training shall be provided with some means of clear
identificationofsuch.ThemannerinwhichthisisaccomplishedisattheCONTRACTORSdiscretionandshall
beApprovebytheLREDCREPRESENTATIVE.
PersonnelidentifiedintheworkareawithoutevidenceofcompletionofInductiontrainingshallberemoved
fromtheworkareamanagedaccordinglybytheCONTRACTOR.
CONTRACTORSshallprovideallpersonnelwithindividuallyuniquecontractspecificphotoidentifycards.
SuchcardsshallbemadeavailabletoanyLREDCRepresentativeuponrequest.TheCONTRACTORshallnot
permit any CONTRACTOR personnel to access the worksite unless they have been issued with their
individuallyuniquephotoidentifycard.
10.2 SPECIALIZEDHEALTH&SAFETYTRAINING
CONTRACTORshallensurethataminimumofone(1)certifiedFirstAiderisprovidedforeverytwentyfive
(25) workers on site. All HSE Staff are required to be current in First Aider training. Preferably, training
acquiredincludesthepracticeofCardioPulmonaryResuscitation.AllFirstAidersarerequiredtomaintain
recordoftheircertificationontheirperson.TheCONTRACTORshallensurethatallpersonnelareawareof
theidentityandcontactinformationforCONTRACTORFirstAiders.
CONTRACTOR shall ensure that specialized health and safety training is provided to personnel using,
implementingoroperatingthefollowing:
-
MobileElevatedWorkPlatforms
PowderActuatedTools
HeavyEquipment
Forklifts
VehicleDrivers
Vessels
PermittoWorkActivities
TrafficControl
SafeDriverTraining(prerequisiteforCONTRACTORonsitevehicledriver)Note:trainingprovidershallbe
preapprovedbyLREDC)
11.0 PERMITTOWORKACTIVITIES
SpecificworkactivitiesattheLREDCProjectarepermitrequiredactivities.CONTRACTORSshallcomplywith
allRequirementsspecifiedbelowandshallrefertotheLREDCConstructionSafetyManagementProcedures
foradditionalrequirementsforeachtypeofpermittedworkactivitylistedbelow.Contractorsarerequired
tomanagetheirownpermitactivitiesandensuretheirsystemisequaltoorgreaterthantherequirement
outlinedintheappropriateLREDCdocumentsandprocedures.Eachcontractorisresponsibleforgathering
anyinformationfromanypartythat,mayberequiredtoproceedwithpermittedactivities.
DocumentNo:LUSHSEWG3432001.14
Page28of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
11.1 EXCAVATION&TRENCHING
Prior to commencing excavation or trenching activities of ANY DEPTH GREATER THAN 1.0 METER,
CONTRACTORshall:
-
conductathoroughinvestigationforsubsurfaceutilitiesandbelowgradeinfrastructure;
Review all existing As Built drawings from all relevant sources;. if As Built drawings are not
available or accuracy is in question, CONTRACTOR shall conduct surveys, using industry standard
technologies,toidentifythepresence,type,andlocationofburiedutilities;
where buried utilities are identified within the limits of proposed excavation, notify and obtain
permissionsfromknownutilityownerspriortodigging.
provide a minimum of one (1) qualified soils competent person responsible for evaluating and
classifying the soil characteristics. The soils competent persons shall evaluate EVERY proposed
excavationlocationbeforeexcavationstarts;
notgenerallyclassifythesoilsatallexcavationlocationswithintheirscopeofworkasbeingofone
typeorclassification;regardlessofhistoricaldata;
adhere to guidance provided by the soils competent person with regard to excavation protective
systemsrequired;and
Aspartofthepermittingprocess,theCONTRACTORSPermitOfficershallwalkdowntheproposed
excavationareapriortobeingissuedapermittodig.
Provide the necessary soil stability calculations as requested by LREDC using computer aided
software to ensure that displacement of excavation does not exceed Lusail approved permissible
limits.
Note: Displacement will be monitored during excavation activities until appropriately backfilled in
accordancewithallstandards.AllincurredcoststobebornebytheCONTRACTOR.
Duringandfollowingexcavationactivities,theCONTRACTORshall:
-
ensure that all open trenches and excavations deeper than five (5) into which personnel plan to
workareinspectedDAILYbyasoilscompetentperson(s)orotherqualifiedinspector(s);
ensure that excavation inspections shall be documented and made available for review by the
LREDCREPRESENTATIVE;
notrequireanypersontoenteranexcavationortrenchthathasbeendeterminedunsafebythe
soilscompetentperson;
provideandmaintainadequatesafeguardsandbarrierstopreventworkersinsideexcavationsfrom
surface hazards, as well as to provide pedestrians and motorists with safeguards which prevent
falling,walkingordrivingintoopenexcavations.ThisRequirementpertainstoanyexcavationwithin
twenty(20)metersofapedestrianwalkwayorroad;
provide all necessary safeguards, supports, etc for stabilizing structures and/ or encumbrances
whichareadjacenttotheexcavationastheexcavationproceeds;
placesolidbarriersaroundallexcavationsover1.2mdeepatadistanceatleast1.2m.Wherenight
timepedestrianorvehicleaccessisadjacenttoexcavationthenallsolidbarrierswillbefittedwith
warninglights;and
ensure that permits shall be valid for a maximum of thirty (30) days. Excavations remaining open
beyondthistimeframeshallbereevaluatedbythecontractorspermitofficer.
11.2. CONFINEDSPACEENTRY(CSE)
CONTRACTOR shall identify all work areas or spaces which meet the definition of a confined space.
Determination shall be made by the CONTRACTOR HSE Manager or other qualified person(s). Confined
spaces shall be designated as permit required or nonpermit required. All permit required confined
DocumentNo:LUSHSEWG3432001.14
Page29of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
spacesshallbesignpostedassuchbytheCONTRACTOR.Thecontractorwillberesponsibleforensuringall
relevant information, permits and training is completed prior to commencing any Confined Space
work.CONTRACTORshalladheretoallorexceedallfacetsoftheirinternalCSEprogramandtheLREDCCSE
Procedure,andshallensurethatthefollowingbasicrequirementshavebeenaddressed:
-
CONTRACTORshallensurethatpersonnelinvolvedwithCSEhavereceivedtherequiredtrainingand
thatallemergencyequipmentisavailable.
Adequatemeasuresshallbeinplacetocontrolaccess.
TheCONTRACTORshallprepareandimplementanLREDCsitespecificCSEemergencyresponseplan
and ensure that a team is fully trained and prepared to handle any emergency foreseeable in
CONTRACTORconfinedspaces.
Air monitoring for hazardous atmospheres shall be conducted as required for all potential
deprivationsand/orcontaminants.
Sufficientmechanicalventilationisprovided.
Retrievalequipmentandplanisinplace.
Communicationssystemshallbeprovidedforbothentrantsandattendants.
Evaluationoftheneedforexplosionsafeequipmentshallbeconductedbyaqualifiedperson.
PPErequirements,includingrespiratoryprotection,havebeenevaluatedandareimplemented.
CSE Permits shall be posted at the space entry and shall be valid for one (1) shift only. Permits shall be
closedoutwhenworkhasbeencompletedortheshiftends,whichevercomesfirst.
11.3 HOTWORK
HotWorkmeansanyflame,spark,orhighheatproducingactivity.Thisincludessuchactivitiesaswelding,
torchcutting,useofchopsaws,andpipesweating.TheCONTRACTORshallputinplaceallprovisionsforA
HotWorkPermitSystemforallactivitiesfallingwithinthedefinitionofHotWork.
Prior to conducting Hot Work, the CONTRACTOR shall ensure that all combustible and/ or flammable
materialswithin10metersoftheworkareahavebeenremovedorcoveredwithfireretardantblankets.A
designatedFireWatchshallbeidentifiedandpostedintheHotWorkarea.Personnelservingasfirewatch
shallhavenootherduties.ThefirewatchshallremainintheHotWorkareaforaminimumofthirty(30)
minutesfollowingcompletionoftheHotWork.Thefirewatchshallbetrainedtousefireextinguishersand
shall know the emergency response procedures and contact information for advanced fire response
services.
HotWorkpermitsshallbepostedintheimmediateHotWorkarea.EachHotWorkareashallbepermitted.
ShouldmultipleworkersbeperformingHotWorkwithinthesameareainrelationtooneCONTRACTOR;i.e.,
withinradiusofthirty(30)meters,one(1)HotWorkpermitshallbeissuedforeach100meterradiusarea.
HotWorkpermitsshallbevalidforone(1)shiftonly.CONTRACTORmayissuehotworkpermitsforlonger
durations to cover a greater number of days. Review and Approval of such requests shall be the
responsibilityoftheContractorpermitofficer.UndernocircumstancesshallanyHotWorkpermitbeissued
forlongerthanseven(7)days.
CONTRACTORshallhavethefollowingcontrolsinplacewhileperformingHotWorkandweldingoperations
atheight:
Allworkactivityshallbecoordinatedwithotheractivitiesinareasbelow
Areasbelowwillbeclearedofallcombustibleandflammablematerials
DocumentNo:LUSHSEWG3432001.14
Page30of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
Fireblanket/fireretardantmaterialshallbeusedtocoveranycombustiblematerialsthatcannotbe
cleared
Fire blanket/fire retardant material shall be removed after Hot Work and welding activities are
completed
11.4. CONTROLOFHAZARDOUSENERGY(LO/TO)
CONTRACTOR shall produce and implement a comprehensive procedure/ program for the Control of
HazardousEnergy,alsoknownasLockout/Tagout.TheCONTRACTORSprogramshallmeetorexceedthe
LREDCConstructionSafetyManagementProcedureforLockout/Tagout.
Typicalformsofenergywhichmayrequireisolationandcontrolincludethefollowing.Pleasenotethatwork
activitiesinvolvingmultipleformsofenergymayrequirecontrol.
-
Electrical
Mechanical
Pneumatic
Steam/Thermal
Hydraulic
Potential
CONTRACTOR shall issue a permit for activities requiring control of hazardous energy through via their
Permit OfficerWork shall not start until the permit has been authorized. In some cases Permits may be
required from LREDC. This will be at the discretion of the LREDC Senior Project Manager or their
representative.
CONTRACTORshallensureallpersonnelinvolvedinworkactivitieswherehazardousenergyisrequiredtobe
controlled shall be adequately trained on CONTRACTOR and any relevant LREDC procedures. Personnel
attaching energy control devices (locks) shall be qualified for such tasks. Only certified electricians shall
performworkonelectricalequipment;energizedordeenergized.
Workshallbeperformedonenergizedelectricalequipment(>50volts)onlyinspecificsituations,andwhere
theCONTRACTORhasobtainedallApprovalsfromtheLREDCREPRESENTATIVE.Otherwise,thereshallbeno
energizedelectricalworkpermittedontheLREDCProject.
11.5. PRESSURIZEDLINETESTING
CONTRACTORshallhaveacomprehensiveprocedureorprogramforpressurizedlinetestingwhichmeetsor
exceeds requirements set forth in this specification and the LREDC Construction Safety Management
Procedures.Onlytrainedandqualifiedpersonnelshallbeinvolvedinpressurizedsystemtests.
CONTRACTOR shall request a Pressurized Line Testing Permit prior to pressurizing any closed system pipe
works. Permits shall be requested through the LREDC REPRESENTATIVE. The criteria for determination of
permitrequirementsshallbeasfollows:
-
Anytestinvolvinghydraulicpressuresinexcessofsixty(60)poundspersquareinchgauge
Anytestinvolvingpneumaticpressureofanyvalue
CONTRACTORS Program shall include twenty four (24) hour prior test notification to the LREDC
REPRESENTATIVE. The CONTRACTOR shall visually communicate the parameters of the test (duration and
pressure(s))priortoandduringthetestatallpointsalongthelineundertest.Linetestingpermitsshallbe
validonlyforthedurationofthetest,butshallnotexceedseventytwo(72)hours.
11.6. CRANESUSPENDEDMANBASKETS
CONTRACTORshallexhaustallavailableoptionspriortoselectingcranesuspendedmanbasketsasawork
platformoption.Wherenoalternativeisavailableorfeasible,theCONTRACTORshallensurethatpriorto
DocumentNo:LUSHSEWG3432001.14
Page31of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
thestartofanyworkactivitiesinvolvingsuspendedworkplatforms,acomprehensiveprogramorprocedure
hasbeenprovidedtoandApprovedbytheLREDCREPRESENTATIVE.Suspendedbasketsshallbedesigned
andassembledbyqualifiedpersonnelonly,asdesignatedbytheCONTRACTOR,viatrainingdocumentsand
records.
Prior to commencing work, the CONTRACTOR shall implement a permit process approved by the LREDC
REPRESENTATIVE. Extensive worker training shall be completed prior to a permit being issued. The
ContractorpermitOfficershallissueapermitonlyafterallconcernshavebeenaddressed.Permitsshallbe
validforone(1)shiftonly.
12.0 HIGHRISKACTIVITIES
12.1 WORKINGNEARWATER
CONTRACTOR shall ensure that all personnel performing work activities on or within five (5) meters of
bodiesofwaterareprovidedwithandwearingapprovedlifepreserversinadditiontoallotherrequiredPPE.
Lifebuoysshallbeprovidedforeachworkerwithexposuretodrowning.Lifebuoysshallbelocatedonland
andbeprovidedwithaminimumofthirty(30)metersoflifeline.Allpersonnelexposedtodrowninghazards
shallbetrainedontheuseoflifepreserversandproceduresforworkingnearwater.
Marinevesselsshallbeseaworthyandusedfortheirintendedpurposeonly.Vesselsshallbeoperatedonly
bytrained,qualifiedoperatorswhoareapprovedbytheCONTRACTOR.TheCONTRACTORmustensurethat
vessels are provided with suitable life saving equipment, lighting, communications, and firefighting
equipment. Means of adequate and appropriate communication between the vessel and land shall be
provided. The vessel shall have occupancy requirements which shall never exceed the manufacturers
recommendations and the CONTRACTOR shall ensure that these are adhered to. The CONTRACTOR shall
provideadedicatedrescuevesselwhichisequippedwithemergencyandcommunicationsequipment.
CONTRACTOR shall provide and implement a Spill Prevention Controls & Countermeasures plan for all
workactivitiesonornearwaterwherehazardousmaterialsareinuse.ThePlanshallbesubmittedtothe
LREDC REPRESENTATIVE for review. A designated spill response team shall be established by the
CONTRACTOR and regular, but not less than annual, training for spill response emergencies shall be
conducted.
A thorough inspectionof marine equipment,tools andemergencyequipmentshall be conductednot less
thanmonthly.Inspectionsshallbedocumentedandmadeavailableforreview.
12.2 WORKINGATHEIGHTS
FALLPROTECTION
TheCONTRACTORshallproperlyimplementasuitableandsufficientriskassessmentforallWorking
atHeightactivitiesasdefinedbythecurrentQCSDocument
CONTRACTORshallensurethatallworkatheightisproperlyplanned,appropriatelysupervisedand
carriedoutinasafemanner,takingintoaccountadverseweatherconditionsthatcouldjeopardize
the health and safety of employees. Planning must include the selection of appropriate work
equipment,andplanningforanyemergenciesoranyrescue.
CONTRACTOR shall ensure that all personnel who are or may be exposed to falls in excess of 1.8
meters(6)areprovidedwithanapprovedmethodof100%fallprotection.Approvedfallprotection
methods include guard rails, fall arrest, fall restraint, positioning devices, controlled access zones,
andlifelines.Safetymonitoringsystemsarenotpermitted.
CONTRACTORshallprovideandimplementawrittenfallprotectionprogramthatmeetsorexceeds
requirements found in latest government approved QCS and the LREDC Construction Safety
ManagementProcedureforFallProtection.
DocumentNo:LUSHSEWG3432001.14
Page32of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
Allequipmentusedshallmeetinternationallyrecognizedtestingrequirements,suchasANSIorEU.
All equipment shall be inspected daily prior to use by the user and used per manufacturers
guidelinesonly.
CONTRACTOR shall identify a qualified person to ensure that fall protection systems meet all
requirementsforsuchpriortosystemsbeingimplemented.
CONTRACTOR shall appoint a registered engineer to design, prepare and provide detailed
specifications for fall protection systems. System specifications shall be made available for review
uponrequestbytheLREDCREPRESENTATIVE.
CONTRACTOR shall enforce and ensure compliance with fall protection requirements on all work
activities where exposure to workers exists. Requests for exemption from fall protection
requirementsforaspecificactivityorscenariomaybesubmittedtotheLREDCREPRESENTATIVEfor
reviewandApproval.
SCAFFOLD
CONTRACTORSwhoplantousescaffoldingsystemsshallprovideandimplementaScaffoldProgram
whichmeetsorexceedsthespecificationsdescribedintheseRequirements,theLREDCConstruction
SafetyManagementProcedureforScaffolding,andallrequirementsofANSIA10.8.Allscaffoldusers
shallbetrainedonscaffoldsafetyrequirementspriortousingscaffoldingsystems.
CONTRACTOR shall provide only scaffold components manufactured specifically as scaffolding
equipmentbyalicensedscaffoldequipmentmanufacturer.Homemadescaffoldcomponentsshall
notbepermittedforuseinscaffoldingsystemsontheLREDCProject.TheCONTRACTORshallnot
permitintermixingofscaffoldcomponentsfromdifferentscaffoldsystemstobeusedinthesame
scaffoldsystem.
CONTRACTOR shall not permit intermixing of scaffold components from different scaffold
componentsfromdifferentscaffoldsystemstobeusedinthesamescaffoldsystem.
CONTRACTORshallappointaminimumofone(1)ScaffoldCompetentPersonwhoisresponsible
forevaluationandinspectionofallscaffoldsystems.Thescaffoldcompetentpersonsqualifications
andtrainingrecords,whichsupport/validatetheirappointmenttothisposition,shallbeprovidedto
theLREDCREPRESENTATIVEonrequest.
CONTRACTORshallensurethatscaffoldsystemsareerected,modified,anddismantledbyScaffold
Qualified Persons only. The qualified person or erector shall submit training records and
documentationtosupport/validatetheirappointmenttothisposition.Onlythequalifiederector(s)
shalldirect/managetheerection,modificationordismantlingofanyscaffoldsystem.
CONTRACTOR shall ensure that safe working loads of scaffold systems are not exceeded. A
comprehensivetagging/identificationsystemshallbeusedtocommunicatetotheuserthestatusof
thescaffolding.
13.0 EQUIPMENTMACHINERY&TOOLS
13.1 PLANT&MOBILEHEAVYEQUIPMENT
Heavy equipment and plant shall be inspected uponmobilizationtothesite and dailypriortouse by the
operator (refer to Section 6.3). The CONTRACTOR shall ensure that persons assigned to operate heavy
equipment and plants are qualified for the specific equipment being operated. Operators shall hold a
currentcertificationfromarecognizedtestingandcertificationagency.
CONTRACTOR shall ensure that all plant and heavy equipment is provided with a current test Certificate.
Test Certificates shall be current within one (1) year, and shall be issued only by licensed and approved
DocumentNo:LUSHSEWG3432001.14
Page33of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
inspections and testing agencies. Equipment shall be so marked with record of the latest Test Certificate.
Shouldequipmentmodificationsand/orrepairsbemade,theequipmentshallberecertifiedpriortobeing
placedbackintoservice.
CONTRACTOR shall maintain a full record of all plant and heavy equipment test certifications, expiration
dates,certifyingagencies,etc.,andshallupdaterecordsaccordinglytoprovidemostcurrentinformation.
Whereheavyequipmentwillbestagedonroads,orwhoseactivitieswillaffectgeneralvehicletravelonsite
roads,theCONTRACTORshallprovideaminimumoftwo(2)trainedandqualifiedFlagmentocontroltraffic
flow and to advise motorists ofCONTRACTOR activities, precautions,etc.Where heavyequipmentwill be
travelling on public roads, the CONTRACTOR shall provide a trailing escort vehicle, equipped with a sign
indicatingslowmovingvehicleahead,towarnvehiclesapproachingfrombehindofthepotentialhazard.
No more than one (1) person (the operator) shall be permitted to sit or ride upon heavy equipment in
operation. The CONTRACTOR shall use strict disciplinary actions for personnel found in violation of this
policy.
Heavyequipmentorplanthavinginternalcombustiontypeengineswhichwillbeoperatedinsidestructures,
tunnels,orenclosedareasshallbeequippedwithexhaustscrubbertechnologytominimizetheproduction
ofCarbonMonoxidegasinconfinedspaces.
Allplantandheavyequipmentshallbeprovidedwithaminimum2.5kgABCdrychemicalfireextinguisher.
AllpersonneloperatingvehiclesorequipmentshallhaveintheirpossessionavalidQatariDriversLicense
identifyingwhatvehiclesandequipmenttheindividualisauthorizedtooperate.
AllvehiclesandequipmentshallberegisteredandlicensedinaccordancewithQatarLaw.Ifequipmentor
operatorsarefoundwithouttherequiredlicensesand/orregistrationtheLREDCmayremovethemfromthe
LREDCProject.
13.2 CRANES,RIGGING&HOISTINGEQUIPMENT
CRANEOPERATORS
-
Training records, licenses, etc for crane operators shall be submitted to the LREDC
REPRESENTATIVE for review a minimum forty eight (48) hours prior to the crane being
mobilizedontothesite.
CraneOperatorsshallbecertifiedforthespecificcranetheyplantooperate.Certifications,
licensesshallbecurrent.
Operator shall understand crane hand signals and be conversationally fluent in the
language(s)spokenbyhisriggers/signalmen.
RIGGING&RIGGINGPERSONNEL
-
The CONTRACTOR shall provide all rigging hardware and tackle necessary for all planned
lifts.
RigginghardwareshallbeinspectedpriortoeachusebytheRigger.Defectiveordamaged
riggingortackleshallbeimmediatelyremovedfromservice,taggedand/ordestroyed.
Rigging inspection shall be documented and records made available to the LREDC
REPRESENTATIVEforreviewuponrequest.
TestCertificatesfromtheriggingmanufacturerforallriggingusedmustbemadeavailable
toLREDCRepresentativeonrequest.Allrecordsmustbeheldonsite..
Riggersshallbeknowledgeableofcranehandsignalsandshallbeconversationallyfluentin
thelanguage(s)spokenbythecraneoperator.
GENERALREQUIREMENTSFORCRANES
DocumentNo:LUSHSEWG3432001.14
Page34of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
CONTRACTORshallnotifytheLREDCREPRESENTATIVEaminimumofseventytwo(72)hours
priortomobilizingacranetotheLREDCProjectorerectingatowercrane.Notowercrane
shall be erected on site without prior Approval of the location(s) by the LREDC HSEQ
DepartmentorRepresentative.
PriortoerectingormobilisinganycranethecontractormustsubmittheLusailMobileand
TowerCrane Notification Form to theLREDC Representative. Acopy isto be retainedwith
thecraneatalltimes
All cranes shall be delivered to the site with a valid Test Certificate, current within ninety
(90)days,issuedbyalicensedandapprovedinspections&testingagency.Certificationmust
berenewedquarterlyforallcranes.
Cranes shall be inspected daily by the operator and at a minimum monthly by the
CONTRACTOR HSE Dept. Inspections shall be documented and made available for review
uponrequest.
TheCONTRACTORshalldesignateaCraneSupervisororsimilarexclusivelyresponsiblefor
cranecoordinationandmanagement,whoshallhavenootherduties.
Allcranesshallhaveloadchartsspecifictothecraneconfigurationprovidedinsidethecab
of the crane. Load charts shall be in a language which is understood by the assigned
operator.
CONTRACTOR shall implement a Critical Lift Plan for all lifts exceeding forty (40) tons,
tandemlifts,tailinglifts,andliftsexceeding75%capacityofthecraneandmancagelifts
Eachcriticalliftshallrequireanindividualliftplan.
TheCriticalLiftPlanshallmeetorexceedtheseLREDCCriticalLiftProceduresandshallbe
ApprovedbytheLREDCREPRESENTATIVEpriortothecriticalliftoccurring.
CONTRACTORshallprovideradiocommunicationtocraneoperatorsandriggers/signalmen.
Craneradiosshallhaveaseparatechannelonwhichtocommunicate.
TaglinesshallbeusedonALLLOADSregardlessofsizeorweight.
CONTRACTORshallhaltallcraneoperationsatwindspeedsof35kmperhour,asmeasured
atthetopofthecranemast,boom,orjib;unlessmanufacturersguidelinesrecommended
cranestoppageatlowerwindspeeds.Themoststringentstandardshallapply.
TheLREDCREPRESENTATIVEmayprovidetheCONTRACTORwithawind advisorywhen
windspeedsreachthirty(30)kmperhourormore.
Contractors are required to monitor wind speeds and weather conditions at all times to
ensuretheydonotoperatemachinery/equipmentoutsidethemanufacturersspecification.
ELEVATINGWORKPLATFORMS
-
Operatorsofscissorliftsandmobileelevatingworkplatforms(MEWP)shallhavecompleted
specialoperatorstraining.Recordofoperatortrainingshallberetainedontheoperatorand
attheCONTRACTORSoffice.
CONTRACTORshallensurethatallpersonnelworkingfromMEWPuseapprovedfallarrest
orrestraintinadditiontostandardguardrailings,asprovidedbythedesignofthelift.
Manufacturersinstructionmanualsshallbeprovidedonallelevatingworkplatforms.
Elevating work platforms shall be provided with a minimum 2.5 kg ABC dry chemical fire
extinguisher.
DocumentNo:LUSHSEWG3432001.14
Page35of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
DocumentNo:LUSHSEWG3432001.14
Page36of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
do so (or less if the urgent rectification is required), LREDC shall be entitled, but not
obligated, to deduct such costs, damages, losses, expenses from any amounts under its
contractwiththeCONTRACTOR;and/or
(v) bring a claim against the CONSTRACTOR in respect of the results of any failure by the
CONTRACTORtocomplywiththeseRequirements.
AnyimpositionoforfailurebytheLREDCREPRESENTATIVEtoissuenotificationofaHSEbreachorafailure
byLREDCtoimposeaPerformanceDeductionshallnotrelievetheCONTRACTORofanyofhisobligations
underitscontract.
In the event of the LREDC REPRESENTATIVE taking action in accordance with this Clause 13 the
CONTRACTORshallnotbeentitledtoanyadditionalcostsorextensiontothetimeforcompletionoftheir
contract.
Furthermore,noneofLREDCortheLREDCREPRESENTATIVE(s)shallbeliablefor,norshalltheCONTRACTOR
beentitledto,anydamages,costs,expenses,losses,orcompensationsforanyimpactstoitswork,project
orreputation,followinganyPaymentDeduction(s),suspension,stoppageofwork,orpermitrevocationsby
LREDCortheLREDCREPRESENTATIVE(s)(asappropriate).
14.2 PERFORMANCEDEDUCTIONS
Performance Deductions shall be paid by the CONTRACTOR for its failure to comply with these
RequirementsandthesearesubjecttoLREDCreviewandApproval.TheCONTRACTORacknowledgesthat
thePerformanceDeductionsarenotapreestimateoflossordamagewhichmaybesufferedtopersonor
property as a result of noncompliance with the Regulations. The CONTRACTOR agrees that the
PerformanceDeductionsarethereforeinadditionto,andnotinsubstitutionof,LREDCsrightsatlawand
shallnotbeinterpretedasfullandinclusivecompensationtoLREDCoranyotherpartyagainstanydamages
orlossestopersonorproperty,includingbutnotlimitedtoLREDCsinfrastructureoranyimprovementsto
theLREDCProject.
IffailuresorviolationsoftheseRequirementsarenotcorrectedwithinthetimescalerequiredbytheLREDC
REPRESENTATIVE, subsequent compensation Performance Deductions shall be imposed upon the
CONTRACTORatLREDCsdiscretion.
ThePerformanceDeductionshallbeappliedforfirstinstanceoffailure.Whererepeatedinstanceof
Requirementviolationoccurs,ormultipleinstancesofthesameviolationoccuratthesametimeand
location,theLREDCREPRESENTATIVEmayapplyPerformanceDeductionsequaltothesumofthe
PerformanceDeductionmultipliedbythenumberofinstancesofviolation.
14.2.1 This list is non exhaustive. Further compensation may be required to be paid, where cost to
LREDC and other affected parties exceed the amounts referred to below. The amounts below are in
additiontoanyamountthatmaybeprescribedundercontract,Qatarilaworotherregulationswhichmay
becollectedbyLREDCoranycompetentauthority.
14.2.2 ThetablebelowhasspecificallyremainedsilentonotherHSEviolationsthatmayoccur.Thosewill
be dealt with using the remedies available under the specific construction contract or sale and purchase
agreementasrelevant.
DocumentNo:LUSHSEWG3432001.14
Page37of38
LusailRealEstateDevelopmentCompany
LREDCConstructionHSEGeneralRequirements
TableofPerformanceDeductionsperOccurrence(inQatariRiyals)
No.
1.
TypeofCONTRACTORViolation
Performance
Deduction
(QAR)
DateOf
Violation
Violation
ClosedOut
5000
2.
5000
3.
Failuretoconductemergencydrillsasspecified.
2000
2000
10000
10000
5000
2000
5000
5000
5000
5000
4.
5.
6.
7.
8.
9.
10.
11
12
* This deduction is in addition to all damages and losses LREDC may claim in order to
cover as a result of the CONTRACTORs failure to comply with the LREDC HSE Required
Standards.
14.2.3 LREDC retains the right and may (exercising its absolute and sole discretion) vary,
amend, suspend, reduce and/or cancel any Performance Deduction(s) issued to the
CONTRACTOR in the event that the CONTRACTOR demonstrates to LREDC CEOs (or
delegated representatives) satisfaction that it has fully implemented a revised HASP and
CAP to comply with LREDCs Construction HSE General requirements and will henceforth
strictly comply with those revised plans
DocumentNo:LUSHSEWG3432001.14
Page38of38